80,000 sf building in plainfield logistics park
Post on 03-Apr-2022
2 Views
Preview:
TRANSCRIPT
Plainfield Logistics ParkOverview & Highlights
80-acre park located in Plainfield, Indiana
Premier southwest submarket of Indianapolis
Located off SR 267 (signalized intersection) with immediate access to I-70
10-minute drive-time to I-465
8-minute drive time to Indianapolis International Airport & FedEx Hub
Close proximity to large, skilled labor pool
10-year real estate tax abatement
Infrastructure complete
DanvilleDanville
ClaytonClayton
MonroviaMonrovia
MooresvilleMooresville
PlainfieldPlainfield
AvonAvon
BrownsburgBrownsburg
WhitestownWhitestown
IndianapolisIndianapolis
GreenwoodGreenwood
FranklinFranklin
www.plainfieldlogisticspark.com
Data Center Building80,000 SF Building in Plainfield Logistics Park
Luke Wessel, SIOR317.639.0471luke.wessel@cushwake.com
Grant Lindley, SIOR, CCIM317.639.0446grant.lindley@cushwake.com
Stephen Lindley317.414.2112slindley@ambrosepg.com
PROPOSEDBUILDING III474,000 SF(918' x 520')
PROPOSEDBUILDING II203,000 SF(780' x 260')
I GNIDLIUBFS 082,981)'062 x '827(
DRIV
E-IN
DRIV
E-IN
DRIV
E-IN
NOITNETED
52'.PYT
50'
TYP.
60'
GNIKRAP OTUA 111
DRIV
E-IN
DRIV
E-IN
GNIKRAP RELIART 02
CR 8
25
SKCOD 11 SKCOD 01
.CA 30.3LECRAP CG
25 F
UTUR
E AU
TO P
ARKI
NG
SR 2
67.CA 25.1
LECRAP CG
50'
TYP.
60'
52'TYP.
10 DOCKS
140'
10 DOCKS
138 AUTO PARKING
DRIV
E-IN
24 F
UTUR
E AU
TOS
10 TRAILERS
DRIV
E-IN
55'
10 FUTURE TRAILERS
50'
TYP.
60'
54'TYP.
140'
140'
24 DOCKS
55'
129
AUTO
PAR
KING
31 AUTO PARKING
36 TRAILERS
36 FUTURE TRAILER PARKING
25 F
UTUR
E AU
TOS
60'
94 FUTUREAUTO PARKING
24 DOCKS
DETENTION
CAMBY ROAD
140'
PROPOSED DATA CENTER
80,000 SF
350'x250'
±8.74 ACRES
I-70
BERM
50' T
REE
PRES
ERVA
TION
ARE
A
60 AUTO PARKING
DRIVE-IN
2 DOCKS
Scale:Date:
North
Master Plan1" = 200'-0"12/10/20
(to scale on 11"x17" paper)
Plainfield Logistics ParkSR 267 & Camby Road
Plainfield, Indiana
Plainfield Logistics ParkProposed Data CenterPlainfield, Indiana
SITE DUE DILIGENCE COMPLETED + INFRASTRUCTURE COMPLETE
Phase I Environmental
Low natural disaster risk
Infrastructure ready by Q1 2021
Electricity feed – two dedicated 12.47 kV distribution circuits
20 MW capacity 18 – 24 months
Long-haul fiber with bandwidth to satisfy data center requirements
Close proximity to major fiber connection point/multiple networks
Zoning I-2 – data center permitted within classification
Outside storage permitted
Maximum building height 75 ft.
Parking 1/3000 SF of floor space
Monument signage
UTILITY PROVIDERS
Water: Town of Plainfield
Power: Duke Energy
Data: AT&T
Sewer: Town of Plainfield
Gas: Vectren
Cushman & WakefieldAmbrose Property Group
Economic Incentives (state and local level)
Data Center Sales Tax Exemption
Property tax offset
Investment and Job Creation
Duke Energy flexible rate options
Rider 58 / 5-year reduction up to 30%
Plainfield Data Center ReportClick here to view
certifiedbyverisite.com
Camby RdCamby Rd
PROPOSEDBUILDING III474,000 SF(918' x 520')
PROPOSEDBUILDING II203,000 SF(780' x 260')
I GNIDLIUBFS 082,981)'062 x '827(
DRIV
E-IN
DRIV
E-IN
DRIV
E-IN
NOITNETED
52'.PYT
50'
TYP.
60'
GNIKRAP OTUA 111
DRIV
E-IN
DRIV
E-IN
GNIKRAP RELIART 02
CR 8
25
SKCOD 11 SKCOD 01
.CA 30.3LECRAP CG
25 F
UTUR
E AU
TO P
ARKI
NG
SR 2
67
.CA 25.1LECRAP CG
50'
TYP.
60'
52'TYP.
10 DOCKS
140'
10 DOCKS
138 AUTO PARKING
DRIV
E-IN
24 F
UTUR
E AU
TOS
10 TRAILERS
DRIV
E-IN
55'
10 FUTURE TRAILERS
50'
TYP.
60'
54'TYP.
140'
140'
24 DOCKS
55'
129
AUTO
PAR
KING
31 AUTO PARKING
36 TRAILERS
36 FUTURE TRAILER PARKING
25 F
UTUR
E AU
TOS
60'
94 FUTUREAUTO PARKING
24 DOCKS
DETENTION
CAMBY ROAD
140'
PROPOSED DATA CENTER
80,000 SF
350'x250'
±8.74 ACRES
I-70
BERM
50' T
REE
PRES
ERVA
TION
ARE
A
60 AUTO PARKING
DRIVE-IN
2 DOCKS
Scale:Date:
North
Master Plan1" = 200'-0"12/10/20
(to scale on 11"x17" paper)
Plainfield Logistics ParkSR 267 & Camby Road
Plainfield, Indiana
Plainfield Advantage
+ Hendricks County Population: 167,009
+ Hendricks County has grown 60.4% since 2000
+ Dedicated programs to support a large, highly skilled workforce
+ Indianapolis Airport ranked Best Airport in North America for 7th consecutive year and features 2nd largest FedEx facility in the world
+ Indiana ranks #1 in Midwest and #5 in the nation as Best State for Business
+ Indiana ranks #1 in Midwest and #10 in the nation as Best Tax Climate
80,000 SF Data Center Building in Plainfield Logistics Park
1-day drive time
DanvilleDanville
ClaytonClayton
MonroviaMonrovia
MooresvilleMooresville
PlainfieldPlainfield
AvonAvon
BrownsburgBrownsburg
WhitestownWhitestown
IndianapolisIndianapolis
GreenwoodGreenwood
FranklinFranklinPark HighlightsPlainfield Logistics Park features flexible sites for build-to-suit opportunities, with up to 3 Class-A distribution buildings planned, totaling nearly 900,000 square feet, and a Verisite certified data center site. These modern, cross-dock and rear-load logistics facilities will range in size from 67,000 square feet to 474,000 square feet.
Plainfield offers easy access to the I-70, I-65 and I-74 distribution corridors, as well as the Indianapolis International Airport, which features the second largest FedEx facility in the world.
Site to Airport8-minute drive time6.4 miles
Site to I-46510-minute drive time8 miles
Site to Indianapolis20-minute drive time16.4 miles
Allison Transmission
Amazon
Balkamp
Becton Dickinson
CEVA
DHL
FedEx
Hartz Pet Products
Home Depot
Kohls
Medline
Niagra Water
PepesiCo
Pill Pack
Rolls-Royce
Sealy Posturpedic
Stitch Fix
Trane
UPS
Walmart
Whirlpool
Corporate Neighbors
top related