Appendix
Appendix A - Public and Agency Participation ProcessAppendix B - Certification of Private Enterprise Participation Process & Financial Capacity of Transit OperatorAppendix C - TIP/STIP Amendments and Administrative ModificationsAppendix D - Metropolitan/Regional Planning Areas Listing of Obligations and Closures -- FFY 2015Appendix E - Urban Secured Projects 2017-2022Appendix F - Rural Secured Projects 2017-2022Appendix G - Non-Federal Secured Local Projects 2017-2022Appendix H - Planned Projects 2017-2022
Appendix A - Public and Agency Participation Process
BFCG Expanded Development Schedule For The 2017-2022 Metropolitan/Regional Transportation Improvement Program
July 1st - Date by which cities and towns are required to adopt their TIPs. (RCW 35.77.010)July 13th - Jurisdiction TIPs due to BFCG – sent electronically through web based STIP software.
August 5th - Jurisdiction TIPs posted to BFCG website.
August 5th – Public Meeting notification sent to MPO/RTPO public involvement distribution list, posted to the BFCG website and Facebook page.
August 21st and August 28th – Ad in the Tri-City Herald and tu Decides, the bilingual newspaper for the Transportation Fair on September 7th.
September 7th – Transportation Fair; Tri-Cities Visitors and Convention Center; Bechtal RoomSeptember 21st – Public Comments due to BFCGSeptember 22nd – Public Comments forwarded to jurisdiction(s) for response.September 27th – Response(s) from jurisdiction are due to BFCG
September 1st – Technical Advisory Committee (TAC) DRAFT TIP reviewSeptember 8th - Policy Advisory Committee (PAC) DRAFT TIP reviewSeptember 16th – Benton-Franklin Board DRAFT TIP Review
October 6th – TAC approval of 2017 MPO/RTPO TIPOctober 13th – PAC approval of 2017 MPO/RTPO TIP October 21st – BFCG Board approval of 2017 MPO/RTPO TIP
October 21st – Forward approved 2017 M/R TIP to WSDOT Olympia
Transportation Fair - Postcard and Flyer
¡FERIA DE TRANSPORTACIÓN!MIÉRCOLES,
7 DE SEPTIEMBRE4:30-6:30pm
www.bfcog.us www.bft.org http://www.tricityregionalchamber.com
Tri-Cities Business and Visitor Center en el Bechtel Board Room y área de sala de espera. 7130 W Grandridge Blvd, Kennewick.
Esta es una oportunidad para aprender sobre proyectos de transportación, planes, y programas de varias organizaciones, y proveer comentario. Juega Transportation Bucks y aplica tus Bucks a estratégias de mobilidad.
*The Benton-Franklin Council of Governments fully complies with Title VI of the Civil Rights Act of 1964 and related statues and regulation in all programs and activities.
BFGG Metropolitan/Regional Draft 2017-2022 Programa de Mejoramiento de Transportación (TIP)Plan de Desarrollo de Tránsito y Programa de Proyectos de Ben Franklin Transit
▶▶
¿Preguntas?Contacta a Jacob González enjgonzales@bfcog.us
Transportation Fair!WEDNESDAY,
SEPTEMBER 7TH4:30-6:30pm
Brought to you by:
Tri-Cities Business and Visitor Center in the Bechtel Board Room. 7130 W Grandridge Blvd, Kennewick.
This is an opportunity to learn about transportation projects, plans, and programs from various organizations, and provide input. Play Transportation Bucks and apply your Bucks to mobility strategies.
*The Benton-Franklin Council of Governments fully complies with Title VI of the Civil Rights Act of 1964 and related statues and regulation in all programs and activities.
Benton-Franklin Council of Governments Draft 2017-2022 Transportation Improvement Program (TIP)Ben Franklin Transit’s Transit Development Plan and Program of Projects
▶▶
www.bfcog.us www.bft.org http://www.tricityregionalchamber.com
Questions?Contact Jacob Gonzalez atjgonzalez@bfcog.us
Transportation Fair!WEDNESDAY,
SEPTEMBER 7TH
4:30-6:30pm
▷Talk by transportation sta�
▷Opportunity to walk around the booths will follow
▷Play Transportation Bucks and apply your Bucks to mobility strategies
▷Light refreshments will be served
What
Where
Why
�e Fair will take place at the Tri-Cities Business and Visitor Center in the Bechtel Board Room and lobby area. 7130 W Grandridge Blvd, Kennewick.
�is is an opportunity to learn about transportation projects, plans, and programs from various organizations, and provide input, including:»BFCG Metropolitan/Regional Dra� 2017-2022 Transportation Improvement Program (TIP)
»Ben Franklin Transit’s Transit Development Plan and Program of Projects
We want to hear your thoughts regarding future transportation plans and projects. Join us and be involved in the discussion to improve our region’s transportation!
Questions?Contact Jacob Gonzalez at jgonzalez@bfcog.us
www.bfcog.us www.bft.org http://www.tricityregionalchamber.com/
*The Benton-Franklin Council of Governments fully complies with Title VI of the Civil Rights Act of 1964 and related statues and regulation in all programs and activities.
¡FERIA DE TRANSPORTACIÓN!MIÉRCOLES,
7 DE SEPTIEMBRE
4:30-6:30pm
▷Discurso de personal de transportación
▷Oportunidad de visitar los puestos despues
▷Juega Transportation Bucks y aplica tus Bucks a estratégias de mobilidad
▷Refrescos serán servidos
Qué
Dónde
Por qué
La Feria se llevará a cabo en el Tri-Cities Business and Visitor Center en el Bechtel Board Room y área de sala de espera. 7130 W Grandridge Blvd, Kennewick.
Esta es una oportunidad para aprender sobre proyectos de transportación, planes, y programas de varias organizaciones, y proveer comentario, incluyendo:»BFGG Metropolitan/Regional Dra� 2017-2022 Programa de Mejoramiento de Transportación (TIP)
»Plan de Desarrollo de Tránsito y Programa de Proyectos de Ben Franklin Transit
Queremos escuchar tus pensamientos con respecto a futuros planes y proyectos de transporte. ¡Únete a nosotros y participa en la discusión para mejorar el transporte de nuestra región!
¿Preguntas?Contacta a Jacob González enjgonzales@bfcog.us
www.bfcog.us www.bft.org http://www.tricityregionalchamber.com/
*El Consejo de Gobiernos Benton-Franklin cumple totalmente con el Título VI de la Ley de Derechos Civiles de 1964 y estatuas relacionadas y la regulación en todos los programas y actividades.
Transportation Fair - Pictures of the event
Transportation Fair Sign in Sheet
Appendix B - Certification of Private Enterprise Participation Process & Financial Capacity of Transit Operator
Ben Franklin Transit Certification Statement
The Benton‐Franklin Council of Governments as the designated MPO/TMA for the Tri‐ Cities, Certifies that Ben Franklin Transit has followed the local process for the projects contained in the 2017 TIP. This process informed all private sector providers of Ben Franklin Transit improvement plans.
MPO Certification Of Transit Operator’s Financial Capacity
UMTA (FTA) Circular 7008.1 requires that MPOs certify the financial capacity of the transit operator for the Annual Element portion of the TIP. The Benton‐Franklin Council of Governments hereby certifies that Ben Franklin Transit has provided financial information showing that they have the financial capacity to carry out the projects programmed in the 2017 M/R TIP. Ben Franklin Transit provided to the Benton‐Franklin Council of Governments a six‐year financial plan that covers 2017‐2022.Ben Franklin Transit’s budget of revenues and expenses for 2017 shows they have the financial capacity to carry out the projects programmed in 2017.
Appendix C - TIP/STIP Amendments and Administrative Modifications
Appendix D - Metropolitan/Regional Planning Area List of Obligationsand Closures - FFY 2015
Pending
Appendix E - Urban Secured Projects 2017-2022
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Benton
Agency: Ben Franklin Transit
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-06637 23 CE No N/A N/A 3,693,944
5307 2017 - 2020 Equipment: Communication, security, data collection, passenger amenities, maintenance equipment
Purchase equipment to be installed on vehicles at the manufacturer or post vehicle delivery on BFT site. Also includes back office support for on road applications and maintenance equipment such as a fluid dispensing system. Includes design and permitting.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalALL 2017 5307 315,152 0 78,792 393,944
ALL 2018 5307 880,000 0 220,000 1,100,000
ALL 2019 5307 880,000 0 220,000 1,100,000
ALL 2020 5307 720,000 0 180,000 900,000
Project Totals 2,795,152 0 698,792 3,493,944
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 393,944 1,100,000 1,100,000 900,000 200,000
Totals 393,944 1,100,000 1,100,000 900,000 200,000
Page 2
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Benton
Agency: Ben Franklin Transit
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-05096 23 CE No N/A N/A 3,819,887
5307 2017 - 2020 Facilities
This is a bucket TIP project containing Ben Franklin Transit's FTA funding for facilities design/planning, equipment, paving, painting, security systems, shelters, passenger amenities, and aesthetics.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalALL 2017 5307 383,478 0 95,869 479,347
ALL 2018 5307 894,108 0 223,527 1,117,635
ALL 2019 5307 422,108 0 105,527 527,635
ALL 2020 5307 494,108 0 123,527 617,635
Project Totals 2,193,802 0 548,450 2,742,252
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 479,347 1,117,635 527,635 617,635 1,077,635
Totals 479,347 1,117,635 527,635 617,635 1,077,635
Page 3
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Benton
Agency: Ben Franklin Transit
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-04000 23 CE No N/A N/A 37,772,848
5307 2017 - 2020 Operating, Preventative Maintenance
This is a bucket TIP project containing Ben Franklin Transit FTA funded, General Labor Operating for a system with fewer than 75 fixed route buses in operation. During all years of this project 5307 Funds will be matched with local to maintain transit service.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalALL 2017 5307 3,311,692 0 3,311,692 6,623,384
ALL 2018 5307 3,602,507 0 3,602,507 7,205,014
ALL 2019 5307 3,771,786 0 3,771,786 7,543,572
ALL 2020 5307 4,021,430 0 4,021,430 8,042,860
Project Totals 14,707,415 0 14,707,415 29,414,830
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 6,623,384 7,205,014 7,543,572 8,042,860 8,358,018
Totals 6,623,384 7,205,014 7,543,572 8,042,860 8,358,018
Page 4
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Benton
Agency: Ben Franklin Transit
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-07002 18 CE No N/A N/A 457,377
5307 2017 - 2020 Planning Study Passenger Amenities, ITS Architecture
Planning study to complete ITS Architecture, Passenger Amenities Improvements and Other as needed.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalALL 2017 5307 105,902 0 26,475 132,377
ALL 2018 5307 100,000 0 25,000 125,000
ALL 2019 5307 32,000 0 8,000 40,000
ALL 2020 5307 64,000 0 16,000 80,000
Project Totals 301,902 0 75,475 377,377
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 132,377 125,000 40,000 80,000 80,000
Totals 132,377 125,000 40,000 80,000 80,000
Page 5
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Benton
Agency: Ben Franklin Transit
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-05091 23 CE No N/A N/A 15,133,011
5307 2017 - 2020 Transit Vehicle Replacements
This is a bucket TIP project which contains Ben Franklin Transit's FTA funded Revenue Vehicles for Replacement or Expansion including Transit Buses, Paratranist Coaches, Staff, and Vanpool Rideshare Vehicles. During all years of this project, the project will provide a cumulative total of up to 155 transit vehicles.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalALL 2017 5307 2,350,917 0 587,729 2,938,646
ALL 2018 5307 2,357,409 0 589,351 2,946,760
ALL 2019 5307 2,412,997 0 603,248 3,016,245
ALL 2020 5307 2,464,863 0 616,216 3,081,079
Project Totals 9,586,186 0 2,396,544 11,982,730
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 2,938,646 2,946,760 3,016,245 3,081,079 3,150,281
Totals 2,938,646 2,946,760 3,016,245 3,081,079 3,150,281
Page 6
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Benton
Agency: Ben Franklin Transit
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-05453 23 CE No N/A N/A 1,044,710
5310 2017 - 2020 Paratransit vehicles
This is a bucket TIP project which contains FTA funded Revenue Vehicles for Replacement or Expansion including Para-transit Coaches, support vehicles and equipment to provide transportation to seniors and disable exceeding ADA requirement. This will include up to 14 each less than 30 foot vehicles. For contracting agencies or organizations; and or sub-recipients providing transportation services such as Arc of Tri-Cities.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalALL 2017 5310 163,844 0 40,961 204,805
ALL 2018 5310 165,482 0 41,371 206,853
ALL 2019 5310 167,137 0 41,785 208,922
ALL 2020 5310 168,808 0 42,202 211,010
Project Totals 665,271 0 166,319 831,590
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 204,805 206,853 208,922 211,010 213,120
Totals 204,805 206,853 208,922 211,010 213,120
Page 7
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Benton
Agency: Ben Franklin Transit
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-05452 23 CE No N/A N/A 4,547,746
5339 2017 - 2020 Vehicle Purchase
This is a bucket TIP project which contains Ben Franklin Transit's FTA funded Revenue Vehicles for Replacement or Expansion including Transit Buses, Paratranist Coaches, and Vanpool Rideshare Vehicles. During all years of this project, the project will provide a cumulative total of up to 50 transit vehicles.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalALL 2017 5339 720,399 0 180,100 900,499
ALL 2018 5339 724,001 0 181,001 905,002
ALL 2019 5339 727,621 0 181,906 909,527
ALL 2020 5339 731,259 0 182,815 914,074
Project Totals 2,903,280 0 725,822 3,629,102
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 900,499 905,002 909,527 914,074 918,644
Totals 900,499 905,002 909,527 914,074 918,644
Federal FundsState Funds Local Funds Total
Agency Totals for Ben Franklin Transit
33,153,008 0 19,318,817 52,471,825
Page 8
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County:
Agency: BFCG
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 9903(009) WA-05977 18 CE No N/A N/A 198,673
2017 - 2018 Unified Planning Work Program
This project will support tasks outlined in BFCG's UPWP for years 2016,2017 and 2018. Primarily "Program Administration, Interagency Coordination and Public Involement" in the Tri-Cities metropolitan area. The work elements are identified numerically as 220 in the UPWP.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2017 STP(UL) 96,520 0 13,030 109,550
PE 2017 STP(US) 3,176 0 428 3,604
PE 2017 STP(R) 17,000 0 2,295 19,295
PE 2018 STP(UL) 48,260 0 6,515 54,775
PE 2018 STP(US) 1,588 0 214 1,802
PE 2018 STP(R) 8,500 0 1,147 9,647
Project Totals 175,044 0 23,629 198,673
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 66,224 132,449 0 0 0
Totals 66,224 132,449 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for BFCG 175,044 0 23,629 198,673
Page 9
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Franklin
Agency: Franklin Co.
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
07 E112(002) WA-00157 11 0.100 CE No Milepost 3.41 Milepost 3.51 1,002,803
Taylor Flats Bridge #903-3.46 Widening
The project consits of widening a functionally obsolete bridge to meet current standards.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2017 STP(UL) 50,000 0 7,803 57,803
Project Totals 50,000 0 7,803 57,803
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 181,000 0 0 0 0
Totals 181,000 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Franklin Co. 50,000 0 7,803 57,803
Page 10
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Franklin
Agency: Pasco
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
16 WA-07739 04 0.100 CE No Road 68 I-182 930,995
Dual Right Turn Southbound 68
This project will add a second right-turn lane from southbound Road 68 onto westbound I-182.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2018 STP(UL) 295,753 0 62,560 358,313
CN 2018 STP(UL) 495,370 0 77,312 572,682
Project Totals 791,123 0 139,872 930,995
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 358,313 0 0 0
CN 0 572,682 0 0 0
Totals 0 930,995 0 0 0
Page 11
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Franklin
Agency: Pasco
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
06 3551(004) WA-06944 04 1.500 CE Yes Lewis Street Sun Willows Blvd 2,085,100
N. 20th Ave. Safety Improvements
Roadway, ADA, and signal improvements to address pedestrian safety and intersection improvements at 20th and Lewis, 20th and Sylvester, 20th and Henry, 20th and Pearl, 20th and I-182 on/off ramps, and 20th and Sunwillows. Address access management at 20th and Lewis, 20th and Court, and 20th and Sun Willows. Addition of two pedestrian hybrid beacons along safe walking routes.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalCN 2017 HSIP 1,164,880 0 635,120 1,800,000
Project Totals 1,164,880 0 635,120 1,800,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,164,880 0 0 0 0
Totals 1,164,880 0 0 0 0
Page 12
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Franklin
Agency: Pasco
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
14 9911(010) WA-05347 21 CE No various various 1,656,861
Traffic Signal Improvements - City Wide - Phase 1
Upgrade traffic signals for better coordination and Fire EMS preemption. Create capacity through corridor signal and ADA improvements.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalCN 2017 STP(UL) 1,080,927 0 168,700 1,249,627
CN 2017 TAP(UL) 252,257 0 39,370 291,627
Project Totals 1,333,184 0 208,070 1,541,254
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,541,254 0 0 0 0
Totals 1,541,254 0 0 0 0
Page 13
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Franklin
Agency: Pasco
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
14 WA-08734 21 CE Yes various various 1,130,992
Traffic Signal Improvements - City Wide Phase 2
Replace all of the City’s obsolete signal equipment with updated signal controllers, signal equipment, signal interconnect equipment, optimized corridor timing plans, vehicle detection system and emergency vehicle priority system. Pedestrian access will be upgraded to meet current ADA right of way accessibility design guidelines for the signalized intersections. PE done under federal project 9911(010)
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalRW 2017 STP(UL) 300,000 0 40,500 340,500
CN 2018 STP(UL) 683,776 0 106,716 790,492
Project Totals 983,776 0 147,216 1,130,992
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 0 340,500 0 0 0
CN 0 790,492 0 0 0
Totals 0 1,130,992 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Pasco 4,272,963 0 1,130,278 5,403,241
Page 14
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County:
Agency: WSDOT - SC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 BPBF BPBF 05 CE No Varies Varies 31,736,754
Asphalt/Chip Seal Preservation Benton-Franklin Council of Governments
Resurface the roadway with chip seal or hot mix asphalt to preserve the structural integrity of the roadway and extend the service life of the pavement. This record is for chip seal/asphalt paving projects within Benton and Franklin counties. For a list of included projects, go to www.wsdot.wa.gov/projects/search.
