appendix 8b. published standards related to our activity
Post on 04-Jan-2016
221 Views
Preview:
TRANSCRIPT
Appendix 8b
STUDY GROUP 5. EUROPEAN STANDARDS
Chairman: Mr. R. Naggar Italy Tel: +39 06 44 23 29 74 Fax: +39 06 44 23 28 32 Email: aniaf.99@flashnet.it Members: Mr. F. Eschler Belgium Tel: +32 50 22 07 49 Fax: +32 50 22 05 96 Email: taveirne@cobonet.be Mr. C. Petit France Tel: +33 1 64 72 72 00 Fax: +33 1 64 26 30 23 Email: cpetit@tso.fr Mr. Ulrich Weiss Germany Tel: +49 71 61 6 02 2 22 Fax: +49 71 61 6 02 3 02 Email: uweiss@leonhard-weiss.de Luxembourg Tel: Fax: Email: The Netherlands Tel: Fax: Email: Mr. Pedro Nobre Portugal Tel: +351 21 754 32 40 Fax: +351 21 754 32 41 Email: apacheco@neopul.com Mr. Javier Talens Spain Tel: +34 93 436 60 90 Fax: +34 93 450 27 41 Email: talensj@ohl.es Mr. Martin Benkler Switzerland Tel: +41 43 322 23 52 Fax: +41 43 322 23 99 Email: martinbenkler@bluewin.ch Mr. Fred Nash United Kingdom Tel: +44 208 6 67 28 16 Fax: +44 208 6 67 27 34 Email: fred.nash@amec.com Associated Members: Mr. A Kinceli Hungary Tel: + 36 74 46 30 03 Fax: +36 74 46 50 12 Email: kinceliantal@mavbk.hu
Mr. H.-J. Schäfer Estonia/Bulgaria Tel: +49 208 85 93 453 Fax: +49 208 85 93 463 Email: b.freyt@koehne.de
ENV 13803-1:2002 Railway applications – Track alignment design parameters – Track gauges 1 435 mm and wider
EN 13803-2:2006 Railway applications – Track alignment design parameters – Track gauges 1 435 mm and wider Part 2: Switches and crossings and comparable alignment design situations with abrupt changes of curvature
EN 13848-1:2003 Railway applications – Track - Track geometry quality Part 1: Characterisation of track geometry
ENV 13848-2:2006 Railway applications - Track – Track geometry quality Part 2: Measuring systems - Track recording vehicles
ENV 13977:2005 Railway applications – Track - Safety requirements for portable machines and trolleys for construction and maintenance
ENV 13231-1:2006 Railway applications – Track – Acceptance of works Part 1: Works on ballasted track – Plain line
ENV 13231-2:2006 Railway applications – Track – Acceptance of works Part 2: Works on ballasted track – Switches and crossings
ENV 13231-3:2006 Railway applications – Track – Acceptance of works Part 3: Acceptance of rail grinding, milling and planning work in track
EN 14730-1:2006 Railway applications – Track – Aluminothermic welding of rails Part 1: Approval of welding processes
EN 14730-2:2006 Railway applications – Track - Aluminothermic welding of rails Part 2: Qualification of aluminothermic welders, approval of contractors and acceptance of welds
EN 14969:2006 Railway applications – Track – Qualification system for railway trackworks contractors
PUBLISHED STANDARDS RELATED TO OUR ACTIVITY
Qualification System for Railway Trackwork Contractors
EFRTC in collaboration with EIM – European Infrastructure Managers have as objective an open European market for all railway track works. For this the actions to take are:
Harmonisation of procurement procedures;
Introduce the application of the European Standard EN 14969 - Qualification system for Railway Trackwork Contractors in the TSI on high speed and conventional lines in order that the standard becomes mandatory;
European List of qualified Railway Trackwork Contractors for the type of activity and by size of contract;
Short list where national conditions are applied on technical requirements of trackwork equipment;
Short list to meet the scope of the standard EN 14969, i.e. identify the trackwork contractors that can be invited for tendering trackwork contracts.
REVIEW OF THE STANDARD EN 14969
The main points of review are:Administrative and legal obligation:
Registration number Chamber of Commerce; legal status; year of foundingDeclarations concerning the company’s and managing directors legal behaviour Proof that the applicant has not suspended his business, is not the subject of insolvency procedure and is not bankruptOverview of taxes in the last three years
Financial criteria for qualification:Statement by an authorised accountant that the information supplied is correct unless formally published annual accounts of the last three years are suppliedIn case the applicant is a daughter company, these data can be supplied by the parent company, together with a declaration concerning financial guarantees by the parent company
Technical criteria for qualification:Type of activity: the In-track welding must be incorporated in the activities of maintenance and track laying or renewal Qualification by activity and size of contracts: annual turnover in each category for the past three years. For each project declaration by the IM of acceptance of works in accordance with EN 13231-1 “Plain line”, EN 13231-2 “Switches and crossing”, EN 13231-3 “Grinding and milling”Qualification of personnel: key personnel must be proper personnel and speak local languageEquipment: the heavy equipment must be in accordance with the standards prEN 14033 Part 1 – 3 “Railbound construction and maintenance machines” and with circulation certificate realised by the national safety authority according directive 2004/49/EC
Qualification certificate:Qualification body: national Infrastructure ManagerQualification validity: three yearsReview period: three years, in cases of changed or series complaints at once
Quality index: introduce an index of the Infrastructure unavailability imputable to the contractor
The second step to the review of the EN 14969 - Qualification system for Railway Trackwork Contractors, is the qualification of the personnel for Railway Trackworks. For this we have the following:
EN 14730-2:2006 - Qualification of aluminothermic welders, approval of contractors and acceptance of welds; prEN xxxxx: Safety protection on the track during work; Standards to elaborate
Qualification of Drivers of railbound construction and maintenance machines Qualification of Technical Supervision Personnel & Technical Engineers of Trackworks