Draft16Dec2016pm
1
Advice Note on Motion 65 cut off date
Synopsis for the Public Consultation feedback
Documenttype Code VersionNo.
DraftNo. Circulated PolicyManager Consultation Deadlineforcomment
Compilationdate
ADVICENOTE ADV-20-007-018 V1-0 0 01/10/to06/12/2016 Dr.PasiMiettinen Public 06/12/2016 01-31/12/2016
Source of comments Nr of respondents Economic North 8 Economic South 4 Social South 1 Environmental North 7 Environmental South 4 National Offices 4 Research Institute 1 Unspecified response in Portuguese 1
total 30
Draft16Dec2016pm
2
Reference
Number of
comments received from chambers
Key message Proposed change
PSU response
ADVICE-20-007-018 3/Economic2/Environment
Economic:AdviceNotedoesnotspeakaboutICLThisadvicenoteisveryconfusing,bothinitsstructureanditscontent.Structure:a),Thenoticeshouldbemoreclearlyseparatedintotwosections;1stsectionbeingdirectedtoCHandCBsand2ndsectionbeingdirectedtoSDGs.b).Usingthesamenumberingforthetwooptionsunderadvice#2andthenumberingofrequirementsfor#1isn’thelpful.Environment:IdonotsupportthedraftAdviceNoteaswritten.Itistoovague.ItisnotconsistentwiththeintentofMotion65.ItseemsalsounfairinOption1clause1.1toaskSDGstoprovideupdatedworkplanswhentheadvicefromPSUand/ortheHCVTWGisalsonotclear.
Economic:RemoveICLfromtitleEnvironment:WestronglyencourageFSCtofullycomplywiththeintentofMotion65defaultindicatorbyputtinginplaceatemporaryhalttologginginatleast80%ofIFLsinFSCforests,untilrobustindicatorsareimplemented.ThisisthecleanestandsimplestwayofsafeguardingIFLswhileindicatorsarebeingdeveloped.
TheconceptofICLcannotberemoved,becauseitiselementarytotheCanadiandialogueandveryusefulforaddressingM65,points3and8.IncaseothercountrieshaveothersolutionsforengagingtheIndigenousPeople,theyareallowedtodroptheconcept.We’llsimplifythestructureofthenextversionoftheAdviceNote
Normativereference 3/Economic
Economic:TheAdviceNotedoesn’trefer“FSC-PRO-60-006V2-0EN”althoughitconflictswithitwhenitimposesstricttimelinesforthecompletionofthetransferprocess.
Economic:addFSC-STD-60-002,FSC-STD-60-006;FSC-PRO-60-006Proposedenddate:January012019
We’lladdthesenormativereferencestothenextversionoftheAdviceNote
Draft16Dec2016pm
3
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
Effectivedate 1/Economic ImportantthattheperiodthatthisAdviceappliedbemadeclear–startdateandexpirydateexplicitlystatedinthescope,asitisonlyintendedasatemporarymeasure
We’lldefineexpirydatetothenextversionoftheAdviceNote
Scope 5/Economic5/Environment1/NationalOffice
Economic:ItishardtounderstandwhytheAdvicenoteonlyapplytofourcountries/regions.Accordingtowww.intactforests.org,“IFLexistedin64countriesinyear2013Ingeneralitisbelievedthatthisissueistooimportanttobedealtinsuchashorttimeframe.CHareinterestedindealingwiththeissueinarationalandscientificbasedway.Thetypeofoperations(verylittleimpact)andthelegalbindingobligationofthecentralAfricancertificateholderstorespecttheirmanagementplanshouldentitlethemnottobeconcernedbytransitionmeasures.TheadviceshouldbeappliedtoallIFLsglobally,forconsistencyandtoaddressvulnerableareasoutsidethe
Economic:TheAdviceNoteshouldapplytoallIFLcountriesEnvironment:ThisAdviceNoteappliestoNetworkPartners,StandardDevelopmentGroups,certificateholdersandCertificationBodiesoperatingincountrieswhereIFLsarepresent.NationalOffice:SpecifyinthescopetheimplicationstoControlledWood
TheSteeringCommitteedecidedtoexpandtheSection1toapplyinallIFLcountries
Draft16Dec2016pm
4
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
priorityregions.ItiscriticallyimportantthatIndonesiaisincludedaswellasthefullAmazonBasin.
Environment:ScopemustbeextendedtoincludeallcountrieswithIFLs.ThisisimportantbecausetheexistingscopemaynotapplytosomeIFLswhicharethemostrareand/orvulnerable.AlsotheapplicabledatesshouldbeincludedhereastheAdviceNoteismeanttobeatemporarymeasure.
Terms&definitions 10/Economic1/Social5/Environment3/NationalOffices1/Research
Economic:GeneralflexibilityinestablishingandmanagingIFLsisneededinCanada“Humaneconomicactivities”isanewterm.Terminologyanddefinitionsshouldbeconsistentwithpre-existingtermsintheIGIs,theFSCGlossaryofTermsandotherstandardsandpolicies.Theword“commercial”isusedintheIGIsandthusshouldalsobeusedinthedefinitionofIFLs.IFLDefinitionMostforestintheworld,includinginthetropicshavebeeninfluencedby
Economic:Option1:Incaseanationalorregionaldefinitionissettofitthelocalconditions,thisdefinitionwillapply.Option2:ThedefaultdefinitionforIFLis“Aterritory…sourceWRIetc.”appliesincasenoregionalornationaldefinitionapplies.…IntactForestLandscapesmapsaccessedthroughGlobalForestWatchasabaseline.“territorywithintoday'sglobalextentofforestcoverwhichcontainsforestandnon-forestecosystemsminimallyinfluencedbycommercialactivities…”
ThedefinitionforIFLgiveninFSC-STD-60-004forIGIsisintendedtobeastartingpointtotheSDGsfornationalorregionaldefinition.ThedefinitioncanbeelaboratedfurtherusingBestAvailableInformation.TheSDGisalsobetterpositionedtodefinewhatexactly‘minimallyinfluencedbyhumanactivity’means.
ThedefinitionforIndigenousCultural
Draft16Dec2016pm
5
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
humanssignificantly,whichhavecreatedalsomanysecondary,disturbedforests.Theconceptof’Intactness’isveryarbitraryandhasbeenabandonedinecologysincelongtime,inthesamewayas‘Climaxforest’.Theseareconceptsthatappliedtoanidealisticview,withoutlookingatthelongerperspective.Also,itisknownthatintermediatedisturbancebringshigherbiodiversityasitcreatesmore‘niches’fordifferentspecies.IngeneralFSCshouldincludethefactthatIFLdefinitionwillberefinedatthenationalorregionalleveltofitlocalconditions.AndFSCshallallowtodefineattheregionalandnationallevelwhatexactly‘minimallyinfluencedbyhumanactivity’means.“CoreAreaofIFL”andICLaredefinedbutnotreferencedinanywayintheadvicenote.Definitionof“CoreareaofIFL”isnotconsistentwith“Coreareas”asdefinedindraftstandardFSC-STD-60-004V1-1.
DeletethedefinitionofICL.GettheconceptdiscussedandapprovedbyMembership,beforeitcanbeincludedintheFSCstandardasitentailsasignificantchangeoftheFSCFMstandard.Define‘’IFLdegradation’’Environment:SpecifywhichhumaneconomicactivitiesaltertheintactnessofIFLs.Replacetheprovideddefinitionby“CoreareaofIFL(FSC-STD-60-004V1-1):TheportionofanIntactForestLandscape*whereintactnessismaintained,thatcontainsthemostimportantecologicalandculturalvaluesandwheretimberharvestingandroadbuildingaregenerallynotpermitted.”ModificationstoBrazil:(i)CoreareaofIFLisatleast15%oftheIntactForestLandscapefallingwithinthemanagementunit,tobeincludedtotheConservationAreaNetwork.(ii)DeleteIndigenousCulturalLandscapefromthedefinitionasitwasnotapartofthemotion65
LandscapeisformulatedbythePermanentIndigenousPeoplesCommittee,whichhasamandateoftheFSCBoardofDirectors.FSCrespectstheIndigenousPeoplesself-determinationrightsandthedefinitionofICLbelongstothesphereofUnitedNationsDeclarationontheRightsofIndigenousPeoples(UNDRIP).Asnobodycommentedthephrasingofdefinition,we’llkeepitasitis.
