AHMEDABAD
METRO PROJECT
Presented by :
Ashish Singh, MBA(PM)
Nitish Tyagi, MBA(PM)
Contents
World’s Metro At A Glance
India’s Metro At A Glance
History of Project (MEGA)
Constitution of MEGA
Vision And Mission
Projects Holds the Advantages of :
Overview
Project Aim
Salient Features Of Project – Phase I
Regulatory Permission Required
Conclusion
World’s Metro At A Glance
The first Metro System, the London Underground, was opened in 1863
Our Planet has now 189 Metro System
Today, we have 607 lines worldwide with a combined length of 11524 km serve 9139 stations
38 cities in the world have driverless lines
The Shangai Metro is the longest system in passenger route length
The New York City Subway has the most stations and the longest amount of total track, with a total of 1355 km (842 miles)
India’s Metro Rail At A Glance
First rapid transit system in India was Kolkata Metro, which started operation in 1984
Delhi Metro was India’s first modern Metro and third rapid transit system in India overall, after Kolkata Metro and Chennai Mass Rapid Transit System (CMRTS), beginning operation in 2002
Rapid Metro Rail Gurgaon started operation Nov 2013, is India’s first privately owned and operated Metro
The Mumbai Monorail, opened on 7 Feb 2014 is first monorail in India
History
A Metro Rail System to facilitate movement between Gandhinagar –Ahmedabad was initiated by Gujarat Infrastructure Development Board (GIDB)
The preparation of detailed project report (DPR) for Metro was initiated by GIDB in 2003 through Delhi Metro Rail Corporation (DMRC)
The DPR is submitted by DMRC in June 2005 and received Central Government approval the same year
Conceptualized in 2003, the project was put on fast track by State Government in 2009
For execution of project, Gujarat Gov. formed a Special Purpose Vehicle –Metro Link Express for Gandhinagar and Ahmedabad (MEGA)
Constitution
Metro Project is a proposed mass-transmit rail system for the cities of Ahmedabad and Gandhinagar, India
The DMRC (Delhi Metro Rail Corporation Ltd) has already done its techno-feasibility study and submitted its report.
Gujarat Government has recently re-approached Delhi Metro Rail Corporation for a modified detailed project report (DRP) for a Metro Rail Project in Ahmedabad.
On 4th Feb 2010, the State Government has set up a ₹ 200 crore Special Purpose Vehicle (SPV) namely, METRO LINK EXPRESS FOR GANDHINAGAR AND AHMEDABAD COMPANY Ltd to implement Metro Rail Project under Company Act, 1956
Vision And Mission
“To provide safe, fast and eco-friendlyRail based mass transmit services to thepublic at affordable rates whilesimultaneously catalyzing dense andorderly Urban Growth”
Project holds the Advantages of :
Very Responsive State Government and Progressive Leadership
Relatively Flat Terrain
Minimum Land Acquisition
Majority Elevated Track
Overview
Locale : Ahmedabad and Gandhinagar, Gujarat
Number of Lines : 5
Number of Station : 53
Daily Ridership : 2 million (2020)
Operation : will start by Oct 2018
Operator : Metro Link Express for Gandhinagar and Ahmedabad (MEGA)
Technical :
- System Length : 83 km (53 miles)
- Average Speed : 45 km/h (28mph)
- Top Speed : 100 km/h (62mph)
Project Aims
MEGA aims to create a landmark metro rail project not only for the state of Gujarat but also for the whole country
MEGA is committed to deliver most cost efficient metro within the shortest time span possible in the country
Seamless connectivity, minimum land acquisition, world class State- of- art infrastructure, fastest implementation, least construction cost are some of the key features of the project
Salient Features (Phase- I)
Gauge (Nominal) : 1435 mm
Route Length (between dead ends)
Speed
- Designed Speed : 80 km/h
Number of Stations
Traffic Forecast
Traction Power Supply
- Voltage : 750 V dc
- SCADA system : provided
- Power Demand (MVA)
Signaling and Train Control
- “CATC” (Continuous Automatic Train Control System) based on “CBTC” (Continuous Based Train Control System) which includes ATP (Automatic Train Protection), ATO (Automatic Train Operation) and ATS (Automatic Train Supervision) sub system using Radio Communication between Track side and Train
Telecommunication And Fare Collection
- Integrated System with Fibre Optic Cable, SCADA etc.
- Automatic Fare Collection System with POM and Smart Cards
Construction Methodology
- Elevated Viaduct
- Underground Section
Total Estimated Cost (as March 2014 prices)
Total Estimated Completion Cost
Regulatory Permission Required
For the Phase I of Metro Project, required clearances/permissions related to Environment for MEGA
Cont.
Cont.
Conclusion
Ahmedabad has witnessed enormous growth during last 10 years
The growth is mainly the result of immigration as the city provided better employment opportunities
Ahmedabad is the principle administrative, commercial and distribution center of Gujarat State
Ahmedabad is fast developing as educational hub of Gujarat
Rapid urbanization in the recent past has put the city’s travel infrastructure to stress
So Metro Project is the supportive solution to overcome the stress of city’s travel infrastructure