arch 330 fall 2008 third set

Post on 01-Feb-2016

24 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

ARCH 330 Fall 2008 Third Set. Rough Carpentry Wall, Floor & Roof Systems. Rough Carpentry wall framing. Header. Cripple. Rough Carpentry wall framing - jobsite photo. Rough Opening. Trimmer. (Usually ¼” per side). Studs. Rough Sill. - PowerPoint PPT Presentation

TRANSCRIPT

ARCH 330ARCH 330Fall 2008Fall 2008Third SetThird Set

Rough CarpentryRough Carpentry

Wall, Floor & Roof Wall, Floor & Roof SystemsSystems

Rough C

arp

entr

y

wall

fram

ing

Header

Cripple

Trimmer

Studs

Rough Sill

(Usually ¼” per side)

Rough Opening

Rough C

arp

entr

y

wall

fram

ing

- job

site

photo

Rough C

arp

entr

y

wall

fram

ing

Engineered Floor Joist (TJI)

King StudTrimmer Stud

Glulam Header

Floor Joist (TJI) Blocking

Rough C

arp

entr

y

head

er

fram

ing

- jobsi

te p

hoto

Trimmer Stud

Stud (typical)

Cripple

Header

Wall Sheathing

Engineered Roof Joist

Roof Sheathing

Hold Down Strap @ Shear Wall

Roof Truss

Roof Sheathing

Double Top Plate Stud

Cripple

Trimmer Stud

Sky

Roof Truss

Stud (typical)

Double Top Plate

Blocking Stud @ Perpendicular Wall

TemporaryBracing

Roof Truss

Stud (typical)

Trimmer Stud

Double Top Plate

Cripple

Rough C

arp

entr

y

wall

fram

ing

- b

ays

& g

ab

le

en

ds

Rough C

arp

entr

y

corn

er

bra

cing

Rough C

arp

entr

y

wall

sheath

ing

Rough C

arp

entr

y

roof

fram

ing

- s

tick

top related