accelerated hybrid construction for education facilities

Post on 11-Apr-2017

14 Views

Category:

Education

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Innovative Modular Solutions | www.innovativemodular.com

Innovative Modular SolutionsAccelerated Hybrid Construction Technology for Education Facilities

2016

Innovative Modular Solutions | www.innovativemodular.com

About Innovative Modular Solutions Founded in 1999o Licensed general contractor / commercial modular contractoro Prime or specialty contractor, offering design-build serviceso Temporary and permanent projects of 400 to 100,000 square feet

Team of industry veterans with diverse, complementary skillso Technical construction managemento Factory manufacturing, managemento General contracting and operations, saleso Sales and sales management

All employees are CPR and first-aid trained.

All field workers are OSHA certified (10 or 30 hour).

Innovative Modular Solutions | www.innovativemodular.com

IMS Offers Accelerated Construction Technology

Innovative Modular Solutions | www.innovativemodular.com

Modular Construction Overview Modular solutions provide an alternative method of construction. Building components are manufactured in a controlled factory environment to the same

building codes as conventional construction, using the same materials. Partially finished components are transported to the project site, assembled and finished. Modular buildings can be one, two or more stories. Modular buildings can be temporary, semi-permanent or permanent. Modular construction can be easily incorporated with other types of construction to

capitalize on the advantages that each has to offer.

Innovative Modular Solutions | www.innovativemodular.com

Benefits of Modular Construction Speed: On Time, Accelerated Construction Scheduleo Concurrent site preparation and modular component fabricationo Reduced weather delayso Works well in areas where the construction season is shorto Reduced job site ‘chaos’ – limited deliveries, limited disruption

Flexibility: Project Team Defines Design and Finisho Design of building as well as makeup of design teamo Portability responds to changes in user demographicso Variety of financing options available

Cost: Controlled Budget Processo Replicable, standardized

• Few change orders • Improved quality

o Costs typically less than conventional construction

Innovative Modular Solutions | www.innovativemodular.com

Modular = Green Inherently green – contributes to sustainable building initiatives Limits site disturbance Minimizes waste onsite due to factory construction and recycling Eliminates environmental factors that affect building materials Reduces overall construction time Simplifies relocation and reuse of buildings Saves energy through o Reduced building volumeo Efficient HVAC designo High insulation levels

Innovative Modular Solutions | www.innovativemodular.com

CONVENTIONAL—SITE BUILT CONSTRUCTION

PRE-ENGINEERED CONSTRUCTION

Project SiteDeliver

CutPrepare

Assemble Piece by Piece

Raw Material Inputs

Manufacturing FacilityDeliver

Cut, PrepareShip

Building Element Outputs

Project SiteDeliver

Assemble Element by Element

Relative Tim

e Scale

Longest Delivery Cycle

MODULAR CONSTRUCTION

Manufacturing FacilityDeliver

Cut, Prepare Assemble

Ship

Building Component Outputs

Project SiteDeliver, Assemble

Component by Component

Shortest Delivery Cycle

Raw Material Inputs Raw Material Inputs

Construction Process:

Innovative Modular Solutions | www.innovativemodular.com

60% - 90% factory completion including MEP

Innovative Modular Solutions | www.innovativemodular.com

Conventional Building Practices employed on site

Innovative Modular Solutions | www.innovativemodular.com

Can be indistinguishable from site built structures

Innovative Modular Solutions | www.innovativemodular.com

Hybrid Construction is a Combination of Modular and Conventional, Pre-Engineered, or another Method of Construction

o Common for Large Projects

o Allows the Project to take Advantage of the Benefits of Different Methods

o High Ceiling, Long Span Spaces can be Conventional or Pre-Engineered

o Repetitive Spaces (Classrooms, Restrooms, Offices) can be Modular

o Concurrent Construction - Preplanning Allows Modular Components to be Built Off-Site While Site Preparation Activities (Grading, Foundations, Utilities, etc.) are completed on site

About Hybrid Construction

Innovative Modular Solutions | www.innovativemodular.com

Existing BuildingAddition Addition

Future Building

Modular Construction easily accommodates Phased Construction o Future Additions (Horizontal)o Future Additions (Vertical) – Add a Second Flooro Future Upgrade to Finishes

Phased Construction Offers Flexibility

Innovative Modular Solutions | www.innovativemodular.com

The Project Team should review all material selections and

specifications

Selections are easily customized

Selections include most options available in conventional construction

Material Selection drives the cost of any construction project

Customers should use and specify ‘commercial grade’ materials

Material Selection

Innovative Modular Solutions | www.innovativemodular.com

Options Include: Outright Purchase

Bond Financing

Operating Lease

Finance Lease

Innovative Modular Solutions | www.innovativemodular.com

Temporary and Semi-Permanent Construction

Innovative Modular Solutions | www.innovativemodular.com

Permanent Modular Construction

Innovative Modular Solutions | www.innovativemodular.com

Custom Floorplans

Innovative Modular Solutions | www.innovativemodular.com

Modular building quality and design has improved significantly Acceleratedo Concurrent construction = shorter schedule

Cost effectiveo Factory costs are controlled, will maintain value if properly designed, built, and

maintained Flexibleo Design and finish

Sustainableo Energy efficient, less disruption

Financingo Several options available

Summary

Innovative Modular Solutions | www.innovativemodular.com

www.innovativemodular.com