1
Tall Wood Building Project
FIRE RESISTANCE DESIGN OF DEMONSTRATION BUILDING
www.NEWBuildSCanada.ca
Exterior Cladding The exterior cladding must conform to NBC 3.1.5.5 and
pass the CAN/ULC S-134 which provides an assessment of the fire spread characteristics of non-load bearing exterior walls.
Current façade set up with the concrete balcony slab extending pass the building serves as a flame deflecting mechanism by breaking up the vertical wood cladding channel.
Wood cladding is mostly used at balconies where it is most desirable by occupants.
3
www.NEWBuildSCanada.ca
Connection Details Maintain all connections protected
• If a member is exposed without gypsum protection the connection must have a minimum wood protection of 91 mm in addition to thickness required to carry the connection
• Protecting connections with gypsum board increases the fire resistance as follow:
• (a) 15 min for 1 layer of 12.7mm (1/2 in) Type X gypsum board• (b) 30 min for 1 layer of 15.9mm (5/8 in) Type X gypsum board• (c) 60 min for 2 layers of 15.9mm (5/8 in) Type X gypsum board
mmmmmmtime
ddddepth
of
requiredheatcharembedment
7min
7.0min1207
4
www.NEWBuildSCanada.ca
Fire Resistance of Structural Assemblies
The fire resistance of the structural elements has been calculated using the following standards.
CAN/CSA O86 CLT Handbook Wood Design Manual Other References
A 1-dimensional heat transfer model that has been developed and could be used to validate results of fire resistance calculations of CLT/LVL walls and floors.
6
www.NEWBuildSCanada.ca
Fire Resistance of Structural Assemblies
Structural wood assemblies used on this building
Assembly Span/Height (m) Load
BEAMS
GL 215 x 342 4.40 - kN/m
GL 215 x 532 7.65 - kN/m
GL 215 x 646 5.57 - kN/m
GL 215 x 532 8.80 - kN/m
COLUMNS
GL 365 x 418 3.00 - kN
GL 730 x 418 3.00 - kN
WALLS
Elevator Core LSL 267mm (3x89mm) 3.00 - kN/m
Moment Frame LSL 267mm (3x89mm) 3.00 - kN/m
7
www.NEWBuildSCanada.ca 9
One dimensional charring rate
One dimensional notional charring rate
Solid Sawn Timber 0.65 0.80
Glued-Laminated Timber 0.65 0.70
Cross-Laminated Timber 0.65 0.70
Structural Composite Lumber 0.65 0.70
Fire Resistance of Structural Assemblies
Charring rate of wood
Depth of Heated Zone (mm)
Heated, zero-strength zone
www.NEWBuildSCanada.ca 10
Original Dimensions
Modified dimensions after 2 hour Fire (3 side exposure)
Modified dimensions after 2 hour Fire
(4 side exposure)
BEAMS
GL 215 x 342 215 x 342 33 x 251 33 x 160
GL 215 x 532 215 x 532 33 x 441 33 x 350
GL 215 x 646 215 x 646 33 X 555 33 X 464
Fire Resistance of Glulam Beams
FACTORS – Douglas Fir-Larch 24f-Eɸ 1.00 kFi 1.35 For Glued-Laminated timberkD 1.15 Short term duration kx 1.00 Curvature factorkH 1.00 System factor kL 1.00 Lateral stability factorksb 1.00 Service conditions fb 30.6 MPa Bending strengthkSV 1.00 Service conditions fv 2.0 MPa Shear strength kT 1.00 No treatment
For 120 minutes fire exposure with no Gypsum board protection
www.NEWBuildSCanada.ca
For 120 minutes fire exposure with no Gypsum board protection
Modified dimensions and resistance after 2 hour fire (3 side exposure)
Original Dimensions
Width (mm)
Depth (mm)
Span(m)
