ABC Chemical Complex 1
Hazardous Liquid Pipelines
ABC Company
ABC Chemical Complex
Engineering Specification
ABC Chemical Complex 2
Hazardous Liquid Pipelines
1.0 SCOPE– Covers the design, materials, fabrication,
construction, inspection, testing, operations, maintenance, and safety aspects of hazardous liquid pipeline systems
– Also covers the components including, but not limited to, pipe, relief devices, valves, fittings, flanges, bolting, gaskets, hangars, and supports.
ABC Chemical Complex 3
Hazardous Liquid Pipelines
EXCLUSIONS– Auxiliary piping such as water, air, steam,
lubricating oil, gas, and fuel– Pressure vessels, heat exchangers, pumps,
meters, and other equipment not in scope– Petroleum refinery, natural gasoline, gas
processing, ammonia, carbon dioxide processing, and bulk plant piping covered in the scope of ASME/ANSI B31.3, Plant Piping.
ABC Chemical Complex 4
Hazardous Liquid Pipelines
Exclusions (Continued)– Gas transmission and distribution piping
systems covered under ASME/ANSI B31.8– Piping at or below 15 psi– Piping above 15 psi if design temperature is
below -20oF or above 250oF– Design and fabrication of proprietary items of
equipment, apparatus, or equipment
ABC Chemical Complex 5
Hazardous Liquid Pipelines
INTENT– Provide engineering specifications for safe
construction, operation, maintenance, and inspection of ABC hazardous liquid pipelines
– Shall meet or exceed the requirements in ASME/ANSI B31.4 and DOT 49CFR195
– Not retroactive for existing pipelines which shall be inspected and tested to the Code used in original design and construction.
ABC Chemical Complex 6
Hazardous Liquid Pipelines
3.0 PIPING SYSTEMS DEFINITIONS– General Terms (14)
– Piping Systems (20)
– Pressure Relief Stations and Regulators (3)
– Valves (2)
– Pipe and Piping Terms (2)
– Dimensional Terms (3)
– Mechanical Properties (5)
– Steel Pipe (3)
ABC Chemical Complex 7
Hazardous Liquid Pipelines
4.0 DESIGN, FABRICATION, OPERATION, AND TESTING TERMS– Uprating (1)– Pressure Terms (8)– Temperature Terms (3)– Stress Terms (5)
ABC Chemical Complex 8
Hazardous Liquid Pipelines
5.0 MATERIALS AND EQUIPMENT– Acceptable Materials and Specifications– Marking– Material Specifications
» Steel Pipe
» Fittings
– Transportation of Line Pipe– Conditions for Reuse of Line Pipe
ABC Chemical Complex 9
Hazardous Liquid Pipelines
6.0 WELDING– Welding Terms
– Preparation for Welding» Safe Practices in Cutting and Welding
» Welding Processes and Filler Metal
» Welding Qualifications
» Qualification Records
» Material Limitations
» Welder Requalification Requirements
» Qualification Records (WPS, PQR, Welder)
ABC Chemical Complex 10
Hazardous Liquid Pipelines
7.0 Design Conditions– Provides a set of standards covering
» Specifications for, and selection of, equipment and piping components
» Acceptable methods of making branch connections
» Provisions for temperature changes
» Approved methods for support and anchorage of exposed and buried piping systems.
ABC Chemical Complex 11
Hazardous Liquid Pipelines
Design Conditions (Continued)– Exclusions
» Pipe Materials (Section 5)» Welding Procedures (Section 6)» Installation and Testing of Piping Systems
– Special Engineering Stresses Not Specifically Covered in Specification
» River crossings, inland coastal water areas, bridges, areas of heavy traffic, long self-supported spans, unstable ground, vibration, earthquake, thermal, etc.