WerespectthesupportgivenbyallBrazilianchamberstotheRIL-basedforestmanagementinAmazon.However,asthegenericconceptofRILisloose,itisimportanttospecifyexactlywhicharetheindicatorsforRILinAmazon,what‘’minimalhumaninfluence’’means
Draft16Dec2016pm
6
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
InBrazil,CoreArea:stakeholdersandNetworkPartnershavesenttheircommentsagainstthedefinitionof80%oftheIFLareaascorearea.CoreareasmustbeacompositionoftheNetworkConservationAreawerethetotalwouldbemaximum15%Definitionof“CoreareaofIFL”isnotconsistentwith“Coreareas”asdefinedindraftstandardFSC-STD-60-004V1-1.ICLDefinition:ThisconceptiscompletelynewtotheFSCsystem.Therefore,incompliancewithFSCprocedures,iftobeincludedintheFSCFMstandard,itshouldbeapprovedbythemembership,differentchambers,theGA.Social:SupportsEconomicandEnvironmentalchambervisiononRILandlimitingthecoreareaas15%.SuggestsdeletingICLconceptfromtheAdviceNoteasitwasnotmentionedintheMotionEnvironment:InBrazil,ReducedImpactLoggingpractisesareso
InBrazil:Modification:CoreareaofIFL:Atleast15%oftheintactforestlandscapefallingwithinthemanagementunit,composedbytheNetworkConservationAreaNationalOffice:Bestavailableinformation*,ofecologicaland/orsocialsources,relevanttoIFLsandICLs,shouldbeacceptable.Asexample,GlobalForestWatchCanada(exampleforCanada),localeco-forestmapsusedforforestmanagementplanning,andreferencesspecifictoICLsandIndigenousculturalvaluescouldbeincluded.*BestAvailableInformation:Data,facts,documents,expertopinions,andresultsoffieldsurveysorconsultationswithstakeholders*andengagementwithIndigenousPeoplesthataremostcredible,accurate,complete,and/orpertinentandthatcanbeobtainedthroughreasonable*effortandcost,subjecttothescale*andintensity*ofthemanagementactivities*andthePrecautionaryApproach*.ThedefinitionofcoreshouldbedevelopedthrougharigorousprocessandincollaborationwithregionalNetworkpartnerstoberepresentativeofregionalrealities.
andhowtherelatedlegislationisformulated.
We’lltakeoutthedefinitionforaCoreareafromthenextversionoftheAdviceNote,becauseitwillnotbereferredinthetextanymore
Draft16Dec2016pm
7
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
delicatethattheyenablemaintainingtheintactnesswithinforestconcessions.ThesemanagementsunitscontinuetobeclassifiedasIFLattheinternationalevaluation.ThereforethereisnoneedofstoptheReducedImpactLoggingoperationsinBrazilNationalOffices:GlobalForestWatchismentionedastheonlydatasource.ThisdataisusefultogetaquickandfirstideaofwhereIntactForestsarelocatedbutnotpreciseenoughandupdatedenoughtomakesuchimportantdecisionon.TheIndigenousChamberhasidentifiedconcernsabouttheidentificationandmappingofIFLs,sinceaprocessofidentificationandmappinginfluencesnationalandprovincialpolicies.Whodecideonthedefinitionofcores?ItwasnotdefinedwhenvotingforintheMotion.FSCCanadahascompletedascience-basedexercisetoproposeadefinitionandtodevelopa
Socialandculturalconsiderationsneedtobeincludedwhendefiningcores.AstheIFLconceptispartofFSC-STD-60-004V-1-1shallbeincludedanexplanationnotesayingwhat“minimuminfluenced”meanstoallowtheapplicationandcontrolofdegradationlevelsinBrazil.ICLconceptshallbebetterunderstoodinordertobeapplicableandnotcontradictorywithIFLconceptinBrazil.Ifapprovedthroughstandarddevelopmentprocessneeded,FSCshallclarifytheindicatorsthatshouldapply.
Modification1:IndigenousCulturalLandscape(givenforinformation):[…]
Modification2:CoreareaofIFL:TheportionofanIntactForestLandscape*whereintactnessismaintained,thatcontainsthemostimportantecologicalandculturalvaluesandwheretimberharvestingandroadbuildingaregenerallynotpermitted
Draft16Dec2016pm
8
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
clearmethodologytoidentifycoreareas.Moreworkisplannedtodevelopmethodologytoidentifysocialandculturalvalues(ICL).Adefinitionofcores,ifimposedinternationally,couldhavesignificantimpactontheproposedapproachdevelopedbyFSCCanadaandpotentialnegativesorunintendedconsequencestoonthegroundpractices.
IFLconcept:TheconceptofIFLitselfisnoteasytoapplyandneedfurtherdetailingtoallowimplementationofprotectionmeasuresinBrazil…andICLconcept:what´sthesource?What´sthelevelofdiscussionthisconceptwassubmittedtopriortoturnanofficialFSCdefinition?Research:TheICLconceptistotallynewandisnotpartofmotion65,thereforeshouldnotbeintegratedwithinFSCnormativeframeworkwithoutaclearlyapprovalatGeneralAssembly.Moreover,theICLconceptisnotusedintheadvice.Itisdefinedin"Terms&
Draft16Dec2016pm
9
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
Definitions",butwithoutreferenceacrosstheadvice.
Background 5/Economic1/NationalOffice
Economic:Theintentofthisadvicenoteisn’tclear.Itshouldbeexplainedhere.Itseemstohavetwopurposes:1).SetexpectationsforCHandCBsinterimtoIFLindicatorsbeingdrafted(tobeclarified)2).SettimelinesforSDGsforthedevelopmentoftheIFLindicators.Itissurprisingtomentionthat“TheFSCBoardofDirectors(BM72.31,July2016)hasconcludedthattheMotion65defaultclausecannotbeimplementedaswritteninthemotion,duetothesignificantundesiredsideeffectsinsomeofthemostimportantcountriesforFSC”whilenotaddressingthischallengeintheAdviceNote.The“Motion65defaultclause”wouldhaveprecludedharvestinginthe“coreareaofeachIFLwithinthemanagementunit”bytheendof2016.ThisAdviceNotewillprecludeharvestingthatdegradeIFLstotheextentthatitlosesitsIFLstatusby3monthsafterJanuary2017.Itisnot
Economic:Addanexplanationoftheendgoalofthenotice.Thiscouldbe:ThepurposeofthisnoticeistoprovidedirectivestocertificateholdersandcertificationbodieswiththeaimofensuringminimalfurtherdestructionofIFLsinterimtothedevelopmentofclearindicatorsonIFLsandICLs,andtodiscloseafinaldeadlineforthefinalizationandimplementationofIFL/ICLrequirements.ThewholeAdviceNoteshouldbewithdrawnandrewritetocomeupwithaproposalthatdoesaddressthe“significantundesiredsideeffects”discussedbytheFSCBoard.ForcountrieswellengagedinthestandardrevisionprocessoftheirFMstandard,thisadvicemustnotapply.TheonlyviablesolutionforIFLandICLinCanada,relyinabalancedmulti-chambercountryadaptedprocessaddressingIFL/ICLforthecountryasawholeandnotattheFMUlevel.IftheAdviceNoteisintendedtobeasafeguardforIFLs,thenitshouldapplytoallcountries,andinparticular,inthosecountrieswherethereisveryfewIFLsremaining.
We’llclarifytheintentoftheAdviceNoteinitsnextversion
Draft16Dec2016pm
10
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
clearhowthischangeofvernacularcombinedwitha3monthsextensiondoesanythingtoaddressthe“significantundesiredsideeffects”thatarementionedintheBackground.WesupporttheconclusionreachedbytheBoardofFSCInternationalatBM72“thattheMotion65defaultclausecannotbeimplementedaswritteninthemotion”.NationalOffice:ThisAdviceNotehasnotadequatelytakenintoaccountagreementsreachedduringtheIFLSolutionsForuminJuly2016.Itdoesn’tconsideranyoftheimportantobjectionsanddifficultiesexpressed.
Advice
6/Economic1/EnvironmentNationalOffice1/Research
Economic:Clearlyseparatethenoticein2sectionswouldprovidemoreclaritytothenotice.Advice#1shouldbere-writtentodirectactionbyCHs,notCBs.TheAdviceNoteitselfissuedbyFSCshould
Economic:Advicedirectedtocertificateholdersandtheircertificationbody.Forexample,“Within3monthsoftheeffectivedateofthisAdviceNote,CertificateHoldersmust….”Add:“Transitionmeasuresbeforetheapplicationofnationalindicatorsorbydefault
We’llseparatetheNoticetotwosections.FirstonetargetedtoallCHsandthesecondonetotheSDGsinprioritycountriesWe’llclarifywhathappensincaseofnon-compliance.
Draft16Dec2016pm
11
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
serveasnoticeThisadvicenotedoesnotaddressthe“significantundesiredsideeffects”mentionedbytheFSCInternationalBOD.Infact,thelackofflexibilityofthisAdviceNotewouldmakethingsmoreproblematicandwouldgenerateevenmoredetrimentalsideeffects.Validfortheentirepoint1.:Itshouldbeclarifiedthatthemeasuresdescribedinpoint1aretransitionmeasuresbeforenationalindicatorsortheIGIareinforce.Ingeneral,itwouldbeimportanttoclarifywhathappensincaseofnon-compliance.FSCcertifiedforestmanagementbasedonRILkeepstheforestsintactasdefinedbyIFLinBrazilTheabsenceofflexibilityinthewording,lackofrecognitionoflimitationstothecertificateholders’‘sphereofinfluence’andmis-alignmentIGI6.5andwiththeICLapproach,maketheAdvicecontentunacceptabletous
ofIGIs”asthetitleofthissection.Addaparagraphontheoutcomeincaseofnon-compliance.ExplainhowthetransitionwilltakeplacefromtherequirementsofthisAdviceNotetotheIndicatorsofarevisedandapprovedNFSS.Environment:“Operations(includingharvestingandroadbuilding)thatdonotimpactmorethan20%ofIntactForestLandscapesmayproceediftheydonotreduceanyIFLsbelowthe50,000hathreshold.GlobalForestWatchIFLmapsmustbeusedinallregions.”IfthislanguageisNOTused,werecommendthechangesoutlinedbelow.
