MONTHLY REPORT
1 | P
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
INDEX
1.0 Project Background 2
2.0 Third Party Quality Audit Consultant 3
3.0 Major Activities and Review Meetings of the Month 3
4.0 Status of TPQA Visits 4
5.0 Progress of NCRMP works 5
TPQA Status Report for NCRMP Works To the end of(31-03-2012) 6
6.0 District wise status of tests conducted by TPQA 28
7.0 Details of Audit Reports Submitted during this Month 29
8.0 Details of Environmental & Social Reports Submitted during this Month 30
9.0 Observations of Submitted Reports 31
Status of Non Compliance Reports for NCRMP works to the end of 31-03-2012
Photographs of Site Visits during the Month
-
7/31/2019 7. March MPR 2012
3/52
MONTHLY REPORT
2 | P
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
1.0 Project Background
Andhra Pradesh (AP) state has one of the longest coastal belts in India. Out of 67,362 Km of road network in the state, the
nine coastal districts cover 26,000 km of road length. Every year during the period of April-May and September-December,
cyclonic situations set in to the Bay of Bengal. With the recent changes in climatic conditions, the catastrophic events are
increasing resulting in very devastating cyclones like Laila, Jal etc where the loss is enormous. In the 97 years ranging
from 1892 to 1989, there were as many as 67 cyclones within the State.
It is essential to provide safe residential accommodation to the vulnerable population during any eventuality or disaster due
to natural calamities such as cyclones and associated tidal waves and storm surges. The project is formulated based on
experiences of Government of Andhra Pradesh in mitigating such disasters during the past and also keeping in view the
existing facilities available in the project area in Andhra Pradesh.
The Government of India has applied for a credit of US$ 255 Million equivalent from the International Development
Association (IDA) toward the cost of National Cyclone Risk Mitigation Project (NCRMP), and it intends to apply the
proceeds to payments for goods, works, related services and consulting services under this Project.
National Cyclone Risk Mitigation Project (NCRMP) Project Implementation Unit (PIU), Andhra Pradesh, headquartered at
Hyderabad has invited the consultants to submit proposals for providing the consultancy services for Third Party Quality
Audit for 9 coastal districts namely Srikakulam, Vijayanagaram, Visakhapatnam, East Godavari, West Godavari, Krishna,
Guntur, Prakasam and Nellore. The project Construction of Multipurpose Cyclone Shelters, Roads to Cyclone
Shelters, and Roads to habitations and Roads & Bridges under NCRMP is funded by International Development
Association and received through Government of India. This consultancy is envisaged to audit the quality of works being
implemented by various line departments working under PIU. The number of works under progress / for which
agreements are concluded in each district is shown in the table below.
District
No. of works(Under Concluded Agreements) No. of works under ProgressNo. ofworks
notstarted
RHB RCS MPCS BridgesRoads(R&B)
Total RHB RCS MPCS BridgesRoads(R&B)
Srikakulam 6 8 2 4 1 21 6 5 2 3 1 4
Vizianagaram - - - 2 1 3 - - - 2 1 0
Visakhapatnam 8 6 7 - - 21 8 6 7 - - 0
East Godavari 2 8 3 - - 13 2 7 3 - - 1
West Godavari 10 - - - - 10 9 - - - - 1
Krishna 5 3 - - - 8 5 3 - - - 0
Guntur 3 12 - 2 - 17 3 7 - 2 - 5
Prakasham 14 7 2 1 - 24 14 6 2 1 - 1
Nellore 16 8 - - - 24 16 8 - - 0
-
7/31/2019 7. March MPR 2012
4/52
MONTHLY REPORT
3 | P
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
2.0 Third Party Quality Audit Consultant.
To provide Consulting Services of Third Party Quality Auditor for Construction of Multipurpose Cyclone Shelters, Roads to
Cyclone Shelters, Roads to habitations, and Roads and Bridges under NCRMP in 9 coastal districts The Commissioner for
Disaster Management & Project Director, Project Implementation Unit (PIU) NCRMP has selected Egis International in JVwith Egis India Consulting Engineers (I) Pvt. Ltd. On 31
stMay2011, the Contract for Consultancy Service was signed
between The Commissioner for Disaster Management & Project Director, Project Implementation Unit (PIU) NCRMP and
the Egis International in JV with Egis India Consulting Engineers (I) Pvt. Ltd.
3.0 Major Activities and Review Meetings of the Month
S.No. Place Date Activity
1 06-03-2012 Hyderabad Attended Review meeting at NCRMP office
2 14-03-2012 Hyderabad Attended Review meeting at NCRMP office
3 16-03-2012 Hyderabad Attended video conference at C Block in the Secretariat onNCRMP works of Panchayat Raj Department
-
7/31/2019 7. March MPR 2012
5/52
MONTHLY REPORT
4 | P
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
4.0 Status of TPQA Visits:
The following table shows the details of TPQA visits to sites in respective districts.
District Total Number of VisitsUp to Feb.'2012 In Mar.'2012 Up to Mar.'2012
Srikakulam 163 25 188
Vizianagaram 60 6 66
Vishakhapatnam 143 36 179
East Godavari 235 65 300
West Godavari 204 43 247
Krishna 137 29 166
Guntur 152 15 167
Prakasam 196 27 223
Nellore 158 18 176
No. of Visits by TPQA
-
7/31/2019 7. March MPR 2012
6/52
MONTHLY REPORT
5 | P
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
5.0 Progress of NCRMP works:
The district wise progress of works is shown below. The works in the West Godavari are not started and the works in
Krishna District has just started. At many places the first milestone is completed but works are not started. The line
departments are to analyze the reasons for the slow progress and if necessary penalty for the slow progress as per the
agreement conditions should be imposed.
Third Party Quality Audit by Egis India consulting services
Summary of Activities
S.No. District
Agreements for PackagesCommunicated
Status of works
PR R&B Progress Not Started
1 Srikakulam 6 5 17 4
2 Vizianagaram - 3 3 0
3 Visakhapatnam 13 0 21 0
4 East Godavari 7 0 12 1
5 West Godavari 3 0 9 1
6 Krishna 4 0 8 0
7 Guntur 6 2 12 5
8 Prakasham 12 1 23 1
9 Nellore 16 0 24 0
Total 67 11 129 12
Total Packages for which Agreements are received 78
Total Number of works in the above packages 141
-
7/31/2019 7. March MPR 2012
7/52
MONTHLY REPORT
6 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
TPQA Status Report for NCRMP Works To the end of(31-03-2012)
S.No. District
Packages /Works
entrustedStatus of Works
No.of
Visitsof
TPQA
TotalNo.