Page 15
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County:
Agency: WSDOT - SC
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2017 NHPP 540,961 0 23,215 564,176
PE 2017 STP 39,427 0 0 39,427
PE 2018 NHPP 346,941 0 16,104 363,045
PE 2018 STP 55,651 0 0 55,651
PE 2019 NHPP 348,959 0 22,804 371,763
PE 2019 STP 221,145 0 0 221,145
PE 2020 STP 72,465 0 2,899 75,364
CN 2017 NHPP 3,025,076 0 66,590 3,091,666
CN 2017 STP 304,434 0 0 304,434
CN 2018 NHPP 5,548,738 0 118,231 5,666,969
CN 2018 STP 362,798 0 0 362,798
CN 2019 NHPP 5,958,895 0 141,692 6,100,587
CN 2019 STP 1,125,690 0 0 1,125,690
CN 2020 NHPP 4,933,681 0 147,919 5,081,600
CN 2020 STP 2,462,275 0 0 2,462,275
Project Totals 25,347,136 0 539,454 25,886,590
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 3,999,703 6,448,463 7,819,185 7,619,239 5,850,164
Totals 3,999,703 6,448,463 7,819,185 7,619,239 5,850,164
Page 16
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County:
Agency: WSDOT - SC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
01 508207R 508207R03 03 1.500 CE Yes 99.00 100.50 24,900,000
I-82/Red Mountain Vicinity - Construct Interchange
Construct interchange. Improved access to the I-82 corridor between Benton County and the I-182 junction is critical for continuing economic development. This project will construct a new freeway overpass and on- and off-ramps for I-82 east of Benton City, to provide direct interstate access to West Richland and the surrounding Red Mountain area, and a new connection to SR 224.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalRW 2017 0 CWA 1,400,000 0 1,400,000
CN 2018 0 CWA 22,500,000 0 22,500,000
Project Totals 0 23,900,000 0 23,900,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 500,000 874,630 18,784,076 3,741,294 0
Totals 500,000 874,630 18,784,076 3,741,294 0
Page 17
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County:
Agency: WSDOT - SC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
02 0240(022) 524003M 524003M03 21 4.070 CE No 30.80 34.87 75,268
SR 240/0.2 Miles E of Jadwin Ave to I-182 - ADA Compliance
Upgrade existing curb ramps to meet ADA compliance. Pedestrian ADA curb ramps at various intersections on SR 240 in the City of Richland do not fully meet ADA standards. This project will upgrade the curb ramps to meet current standards, improving accessibility for all pedestrians.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalCN 2017 NHPP 65,789 0 1,343 67,132
Project Totals 65,789 0 1,343 67,132
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 67,132 0 0 0 0
Totals 67,132 0 0 0 0
Page 18
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County:
Agency: WSDOT - SC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
14 524003O 524003O03 21 12.700 CE No 20.40 34.87 5,000,000
SR 240/Richland Corridor Improvements
Intersection Improvements. SR 240 in Richland is experiencing increased congestion at several existing intersections. This project will construct intersection improvements along the SR 240 corridor in Richland to improve the safety and operational efficiency of this route. Improvements include acceleration and deceleration lanes, new channelization and signal system upgrades.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2019 0 CWA 500,000 0 500,000
CN 2020 0 CWA 4,500,000 0 4,500,000
Project Totals 0 5,000,000 0 5,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 298,000 4,043,040 456,960
Totals 0 0 298,000 4,043,040 456,960
Page 19
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County:
Agency: WSDOT - SC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
02 0240(021) 524003G 524003G03 21 0.400 CE No 31.82 32.22 414,505
SR 240/SR 224/Van Giesen Street - Intersection Improvements
Add acceleration lane. The intersection of SR 240/SR 224/Van Giesen Street in Richland has a history of collisions. This project will construct an acceleration lane for eastbound SR 224 traffic turning onto eastbound SR 240 to reduce the risk of collisions.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalCN 2017 HSIP 374,699 0 7,647 382,346
Project Totals 374,699 0 7,647 382,346
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 364,377 17,970 0 0 0
Totals 364,377 17,970 0 0 0
Page 20
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County:
Agency: WSDOT - SC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
02 0397(013) 539701V 539701V03 22 0.100 CE Yes 17.76 17.86 474,080
SR 397/E Bruneau Ave - Railroad Crossing Improvements
Install cantilever-mounted beacons - Xing #808925X. The railroad crossing on SR 397 at E Bruneau Ave has been identified as a location with a potential for train/vehicle collisions. The crossing is currently equipped with shoulder-mounted railroad crossing signs. This project will install cantilever-mounted flashing beacons to reduce the risk of collisions.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalRW 2017 HSIP 63,092 0 1,288 64,380
CN 2017 HSIP 338,061 0 6,899 344,960
Project Totals 401,153 0 8,187 409,340
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 409,340 0 0 0 0
Totals 409,340 0 0 0 0
Page 21
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County:
Agency: WSDOT - SC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
07 0397(012) 539702D 539702D03 21 0.270 CE Yes 16.05 16.32 335,876
SR 397/S Yew St Vicinity - Roadside Improvements
Shoulder widening and install safety edge. This section of SR 397 has a history of run off the road collisions. This project will widen the existing shoulders and install a safety edge (taper) on the edge of pavement to reduce the risk of collisions.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalCN 2017 HSIP 212,423 0 4,335 216,758
Project Totals 212,423 0 4,335 216,758
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 216,758 0 0 0 0
Totals 216,758 0 0 0 0
Page 22
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County:
Agency: WSDOT - SC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
14 539503X 539503X11 20 0.260 CE No 19.07 19.33 1,444,386
US 395/Pasco - Flamingo Mobile Home Park Noise Walls
Install noise walls. This project will install noise walls in the vicinity of Flamingo Mobile Home Park to reduce the highway noise for adjacent homes and properties.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2017 NHPP 192,016 0 8,001 200,017
CN 2019 NHPP 1,219,481 0 24,888 1,244,369
Project Totals 1,411,497 0 32,889 1,444,386
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 83,228 93,096 1,241,768 36,294 0
Totals 83,228 93,096 1,241,768 36,294 0
Page 23
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County:
Agency: WSDOT - SC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
14 539504R 539504R11 40 0.230 CE No 18.75 18.98 40,851,607
US 395/Pioneer Memorial Bridge - Bridge Painting
Paint Bridge 395/40. The existing steel surfaces on the US 395 Pioneer Memorial Bridge between Kennewick and Pasco are in need of cleaning and painting. This project will clean and paint the existing steel surface to preserve the structural integrity of the bridge.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2020 NHPP 1,393,507 0 58,063 1,451,570
Project Totals 1,393,507 0 58,063 1,451,570
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 1,453,459
Totals 0 0 0 0 1,453,459
Page 24
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County:
Agency: WSDOT - SC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
02 3457(002) 539504O 539504O03 03 0.800 CE No 13.30 14.10 17,000,000
US 395/Ridgeline Drive - Construct Interchange
Construct interchange. The intersection of US 395 and Ridgeline Drive experiences congestion due to recent development in this fast growing area of Kennewick, including a new high school and hospital. This four-laned limited access highway connects I-82 with I-182 through Pasco and Kennewick. Heavy truck volumes and higher vehicle speeds make safe access at this intersection a concern. This project will construct a new grade separated interchange to reduce congestion, improve access, and reduce the of collisions. PE and possible RW phases are being delivered by the City of Kennewick under STIP ID "kenn6".
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalCN 2020 0 CWA 15,000,000 2,000,000 17,000,000
Project Totals 0 15,000,000 2,000,000 17,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 16,818,043 181,957
Totals 0 0 0 16,818,043 181,957
Federal FundsState Funds Local Funds Total
Agency Totals for WSDOT - SC 29,206,204 43,900,000 2,651,918 75,758,122
Page 25
Appendix F - Rural Secured Projects 2017-2022
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County: Benton
Agency: Prosser
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
06 PROSSER 17 04 0.270 CE No Wine Country Road Meade Avenue 1,228,120
7th Street Improvements
The project will reconstruct 7th Street including new hot mix asphalt, curb and gutter, sidewalk, storm drainage, street lights, and ADA ramps.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalCN 2017 0 TIB 909,915 176,505 1,086,420
Project Totals 0 909,915 176,505 1,086,420
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,086,420 0 0 0 0
Totals 1,086,420 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Prosser 0 909,915 176,505 1,086,420
Page 2
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County:
Agency: WSDOT - EAST
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
07 602102H 6021002H11 47 0.010 CE No 2.72 2.73 284,953
SR 21/Sand Hill Coulee Bridge - Deck Repair
Grind Sand Hill Coulee bridge deck and replace it with a modified or latex concrete overlay to preserve the structural integrity of the bridge.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2019 STP 65,215 0 2,717 67,932
CN 2020 STP 212,680 0 4,340 217,020
Project Totals 277,895 0 7,057 284,952
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 29,932 243,998 11,023
Totals 0 0 29,932 243,998 11,023
Federal FundsState Funds Local Funds Total
Agency Totals for WSDOT - EAST 277,895 0 7,057 284,952
Page 3
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County:
Agency: WSDOT - SC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
01 0823(068) 508208S 508208S03 14 0.110 CE No 132.49 132.60 15,623,595
I-82/Columbia River Bridge EB - Truss Deck Replacement
Replace truss deck and barrier on Bridge 82/280S. The bridge deck and barrier on the steel truss portion of the Columbia River Bridge on eastbound I-82 at the WA/OR state boundary are showing signs of deterioration due to normal wear and age. This project will remove and replace the existing bridge deck and barrier to maintain structural integrity, continue safe operation of the highway, and extend the life of the bridge. This project is split between WSDOT (50%) and ODOT (50%).
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalCN 2017 NHPP 7,198,282 0 146,904 7,345,186
CN 2017 0 0 7,345,186 7,345,186
Project Totals 7,198,282 0 7,492,090 14,690,372
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 6,828,095 7,827,137 35,140 0 0
Totals 6,828,095 7,827,137 35,140 0 0
Page 4
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County:
Agency: WSDOT - SC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
01 508209V 508209V03 21 3.630 CE No 88.51 92.14 888,949
I-82/Gibbon Rd Vic to 1 Mile W of Yakitat Rd - Median Cable Barrier
Upgrade existing cable barrier. The existing 3-strand median cable barrier along this section of I-82 east of Prosser no longer meets current design standards. This project will replace the existing barrier with 4-strand high tension cable barrier to further reduce the risk of collisions.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2019 HSIP 123,251 0 5,136 128,387
CN 2020 HSIP 745,351 0 15,211 760,562
Project Totals 868,602 0 20,347 888,949
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 86,085 771,682 31,182
Totals 0 0 86,085 771,682 31,182
Page 5
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County:
Agency: WSDOT - SC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
02 501701N 501701N11 21 1.500 CE No 7.59 9.09 17,168
SR 17/US 395 to 0.15 North of Mesa - Shoulder Rumble Strips
Install shoulder rumble strips. This two lane section of SR 17 has a history of run-off-road collisions. This project will install shoulder rumble strips to reduce the risk of collisions.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2017 HSIP 2,293 0 96 2,389
CN 2018 HSIP 14,485 0 294 14,779
Project Totals 16,778 0 390 17,168
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 2,388 14,780 0 0 0
Totals 2,388 14,780 0 0 0
Page 6
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County:
Agency: WSDOT - SC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 500000F 500000F03 21 CE No varies varies 186,218
SR 22 ET AL/Benton and Yakima Co-Centerline Rumble Strips
Install centerline rumble strips. Sections of SR 22 and SR 221 are two-lane roadways with a high potential for crossover collisions. By installing centerline rumble strips, this project will reduce the risk of this type of collision and improve safety. Shoulder rumble strips may also be considered if warranted. This record represents the Benton county portion of this project split between Benton (50%) and Yakima (50%) counties.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2017 HSIP 36,287 0 1,512 37,799
CN 2018 HSIP 145,450 0 2,969 148,419
Project Totals 181,737 0 4,481 186,218
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 25,344 145,180 15,694 0 0
Totals 25,344 145,180 15,694 0 0
Page 7
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County:
Agency: WSDOT - SC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
06 502402T 502402T03 21 4.850 CE No 38.74 43.59 48,169
SR 24/SR 240 to Vernita - Shoulder and Centerline Rumble Strips
Install shoulder and centerline rumble strips. This two lane section of SR 24 has a history of run-off-road and crossover collisions. This project will install shoulder and centerline rumble strips to reduce the risk of collisions.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2018 HSIP 6,529 0 273 6,802
CN 2019 HSIP 40,540 0 827 41,367
Project Totals 47,069 0 1,100 48,169
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 6,801 41,366 0 0
Totals 0 6,801 41,366 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for WSDOT - SC 8,312,468 0 7,518,408 15,830,876
Page 8
Appendix G - Non-Federal Secured Local Projects 2017-2022
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Franklin
Agency: Pasco
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
14 WA-04350 28 0.500 CE No various various 300,000
Annual ADA Access Handicap Ramp Retrofit
Ongoing effort to bring the City's pedestrian facilities into compliance with federal ADA regulations and standards.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalCN 2017 0 0 120,000 120,000
CN 2018 0 0 60,000 60,000
CN 2019 0 0 60,000 60,000
CN 2020 0 0 60,000 60,000
Project Totals 0 0 300,000 300,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 120,000 60,000 60,000 60,000 60,000
Totals 120,000 60,000 60,000 60,000 60,000
Page 2
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Franklin
Agency: Pasco
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
17 WA-06311 01 1.000 CE No Road 68 Road 84 1,663,000
Chapel Hill Extension
Extension of Chapel Hill Blvd. from Road 68 to Road 84. The road section will match the existing Chapel Hill Blvd width at Road 84. The project will include the necessary signal improvements at the intersection of Road 68 and Chapel Hill Blvd.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2017 0 0 300,000 300,000
Project Totals 0 0 300,000 300,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 300,000 0 0 0 0
Totals 300,000 0 0 0 0
Page 3
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Franklin
Agency: Pasco
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
09 WA-06941 01 1.000 CE No Clemente Lane Convention Drive 250,000
Wrigley Drive Extension
This project will extend Wrigley Drive from Clemente Lane to Convention Drive.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2017 0 0 50,000 50,000
CN 2017 0 0 200,000 200,000
Project Totals 0 0 250,000 250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 50,000 0 0 0 0
CN 200,000 0 0 0 0
Totals 250,000 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Pasco 0 0 850,000 850,000
Page 4
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside October 4, 2016
County: Benton
Agency: Richland
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
16 3440(001) R002 01 0.670 EA Yes Queensgate Drive Cottonwood Drive 37,461,561
Duportail Bridge
Construct a 4-lane road and bridge over the Yakima River with sidewalks and bike paths on both sides. Construct new signalized intersections at Duportail St./Tanglewood Drive and Duportail/City View Drive. Reconstruct SR-240/Duportail intersection and modify traffic signal to accommodate additional lanes. Modify the Queensgate/Duportail intersection. Widen and raise at-grade railroad crossing of Port of Benton track.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalCN 2017 0 CWA 20,000,000 0 20,000,000
Project Totals 0 20,000,000 0 20,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 14,000,000 14,000,000 3,800,000 0
Totals 0 14,000,000 14,000,000 3,800,000 0
Federal FundsState Funds Local Funds Total
Agency Totals for Richland 0 20,000,000 0 20,000,000
Page 5
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County: Benton
Agency: Benton Co.
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
08 WA-09498 04 2.150 No 5.993 8.146 2,100,000
BERT JAMES RD: Sellards to Williamson
Reconstruct 2.15 miles of roadway to all-weather standard.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2017 0 0 50,000 50,000
Project Totals 0 0 50,000 50,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 50,000 0 0 0 0
Totals 50,000 0 0 0 0
Page 6
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County: Benton
Agency: Benton Co.
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
08 BCO2012-17 04 2.000 CE No Williamson Rd (MP 8.146) SR 221 (MP 10.240) 1,960,000
BERT JAMES RD: Williamson to SR 221
Reconstruct a 2 lane road segment.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalRW 2017 0 0 100,000 100,000
Project Totals 0 0 100,000 100,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 100,000 0 0 0 0
Totals 100,000 0 0 0 0
Page 7
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County: Benton
Agency: Benton Co.
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 BCO2012-27 04 CE No various various 1,500,000
EMERGENT PROJECTS
Construct emergent projects.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalALL 2017 0 0 1,500,000 1,500,000
Project Totals 0 0 1,500,000 1,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 250,000 250,000 250,000 250,000 500,000
Totals 250,000 250,000 250,000 250,000 500,000
Page 8
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County: Benton
Agency: Benton Co.
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
08 BCO2012-09 04 3.000 CE Yes Coffin Rd Beck Rd 3,356,000
NINE CANYON RD Ph. III: Coffin to Beck
Reconstruct a segment of gravel road to an all weather road.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalCN 2017 0 CRAB 397,000 336,000 733,000
CN 2018 0 CRAB 2,623,000 0 2,623,000
Project Totals 0 3,020,000 336,000 3,356,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 733,000 2,623,000 0 0 0
Totals 733,000 2,623,000 0 0 0
Page 9
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County: Benton
Agency: Benton Co.
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
07 BCO2015-21 04 2.360 CE No 14.14 16.50 1,475,000
SELLARDS RD Phase II: 2 miles East of SR 221 to 1/2 mile East of Tyacke
Surface and road side rehabilitation.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalCN 2017 0 0 1,400,000 1,400,000
Project Totals 0 0 1,400,000 1,400,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 700,000 700,000 0 0 0
Totals 700,000 700,000 0 0 0
Page 10
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County: Benton
Agency: Benton Co.
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
07 BCO2015-20 04 2.650 CE No 16.50 19.15 1,475,000
SELLARDS RD Phase III: 1/2 mile East of Tyacke to Travis
Surface and road side rehabilitation.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2017 0 0 75,000 75,000
CN 2018 0 0 1,400,000 1,400,000
Project Totals 0 0 1,475,000 1,475,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 75,000 0 0 0 0
CN 0 1,400,000 0 0 0
Totals 75,000 1,400,000 0 0 0
Page 11
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County: Benton
Agency: Benton Co.
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
08 BCO2015-24 04 2.000 CE No 0.00 2.00 1,000,000
TYRELL RD Ph. II: Travis Road to 2 miles West of Plymouth Road
Total road way reconstruction with HMA surfacing and a roadway structure rebuilt to an all weather standard.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalPE 2017 0 0 100,000 100,000
CN 2017 0 0 900,000 900,000
Project Totals 0 0 1,000,000 1,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 1,000,000 0 0 0 0
Totals 1,000,000 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Benton Co. 0 3,020,000 5,861,000 8,881,000
Page 12
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County: Franklin
Agency: Connell
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
07 WA-00684 05 1.850 CE No SR 260 SR 395 250,000
Columbia Ave Chip Seal
Columbia Ave from SR 260 to SR 395. Chip Seal.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalCN 2017 0 TIB 225,000 0 225,000
Project Totals 0 225,000 0 225,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 250,000 0 0 0 0
Totals 250,000 0 0 0 0
Page 13
Washington State S. T. I. P.