We’llintroducetheproposaltoallowthecommercialuseof20%ofIFLswithinthemanagementunit
Draft16Dec2016pm
12
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
Environment:WestronglyencourageFSCtocreateaverysimpleadvicenotethatisstraightforwardandeasytoimplement.ThefoundationforthiswouldbeacaponoperationsinIFLstocreateaholdingpattern,andlimitoperationsinIFLswithoutpreventingthemaltogether.Webelievethatthisapproachwillgivethemajorityofoperatorstocontinuewithplannedoperationswhileindicatorsarebeingdevelopedandimplemented.Ifthisapproachisused,werecommendthattheclausesbelowcanbeeliminated.Research:TheadvicedoesnotclarifyiftherequirementsdescribedbeforeOption1wouldbeincorporatedinFSC-STD-01-001orinotherstandard,oriftherequirementsaregoingtobeincorporatedintheindicatorsonlythroughOption1and2,describedinthisdocument.
1.ByJanuary2017, 10/Economic Economic: Economic: We’lldescribewhatis
Draft16Dec2016pm
13
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
CertificationBodiesshallsendanoticetotheCertificateHoldersrequiringthemtomaintainand/orenhancetheintactnessofIFLareaswithintheManagementUnit,withminimalfurtherdestructionofIFLs.Thenoticeshallrequirethat:
1/Social5/Environment2/NationalOffice1/Research
ThisisunacceptabletosomecompaniesSpecifyiftherequirementsunderpoint1willstillbevalidoncearevisedNFSSisapprovedandgetseffectiveForCHtobeabletosendthisnotice,theinterimIFLmapstobeusedshouldbeclearlyidentifiedhere.Canamapbeincludeddirectlyinthisnoticesothereisnoroomforuseofdifferentsources?AccordingtheevaluationdoneinBrazil,theforestmanagementimplementedincertifiedareasiscapabletokeepforestlandscapesmanagedwithverysimilarcharacteristicstotheuntouched.Then,wecanassumethattheproceduresdefinedinBrazilianlegislationcouldbeadoptedasapossiblewaytomaintaintheIFLwiththeirvalues(RIL,ReducedImpactLogging)Environment:InBrazil,Reduced
ExplainhowthetransitionwilltakeplacefromtherequirementsofthisAdviceNotetotheIndicatorsofarevisedandapprovedNFSS.Define‘destruction’orusetheterm‘degradation’or‘alteration’,wherethereisnolandusechangeDefine‘minimal’EnvironmentSpecifywhichhumanactivitiesdonotmaintainandwhichhumanactivitiesdonotenhancetheintactnessofIFLs.NationalOffice:Thefirststepshouldbethedevelopmentofanapproach.1.ByJanuary2017,CertificationBodiesshallsendanoticetotheCertificateHoldersrequiringthemtomaintainand/orenhancetheintactnessofIFLareaswithintheManagementUnit,withminimalfurtherdestructionofIFLs.Thenoticeshallrequirethat:Research:1.ByJanuary2017,CertificationBodiesshall
allowed,insteadofwhatisprohibitedinthenextversionoftheAdviceNote
Draft16Dec2016pm
14
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
ImpactLoggingpractiseshastobeacceptedSocial:SupportsEconomicandEnvironmentalchambervisiononRILinBrazilNationalOffice:Ifwearerequiringtomaintainand/orenhanceintactnessofIFL,anapproachneedstobedevelopbefore.
ThereisanissuetoenhancetheintactnessofIFLareas,sincesylviculturalpracticeswillimpactintactnessofthelandscape.
sendanoticetotheCertificateHoldersrequiringthattheirforestmanagementactivitiesarealignedwiththeconceptsofReducedImpactLogging,maintainingtheintactnessofIFLareaswithintheManagementUnit,withminimalfurtherdestructionofIFLsinanextentthatdoesnotcompromisetheforestmanagementactivities.
1.1.Nolaterthan3monthsafterreceivingthenotice,CertificateholdersshallnotifytheirCBsaboutanyplannedlogginginIFLsoverthenexttwoyears.
8/Economic1/Social10/Environment2/NationalOffice1/Research
Economic:NotpossibleinQuebeck,whereGovernmentmakestheplanning.ItisclearthattheendresultofthisadvicenoteisthateithernewstandardsarecreatedusingIGIsorexistingstandardsaremodifiedtoincludeIGIsastheyrelatetoIFLs,andthatCHswouldberequiredtoconformtothosestandards.Butwhatisexpectedtohappenintheinterim?
Economic:ThetimeneedstobeextendedtoJanuary2018ManagementplansshouldfollowtheRILprinciplesinBrazil,andanysubsequentchangesshouldstrictlyfollowsuchconceptsinordertokeeptheforestlandscapeprotectedwithminimumchanges.…CBsshallrequirecertificateholderstocomplywiththeIFLsafeguards.Failureto
Thisrequirementappearstobetechnicallyimpossibletobeimplementedinsomecases.Therefore,we’llremovethisfromthenextversionoftheAdviceNote
Draft16Dec2016pm
15
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
#1doesnotprovideclarityonthis.Questionstobeanswered:WhatisexpectedofCHoncethey’vedisclosedtheirplannedlogginginIFLsoverthenexttwoyears?Also:WhatisexpectedofCBs?IfCBsdon’thearfromtheminthreemonths,theygetanNCR?IsitexpectedthatCBsconductanevaluationofwhetherornottheirplannedactivitiesareinconformance?Ifso,basedonwhatbasis?Therequirementsunder#1arenotdetailedenoughtomakethisassessment.Inaddition,giventhetimelines(e.g.mapsdevelopedby12/31/17),theCHnoticedoesnotseemapplicablewithoutmoreclarityon“whatIFLs”aretobeconsideredbyCHandCBsintheinterim.Finally:Whytwoyears?ThetwooptionsproposedforSDGrequirenewindicatorstobeappliedwithin1year(Jan2018).Whateverisrequiredin1.2shouldbeconsistentwith1.1.
complywillresultinMajorNonConformanceEnvironment:Nolaterthan3monthsafterreceivingthenotice,CertificateholdersshallnotifytheirCBsaboutanyplannedlogginginIFLsoverthenexttwoyears,usingthe“IntactForestLandscapes.2000/2013”mapsaccessedthroughGlobalForestWatch(www.globalforestwatch.org)asabaselineAdd:CBsshallrequirecertificateholderstocomplywiththefollowingsafeguards.FailuretocomplywillresultinMajorNonConformanceReports.(Note:Thecurrentdraftdoesn’toutlineanymechanismforenforcement)Clarifytheconditionsunderwhichinitiallyplannedloggingwillbeundertaken;Inthecaseofmodificationsofplannedloggingoperations,providesolutiontointegratemodificationsofmanagementplansinthelegalframeworkInBrazil,ManagementplansshouldfollowtheRILprinciples,andanysubsequentchangesshouldstrictlyfollowsuchconceptsinordertokeeptheforestlandscapeprotectedandlittlechanged.
Draft16Dec2016pm
16
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
ThisrequirementisnotapplicableinallProvincialcontextinCanadaasCHdon’talwayshavetwoyearsofforestmanagementplanexistingateverypointintime.Insomeinstances,harvestingblocksareattributedthroughauctionsales–whichsectorscannotbeknowninadvance.Environment:Mapsusedmustbegloballyconsistent.EnforcementmeasuresneedtobemadeexplicitSocial:SupportsEconomicandEnvironmentalchambervisiononRILinBrazilNationalOffice:Thenwhat?NotclearwhattheCBshoulddoafterthatandwhenandwhattheyhavetoenforce.DuringthelastIFLsolutionsforum,ithasbeendiscussedandalmostagreedthatoperationscouldbepursuedin20%oftheIFLs.Thedegradationof20%oftheIFLswithintheManagementUnithasbeenacceptedbyGreenpeaceandUMD.As
NationalOffice:Pleaseclarify.
Draft16Dec2016pm
17
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
suggestedpreviously,wecoulddraftanoteprecisingclearlywhatisintendedhere.Research:HowcanFSCexpectthatCHsareawareoftheexistenceofIFLSwithinitsFMUs?Thepublicationofmapsisexpectedtotheendof2017andtheimplementationofIFL'sindicatorsisexpectedtoJanuary2017.
1.1.1Amendmentstoforestmanagementplans,whichincreaselogginginIFLsshallnotbepermitted.
6/Economic1/Social9/Environment
Economic:NotpossibleinQuebeck,whereGovernmentmakestheplanning.Forhowlong?TheremaybeconflictwithprovincialdirectioninCanadaDoesthismeanincreaseloggingabovethatwhichwasoriginallyplanned?Giventhattheseseemtobemeasuresforthetransition,whyisthereaneedtospecifythis?FortheCB,thetimeframetomakeamendmentstoMParemuchhigherthanthis.Thislanguageisunacceptablefor
Economic:‘’Amendmentstoforestmanagementplans,whichincreaseloggingandroadbuildinginIFLsshallnotbepermittedwhilethisadvicenoteisineffect.’’Foresthealthloggingsincriticalhazardsituationsshouldbeaccepted(fires,pestanddiseaseoutbreaks)InBrazil,ReducedImpactLoggingtechniques(RIL)shouldbeusedandpresentedtothecertifierasameansofguaranteeingIFLmaintenance.Anadditionalprecautionaryapproachmaybesuggestedbycertifiersinrelationtohigh-impactactivitieswithinareaspreviouslyidentifiedasIFLs,suchasroadleasesandinfrastructures,whilemaintaininglowimpactexplorationactivities.