of QCtestsdone
NCRsQC
ReportsIssued
Environmentaland Social
ReportsIssued
Issued closed Pending
PR R&B StartedNot
Started
1 Srikakulam 06_16 5_5 17 4 188 526 10 9 1 13 17
2 Vizianagaram - 3_3 3 0 66 316 - - - 7 5
3 Visakhapatnam 13_21 - 21 0 179 1193 9 9 - 18 16
4 East Godavari 07_13 - 12 1 300 582 4 4 - 17 3
5 West Godavari 03_10 - 9 1 247 177 - - - 17 19
6 Krishna 04_08 - 8 0 166 42 3 3 0 - 13
7 Guntur 06_15 2_2 12 5 167 291 9 9 - 12 5
8 Prakasham 12_23 1_1 23 1 223 1540 11 9 2 18 15
9 Nellore 16_24 - 24 0 176 643 7 3 4 16 9
Total 67_130 11_11 129 12 1712 5310 53 46 7 118 102
-
7/31/2019 7. March MPR 2012
8/52
MONTHLY REPORT
7 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Srikakulam District up to 31.03.2012
Category Packages allotted under Phase - 1Names of works undereach package
Agreement No. / Date DHS DFCProgress up to31.03.2012
RHB
NCRMP/B-W/AP/RHB/PRED/01/Santhabommali/003
Road from DPN R&Broad to Uddandapalem
/2010-11, Dt.30.04.2011
30.04.11 30.04.12WBM GR-II,GR-III &
Shoulders
Road from K. UmiladaJunction to Koduru (LinkRoad)
/2010-11, Dt.30.04.2011
30.04.11 30.04.12WBM GR-II,GR-III &
Shoulders
Road from Borubadra,Malagam to Kollipadu viaSeepuram, Gantapeta
/2010-11, Dt.30.04.2011
30.04.11 30.04.12WBM GR-II,GR-III &
Shoulders
NCRMP/B-W/AP/RHB/PRED/01/Polaki/006
Road from R&B roadMobagam to
Duubakavanipeta viaGajapathinagaram
/2010-11, Dt.
30.04.201130.04.11 30.04.12
First Milestone i.eEarthwork & Cd
works &GSB
Road fromTalasamudram to DolaRegulator
/2010-11, Dt.30.04.2011
30.04.11 30.04.12
First Milestone i.eEarthwork & Cd
works &GSB
NCRMP/B-W/AP/RHB/PRED/01/Polaki/005
Road from R&B roadEdulavalasa - Killam toJonnam viaTalasamudram
/2011-12, Dt.30.04.2011
30.04.11 31.01.12
First Milestone i.eEarthwork & Cd
works &GSB
Bridges
NCRMP/B-W/ AP/Br/R&B/01/Patnavanipeta/001
Construction of bridge atKm 11/6-8 of NH-5 toPatnavanipetaConnecting
Sundarapalem
46/2011, Dt.17.12.2010
17.12.10 17.06.12
First Milestone i.eFoundation up to well
capping
NCRMP/B-W/AP/Br/R&B/01/ Surampeta/003
Construction of MinorBridge at Km 12/2-4 ofNH-5 to SurampetaRoad via Naruva,Mentada
45/2010-2011,Dt17.12.2010
17.12.10 17.03.12
Second Milestone i.eCompletion up to
below the deck slab.
-
7/31/2019 7. March MPR 2012
9/52
MONTHLY REPORT
8 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/Br/R&B/01/Bendigadda/004
Construction of Highlevel bridge acrossBendigadda at KM 4/10of Pundi-Parlakimidi roadin Srikakulam Dt, A.P.
1/2010,Dt.11.11.2010 11.11.10 11.05.12
First Milestone i.eFoundation up to well
capping
Roads NCRMP/B-W/AP/RD/R&B/01/Nowpada/006)Improvements Naupada-Venkatapuram road from0/0to15/0km
43/2010-11,17.12.2010 17.12.10 17.03.12Second mile stonei.e.WMM,Shoulders
RCS
NCRMP/B-W/AP/RCS/PRED/01/V.Kotturui/002
Road from NP road toURK Puram
G.O.Rt.No.451, Dt.06.04.2011
06.04.11 29.09.12E/W,pipe
culverts,GSB,R/W
Road from Deppuru,Bahadapalli road toOnkuluru to CycloneShelter
G.O.Rt.No.451, Dt.06.04.2011
06.04.11 29.09.12E/W,pipe
culverts,GSB,R/W
Road from R & B Roadto Devunthalada
G.O.Rt.No.451, Dt.06.04.2011
06.04.11 29.09.12E/W,pipe
culverts,GSB,R/WRoad from Pollada toKomarthalada toCyclone Shelter
G.O.Rt.No.451, Dt.06.04.2011
06.04.11 29.09.12E/W,pipe
culverts,GSB,R/W
NCRMP/B-W/AP/RCS/PRED/01/Etcherla/005
Road from Koyyam R &B Road toMoosavanipeta
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.12E/W, pipe culverts,
GSB.
Road from Mentada toDovupeta
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.12E/W, pipe culverts,
GSB.
Road from Kotcherelaroad to Kollibhemavaram& Cyclone Shelter
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.12E/W, pipe culverts,
GSB.
Road from Kotcherlaroad toPathesundrapalem
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.12E/W, pipe culverts,
GSB.
-
7/31/2019 7. March MPR 2012
10/52
MONTHLY REPORT
9 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
MPCSNCRMP/B_W/AP/MPCS/PRED/01/Sa
nthabommali/005
Construction of Cyclone shelterat Kollipadu
G.o rt No451 dt
06.04.2010
07.01.2013
Completion ofGround floorPlinth level
Completion of Ground floorPlinth level
Construction of Cyclone Shelterat Runku
G.o rt No451 dt
06.04.2010
07.01.2013
Completion ofGround floorPlinth level
Completion of Ground floorPlinth level
Status of works in Vizianagaram District up to 31.03.2012
CategoryPackages allottedunder Phase - 1
Names of works under eachpackage
Agreement No./ Date DHS DFCProgress up to
31.03.2012
Bridges
NCRMP/ B-W/ AP/Br/ R&B/ 02/
Puligadda/ 007
Construction of Minor Bridge atKm. 7/2 near Puligadda of Konada Ramatheertham R&B Road toKonathalapalem via Yerukonda,Pasupam, Kollayavalasa (Z.P.