ABC Chemical Complex 12
Hazardous Liquid Pipelines
Allowable Stress Values– S = 0.72 x E x SMYS, psi (MPa)
where 0.72 = design factor
E = weld joint factor, normally 1
– Allowable stress values shall be determined for » Used pipe or new/used pipe of unknown or ASTM 120
specifications» Pipe which is cold worked to meet SMYS and reheated
to 600oF or higher shall be 75% of applicable stress value
ABC Chemical Complex 13
Hazardous Liquid Pipelines
Allowable Stress Values (Continued)– In shear shall not exceed 45% SMYS– In bearing shall not exceed 90% SMYS– Structural supports and restraints shall not
exceed 66% SMYS– Structural supports and restraints of unknown
piping specifications shall be assigned an SMYS of 24,000 psi or less
ABC Chemical Complex 14
Hazardous Liquid Pipelines
Limits of Calculated Stresses Due to Sustained Loads and Thermal Expansion– Internal Pressure Stresses– External Pressure Stresses– Allowable Expansion Stresses– Additive Longitudinal Stresses– Additive Circumferential Stresses Due to
Occasional Loads
ABC Chemical Complex 15
Hazardous Liquid Pipelines
Limits of Calculated Stresses Due to Occasional Loads– Operation
» Sum of longitudinal stresses produced by pressure, live and dead loads, and occasional loads, i.e. wind and earthquake shall not exceed 80% SMYS
– Test» Stress due to test conditions are not subject to above
limitations
ABC Chemical Complex 16
Hazardous Liquid Pipelines
Limitations on Design Pressure, P– Shall not exceed 85% of mill test pressure– Alternatively, shall not exceed 85% of field test
pressure if mill tests are not available Limitations on SMYS
– Used pipe from Company stock with known specifications may be assigned full S value
– An S value = 24,000 psi shall be assigned to pipe with unknown specifications
ABC Chemical Complex 17
Hazardous Liquid Pipelines
Additional Requirements for Nominal Wall Thickness, t– Shall not be reduced to less than 90% of the design
thickness under any circumstances
Allowances– Corrosion (Not required if corrosion controlled)
– Threading and Grooving
– Weld Joint Factors
– Wall Thickness and Defect Tolerances
ABC Chemical Complex 18
Hazardous Liquid Pipelines
Straight Pipe Under Internal Pressure– Design wall thickness of steel pipe shall be
calculated by the following equationt = PiD/2S
where Pi=internal design gage pressure
D=outside diameter of pipe, in.
S=applicable allowable stress value, psi
ABC Chemical Complex 19
Hazardous Liquid Pipelines
Additional Pressure Design Considerations– Flanges, Reducers, Fittings, Elbows, Bends,
and Intersections– Closures
» Quick Opening Closures» Closure Fittings» Closure Heads» Fabricated Closures» Bolted Blind Flange Connections
ABC Chemical Complex 20
Hazardous Liquid Pipelines
Expansion and Flexibility– Means of Providing Flexibility– Amount of Expansion– Properties
» Coefficient of Thermal Expansion
(6.5x10-6in./in./oF)
» Modulus of Elasticity (29x106 psi)
» Poisson’s Ratio (0.3 for steel)
ABC Chemical Complex 21
Hazardous Liquid Pipelines
Design of Pipe Supporting Elements Combined Stress Calculations
– Restrained Pipelines– Unrestrained Pipelines– Analysis
» Basic Assumptions and Requirements
ABC Chemical Complex 22
Hazardous Liquid Pipelines
8.0 CONSTRUCTION– Construction Specifications
– Inspection Provisions
– Right-of-Way
– Handling, Hauling, Stringing, and Storing
– Damage to Fabricated Items and Pipe
– Ditching
– Welding
– Tie In
ABC Chemical Complex 23
Hazardous Liquid Pipelines
CONSTRUCTION (Continued)– Installation of Pipe in Ditch
– Backfilling
– Hot Taps
– Restoration of Right-of-Way and Cleanup
– Special Crossings
– Block and Isolating Valves
– Mainline Valves
– Scraper Traps
ABC Chemical Complex 24
Hazardous Liquid Pipelines
CONSTRUCTION (Continued)– Line Markers
– Corrosion Control
– Pump Station, Tank Farm, and Terminal Construction
– Storage and Working Tankage
– Electrical Installations
– Liquid Metering
– Liquid Strainers and Filters