Thisrequirementappearstobetechnicallyimpossibletobeimplementedinsomecases.Therefore,we’llremovethisfromthenextversionoftheAdviceNote
Draft16Dec2016pm
18
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
reasonsnotedabove.IFLsareofdifferentsizes,locationsandcontexts.Suchaninflexibleapproachisunacceptable.HowcansucharequirementbeguaranteediftherearequestioningsabouttheconceptofIFL,andhowtheOrganization,whichhasevenlessknowledge,canguaranteesucharequirement?ConsideringthatCertifiedManagementareasdon’tdamagetheIFLforestcover,newcertifiedprojectsorExpansionsofcertifiedprojectsunderwayhastobeallowedinBrazilSocial:SupportsEconomicandEnvironmentalchambervisiononRILinBrazilEnvironment:TheseadditionalsafeguardsarerequiredtoensurethatIFLsareintentionallyhigh-graded.
Environment:Add:1.1.2LoggingshallnotbeconductedinIFLsunlessevidenceispresentedwhichprovesthatoperationsoutsidetheIFLarenotsufficienttomeetshort-termwoodsupplyneedsofcertificateholders.1.1.3NoconstructionofloggingroadsortracksinIFLswillbepermittedduringtheperiodthisAdviceNoteapplies.InBrazil,ReducedImpactLoggingtechniques(RIL)shouldbeaccepted
1.1.2Nooperations(includingloggingandroadbuilding)shalloccurwhichdegradeanIFLto
7/Economic1/Social10/Environment2/NationalOffices1/Research
Economic:NotpossibleinQuebeck,whereGovernmentmakestheplanning.
Economic:Nooperations(includingloggingandroadbuilding)shalloccurwhichdegradeanIFLtotheextentthatitlosesitsIFLstatus.
Thisrequirementappearstobetechnicallyimpossibletobeimplementedinsomecases.Therefore,we’llremovethisfromthenext
Draft16Dec2016pm
19
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
theextentthatitlosesitsIFLstatus.
Thisgoesbeyondthe‘sphereofinfluence”,forCHorpartnerforestmanagers,whicharenotthelandowner.Gov’thasdecisionauthorityonlanduseplanning.Motion65:IndicatorswillbedefinedatthenationallevelfortheprotectionofIFL.ThereforetheywillbyoppositiondefinewhatdegradesanIFL.Clarifywhatismeantby“degradeIFLtotheextentthatitlosesitsIFLstatus»duringthetransitionperiod.Duringthetransitiontime,itwasunderstoodthatloggingcantakeplace(whichincludesroadbuilding)duringthesecondmeetingoftheIFLSolutionForum.InBrazil,ForestManagementareas,certifiedbyFSC,hastobeoutoftheIFLrestrictionsbecauseitwasprovedbytheIFLmaps,generatedaboveforestcover(seePWAattachedmaps),thatareasclassifiedasIFLactuallyhavebeenusedforForestManagement,(producingwood)formorethan20years.AtthemapispossibletoconfirmthattheCertified
ComplianceshallbeverifiedbytheCBpriortoanyloggingactivitybeingconductedinIFLs.Additionalcomment:toavoidincreasedcoststoCH,thisevaluationshouldbeaddedtothescopeoftheregularsurveillanceaudittobeplannedin2017and2018(interimtothenew/revisedIFLindicators).Proposal:IncasetheManagementUnitownsorispartofthePFI,generaldataregardingsuchareasandtheirprotectionmeasuresmustbepubliclyavailable.DefineIFLdegradationRILbasedoperationshastobeacceptedinBrazilEnvironment:1.1.4Nooperations(includingloggingandroadbuilding)shalloccurwhichdegradeanIFLtotheextentthatitlosesitsIFLstatuswithintheFMUorthebroaderlandscape.Add:1.1.5AnnualsurveillanceauditsduringthisperiodwillincludeanassessmentofPrinciple3.1.1.6LoggingthatoccursinIFLswillminimizeimpactsonbiodiversityandforestecology,
versionoftheAdviceNote
Draft16Dec2016pm
20
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
FMprotecttheforestSocial:SupportsEconomicandEnvironmentalchambervisiononRILinBrazilNationalOffices:Ifoperationswerealreadyplannedinthisarea,thismayrequiremodificationofamanagementplan.ForestManagementplanningisalongandcomplexprocessinCanadawhichrequirealotofsteps,therespectofalonglistofrequirementandintensiveconsultationswhichmayincludespecificagreementswithstakeholders.Theprocessonlyforanannualplanmaytakeoneyearandanymodificationmayrequiregoingbackintheconsultationprocessandchangingagreements.Thiscannotbealwaysdoneinasoshortperiodoftime.HowanIFLlosesitsstatus?What´sthemetric?IfremainsintheIFLconcept“..minimallyinfluencedbyhumaneconomicactivity,”itshallbeclarifiedwhatmeansminimallyinfluenced.Environment:Wecouldhavethe
andannualsurveillanceauditswillduringthisperiodwillincludeanassessmentofPrinciple9.3.1.1.7VolumefromavoidedIFLareaswillberemovedfromsustainableharvestrates,andannualsurveillanceauditswillbeconductedonPrinciple5.1and5.2.GeneraldataregardingIFLareasandtheirprotectionmeasuresmustbepubliclyavailable.SpecifywhichoperationsdegradeIFLtotheextentthattheylosetheirIFLstatus,andunderwhichconditionsloggingdegradesIFLtothisextent.NationalOfficeInsertwhatexactlywhatcouldnotbedoneto“losesitsIFLstatus”Research:1.1.2ReduceImpactLoggingtechniques(RIL)shouldbeusedandpresentedtothecertificationbodytoensurePFImaintenance.Certificationbodiesmaysuggesttheimplementationofadditionalprecautionaryapproachinhigh-impactactivitieswithinareaspreviouslyidentifiedasIFLs,suchasroadsandinfrastructures,whilemaintaininglowimpact
Draft16Dec2016pm
21
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
situationwherethewholeIFLdoesn’tloseitsstatusbuttheIFLwithinanFMUdoesifwedon’tmakethisspecification.AdditionalsafeguardsareneededtoensurethatmonitoringtakesplaceduringthisperiodandthatCHsdon’tintentionallyincreaseharvestofIFLsforthepurposeofhavingfewerrestrictionsoncetheMotionisimplemented.I’tsnecessaryclarifythemapsandinformationrequested.InBrazilthisinformationisnotpubliclydisclosed(georeferenced)duetotherisksofinvasion,theftofwood,orotherinappropriateuseofsuchinformation.Inaddition,thescaleofidentificationofIFLatthegloballevelwilloftenbeinconsistentwiththescaleofidentificationoftheseareasattheleveloftheforestmanagementunit
explorationactivities.
1.2.Certificateholdersshallmakepubliclyavailablethemapsoftheirmanagementunits,
7/Economic5/Environment1/NationalOffice1/Research
Economic:Asstatedabove,arequirementthatanevaluationbeconductedbytheCBshouldbeincludedinthenotice,includingarequirementforCBsto
Economic:‘’1.2.Certificateholdersshallmakepubliclyavailablethemapsoftheirmanagementunits,ofIFLswithinthesemanagementunits,andof
Thisrequirementappearstobetechnicallyimpossibletobeimplementedinsomecases.Therefore,we’llremovethisfromthenext
Draft16Dec2016pm
22
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
ofIFLswithinthesemanagementunits,andofanyplannedlogginginIFLs.
postpubliclythereportofthatassessment,confirmingtheseplansareinconformance.Thisrequirementisnotconstructive.Itsstrictapplicationwouldonly“paintatargetontheback”ofeverycertificateholdersplanningtologinIFLsUntilIFLmappingmethodologyandconsultationonFSCCanadaIFL/ICLindicatorsarefinalized,wecannotconfirm‘IFL’ItcannotbethatFSCFMcertificateholdershavenoobligationtomakemapsavailable,andnowthosewhoareinIFLhavetomakemapspublicallyavailable.Whatkindofmaps?InBrazilmanyofthisinformationisnotpubliclydisclosed(georeferenced)duetotherisksofinvasion,theftofwood,ortheinappropriateuseofsuchinformation.Inaddition,thescaleofidentificationofIFLSatthegloballevelwilloftenbeinconsistentwiththescaleofidentificationoftheseareasatthe
anyplannedlogginginIFLs.CBsshallpostpublicsummariesoftheevaluationconductedtoconfirmthestatusoftheaffectedIFLs’’Delete1.2andinsteadrelyonpublicparticipationandstakeholderinvolvementrequiredbytheforestmanagementstandard.CHshallmakepublicallyavailablethemaps….(i.e.thiscanbetotheirCertificationBodyandtoFSCforexample)Environment:1.2.Certificateholdersshallmakepubliclyavailablethemapsoftheirmanagementunits,ofIFLswithinthesemanagementunits,ofannualharvestblocks,andofanyplannedlogginginIFLs,usingthe“IntactForestLandscapes.2000/2013”mapsaccessedthroughGlobalForestWatch(www.globalforestwatch.org)asabaseline.Add:1.3.3Incountriesthatarescoredbelow50inTransparencyInternational’scorruptionindex,therequirementsin1.1and1.2shallbeverifiedbyASI.NationalOffice:Clarifywhenthishastobecompleted.Isitthesameactionaspoint1.4ofoption1below?Isitforendof2017?
versionoftheAdviceNote
Draft16Dec2016pm
23
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
leveloftheforestmanagementunitEnvironment:Consistencyinmapsisnecessary.Concernthatinsomeregions,IFLswillcontinuetobesubjecttostatusquopracticesdespiterequirements.NationalOffice:Inordertomakemapsavailable,theIFLidentificationmethodologyshouldbecompletedandcertificateholderwillneedtoanalysetheirtenureanddefineIFLproperly.ItcannotbedonewiththehighlevelsatellitemapsfromGFWastheinformationisnotpreciseenoughandwilllandonexpectationsonareasthatareperhapsnotanIFL.IdentificationandmappingofIFLsrequiressocialandculturalconsiderations,especiallyasitrelatestoIndigenousrightsandinterests.Thisneedstobeincludedwithmoreresourcesdedicatedtounderstandwaysthatthiscanbecompleted.InsomepartsofCanada,itisthegovernmentwhichisresponsibletoplanmanagementactivitiesonpubliclands(90%ofterritory).Certificateholdersdonothavealotofinfluence
1.2.Certificateholdersshallmakepubliclyavailabletheoftheirmanagementunits,ofIFLswithinthesemanagementunits,andofanyplannedlogginginIFLsmapstoFSCandtoitsCertificationBody.
