APPENDIX 8
SERVICE INFRASTRUCTURE AVAILABILITY (SERLING CONSULTING)
Bellevue Primary School Site,
Bellevue, Western Australia
Infrastructure Servicing Report
Strategic Planning Institute Pty Ltd
Our Ref: SC00182.010
JULY, 2014
Serling Consulting (Australia) Pty Ltd Contract No: SC00182.010 Bellevue Primary School Site, Bellevue – Strategic Planning Institute Infrastructure Servicing Report
S:\Projects\SC00182.010 - Bellvue Primary School Site\Report\Infrastructure Servicing Report\R01as Bellevue PSS ISR 140721.docx
BELLEVUE PRIMARY SCHOOL,
BELLEVUE, WESTERN AUSTRALIA
STRATEGIC PLANNING INSTITUTE PTY LTD
Our Ref: SC00182.010
Serling Consulting (Australia) Pty Ltd
ABN 15 162 648 222
Unit 1 61 Guthrie Street,
Osborne Park WA 6017
Tel: +61 8 6500 8888
Fax: + 61 8 6500 8899
Web: www.serling.com.au
COPYRIGHT: The concepts and information contained in this document are the property of Serling Consulting (Australia) Pty Ltd. Use or copying of this document in whole
or in part without the written permission of Serling Consulting (Australia) Pty Ltd constitutes an infringement of copyright.
Infrastructure Servicing Report
FINAL
JULY 2014
Serling Consulting (Australia) Pty Ltd Contract No: SC00182.010 Bellevue Primary School Site, Bellevue – Strategic Planning Institute Infrastructure Servicing Report
R01as Bellevue PSS ISR 140721.docx PAGE 1
Contents
1. Introduction 1
1.1 Report Layout and General Advice 1
1.2 Notes Pertaining To This Report 2
1.3 Basis for Forming the Report (Available Information, Reasoning, Literature) 2
1.4 Location and Description of the Landholding 2
2. Existing Infrastructure & Proposed Requirements 4
2.1 Existing Sewerage System & Proposed Requirements 4
2.2 Existing Water Supply & Proposed Requirements 5
2.3 Existing Electricity Supply & Proposed Requirements 5
2.4 Existing Telecommunications Supply & Proposed Requirements 5
2.5 Existing Gas Supply & Proposed Requirements 6
2.6 Stormwater Drainage Considerations 6
2.7 Earthworks 7
3. Conclusion, Perceived Risks, Opportunities & Mitigation Strategies 8
Appendix A Aerial Photograph 9
Appendix B Water Corporation Correspondence 10
Appendix C Dial Before You Dig Information 11
Appendix D Perth Groundwater Atlas Information 12
Serling Consulting (Australia) Pty Ltd Contract No: SC00182.010 Bellevue Primary School Site, Bellevue – Strategic Planning Institute Infrastructure Servicing Report
R01as Bellevue PSS ISR 140721.docx PAGE 2
Document history and status
Revision Date issued Reviewed by Approved by Date
approved Revision type
A 17/07/2014 G. Alexander G. Alexander 17/07/2014 Draft
0 18/07/2014 G. Alexander G. Alexander 18/07/2014 Final
Distribution of copies
Revision Copy no Quantity Issued to
Final 01 1 Strategic Planning Institute (Burdtit
Krost)
Printed: 21 July 2014
Last saved: 21 July 2014
File name: R01as Bellevue PSS ISR 140721.docx
Author: Aaron Smith
Project Manager: Gil Alexander
Name of Organisation: Strategic Planning Institute
Name of project: Bellevue Primary School
Name of document: R01as Bellevue PSS ISR 140721.docx
Document version: Final
Project number: SC00182.010
Serling Consulting (Australia) Pty Ltd Contract No: SC00182.010 Bellevue Primary School Site, Bellevue – Strategic Planning Institute Infrastructure Servicing Report
R01as Bellevue PSS ISR 140721.docx PAGE 1
1. Introduction
1.1 Report Layout and General Advice
Serling Consulting (Australia) Pty Ltd (Serling Consulting is providing this preliminary
infrastructure assessment and civil engineering feasibility for the development of old Bellevue
Primary School located at Lot 3 and Lot 15597 Wilkins Street, Bellevue, on behalf of Strategic
Planning Institute Pty Ltd (SPI). Information provided by SPI indicates that the subject
landholding is to yield approximately 72 dwellings (R40) and this forms the basis of the
engineering infrastructure assessment as requested by the client.
The report includes an assessment of the following: -
• Review all available topographical, hydrological, geotechnical, environmental,
WAPC planning and servicing reports relevant to the landholding;
• Review all current available servicing planning from the relevant servicing authorities
with regards to the applicability of the servicing strategies for the proposed
development layouts. Where no such planning is available, we have provided
commentary based on our expectations for services infrastructure based on our
experience; and
• Identify likely requirements for importation of fill across the development zone.
The report is laid out as follows: -
• Section 1 Introduction - Report Layout and General Advice
• Section 2 Existing Major Infrastructure & Potential Major Infrastructure
Requirements
• Section 3 Conclusion, Perceived Risks & Potential Risk Mitigation Strategies
The infrastructure advice provided in this report is preliminary in nature only and subject to
change as the development conditions are ratified through the planning and implementation
phases of the project. We have discussed the upgrade requirements for the subject site in
terms of major infrastructure requirements, including: -
• Sewer – requirements for any external upgrade of services, and infrastructure
required within the subject site for development of land for residential purposes;
• Water – as above for sewer infrastructure;
• Power – refer to separate UPD report;
• Gas – expected connection points, provisional sum allocation for connection and
extension of external gas supplies to the subject site;
• Telecoms – refer to separate UPD report;
• Roads – No consideration for the construction of internal roads has been made
although it is not considered a risk item;
Serling Consulting (Australia) Pty Ltd Contract No: SC00182.010 Bellevue Primary School Site, Bellevue – Strategic Planning Institute Infrastructure Servicing Report
R01as Bellevue PSS ISR 140721.docx PAGE 2
• Stormwater – refer to drainage report (140626 Bellevue Primary School
Redevelopment Drainage Strategy Rev 0) completed by Serling Consulting
• Groundwater – general discussion on groundwater and site soil conditions from the
Perth Groundwater Atlas Maps; and
• Siteworks – general discussion on the likely clearing requirements, and any site
specific earth working requirements including discussion regarding the likely
requirements for site retaining walls.
1.2 Notes Pertaining To This Report This report has been provided as an input to the overall due diligence concerning the expected
infrastructure requirements and the expected engineering issues for mitigation for the
development of the aforementioned landholding. This report will be utilised by the SPI and the
stakeholder team to determine the suitability of development at the subject site.
This study has been completed as a desktop analysis, prior to the commencement of any level
of engineering design.
The following key point should be considered in the usage of this report: -
• Some feedback has been sought from the various regulatory authorities, however
the information received from those authorities is subject to change upon formal
application.
1.3 Basis for Forming the Report (Available Information, Reasoning, Literature)
• Dial Before You Dig Information Received - Serling Consulting have requested
existing infrastructure locations and information through the Dial Before You Dig service.
This information is provided in Appendix C –Dial Before You Dig Information.
• Aerial Imagery (Satellite Photography) – Serling Consulting have reviewed aerial
imagery of the site to determine the vegetation coverage of the area proposed for
development and to determine the extent of buildings and stockpiles over the
landholdings requiring demolition and / or remediation.
• Perth Groundwater Atlas – Serling Consulting have requested landfall geology,
groundwater levels and soil conditions for the subject landholding though the
Department of Water’s Perth Groundwater Atlas. This information is provided in
Appendix D –Perth Groundwater Atlas Information.
• Site Visit – A site visit conducted by Serling Consulting.
1.4 Location and Description of the Landholding
The subject landholding at Wilkins Street is bound by Clayton Street to the north, Pascoe Street
to the east and Roe Highway to the west. The 1.66ha subject landholding is expected to
provide 72 dwellings for SPI.