2017 to 2020
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG N Inside Y Outside October 4, 2016
County: Franklin
Agency: Connell
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
16 WA-00688 05 No City Limit City Limit 35,000
Street Preservation Program
Overlays, seals,ETC.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds TotalCN 2017 0 0 35,000 35,000
Project Totals 0 0 35,000 35,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 35,000 0 0 0 0
Totals 35,000 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Connell 0 225,000 35,000 260,000
Page 14
Appendix H - Planned Projects 2017-2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 9 BCO2014-03 07/02/13 07/02/13 2013 519 01 C G P T 0.700 CE Yes
WILLAMETTE HEIGHTS - S. 38th AVE. (W. Rich. Limits to W. Rich. Limits
S. 38th Ave.
W. Rich. City Limits to W. Rich. City Limits
New construction in the vicinity of the Willamette Heights subdivision, S 38th Ave.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 0 290,000 290,000
P RW 2017 0 0 10,000 10,000
P CN 2019 STP(U) 983,000 0 0 983,000
Totals 983,000 0 300,000 1,283,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 290,000 0 0 0 0
RW 10,000 0 0 0 0
CN 0 0 983,000 0 0
Totals 300,000 0 983,000 0 0
Report Date: October 04, 2016 Page 1
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 9 BCO2014-04 07/02/13 07/02/13 2013 519 01 C G P T 0.100 CE Yes
WILLAMETTE HEIGHTS-MT.ADAMS VIEW (S. 38th Ave East to W.Rich.Limits)
Mt. Adams View Rd.
S. 38th Ave. East to W. Richland City Limits
New construction in the vicinity of the Willamette Heights subdivision, Mt Adams View.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 0 15,000 15,000
P RW 2017 0 0 5,000 5,000
P CN 2017 0 0 180,000 180,000
Totals 0 0 200,000 200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 15,000 0 0 0 0
RW 5,000 0 0 0 0
CN 180,000 0 0 0 0
Totals 200,000 0 0 0 0
Report Date: October 04, 2016 Page 2
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 17 BCO2016-01 07/28/15 07/28/15 01 C G P T 0.500 CE Yes
DAGUE RD: Terril to Game Farm
Dague Rd
Terril Rd to Game Farm Rd
Proposed new roadway to be built to an all weather standard.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2022 0 0 25,000 25,000
P RW 2022 0 0 10,000 10,000
P CN 2022 0 0 215,000 215,000
Totals 0 0 250,000 250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 25,000
RW 0 0 0 0 10,000
CN 0 0 0 0 215,000
Totals 0 0 0 0 250,000
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Benton Co. 983,000 0 750,000 1,733,000
Report Date: October 04, 2016 Page 3
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 3 / E112(002) WA-00157 06/29/16 06/29/16 2016-260 11 P T W 0.100 CE No
Taylor Flats Bridge #903-3.46 Widening
Taylor Flats Road
Milepost 3.41 to Milepost 3.51
The project consits of widening a functionally obsolete bridge to meet current standards.
903-3.46
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2017 STP(UL) 50,000 0 7,803 57,803
P CN 2017 0 CRAB 516,000 129,000 645,000
Totals 50,000 516,000 136,803 702,803
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 181,000 0 0 0 0
CN 0 545,000 0 0 0
Totals 181,000 545,000 0 0 0
Report Date: October 04, 2016 Page 4
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
00 7 WA-01011 06/29/16 06/29/16 2016-260 18 CE No
Dent Road and Burns Road Corridor Study
to
A study for transportation needs along the Dent Road and Burns Road corridor.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2019 0 0 75,000 75,000
Totals 0 0 75,000 75,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 75,000 0 0
Totals 0 0 75,000 0 0
Report Date: October 04, 2016 Page 5
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 14 WA-06282 06/29/16 06/29/16 2016-260 04 P T W 1.040 CE No
Dent Road Widening
10050
MP 2.19 to Burns Road
Widen existing county road to accommodate additional traffic from recent development.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 STP(U) 12,975 0 2,025 15,000
P RW 2020 STP(U) 12,975 0 2,025 15,000
P CN 2020 STP(U) 103,800 0 16,200 120,000
Totals 129,750 0 20,250 150,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 15,000 0
RW 0 0 0 15,000 0
CN 0 0 0 120,000 0
Totals 0 0 0 150,000 0
Report Date: October 04, 2016 Page 6
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 16 WA-01308 06/29/16 06/29/16 2016-260 04 P T W CE Yes
Dent Road/Road 68/Taylor Flats Road/Clark Road Intersection
Various Roads
Intersection Project to Intersection Project
Re-design and construct a new intersection for all five (5) legs.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2021 STP(U) 865,000 0 135,000 1,000,000
Totals 865,000 0 135,000 1,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 1,000,000
Totals 0 0 0 0 1,000,000
Report Date: October 04, 2016 Page 7
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 22 WA-09037 06/29/16 06/29/16 2016-260 04 P T W 3.370 CE No
Taylor Flats Overlay and Widening I
09030
0.09 City Limits to 3.46 Taylor Flats Bridge
Reconstruct and resurface to an all-weather standard.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 STP(U) 2,162,500 0 337,500 2,500,000
Totals 2,162,500 0 337,500 2,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 2,500,000
Totals 0 0 0 0 2,500,000
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Franklin Co. 3,207,250 516,000 704,553 4,427,803
Report Date: October 04, 2016 Page 8
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 kenn25 06/21/16 06/21/16 16-13 04 C G O P S T W
0.440 CE Yes
10th Avenue Reconstruction
10th Avenue
Clearwater Avenue to Steptoe Street (Clodfelter)
Street reconstruction - one travel lane each direction & TWLTL. Curb, gutter, sidewalk, storm drainage and illumination. Clearwater widening for left turn storage.Roundabout or Traffic Signal @ Clearwater & 10th Avenue
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 0 209,000 209,000
P RW 2017 0 0 200,000 200,000
P CN 2018 0 0 2,146,000 2,146,000
Totals 0 0 2,555,000 2,555,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 209,000 0 0 0 0
RW 200,000 0 0 0 0
CN 0 2,146,000 0 0 0
Totals 409,000 2,146,000 0 0 0
Report Date: October 04, 2016 Page 9
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 kenn9 06/21/16 06/21/16 16-13 04 C G O P S T W
0.810 CE No
10th Avenue Widening
Montana to Columbia Center Blvd.
Widening south side of the 10th Avenue. Bike lane, curb, gutter, illumination, sidewalk, center turn-lane, HMA Overlay of existing.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 TIB 96,000 64,000 160,000
P CN 2018 0 TIB 1,551,000 1,034,000 2,585,000
Totals 0 1,647,000 1,098,000 2,745,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 160,000 0 0 0 0
CN 0 2,585,000 0 0 0
Totals 160,000 2,585,000 0 0 0
Report Date: October 04, 2016 Page 10
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 kenn38 06/21/16 06/21/16 16-13 04 C G O P S T W
1.000 DCE Yes
45th Avenue Widening
Ely Street to Olympia Street
Reconstruction: roadway, curb, gutter, sidewalks, illumination, storm drainage, replace AC water lines, traffic control devices, channelization, signage. Project includes curb, gutter & sidewalk construction on one side of Ely Street from 45th to KID Canal.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 0 0 335,000 335,000
P RW 2020 0 0 150,000 150,000
P CN 2021 0 0 3,550,000 3,550,000
Totals 0 0 4,035,000 4,035,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 335,000 0
RW 0 0 0 150,000 0
CN 0 0 0 0 3,550,000
Totals 0 0 0 485,000 3,550,000
Report Date: October 04, 2016 Page 11
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 Kenn62 06/21/16 06/21/16 16-13 21 C G O P S T W
0.100 CE No
Amistad Elementary School Crossing Improvements
Kennewick Avenue
Ione Street to Intersection project
Install Rectangular Rapid Flash Beacon and associated signage.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 SRTS 8,000 0 8,000
P CN 2018 0 SRTS 76,750 0 76,750
Totals 0 84,750 0 84,750
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 8,000 0 0 0 0
CN 0 76,750 0 0 0
Totals 8,000 76,750 0 0 0
Report Date: October 04, 2016 Page 12
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 kenn5 06/21/16 06/21/16 16-13 01 C G P S T W
2.010 CE Yes
Bob Olson Parkway
City Limits (Sec. 7 T8N 29E) to Sherman Street
New road construction - 2 travel lanes in each direction, medians, curb & gutter, sidewalk.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2017 0 0 4,310,000 4,310,000
Totals 0 0 4,310,000 4,310,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 4,310,000 0 0 0 0
Totals 4,310,000 0 0 0 0
Report Date: October 04, 2016 Page 13
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 kenn50 06/21/16 06/21/16 16-13 21 C G P S T W
0.240 DCE Yes
Canal Drive & Edison Street Intersection Improvements
Canal Drive
Intersection Canal Dr. to and Edison Street
Roadway and storage lanes for turning motions, channelization modifications, access reconstructions sidewalk improvements, frontage improvements, signal modification, APS and ADA improvements.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 138,000 138,000
P RW 2019 0 0 150,000 150,000
P CN 2020 0 0 1,137,000 1,137,000
Totals 0 0 1,425,000 1,425,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 138,000 0 0
RW 0 0 150,000 0 0
CN 0 0 0 1,137,000 0
Totals 0 0 288,000 1,137,000 0
Report Date: October 04, 2016 Page 14
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 kenn16 06/21/16 06/21/16 16-13 28 O 0.550 CE No
Canal Drive Sidewalks
Canal Drive
US 395 to Hartford Street
Construct new sidewalks. Minor widening & curb construction.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2021 0 TIB 14,000 4,000 18,000
P CN 2021 0 TIB 186,000 46,000 232,000
Totals 0 200,000 50,000 250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 18,000
CN 0 0 0 0 232,000
Totals 0 0 0 0 250,000
Report Date: October 04, 2016 Page 15
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 Kenn61 06/21/16 06/21/16 16-13 21 C G O P S T W
0.730 DCE Yes
Cascade Elementary School Sidewalk
Lyle Street to Cascade Street
Construct approximately 3,700 linear feet of new curb, gutter and sidewalk from Lyle Street to Cascade Street. Project includes a crossing of Highland Drive with a pedestrian activated Rectangular Rapid Flash Beacon (RRFB).
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 SRTS 40,000 0 40,000
P RW 2018 0 SRTS 406,000 0 406,000
P CN 2019 0 SRTS 360,000 80,000 440,000
Totals 0 806,000 80,000 886,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 40,000 0 0 0 0
RW 0 406,000 0 0 0
CN 0 0 440,000 0 0
Totals 40,000 406,000 440,000 0 0
Report Date: October 04, 2016 Page 16
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 kenn12 06/21/16 06/21/16 16-13 04 C G P S T W
1.370 CE Yes
Cascade Street
W. 45th Avenue to 27th and Washington
City standard street, curb, gutter, sidewalk, illumination, storm drainage. Includes new construction from Highland Drive to 45th Avenue. Also, roundabouts at 45th & Cascade, 27th and Washington and Cascade and Highland.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2021 0 0 485,000 485,000
P RW 2021 0 0 346,000 346,000
P CN 2022 0 0 5,539,000 5,539,000
Totals 0 0 6,370,000 6,370,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 485,000
RW 0 0 0 0 346,000
CN 0 0 0 0 5,539,000
Totals 0 0 0 0 6,370,000
Report Date: October 04, 2016 Page 17
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 kenn24 06/21/16 06/21/16 16-13 21 W 0.100 CE Yes
Center Parkway & Deschutes Ave. Roundabout
Center Parkway to Deschutes Avenue
Construction of a small diameter roundabout at Center Parkway and Deschutes Avenue.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2018 0 0 40,000 40,000
P RW 2018 0 0 50,000 50,000
P CN 2019 0 0 310,000 310,000
Totals 0 0 400,000 400,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 40,000 0 0 0
RW 0 50,000 0 0 0
CN 0 0 310,000 0 0
Totals 0 90,000 310,000 0 0
Report Date: October 04, 2016 Page 18
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 kenn37 06/21/16 06/21/16 16-13 04 P S T W 0.570 DCE Yes
Center Parkway Interchange
Intersection of Steptoe to 1-82
On/off ramps to a structure constructed under a separate project, traffic control devices, channelization, signage.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 0 0 2,120,000 2,120,000
P RW 2020 0 0 100,000 100,000
P CN 2021 0 0 6,490,000 6,490,000
Totals 0 0 8,710,000 8,710,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 2,120,000 0
RW 0 0 0 100,000 0
CN 0 0 0 0 6,490,000
Totals 0 0 0 2,220,000 6,490,000
Report Date: October 04, 2016 Page 19
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 kenn46 06/21/16 06/21/16 16-13 05 S T W 25.000 DCE No
City Arterial Pavement Preservation
City Wide to City Wide
Infrastructure preservation on city arterials.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 0 100,000 100,000
P CN 2017 0 0 1,300,000 1,300,000
Totals 0 0 1,400,000 1,400,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 100,000 0 0 0 0
CN 1,400,000 0 0 0 0
Totals 1,500,000 0 0 0 0
Report Date: October 04, 2016 Page 20
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 kenn47 06/21/16 06/21/16 16-13 04 C G P T W 0.100 DCE No
Clearwater Avenue - Utah Street Intersection Improvement
Intersection Clearwater to and Utah Street
Construct widening for right turn lane, modify permanent pavement markings, permanent traffic control signing, and storm drainage modifications.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 21,000 21,000
P CN 2020 0 0 188,000 188,000
Totals 0 0 209,000 209,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 21,000 0 0
CN 0 0 0 188,000 0
Totals 0 0 21,000 188,000 0
Report Date: October 04, 2016 Page 21
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 kenn55 06/21/16 06/21/16 16-13 04 C G O P S T W
0.100 CE Yes
Clearwater/Kellogg Intersection Improvements
intersection to intersection
Construct additional storage lanes for increased turning motions. Signal modifications. Channelization
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 90,800 90,800
P RW 2019 0 0 99,000 99,000
P CN 2020 0 0 835,200 835,200
Totals 0 0 1,025,000 1,025,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 90,800 0 0
RW 0 0 99,000 0 0
CN 0 0 0 835,200 0
Totals 0 0 189,800 835,200 0
Report Date: October 04, 2016 Page 22
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 WA-07765 06/21/16 06/21/16 16-13 03 C G O P S T W
0.750 CE Yes
Columbia Center Boulevard Widening
Quinault Avenue to Deschutes Avenue
Street reconstruction and widening. Construct an additional travel lane in each direction, curb & gutter, sidewalk, storm drainage, illumination, signal modifications.
kenn18
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 717,000 717,000
P RW 2020 0 0 700,000 700,000
P CN 2021 0 0 5,243,000 5,243,000
Totals 0 0 6,660,000 6,660,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 717,000 0 0
RW 0 0 0 700,000 0
CN 0 0 0 0 5,243,000
Totals 0 0 717,000 700,000 5,243,000
Report Date: October 04, 2016 Page 23
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 kenn14 06/21/16 06/21/16 16-13 31 O 1.500 CE No
Columbia Overlook - Phase 2
Canal Drive
Neel Street to US 395
Install concrete sidewalk on north side of roadway. Irrigation system installation and landscaped linear park. Requires agreement with BNSF Railway.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2018 0 0 76,000 76,000
P CN 2019 TAP(UL) 598,580 0 93,420 692,000
Totals 598,580 0 169,420 768,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 76,000 0 0 0
CN 0 0 692,000 0 0
Totals 0 76,000 692,000 0 0
Report Date: October 04, 2016 Page 24
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 kenn17 06/21/16 06/21/16 16-13 28 O 0.200 CE No
E. 10th Avenue Sidewalks
E. 10th Avenue
SR 397 to Oak Street
Construction of new sidewalks.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 TIB 14,000 4,000 18,000
P CN 2017 0 TIB 186,000 46,000 232,000
Totals 0 200,000 50,000 250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 18,000 0 0 0 0
CN 232,000 0 0 0 0
Totals 250,000 0 0 0 0
Report Date: October 04, 2016 Page 25
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 Kenn63 06/21/16 06/21/16 16-13 28 C G O P S T W
0.360 DCE No
East Columbia Park Bicycle Improvements – Phase 2
Columbia Park Trail
SR240 entrance to 1900 feet west
The project will construct pavement widening for dedicated bicycle lanes. The project includes permanent pavement markings and signage.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 Ped/Bike Program 25,000 3,000 28,000
P CN 2018 0 Ped/Bike Program 181,800 18,200 200,000
Totals 0 206,800 21,200 228,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 28,000 0 0 0 0
CN 0 200,000 0 0 0
Totals 28,000 200,000 0 0 0
Report Date: October 04, 2016 Page 26
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 Kenn60 06/21/16 06/21/16 16-13 21 C G O P S T W
0.080 CE No
Hawthorne Elementary School Crossing Improvements
Neel Street
John Day Avenue to 400 feet north
Construct a new crossing at the intersection of Neel & John Day, construct a median refuge at the existing crossing at mid-block,extend the school zone on Neel Street to encompass both crosswalks, install RRFB at both crossings.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 SRTS 16,500 0 16,500
P CN 2018 0 SRTS 157,850 0 157,850
Totals 0 174,350 0 174,350
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 16,500 0 0 0 0
CN 0 157,850 0 0 0
Totals 16,500 157,850 0 0 0
Report Date: October 04, 2016 Page 27
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 kenn13 06/21/16 06/21/16 16-13 04 C G O P S T W
0.530 CE Yes
Kennewick Avenue Widening
Kennewick Avenue
Union Street to Morain Street
Reconstruction and widening. Curb, gutter, sidewalk, storm drainage & illumination.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 0 0 190,000 190,000
P RW 2021 0 0 180,000 180,000
P CN 2022 0 0 1,866,000 1,866,000
Totals 0 0 2,236,000 2,236,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 190,000 0
RW 0 0 0 0 180,000
CN 0 0 0 0 1,866,000
Totals 0 0 0 190,000 2,046,000
Report Date: October 04, 2016 Page 28
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 / 3532(001) kenn20 06/21/16 06/21/16 16-13 04 C G O P S T W
0.570 CE Yes
Metaline Avenue Widening
Metaline Avenue
Kellogg Street to Edison Street
Reconstruction and widening. Curb, gutter, sidewalk, storm drainage and illumination.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2017 STP(UL) 1,351,130 0 210,870 1,562,000
Totals 1,351,130 0 210,870 1,562,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,562,000 0 0 0 0
Totals 1,562,000 0 0 0 0
Report Date: October 04, 2016 Page 29
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 kenn41 06/21/16 06/21/16 16-13 04 C G O P S T W
1.090 DCE Yes
Montana Street Extension
10th Avenue to Ridgeline Drive
New construction: roadway, curb, gutter, sidewalks, illumination, storm drainage, traffic control devices, channelizatin, signage.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 693,600 693,600
P RW 2019 0 0 455,000 455,000
P CN 2020 0 0 5,541,400 5,541,400
Totals 0 0 6,690,000 6,690,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 693,600 0 0
RW 0 0 455,000 0 0
CN 0 0 0 5,541,400 0
Totals 0 0 1,148,600 5,541,400 0
Report Date: October 04, 2016 Page 30
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 kenn40 06/21/16 06/21/16 16-13 04 C G O P S T W
0.510 DCE Yes
Morain Street Extension
10th Avenue to 19th Avenue
New construction: roadway, curb, gutter, sidewalks, illumination, storm drainage, traffic control devices, channelization, signage. Kennewick Irrigation District (KID) Bridge/Culvert.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2021 0 0 206,000 206,000
P RW 2021 0 0 440,000 440,000
P CN 2022 0 0 1,779,000 1,779,000
Totals 0 0 2,425,000 2,425,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 206,000
RW 0 0 0 0 440,000
CN 0 0 0 0 1,779,000
Totals 0 0 0 0 2,425,000
Report Date: October 04, 2016 Page 31
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 kenn28 06/21/16 06/21/16 16-13 04 C G O P S W
1.250 DCE Yes
Ridgeline Drive Extension Phase 3
Center Parkway to Sherman Street
New alignment, gutter, sidewalks, illumination, storm drainage and controlled intersection. Right-of-way by developer donation.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 290,000 290,000
P CN 2020 0 0 3,340,000 3,340,000
Totals 0 0 3,630,000 3,630,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 290,000 0 0
CN 0 0 0 3,340,000 0
Totals 0 0 290,000 3,340,000 0
Report Date: October 04, 2016 Page 32
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 kenn27 06/21/16 06/21/16 16-13 01 C G O P S T W
1.250 EA Yes
Ridgeline Drive Extension Phase 4
Ridgeline Drive
Clodfelter Rd. to Center Parkway
New alignment. Curb, gutter, sidewalk, storm drainage, illumination and controlled intersection. Right-of-way by developer donation.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 463,000 463,000
P CN 2020 0 0 5,237,000 5,237,000
Totals 0 0 5,700,000 5,700,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 463,000 0 0
CN 0 0 0 5,237,000 0
Totals 0 0 463,000 5,237,000 0
Report Date: October 04, 2016 Page 33
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 kenn32 06/21/16 06/21/16 16-13 03 C G O P S T W
0.530 DCE Yes
Ridgeline Drive Reconstruction
Southridge Blvd. to Sherman St.