I (mm4) S (mm3) Mfactored (KN*m)
Mresistance (KN*m)
GL 215 x 342 33 251 4.40 4.3E+07 3.5E+05 16.46GL 215 x 532 33 441 7.65 2.4E+08 1.1E+06 50.82GL 215 x 646 33 555 5.57 4.7E+08 1.7E+06 80.48GL 215 x 532 33 441 8.80 2.4E+08 1.1E+06 50.82
Modified dimensions and resistance after 2 hour fire (4 side exposure)
Original Dimensions
Width (mm)
Depth (mm)
Span(m) I (mm4) S (mm3) Mfactored
(KN*m)Mresistance (KN*m)
GL 215 x 342 33 160 4.40 1.1E+07 1.4E+05 6.69GL 215 x 532 33 350 7.65 1.2E+08 6.7E+05 32.01GL 215 x 646 33 464 5.57 2.7E+08 1.2E+06 56.25GL 215 x 532 33 350 8.80 1.2E+08 6.7E+05 32.01
Fire Resistance of Glulam Beams
11
www.NEWBuildSCanada.ca
Fire Resistance of Glulam Columns
Original Dimensions
Modified dimensions after 2 hour Fire (3 side exposure)
Modified dimensions after 2 hour Fire
(4 side exposure)
COLUMNS
GL 730 x 418 418 x 730 236 x 639 236 x 548
GL 365 x 418 365 x 418 183 x 327 183 x 236
FACTORS – Douglas Fir-Larch 24f-Eɸ 1.00 kFi 1.35 For Glued-Laminated timberkD 1.15 Short term duration kx 1.00 Curvature factorkH 1.00 System factor kL 1.00 Lateral stability factorkSC 1.00 Service conditions kZV 1.00 Size factor for shearkSV 1.00 Service conditions fC 30.2 MPa // Bending strengthkT 1.00 No treatment fb 30.6 MPa // Compression strengthE 13100 MPa
For 120 minutes fire exposure with no Gypsum board protection
12
www.NEWBuildSCanada.ca
For 120 minutes fire exposure with no Gypsum board protection
Modified dimensions and resistance after 2 hour fire (3 side exposure)
Original Dimensions
Width (mm)
Depth (mm)
Height(m)
Pf(kN)
Pr (kN)
Mr (KN*m)
Total e (mm)
Pf/Pr + Mf/Mr
GL 730 x 418 236 639 3.0 4249.5 763.0 115.7GL 365 x 418 183 327 3.0 1577.1 154.9 111.5
Modified dimensions and resistance after 2 hour fire (4 side exposure)
Original Dimensions
Width (mm)
Depth (mm)
Height(m)
Pf(kN)
Pr (kN)
Mr (KN*m)
Total e (mm)
Pf/Pr + Mf/Mr
GL 730 x 418 236 548 3.0 3644.3 561.1 70.2GL 365 x 418 183 236 3.0 1138.2 80.7 68.7
Fire Resistance of Glulam Columns
Eccentricity is greater on columns exposed from 3 sides than from all 4 sides.
13
www.NEWBuildSCanada.ca
Fire Resistance of LSL Wall Panels
Original Wall Thickness
(mm)
Thickness after 2 hour fire
(1 side exposed) (mm)
Thickness after 2 hour fire
(2 sides exposed) (mm)COLUMNS
LSL 267 (3 x 89) 267 182 97
FACTORS – 2.1E LSL Panelɸ 1.00 kFi 1.35 For Glued-Laminated timberkD 1.15 Short term duration kx 1.00 Curvature factorkH 1.00 System factor kL 1.00 Lateral stability factorkSC 1.00 Service conditions kZV 1.00 Size factor for shearkSV 1.00 Service conditions fC 36.05 MPa Compression strengthkT 1.00 No treatment fb 44.6 MPa Bending strengthE 14480 MPa
1-dimensional charring rate of 0.65mm/min will be used as there is no corner rounding to account for in Wall assemblies
14
www.NEWBuildSCanada.ca
For 120 minutes fire exposure with no Gypsum board protection
Modified dimensions and resistance after 2 hour fire (1 side exposure)
Original Dimensions
Thickness (mm)
Height(m)
Pf(kN)
Pr (kN/m)
Mr (KN*m)
Total e (mm)
Pf/Pr + Mf/Mr
LSL 267 (3 x 89) 182 3.0 6469.0 353.9 87.7
Fire Resistance of LSL Wall Panels
Eccentricity is greater on walls exposed from 1 side than from both sides.
