al rawdha world center trad. & cont. llc. · 2019. 1. 17. · al rawdha world center trad....
Post on 23-Aug-2020
2 Views
Preview:
TRANSCRIPT
Al Rawdha World Center Trad. & Cont. LLC.
P.O. Box 335, Postal Code 133, Al Khuwair, Sultanate of Oman C.R. No. 1/02694/8, Phone: 24479934, Fax: 2447556, email: al_rawdha77@yahoo.com
Al Rawdha World Center Trad. & Cont. LLC. Major projects S.
No. Project Consultant Client Cost RO.
1. Construction of store room at Vocational Training Center, Seeb
Ministry of Manpower
Ministry of Manpower 32,300.000
2. Modification & Refurbishment to hostel block A at Higher Technical College, Muscat
National Engineering
Office
Ministry of Manpower 231,065.081
3. Construction of proposed rehabilitation work for main hostel entrance at Higher Technical College, Muscat
National Engineering
Office
Ministry of Manpower 323,134.400
4. Proposed modification to student canteen building at Higher Technical College, Muscat
National Engineering
Office
Ministry of Manpower 192,764.506
5. Construction to proposed rehabilitation work for hostel block C at Higher Technical College, Muscat.
National Engineering
Office
Ministry of Manpower 335,902.460
6. Maintenance work of the technical workshop at Vocational Training Center, Seeb
National Engineering
Office
Ministry of Manpower 141,960.000
7. Maintenance work of the administrative building at Vocational Training Centre, Seeb (Sub-contract from M/s. Ruboa Al Maha Trading)
National Engineering
Office
Ministry of Manpower 361,760.000
8. Supply and installation of portacabins at Nimr. - Halliburton
Worldwide Ltd 44,100.000
9. Supply and installation of portacabins at Saih Rawl - Halliburton
Worldwide Ltd 44,100.000
10. Rehabilitation works for pressure test bay at Fahud. - Halliburton
Worldwide Ltd. 56,200.000
11. Construction of acid warehouse at Nimr - Halliburton
Worldwide Ltd 54,200.000
12. Construction of acid warehouse at Mukhaizna - Halliburton
Worldwide Ltd 184,000.000
Al Rawdha World Center Trad. & Cont. LLC. S.
No. Project Consultant Client Cost RO.
13. Maintenance work for the technical workshops at Vocational Training Centre, Seeb.
National Engineering
Office.
Ministry of Manpower 1,295,210.000
14. Construction of 13 villas at Azaiba
Module Engineering Consultants
Al Ghadir Al Arabia LLC 1,420,000.000
15. Construction of offices and shops at Azaiba
3 Dimensions Engg.
Consultancy
Al Azaiba Co. LLC. 258,000.000
16. Construction of proposed residential villas at Azaiba
Dawood Engineering Al Azaiba 270,000.000
Al Rawdha World Center Trad. & Cont. LLC. Tools/equipments/vehicles S.
No. Description Quantity Unit Remarks
1. Rotary hammer 4 No. Good 2. Demolition hammer 3 No. Good 3. 24” rotary hammer 4 No. Good 4. 4” angle grinder 6 No. Good 5. Tile cutter 4 No. Good 6. Router 5 No. Good 7. Hilti epoxy dispenser 3 Set Good 8. Sokkia auto level transit 4 No. Good 9. Concrete mixer 5 No. Good 10. Concrete vibrator 4 No. Good 11. Plate compactor 1 No. Good 12 230V ACD welding machine 4 No. Good 13. 3 ton Elf truck 1 No. Good 14. Mitsubishi pick-up 5 No. Good 15. Mitsubishi Pajero 1 No. Good 16. Generator 3 No. Good 17. Gas cutter 2 Set Good 18. Water tank 3 No. Good 19. Water pump 3 No. Good 20. Welding machine 1 No. Good
Al Rawdha World Center Trad. & Cont. LLC. Work/Labour force S.
No. Description Omani Expatriate Total
1. Project Co-ordinator 1 1 2. Materials Purchaser 1 1 3. Accountant 1 1 4. P.R.O. 1 1 5. Secretary 1 1 6. Civil Engineer 1 1 7. Site Engineer 2 2 8. General Foreman 2 2 9. Electrical/Mechanical leadman 2 2 10. Electrician 2 2 11. Plumber 5 5 12. Carpenter 2 3 5 13. Mason 1 6 7 14. Steel Fixer 1 2 3 15. Painter 2 2 16. Welder 1 1 17. Helper 6 6 18. Driver 3 3 19. Receptionist 1
Al Rawdha World Center Trad. & Cont. LLC. CONSTRUCTION METHODOLOGY PRELIMINARIES Contract agreement Plan and design Shop drawings Specifications Site condition Subordinate assignments and accomplish all necessary testing. MOBILIZATION Mobilize preconstruction requirements and during construction Site office Work force accommodation Sanitation Communication Safety precautions Tools and equipments Stock room/warehouse PRECONSTRUCTION Laybouting, buterboard and staking Surveying EARTHWORKS Site cleaning Excavation Demolition of rubbish if necessary Backfilling.
Al Rawdha World Center Trad. & Cont. LLC. CONSTRUCTION PROPER SUBSTRUCTURES Fabrication of steel reinforcements Formworks and shoring, making all joints watertight Concreting works (column footing and plinth beams) Removal of forms Block works Ant-termite treatment Compacting Backfilling SUPERSTRUCTURES Fabrication of steel reinforcements Formworks and shoring, making all joints watertight Concreting works (column footing and plinth beams) Removal of forms Plastering works ELECTRICAL WORKS Installation of conduit pipes Installation of wires Installation of fittings, sockets etc. PLUMBING WORKS Installation of air-condition preliminaries Installation of fire fighting requirements
Al Rawdha World Center Trad. & Cont. LLC. FINISHING Ceiling works Tile works Priming paint Finishing paint application Installation of light fittings Installation of air-condition units Installation of fire fighting fittings Installation of sanitary fittings. HARDWARE Installation of doors and windows Installation of railings, GRC panels etc. Installation of ironmongeries EXTERIOR FINISHING Landscaping Soil and area leveling, compacting Installation of curbs and paver blocks Storm drainage pipelines and manholes POST CONSTRUCTION Site clearing Transporting rubbishes and debris off site Snag listing inspection Final handover Demobilization. Note: All works prior to execution will undergo inspection as per consultants approval
Al Rawdha World Center Trad. & Cont. LLC. ORGANISATION CHART
GENERAL MANAGER
Civil Engineer
Quality AssuranceQuality Control
Proj. Coordinator/Procurement
Site Engineer
QuantitySurveyor
General Foreman
CAD Operator
Civil Foreman
Mason, Steel Fixer, Carpenter, Labour
ElectricalMechanical
Scaffolder, PainterWelder
Electrician/PlumberHelper, AC Technician
FINANCE PROJECT ENGR. ADMIN./PRO
top related