Reconstruct roadway, curb, gutter, sidewalks, illumination, storm drainage, traffic control devices, channelization, signage.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 0 178,400 178,400
P CN 2018 0 0 2,061,600 2,061,600
Totals 0 0 2,240,000 2,240,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 178,400 0 0 0 0
CN 0 2,061,600 0 0 0
Totals 178,400 2,061,600 0 0 0
Report Date: October 04, 2016 Page 34
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 kenn29 06/21/16 06/21/16 16-13 04 C G O P S W
0.300 DCE Yes
Sherman Street
Ridgeline Drive to Bob Olson Parkway
Reconstruction, curb, gutter, sidewalk, illumination and intersection control. Right-of-way by developer donation.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2018 0 0 262,100 262,100
P CN 2019 0 0 2,364,900 2,364,900
Totals 0 0 2,627,000 2,627,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 262,100 0 0 0
CN 0 0 2,364,900 0 0
Totals 0 262,100 2,364,900 0 0
Report Date: October 04, 2016 Page 35
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 kenn10 06/21/16 06/21/16 16-13 01 C G O P S T W
0.380 CE Yes
Southridge Center Parkway Extension
Bob Olson Parkway to Ridgeline Drive
New construction. City standard street, curb, gutter, sidewalk, illumination. Roundabouts at Bob Olson Parkway and Ridgeline Drive.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 303,000 303,000
P RW 2020 0 0 375,000 375,000
P CN 2021 0 0 2,152,000 2,152,000
Totals 0 0 2,830,000 2,830,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 303,000 0 0
RW 0 0 0 375,000 0
CN 0 0 0 0 2,152,000
Totals 0 0 303,000 375,000 2,152,000
Report Date: October 04, 2016 Page 36
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 WA-07764 06/21/16 06/21/16 16-13 01 C G O P S T W
0.280 CE Yes
Southridge/UGA Center Parkway Extension
Ridgeline to I-82
New construction. City standard street, curb, gutter, sidewalk, illumination. Grade separation @ I-82. Access to I-82 will be a separate project. Interchange justification report.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 1,156,000 1,156,000
P CN 2021 0 0 10,159,000 10,159,000
Totals 0 0 11,315,000 11,315,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 1,156,000 0 0
CN 0 0 0 0 10,159,000
Totals 0 0 1,156,000 0 10,159,000
Report Date: October 04, 2016 Page 37
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
00 Kenn64 06/21/16 06/21/16 16-13 28 C G O P S T W
0.620 DCE No
Spirit of America Trail – 15th to 27th
Spirit of America Trail
15th Avenue to 27th Avenue
The project will construct a 12-foot wide shared use (ped/bike) facility. The project includes paving the staging/parking area at the south termini, pavement markings and signage.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 Ped/Bike Program 45,000 5,000 50,000
P CN 2018 0 Ped/Bike Program 180,000 20,000 200,000
Totals 0 225,000 25,000 250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 50,000 0 0 0 0
CN 0 200,000 0 0 0
Totals 50,000 200,000 0 0 0
Report Date: October 04, 2016 Page 38
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
12 kenn6 06/21/16 06/21/16 16-13 04 C G P S T W
0.250 CE No
US395/Ridgeline Drive Intersection Improvements
Ridgeline Drive to US395 Intersection
Construction of a grade separated intersection at US395 and Ridgeline Drive. Includes improvements on SR395. Prior PE $786,000
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 0 2,000,000 2,000,000
P CN 2019 0 0 4,000,000 4,000,000
S CN 2021 0 CWA 15,000,000 0 15,000,000
Totals 0 15,000,000 6,000,000 21,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 2,000,000 0 0 0 0
CN 0 0 4,000,000 15,000,000 0
Totals 2,000,000 0 4,000,000 15,000,000 0
Report Date: October 04, 2016 Page 39
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 Kenn31 06/21/16 06/21/16 16-13 21 C G O P S T W
0.100 CE No
Washington Elementary School Crossing Improvements
Intersection to Intersection
Install rectangular rapid flash beacon and associated signage and channelization
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 SRTS 5,500 0 5,500
P CN 2018 0 SRTS 51,800 0 51,800
Totals 0 57,300 0 57,300
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 5,500 0 0 0 0
CN 0 51,800 0 0 0
Totals 5,500 51,800 0 0 0
Report Date: October 04, 2016 Page 40
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 Kenn65 06/21/16 06/21/16 16-13 28 C G O P S T W
0.100 CE No
Washington Street/6th Avenue Pedestrian Safety Improvements
Washington Street
6th Avenue to Intersection
The project will install a pedestrian activated rectangular rapid flash beacon (RRFB) to improve recognition and warning,especially for southbound. Construction of a center median to provide a pedestrian shelter at the mid-point of the crossing and existing curb ramps reconstructed to current ADA standards. Crosswalk blocks will be installed to define the safe walking route;Washington Street channelization will be removed and reinstalled to utilize the existing width to the fullest advantage (lanes will be narrowed to provide traffic calming through the intersection).
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 Ped/Bike Program 45,000 5,000 50,000
P CN 2018 0 Ped/Bike Program 180,000 20,000 200,000
Totals 0 225,000 25,000 250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 50,000 0 0 0 0
CN 0 20,000 0 0 0
Totals 50,000 20,000 0 0 0
Report Date: October 04, 2016 Page 41
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Kennewick
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 kenn4 06/21/16 06/21/16 16-13 01 C P S T W 1.000 CE Yes
Zintel Way/Ridgeline Drive/Bofer Canyon
Zintel Way to US 395
Zintel Way new street construction - Ridgeline Drive reconstruction - Bofer Canyon realignment. All roadways - sidewalks, curb and gutter, illumination, storm drainage, roundabout. (Right-of-way by developer donation).
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2021 0 0 2,405,000 2,405,000
Totals 0 0 2,405,000 2,405,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 0 0 0 2,405,000
Totals 0 0 0 0 2,405,000
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Kennewick 1,949,710 18,826,200 86,926,490 107,702,400
Report Date: October 04, 2016 Page 42
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
12 WA-04357 01 C G O P S T W
1.000 EIS Yes
A St & US 12 Interchange
A Street
A Street to US 12
New Interchange at US-12 between "A" Street and Sacajawea Road. WSDOT will be the lead on this project. The interchange will help with economic development of the industrial area.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2021 0 0 3,000,000 3,000,000
Totals 0 0 3,000,000 3,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 0 0 0 3,000,000
Totals 0 0 0 0 3,000,000
Report Date: October 04, 2016 Page 43
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 WA-04347 05 1.000 CE No
Annual Alley Hard Surface Maintenance & Preservation
Various
various to various
The alleyway hard surface maintenance and preservation program is expected to improve accessibility in alleyways by providing maintenance to existing alleyways. The program consists in the application some hard surface treatment to existing alleyways to prolong their life. The areas subject to this program will rotate to assure all alleyways are preserved.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2017 0 0 180,000 180,000
P CN 2018 0 0 100,000 100,000
P CN 2019 0 0 100,000 100,000
P CN 2020 0 0 100,000 100,000
P CN 2021 0 0 100,000 100,000
P CN 2022 0 0 100,000 100,000
Totals 0 0 680,000 680,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 180,000 100,000 100,000 100,000 200,000
Totals 180,000 100,000 100,000 100,000 200,000
Report Date: October 04, 2016 Page 44
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 WA-08131 05 No
Annual Pavement Preservation Program
various locations
various to various
This program includes all pavement preservation activities such as Crack seal, Overlays and Micro-surfacing throughout the city
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2017 0 0 750,000 750,000
P CN 2018 0 0 750,000 750,000
P CN 2019 0 0 750,000 750,000
P CN 2020 0 0 750,000 750,000
P CN 2021 0 0 750,000 750,000
P CN 2022 0 0 750,000 750,000
Totals 0 0 4,500,000 4,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 750,000 750,000 750,000 750,000 1,500,000
Totals 750,000 750,000 750,000 750,000 1,500,000
Report Date: October 04, 2016 Page 45
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 WA-04363 44 0.100 CE No
Burden & Road 60 (Signal)
Burden Blvd
Buden Blvd to Road 60
This project will upgrade the intersection at Burden & Road 60 to a signalized intersection.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 0 30,000 30,000
Totals 0 0 30,000 30,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 30,000 0 0 0 0
Totals 30,000 0 0 0 0
Report Date: October 04, 2016 Page 46
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 WA-08132 01 P S T W 1.000 CE No
Burns Road (Road 52 to Pasco City Limits)
Burns Road
Road 52 to City Limits
Extension of Burns Road from Road 52 to City Limits
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 0 250,000 250,000
Totals 0 0 250,000 250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 250,000 0 0 0 0
Totals 250,000 0 0 0 0
Report Date: October 04, 2016 Page 47
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 WA-08149 01 0.500 No
Burns Road (Road 68 to Convention Dr)
Burns Road
Road 68 to Convention Dr
Extension of Burns Rd from Rd 68 to Convention Dr.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 0 100,000 100,000
P RW 2017 0 0 100,000 100,000
Totals 0 0 200,000 200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 100,000 0 0 0 0
RW 100,000 0 0 0 0
Totals 200,000 0 0 0 0
Report Date: October 04, 2016 Page 48
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 WA-06311 01 C G O P S T W
1.000 CE No
Chapel Hill Extension
Chapel Hill Blvd.
Road 68 to Road 84
Extension of Chapel Hill Blvd. from Road 68 to Road 84. The road section will match the existing Chapel Hill Blvd width at Road 84. The project will include the necessary signal improvements at the intersection of Road 68 and Chapel Hill Blvd.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2017 0 0 300,000 300,000
P CN 2019 STP(UL) 1,178,995 0 184,005 1,363,000
Totals 1,178,995 0 484,005 1,663,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 300,000 0 0 0 0
CN 0 0 1,363,000 0 0
Totals 300,000 0 1,363,000 0 0
Report Date: October 04, 2016 Page 49
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 WA-08141 04 0.650 No
Downtown Street Circulation
Lewis Street
various to various
This project will improve the street networking to provide multi-modal access and downtown revitalization.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 STP(UL) 200,000 0 300,000 500,000
P CN 2019 STP(UL) 1,000,000 0 1,000,000 2,000,000
Totals 1,200,000 0 1,300,000 2,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 500,000 0 0
CN 0 0 2,000,000 0 0
Totals 0 0 2,500,000 0 0
Report Date: October 04, 2016 Page 50
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 WA-04356 01 C G O P S T W
1.000 EIS Yes
Foster Wells / US 395 Interchange
Foster Wells
Foster Wells to US395
Install interchange at Foster Wells Road and US-395.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2021 STP(UL) 500,000 0 0 500,000
Totals 500,000 0 0 500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 500,000
Totals 0 0 0 0 500,000
Report Date: October 04, 2016 Page 51
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 WA-04361 44 0.100 CE No
Madison Avenue & Burden Blvd Signal (Design and Construction)
Madison Ave
Madison Ave to Burden Blvd
Intersection of Road 44 and Burden Blvd - Install traffic signal at the intersection of Madison Ave and Burden Blvd.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 0 0 15,000 15,000
P CN 2020 0 0 175,000 175,000
Totals 0 0 190,000 190,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 15,000
CN 0 0 0 0 175,000
Totals 0 0 0 0 190,000
Report Date: October 04, 2016 Page 52
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 / 0397(008) WA-04106 03 C G O P S T W
1.700 CE Yes
Oregon Avenue (SR397) Corridor Project - Phase 1
Oregon Avenue
"A" Street to I-182/US 12
The project will upgrade the existing Oregon Avenue corridor between the I-182/US 12 Interchange and "A" Street to provide safety, access management and mobility improvements. The project consists of pavement widening, installation of median/curbing in select locations; restriping to create left turn lanes at intersections and two-way left-turn lane between intersections. Installation of sidewalks and installation/ upgrade of curb and gutter, driveways and ADA ramps to meet standards, stormwater infrastructure, illumination and streetscaping. Traffic signals will be added at the intersections of Oregon Ave (SR 397) and Idaho Avenue, E. Salt Lake Street and Broadway St.Existing traffic signals will be updated at the intersection of Oregon Avenue and Lewis Street and 'A' Street.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2017 HSIP 848,000 TIB 4,230,000 0 5,078,000
P CN 2017 0 0 2,400,000 2,400,000
Totals 848,000 4,230,000 2,400,000 7,478,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 7,478,000 0 0 0 0
Totals 7,478,000 0 0 0 0
Report Date: October 04, 2016 Page 53
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 WA-04364 44 C G O P S T W
0.100 CE No
Pedestrian Walkway on Road 68 Overpass
Road 68
I-182 to Road 68
This project will widen the existing Road 68 overpass to accommodate a pedestrian walkway.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2021 0 0 138,375 138,375
P CN 2021 STP(UL) 886,625 0 0 886,625
Totals 886,625 0 138,375 1,025,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 138,375
CN 0 0 0 0 886,625
Totals 0 0 0 0 1,025,000
Report Date: October 04, 2016 Page 54
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 WA-08142 04 No
Pedestrian Walkway on Sylvester Street Overpass
Sylvester St
28th Ave to 32nd Ave
Provide a pedestrian walkway at the Sylvester Street overpass at US 395 to allow for safe pedestrian crossing.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2018 0 TIB 232,500 67,500 300,000
P CN 2018 HSIP 1,000,000 TIB 200,000 0 1,200,000
Totals 1,000,000 432,500 67,500 1,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 300,000 0 0 0
CN 0 1,200,000 0 0 0
Totals 0 1,500,000 0 0 0
Report Date: October 04, 2016 Page 55
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
02 WA-06942 03 C G O P T W
0.500 CE No
Road 68 Triple Right
Road 68
Road 68 to Interchange
This project will add a triple right turn at Road 68 and interchange for westbound I-182 to northbound Road 68.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 0 350,000 350,000
P CN 2017 STP 302,750 0 47,250 350,000
Totals 302,750 0 397,250 700,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 350,000 0 0 0 0
CN 350,000 0 0 0 0
Totals 700,000 0 0 0 0
Report Date: October 04, 2016 Page 56
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 WA-06309 03 C G O P S T W
1.000 CE Yes
Road 68 Widening - South
Road 68
Argent Road to South I-182
Widening Road 68 from Argent to I-182; increasing to two travel lanes in each direction, center turning movement with total of 5 lanes. Sidewalks will be installed on both sides, street lights and landscaping.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 100,000 100,000
P RW 2019 0 0 40,000 40,000
P CN 2020 STP(UL) 519,000 0 81,000 600,000
Totals 519,000 0 221,000 740,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 100,000 0 0
RW 0 0 40,000 0 0
CN 0 0 0 600,000 0
Totals 0 0 140,000 600,000 0
Report Date: October 04, 2016 Page 57
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 WA-04362 03 G O P S T 0.050 EA Yes
Sandifur (Convention to Road 68)
Sandifur Parkway
Convention to Road 68
This project will widen the existing roadway to the equivalent of a five lane section to accommodate future growth and traffic impacts. It will include curb and gutter, sidewalks, illumination and landscaping.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 0 50,000 50,000
P RW 2019 0 0 35,000 35,000
P CN 2020 STP(UL) 216,250 0 33,750 250,000
Totals 216,250 0 118,750 335,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 50,000 0 0 0 0
RW 0 0 0 35,000 0
CN 0 0 0 0 250,000
Totals 50,000 0 0 35,000 250,000
Report Date: October 04, 2016 Page 58
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 8 / 3522(001) WA-01693 06/20/11 06/20/11 3323 03 C G O P S T W
1.240 CE Yes
Argent Road Widening
Argent Road
20th Avenue to Road 36
The project consists of widening the existing 3 lane roadway to 5 lanes as part of mobility improvement for this corridor, which will accommodate future traffic needs including Columbia Basin College traffic and commercial development for Port of Pasco. The project also includes installation of a new traffic signal at 36th Avenue and Argent Road, as well as modifications/upgrades to existing traffic signals at Varney Lane/Saraceno Way and 20th Avenue intersections.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2018 STP(UL) 350,000 0 54,624 404,624
P CN 2018 0 0 4,095,376 4,095,376
Totals 350,000 0 4,150,000 4,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 4,500,000 0 0 0
Totals 0 4,500,000 0 0 0
Report Date: October 04, 2016 Page 59
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 15 WA-01699 06/20/11 06/20/11 3323 03 C G O P S T W
0.750 CE No
Road 100 Widening
Road 100
Chapel Hill to Court Street
This project will improve traffic conditions by widening the road from Court Street to Chapel Hill Boulevard.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2021 STP(UL) 103,800 0 16,200 120,000
P CN 2021 STP(UL) 951,500 0 148,500 1,100,000
Totals 1,055,300 0 164,700 1,220,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 120,000
CN 0 0 0 0 1,100,000
Totals 0 0 0 0 1,220,000
Report Date: October 04, 2016 Page 60
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 16 WA-01700 06/20/11 06/20/11 3323 03 C G O P S T W
0.500 CE No
Sandifur Parkway (Rd 52 - Rd 60)
Sandifur Parkway
Road 52 to Road 60
Currently there is a half street between Rd 52 and 60. This project will finish Sandifur Parkway from Road 52 and Road 60 to improve safety and provide the same street width for the continuation of the road.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 50,000 50,000
P CN 2020 STP(UL) 344,270 0 53,730 398,000
Totals 344,270 0 103,730 448,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 50,000 0 0
CN 0 0 0 398,000 0
Totals 0 0 50,000 398,000 0
Report Date: October 04, 2016 Page 61
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 25 WA-01705 06/20/11 06/20/11 3323 04 C G O P S T W
1.500 EA No
Sacagawea Heritage Trail
Sacagawea
Road 52 to Road 72
This project will lower the levee and install pathways for pedestrians, thus providing access along the river and connecting trails.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2018 0 0 65,000 65,000
P CN 2018 TAP(UL) 600,000 TIB 200,000 50,000 850,000
Totals 600,000 200,000 115,000 915,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 65,000 0 0 0
CN 0 850,000 0 0 0
Totals 0 915,000 0 0 0
Report Date: October 04, 2016 Page 62