Draft16Dec2016pm
24
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
ondecision,including,timing(intermofspeedinguptheprocess)Notclearwhenthishastobecompleted.Isitthesameactionaspoint1.4ofoption1below?Isitforendof2017?
ThisrequirementneedstobecheckedbyLegalUnitIguess,sinceIdon’tknowtowhichextentFSCismandatedtoaskCHstomakeeconomicintelligencepublic.Therearealsoissueswhereconcessionsareprivatelyowned(US…)YoumayhaveseenmapsdraftedbyourOffice(thankstoWWF-USfunds)foreachcountry,withtheseinformation(exceptroadsplanningforthenextyears)areavailableandwehavesignedaDataSecrecywitheachCertificateHolderallowingustousethemapsandpublishthem.Research:ThepublicationofmapsiscomplicatedinBrazil,becauseitcanbringsIFLstotheattentionofill-intentionedperson,puttingtheseareasinrisk(invasions,theftofwood,orinappropriateuseof
Draft16Dec2016pm
25
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
suchinformation).2.StandardDevelopmentGroups(SDGs)inBrazil,Canada,CongoBasinandRussiashallusethedefaultgenericIFLindicators(aspresentedinFSC-STD-60-004V1-1)forthedevelopmentofnationalindicatorsfortheprotectionofIFLs.
8/Economic5/Environment2/NationalOffices
Economic:Thisisunclear.Whatthelinksand/orimplicationsarebetweentherequirementsof#1and#2andthisshouldbeclarified.Forexample,ascommentedabove,itisconfusingtoaskCHtodiscloseanyplanninginIFLs(1.1ofsection1)whilethemappingofIFLsisnotyetfinalized(1.4ofsection2).Timelines(2vs1year)arealsoconfusingTheIGI’scanaccordingtoFSCprocedures(forIFLorotherindicators),beadaptedtotheNationalorRegionalsituation.Isthisvalidforthetransitionmeasures?TheadviceshouldbeappliedtoallIFLsglobally,forconsistencyandtoaddressvulnerableareasoutsidethepriorityregions.Environment:Scopeneedstobebroadened.NationalOffices:FSCCanadahasworkedhardoverthe
Economic:Replace“use”by“adaptoradopt”andadd“aspertheoptionshighlightedbelow”attheendStandardDevelopmentGroups(SDGs)incountrieswhereIFLsarepresentshallusethe…AdoptFSCCanada’sIFL/ICLindicatorsifGov’tsupports.TimelinesshouldallowsufficienttimeforFSCCanadatocompletedrafting,fieldtestingandfinalisationofIFL/ICLindicators.Environment:2.StandardDevelopmentGroups(SDGs)incountrieswhereIFLsarepresentshallusethedefaultgenericIFLindicators(aspresentedinFSC-STD-60-004V1-1)forthedevelopmentofnationalindicatorsfortheprotectionofIFLs.NationalOffices:FSCneedstocoordinateaprocesswithNetworkPartnerstoexplorecompatibilityofproposedapproacheswiththework(IGIs)comingfromtheHCVWG.TherewillbebacklashifatopdownapproachoftheIGIsisimposedonNPsFocusneedstobeoncomingtoanagreementonworkplanandtimelinesforcountrieswith
Thisrequirementseemstoraiselotsofconfusion.ThenextversionofIGIsisintendedtohelptheSDGssimilarlyasthecurrentversion,sothattheSDGswillhavethepossibilitytoadopt,adapt,ordroptheIGIs.AstheuseofIGIsisdescribedinfulldetailsintheTransferProcedure,itisnotnecessarytorepeatitintheAdviceNote.We’llremovethisclausefromthenextversion.
Draft16Dec2016pm
26
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
last2yearstodevelopindicatorsthatmakesenseinourcontext.TheIFLIGIindicatorsarenotenoughtoallowproperindicatordevelopmentforBrazil.TheSDGsneedtohavetheresultofIFLTechnicalWGtoclarifytermsanddefinitionsatleasttoensureminimumconsistencybetweenglobalnationalstandards.
significantIFLs.ThatwillleadtothelongtermsuccessforsafeguardingIFLandICL
StandardDevelopmentGroups(SDGs)inBrazil,Canada,CongoBasinandRussiashallusethedefaultgenericIFLindicators(aspresentedinFSC-STD-60-004V1-1)forthedevelopmentofnationalindicatorsfortheprotectionofIFLsoncefinalizedtheworkofIFLTechnicalWorkingGroúpandtheresultsincludedonFSC-STD-60-004.
OR
StandardDevelopmentGroups(SDGs)inBrazil,Canada,CongoBasinandRussiashallusethedefaultgenericIFLindicators(aspresentedinFSC-STD-60-004V1-1)forthedevelopmentofnationalindicatorsfortheprotectionofIFLs.TheresultsofIFLTechnicalWorkingGroupwillgenerateaGuidanceonhowtodevelopnationalindicatorsandwillbepublishedtillMarch2017.
Option 1: Adapting theInternational GenericIndicators
NOTE:Options 1 shall beimplemented by SDGs asthedefaultoption
4/Economic
Economic:IFLindicatorscouldnotbedefinedandimplementedbeforeICLisdefinedthroughproperengagementwithFN.Anyrushingofthisprocesscouldonlyleadtofailureandtheadditionalpotentialadverseeffectoflosingthe
Economic:Thereshouldbenoshort-cutoftheNFSStransferprocessforthesolepurposeofimplementingIFLindicators.
We’lltrytorelaxthetimelinestoenablemeaningfulengagementwithIPAdaptingordroppingtheIGIsisallowedaccordingto
Draft16Dec2016pm
27
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
supportofFN,acriticalpartnerinthedevelopmentoftheFSCstandardsinCanada.It’snotclearthat“adapting”theIGIIndicatorsisallowed(“shallusethedefaultIGIIndicators”)eventhoughitisclearlyintendedtobeallowedunderoption1,whichisthedefaultoption.
theTransferProcedure
1.1 By 31 January 2017,SDGs shall provideupdated work plans withdefined and timetableddeliverables for theprocessofdeveloping IFLindicators,including:
a) Description howthe IFL indicatordevelopmentprocess will beaccelerated.
b) PlansforengagingIndigenousPeoples(throughFPIC).
7/Economic1/Social10/Environment2/NationalOffices
Economic:1.1b)Engagementwithindigenouspeoples?DoestheSDGneedtodoFPICprocesses?Ifforeachoftheabovequestionstheanswerisyes,ourpositioningiscontraryinBrazil,sincetheconceptofIntactIndigenousLandscapesisnotpartofmotion65,justasthereisnoclearlydefinedconcept,muchlessvalidatedbyFSCmembers.AnotherimportantpointisthatSDGsdonothavecapacity(sinceallitsmembersarevoluntary)anotherpointofimportanceisthatthistypeofcostisimpracticable.Wesupportthisoption,butthereshouldbemoretimeforthisEnvironment:PIPCindicatedthatitwouldbefinalizingworkplansbythe
Economic:Furtherexplainhowthese“PlansforengagingIndigenousPeoples(throughFPIC)”alignwithoraddtoFSC-PRO-60-006.ProposalforBrazil:1.1.bAplanforengagingaffectedpartiesshouldbepartoftheSDG'sdevelopmentprocessofindicators(meetings,workshops,etc.)Itisaddedtothisjustificationthatthecurrent(andunderreview)Standardsalreadydefinetheprocessesofrelationshipswithtraditionalcommunitiesandimpactedindigenouspeoples.Environment:b)PlansforengagingIndigenousPeoples(throughFPIC).Whererelevant,updatedworkplanswithdefinedandtimetableddeliverablesfortheincorporationofIndigenousCulturalLandscapes(ICLs)willalsobefinalizedby31January2017.
