air quality permit compliance assistance seminar january 14, 2014

Post on 24-Feb-2016

20 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Air Quality Permit Compliance Assistance Seminar January 14, 2014. PING, Inc. 52 Acres 20 Buildings 1,000 employees Non-title V permit 47 pages VOCs & PM EHS Staff. Sources. Grinding Processes. Sources. Abrasive Blasting Processes. Sources. Emergency Generator. Sources. - PowerPoint PPT Presentation

TRANSCRIPT

Air Quality Permit Compliance Assistance Seminar

January 14, 2014

PING, Inc.

• 52 Acres• 20 Buildings• 1,000 employees

• Non-title V permit• 47 pages• VOCs & PM

• EHS Staff

Sources

Grinding Processes

Sources

Abrasive Blasting Processes

Sources

Emergency Generator

Sources

Fugitive Dust

Sources

Solvent Cleaning

Sources

Assembly

Manage Requirements

Task Requirements

Manage Requirements

Track Use - Warehouse Records

Part Number Part Description Transaction Date Transaction Qty Status Issue6851 SOLVENT 2013-11-25 -55 Sold

9046 EPOXY 2013-11-01 -12 Sold9046 EPOXY 2013-11-04 -36 Sold9046 EPOXY 2013-11-05 -36 Sold9046 EPOXY 2013-11-05 -24 Sold9046 EPOXY 2013-11-06 -60 Sold9046 EPOXY 2013-11-07 -36 Sold9046 EPOXY 2013-11-11 -12 Sold9046 EPOXY 2013-11-11 -96 Sold9046 EPOXY 2013-11-11 -24 Sold9046 EPOXY 2013-11-13 -12 Sold9046 EPOXY 2013-11-13 -84 Sold9046 EPOXY 2013-11-14 -36 Sold9046 EPOXY 2013-11-15 -12 Sold9046 EPOXY 2013-11-18 -36 Sold9046 EPOXY 2013-11-19 -48 Sold9046 EPOXY 2013-11-20 -48 Sold9046 EPOXY 2013-11-22 -48 Sold9046 EPOXY 2013-11-27 -12 Sold

-672

Manage Requirements

Track Use - Operator Records

Manage Requirements

Track Use - Disposal Records

Manage Requirements

Add Requirements to Procedures

Manage Requirements

Note Critical Equipment

Manage Requirements

Critical Equipment – Keep Documentation

Manage Requirements

O&M - Incorporate into Existing Preventive Maintenance

Manage Requirements

O&M - Document into Existing Preventive Maintenance

Manage Requirements

Inspections – Use Existing Forms

Manage Requirements

Inspections – Use Existing Forms

Dust Control Flowchart on Back

Side of Dual Inspection Form

Manage Requirements

Inspections – Place Forms Near Use

Manage Requirements

Inspections – Negotiate and Document What You Do

Manage Requirements

Post Requirements

Manage Requirements

Training – Track Frequency

Manage Requirements

Training – Retain Documentation

Manage Requirements

Use Best Practices

Closing Thoughts

Don’t re-invent the wheel

Use existing practices – modify if needed

Manage Value

Ask for help

top related