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 26 WA-01706 06/20/11 06/20/11 3323 44 C G O P S T W
0.250 CE No
Road 68 and Court Street Signal
Road 68
Court Street to Road 68
Intersection improvements at the intersection of Road 68 and Court Street will consist of a traffic signal to improve efficiency and safety.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 40,000 40,000
P CN 2019 0 0 300,000 300,000
Totals 0 0 340,000 340,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 40,000 0 0
CN 0 0 300,000 0 0
Totals 0 0 340,000 0 0
Report Date: October 04, 2016 Page 63
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 30 WA-01708 06/20/11 06/20/11 3323 44 C G O P S T W
0.100 CE No
Road 100 & Argent Road Traffic Signal
Road 100
Road 100 to Argent Road
This project will install a new traffic signal at Argent Road and Road 100 to meet the demand in traffic flow when the traffic signal is warranted.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 30,000 30,000
P CN 2019 0 0 220,000 220,000
Totals 0 0 250,000 250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 30,000 0 0
CN 0 0 220,000 0 0
Totals 0 0 250,000 0 0
Report Date: October 04, 2016 Page 64
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 31 WA-01728 06/20/11 06/20/11 3323 44 C G O P S T W
0.100 CE No
Road 84 & Chapel Hill Traffic Signal
Road 84
to
Install a new signal at the intersection of Road 84 & Chapel Hill to increase traffic flow in the area.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 40,000 40,000
P CN 2019 0 0 300,000 300,000
Totals 0 0 340,000 340,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 40,000 0 0
CN 0 0 300,000 0 0
Totals 0 0 340,000 0 0
Report Date: October 04, 2016 Page 65
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 33 WA-01710 06/20/11 06/20/11 3323 01 C G O P S T W
1.250 CE Yes
Road 76 Overpass - Argent Road to Burden Blvd
Road 76
Argent Road to Burden Blvd
Extend Road 76 north from Argent Road to Burden Blvd. Extending Road 76 between Argent Rd and Burden Blvd will serve as a connector between two arterial roadways near the new Chiawana High School which will lower volumes in the West Pasco area along Argent Rd and at the intersection of Argent Rd and Rd 68, and Rd 68 and Burden.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 STP(UL) 86,500 0 13,500 100,000
P RW 2019 STP(UL) 86,500 0 13,500 100,000
P CN 2020 STP(UL) 9,238,200 OTHER 1,441,800 0 10,680,000
Totals 9,411,200 1,441,800 27,000 10,880,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 100,000 0 0
RW 0 0 100,000 0 0
CN 0 0 0 10,680,000 0
Totals 0 0 200,000 10,680,000 0
Report Date: October 04, 2016 Page 66
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 34 WA-01711 06/20/11 06/20/11 3323 44 C G O P S T W
0.100 CE No
Road 44 & Burden Traffic Signal
Road 44
Road 44 to Burden Blvd
This project will install a traffic signal to improve traffic flow and level of service requirements.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 0 0 30,000 30,000
P CN 2020 0 0 160,000 160,000
Totals 0 0 190,000 190,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 30,000 0
CN 0 0 0 160,000 0
Totals 0 0 0 190,000 0
Report Date: October 04, 2016 Page 67
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 41 WA-01715 06/20/11 06/20/11 3323 03 C G O P S T W
0.250 EIS Yes
Lewis Street Overpass
Lewis Street
2nd Ave to 10th Ave
This project will construct a new overpass between 2nd Ave and Oregon Ave. A new overpass will replace the existing underpass which is deteriorating. State funds have been assigned to the project and federal funds have been allocated. Land acquisition is complete.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 STP(UL) 1,211,000 0 189,000 1,400,000
S CN 2020 0 CWA 15,000,000 0 15,000,000
P CN 2021 STP(UL) 17,300,000 0 5,700,000 23,000,000
Totals 18,511,000 15,000,000 5,889,000 39,400,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 1,200,000 200,000 0 0 0
CN 0 0 0 15,000,000 23,000,000
Totals 1,200,000 200,000 0 15,000,000 23,000,000
Report Date: October 04, 2016 Page 68
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 46 WA-01719 06/20/11 06/20/11 3323 44 C G O P S T W
0.100 CE No
Lewis Street & Heritage Ave Traffic Signal
Lewis Street
Lewis Street to Heritage Ave
This project will install a new traffic signal to meet the demand in traffic growth and to better serve the industrial area for growth and economic development.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 30,000 30,000
P CN 2019 0 0 190,000 190,000
Totals 0 0 220,000 220,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 30,000 0 0
CN 0 0 190,000 0 0
Totals 0 0 220,000 0 0
Report Date: October 04, 2016 Page 69
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Pasco
County: Franklin
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 47 WA-01720 06/20/11 06/20/11 3323 44 C G O P S T W
0.100 CE No
Heritage Ave & A Street Traffic Signal
Heritage Ave
Heritage Ave to A Street
This project will upgrade the intersection at Heritage Ave and A Street to a signalized intersection.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 30,000 30,000
P CN 2019 0 0 190,000 190,000
Totals 0 0 220,000 220,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 30,000 0 0
CN 0 0 190,000 0 0
Totals 0 0 220,000 0 0
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Pasco 36,923,390 21,304,300 25,986,310 84,214,000
Report Date: October 04, 2016 Page 70
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Port of Benton
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 WA-08224 03 0.300 CE No
Improvements to Waterfront Drive, North of University Drive
Waterfront Drive
to
Reconstruct existing Gravel road and add asphalt.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2017 0 OTHER 275,000 100,000 375,000
Totals 0 275,000 100,000 375,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 275,000 0 0 0 0
Totals 275,000 0 0 0 0
Report Date: October 04, 2016 Page 71
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Port of Benton
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 WA-05723 03 0.250 CE No
Snyder Road Reconstruction & Rail Road Crossing
Snyder Road
to
Improve existing Roadway and Install Rail Road Crossing
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2017 0 OTHER 275,000 100,000 375,000
Totals 0 275,000 100,000 375,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 275,000 0 0 0 0
Totals 275,000 0 0 0 0
Report Date: October 04, 2016 Page 72
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Port of Benton
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 4 WA-01843 06/08/11 06/10/11 11-16 01 0.490 CE No
Larson Road
Larson Road
to
Build new Road from Battelle Blvd to Horn Rapids Road.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2017 0 0 650,000 650,000
Totals 0 0 650,000 650,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Report Date: October 04, 2016 Page 73
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Port of Benton
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
00 5 WA-01844 06/08/11 06/10/11 11-16 05 CE No
Slurry Seal Project
to
Slurry Seal Project, various locations from 1st Street to Horn Rapids Road. Within the Technology and Business Campus.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2017 0 0 100,000 100,000
Totals 0 0 100,000 100,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Report Date: October 04, 2016 Page 74
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Port of Benton
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 6 WA-01845 06/08/11 06/10/11 11-16 04 CE No
Battelle Blvd. Traffic Signal Upgrade
to
Battelle Blvd and George Washington Way Traffic Signal Upgrade.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2018 0 0 200,000 200,000
Totals 0 0 200,000 200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Report Date: October 04, 2016 Page 75
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Port of Benton
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 7 WA-01846 06/08/11 06/10/11 11-16 01 0.500 CE No
Horn Rapids Road Extension Project
to
Horn Rapids Road Extension from East end of Horn Rapids Road to 1,000 ft East. Technology & Business Campus.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2019 0 0 350,000 350,000
Totals 0 0 350,000 350,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Report Date: October 04, 2016 Page 76
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Port of Benton
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
00 8 WA-01847 06/08/11 06/10/11 11-16 06 1.000 CE No
Sidewalk Improvement Project Phase 2
to
Sidewalk Improvement Project Assorted within the Technology and Business Campus. Area boundaries George Washington Way, Richardson rd., University Drive, and 11th Street.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2017 0 0 1,060,000 1,060,000
Totals 0 0 1,060,000 1,060,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Report Date: October 04, 2016 Page 77
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Port of Benton
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
00 9 WA-01848 06/08/11 06/10/11 11-16 03 CE No
South Richland Rail Transload Facility
to
Construction of Transload Facility, including road and rail improvements adjacent to I-182, SR 240, and Jadwin Ave.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2018 0 0 250,000 250,000
Totals 0 0 250,000 250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Report Date: October 04, 2016 Page 78
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Port of Benton
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 11 WA-01851 06/08/11 06/10/11 11-16 03 0.300 CE No
Benitz Road
to
Reconstruction of Benitz Road from Wine Country Road to Yakima River. Industrial Road.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2017 0 0 250,000 250,000
Totals 0 0 250,000 250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Report Date: October 04, 2016 Page 79
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Port of Benton
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 12 WA-01852 06/08/11 06/10/11 11-16 03 0.470 CE No
Lee Road
Lee Road
to
Reconstruction 24' side roadway to 36' wide roadway from Benitz Road to West POB Boundary.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2019 0 0 625,000 625,000
Totals 0 0 625,000 625,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Report Date: October 04, 2016 Page 80
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Port of Benton
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 13 WA-01853 06/08/11 06/10/11 11-16 03 P S T W 0.400 CE No
1st Street West Project
1st Street
to
Construct roadway from Stevens Drive to 2000' West.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2017 0 0 1,500,000 1,500,000
Totals 0 0 1,500,000 1,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Port of Benton 0 550,000 5,185,000 5,735,000
Report Date: October 04, 2016 Page 81
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 1 / 3440(001) R002 01 C P T W 0.670 EA Yes
Duportail Bridge
Duportail Street
Queensgate Drive to Cottonwood Drive
Construct a 4-lane road and bridge over the Yakima River with sidewalks and bike paths on both sides. Construct new signalized intersections at Duportail St./Tanglewood Drive and Duportail/City View Drive. Reconstruct SR-240/Duportail intersection and modify traffic signal to accommodate additional lanes. Modify the Queensgate/Duportail intersection. Widen and raise at-grade railroad crossing of Port of Benton track.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2017 0 CWA 20,000,000 0 20,000,000
P CN 2017 0 0 11,800,000 11,800,000
Totals 0 20,000,000 11,800,000 31,800,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 14,000,000 14,000,000 3,800,000 0
Totals 0 14,000,000 14,000,000 3,800,000 0
Report Date: October 04, 2016 Page 82
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 2 / 3459(001) R001 01 0.330 CE Yes
Center Parkway Extension
Center Parkway
Gage Blvd to Tapteal Dr
Construct new 3-lane roadway with bike lanes, curb, gutter and sidewalk on both sides. Construct a signalized/gated at-grade crossing of the Port of Benton R/R track.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2017 STP(UL) 556,770 TIB 360,420 0 917,190
P CN 2017 STP(UL) 300,000 TIB 116,930 0 416,930
Totals 856,770 477,350 0 1,334,120
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,334,120 0 0 0 0
Totals 1,334,120 0 0 0 0
Report Date: October 04, 2016 Page 83
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 4 R033 03 O P S W 0.360 CE Yes
Queensgate Drive/Columbia Park Trail Improvements
Queensgate Drive
Keene Road to I-182 EB ramp terminal
Reconfigure the Queensgate Drive/Columbia Park Trail intersection by constructing a roundabout and extending Columbia Park Trail west to Jericho Court. Bike/Ped connections will be made to the Queensgate Pathway. Queensgate Drive will be widened to accommodate 4 travel lanes between Jericho Road and the I-182 EB ramp terminals. Access control will be implemented between Keene Road and Columbia Park Trail. All streets will include curb, gutter, sidewalks, street lights, storm drainage, and other utilities. Construct WB right-turn lane on Keene Road.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 TIB 100,000 20,000 120,000
P RW 2017 0 TIB 83,000 17,000 100,000
P CN 2017 0 TIB 1,245,400 234,600 1,480,000
Totals 0 1,428,400 271,600 1,700,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 120,000 0 0 0 0
RW 100,000 0 0 0 0
CN 1,480,000 0 0 0 0
Totals 1,700,000 0 0 0 0
Report Date: October 04, 2016 Page 84
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 5 R019 31 P S W 0.500 CE No
Swift Boulevard Improvements
Swift Boulevard
Stevens Dr to George Washington Way
Mill and overlay street, widen sidewalks, add shared parking/bike lanes, add decorative street lighting, irrigation, street trees and landscaped medians.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 STP(UL) 64,000 0 16,000 80,000
P CN 2017 STP(UL) 1,045,000 0 240,000 1,285,000
Totals 1,109,000 0 256,000 1,365,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 80,000 0 0 0 0
CN 1,250,000 0 0 0 0
Totals 1,330,000 0 0 0 0
Report Date: October 04, 2016 Page 85
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 6 R018 28 P W 0.400 CE Yes
Vantage Highway Pathway - Phase 2
Snyder Street
Robertson Drive to Stevens Drive
Construct a new, separated Hot Mix Asphalt multi-use pathway connecting the Vantage Highway Pathway Phase 1 with the Stevens Drive Pathway.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 Ped/Bike Program 43,250 6,750 50,000
P RW 2017 0 Ped/Bike Program 21,625 3,375 25,000
P CN 2018 0 Ped/Bike Program 505,750 89,250 595,000
Totals 0 570,625 99,375 670,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 50,000 0 0 0 0
RW 25,000 0 0 0 0
CN 0 595,000 0 0 0
Totals 75,000 595,000 0 0 0
Report Date: October 04, 2016 Page 86
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 7 R031 03 O S W 0.680 CE Yes
South George Washington Way Intersection Improvements
George Washington Way
I-182 to Comstock Street
Upgrade and reconfigure George Washington Way(GWW) including the intersections of GWW/Columbia Point Drive/Adams Street and GWW/Comstock Street to provide improved safety, capacity, and mobility. Improve pedestrian access and safety crossing George Washington Way. Also includes modifying the WB I-182, NB SR 240, and SB SR 240 ramps to improve safety.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 STP(UL) 187,800 TIB 450,720 112,680 751,200
P RW 2020 STP(UL) 125,000 TIB 75,000 300,000 500,000
P CN 2021 STP(UL) 2,159,700 TIB 5,183,280 1,295,820 8,638,800
Totals 2,472,500 5,709,000 1,708,500 9,890,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 751,200 0 0
RW 0 0 0 500,000 0
CN 0 0 0 0 8,638,800
Totals 0 0 751,200 500,000 8,638,800
Report Date: October 04, 2016 Page 87
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 8 R010 04 C P S T W 0.720 CE No
Columbia Park Trail - East
Columbia Park Trail
SR 240 WB Offramp to East City Limits
Reconstruct the street to provide 3-lanes, with curb, gutter, sidewalks, bike lanes street lights, drainage facilities and streetscape on both sides.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 0 TIB 90,000 60,000 150,000
P CN 2021 0 TIB 690,000 460,000 1,150,000
Totals 0 780,000 520,000 1,300,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 150,000 0
CN 0 0 0 0 1,150,000
Totals 0 0 0 150,000 1,150,000
Report Date: October 04, 2016 Page 88
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 9 R029 03 S W 0.230 CE Yes
Steptoe Street / Tapteal Drive Intersection Improvements
CID Canal to Canyon Street
Realign Tapteal Drive and Steptoe Street intersection by constructing a new intersection. Also includes sidewalks, street lights, fully signalized and gated at-grade railroad crossing, storm drainage.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P RW 2021 0 0 50,000 50,000
P CN 2021 0 0 1,330,000 1,330,000
Totals 0 0 1,380,000 1,380,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 0 0 0 0 50,000
CN 0 0 0 0 1,330,000
Totals 0 0 0 0 1,380,000
Report Date: October 04, 2016 Page 89
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 10 R008 01 O P S W 1.200 CE Yes
Rachel Road Improvements
Rachel Road
Leslie Rd to Steptoe St
Construct a 2-lane collector with curb, gutter & sidewalk, street lights and storm drainage on both sides of the street. Left turn lanes will be constructed where needed.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 200,000 200,000
P RW 2020 0 0 300,000 300,000
P CN 2021 0 0 1,700,000 1,700,000
Totals 0 0 2,200,000 2,200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 200,000 0 0
RW 0 0 0 300,000 0
CN 0 0 0 0 1,700,000
Totals 0 0 200,000 300,000 1,700,000
Report Date: October 04, 2016 Page 90
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 11 R012 01 C G P S T W
0.450 CE No
Queensgate Drive Extension
Queensgate Drive
Shockley Rd to Keene Rd
Construct a 3-lane street with curb, gutter, sidewalk, street lights and drainage facilities on both sides. Construct a roundabout at the Queensgate Drive/Shockley Road intersection. Modify the Keene Road/Queensgate Drive traffic signal to accommodate the new south leg of Queensgate Drive.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 0 0 150,000 150,000
P RW 2020 0 0 100,000 100,000
P CN 2021 0 0 850,000 850,000
Totals 0 0 1,100,000 1,100,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 150,000 0
RW 0 0 0 100,000 0
CN 0 0 0 0 850,000
Totals 0 0 0 250,000 850,000
Report Date: October 04, 2016 Page 91
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 12 R028 04 O P 0.750 CE No
Gage Boulevard Improvements
Gage Boulevard
Penny Royal Ave to Morency Dr.
Add bike lanes, shoulders, sidewalks, street lights, storm drainage on Gage Boulevard.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2021 0 0 75,000 75,000
P CN 2022 0 0 750,000 750,000
Totals 0 0 825,000 825,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 75,000
CN 0 0 0 0 750,000
Totals 0 0 0 0 825,000
Report Date: October 04, 2016 Page 92
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 13 R009 01 P S W 0.070 CE Yes
Bellerive Drive Extension
Bellerive Drive
Rachel Rd to 100' S. of Wenatchee Ln.