Road)
31/2010-201 Dt.1.12.2010
01.12.10 31.05.1293.96% of work
completed
NCRMP/ B-W/ AP/Br/ R&B/ 02/
Chakaligadda / 008
Construction of Minor Bridge atKm 15/2 near Chakaligedda of
Konada Ramatheertham R&B roadto Konatalapalem (via) Yerukonda,
Pasupam, Kollayavalasa (ZP
Road)
34/2010-2011 Dt.8.12.2010
08.12.10 07.06.1278.76% of work
completed
Road (R&B)NCRMP/B-
W/AP/RD/R&B/ 02/Konada/009
Improvements to Road fromKonada Ramatheertham (R&B)Road to Konathalapalem (Via)
Pasupam, Yerukonda,Kollayavalasa from Km 12/0 to
16/5 (Km 0/0 to 4/0 i.e. up to NH-5crossing)
33/2010-201 Dt.8.12.2010
08.12.10 07.03.12100% of work
completed
-
7/31/2019 7. March MPR 2012
11/52
MONTHLY REPORT
10 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Visakhapatnam District up to 31.03.2012
Category Packages allotted under Phase- 1Names of works
under each
package
Agreement
No. / Date
DHS DFC Progress up to 31.03.2012
RHB
NCRMP/B-W/AP/RHB/PRED/03/Nakkapalli/001
Road from Vempadu toPatimeeda
/2010-11, Dt.11.01.2011
11.01.11 11.01.12 Milestone is completed
Road from R&B road toMulaparra up to Beach
end
/2010-11, Dt.11.01.2011
11.01.11 27.10.11 Milestone is completed
NCRMP/B-W/AP/RHB/PRED/03/Anandapuram/003
Road from R&B B.PKallalu to
Matchvanipalem
/2010-11, Dt.10.03.2011
10.03.11 09.12.11Milestone is completed
NCRMP/B-W/AP/RHB/PRED/03/Paravada/004
Road from R & B roadto Pothu Rajannapalem
/2010-11, Dt.28.03.2011
28.03.11 27.12.11 Milestone is completed
Road from R & B roadto Jalaripeta
/2010-11, Dt.28.03.2011
28.03.22 28.12.11 Milestone is completed
NCRMP/B-W/AP/RHB/PRED/03/Rambilli/006Road from R & B road
to Venkayyapalem/2010-11, Dt.11.01.2011
11.01.11 11.10.11 Milestone is completed
NCRMP/B-W/AP/RHB/PRED/03/Atchutapuram/007
Road from R&B road toAva- Somavaram
/2011-12, Dt.27.04.2011
27.04.11 26.01.12 Milestone is completed
Road from R&B Roadto Avarajam
/2011-12, Dt.27.04.2011
27.04.11 26.01.12 Milestone is completed
-
7/31/2019 7. March MPR 2012
12/52
MONTHLY REPORT
11 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Visakhapatnam District up to 31.03.2012
CategoryPackages allotted under
Phase - 1Names of works under each
packageAgreement No. /
DateDHS DFC
Progress upto
31.03.2012
RCS
NCRMP/B-W/AP/RCS/PRED/03/Anandapuram/001
Road from NH-5 toRamarayadupalem
/2010-11, Dt. 15.09.2011 15.09.11 14.06.12
RoadFurniture &Shoulderwork is inprogress
NCRMP/B-W/AP/RCS/PRED/03/Rambilli/002
Road from R&B road toKrishnampalem
/2010-11, Dt. 15.09.2011 15.09.11 14.09.12
CD works areProgress &B.T work isCompleted
Road from R & B road toKattubolu to Marripalem /2010-11, Dt. 15.09.2011 15.09.11 14.09.12
CD works arein progress &
WBM Grade-3 work is inprogress
Road from R & B road toRajakoduru
/2010-11, Dt. 15.09.2011 15.09.11 14.09.12
CD Work iscompleted &B.T work iscompleted
NCRMP/B-W/AP/RCS/PRED/03/
Nakkapalli/003
Road from R & B road toPedateenarla to Chinateenarla
/2010-11, Dt. 15.09.2011 15.09.11 14.06.12
B.T & C.Croad worksareCompleted.
Road from Upamaka RajayyapetaR & B road to Janakayyapeta
/2010-11, Dt. 15.09.2011 15.09.11 14.06.12
CD works areprogress &B.T work iscompleted
-
7/31/2019 7. March MPR 2012
13/52
MONTHLY REPORT
12 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Visakhapatnam District up to 31.03.2012
Category Packages allotted under Phase - 1Names of works under
each packageAgreement No.
/ Date
Milestone Completion Dates Progress w.r.t.milestone up to
31.03.2012First Second Third
MPCS
NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cycloneshelter at Gajapathi
Nagaram
/2011-12, Dt.03.10.2011
02.02.12 02.06.12 02.10.12Earth work is in
progress.
Construction of cycloneshelter at Ratnayampeta
/2011-12, Dt.03.10.2011
02.02.12 02.06.12 02.10.12
Stilt Slab iscompleted & 1stFloor Columns
work are inprogress.
NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002
Construction of cycloneshelter at Patimeeda
/2011-12, Dt.03.10.2011
02.03.12 02.08.12 02.01.13
Foundation footingwork is completedand Columns are
progress up tobottom level ofPlinth beam and
FoundationRefilling work is in
progress
Construction of cycloneshelter at Moolaparra
/2011-12, Dt.03.10.2011
02.03.12 02.08.12 02.01.13
Columns lay up tobottom of plinth
beam or Basementwork is in
completed & Plinthbeam PCC iscompleted.
Construction of cycloneshelter at Bangarampeta
/2011-12, Dt.03.10.2011
02.03.12 02.08.12 02.01.13
Stair case & Rampworks are in
progress, Columnslay up to Roof leveland Form work for
Stilt Slab is inprogress.
-
7/31/2019 7. March MPR 2012
14/52
MONTHLY REPORT
13 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/MPCS/PRED/03/Rambillii/004Construction of cyclone
shelter atVenkayyapalem
/2011-12, Dt.03.10.2011
02.01.12 02.04.12 02.07.12
Earth work inprogress, Workstopped due tofinalization of
foundation designs.
NCRMP/B-W/AP/MPCS/PRED/03/Parawada/001Construction of cyclone
shelter atTikkavanipalem
/2011-12, Dt.07.10.2011
06.01.12 06.04.12 06.07.12
E/W foundationexcavation is
completed & Dueto site problem
work is stopped.
Status of works in East Godavari District up to 31.03.2012
Category Packages allotted under Phase - INames of works
under each
package
AgreementNo. / Date
Mile stonesRemarks
First Second Third
RHB (2 )RCS (8)
MPCS (3)
NCRMP/B-W/AP/RHB/PRED/04/Katrenikona/003
Road from PR roadsto Dasarivanipeta and
to Cyclone Shelter
/2011-12Dt:27.04.2011
30-11-2011 30-11-2011 20-01-2012 Completed.
NCRMP/B-W /RCS/PRED/04/Karapa/001Approach Road tocyclone Shelter at
Adavipudi
2011-12Dt:20.05.2011
30-11-2011 31-10-2011 31-01-2012 Completed.
NCRMP/B-W/AP/RHB/PRED/04/Karapa/001/
Road fromGurajanapalli to
Bandulavaripalem
2011-12Dt:27.04.2011
30-09-2011 31-10-2011 31-01-2012 Completed.
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto P.Chodipallipeta CS
2011-12Dt:07.09.2011
3 months 3 months 3 months55% completed ,WBM
Gr-III completed
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
15/52
MONTHLY REPORT
14 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto K.Chodipallipeta CS
/2011-12Dt:07.09.2011
3 months 3 months 3 months55% completed , WBM
Gr
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Hukumpeta CS
/2011-12Dt:07.09.2011
3 months 3 months 3 months55% completed , WBM
Gr
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Gaddipeta CS
/2011-12Dt:07.09.2011
3 months 3 months 3 months55% completed , WBM
Gr
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Danavaipeta CS
/2011-12Dt:07.09.2011
3 months 3 months 3 months55% completed , WBM
Gr
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004/
Road from R&B Roadto G.Musalayyapeta
CS2011-12
Dt:07.09.20113 months 3 months 3 months To be started
NCRMP/B-W/AP/RCS/PRED/04/Uppalaguptam/003
Road from R&B Roadto Chinaraghavulapeta
Cyclone Shelter
/2011-12 Dt:23.09.2011
3 months/22.11.2011
3 months22.06.2011
----------- To be started
NCRMP/B-W/AP/MPCS/PRED/04/Uppalaguptam/002
Construction ofCyclone Shelter at
Pedaraghavulapeta ofUppalaguptam Mandal
E.G.Dt.
