Al-Shandagha RevitalizationDubai, UAE, 1996

Adil AbdallaRestoration Architect, then Head of Research Unit, Historical Buildings Section, Dubai Municipality

2

Ratio

nale

Historical, But Not Listed Buildings

No Formal Management Plan, But Apprentice Process

Simple Post Restoration Plans

Technical Merit is Minor due to Short Life-Time

Early Activities as Awareness was Mounted Up

Sim

ple

Syst

emati

c Ap

proa

ch

3

Consolidate the Structure, and Transfer the Loads

Remove or Reduce Structural Weights

Treat Humidity and Termite, and Isolate Wet Installations

Sequential Rebuild Deteriorated Foundations & Walls

Redo Lintels, Columns, Beams and Horizontal Ties

Redo Roofs & Ceilings with Minimal Weights

Redo Plaster and Ironmongery Frames

Insert New Electromechanical Utilities and Facilities

Provide New Flooring, and Surrounding Banks

Provide Finishing Accessories

Record, Survey & Document The Building1

3

4

5

6

7

8

9

10

11

12

Define Museology and Usage Requirements2