Construct a new 2-lane street with curb, gutter, sidewalk, bike lanes, street lights and storm drainage facilities.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 10,000 10,000
P RW 2020 0 0 10,000 10,000
P CN 2021 0 0 50,000 50,000
Totals 0 0 70,000 70,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 10,000 0 0
RW 0 0 0 10,000 0
CN 0 0 0 0 50,000
Totals 0 0 10,000 10,000 50,000
Report Date: October 04, 2016 Page 93
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 14 R035 28 O W 0.270 CE No
Marcus Whitman Elementary - SRTS
Snow Ave
Duportail Street to Hoffman Street
Construct concrete sidewalks, curb and gutter, storm drainage, street lights, and HMA overlay on Snow Avenue between Duportail Street and Hoffman Street. Construct concrete sidewalks, curb and gutter, storm drainage, street lights, and HMA to tie into the south side of Gray Street between Snow Avenue and Winslow Avenue on the designated school walk route for Marcus Whitman Elementary.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 SRTS 30,000 0 30,000
P CN 2018 0 SRTS 461,200 0 461,200
Totals 0 491,200 0 491,200
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 30,000 0 0 0 0
CN 0 461,200 0 0 0
Totals 30,000 461,200 0 0 0
Report Date: October 04, 2016 Page 94
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
14 15 R016 28 C P T 2.250 CE No
Stevens Drive Pathway
Stevens Drive
Spengler St to Horn Rapids Rd
Construct a separated multi-use pathway on east side of Stevens Drive.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 0 0 70,000 70,000
P CN 2021 0 0 880,000 880,000
Totals 0 0 950,000 950,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 70,000 0
CN 0 0 0 0 880,000
Totals 0 0 0 70,000 880,000
Report Date: October 04, 2016 Page 95
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 16 R013 01 P S W 2.000 CE Yes
Queensgate Drive - Phase II
Queensgate Drive
Bermuda Rd to Alla Vista Rd
Construct new 2-lane collector with curb, gutter, sidewalk, street lights, and storm drainage facilities on both sides
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 0 0 300,000 300,000
P RW 2021 0 0 500,000 500,000
P CN 2022 0 0 2,600,000 2,600,000
Totals 0 0 3,400,000 3,400,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 300,000 0
RW 0 0 0 0 500,000
CN 0 0 0 0 2,600,000
Totals 0 0 0 300,000 3,100,000
Report Date: October 04, 2016 Page 96
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
12 17 R034 28 1.750 CE No
Vantage Highway Pathway - Phase 3
SR 240
Twin Bridges Road to Kingsgate Way
Construct a new, separated Hot Mix Asphalt multi-use pathway on the north side of SR 240.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2021 TAP(UL) 30,000 0 20,000 50,000
P CN 2022 TAP(UL) 500,000 0 50,000 550,000
Totals 530,000 0 70,000 600,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 50,000
CN 0 0 0 0 550,000
Totals 0 0 0 0 600,000
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Richland 4,968,270 29,456,575 24,650,475 59,075,320
Report Date: October 04, 2016 Page 97
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 1 / 3476(001) WA-00169 05/17/16 07/07/16 19-16 01 C G O P S T W
1.000 CE Yes
Paradise Way Extension - Phase 4
Paradise Way
Well # 6 to SR 224
New construction of a two lane roadway with a center turn lane. Including constructing pedestrian and bicycle facilities, storm drainage, and illumination.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2017 0 0 1,390,000 1,390,000
Totals 0 0 1,390,000 1,390,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,390,000 0 0 0 0
Totals 1,390,000 0 0 0 0
Report Date: October 04, 2016 Page 98
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 2 / 3509(004) WA-00167 05/17/16 07/07/16 19-16 03 C O P S T W
0.500 CE No
Bombing Range Road - Phase 8
Bombing Range Road
Silver Lake Court to Arena Road
Roadway widening creating two lanes and a center turn lane. Including constructing pedestrian and bicycle facilities, storm drainage, and illumination.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2017 0 0 430,000 430,000
Totals 0 0 430,000 430,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 430,000 0 0 0 0
Totals 430,000 0 0 0 0
Report Date: October 04, 2016 Page 99
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 3 / 9903(013) 00186 05/17/16 07/07/16 19-16 03 C T 1.400 CE Yes
S 38th Ave & Mt. Adams View Drive
S. 38th Ave and Mt. Adams View Drive
S 38th Ave: Orchard St to North Lake Drive to Mt. Adams View Drive: Bombing Range Road to S. 38th Ave
Rebuild the existing gravel roadway into a paved two land roadway with shoulders.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2017 0 0 1,243,000 1,243,000
Totals 0 0 1,243,000 1,243,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,243,000 0 0 0 0
Totals 1,243,000 0 0 0 0
Report Date: October 04, 2016 Page 100
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 4 WA-00166 05/17/16 07/07/16 19-16 21 C P T 0.000 CE Yes
S 38th Ave / SR224 Traffic Signal
S 38th Ave / SR 224
S 38th Ave to SR 224
Signalize Intersection
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2018 0 0 577,000 577,000
Totals 0 0 577,000 577,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 577,000 0 0 0
Totals 0 577,000 0 0 0
Report Date: October 04, 2016 Page 101
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 5 WA-07769 05/17/16 07/07/16 19-16 05 S W CE No
Grosscup Blvd Pavement Preservation
Grosscup Blvd
SR 224 to North 62nd Ave
Pavement Restoration
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2018 0 0 253,125 253,125
Totals 0 0 253,125 253,125
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 253,125 0 0 0
Totals 0 253,125 0 0 0
Report Date: October 04, 2016 Page 102
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 6 00190 05/17/16 07/07/16 19-16 05 C P S T W 0.720 CE No
North 62nd Pavement Preservation
North 62nd Ave
SR 224 to Grosscup Blvd
Pavement Preservation
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2018 0 0 907,000 907,000
Totals 0 0 907,000 907,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 907,000 0 0 0
Totals 0 907,000 0 0 0
Report Date: October 04, 2016 Page 103
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 7 WA-07770 05/17/16 07/07/16 19-16 05 S W CE No
Harrington Dr Pavement Preservation
Harrington Dr
North 62nd Ave to West City Limits
Pavement Preservation
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2018 0 0 230,604 230,604
Totals 0 0 230,604 230,604
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 230,604 0 0 0
Totals 0 230,604 0 0 0
Report Date: October 04, 2016 Page 104
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 8 WA-07771 05/17/16 07/07/16 19-16 05 S W CE No
Kennedy Rd Pavement Preservation
Kennedy Rd
Bombing Range Road to West City Limits
Pavement Preservation
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2018 0 0 143,732 143,732
Totals 0 0 143,732 143,732
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 143,732 0 0 0
Totals 0 143,732 0 0 0
Report Date: October 04, 2016 Page 105
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 9 WA-07772 05/17/16 07/07/16 19-16 05 S W CE No
Paradise Way Pavement Preservation
Paradise Way
Bombing Range Road to 600' W of Jade Ave
Pavement Preservation
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2019 0 0 492,000 492,000
Totals 0 0 492,000 492,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 492,000 0 0
Totals 0 0 492,000 0 0
Report Date: October 04, 2016 Page 106
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 10 WA-07773 05/17/16 07/07/16 19-16 05 S W CE No
Ruppert Rd Pavement Preservation
Ruppert Rd
SR 224 to West City Limits
Pavement Preservation
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2019 0 0 298,280 298,280
Totals 0 0 298,280 298,280
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 298,280 0 0
Totals 0 0 298,280 0 0
Report Date: October 04, 2016 Page 107
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 11 WA-00181 05/17/16 07/07/16 19-16 01 C G O P S T W
1.100 CE Yes
Belmont Blvd - Phase 2
Belmont Blvd
Paradise Way to SR 224
Construct Urban Arterial Collector
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2020 0 0 3,410,000 3,410,000
Totals 0 0 3,410,000 3,410,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 3,410,000 0
Totals 0 0 0 3,410,000 0
Report Date: October 04, 2016 Page 108
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 12 00184 05/17/16 07/07/16 19-16 03 C P S T W 0.230 EA Yes
S 38th Ave Downtown Redevelopment Project
S 38th Ave
Van Giesen (SR 224) to Fallon Dr
Construct Urban Collector Roadway
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2021 0 0 4,707,000 4,707,000
Totals 0 0 4,707,000 4,707,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 4,707,000
Totals 0 0 0 0 4,707,000
Report Date: October 04, 2016 Page 109
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 13 WA-00171 05/17/16 07/07/16 19-16 03 C G P S T W
0.700 CE No
Bombing Range Road Widening
Bombing Range Road
Collins Road to Norma
Roadway Widening
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2021 0 0 3,729,000 3,729,000
Totals 0 0 3,729,000 3,729,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 3,729,000
Totals 0 0 0 0 3,729,000
Report Date: October 04, 2016 Page 110
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 14 WA-00168 05/17/16 07/07/16 19-16 01 0.720 CE No
Keene Road - Phase 6
Keene Road
Pacific Rim Winery to Ruppert Road
Construct 3 Lane Urban Section with 12' ACP Pathway.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 3,313,000 3,313,000
Totals 0 0 3,313,000 3,313,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 3,313,000
Totals 0 0 0 0 3,313,000
Report Date: October 04, 2016 Page 111
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 15 00191 05/17/16 07/07/16 19-16 03 C G O P S T W
0.100 CE Yes
Bombing Range Road / Austin Drive Intersection Improvements
Bombing Range Road
Bombing Range Road to Austin Drive
Intersection Access and Safety Improvements
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 96,000 96,000
Totals 0 0 96,000 96,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 96,000
Totals 0 0 0 0 96,000
Report Date: October 04, 2016 Page 112
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 16 WA-00180 05/17/16 07/07/16 19-16 03 C O P S T W
0.800 CE Yes
S 38th Ave - Phase 2
S 38th Ave
Grant Street to Orchard St
Construct 3 Lane Urban Section and Widen Bridge
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 2,068,000 2,068,000
Totals 0 0 2,068,000 2,068,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 2,068,000
Totals 0 0 0 0 2,068,000
Report Date: October 04, 2016 Page 113
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 17 WA-00183 05/17/16 07/07/16 19-16 01 C G O P T 0.120 No
Watkins Way Extension
Watkins Way
West Lattin to Hazelwood Drive
Construct Arterial Collector
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 346,000 346,000
Totals 0 0 346,000 346,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 346,000
Totals 0 0 0 0 346,000
Report Date: October 04, 2016 Page 114
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 18 WA-00178 05/17/16 07/07/16 19-16 03 C G O P S T W
2.780 CE No
Keene Road Widening
Keene Road
Bombing Range Road to SR 224
Road Widening to 4 Lanes with 12' ACP Pathway
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 7,180,000 7,180,000
Totals 0 0 7,180,000 7,180,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 7,180,000
Totals 0 0 0 0 7,180,000
Report Date: October 04, 2016 Page 115
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 19 WA-00173 05/17/16 07/07/16 19-16 01 C G O P S T W
1.980 CE Yes
Keene Road - Phase 7
Keene Road
Ruppert Road to Twin Bridges
Construct 2 Lane Rural Section
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 4,206,000 4,206,000
Totals 0 0 4,206,000 4,206,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 4,206,000
Totals 0 0 0 0 4,206,000
Report Date: October 04, 2016 Page 116
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 20 WA-00172 05/17/16 07/07/16 19-16 01 C G O P S T W
1.500 CE Yes
Paradise Way Extension - Phase 5
Paradise Way
SR 224 to Ruppert Road
Construct 3 Lane Urban Section
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 3,259,000 3,259,000
Totals 0 0 3,259,000 3,259,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 3,259,000
Totals 0 0 0 0 3,259,000
Report Date: October 04, 2016 Page 117
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 21 00185 05/17/16 07/07/16 19-16 03 C P S T W 0.390 EA Yes
Fallon Dr Downtown Redevelopment Project
Fallon Dr
SR 224 to S 39th Ave
Construct Urban Collector
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 2,053,000 2,053,000
Totals 0 0 2,053,000 2,053,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 2,053,000
Totals 0 0 0 0 2,053,000
Report Date: October 04, 2016 Page 118
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 22 WA-08825 05/17/16 07/07/16 19-16 21 C O P S T W
0.000 CE Yes
SR 224 / RUPPERT ROAD TRAFFIC SIGNAL
SR 224 / RUPPERT RD
SR 224 to RUPPERT RD
SIGNALIZE INTERSECTION
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 500,000 500,000
Totals 0 0 500,000 500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 500,000
Totals 0 0 0 0 500,000
Report Date: October 04, 2016 Page 119
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 23 WA-08826 05/17/16 07/07/16 19-16 21 C O P S T W
0.000 CE No
SR 224 / PARADISE WAY TRAFFIC SIGNAL
SR 224/PARADISE WAY
SR 224 to PARADISE WAY
SIGNALIZE INTERSECTION
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 420,000 420,000
Totals 0 0 420,000 420,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 420,000
Totals 0 0 0 0 420,000
Report Date: October 04, 2016 Page 120
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 24 WA-08827 05/17/16 07/07/16 19-16 21 C O P S T W
0.000 CE No
SR 224 / KEENE RD TRAFFIC SIGNAL
SR 224 / KEENE RD
SR 224 to KEENE RD
SIGNALIZED INTERSECTION
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 500,000 500,000
Totals 0 0 500,000 500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 500,000
Totals 0 0 0 0 500,000
Report Date: October 04, 2016 Page 121
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 25 WA-08828 05/17/16 07/07/16 19-16 21 C O P S T W
0.000 CE Yes
BOMBING RANGE RD/MT ADAMS VIEW DR INTERSECTION MODIFICATIONS
BOMBING RANGE RD/MT ADAMS VIEW DR
Bombing Range Road to Mt. Adams View Drive: Bombing Range Road to S. 38th Ave
SIGNALIZE INTERSECTION
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 500,000 500,000
Totals 0 0 500,000 500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 500,000
Totals 0 0 0 0 500,000
Report Date: October 04, 2016 Page 122
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 26 WA-08829 05/17/16 07/07/16 19-16 21 C O P S T W
0.000 CE No
BOMBING RANGE RD/ KEENE RD ROUNDABOUT MODIFICATIONS
BOMBING RANGE RD/MT ADAMS VIEW DR
Bombign Range Road to KEENE RD
ROUND-A-BOUT MODIFICATIONS
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 1,000,000 1,000,000
Totals 0 0 1,000,000 1,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 1,000,000
Totals 0 0 0 0 1,000,000
Report Date: October 04, 2016 Page 123
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 27 WA-08830 05/17/16 07/07/16 19-16 11 0.000 CE No
BOMBING RANGE RD BRIDGE REPLACEMENT
BOMBING RANGE RD/SR 224
Bombing Range Road to SR 224
BRIDGE REPLACEMENT
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 1,400,000 1,400,000
Totals 0 0 1,400,000 1,400,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 1,400,000
Totals 0 0 0 0 1,400,000
Report Date: October 04, 2016 Page 124
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: West Richland
County: Benton
MPO/RTPO: BFCG Y Inside N Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 28 WA-08831 05/17/16 07/07/16 19-16 11 C O P S T W
0.000 CE No
S 38TH AVE BIDGE REPLACEMENT
S 38TH AVE
S 38TH AVE to S 38TH AVE
BRIDGE REPLACEMENT
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 900,000 900,000
Totals 0 0 900,000 900,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 900,000
Totals 0 0 0 0 900,000
Federal Funds State Funds Local Funds Total Funds
Grand Totals for West Richland 0 0 45,551,741 45,551,741
Report Date: October 04, 2016 Page 125
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton City
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 1 BC-000006 06/19/12 06/19/12 2012-22 05 P S T W 0.340 CE No
Chris Avenue Overlay Project
Chris Avenue
SR 225 to 14th Street
Overlay and Widening
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 TIB 64,600 3,400 68,000
P CN 2017 0 TIB 581,400 30,600 612,000
Totals 0 646,000 34,000 680,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 68,000 0 0 0 0
CN 612,000 0 0 0 0
Totals 680,000 0 0 0 0
Report Date: October 04, 2016 Page 126
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton City
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 2 BC-000010 06/17/14 04 0.300 CE No
8th Street * Della Sidewalks, Curb & Gutters
8th Street/Della Ave.
Dale Avenue to Della/ 8th & 9th
Remove existing deteriorated sidewalk, construct new curb and sidewalk with ADA ramps, pave between new sidewalk and add storm drainage
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2017 0 TIB 189,000 21,000 210,000
Totals 0 189,000 21,000 210,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Report Date: October 04, 2016 Page 127
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton City
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 3 BC-000014 01 0.150 No
Edith Avenue Construction Project
Edith
Della Avenue to 13th Street
Construct Edith Avenue to connect existing roadway with 13th street
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2017 0 0 330,000 330,000
Totals 0 0 330,000 330,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 330,000 0 0 0 0
Totals 330,000 0 0 0 0
Report Date: October 04, 2016 Page 128
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton City
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 5 BC-000005 06/19/12 06/19/12 2012-22 05 0.140 CE No
6th Street Overlay Project
6th Street
Babs Avenue to Belle Avenue
Pavement Overlay and Striping
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2017 0 0 28,000 28,000
Totals 0 0 28,000 28,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Report Date: October 04, 2016 Page 129
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton City
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 6 BC-000007 06/19/12 06/19/12 2012-22 03 T W 0.200 CE No
Alma Avenue Overlay Project
Alma Avenue
2nd Street to West End
Pavement Overlay & Cul-de-Sac Construction
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2017 0 WSDOT 32,000 8,000 40,000
Totals 0 32,000 8,000 40,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Report Date: October 04, 2016 Page 130
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton City
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 6 BC-000016 04 0.140 No
Sun Valley Way Reconstuction
Sun Valley Way
9th Street to Capri Court
Total Reconstruction (road only with compaction of settlement areas, drainage repairs & total repaving
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2021 0 0 13,000 13,000
P CN 2021 0 0 137,000 137,000
Totals 0 0 150,000 150,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Report Date: October 04, 2016 Page 131
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton City
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 7 BC-000002 06/19/12 06/19/12 2012-22 05 0.240 CE No
12th Street Overlay Project
12th Street
Corral Creek Road to 350' South of Neptune
Pavement Overlay
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2019 0 OTHER 35,000 13,000 48,000
Totals 0 35,000 13,000 48,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Report Date: October 04, 2016 Page 132
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton City
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
02 9 BC-000013 21 No
9th Street Sidewalk
Ellen Ave to Grace Ave
New Sidewalk
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2019 0 TIB 82,000 4,300 86,300
Totals 0 82,000 4,300 86,300
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Report Date: October 04, 2016 Page 133
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton City
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 9 BC-000012 06/19/12 06/19/12 2012-22 05 0.220 CE No
Della Avenue Overlay Project
Della Avenue
13th Street to West End
Pavement Overlay
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2018 0 0 66,000 66,000
Totals 0 0 66,000 66,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Report Date: October 04, 2016 Page 134
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton City
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 10 BC-000015 05 No
Carol/Cora/Irma Double Shot Road Surface
Carol, Cora, Irma
to
Double Shot surface - 20' wide
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2020 0 0 60,000 60,000
Totals 0 0 60,000 60,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
0 0 0 0 0
Totals 0 0 0 0 0
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Benton City 0 984,000 714,300 1,698,300
Report Date: October 04, 2016 Page 135
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 5 BCO2012-17 06/07/16 04 P T 2.000 CE No
BERT JAMES RD: Williamson to SR 221
15650
Williamson Rd (MP 8.146) to SR 221 (MP 10.240)
Reconstruct a 2 lane road segment.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S RW 2017 0 0 100,000 100,000
P CN 2020 0 CRAB 1,764,000 96,000 1,860,000
Totals 0 1,764,000 196,000 1,960,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 100,000 0 0 0 0
CN 0 0 0 1,860,000 0
Totals 100,000 0 0 1,860,000 0
Report Date: October 04, 2016 Page 136
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 6 WA-09498 06/07/16 04 P T 2.150 No
BERT JAMES RD: Sellards to Williamson
15650
5.993 to 8.146
Reconstruct 2.15 miles of roadway to all-weather standard.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2017 0 0 50,000 50,000
P CN 2020 0 CRAB 1,890,000 160,000 2,050,000
Totals 0 1,890,000 210,000 2,100,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 50,000 0 0 0 0
CN 0 0 0 683,333 1,366,667
Totals 50,000 0 0 683,333 1,366,667
Report Date: October 04, 2016 Page 137
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 10 BCO2015-11 07/15/14 07/15/14 2014-545 04 C P T W 1.500 CE Yes
HANKS RD: 1/2 mile East of McDonald to Aller
Hanks Rd Phase 2
7.60 to 9.10
Reconstruction of vertical and horizontal alignment to an all weather road standard.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 0 90,000 90,000
P RW 2017 0 0 10,000 10,000
P CN 2022 0 CRAB 1,620,000 80,000 1,700,000
Totals 0 1,620,000 180,000 1,800,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 90,000 0 0 0 0
RW 10,000 0 0 0 0
CN 0 0 0 0 1,700,000
Totals 100,000 0 0 0 1,700,000
Report Date: October 04, 2016 Page 138
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 11 BCO2015-10 07/15/14 07/15/14 2014-545 04 C P T W 1.530 CE Yes
HANKS RD: Crosby to 1/2mile East of McDonald
Hanks Rd Phase1
6.07 to 7.60
Reconstruction of vertical and horizontal alignment to an all weather road standard.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 0 90,000 90,000
P RW 2017 0 0 10,000 10,000
P CN 2022 0 0 1,700,000 1,700,000
Totals 0 0 1,800,000 1,800,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 90,000 0 0 0 0
RW 10,000 0 0 0 0
CN 0 0 0 0 1,700,000
Totals 100,000 0 0 0 1,700,000
Report Date: October 04, 2016 Page 139
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 12 BCO2012-14 07/02/13 04 P T 2.300 CE No
CASE RD: OIEH to Hanks
31550
OIEH to Hanks Rd.