EngagingtheIndigenousPeoplesisnecessaryforaddressingthepoints3and8ofM65.TheAdvicetoSDGswillbedroppedout.We’llproviderecommendationforthistopicintheNewsItem
Draft16Dec2016pm
28
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
endof2016atthelastIFLSolutionsForum.ImportanttointegrateICLsintothis.Social:SupportsEconomicandEnvironmentalchambervisionsinBrazilNationalOffice:Wewelcomeadiscussionaroundourworkplanandtimeline.FPICisaconcepttobeusedwhenyouaredelegatingrightsoverresourcesand/orlands.InthecasedevelopmentofindicatorsFPICdonotapplyforBrazil.Certificationisvoluntary.IfanOrganizationwouldliketomanageaIndigenousPeoplesLandthanFPICwouldapply.Research:This deadline is unfeasible, becauseSDGwouldhave less thanamonthtodevelop the work plan, taking intoaccountthattheeffectivedateof thisadviceisJanuary2017.Onemonthisashort deadline when we are talkingabout a teamwork, which demands
InBrazil,theprocessesofrelationshipswithtraditionalcommunitiesandimpactedindigenouspeoplesisalreadydesignedNationalOffice:
1.1. b) Plans for engaging IndigenousPeoples (through FPIC through culturallyappropriateengagement).
Draft16Dec2016pm
29
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
engagement with indigenous people.Moreover, January is a month whenthemostpersonareonvacation. Thedeadlinesmustbemorerealistic.Inaddition,itembmustbeexcludedbecausetheconceptofICLisnotpartofmotion65andtheIGIsalreadydemandengagementwithtraditionalcommunitiesandimpactedindigenouspeoples.
1.2 SDGs shall completethe transfer of nationalforest stewardshipstandard (NFSS) to P&CV5,oramendtheexistingNFSS with IFL indicatorsand submit the NFFS toPSU before 31 July 2017forapproval.
6/Economic1/Social9/Environment2/NationalOffices1/Research
Economic:TheideaofacceleratingthetransferofNFSSinthecontextofspecificindicatorcouldcreateacomplexandproblematicsituation.ItisnotlikelythatbyadoptingsuchanAdviceNotewillsuddenlyacceleratetheSDGsworktotransfertheNFSS.ItisasunlikelythatSDGswillbecomfortableadoptinganNFSSthatmightaddressIFLsbutnotyetthefullsuiteofotherIndicators(includingICLs).Assuch,countriescouldend-upapplyingOption2whileatthesametimecontinuingtheworkontheirtransferofNFSStoP&CV5.ThiswouldcreateanumberofdifferentNFSStobeapplyinashorttimeperiodwhichwouldbeconfusingandprostrating.
Economic:Thereshouldbenoshort-cutoftheNFSStransferprocessforthesolepurposeofimplementingIFLindicators.Timelineuntilend2017…oraccordingtoagreedworkplantimetableProposalforBrazil:changethedateJuly31,2017to"sixmonthsafterpublicationoftheindicatorsandsupplementarymaterialscomingfromtheInternationalWorkingGrouphavebeenapproved."Environment:1.2SDGsshallcompletethetransferofnationalforeststewardshipstandard(NFSS)toP&CV5,oramendtheexistingNFSSwithIFLindicators(andICLindicatorswhererelevant)andsubmitthe
TheAdvicetoSDGswillbedroppedout.We’llproviderecommendationforthistopicintheNewsItemWeareplanningtohandleRIL/AmazoninthenextversionofHCVGuideline,HCV2
Draft16Dec2016pm
30
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
Itisproposedthatthetime-lineisuntilend2017.SeenthecomplexityoftheIFLconcept,thetimelineistooshort.ThisdeadlineshouldbeextendedtoaftertheGeneralAssemblyforBrazilsincethismatterwillbeontheagenda.TheInternationalWorkingGrouphasnotyetbeenabletobringpartiallyacceptedmaterialfortropicalforestmanagementissues.Social:SupportsEconomicandEnvironmentalchambercommentsinBrazilEnvironment:Seecommentabove.InBrazil,thisdeadlinecan’tbeachieved.ItshouldbeextendedovertheGeneralAssemblysincethismatterwillbeontheagenda.Sofar,theindicatorssuggestedbyHCVTWGarenotpracticalforthetimberproducersintropicalcountries.NationalOffice:TheproposedapproachdevelopedforIFLandICLsbyFSCCanadawillnotbereadyforthistime.Wewouldliketo
NFFStoPSUbefore31July2017forapproval.1.2.Certificateholdersshallmakepubliclyavailablethemapsoftheirmanagementunits,ofIFLswithinthesemanagementunits,ofannualharvestblocks,andofanyplannedlogginginIFLs,usingthe“IntactForestLandscapes.2000/2013”mapsaccessedthroughGlobalForestWatch(www.globalforestwatch.org)asabaseline.
Add:
1.3.3Incountriesthatarescoredbelow50inTransparencyInternational’scorruptionindex,therequirementsin1.1and1.2shallbeverifiedbyASI.
ForBrazil,thedate31July2017shouldbepostponedto"sixmonthsaftertheapprovalandpublicationoftheIGIsforIFLsproducedbytheHCVTWG."
Draft16Dec2016pm
31
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
exploredevelopingstagedrequirementsandcomingtoagreementwithFSCIConaworkplanandtimelinethatwilldeliversuccessfuloutcomes.‘’…oramendtheexistingNFSSwithIFLindicators’’Doesthismeanthatwe(Russia)cantakeourrecentNFSS,basedonP&CV4,andincorporateIFLindicatorsasrequiredbyM65there?Ifyes,whataretherequirementsforthenationalapprovalofsucha“hybrid”NFSS?Aretheythesameasin60-006?(twopublicconsultationsnotlessthan60dayseach,consultativeforumetc.),oraretheyeasier?Shallwesubmitthewholestandardfortheconsultations,orjustindicators?Andsoon.Isupposethatthereshallbeasetofrulesforthisoption.Andhowwilltherequirementsforthefurthertransferofthis“hybrid”standardtoP&CV5looklike?Theprocedure,thetimeschedule,etc.?Research:FSCshouldreviewalldeadlines,consideringthatthedefinition
Draft16Dec2016pm
32
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
regardingIFL’sfuturewillonlybetakenattheFSCGA2017.
1.3 The approved NFSSshall be published by 01October 2017 to becomeeffective on 01 January2018.
9/Economic1/Social4/Environment2/NationalOffice1/Research
Economic:Idem,timelineuntilend2018ThistiminggoesagainsttherulesoftransferofstandardsapprovedandvalidintheFSCsystem.OurreadingisCHmustbeinconformancewiththenew/revisedstandardbyJan2018.Thisleavesonly3monthstodevelopmapsANDthelaunchingofcommunicationsstrategies(soit’sclearwhat’srequiredoncecommunicationsarelaunched).Thistimelineseemsveryshort.PerhapsthemappingofIFLsshouldbedoneasthe1ststepinpriority(toinformtheprocessinsection#1forCHandCBs),thenworkcanbedoneonhowtheywillneedtobetakenintoaccount.Environment:ThisproposalgoesagainstalltherulesoftransferofstandardsapprovedandvalidintheFSCsystem,thetransferprocessprovidesfor1yearofadaptationperiodbetweenstandards,thistimeis
Economic:Timelineuntilend2018…oraccordingtoagreedworkplantimetableProposalforBrazil:1-Delete.Or2-Thiswillbeeffectiveonthefield1yearaftertheapprovalbythePSUofthestandardthisbecomesvalidinthefield.EnvironmentProposalto(i)Deleteor(ii)Maintainthedeadlinesalreadyforeseenwithinthenormsoftransfer,thatis,1yearaftertheapprovalbythePSUofthestandardthisbecomesvalidinthefield.NationalOffice:PleaseclarifyhowtodealwithICLs.IntheIFLSolutionsForum,someresponsibilitiesweregiventothePIPCtosubmitaworkplanandatimeline.Thisshouldremainanimportantaspect.Modification:1.3TheapprovedNFSSshallbepublishedby31December2017tobecomeeffectiveon01September2018.
TheAdvicetoSDGswillbedroppedout.
Draft16Dec2016pm
33
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
necessary,evenmoreatthismomentwheretheV5standardhasgreatchangesandWhichreflectsignificantchangesinthefieldbythecertificateholders.SuchadeadlinelikepresentedisimpracticableandwillimplythelossofallcertificatesintheBrazilianAmazon.Social:SupportsEconomicandEnvironmentalchambercommentsinBrazilNationalOffice:ThisAdviceNotedoesn’tmentionICL.AttheIFLSolutionForuminJuly,thePIPCmadeclearthattheywon’tsupportIFLimplementationbeforeICLhasbeendeterminedasthisconceptofIFLmaybeconflictingwiththeirrightsandinterestsandwiththeICLconcept.DuringtheForum,ithasbeenclearlystatedthatIFLcannotstandwithoutICL.Sofar,IGIsarenotfullyfinalized,wedon’thavecleardefinitionsonICLandweareimplementinghighlycomplexprocessesacrosstheGlobe,quitedifferentsometimesbetweenkey
Draft16Dec2016pm
34
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
prioritiesregion.Research:Twomonths(JulytoOctober2017)seemstobeanambitiousdeadlinetoPSUevaluateNFSSoffourcountries.Furthermore,thisschedulegoesagainsttheproceduretotransfertheIGIs,whichgivesCHsandCBsoneyearofadaptationtothenewNFSS.