Modified dimensions and resistance after 2 hour fire (2 side exposure)
Original Dimensions
Thickness (mm)
Height(m)
Pf(kN)
Pr (kN/m)
Mr (KN*m)
Total e (mm)
Pf/Pr + Mf/Mr
LSL 267 (3 x 89) 97 3.0 1248.9 100.5 46.8
15
www.NEWBuildSCanada.ca
Fire Resistance of Composite Deck
Modified dimensions and resistance after 2 hour fire (3 side exposure)
Original Dimensions
Width (mm)
Depth (mm)
Span(m)
I (mm4) S (mm3) Mfactored (KN*m)
Mresistance (KN*m)
GL 532 x 175 532 175 1.7E+07 4.1E+05 19.5
Each beam on the composite deck can support a moment 19.5 kN*m after a 2 hour fire. Adding the composite action of the concrete providing the compressive strength increases the overall load capacity of the deck.
Beams spaced at 0.8m on center
16
www.NEWBuildSCanada.ca
Fire Resistance of Steel Beam
Steel beam section: S5x10This steel I-joist used to connect the LSL walls to the LSL Core must meet the 2 hour fire resistance specified for all structural elements. Options to protect the steel section could include one or a combination of the following.
• Gypsum board encasement• Spray foam protection
ASTM E119 T=1010 C at 2 hours. A real fire could reach higher temperaturesAt such temperatures the strength and stiffness of the steel are reduced
17
www.NEWBuildSCanada.ca
Fire safety during constructionBuildings are at most vulnerable state during construction due to lack of fully operational life safety systems such as
Sprinklers Fire alarms Fire compartmentalization
Section 5.6, Division B of the BC Fire Code requires a Construction Fire Safety Plan (CFSP) prior to construction, renovation or demolition of a building.
19
www.NEWBuildSCanada.ca
Fire safety during construction Existing Standards
Section 2.8, 5.2 and 5.6 “Construction and Demolition Sites”, Division B of the 2012 BC Fire Code
Part 8, Division B “Safety Measures at Construction and Demolition sites” of the 2012 BC Building Code
Office of the Fire Commissioner of BC, OFC Bulletin Standata Fire Code Interpretation FCI-09-03
Further Resources NFPA 1, Fire Code NFPA 101, Life Safety Code SFPE Engineer Guide to Fire Risk Assessment City of Vancouver
o City of Vancouver Building By-law (VBBL) 2007, Division B, Part 8o City of Vancouver Fire By-law (VFBL) 2000, Section 2.14 and 5.2
20
www.NEWBuildSCanada.ca
The minimum requirements for fire safety are highlighted in the BCFC, Div B, 5.6.1.3 / 2.8.2.1 are as follows:
Designation of personnel responsible for carrying fire safety duties
Establishing emergency procedures such as Fire Alarms. Procedures once alarm sounds Notification of fire department and definition of fire
fighting procedure Documentation of type, location and operation of fire
emergency systems List of response numbers as well as names, addresses and
telephone numbers of personnel to be contacted during and after working hours in case of emergency
Fire safety during construction
Fire Safety Training
Enforcement
21
www.NEWBuildSCanada.ca
Leading cause of fires in buildings under construction are: Incendiary or suspicious (40%) Open flame, embers or torches (21%) Heating equipment (10%) Smoking on site
Ignition SourceFuelOxygen (Can’t be controlled)
Ignition Sources: Reduce the need for “hot work” Separate heating equipment from
structure under construction Constant vigilance
Fuel Sources: House keeping. Limit the amount of
fuel on site Proper storage of combustible waste
on site and the removal of such as often as possible.
Strict control on storage of flammable liquids and gases
Fire safety during construction
22
www.NEWBuildSCanada.ca
Fire safety during construction Features that need coordination before construction
Unobstructed stairs at each level Early installation of water pumps Management of temporary heating equipment Maintaining high housekeeping standards Fire department access to site at all times Fire watch during hot works operations Fire alert warning systems
Active sprinkler system
Portable fire extinguishers
Active standpipe Fire Hydrant