Reconstruct a segment of road to an all weather road.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2020 0 0 2,000,000 2,000,000
Totals 0 0 2,000,000 2,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 0 0 660,000 1,340,000
Totals 0 0 0 660,000 1,340,000
Report Date: October 04, 2016 Page 140
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 13 2014-17 07/02/13 07/02/13 2013 519 04 P T 3.000 CE Yes
COUNTY WELL ROAD - Phase 1: SR221 to McBee
County Well Rd. #11110
SR 221 to McBee Road
Reconstruct current road to an all weather road. Existing alignment will remain the same but the profile will be improved. New subgrade will have one foot of surfacing with 0.30' of HMA. Other items of work include Guardrails and drainage.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 0 0 175,000 175,000
P RW 2020 0 0 50,000 50,000
P CN 2020 0 0 2,025,000 2,025,000
Totals 0 0 2,250,000 2,250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 175,000 0
RW 0 0 0 50,000 0
CN 0 0 0 2,025,000 0
Totals 0 0 0 2,250,000 0
Report Date: October 04, 2016 Page 141
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 14 2014-18 07/02/13 07/02/13 2013 519 04 P T 2.000 CE Yes
COUNTY WELL ROAD - Phase 2: McBee to Clodius
County Well Rd. #11110
McBee Rd. to Clodius Rd.
Reconstruct current road to an all weather road. Existing alignment will remain the same but the profile will be improved. New subgrade will have one foot of surfacing with 0.30' of HMA. Other items of work include Guardrails and drainage
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2022 0 0 100,000 100,000
P RW 2022 0 0 50,000 50,000
P CN 2022 0 0 1,350,000 1,350,000
Totals 0 0 1,500,000 1,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 100,000
RW 0 0 0 0 50,000
CN 0 0 0 0 1,350,000
Totals 0 0 0 0 1,500,000
Report Date: October 04, 2016 Page 142
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 15 2014-19 07/02/13 07/02/13 2013 519 04 P T 1.800 CE Yes
COUNTY WELL ROAD -Phase 3: Clodius to County Pit
County Well Rd. #11110
Clodius Rd. to County Pit
Reconstruct current road to an all weather road. Existing alignment will remain the same but the profile will be improved. New subgrade will have one foot of surfacing with 0.30' of HMA. Other items of work include Guardrails and drainage.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2022 0 0 85,000 85,000
P RW 2022 0 0 50,000 50,000
P CN 2022 0 0 1,215,000 1,215,000
Totals 0 0 1,350,000 1,350,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 85,000
RW 0 0 0 0 50,000
CN 0 0 0 0 1,215,000
Totals 0 0 0 0 1,350,000
Report Date: October 04, 2016 Page 143
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 16 BCO2014-16 07/02/13 07/02/13 2013 519 04 P T 2.100 CE Yes
FINLEY RD: M.P. 5.2 to End of Pavement
Finley Road
M.P. 5.2 to End of Pavement
Reconstruct a segment of gravel road to an all weather road.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2022 0 0 125,000 125,000
P RW 2022 0 0 50,000 50,000
P CN 2022 0 0 1,575,000 1,575,000
Totals 0 0 1,750,000 1,750,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 125,000
RW 0 0 0 0 50,000
CN 0 0 0 0 1,575,000
Totals 0 0 0 0 1,750,000
Report Date: October 04, 2016 Page 144
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 18 BCO2016-17 07/28/15 07/28/15 04 P T 2.200 CE Yes
JOHNSON RD: CR 12 to Griffin
Johnson Rd
Griffin to CR 12
Reconstruct to widen roadway for safety.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2018 0 0 75,000 75,000
P RW 2019 0 0 75,000 75,000
P CN 2022 0 0 1,320,000 1,320,000
Totals 0 0 1,470,000 1,470,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 75,000 0 0 0
RW 0 0 75,000 0 0
CN 0 0 0 0 1,320,000
Totals 0 75,000 75,000 0 1,320,000
Report Date: October 04, 2016 Page 145
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 22 BCO2012-19 07/02/13 07/02/13 04 P T 0.500 CE No
JOHNSON RD/GRIFFIN RD: Intersection Improvements
20250 / 20280
Intersection to Intersection
Intersection improvements.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2022 0 0 100,000 100,000
P CN 2022 0 0 900,000 900,000
Totals 0 0 1,000,000 1,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 0 100,000
CN 0 0 0 0 900,000
Totals 0 0 0 0 1,000,000
Report Date: October 04, 2016 Page 146
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 23 BCO2016-22 07/28/15 07/28/15 21 0.000 CE No
OBSOLETE BRIDGE REMOVAL
Varies
N/A to N/A
Removing short span bridges over filled in irrigation canals.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2020 0 0 300,000 300,000
Totals 0 0 300,000 300,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 0 0 100,000 200,000
Totals 0 0 0 100,000 200,000
Report Date: October 04, 2016 Page 147
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 24 BCO2016-23 07/28/15 07/28/15 21 0.000 CE No
ROADSIDE WATERWAY PIPING AND SAFETY MITIGATION
N/A to N/A
Safety improvements of roadways next to waterways.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2021 0 0 300,000 300,000
Totals 0 0 300,000 300,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 0 0 0 300,000
Totals 0 0 0 0 300,000
Report Date: October 04, 2016 Page 148
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
00 25 BCO2012-24 07/02/13 07/02/13 44 No
PATHS & TRAILS
various
various to various
Construct Paths & Trails, as required. (Emergent path projects)
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2017 0 0 60,000 60,000
Totals 0 0 60,000 60,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 10,000 10,000 10,000 10,000 20,000
Totals 10,000 10,000 10,000 10,000 20,000
Report Date: October 04, 2016 Page 149
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Benton Co.
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
00 26 BCO2012-26 07/02/13 07/02/13 22 CE No
RAILROAD CROSSINGS
various
various to various
Upgrade RR-Xings, when approved for funding.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2017 STP(S) 54,000 0 6,000 60,000
Totals 54,000 0 6,000 60,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 10,000 10,000 10,000 10,000 20,000
Totals 10,000 10,000 10,000 10,000 20,000
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Benton Co. 54,000 5,274,000 14,372,000 19,700,000
Report Date: October 04, 2016 Page 150
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 1 WA-00684 06/06/16 06/20/16 2016-07 05 1.850 CE No
Columbia Ave Chip Seal
Columbia Ave
SR 260 to SR 395
Columbia Ave from SR 260 to SR 395. Chip Seal.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2017 0 TIB 225,000 0 225,000
P CN 2017 0 0 25,000 25,000
Totals 0 225,000 25,000 250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 250,000 0 0 0 0
Totals 250,000 0 0 0 0
Report Date: October 04, 2016 Page 151
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 2 WA-00822 06/06/16 06/20/16 2016-07 03 0.300 CE No
East Birch Street
E. Birch St
Columbia Ave to Pioneer Pool
Reconstruction, drainage, curbs, gutters and sidewalk on one side.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 OTHER 65,000 0 65,000
P CN 2017 0 TIB 778,500 21,500 800,000
Totals 0 843,500 21,500 865,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 65,000 0 0 0 0
CN 800,000 0 0 0 0
Totals 865,000 0 0 0 0
Report Date: October 04, 2016 Page 152
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 4 WA-00682 06/06/16 06/20/16 2016-07 03 G P S T W 0.510 CE No
East Clark Street
E. Clark St.
Columbia Ave to Ford Ave
Reconstruction, drainage, curbs, gutters and sidewalk on both sides.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2018 0 0 150,000 150,000
P CN 2018 0 PWTF 1,600,000 0 1,600,000
Totals 0 1,600,000 150,000 1,750,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 150,000 0 0 0 0
CN 1,600,000 0 0 0 0
Totals 1,750,000 0 0 0 0
Report Date: October 04, 2016 Page 153
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 5 WA-03813 06/06/16 06/20/16 2016-07 04 0.230 No
South 5th Street Re-Construct
Hawthorne to Juniper
Reconstruction, drainage, curbs and gutters.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 0 0 71,000 71,000
P CN 2017 0 TIB 639,000 0 639,000
Totals 0 639,000 71,000 710,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 71,000 0 0 0 0
CN 639,000 0 0 0 0
Totals 710,000 0 0 0 0
Report Date: October 04, 2016 Page 154
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 6 WA-00690 06/06/16 06/20/16 2016-07 03 0.330 No
Hawthorne Street Project
Hawthorne St
S. Columbia Ave to S. 5th
Reconstruction, curbs, gutters,and sidewalk on one side.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2018 0 PWTF 88,000 0 88,000
P CN 2019 0 PWTF 781,800 10,200 792,000
Totals 0 869,800 10,200 880,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 88,000 0 0 0 0
CN 0 792,000 0 0 0
Totals 88,000 792,000 0 0 0
Report Date: October 04, 2016 Page 155
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 7 WA-08035 06/06/16 06/20/16 2016-07 05 1.100 No
W. Clark St. Chip Seal
Columbia Ave to SR 260
Chip Seal from Columbia Ave. to SR 260
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2018 0 TIB 22,000 0 22,000
P CN 2018 0 TIB 198,000 0 198,000
Totals 0 220,000 0 220,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 22,000 0 0 0 0
CN 198,000 0 0 0 0
Totals 220,000 0 0 0 0
Report Date: October 04, 2016 Page 156
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 8 WA-00694 06/06/16 06/20/16 2016-07 05 T W 1.100 No
Nordheim Road Chip Seal
Nordheim Rd
Garfield to Airport Rd
Chip Seal
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2018 0 TIB 54,000 6,000 60,000
Totals 0 54,000 6,000 60,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 60,000 0 0 0 0
Totals 60,000 0 0 0 0
Report Date: October 04, 2016 Page 157
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
16 9 WA-00689 06/06/16 06/20/16 2016-07 01 1.300 No
Ford Street Extension
Ford St
Ash Street to N. Columbia Ave
New Construction.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2018 0 OTHER 150,000 0 150,000
P RW 2019 0 OTHER 150,000 0 150,000
P CN 2020 0 OTHER 2,200,000 0 2,200,000
Totals 0 2,500,000 0 2,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 150,000 0 0 0 0
RW 0 150,000 0 0 0
CN 0 0 2,200,000 0 0
Totals 150,000 150,000 2,200,000 0 0
Report Date: October 04, 2016 Page 158
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
00 10 WA-00691 06/06/16 06/20/16 2016-07 06 0.610 Yes
Ford Ave. Bike Path Extension
Ford Ave
Clark St. to N. Columbia Ave.
Construction and extension of pedestrian/bicycle path.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2018 0 0 30,000 30,000
P CN 2019 0 0 270,000 270,000
Totals 0 0 300,000 300,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 30,000 0 0 0 0
CN 0 270,000 0 0 0
Totals 30,000 270,000 0 0 0
Report Date: October 04, 2016 Page 159
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 11 WA-03814 06/06/16 06/20/16 20156-07 01 0.020 No
Birch to Burke Connector
Birch St to Burke Ave
Construct road across old railroad right of way to connect Birch to Burke.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 30,000 30,000
P CN 2019 0 TIB 300,000 0 300,000
Totals 0 300,000 30,000 330,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 30,000 0 0 0 0
CN 300,000 0 0 0 0
Totals 330,000 0 0 0 0
Report Date: October 04, 2016 Page 160
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
19 12 WA-00685 06/06/16 06/20/16 2016-07 03 C G P S T W
0.170 CE No
East Davis Street
E.Davis St.
Almira to Chelan
Reconstruction with drainage, curbs, gutters and sidewalk on both sides.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 50,000 50,000
P CN 2019 0 TIB 540,000 10,000 550,000
Totals 0 540,000 60,000 600,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 50,000 0 0 0 0
CN 550,000 0 0 0 0
Totals 600,000 0 0 0 0
Report Date: October 04, 2016 Page 161
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 13 WA-06634 06/06/16 06/20/16 2016-07 04 0.120 No
South Burke Re-Construct
Fir Street to Elm Street
Reconstruction with drainage, curbs, gutters and sidewalk on 1 side
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2018 0 0 42,000 42,000
P CN 2018 0 TIB 378,000 0 378,000
Totals 0 378,000 42,000 420,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 42,000 0 0 0 0
CN 378,000 0 0 0 0
Totals 420,000 0 0 0 0
Report Date: October 04, 2016 Page 162
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
00 14 WA-00686 06/06/16 06/20/16 2016-07 06 0.420 Yes
Old Railroad right of way path
Columbia Ave to Ford Ave
Construction of pedestrian/bicycle path.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 0 0 10,200 10,200
P CN 2020 BR 173,000 0 16,800 189,800
Totals 173,000 0 27,000 200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 10,200 0 0 0 0
CN 189,800 0 0 0 0
Totals 200,000 0 0 0 0
Report Date: October 04, 2016 Page 163
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
00 15 WA-00695 06/06/16 06/20/16 2016-07 06 0.100 Yes
SR 260 Pedestrian Crossing
SR 260
Gum St to Hawthorne
Construct a pedestrian bridge across SR 260.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 0 0 60,000 60,000
P CN 2020 0 OTHER 540,000 0 540,000
Totals 0 540,000 60,000 600,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 60,000 0 0 0 0