/2011-12Dt:17.10.2011
3 months16.01.2012
3 months16.04.2012
3 months16.07.2012
11% completed, RCCRaft Completed and
RCC Pedestals Workis in Progress
NCRMP/B-W/AP/MPCS/PRED/04/Thondangi/004
Construction ofCyclone Shelter atLaxamanudupadu
inThondangi
/2011-12Dt:07.09.2011
11% completed, RCCRaft Completed and
RCC Pedestals Workis in Progress
NCRMP/B-W/AP/MPCS/PRED/04/Thondangi/004
Construction ofCyclone Shelter at
Avulamanda
/2011-12Dt:07.09.2011
5% completed, PCCwork Completed
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
16/52
MONTHLY REPORT
15 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in West Godavari District up to 31.03.2012
CategoryPackages allotted under Phase
- 1Names of works under
each packageAgreementNo. / Date
Milestone Completion Dates Progress w.r.t.milestone up to
31.03.2012Remarks
First Second Third
RHB
Mogalthuru Mandal NCRMP
W.G.Dist
Road from NH 214 A atRanga Statue center to
Harijanawada of Kalipatnam(E) (Mogalthuru Mandal
W.G.Dist.)
16 /2011-12
Dt.27.04.2011
27/4/2011to
22/9/2011
23/9/2011to
24/2/2012
25/2/2012to
26/7/2012
54.75%
GSB, G-II & CC Pavement
Completed.
Gr-III is in Progress.
R&B road at PanchayatOffice to Pulaparthivarithota
via Badava(Mogalthuru Mandal
W.G.Dist.)
58.38%
GSB, G-II & CC Pavement
Completed.
Gr-III is in Progress.
Mogalthuru Vempa R&BRoad at Uchintha Kalava
Bridge to Gogulamma
Harijanapeta (MogalthuruMandal W.G.Dist.)
75.34%
GSB, G-II, Gr-III & CC
Pavement Completed.
Shoulders work is in
Progress.
From Narsapur MogalthurR&B road to Dayadaldaspeta
via Venkateswara Swamytemple (Mogalthuru Mandal
W.G.Dist.)
73.50%
GSB, CC Pavement
Completed.
Shoulders work is in
Progress.
Road from NH 214 A road toHarijanapeta of Kothota
(Mogalthuru MandalW.G.Dist.)
27/4/2011to
22/9/2011
23/9/2011to
24/2/2012
25/2/2012to
26/7/201299.2% CC Road Completed.
Narsapur Mandal W.G.Dist.
R&B road to Indira Nagar(via) Pochamma temple
(Narsapur Mandal W.G.Dist.)21 /2011-12Dt.09.05.2011
09/05/2011to
04/09/2011
05/09/2011to
06/01/2012
07/01/2011to
08/5/2012
0% ..........
Road from R&B road toPedalanka (Narsapur Mandal
W.G.Dist.)34.75%
G-II, Gr-III Completed.
CC Pavement & Culverts
work
Is in Progress.
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
17/52
MONTHLY REPORT
16 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Krishna District up to 31.03.2012
Category Packages allotted under Phase - 1Names of works under each
packageAgreement No. /
DateDHS DFC
Progress up to31.03.2012
RHB
NCRMP/B-W/AP/RHB/PRED/06/Machipatnam/001
Road connecting R&B roadthrough Gantalammapalem
/2011-12Dt.27.4.2011
27.04.11 26.01.2012CD works,GSB,Gr-II,Gr-III,BT completed
NCRMP/B-W/AP/RHB/PRED/06/Machipatnam/002
Road from R & B Road to B.VThota
/2011-12Dt.27.4.2011
27.04.11 26.01.2012
CD works,GSB,Gr-II,Gr-III,BT completed
Road from Potlapalem Z.P roadto Chikativanipalem
CD works,GSB,Gr-II,Gr-III,BT completed
NCRMP/B-W/AP/RHB/PRED/06/Kruthivennu/003
Road from Intheru R&B Road toRangaraopet
/2011-12Dt.27.4.2011
27.04.11 26.01.2012
CD works,GSB,Gr-II,Gr-III,BT completed
Road from R&B road to CycloneShelter at Chandala
CD works,GSB,Gr-II,Gr-III,BT completed
Road from LB Cheria CCroad to Chillapalemm of LBCheria (Narsapur Mandal
W.G.Dist.
28.66%
GSB, G-II, Gr-III Completed.
CC Pavement & Culvert
work
Is in Progress.
Kalla Mandal W.G.Dist.
From A-U R&B Road toSatyanarayanapuram (Kalla
Mandal W.G.Dist.)25 /2011-12Dt.26.05.2011
26/5/2011To
20/8/2011
20/8/2011to
21/11/2011
22/11/2011To
23/2/2012
100% Completed.
From A-U R&B Road toMekaladibba (Kalla Mandal
W.G.Dist.)100% Completed.
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
18/52
17 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Krishna Districts up to 31.03.2012
Category Packages allotted under Phase - 1Names of works
under eachpackage
AgreementNo. / Date
Milestone Completion Dates Progress
w.r.t.milestone
up to31.03.2012
RemarksFirst Second Third
RCSNCRMP/B-W
/AP/RCS/PRED/06/Machipatnam/001
Road fromBhogireddipalli R&B
Road toRamakhandam
/2011-12/Dt.02.09.2011
01.12.2011 01.03.12 01.06.12 13.20% GSB workcompleted
Road from R&BRoad Chinnapuram
to Gundupalem
/2011-12/27.04.2011
01.12.2011 01.03.12 01.06.12
12.14%GSB workcompleted.
Road fromPotlapalem Z.P
road to Pothepalli.
/2011-12/Dt.02.09.2011
01.12.2011 01.03.12 01.06.1231.68%
GSB, Gr-IIcompleted
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
19/52
18 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in GUNTUR District up to 31.03.2012
CategoryPackages allotted under
Phase - 1Names of works under each package
Agreement No./Date
DHS DFCProgress up to
31.03.2012
RHB
NCRMP/B-W/AP/RHB/PRED/07/KARLAPAL
EM/001
R/f Ganapavaram R&BRoad t o Kesavapuri ST colony 7/2011-201227.04.2011
27.04.11 26.01.2012 Completed.
NCRMP/B-W/AP/PRED/07/Nagaram/002
R/f R&B Road to Mohammad Alipalem
8/2011-201227.04.2011
27.04.11 26.4.2012
WBM Gr -IIImaterial collection
is in progress.
R/f R&B Road to Katuivaripalem.CC Road, GSB is in
Progress.
Bridges
NCRMP/B-W/AP/Br/R&B/07/Bapatla/010
Reconstruction of High level Bridge @Km5/2 of
Bapatla-Suryalanka Road across Perali drain inGuntur
79/2010-20111.12.2010
01.12.10 31.5.2012
Super structer is inprogress. 9 slabscompleted. Work
Completed value is255.00 Lakhs.