Serling Consulting (Australia) Pty Ltd Contract No: SC00182.010 Bellevue Primary School Site, Bellevue – Strategic Planning Institute Infrastructure Servicing Report
R01as Bellevue PSS ISR 140721.docx PAGE 3
Using aerial imagery available from Google Earth and the information obtained by Serling
Consulting during a site visit, the old primary school building is still located on site including the
old car parks and facilities are still there as well as a nursery which currently occupies the
southern portion of the subject landholding.
The subject landholding has sections of medium to large tree vegetation across and
surrounding the subject landholding (Refer to Appendix A).
Serling Consulting (Australia) Pty Ltd Contract No: SC00182.010 Bellevue Primary School Site, Bellevue – Strategic Planning Institute Infrastructure Servicing Report
R01as Bellevue PSS ISR 140721.docx PAGE 4
2. Existing Infrastructure & Proposed Requirements
This section documents the locations of existing major services infrastructure pertinent to the
re-development of the subject landholding, or which needs to be considered due to the
proposed works.
Existing services are in immediate proximity of the subject landholdings. These are detailed in
the following sections: -
• Section 2.1 Existing Sewerage System & Proposed Requirements
• Section 2.2 Existing Water System & Proposed Requirements
• Section 2.3 Existing Electricity Supply & Proposed Requirements
• Section 2.4 Existing Telecommunications Supply & Proposed Requirements
• Section 2.5 Existing Gas Supply & Proposed Requirements
• Section 2.6 Stormwater Drainage Considerations
• Section 2.7 Roadworks & General Traffic Engineering Issues
• Section 2.8 Vegetation, Buildings & Clearing / Earthworks Issues
2.1 Existing Sewerage System & Proposed Requirements
The following information has been obtained through a review of existing services information
available through the Dial Before You Dig and Water Corporation ESINet systems (Refer
Appendix C for more information): -
• 225mm-diameter PVC-U sewer main in Henkin Street; and • 225mm-diameter PVC-U sewer main Clayton Street.
Currently there is no existing sewer connection servicing the subject landholding nor is it within a catchment that has a permanent wastewater pumping station. The closest connection points however do not fall within the same catchment boundaries as the subject landholding. Therefore headworks infrastructure will need to be constructed to provide a connection to the proposed development as a part of the development process. A private wastewater pumping station and pressure main discharging into a nearby wastewater infrastructure may also be a viable alternative, though any maintenance would be by the developer at the developers cost. The Water Corporation was contacted regarding the serviceability of the subject landholding based on the proposed development and they have confirmed the above requirements. Should there be a requirement to upgrade any existing infrastructure; the cost of the upgrades would be fully funded by the developer. Any wastewater pumping station (private or headworks infrastructure) will require careful planning as it will need to be located such that only compatible land uses are placed within the odour buffer for the waste water pumping station. It should be noted that crossing the catchment boundaries and discharging into one of the possible connection points in Clayton Street or Henkin Street may be an option, however this would need to be negotiated with, and require special approval from, the Water Corporation.
Serling Consulting (Australia) Pty Ltd Contract No: SC00182.010 Bellevue Primary School Site, Bellevue – Strategic Planning Institute Infrastructure Servicing Report
R01as Bellevue PSS ISR 140721.docx PAGE 5
Refer to Appendix B – Water Corporation Correspondence for more information.
2.2 Existing Water Supply & Proposed Requirements
The following information has been obtained by a dial before you dig request (Refer to
Appendix C for more information): -
• 100mm-diameter cast iron water main in running through the subject landholding along the western border of Lot 3;
• 100mm-diameter PVC water main in Clayton Street; • 400mm-diameter steel water main in Clayton Street; • 100mm-diameter cast iron water main in Wilkins Street;
There is an existing water connection to the subject landholding off the 100mm-diameter water
mains in the fronting road reserve of Clayton Street. Serling Consulting does not believe that a
service off this main for the proposed development (72 dwellings) will pose any issues and,
based on discussions with the Water Corporation, this appears to be the case. Refer to
Appendix B – Water Corporation Correspondence for more information. It is expected that as a
part of the redevelopment the water meter will need to be upgraded to a larger meter to cater
for the additional flow requirements. This will form part of the headworks arrangement with the
Water Corporation.
It should be noted that the existing 100mm diameter cast iron main running through the subject
landholding will require an easement and any development plans should take into account the
location of this main.
The Water Corporation was contacted regarding the serviceability of the subject landholding
based on the proposed development and they have confirmed the above requirements though
they did not confirm if there were any requirements to upgrade the existing infrastructure as a
result of the proposed development. Should there be a requirement to upgrade any existing
infrastructure; the cost of the upgrades would be fully funded by the developer.
2.3 Existing Electricity Supply & Proposed Requirements
Refer Separate UPD Report for details.
2.4 Existing Telecommunications Supply & Proposed Requirements
Refer Separate UPD Report for details.
Serling Consulting (Australia) Pty Ltd Contract No: SC00182.010 Bellevue Primary School Site, Bellevue – Strategic Planning Institute Infrastructure Servicing Report
R01as Bellevue PSS ISR 140721.docx PAGE 6
2.5 Existing Gas Supply & Proposed Requirements
The following information has been obtained by a dial before you dig request (Refer to
Appendix C for more information): -
• 80mm-diameter PVC medium pressure gas reticulation main in Wilkins Street; • 155mm-diameter PVC medium pressure gas reticulation main in Clayton Street;
There is an existing connection off the 155mm diameter gas pipeline which is available in the
fronting road reserve of Clayton Street as well as an 80mm gas pipeline in Wilkins Street is
available to service the landholding (Refer to Appendix C for more information). These mains
should be sufficient to service the proposed development of the subject landholding, however
this will need to be confirmed with ATCO Gas during detailed design.
2.6 Stormwater Drainage Considerations
Refer to Separate Drainage Report (140626 Bellevue Primary School Redevelopment Drainage
Strategy Rev 0) completed by Serling Consulting.
Surface Geology (Perth Groundwater Atlas)
The subject landholdings are relatively flat with a very gentle slope from the north-east to the
south-west ranging from RL17.0 AHD to RL 16.0 AHD. Clearance to groundwater table levels is
expected to be in the order of 5.0m
The subject landholding is expected to feature Alluvium with clay, loam, and sand. (Refer to
Appendix D).
Please not that this advice is general in nature and should be followed up by a detailed
geotechnical report by a suitably qualified consultant.
Generalised Groundwater Salinity (Perth Groundwater Atlas)
The generalised salinity measure is expected to be in the range of 1,500 to 3,000 mg/L TDS.
This is not expected to have any impact on development and the groundwater is not suitable for
garden bore use (Refer to Appendix D).
Risk of Shallow Acid Sulphate Soils (Perth Groundwater Atlas)
Perth Groundwater Atlas indicates that the subject landholding has no known risk of acid
sulphate soils (Refer to Appendix D). This advice however is general in nature and should be
followed up by a detailed geotechnical report by a suitably qualified consultant.
Previous Site Uses
The subject landholding was the previous site of the Bellevue Primary School and the old
school building and facilities are still there as well as a nursery which currently occupies the
Serling Consulting (Australia) Pty Ltd Contract No: SC00182.010 Bellevue Primary School Site, Bellevue – Strategic Planning Institute Infrastructure Servicing Report
R01as Bellevue PSS ISR 140721.docx PAGE 7
southern portion of the subject landholding. Serling Consulting does not believe that this will
preclude the subject landholding from any development.
2.7 Earthworks The extent of earthworks will reflect the expected land use. The required site classification will
impact directly on the quantity of imported fill. Given that the subject landholding is expected to
have Guilford clay as the soil type, a Class A site generally requires 1.8m of clean fill to achieve
this classification, or 1.2m of clean fill should a Class S site be required. The required site
classification will have significant impacts on the cost to develop the site. Imported fill can range
from $20-$30 per cubic metre.