ABC Chemical Complex 25
Hazardous Liquid Pipelines
9.0 INSPECTION – General
» Shall assure compliance with material, construction, welding, assembly, and testing requirements of ABC Specifications, ASME/ANSI B31.4 and DOT 49CFR 195
– Qualification of Inspectors» Inspection personnel shall be qualified by training
and experience to the criteria in API 570
ABC Chemical Complex 26
Hazardous Liquid Pipelines
Inspection Services– Right-of-way and
grading– Ditching– Line up and pipe
surface inspection– Welding– Coating– Cathodic protection– Tie-in and lowering
– Backfilling & cleanup
– Pressure testing
– Station construction
– River crossings
– Electrical installation
– Radiography
– Corrosion control» external
» internal
ABC Chemical Complex 27
Hazardous Liquid Pipelines
Inspection Services– Backfilling & cleanup– Pressure testing– Station construction– River crossings– Electrical installation– Radiography– Corrosion control
» external» internal
ABC Chemical Complex 28
Hazardous Liquid Pipelines
Type and Extent of Examination Required– Visual
» Material-mechanical damage
» Permanent records: Location of pipe, wall thickness, type, specification, and manufacturer
– Construction» Surface defects: before coating operation and during
lowering-in and backfilling operations
» Pipe swabbing operation
ABC Chemical Complex 29
Hazardous Liquid Pipelines
» Proper alignment and condition of weld joint surface before welding
» Inspect stringer bead for cracks» Remove irregularities on weld cap to prevent
coating damage» Inspect all repairs, changes, or replacements prior to
backfilling operation» Inspect fit of pipe to ditch prior to backfilling» Inspect backfilling operations for quality and
compaction of backfill, placement of material for erosion control, and possible coating damage
ABC Chemical Complex 30
Hazardous Liquid Pipelines
» Inspect cased crossings during installation to assure that the carrier pipe is supported, sealed, and insulated from the casing
» Inspect piping components other than pipe to insure damage-free condition and proper installation
ABC Chemical Complex 31
Hazardous Liquid Pipelines
Supplementary Types of Examination– Weld inspection and testing
» Complete in accordance with ABC Specs and ASME/ANSI B31.4
– Weld defect and repair» Complete in accordance with ABC Specs and
ASME/ANSI B31.4
– Coatings» Use ABC Specs and ASME/ANSI B31.4
ABC Chemical Complex 32
Hazardous Liquid Pipelines
9.2 TESTING– Testing of Fabricated Items
– Testing After New Construction» Systems or Parts of Systems
» Testing Tie-Ins
» Testing Controls and Protective Equipment
– Hydrostatic Testing of Internal Pressure Piping» Hydrotest to 1.25 times the internal design pressure for at least
four (4) hours
» Use API 1110 for guidance in hydrostatic tests
ABC Chemical Complex 33
Hazardous Liquid Pipelines
» Treat hydrotest water with a bactericide and corrosion inhibitor
» Relieve excess pressure during the test as required
» Hydrotesting with gas or nonvolatile hydrocarbons is not permitted on ABC projects without written permission from Company management
– Leak Testing» Reduce hydrotest pressure to design pressure and
hold for an additional eight (8) hours
ABC Chemical Complex 34
Hazardous Liquid Pipelines
Qualification Tests for Pipe– Visual Examination
– Bending Properties
– Determination of Wall Thickness
– Determination of Weld Joint Factor
– Weldability
– Determination of Yield Strength
– Minimum Yield Strength Value
– Records
ABC Chemical Complex 35
Hazardous Liquid Pipelines
10.0 Operation and Maintenance Plans and Procedures
– Written detailed plans and training programs for employees
– Plan for external and internal corrosion control– Written emergency plan– Plan for reviewing changes in conditions
affecting the integrity and safety of the piping system.
ABC Chemical Complex 36
Hazardous Liquid Pipelines
– Liaison with local authorities and other pipeline operators to prevent excavation accidents.