NCRMP/B-W/AP/Br/R&B/07/Bapatla/011
Reconstruction of High level Bridge @Km2/4 ofBapatla-Pandurangapuram Road across Perali
drain in Guntur78/2010-2011
1.12.201001.12.10 31.5.2012
10 slabs WithRailing completed,
Approaches,Wearing Coat work
is in Progress.Work completedvalue is 295.00
Lakhs
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
20/52
19 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in GUNTUR District up to 31.03.2012
Category Packages allotted under Phase - 1Names of works under each
package
Agreement No. /
DateDHS DFC Progress up to 31.03.2012
RCS
NCRMP/B-W/AP/RCS/PRED/07/P
Palem/001
Road from R&B Road to
Mandevaripalem
/2010-11
Dt.01.11.201101.11.11 31.07.2012 Work yet to be s tarted
Road from R&B Road Alluru to
Yadavapalem
/2010-11
Dt.01.11.201101.11.11 31.07.2012
Work yet to be started
NCRMP/B-
W/AP/RCS/PRED/07/KarlaPalem/002
Road from Ganapavaram R & B
road to Pedamarpuvaripalem
/2010-11
Dt.01.11.201101.11.11 31.10.2012
Work yet to be started
Road from R & B Road to
Chinapuluguvaripalem
/2010-11
Dt.01.11.2011 01.11.11 31.10.2011 Work yet to be started
Road from R & B road to
Yaramvaripalem
/2010-11
Dt.01.11.201101.11.11 31.10.2011
CC Road work is Completed,Shoulders, and GSB is in
progress.
Road from R & B road to
Pedagollapalem Cyclone Shelter
/2010-11
Dt.01.11.201101.11.11 31.10.201 CC Road work is Completed,
Shoulder work is in progress.
Pedagollapalem PR Road to
Bonthagorlapalem
/2010-11
Dt.01.11.201101.11.11 31.10.201
Work yet to be started
NCRMP/B-
W/AP/RCS/PRED/07/Nizampatnam/003
Road from R&B Road to
Gurunadhanagar
/2010-11 Dt.
17.10.201117.10.11 16.07.12 Work to be Grounded
Road from R&B Road to Adavala
H/O Bavajipalem
/2010-11 Dt.
17.10.201117.10.11 16.07.12 CC Road work is Completed,
Shoulder work yetobe start.
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
21/52
20 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from R&B Road to
Atlavaripalem
/2010-11 Dt.
17.10.201117.10.11 16.07.12
CC Road work is Completed.
NCRMP/B-W/AP/RCS/PRED/07/Bapatla/004
Road from R&B Road to
Hanumanthanagar 2010-11
Dt13.10.201113.10.11 12.07.2012
CC Road work is Completed,
Shoulder work is in progress.
Road from R & B road to
AdarsanagarCC Road work is Completed,Shoulder work is in progress.
Status of works in Prakasam District up to 31.03.2012
CategoryPackages allottedunder Phase - 1
Names of works
under eachpackage
Agreement No. /Date
Milestone completion dates
Progress up to31.03.2012 Remarks
First Second Third
BRIDGESNCRMP/B-
W/AP/Br/R&B/08/Kanaparthy/012
Construction ofHigh level Bridge at
Km 16/10 ofNaguluppalapadu Kanaparthy road inPrakasam District
76/2010-11 Dated1/12/2010
5/31/2011Completion
up to silllevel
12/31/2011Completion upto below deck
slab
5/31/2012Completion of
entire workincluding
approaches
Slab S4 and S5completed.
Reached Milestone-III
RHBNCRMP/B-
W/AP/RHB/PRED/08/S.Konda/001
Road from PakalaZP Road to
Aulavaripalem
Cyclone shelter
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001
Dated 25.04.2011 8/24/2011Earth work,CD work,
GSB
12/24/2011WBM, Grade II
& III
4/24/2012 BT,Shoulders &road furniture
CC RoadCompleted.
Shoulders work in
progress
Reached Milestone-III
Road from R&BRoad to
Somarajupalli
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001Dated 25.04.2011
BT Completed fromKM 1/375 to 2/146.
WBM-Grade-IIIwork is in progress
for the balanceportion
Reached Milestone-III
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
22/52
21 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from R&Broad to
Narravaripalem
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001Dated 25.04.2011
Earth workCompleted & CD
work is in progress.
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002
Road from NH5 toMulaguntapadu
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated 10/02/2011 6/9/2011
Earth work,CD work,
GSB
10/9/2011WBM, Grade II
& III
2/9/2012 BT,Shoulders &road furniture
WBM-Grade-IIwork is completed.
Not Reached asper Mile stone-III (Awaiting forEOT Proposal)
Road from R&Broad to
Chalivendradibba
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated -10/02/2011
CC work iscompleted from KM
0/0 to KM 0/270
Not Reached asper Mile stone-III (Awaiting forEOT Proposal)
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002
Road from PakalaR&B road to
Mosanaladinne
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated 10/02/2011
6/9/2011Earth work,CD work,
GSB
10/9/2011WBM, Grade II
& III
2/9/2012 BT,Shoulders &road furniture
WBM-Grade-IImaterial collection
is in progress
Not Reached asper Mile stone-III (Awaiting forEOT Proposal)
Road from R&Broad to Binginapalli
HarijanawadaCyclone Shelter
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated 10/02/2011
Nil
Not Reached asper Mile stone-III (Awaiting forEOT Proposal)
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/003
Road from R&BRoad Allur to M T
Raju colony
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/003Dated 27/04/2011
8/26/2011Earth work,CD work,
GSB
12/26/2011WBM, Grade II
& III
4/26/2012 BT,Shoulders &road furniture
BT Completed,Shoulders work is
in progress
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
Road from KEMR&B Road to
NCRMP/B-W/AP/RHB/PRED/0
9/26/2011Earth work,
2/26/2012WBM, Grade II
7/26/2012 BT,Shoulders &
BT completed.CDwork completed.CC
Reached Milestone-III
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
23/52
22 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
8/Kothapatnam/004 Sankuvarigunta 8/Kothapatnam/004Dated 27/04/2011
CD work,GSB
& III road furniture road workcompleted
Road from KEM R& B Road to
Pullareddypalem
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/004Dated 27/04/2011
BT Completed,Shoulders work is
in progress
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/07
Road from MCRoad to
SubbarayaduSatram
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/07dated 27/04/2011
8/26/2011Earth work,CD work,
GSB
12/26/2011WBM, Grade II
& III
4/26/2012 BT,Shoulders &road furniture
WBM-Grade-IIICompleted
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/08
Road from R&Broad Tettu to
Ramayapatnam
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/08
dated 27/04/2011
8/26/2011Earth work,CD work,
GSB
12/26/2011WBM, Grade II
& III
4/26/2012 BT,Shoulders &
road furniture
CC road and BTlying completed,
shoulders
progress.
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/09
Road from R&Broad Pellur toVasepallipadu
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/09dated 16/03/2011
7/15/2011Earth work,CD work,
GSB
11/15/2011WBM, Grade II
& III
3/15/2012 BT,Shoulders &road furniture
BT Completed,Shoulders work is
in progress
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/10
Road from R&Broad to Kesupalem
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/10dated 19/04/2011
7/18/2011Earth work,CD work,
GSB
10/18/2011WBM, Grade II
& II
1/18/2012 BT,Shoulders &road furniture
BT Completed,Shoulders work
Completed
Reached Milestone-III
RCSNCRMP/B-
W/AP/RCS/PRED/08/Vetapalem/001
Road from R&B
road toVijayanagaramcolony cyclone
shelter
NCRMP/B-W/AP/RCS/PRED/0
8/Vetapalem/001dated 2011/12
dated 30.09.2011
1/29/2012Earth work,
GSB
5/29/2012shoulders, Gr-
III
9/29/2012 BT,CC pavement
and roadfurniture
cc road completed
& BT roadcompleted&
shoulders progress
Reached Milestone-III
Road from NH roadto
Challareddypalem
360 meters BTcompleted WBM-Grade-III work in
Progress.