Serling Consulting (Australia) Pty Ltd Contract No: SC00182.010 Bellevue Primary School Site, Bellevue – Strategic Planning Institute Infrastructure Servicing Report
R01as Bellevue PSS ISR 140721.docx PAGE 8
3. Conclusion, Perceived Risks, Opportunities & Mitigation Strategies
Serling Consulting have completed a preliminary engineering infrastructure assessment of the
nominated subject landholding at Wilkins Street is bound by Clayton Street to the north, Pascoe
Street to the east and Roe Highway to the west. This section highlights the key items to be
considered in this development, if the development was to be considered in isolation of other
landholdings in the area: -
•••• Sewer Reticulation
Currently there is no existing sewer connection servicing the subject landholding nor is it within
a catchment that has a permanent wastewater pumping station. Therefore headworks
infrastructure will need to be constructed or a private wastewater pumping station and pressure
main to provide a connection to the proposed development as a part of the development
process.
•••• Water Reticulation
There is an existing water connection to the subject landholding of the existing water mains in
Clayton Street however it is expected that as a part of the redevelopment this connection will
need to be upgraded to a larger meter to cater for the additional flow requirements which will
form part of the headworks arrangement with the Water Corporation.
• Gas
There is an existing connection off the 155mm diameter gas pipeline is available in the fronting
road reserve of Clayton Street. This main should be sufficient to service the subject
landholding. This will need to be confirmed with ATCO Gas during detailed design.
• Previous Site Uses
There are no expected contaminated site issues due to the previous site uses however this will
need to be confirmed with a suitably qualified consultant.
Serling Consulting (Australia) Pty Ltd Contract No: SC00182.010 Bellevue Primary School Site, Bellevue – Strategic Planning Institute Infrastructure Servicing Report
R01as Bellevue PSS ISR 140721.docx PAGE 9
Appendix A Aerial Photograph
Serling Consulting (Australia) Pty Ltd Contract No: SC00182.010 Bellevue Primary School Site, Bellevue – Strategic Planning Institute Infrastructure Servicing Report
R01as Bellevue PSS ISR 140721.docx PAGE 10
Appendix B Water Corporation Correspondence
1
Aaron Smith
From: Kevin Purcher <Kevin.Purcher@watercorporation.com.au>
Sent: Friday, 4 July 2014 3:13 PM
To: Aaron Smith
Subject: RE: Lot 3 Wilkins Street, Bellevue Due Diligence - Reply
Hi Aaron
In regards to your proposal the Water Corporation offers the following comments.
Water Reticulated water is currently available to the subject area. All water main extensions, if required for the development site, must be laid within the existing and proposed road
reserves, on the correct alignment and in accordance with the Utility Providers Code of Practice.
Water mains are located within the subject land near the western boundary. Pressured water mains should not be located in private land and should be located in and protected by Reserves (ie road reserves). The developer is required to fund the full cost of protecting,
relocating or modifying any of the existing infrastructure which may be affected by the above proposal.
Wastewater The subject site is located in a different catchment from the sewers in Henkin Street. There is
no permanent pump station for the catchment the subject site falls within. If a wastewater connection is required the development will require headworks infrastructure to be
constructed. The headworks infrastructure may be required to be constructed as part of the development process of this or other proposed developments in the area. A temporary pump
station may be an option to serve the area. Consideration must be made to the location of any proposed pump station. A pump station will require appropriate land to be provided for the works and the odour buffer that will surround the works. The extent of the buffer should
be determined at the planning/design stage to ensure that only compatible land use is within the buffer. A route for a headworks pressure main will also be required, up to 20 metres
wide. The route should be in the form of a road reserve. General Comments
The principle followed by the Water Corporation for the funding of subdivision or development is one of user pays. The developer is expected to provide all water and sewerage reticulation
if required. A contribution for Water, Sewerage and Drainage headworks may also be required. In addition the developer may be required to fund new works or the upgrading of existing works and protection of all works. Any temporary works needed are required to be
fully funded by the developer. The Corporation may also require land being ceded free of cost for works.
The information provided above is subject to review and may change. If the proposal has not proceeded within the next 6 months, the Corporation should be contacted to confirm if the
information is still valid.
Should you have any queries or require further clarification on any of the above issues, please do not hesitate to contact the Enquiries Officer.
Regards
2
Kevin Purcher
Senior Development Planner
Development Services
Water Corporation
T: (08) 9420 2385
From: Aaron Smith [mailto:asmith@serling.com.au]
Sent: Thursday, 29 May 2014 5:21 PM To: Land Planning
Cc: Willem Du Toit
Subject: Lot 3 Wilkins Street, Bellevue Due Diligence
Hi,
Please find attached a copy of our request for information to support our due diligence report for Lot 3 Wilkins
Street, Bellevue.
If you require any additional information please do not hesitate to contact me.
Regards,
Aaron SmithAaron SmithAaron SmithAaron Smith
Civil Engineer Serling Consulting (Australia) Pty Ltd Unit 1/ 61 Guthrie Street, Osborne Park, WA 6017 Tel: (08) 6500 8888 Direct: (08) 6500 8803 Mobile: 0424 319 116 Email: asmith@serling.com.au Web: www.serling.com.au
Water Corporation E-mail - To report spam Click here
This Electronic Mail Message and its attachments are confidential. If you are not the intended recipient, you
may not disclose or use the information contained in it. If you have received this Electronic Mail Message in
error, please advise the sender immediately by replying to this email and delete the message and any
associated attachments. While every care is taken, it is recommended that you scan the attachments for
viruses. This message has been scanned for malware by Websense. www.websense.com
------------------------
This email was scanned by BitDefender.
Serling Consulting (Australia) Pty Ltd Contract No: SC00182.010 Bellevue Primary School Site, Bellevue – Strategic Planning Institute Infrastructure Servicing Report
R01as Bellevue PSS ISR 140721.docx PAGE 11
Appendix C Dial Before You Dig Information
Seq. No. Authority Name Phone Status33795067 ATCO Gas Australia 131352 NOTIFIED33795065 City of Swan 0892679188 NOTIFIED33795066 Telstra, WA 1800653935 NOTIFIED33795068 Water Corporation WA 0894248115 NOTIFIED33795064 Western Power 1300769345 NOTIFIED
END OF UTILITIES LIST
Phone: 1100www.1100.com.au
Dig Site and Enquiry Details
Caller Details
Asset Owner Details
WARNING: The map below only displays the location of the proposed dig site and does not display any asset owners' pipe or cables. The area highlighted has been used only to identify the participating asset owners, who will send information to you directly.
● Check that the location of the dig site is correct. If not you must submit a new enquiry. ● Should the scope of works change, or plan validity dates expire, you must submit a new enquiry. ● Do NOT dig without plans. Safe excavation is your responsibility. If you do not understand the plans or how to proceed safely, please contact the relevant asset owners.
Your Responsibilities and Duty of Care● If plans are not received within 2 working days, contact the asset owners directly & quote their Sequence No.● ALWAYS perform an onsite inspection for the presence of assets. Should you require an onsite location, contact the asset owners directly. Please remember, plans do not detail the exact location of assets.● Pothole to establish the exact location of all underground assets using a hand shovel, before using heavy machinery.● Ensure you adhere to any State legislative requirements regarding Duty of Care and safe digging requirements.● If you damage an underground asset you MUST advise the asset owner immediately.● By using this service, you agree to Privacy Policy and the terms and disclaimers set out at www.1100.com.au● For more information on safe excavation practices, visit www.1100.com.au
The assets owners listed below have been requested to contact you with information about their asset locations within 2 working days.Additional time should be allowed for information issued by post. It is your responsibility to identify the presence of any underground assets in and around your proposed dig site. Please be aware, that not all asset owners are registered with the Dial Before You Dig service, so it is your responsibility to identify and contact any asset owners not listed here directly.** Asset owners highlighted by asterisks ** require that you visit their offices to collect plans.# Asset owners highlighted with a hash require that you call them to discuss your enquiry or to obtain plans.
