FINAL PROJECT REVIEW PRESENTATION
MSD P09011 - VISUAL AND AUDITORY OBJECT RECOGNITION TESTING APPARATUS & OBJECTS
Andrew Chorney- Project ManagerMichael Goldberg- Lead Engineer
Timothy Bukowski- Industrial EngineerMahmudul Khan- Electrical Engineer
Martin Martinez- Mechanical EngineerJason Hess- Industrial Engineer
Project Description Primary Objective:
Design an apparatus that will be used to present three-dimensional objects in a match-to-sample procedure
Purpose: To assess the beluga whale’s visual and auditory
perception abilities Scope of Project:
1 Testing Apparatus 2 sets of 42 Target Objects Testing Procedure Supporting Documentation
Budget: $3500
Primary Design Criteria
Operator and whale safe
Quiet operation Durable &
weatherproof Corrosion-proof No external power Compact and
mobile 1-person operation
Able to block whale and trainer’s view of both object sets
24” total design width
1-3sec target time between object set display, 5 sec max
5lb max object weight
Final Concept
Final Design
1. Apparatus is assembled
2. Objects are attached
3. Apparatus is rotated over the pool
4. Apparatus is lowered into underwater testing position
5. Sample object is lowered
6. Sample object is raised
7. Choice set is lowered
8. Choice set is raised
9. Apparatus is raised into attachment position
10. Apparatus is rotated over the beach
11. Objects are removed
Apparatus Operation
Objects
Difficulty Set Number Size Material Shape
Easy Easy 18 Vary Vary Vary
Intermediate
A 4 Vary Vary Same
Intermediate
B 4 Vary Same Vary
Intermediate
C 4 Same Vary Vary
Difficult D 4 Same Same Vary
Difficult E 4 Vary Same Same
Difficult F 4 Same Vary Same
Easy Set
Set BSet A- (Approval Pending)
Set C Set D- (Rebuild Required)
Set E Set F
Object Sets
System Testing Results: Pool
Trial 1
Trial 2
Trial 3
Trial 4
Trial 5
Average
Filling Tub 53.6 36.8 45.2 47.5 41.6 44.94
Emptying Tub 457 462 450 487 455 462.2
Setup 602 581 591 624 596 598.8
Changing sets 53.5 51.6 38.9 45.6 47.8 47.48
Raising/lowering Objects
6.2 6.7 4.8 5.5 4.9 5.62
Disassemble 589 596 621 605 599 602
Note: All times are in seconds.
System Testing Results: On-site
• Tested in Mystic Aquarium on 5/15/09• Apparatus functioned as designed• Trainers examined apparatus and objects for whale safety• Trainers approved of the design and its functionality• Recommendations from trainers:
• Add labels for sample and choice pulleys• Ensure double blind test by creating a shield to block view of
experimenter from the whale• Tether apparatus to beach• Replace top shield • Replace coated wires• Adjust to swing apparatus to left instead of right• Add ability to roll up shields out of the way• Ensure all objects are whale safe, i.e. no sharp edges
Customer Needs Checklist: Apparatus and Objects
Need #
Level of Importance
Customer Needs
CN1 1 Operator and Whale Safe
CN2 2 Minimal Disturbance to Whale
CN3 3 Durable
CN4 4 Easily Replaceable Parts
CN5 5 Visually Pleasing
Customer Needs Checklist: Apparatus
Need #
Level of Importance
Customer Needs
CN6 1 Portable
CN7 2 Stable on uneven surface
CN8 3 Nondestructive to beach
CN9 4 Preferably – no external power required
CN10 5 Rapid set up
Customer Needs Checklist: Operation of Apparatus
Need # Level of Importance
Customer Needs
CN11 1 Hidden operation (Data Collection)
CN12 2 Non-hidden operation (Training Phase)
CN13 3 Flexibility of Object Positioning
CN14 4 Single Person Operation
CN15 5 Display above and below water
CN16 6 Rapid set up
CN17 7 Adjustable interval between sample and choice set
Customer Needs Checklist: ObjectsNeed #
Level of Importance
Customer Needs
CN18 1 Variety of objects to meet specified criteria
CN19 2 Sink in Water
CN20 3 Work well with apparatus
Technical Specifications Checklist
Spec. # Importance Specification unit Marginal value
Ideal value
ES1 High Max. width of apparatus
in 35 35
ES2 High Max. weight of apparatus, piece
lb 40
ES3 High Display height above water
in 0-2
ES4 High Display height below water
in 6-24
ES5 High Distance from pool edge
in 12
ES6 High Persons required for operation
person 1
ES7 High Interval btwn sample & choice set
Sec 5
ES8 High Objects must sink Y/N Y
ES9 High Min. size of objects in 6
Technical Specifications Checklist
Spec. # Importance Specification unit Marginal value
Ideal value
ES10 Medium Max. length of apparatus, set up
in 92 36
ES11 Medium Max. height of apparatus, set up
in 48 36
ES12 Medium Rebuild cost $ <$2000 <$1500
ES13 Low Time to set up min 15 5-10
ES14 Low Highly custom/ long lead parts required for build
% <5% 0%
ES15 Medium Apparatus and object usage reliability
hr 100 150
ES16 High Max. weight of object
lb 5
ES17 High Apparatus and Objects Resistant to Corrosion
mo 24 36
Objective Project Evaluation: Success/Failure
• Project was a success• Approved apparatus concept was
designed and built successfully• Final built design was approved by
customer and whale trainers• Objects were created based on
customer and aquarium’s criteria• Both apparatus and objects function
as designed
THANK YOU!