Reached Milestone-III
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
24/52
23 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from R&Broad to jeevaraksh
nagar colonycyclone shelter
C.C.completed.Shoulders Progress.
Reached Milestone-III
Road from R&Broad to Ramnagar
colony cycloneshelter
C.C.completed.Shoulders Progress.
Reached Milestone-III
Road from R&Broad to cyclone
shelter atMankenavaripalem
Not Grounded
NCRMP/B-W/AP/RCS/PRED/0
8/Chirala/002
Road from R&BRoad to
Keertivaripalemcyclone shelter NCRMP/B-
W/AP/RCS/PRED/08/Chirala/002
dated 27.08.2011
C.C.completed.Sho
ulders Progress.
Reached Mile
stone-III
Road from R&BRoad to Devinutulacyclone shelter ofChirala mandal in
Prakasham district.
C.C.completed.Shoulders Progress.
Reached Milestone-III
MPCSNCRMP/B-
W/APMPCS/PRED/08/Ulavapadu/001
Chakicharla cycloneshelter in
Ulavapadu mandalPrakasam district
NCRMP/B-W/AP/MPCS/PRED/08/Ulavapadu/001
24.11.2011All items upto stilt floor
slabincluding
ramp, staircase
foundations,columns,bea
ms,pccflooring etc.,
24.02.2012 Allitems up to
second floorslab includingfirst floor, andin 2nd floor
including staircase, columns
etc.,
24.05.2012Head room,plastering,
flooring, watersupply
arrangements,sanitary fitting,
electricalitems,
compoundwall, cc
pavement.Earthenmounds(raised
Terrace roof slabcompleted. Brick
work is in progressin ground floor.
Reached Milestone-III
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
25/52
24 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
portion), waterharvesting,septic tank,slump and
soak pit.etc.
NCRMP/B-W/APMPCS/PRED/
08/NG Padu/003
Kanaparthy cycloneshelter in
Naguluppapadumandal Prakasam
district
NCRMP/B-W/AP/MPCS/PRED/08/NG Padu/003
23.11.2011All items upto stilt floor
slabincluding
ramp, staircase
foundations,columns,bea
ms,pccflooring etc.,
23.02.2012 Allitems up to
first floor slaband head
room slab in 2nd floor
including staircase, columns
etc.,
23.05.2012plastering,
flooring, watersupply
arrangements,sanitary fitting,
electricalitems,
compoundwall, cc
pavement.Earthenmounds
(raisedportion), water
harvesting,septic tank,slump and
soak pit.etc.
Stilt floor roof slabcompleted. InGround floor
Columns work is inprogress
As per Milestone-II, NotCompleted
Status of works in Nellore District up to 31.03.2012
(RCS)
Package Number Name of Work Milestone1 Milestone2 Milestone3 Remarks
Progress upto
31.03.2012
NCRMP/B-W/AP/09MUTHUKUR/RC
S/002
Road from R&B Roadkappaladoruvu to bandla
palem H.wada
3Months: EarthWork, Pipe
Culverts, GSB
6 Months: WBMGrII,GrII,CC
Pavement andShoulders
9 Months: BTCC road and
Road Furniture
COMPLETED,ROAD FURNITUREIS IN PROGRESS
94% of workcompleted
NCRMP/B-W/AP/09/D.V.SATRAM/R
CS/008
Road from R&B road toSullurpeta Mallam to
berjengalapalli cyclone shelter
3Months: EarthWork, Pipe
Culverts, GSB
6 Months: WBMGrII, GrII Shouldersand CC Pavement
9 Months: BT,CC Pavement
and RoadFurniture
BT COMPLETED94 % of work
completed
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
26/52
25 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/09T.P.GUDUR/RC
S/005
Road from7/2 M.C Road tovenkannapalem pattapupalem
BT COMPLETED96 % of work
completed
NCRMP/B-
W/AP/09chillakur/RCS/004
Road from KatuivaripalemR&B road to vellapalm
3Months: Earth
Work,CDWorks,GSB
6 Months: WBM
GrII, GrII andShoulders
9 Months: BT,CC Pavement
and RoadFurniture
WBM Gr -III is inprogress
76 % of workcompleted
NCRMP/B-W/AP/09kota/RCS /001
road from R&B road to A.SPURAM 3Months: Earth
Work, PipeCulverts, GSB
6 Months: WBMGrII, GrII and
Shoulders
9 Months: BT,CC Pavement
and RoadFurniture
COMPLETED,ROAD FURNITUREIS IN PROGRESS
97 % of workcompleted
Road from GD Road toVavillapalem
BT Completed96 % of work
completed
NCRMP/B-
W/AP/RCS/PRED/09/KAVALI/007
Road from Kotha Satram R&Bto Indiranagar (via)
Thumalapenta palam,
Patharavadu palam, Ramudupalam, Karaduvari palam
&Sreeramapuram in SPSRNellore District.
4Months: Earth
Work, PipeCulverts, GSB
4 Months: WBMGrII, GrII ,
Shoulders and CCPavement
4 Months: BT,CC Pavement
and RoadFurniture
BT COMPLETED
78 % of work
completed
NCRMP/B-W/AP/RCS/PRED/09/KA
VALI/006
Road Connecting R&B Roadthrough Voter Village in SPSR
Nellore District.
4 Months: EarthWork, PipeCulverts,
GSB
4 Months: WBMGrII, GrII ,
Shoulders and CCPavement
4 Months: BT,CC Pavement
and RoadFurniture
GSB AND CDWORKS IS IN
progress
16% of workcompleted
Status of works in Nellore District up to 31.03.2012
RHBNCRMP/B-
W/AP/RHB/PRED/09RHB/KAVALI/004
Road from5/8 of
Chennayapalem Road toGummadi bandla
5Months:Earthwork, CD
Works,ccpavement and GSB
10 Months: WBMGrII,GrII andShoulders
15 Months: BTand RoadFurniture
BT IS completed
87 % of
work iscompleted
Road from PedattapupalemR&B road to Chennayapalem
H.wada
WBM Gr -III isCompleted
58 % ofwork is
completed
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
27/52
26 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from K.T R&B Road toAlliguntapalem
BT IS Completed,shoulders is in
progress
85 % ofwork is
completed
NCRMP/B-W/AP/RHB/PRED/09BOGOL
U/RHB/002
Road from 1/6 of ZuvvaladinneR&B Road to Tellagunta KM to
2/720
3Months: EarthWork, Pipe
Culverts, GSB
6 Months: WBMGrII, GrII and
Shoulders
9 Months: BTand RoadFurniture
BT IS Completed,shoulders is in
progress
97 % ofwork is
completed
NCRMP/B-W/AP/RHB/PRED/09BOGOL
O/RHB/001
1. Road from NH5 toSambasivapuram
5Months: EarthWork, Pipe
Culverts, GSB
10 Months: WBMGrII, GrII and
Shoulders
15 Months: BTand RoadFurniture
BT IS Completed,shoulders is in
progress
90 % ofwork is
completed
Road from 9/6 of JuvvaladinneR&B Road to 11/0 of
Juvvaladinne R&B Road Via
Vekateshpalem
BT IS Completed,shoulders is in
progress
91 % ofwork is
completed!