Lodge Your Free Enquiry Online – 24 Hours a Day, Seven Days a Week
Contact:Company: Mobile: Fax:
Email:
Caller Id:
Address:
User Reference:
Job Purpose:
Enquiry Date:
Working on Behalf of:
Start Date:
Onsite Activity:
Location in Road:
Phone:
End Date:
Address:
Location of Workplace:
Notes/Description of Works:
Both
07/05/2014 07/05/2014
Job No 7375049
0865008888
Osborne Park WA 6017
Clayton Street
Not Supplied
Private
876479
Not Supplied
Unit 210 396 Scarborough Beach Road
CarriageWay,Footpath,Nature Strip
Design
Not Supplied
01/05/2014
Not Supplied
Bellevue WA 6056
asmith@serling.com.au
Tendering
Mr Aaron SmithSerling Consulting
1 2
3 4
Scale:
/
Overview Map Only
Please read all warnings, conditions and information on the attached “Underground Asset Details” information sheet. This plan is issued subject to that information and those conditions and warnings (including, but not limited to, the “NO HOT WORKS” warning). Plans are current for only 30 days from date of request, indicative only and not warranted to be accurate. It is your responsibility to carefully locate underground assets and follow safe work practises and procedures (eg pot-holing). ATCO Gas Australia will seek compensation for damage caused to assets.
Map Tile:Job No:Sequence No:
Location:737504933795067
Date: Clayton Street1:3,000Overview
01/05/2014© 2011 ATCO Gas Australia Pty LtdACN 089 531 975
0 60 12030Meters
© 2011 Western Australian Land Information Authority trading as LandgateBased on information provided by and with the permission of theWestern Australian Land Information Authority trading as Landgate
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
C1
D1
D1
OLS C1
D1
D1
D1
D1
C1
D1D1
BELLEVUE
ROE HWY
CLAYTON STROE HWY
ROE HWY
ROE HWY
RASON PDE
CLAYTON ST
ROBINSON RD
IRWIN ST
ROE HWY
CLAYTON ST
WILKINS ST
CLAYTON ST
CLAYTON ST
PASC
OE ST
HELEN ST
RASON PDE
CLAYTON ST
EDWA
RD ST
32 - 38
40 65
32 - 38
40
76
51
67
31 29
6
69
2
7169
32 - 38
33
49
61
62
35
32 - 38
37
78
42
47
80
4341
55
44
45
53
47
49
3
32 - 38
39
70
21
71
117
90
106
76
3
89
23
88
97
110
5
99
87
129 350
215
22
128
130
98
127
1
501
1
126
8586
721
8483
20
15597
414
AB 15
0 PVC
1.5
AB 15
0 PVC
AB 155 PVC 0
155 PVC
1.5 MP 7
0kPa
160 PE 0 MP70kPa
155 PVC1.2 MP70kPa
110 PE
1.5 MP
70kPa
100 PV
C1.5
MP 70kP
a
50 PVC 1.5 MP 70kPa
155 PVC 1MP 70kPa
155 PVC 1.5 MP 70kPa
100 PV
C 1.5 MP 7
0kPa
155 PVC1.5 MP70kPa
155PVC 1MP 70kPa
155
PVC M
P70
kPa
155 PVC 1.3 MP 70kPa
155 PVC 0MP 70kPa
155 PVC 1.5 MP 70kPa
150 ST1 MP70kPa
80 PVC1.5 MP 70kPa
155 PVC 1.5
MP 70kPa
160 PE 1
.5MP 7
0kPa
DOC1.5m
DOC1.1m
**
SEE AT1:50
SEEAT 1:50
SEE AT1:50
EOMON EBL
FENCEAND
WALL LINE
450MM COVER PLUSCONCRETE
SLAB
PVC
Sleeve
Scale:
/Please read all warnings, conditions and information on the attached “Underground Asset Details” information sheet. This plan is issued subject to that information and those conditions and warnings (including, but not limited to, the “NO HOT WORKS” warning). Plans are current for only 30 days from date of request, indicative only and not warranted to be accurate. It is your responsibility to carefully locate underground assets and follow safe work practises and procedures (eg pot-holing). ATCO Gas Australia will seek compensation for damage caused to assets.
Map Tile:Job No:Sequence No:
Location:737504933795067
Date: Clayton Street1:1,5001
01/05/2014© 2011 ATCO Gas Australia Pty LtdACN 089 531 975
0 30 6015Meters
© 2011 Western Australian Land Information Authority trading as LandgateBased on information provided by and with the permission of theWestern Australian Land Information Authority trading as Landgate
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
D1
D1D1D1
D1
D1D1
D1
D2
D1D1
D2
D1
D1
D1
OLS D1
D1
D1
D1
D1
D1D1
D2
D1
D1
D1
D1
D2
D2
D1
D1
BELLEVUE
RASON PDE
PURTON PL
PASC
OE ST
HENK
IN ST
CLAYTON ST
HENK
IN ST
PASC
OE ST
HELEN ST
3
14
16
74
25 - 27
75 - 75B
23
77
13
16
6
2 - 4
18
6
80
84
83
18
9
95
21
79
8587 - 87B
7
10
24
82
20
10
5
2
2 - 4
6
12
15
15
11
9193
8
8
10978
24
19
81
20
17
18
13
14
7
1
97
15A
85
11
89 - 89A
12
573
24
85A
3
114
66
162
1
52
35
4
37
6
3349
124
46
802
54
51
117
1
119
60
58
120
2
64
5
3
61
48
55
4
39
1
67
113
1
112
15
49
50
45
1
2
36
692
6396
61
1
63
2
801
123
121
40
118
38
116
2
65
1
115
34
13510
53
2
59
20 PE
70kP
a
155 PVC 1.5 MP 70kPa
155 PVC1.5 MP70kPa
80 PVC1.5MP 70kPa
50 PV
C 1.5
MP 70
kPa
80 PVC 1.5 MP 70kPa
50 PV
C 1.5
MP 7
0kPa
50 PVC 1.5 MP 70kPa
50 PV
C 1.5
MP 7
0kPa
50 PVC0 MP70kPa
2 (90) DEGREEELBOWS DOWN
1.5M
19/5/99
Scale:
/Please read all warnings, conditions and information on the attached “Underground Asset Details” information sheet. This plan is issued subject to that information and those conditions and warnings (including, but not limited to, the “NO HOT WORKS” warning). Plans are current for only 30 days from date of request, indicative only and not warranted to be accurate. It is your responsibility to carefully locate underground assets and follow safe work practises and procedures (eg pot-holing). ATCO Gas Australia will seek compensation for damage caused to assets.
Map Tile:Job No:Sequence No:
Location:737504933795067
Date: Clayton Street1:1,5002
01/05/2014© 2011 ATCO Gas Australia Pty LtdACN 089 531 975
0 30 6015Meters
© 2011 Western Australian Land Information Authority trading as LandgateBased on information provided by and with the permission of theWestern Australian Land Information Authority trading as Landgate
!
!
!
!
!
!
!
!
!
!
!
!
!
BELLEVUE
WILKINS ST
PASC
OE ST
WILKINS STRO
E HWY
ROE HWYROE HWYCLAYTON ST
10
12
416
228
417
SEE AT1:50
PVC Sleeve
Scale:
/Please read all warnings, conditions and information on the attached “Underground Asset Details” information sheet. This plan is issued subject to that information and those conditions and warnings (including, but not limited to, the “NO HOT WORKS” warning). Plans are current for only 30 days from date of request, indicative only and not warranted to be accurate. It is your responsibility to carefully locate underground assets and follow safe work practises and procedures (eg pot-holing). ATCO Gas Australia will seek compensation for damage caused to assets.
Map Tile:Job No:Sequence No:
Location:737504933795067
Date: Clayton Street1:1,5003
01/05/2014© 2011 ATCO Gas Australia Pty LtdACN 089 531 975
0 30 6015Meters
© 2011 Western Australian Land Information Authority trading as LandgateBased on information provided by and with the permission of theWestern Australian Land Information Authority trading as Landgate
!
!
!
!
!
!
!
!
!
!
!
!
!