1.4 A communicationsplan shall be launchedwith all affectedcertificateholdersineachcountry/sub-region,ensuring a dialogue onIFL areas that leads toclear maps beingdevelopedbeforetheendof 2017 (maps shall bebased on existing mapsprovided through GlobalForest Watch, but withthe flexibility to updateto current situation incases where newinformationisavailable).
6/Economic4/Environment1/NationalOffice1/Research
Economic:MappingshouldnotbebasedonGFWmapsonly,butonregionallyadaptedinterpretationofIFL.ItseemsthesemapswillbedifferentthantheonestobeconsideredbyCHholdersintheinterim(1.1insectionforCHandCBs)butitwouldbelessconfusingiftheywerethesame,i.e.themappingexerciserequiredundersection2shouldbedonepriortorequestingCHholderdisclosingplannedlogging.Itcouldreduceconfusiontoseparaterequirementsonthemappingfromthecommunicationplanissue.Thecommunicationpartof1.4shouldbetransferredto1.5anditshouldbeclarifiedspecificallywhowilldevelop
Economic:RemovethesentenceinparenthesisTimelineaccordingtoagreedworkplantimetableNationalOffice:Communicationplanneedstobedefinedinaccordancewiththeworkplan.
TheAdvicetoSDGswillbedroppedout.We’llproviderecommendationforthecommunicationsplanintheNewsItem
Draft16Dec2016pm
35
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
andimplementthecommunicationsplan(i.e.NationalInitiativesorPSUintheabsenceofNis.)andwhoisresponsiblefordevelopingmaps.Environment:Thisshouldbearequirementforoption2aswell.NationalOffice:Maybepossiblebutwearenotintotalharmonywiththe«datasourceofIFL»aswritteninthe«Terms&definitions»section.Sensitivityofmappingandidentificationneedsfurtherdiscussion.ButoverallagreefullywithneedforacommunicationplanthatiscoordinatedwithFSCIC.Research:Wouldbemorelogicaltoextendthedeadlinestolaunchthestandardstogetherwiththemaps,becausetheimplementationofindicatorsdependsonthemaps.ThepublicationofindicatorsinOctoberandthemapsonlyinDecemberwouldcreateauselessgap.
1.5Communicationsshallbe initiated withgovernments explaining
4/Economic1/NationalOffice
Economic:Whodoesthis?
Economic:Clarifytheresponsibility
WesupportthesuggestionfromtheNationalOfficeto
Draft16Dec2016pm
36
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
the IFL process, what itaims to achieve andhowit may impact onconcessionholders.
WhatisthecommunicationapproachiftheIFLprocessconflictswithestablishedgovernmentproceduresforprotectedareasand/orwithforestmanagementrequirementsthroughthegovernment-regulatedFMPprocess?NationalOffice:WhilenotapprovedtheIFLapproach/indicators,theactivitieswouldfocusonengaginggovernmentsonthediscussionofimportanceofIFLsandtheFSCstandarddevelopmentprocess.It´sstillnotclearwhatacorezonemeansthelevelofmanagementallowedonIFL.HowthecommunicationintheproposedwaywithGovernmentswouldoccurswithoutcausingpanic?Theengagementonstandarddevelopmentprocesswouldbemoreeffective.
CommunicationswithgovernmentsshallbeinitiatedbyFSCNationalofficesexplainingtheNationalForestStewardshipStandarddevelopmentprocessandhowIFL/ICLindicatorsaretobeintegratedintoafinalNFSSNationalOffice:1.5DuringIFLindicatorsdevelopment,governmentsasastakeholdershallbeinvitedtotakepartoftheconsultationprocess.AfterapprovalofNFSScommunicationsshallbeinitiatedwithgovernmentsexplainingtheIFLprocess,whatitaimstoachieveandhowitmayimpactonconcessionholders.
invitegovernmentrepresentativestoparticipatetheconsultationprocessoftheIFLindicators.We’llproviderecommendationforthistopicintheNewsItem
Option2:AdoptingtheInternational GenericIndicators
NOTE: Option 2 onlyapplies when NetworkPartner or SDGs fail toimplementOption1.
4/Economic
Economic:‘’Option’’isnotreallyanoptionhereOPTION1section1.4&1.5shouldbeincludedinbothOption1and2.Communicationsplanswillbenecessaryregardlessofwhethernational/regionalorinternational
Economic:Selectotherwordfor‘’Options1and2’’ordropOption2
ThispartoftheAdviceNotewillbedroppedout,inordertoprovidesufficienttimeforthedialoguewiththeIndigenousPeoples
Draft16Dec2016pm
37
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
indicatorsareused.ThisoptiondoesnotpermitthedevelopmentofaflexibleandintegratedapproachthatisnecessaryforthepossibilityofapragmaticIFL/ICLoutcomeintheCanadianNFSS.
2.1 For countries wherenational IFL indicatorshavenotbeen submittedtoPSUbytheendofJuly2017, the following shallapply:
3/Economic1/Social4/Environment
Economic:ThedatecannotbefixedsincethegenericinternationalindicatorsforIFLaswellastheirconceptualdefinitionsarestillindevelopmentandfarfrombeingapproved.Environment:ThedatecannotbefixedsincethegenericinternationalindicatorsforIFLaswellastheirconceptualdefinitionsarestillindevelopmentandfarfrombeingapprovedbytheBrazilians.Social:SupportsEconomicandEnvironmentalchambercommentsinBrazil
Economic:Proposal:replace"bytheendofJuly2017"with"sixmonthsafterapprovalofmaterialfromtheInternationalWorkingGrouponIFLs".Environment:ProposalforBrazil:replace"bytheendofJuly2017"with"sixmonthsafterapprovalofmaterialfromtheinternationalHCVTWG".
ThispartoftheAdviceNotewillbedroppedout,inordertoprovidesufficienttimeforthedialoguewiththeIndigenousPeoples
2.2TheNetworkPartneror SDG shall incorporatethe default generic IFLindicators (as presentedin FSC-STD-60-004 V1-1)intotheexistingNFSS.
1/Economic
Economic:TheFSC-STD-60-004V1-1isnotadopted.FSCInternationalwebsiteindicatethat“Firstconsultationisnowclosed.Wearecurrentlyassessing
Economic:Tobeclear,theAdviceNoteshouldre-stateanylanguageitneedstoreferfromaDraftstandardorindicatewhetherornotthedraftorthefinalversionwillapply.
ThispartoftheAdviceNotewillbedroppedout,inordertoprovidesufficienttimeforthedialoguewiththe
Draft16Dec2016pm
38
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
feedback.”Itdoesappearcontradictorytobothbeconsultingonindicatorsandapplyingthemwhiledraftinanadvicenote.Itisalsounclearwhethertheseindicatorsshouldbeusedascurrentlydrafted(moreoverthedraftdocumentisnomoreaccessible)orifthefinalversionwillbetheonetobeimplemented.
IndigenousPeoples
2.3TherevisedNFSSshallbe submitted to PSU forapproval by the end ofJuly2017.
4/Economic1/Social4/Environment
Economic:Thedatescannotbefixedsincethegenericinternationalindicatorsanddefinitionsarestillunderdevelopmentandfarfrombeingapproved.Environment:ThedatecannotbefixedsincethegenericinternationalindicatorsforIFLaswellastheirconceptualdefinitionsarestillindevelopmentandfarfrombeingapprovedbytheBrazilians.Social:SupportsEconomicandEnvironmentalchambercommentsinBrazil
Economic:Thereshouldbenoshort-cutoftheNFSStransferprocessforthesolepurposeofimplementingIFLindicators.ProposalforBrazil:replace"bytheendofJuly2017"with"sixmonthsafterapprovalofmaterialfromtheInternationalWorkingGrouponIFLs".Environment:ProposalforBrazil:replace"bytheendofJuly2017"with"sixmonthsafterapprovalofmaterialfromtheinternationalHCVTWG".
ThispartoftheAdviceNotewillbedroppedout,inordertoprovidesufficienttimeforthedialoguewiththeIndigenousPeoples
2.4TheapprovedNFSSshallbepublishedby01October2017tobecomeeffectiveon01January2018.
2/Economic1/Social4/Environment
Economic:Moretimeisnecessary,evenmoreatthismomentwheretheV5standardhasgreatchangesandreflects
Economic:ProposalforBrazil:1- Delete.2- Or2-tomaintainthedeadlines
ThispartoftheAdviceNotewillbedroppedout,inordertoprovidesufficienttimeforthe
Draft16Dec2016pm
39
Reference
Number of comments received
from chambers
Key message Proposed change
PSU response
significantchangesinthefieldSuchadeadlineisimpracticableThistimelineisnotconsistentwiththestandardandproceduresthatsurroundthetransferordevelopmentofNFSS.Environment:ThisproposalgoesagainstalltherulesoftransferofstandardsapprovedandvalidintheFSCsystem,thetransferprocessprovidesfor1yearofadaptationperiodbetweenstandards,thistimeisnecessary,evenmoreatthismomentwheretheV5standardhasgreatchangesandWhichreflectsignificantchangesinthefieldbythecertificateholders.SuchadeadlinelikepresentedisimpracticableandwillimplythelossofallcertificatesintheBrazilianAmazon.Social:SupportsEconomicandEnvironmentalchambercommentsinBrazil
alreadyforeseenwithinthenormsoftransfer,thatis,1yearaftertheapprovalbythePSUofthestandardthisbecomesvalidinthefield.EnvironmentProposalto(i)Deleteor(ii)Maintainthedeadlinesalreadyforeseenwithinthenormsoftransfer,thatis,1yearaftertheapprovalbythePSUofthestandardthisbecomesvalidinthefield.
dialoguewiththeIndigenousPeoples
Additionalquestion: Suggestionsforadditionalsafeguards PSUresponse
Draft16Dec2016pm
40
FSC secretariat islooking for additionalsafeguards to limitlogging in IFLs in 2017and 2018.Do youhavesuggestionsforsuch?