– Procedures to analyze all failures and accidents to determine the cause and prevent recurrence.
– Record system to administer the plans and procedures.
– Procedures for abandoning pipelines– Procedures to assure public safety in pipeline
operation and maintenance
ABC Chemical Complex 37
Hazardous Liquid Pipelines
– Operation and maintenance of piping systems in conformance with ABC Specifications, ASME/ANSI B31.4, and DOT 49CFR195.
– Plan and procedure modifications as required
ABC Chemical Complex 38
Hazardous Liquid Pipelines
10.2 PIPELINE OPERATIONS AND MAINTENANCE
– Operating Pressure» The internal design pressure and pressure rating for
all components shall not be exceeded in steady state operations.
» Pressure rise due to surges shall not exceed the internal design pressure at any point in the piping system by more than 10%.
ABC Chemical Complex 39
Hazardous Liquid Pipelines
» Requalification of a piping system is required if a higher operating pressure produces a hoop stress more than 20% SMYS. Requirements in paragraph 456, ASME/ANSI B31.4 shall be followed without exception.
» Derating of a pipeline to a lower operating pressure in lieu of repair or replacement may be completed with the maximum operating pressure determined by paragraph 10.2.7, ABC Specification.
» Codes in effect during original construction shall be consulted for allowable stress and design criteria.
ABC Chemical Complex 40
Hazardous Liquid Pipelines
– Communications– Markers– Right-of-Way Maintenance– Patrolling– Pipeline Repairs
» Repairs shall be completed in accordance with ABC Specification, Repair of Pipelines.
» Allowable pipeline repairs and repair methods are summarized in B31.4 and ABC specifications.
ABC Chemical Complex 41
Hazardous Liquid Pipelines
Railroads and Highways Crossing Existing Pipelines– Use API 1102 to determine the total stress
caused by internal pressure and external loads. If new external pipe loading exceeds 0.72SMYS, Company will install mechanical reinforcement, suitable protection, or increased pipe thickness.
– Installation of uncased carrier pipe is preferred.
ABC Chemical Complex 42
Hazardous Liquid Pipelines
10.3 PUMP STATION, TERMINAL, AND TANK FARM OPERATION AND
MAINTENANCE– Pressure limiting devices, regulators, flow
controllers, relief valves, and other safety devices shall be inspected annually to determine condition and functionality.
– Inspect storage tanks in accordance with API 653.
ABC Chemical Complex 43
Hazardous Liquid Pipelines
CORROSION CONTROL EMERGENCY PLAN RECORDS
– Necessary operational data– Pipeline patrol records– Corrosion records as required by B31.4– Records for routine and/or unusual inspections– Pipeline repair records
ABC Chemical Complex 44
Hazardous Liquid Pipelines
10.7 QUALIFYING A PIPING SYSTEM FOR A HIGHER OPERATING PRESSURE
– Review initial design and previous testing
– Determine present condition by leak surveys and other field inspections, examination of maintenance and corrosion control records, or other suitable means.
– Complete necessary repairs, replacements, or alterations.
ABC Chemical Complex 45
Hazardous Liquid Pipelines
– Maximum steady state operating pressure may be increased after compliance with the previous slide and one of the following provisions:
» If the condition of the pipeline is consistent with the design and hydrotesting has been completed to a test pressure equal to or higher than required for the new steady state operating pressure, the system is approved for the higher operating pressure.
» The system is successfully hydrotested to a test pressure required for the higher operating pressure.
ABC Chemical Complex 46
Hazardous Liquid Pipelines
10.8 Abandoning a Piping System– Disconnect all facilities to be abandoned from
all transported sources, i.e., other pipelines, meter stations, control lines, and other equipment.
– Purge all facilities to be abandoned to replace the transported liquid and vapor with an inert material.
– Seal the ends of the piping system.
ABC Chemical Complex 47
Hazardous Liquid Pipelines
11.0 CORROSION CONTROL– Scope– External Corrosion Control– Internal Corrosion Control– Pipelines in High Temperature Service– Stress Corrosion and Other Phenomena– Records