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
OLS D1
D1
D1
D1
OLS D1D1
D1
D1
OLS D1
D1
D1
OLS D1
BELLEVUE
WILKINS ST
WILKINS ST
HENK
IN ST
CLAYTON ST
2624
103
9054 94
114
16
4644
92
20
112
18 - 18B
50
10242
40
96
100
30
34
98
32
28
104
108
22
48
88
106
107
110
52
3836
98
164
185
184
186
11
175
189
187
16714162
401
181178
169166
12
183
179
10
182
180
176
177
173
804
239
170
174
172
803
165163
50 PV
C 1.5
MP 7
0kPa
155 PVC 1.5 MP 70kPa
80 PVC 1.5 MP 70kPa
80 PV
C1.5
MP
70kP
a
80 PVC 1.5 MP 70kPa
Scale:
/Please read all warnings, conditions and information on the attached “Underground Asset Details” information sheet. This plan is issued subject to that information and those conditions and warnings (including, but not limited to, the “NO HOT WORKS” warning). Plans are current for only 30 days from date of request, indicative only and not warranted to be accurate. It is your responsibility to carefully locate underground assets and follow safe work practises and procedures (eg pot-holing). ATCO Gas Australia will seek compensation for damage caused to assets.
Map Tile:Job No:Sequence No:
Location:737504933795067
Date: Clayton Street1:1,5004
01/05/2014© 2011 ATCO Gas Australia Pty LtdACN 089 531 975
0 30 6015Meters
© 2011 Western Australian Land Information Authority trading as LandgateBased on information provided by and with the permission of theWestern Australian Land Information Authority trading as Landgate
Scale:
Edw
ard
Stre
et
Edw
ard
Stre
et
Edw
ard
Stre
et
Edw
ard
Stre
et
Edw
ard
Stre
et
Edw
ard
Stre
et
Edw
ard
Stre
et
Edw
ard
Stre
et
Edw
ard
Stre
et
Helen StreetHelen StreetHelen StreetHelen StreetHelen StreetHelen StreetHelen StreetHelen StreetHelen Street
Helen StreetHelen StreetHelen Street
Helen StreetHelen Street
Helen StreetHelen StreetHelen StreetHelen Street
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
et
Irwin
Stre
et
Irwin
Stre
et
Irwin
Stre
et
Irwin
Stre
et
Irwin
Stre
et
Irwin
Stre
et
Irwin
Stre
et
Irwin
Stre
et
Irwin
Stre
et
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Purton PlacePurton PlacePurton PlacePurton PlacePurton PlacePurton PlacePurton PlacePurton PlacePurton Place
Rason
Parade
Rason
Parade
Rason
Parade
Rason
Parade
Rason
Parade
Rason
Parade
Rason
Parade
Rason
Parade
Rason
Parade
Robin
son
Road
Robin
son
Road
Robin
son
Road
Robin
son
Road
Robin
son
Road
Robin
son
Road
Robin
son
Road
Robin
son
Road
Robin
son
Road
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Wilkins StreetWilkins StreetWilkins Street
Wilkins StreetWilkins Street
Wilkins StreetWilkins StreetWilkins Street
Wilkins Street
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Clayton StreetClayton StreetClayton Street
Clayton StreetClayton Street
Clayton StreetClayton StreetClayton Street
Clayton Street
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
1 2
3 4
5 6
Overvie
w
1:1000Date Generated: 01/05/2014Sequence Number: 33795065
Location: Address:Clayton Street, Bellevue, WA, 6056
Disclaimer: The City of Swan cautions that, while every care is taken to provide a useful guide in thisplan, the accuracy, reliability and completeness of the data presented cannot be guaranteed. Exactpositions of any assets shown on this map report should be confirmed on site, and inquiries made withrespect to assets on City of Swan land that may not be indicated, but are present. Please refer to theaccompanying letter for further details.
Job Number: 7375049
City of Swan - Drainage
Scale:
Helen Street
Helen Street
Helen Street
Helen Street
Helen Street
Helen Street
Helen Street
Helen Street
Helen Street
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Rason
Parade
Rason
Parade
Rason
Parade
Rason
Parade
Rason
Parade
Rason
Parade
Rason
Parade
Rason
Parade
Rason
Parade
Robin
son
Road
Robin
son
Road
Robin
son
Road
Robin
son
Road
Robin
son
Road
Robin
son
Road
Robin
son
Road
Robin
son
Road
Robin
son
Road
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Clayton StreetClayton StreetClayton Street
Clayton StreetClayton Street
Clayton StreetClayton StreetClayton Street
Clayton Street
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
1 2
3 4
1:1000Date Generated: 01/05/2014Sequence Number: 33795065
Location: Address:Clayton Street, Bellevue, WA, 6056
Disclaimer: The City of Swan cautions that, while every care is taken to provide a useful guide in thisplan, the accuracy, reliability and completeness of the data presented cannot be guaranteed. Exactpositions of any assets shown on this map report should be confirmed on site, and inquiries made withrespect to assets on City of Swan land that may not be indicated, but are present. Please refer to theaccompanying letter for further details.
Job Number: 7375049
City of Swan - Drainage
Scale:
Helen StreetHelen StreetHelen Street
Helen StreetHelen Street
Helen StreetHelen StreetHelen StreetHelen Street
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
et
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Rason ParadeRason ParadeRason Parade
Rason ParadeRason Parade
Rason ParadeRason ParadeRason Parade
Rason Parade
Clayton Street
Clayton Street
Clayton Street
Clayton StreetClayton Street
Clayton Street
Clayton Street
Clayton Street
Clayton Street
1 2
3 4
1:1000Date Generated: 01/05/2014Sequence Number: 33795065
Location: Address:Clayton Street, Bellevue, WA, 6056
Disclaimer: The City of Swan cautions that, while every care is taken to provide a useful guide in thisplan, the accuracy, reliability and completeness of the data presented cannot be guaranteed. Exactpositions of any assets shown on this map report should be confirmed on site, and inquiries made withrespect to assets on City of Swan land that may not be indicated, but are present. Please refer to theaccompanying letter for further details.
Job Number: 7375049
City of Swan - Drainage
Scale:
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Wilkins StreetWilkins StreetWilkins Street
Wilkins StreetWilkins Street
Wilkins StreetWilkins StreetWilkins Street
Wilkins Street
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Roe H
ighway
Clayton Street
Clayton Street
Clayton Street
Clayton StreetClayton Street
Clayton Street
Clayton Street
Clayton Street
Clayton Street
Roe Highway
Roe Highway
Roe Highway
Roe Highway
Roe Highway
Roe Highway
Roe Highway
Roe Highway
Roe Highway
1 2
3 4
5 6
1:1000Date Generated: 01/05/2014Sequence Number: 33795065
Location: Address:Clayton Street, Bellevue, WA, 6056
Disclaimer: The City of Swan cautions that, while every care is taken to provide a useful guide in thisplan, the accuracy, reliability and completeness of the data presented cannot be guaranteed. Exactpositions of any assets shown on this map report should be confirmed on site, and inquiries made withrespect to assets on City of Swan land that may not be indicated, but are present. Please refer to theaccompanying letter for further details.
Job Number: 7375049
City of Swan - Drainage
Scale:
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
et
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Pasc
oe S
treet
Wilkins StreetWilkins StreetWilkins Street
Wilkins StreetWilkins Street
Wilkins StreetWilkins StreetWilkins Street
Wilkins Street
Clayton StreetClayton StreetClayton Street
Clayton StreetClayton Street
Clayton StreetClayton StreetClayton Street
Clayton Street
1 2
3 4
5 6
1:1000Date Generated: 01/05/2014Sequence Number: 33795065
Location: Address:Clayton Street, Bellevue, WA, 6056
Disclaimer: The City of Swan cautions that, while every care is taken to provide a useful guide in thisplan, the accuracy, reliability and completeness of the data presented cannot be guaranteed. Exactpositions of any assets shown on this map report should be confirmed on site, and inquiries made withrespect to assets on City of Swan land that may not be indicated, but are present. Please refer to theaccompanying letter for further details.
Job Number: 7375049
City of Swan - Drainage
Scale:
3 4
5 6
1:1000Date Generated: 01/05/2014Sequence Number: 33795065
Location: Address:Clayton Street, Bellevue, WA, 6056
Disclaimer: The City of Swan cautions that, while every care is taken to provide a useful guide in thisplan, the accuracy, reliability and completeness of the data presented cannot be guaranteed. Exactpositions of any assets shown on this map report should be confirmed on site, and inquiries made withrespect to assets on City of Swan land that may not be indicated, but are present. Please refer to theaccompanying letter for further details.