NCRMP/B-W/AP/RHB/PRED/09/VIDAV
ALURU/005
1)Road from kt R&B ROAD TOALLAGANIPADU to Vavilla
5Months: EarthWork, Pipe
Culverts, GSB
10 Months: WBMGrII, GrII and
Shoulders
15 Months: BTand RoadFurniture
construction ofstructures iscompleted,ccPavement is
Completed.GSB isin Progress
40 % ofwork is
completed!
Road from R&B roadKancharapalem HW to
Alaganipadu.
earth work inembankment is in
progress
55 % ofwork is
completed
NCRMP/B-W/AP/RHB/PRED/09V.CHAL
EM/RHB/007
ROAD FROM SUVEPALLI-PUDIPARTHI ROAD TO
SRIKANTH COLONY 4Months: EarthWork, Pipe
Culverts, GSB
8 Months: WBMGrII, GrII and
Shoulders
12 Months: BTand RoadFurniture
COMPLETED,ROAD FURNITURE ISIN PROGRESS
95 % ofwork is
completed!
providing BT Surface to theroad from R&B road to Edagali
Kandriga
COMPLETED,ROAD FURNITURE ISIN PROGRESS
97 % ofwork is
completed
MONTHLY REPORT
C lt S i f Thi d P t Q lit A dit (TPQA) f N ti l C l Ri k Miti ti P j t (NCRMP)
-
7/31/2019 7. March MPR 2012
28/52
27 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RHB/PRED/09CHITTA
MURU/003
Road from R&B Road toMuttembake Via Pittuvanipalli
5Months: EarthWork, Pipe
Culverts, GSB
10 Months: WBMGrII, GrII and
Shoulders
15 Months: BTand Road
Furniture
WBM Gr -III,GR-IIIS IN PROGRESS
27 % ofwork is
completed
Road from R&B Chittamur toSoma Samudram
WBM Gr-II is inProgress
29 % ofwork is
completed
NCRMP/B-W/AP/09/MUTHUKUR/RHB/
006
Road from R&B roadtopatuvarikandriga
3Months: EarthWork, Pipe
Culverts, GSB
6 Months: WBMGrII,GrII,CC
Pavement andShoulders
9 Months: BTand RoadFurniture
BT IS completed,ccPavement
COMPLETED,ROAD FURNITURE ISIN PROGRESS
99 % ofwork is
completed
NCRMP/B-W/AP/09Allur/RHB/009
Road from R&Broad alluru toGalidibbalu (via)Chukavani
dibba
5Months: Earth
Work, PipeCulverts, GSB
10 Months: WBM
GrII, GrII andShoulders
15 Months: BT
and RoadFurniture
GSB completed,cc
works in progress,Gr-III
COMPLETED
58 % ofwork is
completed
NCRMP/B-W/AP/RHB/PRED/009/T.P.G
UDUR/012
Ring Road to TP Gudur-Salipeta R & B Road via CS
Puram and Mandapam Village3Months: Earth
Work, PipeCulverts, GSB
6 Months: WBMGrII,GrII,CC
Pavement andShoulders
9 Months: BTand RoadFurniture
WBM Gr -III, IS INPROGRESS
71 % ofwork is
completed
Road from R & B Road C SPuram to Sivaramapuram
WBM Gr -III is inprogress
73 % ofwork is
completed
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
29/52
28 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
6.0 District wise status of tests conducted by TPQA:
Apart from monitoring the tests being conducted by the implementation team (contractors & Line department) at
various stages, the Third party Quality Audit team also conducted tests to confirm its compliance with the standards.
These tests are carried out in the site itself and in some cases samples are collected and testing done in outside
laboratories. The details of tests conducted in the field till end of September 2011 are presented.
Summary of QC Tests - Up to 31.3.2012
S.No. DistrictTotal No. Tests
Done
Total no. of Tests
Passed Failed
1 Srikakulam 526 526 0
2 Vizianagaram 316 316 0
3 Visakhapatnam 1193 1184 9
4 East Godavari 582 582 0
5 West Godavari 177 177 0
6 Krishna 42 42 0
7 Guntur 291 287 4
8 Prakasham 1540 1540 0
9 Nellore 643 642 1
Total 5310 5296 14
The works in West Godavari and Krishna Districts were just started
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
30/52
29 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7.0 Details of Quality Control Audit Reports Submitted During this Month:
Package Number Name of Work District
NCRMP/B-
W/AP/RCS/PRED/04/KARAPA/001
Road from approach road to cyclone shelter
at Adivipudi in E.G.Dt.
East Godavari
NCRMP/B-
W/AP/RHB/PRED/04/KARAPA/001
Road from GURAJANAPALLI to
BANDULAVARIPALEM in East Godavari
District.
East Godavari
NCRMP/B-
W/AP/RCS/PRED/04/THONDANGI/004
Road from R&B Road to Danavaipeta East Godavari
NCRMP/B-
W/AP/RCS/PRED/04/THONDANGI/004
Road from R&B Road to Gaddipeta of
Thondangi Mandal in East Godavari District
East Godavari
NCRMP/B-
W/AP/RCS/PRED/04/THONDANGI/004
Road from R&B Road to Hukumpeta
Cyclone Shelter
East Godavari
NCRMP/B-W/AP/RCS/PRED/04/THONDANGI/004
Road from R&B Road to K.Chodipallipeta East Godavari
NCRMP/B-
W/AP/RCS/PRED/04/THONDANGI/004
Road from R&B Road to P.Chodipallipeta East Godavari
NCRMP/B-W/AP/RHB/
PRED/05/Narsapur/002
Road from LB Cheria CC road to
Chillapalemm of LB Cheria of Narsapur
Mandal in West Godavari District.
West Godavari
NCRMP/B-W/AP/RHB/
PRED/05/Narsapur/002
Road from R&B road to Pedalanka of
Narsapur Mandal in West Godavari District.
West Godavari
NCRMP/B-
W/AP/RHB/PRED/05/MOGALTHURU/001
Road from NH 214 A road to Harijanawada
of Kothota of Mogalthuru Mandal in West
Godavari District.
West Godavari
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
31/52
30 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-
W/AP/RHB/PRED/05/MOGALTHURU/001
Road from NH 214 A at Ranga statue
center to Harjanawada of Kalipatnam (E) of
Mogalthuru Mandal in West Godavari
District.
West Godavari
NCRMP/B-
W/AP/RHB/PRED/05/MOGALTHURU/001
R&B Road at Panchayat office to
Pulaparthivarithota via Badava of
Mogalthuru Mandal in West Godavari
District.
West Godavari
NCRMP/B-
W/AP/RHB/PRED/05/MOGALTHURU/001
Mogaltur Vempa R&B Road at Uchintha
kalava Bridge to Gogulamma Harijanapeta
of Mogalthuru Mandal in West Godavari
District.
West Godavari
NCRMP/B-W/AP/RD/R&B/02/Konada/009 Improvements to Road from Konada
Ramatheertham (R&B) Road to
Konathalapalem (Via) Pasupam,
Yerukonda, Kollayavalsa from Km 12/0 to
16/5 (Km 0/0 to 4/0 i.e. up to NH-5
crossing) in Vizianagaram District, Andhra
Pradesh.
