a12-1 · trap of the jhimruk hydropower plant has been calc lated [andrcassen, 1994']. the...

Post on 21-Mar-2020

9 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Part 6-1 Appendix 12

A12-1 The Study on Introduction of Renewable Energies in Rural Areas in Myanmar

Nippon Koei / IEEJ Volume 6 Appendices to Manuals

Notes; Source: “Sediment control: recent developments for headworks” by D.K. Lysne, N.R.B.Olsen, H.St∅le and T.Jacobsen,

The Norwegian Institute of Technology, Trondhelm, Norway, pp.46 – 49 of Hydropower and Dam March 1995.

Part 6-1 Appendix 12

A12-2 The Study on Introduction of Renewable Energies in Rural Areas in Myanmar

Nippon Koei / IEEJ Volume 6 Appendices to Manuals

Part 6-1 Appendix 12

A12-3 The Study on Introduction of Renewable Energies in Rural Areas in Myanmar

Nippon Koei / IEEJ Volume 6 Appendices to Manuals

top related