Job Number: 7375049
City of Swan - Drainage
Scale:
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
etH
enki
n St
reet
Hen
kin
Stre
et
Wilkins StreetWilkins StreetWilkins Street
Wilkins StreetWilkins Street
Wilkins StreetWilkins StreetWilkins Street
Wilkins Street
3 4
5 6
1:1000Date Generated: 01/05/2014Sequence Number: 33795065
Location: Address:Clayton Street, Bellevue, WA, 6056
Disclaimer: The City of Swan cautions that, while every care is taken to provide a useful guide in thisplan, the accuracy, reliability and completeness of the data presented cannot be guaranteed. Exactpositions of any assets shown on this map report should be confirmed on site, and inquiries made withrespect to assets on City of Swan land that may not be indicated, but are present. Please refer to theaccompanying letter for further details.
Job Number: 7375049
City of Swan - Drainage
BELLEVUE Page 2 Page 4
Page 3
Page 5
01/05/2014
Sequence No:
1Page:
The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 2068.of 5 Water
Information Brochure Damage33795068
Print Date:
WARNING - CRITICAL PIPELINERefer toPrevention andLegend for details
Scale: 1:4567
Index Page
01/05/2014
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 2068.
Sequence No: 33795068
Print Date:
Scale: Centre Point:
Waterof 52Page:
WARNING - CRITICAL PIPELINERefer to Information Brochure DamagePreventionandLegend for details
116.022°, -31.901°
01/05/2014
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 2068.
Sequence No: 33795068
Print Date:
Scale: Centre Point:
Waterof 53Page:
WARNING - CRITICAL PIPELINERefer toInformation Brochure DamagePreventionandLegend for details
116.026°, -31.903°
01/05/2014
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 2068.
Sequence No: 33795068
Print Date:
Scale: Centre Point:
Waterof 54Page:
WARNING - CRITICAL PIPELINERefer to Information Brochure DamagePreventionandLegend for details
116.026°, -31.901°
01/05/2014
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 2068.
Sequence No: 33795068
Print Date:
Scale: Centre Point:
Waterof 55Page:
WARNING - CRITICAL PIPELINERefer to Information Brochure DamagePreventionandLegend for details
116.026°, -31.899°
BELLEVUE
Page 3
Page 5
Page 4 Page 2
01/05/2014
Sequence No:
1Page:
The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 2068.of 5 Sewer
Information Brochure Damage33795068
Print Date:
WARNING - CRITICAL PIPELINERefer toPrevention andLegend for details
Scale: 1:4567
Index Page
01/05/2014
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 2068.
Sequence No: 33795068
Print Date:
Scale: Centre Point:
Sewerof 52Page:
WARNING - CRITICAL PIPELINERefer to Information Brochure DamagePreventionandLegend for details
116.022°, -31.901°
01/05/2014
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 2068.
Sequence No: 33795068
Print Date:
Scale: Centre Point:
Sewerof 53Page:
WARNING - CRITICAL PIPELINERefer toInformation Brochure DamagePreventionandLegend for details
116.026°, -31.903°
01/05/2014
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 2068.
Sequence No: 33795068
Print Date:
Scale: Centre Point:
Sewerof 54Page:
WARNING - CRITICAL PIPELINERefer to Information Brochure DamagePreventionandLegend for details
116.026°, -31.901°
01/05/2014
1:1500 The Water Corporation has taken due care in the preparation of this map but accepts no responsibilityfor any inaccuracies or inappropriate use. This plan may be reproduced in its entirety for the purposeof site work planning but shall not otherwise be altered or published in any form without the permissionof the Water Corporation. The Water Corporation may need to be advised of any planned grounddisturbing activities near facilities on this map. Refer to Brochure - "Protecting Buried Pipelines".Please report any inaccuracies to Spatial Information Management Group on (08) 9420 2068.
Sequence No: 33795068
Print Date:
Scale: Centre Point:
Sewerof 55Page:
WARNING - CRITICAL PIPELINERefer to Information Brochure DamagePreventionandLegend for details
116.026°, -31.899°
33795064 1/05/2014
1:3075
´
A4 Scale :
Date of Issue:Sequence Number:
Information valid for 30 daysfrom date of issue
Privately owned cables NOT SHOWN(including house services)
This map is INDICATIVE ONLY.Hand exposure via pothole
method is MANDATORY.Telephone Support: 1300 769 345
Mon to Fri - 07:00 to 16:30
* Please refer to coversheetWARNING! Look out for
overhead power lines
UNDERGROUND LEGENDCommunications Assets
Data Pilot Cable
Area of interestFeature
OVERVIEW ONLY
0 20 40 60 8010
Metres
33795064 1/05/2014
1:1500
47
51
55
40
7678
44
43
42
61
46
59
49
49
57
45
41
53
40
47
17
44
39
CLAYTON ST
CLAY
TON S
T OFF
RAMP
Roe H
wy
Helen St
Robinson
Rd
Clayton St
Rason
Pde Ea
st
Wilkins St
Helen St
Roe H
wy
HELEN ST
ROBINSO
N RD
67
61
65
29
71
62
69
31
Lot 15597
´
A4 Scale :
Date of Issue:Sequence Number:
Information valid for 30 daysfrom date of issue
Privately owned cables NOT SHOWN(including house services)
This map is INDICATIVE ONLY.Hand exposure via pothole
method is MANDATORY.Telephone Support: 1300 769 345
Mon to Fri - 07:00 to 16:30
* Please refer to coversheetWARNING! Look out for
overhead power lines
UNDERGROUND LEGENDCommunications Assets
Data Pilot Cable
Area of interestFeature
0 10 20 30 405
Metres
33795064 1/05/2014
1:1500
1
2
36
7
6
2
8
448
2
2
7
5
24
19
24
17
2123
10
4A
18
24
25
14
12
10
16
15
25
1214
1120
15
18
13
16
1820
103
Lot 1
Helen St
Henk
in St
Rason Pde East
Purton Pl
HELEN ST
RASON PDE
HENK
IN ST
PASC
OE ST
PASC
OE ST
53
7
1
95
85
74
1A
97
82
1A
95
91
80
89
84
75
13
86
83
79
85
81
77
93
11
87
78
7375A
15A
87B87A
75B
85A
´
A4 Scale :
Date of Issue:Sequence Number:
Information valid for 30 daysfrom date of issue
Privately owned cables NOT SHOWN(including house services)
This map is INDICATIVE ONLY.Hand exposure via pothole
method is MANDATORY.Telephone Support: 1300 769 345
Mon to Fri - 07:00 to 16:30
* Please refer to coversheetWARNING! Look out for
overhead power lines
UNDERGROUND LEGENDCommunications Assets
Data Pilot Cable
Area of interestFeature
0 10 20 30 405
Metres
33795064 1/05/2014
1:1500
ROE HWY O
N RAMPRoe
Hwy
Roe H
wy ´
A4 Scale :
Date of Issue:Sequence Number:
Information valid for 30 daysfrom date of issue
Privately owned cables NOT SHOWN(including house services)
This map is INDICATIVE ONLY.Hand exposure via pothole
method is MANDATORY.Telephone Support: 1300 769 345
Mon to Fri - 07:00 to 16:30
* Please refer to coversheetWARNING! Look out for
overhead power lines
UNDERGROUND LEGENDCommunications Assets
Data Pilot Cable
Area of interestFeature
0 10 20 30 405
Metres
33795064 1/05/2014
1:1500
26
30
3432