3/Economic1/Social7/Environment2/NationalOffices
Economic:
TheMinistryofForests,WildlifeandParksofQuebecsupportsforestcompaniesintheprovincewhowishtogetforestcertification.Inaccordancewiththisobjective,wewanttomeasuretheimpactthetransitionalmeasuresproposedbytheFSC(Motion65)willhaveonexistingcertificates.Tocarryoutthisanalysis,wemustfirstlyupdatetheintactforestlandscapes(IFL)layerproducedbytheGlobalForestWatchin2013.WealsoneedtovalidatetheIFLsectorsthathavebeenidentifiedsincetheyweregeneratedfromsatelliteimagery.Theseoperationsrequiretomanagealotofdataandtaketime.Furthermore,FSCCanadapublishestodayaguidefortheimplementationoftheIFLconceptinCanada.Giventheimportanceofthisissue,youwillunderstandthatweprefertocompleteouranalysisandtakeintoaccountallavailableinformationbeforesharinganycommentswithFSCInternational.Therefore,youwillreceiveourconclusionsbytheendofDecember2016,ifrelevant.ItistroublingthatFSCSecretariatislookingforadditionalsafeguardstolimitlogginginIFLswhiletheBoardofdirectorshasmandatedtheSecretariattoavoid“thesignificantundesiredsideeffectsinsomeofthemostimportantcountriesforFSC”.Aswritten,thisAdviceNotemightnotevenpreventthose“significantundesiredeffects”tohappen.Thisissueshouldbefirstmanagedatthecountrylevelandnotatthemanagementunitlevel.IfacountryalreadyhasmostofitsIFLoutsidethereachofforestmanagementactivities,itshouldsufficetomeettheintentofprotectingIFL.AdditionalindicatorsshouldbedevelopedinaveryshorttimeframeforrestoringIFLincountrieswithfewIFLlefttodemonstratethatIFLisanewemergingvalueintheFSCworldandtoensuresomefairness.
ConsistentwithrecommendationsfromtheIFLSolutionsForum,FSCpersonnelshoulddevelopanengagementstrategywithCanadianprovincialagencieswithlanduseplanningjurisdiction.ManyareasthattodayinCanadaappearas‘IFLsaretheresultoflanduseplanningprocessesanddecisionsmadebyprovincialagencies.Goingforward,forIFLsthatarenotprotected,theCHisnotincontrolofthisoutcomeandcanonlymakerecommendationstolanduseplanningauthorities.Government
TheseaspectswillbetakenintoconsiderationswhenformulatingtheAgendasforthenextIFLSolutionsForummeetings
Draft16Dec2016pm
41
agenciesmayacttoimplementanIFLprotectionrecommendation,rejectit,acceptatemporarydeferral,confirmexistingallocationofthelandforforestmanagement,re-allocatethelandorotherpurposeconsistentwiththepublicinterest.FirstNationswillbeconsultedbygovernmentintheseprocesses.Agreeincertaincircumstancesandregionsthat‘logging’inIFLhasnoimpactontheintegrity,intactnessandbiodiversityoftheforest.
Allowing SFM (Sustainable Forest Management) will attain the objective that FSCstrivesfor:
• tomaintainthetropicalforestandavoidconversiontootherland-uses;
• to see IFL in its wider landscape context: protected areas which could beincreased and SFM in the surrounding area, where for ex. In the tropicalforests, there is no impact on connectivity, wildlife is well protected andforestsaremaintainedunderFSCcertified,SFM;
InterpretIFLinitswidercontext,useascientificbasisforimplementingtheconcept,based on scientific information of degradation, un-sustainable management andfragmentation,andnotonsatelliteimagesofroadsonly.
ThepositiontoIFLcoreareasmustcomeupwithaclearroadmap:arecertificateholdersallowedtoharvestornotwithinCoreAreasduringthistransitionperiod?
WhataboutthosewhohavestartedharvestingwithinthoseareaswithrespecttotheirongoingManagementPlans?Aretheylosingtheircertificates?
ArecertifiedcompaniesbeingallocatedthepossibilitytoidentifytheirIFLcoreareasduringtheirplanning?
If those questions can be answered, than we can assess as well the need to addfurthersafeguards.
Brazil: Very concerned with potential problems in tropical forests the fact thatopinionsarenotbeenheardbytheWorkingGrouporFSChimself.
Brazil:VoicesfromthefieldclaimsthatifthisconceptisappliedhowitisFSCwillnotlhaveanycertifiedforestmanagementoperationsintropicalforests.Thisthiswillbeahugelossforall.Aforestwithouteconomicvaluewillturnintonon-forestuse.
Draft16Dec2016pm
42
Brazil:TheadoptionoftheIFLoperationsrestrictionsonFSCForestManagementcertifiedareasisanindirectassumptionthatFSCcertificationhasnoeffectiveness,despitealltechnicalinformationbedemonstratingtheopposite.Brazil:It’simportanttoclarifythatiftheIFLwillbeadopted,theFSCwilllossallFMcompaniesinAmazonia,openingspacetotheillegalwood.TheIFLmodeldoesn'tworkstotheseriousAmazonianCompanies.Environment:WehaveintegratedsafeguardsthroughoutthetextoftheAdvice,seeabove.
InBrazil,weunderstandthepressureandthedemandsfrommemberstoapplythismotion,butwearealsoveryworriedaboutthepotentialproblemsthemotionmayresulttothecertificationoftropicalforests.WehavethefeelingthatourconcernsarenotlistenedbytheHCVTechnicalWorkingGroup.Youallneedtobeawarethatifthisconceptwillbeappliedinitsoriginalform,therewillbenolongerFSCcertifiedforestmanagementinthetropics.Thiswouldbeabigloss,becausetheforestthatdonothaveeconomicvalueturnsintoothernon-forestsuses.InBrasilweonlyhave10forestsmanagementunitscertified,becausewearestrugglingwiththeillegallogging.IfFSCcreatesmoreproblemstothecertifiedcompanies,whicharealreadyinthebrinkofeconomicfeasibility,theymaybelostforgood.Itismorethanatechnicalproblem,itisapoliticalissueforus,andwethinkthatFSCICandothersarenotlisteningus.Oursystem(FSCsystem)havebeenalreadyquestioninourcountry,becauseofothermistakesformFSCIC.Social:SupportsEconomicandEnvironmentalchambercommentsinBrazilNationalOffices:FSCCanadawouldliketoworkwithourstakeholderstonegotiateasolutionandagreeonpotentialsafeguardsforCanada.AnexampleinCanadacouldbetheimplementationofthecaribouindicator…..FSCwouldadvicetheuseofReducedImpactLoggingonIFLuntilIFLindicatorapprovalatnationalleveltogetherwithclearguidanceonwhat“coreareas*”means.Mostimportantistobeclearisifcoreareaiswithinmanagementunitoratlandscape
Draft16Dec2016pm
43
level.Ifcoreareacouldbebetterexplained,FSCwouldincludearecommendationforcertificateholdersthattimberharvestingandroadbuildingarenotpermittedinsideIFLcoreareaswithinthemanagementunitsayingalsotheminimum%ofcoreareathatshouldbedefinedbytheCHtakingintoconsiderationlandscapelevelandmanagementplan.*Coreareas:TheportionofanIntactForestLandscape*whereintactnessismaintained,thatcontainsthemostimportantecologicalandculturalvaluesandwheretimberharvestingandroadbuildingaregenerallynotpermitted.(FSC-STD-60-004V1-0ENINTERNATIONALGENERICINDICATORS)My thoughts around how could be shaped the next Advice Note, allowing key regions to pursue the initiated work: According to me, FSC should act as a facilitator to insure that IFL debate is consequently connected to:
- Key areas for conservations (not only for forest stands: endangered species, sensible biotopes…);
- Human footprints and its prospective with the land-use plans being developed by WRI across the Globe;
- Indigenous and local communities territories; - Key ecological corridors that should be maintained for the humankind (network
of protected areas and FSC certified concessions). We didn’t start properly the dialogue with governments by lack of human resources and of money. Inviting governments for a roundtable is extremely costly and time-consuming. This dialogue will be highly difficult but needed, of course. I already know that reviewing a management plan because of the Motion 65 would be something almost impossible in a time frame inferior to 05 years, because we are not parliamentarians and even if FSC is changing the paradigms of the forestry sector for 20 years, we need time and means to achieve our mission. The indicator 1.5 is key in the process, and this would require a real brainstorm between Regional Offices, PSU and Director’s Office to see how we could be relevant and efficient here. FSC Congo Basin Office is committed to implement the Advice Note and FSC policies but we enter in a new phase here, after the already commonly accepted HCV management.
Draft16Dec2016pm
44
I would also allow myself to ask that the next version of the Advice Note be more clear in terms of what is prohibited and what is accepted until a new NFSS enters into force. This is highly sensitive but needs to be discussed by our peers and across the chamber.