CN 540,000 0 0 0 0
Totals 600,000 0 0 0 0
Report Date: October 04, 2016 Page 164
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
17 16 WA-00693 06/06/16 06/20/16 2016-07 01 0.350 Yes
South Sixth Street Extension
S. Sixth St.
Clark St. to Elm Street
New construction of road and bridge over railway and Equatzel Coulee.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 STP(S) 300,000 0 0 300,000
P RW 2021 STP(S) 105,000 0 0 105,000
P CN 2022 STP(S) 2,595,000 0 0 2,595,000
Totals 3,000,000 0 0 3,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 300,000 0 0 0 0
RW 0 105,000 0 0 0
CN 0 0 2,595,000 0 0
Totals 300,000 105,000 2,595,000 0 0
Report Date: October 04, 2016 Page 165
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 17 WA-09018 06/06/16 06/20/16 2016-07 04 0.350 CE No
Old Town Re-Constuct-Phase 1
N. 3rd, 4th, 5th & Franklin
100 Blk of N. 3rd to 200 Blk of N. 5th
Reconstruct, drainage, curbs, gutters & sidewalk on one side.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2018 0 0 60,000 60,000
P CN 2018 0 TIB 1,080,000 60,000 1,140,000
Totals 0 1,080,000 120,000 1,200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 60,000 0 0 0 0
CN 1,140,000 0 0 0 0
Totals 1,200,000 0 0 0 0
Report Date: October 04, 2016 Page 166
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Connell
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 18 WA-09019 06/06/16 06/20/16 2106-07 04 0.500 CE No
Old Town Reconstruct-Phase 2
N.3rd,4th,5th & Borah
200 N. 3rd to 300 N. 5th
Reconstruct, drainage, curbs, gutters & sidewalk on one side.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 85,000 85,000
P CN 2019 0 TIB 1,530,000 85,000 1,615,000
Totals 0 1,530,000 170,000 1,700,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 85,000 0 0 0 0
CN 1,615,000 0 0 0 0
Totals 1,700,000 0 0 0 0
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Connell 3,173,000 11,319,300 1,092,700 15,585,000
Report Date: October 04, 2016 Page 167
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 2 / F115(003) WA-05183 06/29/16 06/29/16 2016-260 04 P T 3.010 CE Yes
Pasco-Kahlotus Road Reconstruction/Overlay II
Pasco-Kahlotus Road
MP 5.92 - Peterson Road to MP 8.93
The project will upgrade an existing two-lane roadway to provide safety, mobility, and approach improvements. The improvements will consist of reconstructing a portion of the roadway to correct for vertical sight distance issues, pavement widening and overlay for the total length of the project, roadway-related storm water facilities, and address clear zone issues.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2017 0 CRAB 847,000 1,053,000 1,900,000
Totals 0 847,000 1,053,000 1,900,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,900,000 0 0 0 0
Totals 1,900,000 0 0 0 0
Report Date: October 04, 2016 Page 168
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 4 WA-09033 06/29/16 06/29/16 2016-260 11 0.100 CE No
Smith Canyon #722-0.07 Replacement
07220
0.02 to 0.12
Replace existing bridge 722-0.07
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2017 0 0 15,000 15,000
Totals 0 0 15,000 15,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 15,000 0 0 0 0
Totals 15,000 0 0 0 0
Report Date: October 04, 2016 Page 169
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 5 WA-01027 06/29/16 06/29/16 2016-260 04 P T W 4.120 CE Yes
Glade North Overlay III
Glade North Road
Selph Landing Road to Sagemoor Road
Widen and Overlay existing road and upgrade to an All-weather standard.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P RW 2017 STP(R) 259,500 0 40,500 300,000
P CN 2018 STP(R) 2,486,875 0 388,125 2,875,000
Totals 2,746,375 0 428,625 3,175,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 300,000 0 0 0 0
CN 0 2,875,000 0 0 0
Totals 300,000 2,875,000 0 0 0
Report Date: October 04, 2016 Page 170
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 6 WA-07940 06/29/16 06/29/16 2016-260 28 P S T W 0.410 CE No
Basin City Alternative Transportation Route Improvements II
Bailie Boulevard
0.00 to 0.41
Replace pedestrian ramps, install new sidewalks, improve adjunct facilities, and improve site drainage.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2017 TAP(R) 18,665 0 0 18,665
P CN 2018 TAP(R) 281,335 0 0 281,335
Totals 300,000 0 0 300,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 18,665 0 0 0 0
CN 0 281,335 0 0 0
Totals 18,665 281,335 0 0 0
Report Date: October 04, 2016 Page 171
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 8 WA-06254 06/29/16 06/29/16 2016-260 21 P T CE No
Bridge Approach Adjustment
Countywide
Countywide to Countywide
Correct approaches on bridges countywide that are either higher or lower than the bridge deck.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 CRAB 13,500 1,500 15,000
P CN 2019 0 CRAB 121,500 13,500 135,000
Totals 0 135,000 15,000 150,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 15,000 0 0
CN 0 0 135,000 0 0
Totals 0 0 150,000 0 0
Report Date: October 04, 2016 Page 172
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 9 WA-09034 06/29/16 06/29/16 2016-260 21 P CE No
Illumination LED Retrofit Countywide
Countywide
n/a to n/a
Convert existing high-pressure sodium lights to energy-efficient LED lights
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 0 5,000 5,000
P CN 2019 0 0 45,000 45,000
Totals 0 0 50,000 50,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 5,000 0 0
CN 0 0 45,000 0 0
Totals 0 0 50,000 0 0
Report Date: October 04, 2016 Page 173
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 10 WA-09036 06/29/16 06/29/16 2016-260 04 P T 0.300 CE No
Elm Road and Everett Road Intersection
Elm Road/Everett Road
Intersection to Intersection
Reconstruct intersection to address drainage issues
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 0 0 15,000 15,000
P CN 2020 0 0 135,000 135,000
Totals 0 0 150,000 150,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 15,000 0
CN 0 0 0 135,000 0
Totals 0 0 0 150,000 0
Report Date: October 04, 2016 Page 174
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 11 WA-06261 06/29/16 06/29/16 2016-260 05 P T CE No
Roadway Approach Improvement
Countywide
Countywide to Countywide
Improve roadway approaches to BST roads from gravel roads.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 0 0 20,000 20,000
P CN 2020 0 0 180,000 180,000
Totals 0 0 200,000 200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 20,000 0
CN 0 0 0 180,000 0
Totals 0 0 0 200,000 0
Report Date: October 04, 2016 Page 175
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 12 WA-06258 06/29/16 06/29/16 2016-260 06 P T CE No
Scooteney Road Drainage Correction
03070
MP 5.20 to MP 5.20
Roadway repair and drainage redirection.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 STP(R) 25,950 0 4,050 30,000
P CN 2020 STP(R) 147,050 0 22,950 170,000
Totals 173,000 0 27,000 200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 200,000 0
Totals 0 0 0 200,000 0
Report Date: October 04, 2016 Page 176
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
00 13 WA-01010 06/29/16 06/29/16 2016-260 18 CE No
Rural Freight Mobility Plan Study
Countywide
to
This study will include performing an analysis of existing classified and non classified routes in selected areas of the county.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2020 0 0 75,000 75,000
Totals 0 0 75,000 75,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 75,000 0
Totals 0 0 0 75,000 0
Report Date: October 04, 2016 Page 177
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 15 WA-09041 06/29/16 06/29/16 2016-260 11 T W 0.100 CE No
Selph Landing #906-8.79 Replacement
09060
8.74 to 8.84
Replace existing bridge #906-8.79
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2021 0 0 225,000 225,000
Totals 0 0 225,000 225,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 225,000
Totals 0 0 0 0 225,000
Report Date: October 04, 2016 Page 178
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
06 17 WA-01040 06/29/16 06/29/16 2016-260 04 P T 2.810 CE Yes
Hollingsworth Road All-Weather
Hollingsworth Road
Sagehill Road to South Wahluke Road
Reconstruct and resurface to an All-weather standard.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2021 STP(R) 2,162,500 0 337,500 2,500,000
Totals 2,162,500 0 337,500 2,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 2,500,000
Totals 0 0 0 0 2,500,000
Report Date: October 04, 2016 Page 179
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 18 WA-06257 06/29/16 06/29/16 2016-260 01 P T 3.060 CE Yes
Coyan Road (Warehouse Road to Muse Road)
02000
2.28 Muse Road to 5.34 Warehouse Road
Construct road over existing gravel roadway.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2021 STP(R) 2,162,500 0 337,500 2,500,000
Totals 2,162,500 0 337,500 2,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 2,500,000
Totals 0 0 0 0 2,500,000
Report Date: October 04, 2016 Page 180
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 19 WA-01015 06/29/16 06/29/16 2016-260 04 P T W 2.520 CE Yes
Pasco-Kahlotus Road V
Pasco-Kahlotus Road
MP 13.08 to MP 15.60 Murphy Rd
Reconstruct and Resurface Road.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 CRAB 1,800,000 200,000 2,000,000
Totals 0 1,800,000 200,000 2,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 2,000,000
Totals 0 0 0 0 2,000,000
Report Date: October 04, 2016 Page 181
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 20 WA-06256 06/29/16 06/29/16 2016-260 11 P T W 0.100 CE No
N Cherry Dr Bridge #944-0.05 Replacement
09440
0.00 to 0.10
Replace existing, structurally-deficient bridge. 944-0.05
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 BR 865,000 0 135,000 1,000,000
Totals 865,000 0 135,000 1,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 1,000,000
Totals 0 0 0 0 1,000,000
Report Date: October 04, 2016 Page 182
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 21 WA-09043 06/29/16 06/29/16 2016-260 03 P W 2.760 CE Yes
Coyan Road (Muse Road to Hatton Road) II
02000
0.04 Hatton Road to 2.80 Muse Road
Reconstruct and pave road. This project includes a R/R overpass.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 STP(R) 4,325,000 0 675,000 5,000,000
Totals 4,325,000 0 675,000 5,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 5,000,000
Totals 0 0 0 0 5,000,000
Report Date: October 04, 2016 Page 183
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 23 WA-01048 06/29/16 06/29/16 2016-260 04 P T W 3.600 CE Yes
R-170 Road (Klamath Road to Ringold Road) All Weather
R-170 Road
MP 11.95 Klamath Hill Road to MP 15.55 Ringold Road
Reconstruct and resurface to an All-weather standard.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 STP(R) 2,162,500 0 337,500 2,500,000
Totals 2,162,500 0 337,500 2,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 2,500,000
Totals 0 0 0 0 2,500,000
Report Date: October 04, 2016 Page 184
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 24 WA-09046 06/29/16 06/29/16 2016-260 03 P T W 3.000 CE Yes
Ringold Road (Taylor Flats to R-170) Reconstruction
05060
3.07 Taylor Flats to 6.07 R-170
Reconstruct to All Weather road, add truck climbing lane, address intersection of Ringold Road and Taylor Flats
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 STP(R) 4,325,000 0 675,000 5,000,000
Totals 4,325,000 0 675,000 5,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 5,000,000
Totals 0 0 0 0 5,000,000
Report Date: October 04, 2016 Page 185
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Franklin Co.
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 25 WA-01031 06/29/16 06/29/16 2016-260 04 P T 1.500 CE Yes
Pepiot Road All Weather
Pepiot Road
Mesa City Limits to Milepost 1.50
Reconstruct and resurface to an All-weather standard. The route will need to be classified.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 CRAB 1,200,000 300,000 1,500,000
Totals 0 1,200,000 300,000 1,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 1,500,000
Totals 0 0 0 0 1,500,000
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Franklin Co. 19,221,875 3,982,000 5,236,125 28,440,000
Report Date: October 04, 2016 Page 186
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Mesa
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
06 1 Mesa-4 06/14/16 06/14/16 2016-08 03 S 0.190 CE No
Pepiot Road
Pepiot Road
SR17 to Eastern Most School Exit
Widen, pave, curb, drains, sidewalks, and engineering.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2018 0 TIB 375,000 0 375,000
Totals 0 375,000 0 375,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 375,000 0 0 0
Totals 0 375,000 0 0 0
Report Date: October 04, 2016 Page 187
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Mesa
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
02 2 Mesa-7 06/14/16 06/14/16 2016-08 03 S 0.200 No
First Avenue Intersection
First Avenue Intersection
Pepiot Road to Old Town Road
Reconstruct intersection.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2020 0 TIB 450,000 0 450,000
Totals 0 450,000 0 450,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 450,000 0 0
Totals 0 0 450,000 0 0
Report Date: October 04, 2016 Page 188
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Mesa
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
02 3 Mesa-3 06/14/16 06/14/16 2016-08 44 S W 0.040 CE No
Manton Way
Manton Way
First Avenue to Rowell Avenue
Construct sidewalk.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2021 0 TIB 75,000 0 75,000
Totals 0 75,000 0 75,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 75,000 0
Totals 0 0 0 75,000 0
Report Date: October 04, 2016 Page 189
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Mesa
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
02 4 Mesa-2 06/14/16 06/14/16 2016-08 44 S W 0.570 CE No
First Avenue
First Avenue
Pepiot Road to Manton Way
Install curbs, gutters and sidewalks.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2020 0 TIB 300,000 0 300,000
Totals 0 300,000 0 300,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 300,000 0 0
Totals 0 0 300,000 0 0
Report Date: October 04, 2016 Page 190
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Mesa
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 5 Mesa-5 06/14/16 06/14/16 2016-08 01 W 0.030 EIS No
May Avenue North
May Avenue
Manton Way to North SR 17 access
Install water line, curb, gutters, sidewalk, paving, and engineering.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2021 0 OTHER 200,000 0 200,000
Totals 0 200,000 0 200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 200,000 0
Totals 0 0 0 200,000 0
Report Date: October 04, 2016 Page 191
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Mesa
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 6 Mesa-6 06/14/16 06/14/16 2016-08 06 S W 0.060 CE No
Farrell Street
Farrell Street
May Avenue to Caldona Avenue
Replace water line and replace street.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2021 0 OTHER 48,000 0 48,000
Totals 0 48,000 0 48,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 48,000
Totals 0 0 0 0 48,000
Report Date: October 04, 2016 Page 192
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Mesa
County: Franklin
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 7 Mesa 06/14/16 06/14/16 2016-08 05 S W 0.030 CE No
Petra Court
Petra Court
First Avenue to Eveland Heights
Sealcoat.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 TIB 10,000 0 10,000
Totals 0 10,000 0 10,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 10,000
Totals 0 0 0 0 10,000
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Mesa 0 1,458,000 0 1,458,000
Report Date: October 04, 2016 Page 193
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Prosser
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 2 / B030(001) PROSSER 7 07/12/16 07/12/16 16-1519 04 C P S T W 0.760 CE No
Old Inland Empire Highway Improvements
West City Limits to Wine Country Road
Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2018 STP(US) 2,069,080 0 322,920 2,392,000
Totals 2,069,080 0 322,920 2,392,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 2,392,000 0 0 0
Totals 0 2,392,000 0 0 0
Report Date: October 04, 2016 Page 194
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Prosser
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 3 / 3735(001) PROSSER 10 07/12/16 07/12/16 16-1519 04 C P S T W 0.250 CE No
Old Inland Empire Highway - Phase 2
Wine Country Road to Wamba Road
Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2018 0 TIB 116,910 12,990 129,900
P CN 2019 0 TIB 896,220 99,580 995,800
Totals 0 1,013,130 112,570 1,125,700
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 129,900 0 0 0
CN 0 0 995,800 0 0
Totals 0 129,900 995,800 0 0
Report Date: October 04, 2016 Page 195
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Prosser
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 4 WA-06502 07/12/16 07/12/16 16-1519 04 C P S T W 0.510 CE Yes
Old Inland Empire Highway - Phase 3
Wamba Road to Grant Road
Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 STP(US) 160,900 0 25,100 186,000
P RW 2019 STP(US) 50,000 0 9,000 59,000
P CN 2020 STP(US) 1,658,000 0 258,000 1,916,000
Totals 1,868,900 0 292,100 2,161,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 186,000 0 0
RW 0 0 59,000 0 0
CN 0 0 0 1,916,000 0
Totals 0 0 245,000 1,916,000 0
Report Date: October 04, 2016 Page 196
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Prosser
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 5 PROSSER 3 07/12/16 07/12/16 16-1519 21 C P S T W 1.000 CE No
Kinney Way/ Concord/ Market Sidewalk Improvements
Park Avenue to State Route 22
Curb and gutter and sidewalk improvements.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2018 0 OTHER 55,000 6,000 61,000
P CN 2019 0 OTHER 575,000 63,000 638,000
Totals 0 630,000 69,000 699,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 61,000 0 0 0
CN 0 0 638,000 0 0
Totals 0 61,000 638,000 0 0
Report Date: October 04, 2016 Page 197
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Prosser
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 6 PROSSER 5 07/12/16 07/12/16 16-1519 04 C P S T W 0.440 CE No
Wamba Road Improvements - Phase 1
Old Inland Empire Highway to Merlot Drive
Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt and striping.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 OTHER 76,000 75,000 151,000
P CN 2020 0 OTHER 686,000 687,000 1,373,000
Totals 0 762,000 762,000 1,524,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 151,000 0 0
CN 0 0 0 1,373,000 0
Totals 0 0 151,000 1,373,000 0
Report Date: October 04, 2016 Page 198
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Prosser
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 7 PROSSER 6 07/12/16 07/12/16 16-1519 04 C P S T W 0.150 CE No
Wamba Road Improvements - Phase 2
Wine Country Road to Old Inland Empire Highway
Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2020 0 OTHER 26,000 33,000 59,000
P CN 2021 0 OTHER 218,000 291,000 509,000
Totals 0 244,000 324,000 568,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 59,000 0
CN 0 0 0 0 509,000
Totals 0 0 0 59,000 509,000
Report Date: October 04, 2016 Page 199
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Prosser
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 8 PROSSER 8 07/12/16 07/12/16 16-1519 04 C P S T W 0.950 CE No
Byron Road Improvements
Sheridan Avenue to West City Limits
Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 OTHER 254,640 63,660 318,300
P CN 2020 0 OTHER 1,952,400 488,100 2,440,500
Totals 0 2,207,040 551,760 2,758,800
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 318,300 0 0
CN 0 0 0 2,440,500 0
Totals 0 0 318,300 2,440,500 0
Report Date: October 04, 2016 Page 200
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Prosser
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
08 9 PROSSER 9 07/12/16 07/12/16 16-1519 04 C P S T W 0.390 CE No
Nunn Road Improvements
West City Limits to 200 east of Casi Court
Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2019 0 TPP 102,000 11,000 113,000
P CN 2020 0 TPP 916,000 103,000 1,019,000
Totals 0 1,018,000 114,000 1,132,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 113,000 0 0
CN 0 0 0 1,019,000 0
Totals 0 0 113,000 1,019,000 0
Report Date: October 04, 2016 Page 201
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Prosser
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 10 PROSSER 11 07/12/16 07/12/16 16-1519 04 C P S T W 0.500 CE No
Prosser Avenue Improvements
Market Street to Memorial Street
Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2019 0 0 1,668,000 1,668,000
Totals 0 0 1,668,000 1,668,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 1,668,000 0 0
Totals 0 0 1,668,000 0 0
Report Date: October 04, 2016 Page 202
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Prosser
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 11 PROSSER 12 07/12/16 07/12/16 16-1519 04 C P S T W 0.310 CE No
Alexander Court Improvements - Phase 1
Highland Drive to Paterson Road
Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2021 0 0 973,000 973,000
Totals 0 0 973,000 973,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 973,000
Totals 0 0 0 0 973,000
Report Date: October 04, 2016 Page 203
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Prosser
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 12 PROSSER 13 07/12/16 07/12/16 16-1519 04 C P S T W 0.230 CE No
Alexander Court Improvements - Phase 2
Wine Country Road to Highland Drive
Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2021 0 0 700,000 700,000
Totals 0 0 700,000 700,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 700,000
Totals 0 0 0 0 700,000
Report Date: October 04, 2016 Page 204
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Prosser
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
09 13 PROSSER 14 07/12/16 07/12/16 16-1519 04 C P S T W 0.200 CE No
Benson Avenue Improvements
Mercer Court to Alexander Court
Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, hot mix asphalt, and pavement markings.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 589,000 589,000
Totals 0 0 589,000 589,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 589,000
Totals 0 0 0 0 589,000
Report Date: October 04, 2016 Page 205
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Prosser
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 14 PROSSER 15 07/12/16 07/12/16 16-1519 04 C P S T W 0.280 CE No
Highland Drive Improvements
Alexander Court to State Route 22
Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, hot mix asphalt, and pavement markings.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 1,093,000 1,093,000
Totals 0 0 1,093,000 1,093,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 1,093,000
Totals 0 0 0 0 1,093,000
Report Date: October 04, 2016 Page 206
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Prosser
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
06 15 PROSSER 16 07/12/16 07/12/16 16-1519 06 P S T W 0.170 CE No
Downtown Intersection Improvements - 5th Street
Bennett Street to Meade Street
Intersection Improvements including planing, hot mix asphalt overlay, curb and gutter, sidewalk, storm drainage, and pavement markings.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2022 0 0 335,000 335,000
Totals 0 0 335,000 335,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 0 0 0 335,000
Totals 0 0 0 0 335,000
Report Date: October 04, 2016 Page 207
Six Year Transportation Improvement ProgramFrom 2017 to 2022
Agency: Prosser
County: Benton
MPO/RTPO: BFCG N Inside Y Outside
Fu
nctio
nal
Class
Prio
rity Nu
mb
er
A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description
B. STIP ID
G. Structure ID
Hearin
g
Ad
op
ted
Am
end
men
t
Reso
lutio
n N
o.
Imp
rovem
ent T
ype
Utility C
od
es
To
tal Len
gth
En
viron
men
tal Typ
e
RW
Req
uired
07 16 WA-06603 07/12/16 07/12/16 16-1519 21 C P S T W CE No
Wine Country Road Illuminated Crosswalk Project
WCR/Chardonnay Avenue to
Install an illuminated crosswalk.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2018 0 Ped/Bike Program 55,510 5,390 60,900
Totals 0 55,510 5,390 60,900
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 60,900 0 0 0
Totals 0 60,900 0 0 0
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Prosser 3,937,980 5,929,680 7,911,740 17,779,400
Report Date: October 04, 2016 Page 208