28
98
24
106104
102100
Lot 239
CLAYTON ST
Wilkins St
Henk
in St
Clayton St
WILKINS ST
46
3638
5254
4244
48
9492
90
96
40
88
50
56 ´
A4 Scale :
Date of Issue:Sequence Number:
Information valid for 30 daysfrom date of issue
Privately owned cables NOT SHOWN(including house services)
This map is INDICATIVE ONLY.Hand exposure via pothole
method is MANDATORY.Telephone Support: 1300 769 345
Mon to Fri - 07:00 to 16:30
* Please refer to coversheetWARNING! Look out for
overhead power lines
UNDERGROUND LEGENDCommunications Assets
Data Pilot Cable
Area of interestFeature
0 10 20 30 405
Metres
33795064 1/05/2014
1:3075
´
A4 Scale :
Date of Issue:Sequence Number:
Information valid for 30 daysfrom date of issue
Privately owned cables NOT SHOWN(including house services)
This map is INDICATIVE ONLY.Hand exposure via pothole
method is MANDATORY.Telephone Support: 1300 769 345
Mon to Fri - 07:00 to 16:30
* Please refer to coversheet
CURRENT Work Area *COMPLETED Area *
Ã## Transformer site
Distribution CablesHigh Voltage Cable (1kv - 33kv)
Earth Wire
Low Voltage Cable (< 1kv)Street Light Circuit (< 1kv)Street Light Pilot (< 1kv)
Cable Pole Terminations0 HV Termination #LV Termination
Structures!P Pillar& Metal Pole## Transformer
Site
UG Crossing *Ring Main UnitLV Distribution Frame
Proposed Construction Assets
High Voltage Underground CableLow Voltage Underground Cable
& Metal Pole!P Pillar
0 HV Termination
#LV Termination
Design Area *
State Underground Power Project
WARNING! Look out foroverhead power lines
UNDERGROUND LEGEND
Area of interestFeature
OVERVIEW ONLY
0 20 40 60 8010
Metres
33795064 1/05/2014
1:1500
##
!P
!P
!P
!P
!P
!P
&
&
&
&
&
&
&
&
#
#
#
#
#
0
0
0
0
4751
55
40
7678
44
43
42
61
46
59
49
49
57
45
41
53
40
47
17
44
39
CLAYTON ST
CLAY
TON
ST O
FF R
AMP
HELEN ST
RASO
N PDE
ROBIN
SON RD
WILKINS ST
HELEN ST
67
61
65
29
71
62
69
31
Lot 15597
´
A4 Scale :
Date of Issue:Sequence Number:
Information valid for 30 daysfrom date of issue
Privately owned cables NOT SHOWN(including house services)
This map is INDICATIVE ONLY.Hand exposure via pothole
method is MANDATORY.Telephone Support: 1300 769 345
Mon to Fri - 07:00 to 16:30
* Please refer to coversheet
CURRENT Work Area *COMPLETED Area *
Ã## Transformer site
Distribution CablesHigh Voltage Cable (1kv - 33kv)
Earth Wire
Low Voltage Cable (< 1kv)Street Light Circuit (< 1kv)Street Light Pilot (< 1kv)
Cable Pole Terminations0 HV Termination #LV Termination
Structures!P Pillar& Metal Pole## Transformer
Site
UG Crossing *Ring Main UnitLV Distribution Frame
Proposed Construction Assets
High Voltage Underground CableLow Voltage Underground Cable
& Metal Pole!P Pillar
0 HV Termination
#LV Termination
Design Area *
State Underground Power Project
WARNING! Look out foroverhead power lines
UNDERGROUND LEGEND
Area of interestFeature
0 10 20 30 405
Metres
33795064 1/05/2014
1:1500
!P
!P
!P
!P
!P!P
!P
!P
!P
!P
!P
!P
!P
!P
!P
&
#
#
#
#
# #
#
#
#
#
#
#
#
#
0
0
0
0
1
2
36
7
6
2
8
448
2
2
7
5
24
19
24
17
2123
10
4A
18
24
25
14
12
10
16
15
25
1214
1120
15
18
13
16
1820
103
Lot 1
HELEN ST
RASON PDE
HENK
IN ST
PASC
OE S
T
PURTON PL
PASC
OE S
T
53
7
1
95
85
74
1A
97
82
1A
95
91
80
89
84
75
13
86
83
79
85
81
77
93
11
87
78
7375A
15A
87B87A
75B
85A
´
A4 Scale :
Date of Issue:Sequence Number:
Information valid for 30 daysfrom date of issue
Privately owned cables NOT SHOWN(including house services)
This map is INDICATIVE ONLY.Hand exposure via pothole
method is MANDATORY.Telephone Support: 1300 769 345
Mon to Fri - 07:00 to 16:30
* Please refer to coversheet
CURRENT Work Area *COMPLETED Area *
Ã## Transformer site
Distribution CablesHigh Voltage Cable (1kv - 33kv)
Earth Wire
Low Voltage Cable (< 1kv)Street Light Circuit (< 1kv)Street Light Pilot (< 1kv)
Cable Pole Terminations0 HV Termination #LV Termination
Structures!P Pillar& Metal Pole## Transformer
Site
UG Crossing *Ring Main UnitLV Distribution Frame
Proposed Construction Assets
High Voltage Underground CableLow Voltage Underground Cable
& Metal Pole!P Pillar
0 HV Termination
#LV Termination
Design Area *
State Underground Power Project
WARNING! Look out foroverhead power lines
UNDERGROUND LEGEND
Area of interestFeature
0 10 20 30 405
Metres
33795064 1/05/2014
1:1500
ROE HWY ON RAMP´
A4 Scale :
Date of Issue:Sequence Number:
Information valid for 30 daysfrom date of issue
Privately owned cables NOT SHOWN(including house services)
This map is INDICATIVE ONLY.Hand exposure via pothole
method is MANDATORY.Telephone Support: 1300 769 345
Mon to Fri - 07:00 to 16:30
* Please refer to coversheet
CURRENT Work Area *COMPLETED Area *
Ã## Transformer site
Distribution CablesHigh Voltage Cable (1kv - 33kv)
Earth Wire
Low Voltage Cable (< 1kv)Street Light Circuit (< 1kv)Street Light Pilot (< 1kv)
Cable Pole Terminations0 HV Termination #LV Termination
Structures!P Pillar& Metal Pole## Transformer
Site
UG Crossing *Ring Main UnitLV Distribution Frame
Proposed Construction Assets
High Voltage Underground CableLow Voltage Underground Cable
& Metal Pole!P Pillar
0 HV Termination
#LV Termination
Design Area *
State Underground Power Project
WARNING! Look out foroverhead power lines
UNDERGROUND LEGEND
Area of interestFeature
0 10 20 30 405
Metres
33795064 1/05/2014
1:1500
!P
!P
&
#
#
#
#
#
#
0
0
0
0
26
30
3432
28
98
24
106104
102100
Lot 239
CLAYTON ST
WILKINS ST
46
3638
5254
4244
48
9492
90
96
40
88
50
56 ´
A4 Scale :
Date of Issue:Sequence Number:
Information valid for 30 daysfrom date of issue
Privately owned cables NOT SHOWN(including house services)
This map is INDICATIVE ONLY.Hand exposure via pothole
method is MANDATORY.Telephone Support: 1300 769 345
Mon to Fri - 07:00 to 16:30
* Please refer to coversheet
CURRENT Work Area *COMPLETED Area *
Ã## Transformer site
Distribution CablesHigh Voltage Cable (1kv - 33kv)
Earth Wire
Low Voltage Cable (< 1kv)Street Light Circuit (< 1kv)Street Light Pilot (< 1kv)
Cable Pole Terminations0 HV Termination #LV Termination
Structures!P Pillar& Metal Pole## Transformer
Site
UG Crossing *Ring Main UnitLV Distribution Frame
Proposed Construction Assets
High Voltage Underground CableLow Voltage Underground Cable
& Metal Pole!P Pillar
0 HV Termination
#LV Termination
Design Area *
State Underground Power Project
WARNING! Look out foroverhead power lines
UNDERGROUND LEGEND
Area of interestFeature
0 10 20 30 405
Metres
33795064 1/05/2014
1:3075
´
A4 Scale :
Date of Issue:Sequence Number:
Information valid for 30 daysfrom date of issue
Privately owned cables NOT SHOWN(including house services)
This map is INDICATIVE ONLY.Check that you have enough
clearance from the DANGER ZONESnear overhead powerlines.
Telephone Support: 1300 769 345Mon to Fri - 07:00 to 16:30
* Please refer to coversheet
High Voltage (1kv - 33kv)Low Voltage (< 1kv)
Structures& Power Pole
High Voltage Overhead PowerlineLow Voltage Overhead Powerline
& Power Pole
Design Area *
OVERHEAD LEGEND
Area of interestFeature
" Transmission PolesTransmission Overhead Powerline
Proposed Construction Assets
Transmission (33kv - 330kv)
Communications AssetsOver Head Pilot Cable
Distribution Overhead Powerline
OVERVIEW ONLY
0 20 40 60 8010
Metres
33795064 1/05/2014
1:1500
4751
55
40
7678
44
43
42
61
46
59
49
49
57
45
41
53
40
47
17
44
39
Roe H
wy
Helen St
Robin
son R
d
Clayton St
Raso
n Pde
East
Roe H
wy (No
rthbo
und)
off t
o Clay
ton St
Wilkins St
Helen St
Roe H
wy
ROE
HELEN ST
ROBINSON RD
67
61
65
29
71
62
69
31
Lot 15597
´
A4 Scale :
Date of Issue:Sequence Number:
Information valid for 30 daysfrom date of issue
Privately owned cables NOT SHOWN(including house services)
This map is INDICATIVE ONLY.Check that you have enough
clearance from the DANGER ZONESnear overhead powerlines.
Telephone Support: 1300 769 345Mon to Fri - 07:00 to 16:30
* Please refer to coversheet
High Voltage (1kv - 33kv)Low Voltage (< 1kv)
Structures& Power Pole
High Voltage Overhead PowerlineLow Voltage Overhead Powerline
& Power Pole
Design Area *
OVERHEAD LEGEND
Area of interestFeature
" Transmission PolesTransmission Overhead Powerline
Proposed Construction Assets
Transmission (33kv - 330kv)
Communications AssetsOver Head Pilot Cable
Distribution Overhead Powerline
0 10 20 30 405
Metres
33795064 1/05/2014
1:1500
1
2
36
7
6
2
8
448
2
2
7
5
24
19
24
17
2123
10
4A
18
24
25
14
12
10
16
15
25
1214
1120
15
18
13
16
1820
103
Lot 1
Helen St
Henk
in S
t
Rason Pde East
Purton Pl
HELEN ST
RASON PDE
HENK
IN ST
PASC
OE S
TPA
SCOE
ST
53
7
1
95
85
74
1A
97
82
1A
95
91
80
89
84
75
13
86
83
79
85
81
77
93
11
87
78
7375A
15A
87B87A
75B
85A
´
A4 Scale :
Date of Issue:Sequence Number:
Information valid for 30 daysfrom date of issue
Privately owned cables NOT SHOWN(including house services)
This map is INDICATIVE ONLY.Check that you have enough
clearance from the DANGER ZONESnear overhead powerlines.
Telephone Support: 1300 769 345Mon to Fri - 07:00 to 16:30
* Please refer to coversheet
High Voltage (1kv - 33kv)Low Voltage (< 1kv)
Structures& Power Pole
High Voltage Overhead PowerlineLow Voltage Overhead Powerline
& Power Pole
Design Area *
OVERHEAD LEGEND
Area of interestFeature
" Transmission PolesTransmission Overhead Powerline
Proposed Construction Assets
Transmission (33kv - 330kv)
Communications AssetsOver Head Pilot Cable
Distribution Overhead Powerline
0 10 20 30 405
Metres
33795064 1/05/2014
1:1500
Roe H
wy
Clayton St on to
Roe Hwy (Southbound)
Roe H
wy
ROECL
AYTO
N´
A4 Scale :
Date of Issue:Sequence Number:
Information valid for 30 daysfrom date of issue
Privately owned cables NOT SHOWN(including house services)
This map is INDICATIVE ONLY.Check that you have enough
clearance from the DANGER ZONESnear overhead powerlines.
Telephone Support: 1300 769 345Mon to Fri - 07:00 to 16:30
* Please refer to coversheet
High Voltage (1kv - 33kv)Low Voltage (< 1kv)
Structures& Power Pole
High Voltage Overhead PowerlineLow Voltage Overhead Powerline
& Power Pole
Design Area *
OVERHEAD LEGEND
Area of interestFeature
" Transmission PolesTransmission Overhead Powerline
Proposed Construction Assets
Transmission (33kv - 330kv)
Communications AssetsOver Head Pilot Cable
Distribution Overhead Powerline
0 10 20 30 405
Metres
33795064 1/05/2014
1:1500
26
30
3432
28
98
24
106104
102100
Lot 239
Wilkins St
Henk
in S
t
Clayton St
CLAYTON
WILKINS ST
46
3638
5254
4244
48
9492
90
96
40
88
50
56 ´
A4 Scale :
Date of Issue:Sequence Number:
Information valid for 30 daysfrom date of issue
Privately owned cables NOT SHOWN(including house services)
This map is INDICATIVE ONLY.Check that you have enough
clearance from the DANGER ZONESnear overhead powerlines.
Telephone Support: 1300 769 345Mon to Fri - 07:00 to 16:30
* Please refer to coversheet
High Voltage (1kv - 33kv)Low Voltage (< 1kv)
Structures& Power Pole
High Voltage Overhead PowerlineLow Voltage Overhead Powerline
& Power Pole
Design Area *
OVERHEAD LEGEND
Area of interestFeature
" Transmission PolesTransmission Overhead Powerline
Proposed Construction Assets
Transmission (33kv - 330kv)
Communications AssetsOver Head Pilot Cable
Distribution Overhead Powerline
0 10 20 30 405
Metres
Serling Consulting (Australia) Pty Ltd Contract No: SC00182.010 Bellevue Primary School Site, Bellevue – Strategic Planning Institute Infrastructure Servicing Report
R01as Bellevue PSS ISR 140721.docx PAGE 12
Appendix D Perth Groundwater Atlas Information
LEGEND
500 m
Approx. when reproduced at A4
Geocentric Datum of Australia 1994
Information derived from this map should be
confirmed with the data custodian
acknowledged by the agency acronym in the
legend.
Created at 15:45 on 1 May 2014
Contact: Groundwater Information Line
Phone: (08) 6364 6565
Email: groundwater@water.wa.gov.au
http://www.water.wa.gov.au/idelve/gwa/print.jsp?&ts=139893035257...
1 of 1 1/05/2014 3:46 PM
Items of Interest
Groundwater Salinity - TDS in mg/L 1500 - 3000
Surface Geology type Alluvium - clay, sand and loam
Iron Staining Risk Low risk
Garden Bore Suitability Unsuitable
Acid Sulfate class No known risk
Acid Sulfate Soils
Class 1 : High risk of ASS or PASS <3m from soil surface
Class 2 : Moderate to low risk of shallow ASS or PASS; Generally at >3m depth
Class 3 : Low to nil risk of shallow ASS or PASS; Generally at >3m depth
Public Drinking Water Source Areas (PDWSA)
Protection Area-P1 : Areas defined to ensure that there is no degradation of the water source.
Protection Area-P2 : Areas defined to ensure that there is no increased risk of pollution to the water source.
Protection Area-P3 : Areas defined to manage the risk of pollution to the water source.
Protection Area-NA : Not asssigned.
Groundwater Salinity
0 – 500 mg/L : Fresh
501 – 1000 mg /L: Marginal
1001 – 5000 mg/L: Brackish
> 5000 mg/L : Saline
Garden Bore Suitability
Suitable : Use of groundwater for domestic irrigation supported in preference to scheme water
Unsuitable : Additional domestic garden bores not supported as water quantity or quality may not be appropriate
To view the Department's policy on Garden Bores, click here.
Iron Staining Risk
High risk : areas delineated as having an elevated iron / manganese staining risk
Low risk : areas low in iron concentration, away from present or past wetlands with neutral to alkaline pH
For further information contact the Department of Water Groundwater Information Line on (08)6364 6565 or email :groundwater@water.wa.gov.au