Vijayanagaram
NCRMP/B-
W/AP/MPCS/PRED/03/Nakkapalli/002
Construction of cyclone shelter at
Bangarampeta in Nakkapalli
Vishakhapatnam
NCRMP/B-
W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at
Ratnayampeta in Payakaraopeta
Vishakhapatnam
NCRMP/B-
W/AP/RCS/PRED/03/Nakkapalli/003
Road from R&B road to Pedatheernala to
Chinatheernala
Vishakhapatnam
8.0 Details of Environmental and Social Reports Submitted During this Month:
Package Number Name of Work District
NCRMP/B-
W/AP/RHB/PRED/06/Machilipatnam/002
Road from R&B Road to B.V.Thota Krishna
NCRMP/B-
W/AP/RHB/PRED/06/Kruthivennu/003
Road from R&B Road to Cyclone Shelter of
Chandala
Krishna
NCRMP/B-
W/AP/RHB/PRED/06/Machilipatnam/002
Road from Potalapalem Z.P.Road to
Chikativanipalem
Krishna
NCRMP/B-
W/AP/RHB/PRED/06/Machilipatnam/001
Road connecting R&B Road through
Gantalammapalem
Krishna
NCRMP/B-
W/AP/RCS/PRED/06/Machilipatnam/001
Road from Chinnapuram to Gundupalem Krishna
NCRMP/B-
W/AP/RCS/PRED/06/Machilipatnam/001
Road from Potalapalem Z.P.Road to
Potepalli
Krishna
NCRMP/B-
W/AP/RCS/PRED/06/Machilipatnam/001
Road from Bhogireddipalli R&B Road to
Ramakhandam
Krishna
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
32/52
31 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-
W/AP/RHB/PRED/06/Kruthivennu/003
Road from R&B Road to Rangaraopet Krishna
NCRMP/B-
W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at
Gajapathinagaram in Visakhapatnam
District
Visakhapatnam
NCRMP/B-
W/AP/MPCS/PRED/03/Nakkapalli/002
Construction of cyclone shelter at
Mullaparra in Visakhapatnam District
Visakhapatnam
NCRMP/B-
W/AP/MPCS/PRED/03/Nakkapalli/002
Construction of cyclone shelter at
Patimeeda in Visakhapatnam District
Visakhapatnam
NCRMP/B-
W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at
Ratnayampeta in Visakhapatnam District
Visakhapatnam
NCRMP/B-W/AP/RHB/PRED/01/SANTHABOMMALI/00
5
Construction of Cyclone Shelter at
Kollipadu
Srikakulam
NCRMP/B-
W/AP/RHB/PRED/01/SANTHABOMMALI/00
5
Construction of Cyclone Shelter at Runku
Srikakulam
NCRMP/B-W/AP/RCS/PRED/01/Itcherla/005 Road from Kotcherela to Pata
Sundarapalem & Cyclone Shelter
Srikakulam
NCRMP/B-W/AP/RCS/PRED/01/Itcherla/005 Road from Kotcherela Road to Kolli
Bhimavaram & Cyclone Shelter
Srikakulam
NCRMP/B-
W/AP/Br/R&B/01/Patnavanipeta/001
Construction of High Level Bridge across at
Km.11/6-8 of NH-5 to Patnavanipeta road in
Srikakulam district.
Srikakulam
NCRMP/B-W/AP/BR/R&B/02/Puligadda/007 Construction of Minor Bridge at Km.7/2
near Puligadda of Kona Ramatheertham
R&B Road to Konathalapalem via
Yerukonda, Pasupam, Kollayavalsa (ZP
Road) in Vizianagaram District
Vizianagaram
NCRMP/B-
W/AP/BR/R&B/02/Chakaligadda/008
Construction of Minor Bridge at Km.15/2
near Chakaligadda of Kona
Ramatheertham R&B Road to
Konathalapalem via Yerukonda, Pasupam,
Kollayavalsa (ZP Road) in Vizianagaram
District
Vizianagaram
9.0 Observations in the submitted reports:
Name ofWork:
ROAD FROM APPROACH ROAD TO CYCLONE SHELTER AT ADAVIPUDI.
1. 100% value of the work is completed.
2 As per the Agreement the Milestones fixed are as follows.Milestone 1 - to the end of Dt.31.11.2011, Earth work, Pipe culverts.Milestone 2 - to the end of Dt.31.11.2011, WBM Gr-II, Gr-III and Shoulders.
Milestone 3 - to the end of Dt.31.01.2012, BT and Road Furniture.3 The measurements like width and thickness of the OGPC and Seal coat Layer from Km 0.000 to Km
1.930 are verified and found to be fairly tallying with the required measurements. The details aregiven in Annexure - 1.
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
33/52
32 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
4 Sieve analysis, Bitumen Extraction, AIV and FIV QC tests conducted for OGPC and Seal coat inbetween Km 0.000 to Km 1.930 and Prime and tack coat QC test conducted for rate of spray of Kg/Sq m.
5
With M 30 Grade of concrete mix, 200 mm thick CC Pavement was completed from Km 1.917 To km1.970 .Measurements like width & thickness are checked at execution time and Slump testconducted, 6 No of cubes are casted and 3 cubes were tested for 7 day strength. 3 cubes will betested for 28 day compressive strength. Cores will be taken to confirm the compressive strength after28 days. QC tests were also conducted for FA, CA, water and Cement.
6 The measurements like width and thickness of the WBM Gr-III Layer from Km 1.680 to Km 1.930 andKm 0.000 to Km 1.250 are verified and found to be fairly tallying with the required measurements.The details are given in Annexure - 1.
7 Volumetric analysis tests were conducted for WBM Grade III layer from Km 1.680 to Km 1.930 andKm 0.000 to Km 1.250 QC tests were conducted for WBM Grade III ( field and lab ) i.e.
Gredation,AIV,FIV and Water absorption. The details are given in QC Test summary. They are fairlytallying with the specification requirements of clause 405 of MORD.8 Guard stone shall be provided at L/S of the road berm portion, throughout irrigation canal from Km
1.680 to 1.970 at an closed interval of 2.0m9 Painting is to be done with Black & White strips for the guard stones and also white painting to be
done for speed breakers & pipe culvert body walls for the clear visibility to vehicular traffic.10 CD Works: 1) Pipe culverts 600mm dia 2no.s in KM 0/2, Km.1/6 Completed.11 Cautionary and Warning signboards at school and speed brokers locations shall be erected as per
the NCRMP norms.12 Concrete was laid over pipe culvert portion in Km 0/2 but concrete and bituminous layers be joined
smoothly without any bump.13 Para wise compliance report shall be furnished duly attending to the above remarks and the earlier
QCR.
Name ofWork:
ROAD FROM GURAJANAPALLI TO BANDULAVANIPALEM
1. 100% value of the work is completed.
2. As per the Agreement the Mile stones fixed are as follows.Milestone 1 Earth work & Pipe culverts, GSB : to the end of Dt. 30.09.2011Milestone 2 CC Pavement, WBM Gr II and Gr III and Shoulders : to the end of Dt. 31.10.2011Milestone 3 BT and Road Furniture : to the end of Dt. 31.01.2012
3. The measurements like width and thickness of the OGPC and Seal coat Layer from Km 0.000 to Km1.930 are verified and found to be fairly tallying with the required measurements. The details are givenin Annexure - 1. They are fairly tallying.
4. Sieve analysis, Bitumen Extraction, AIV and FIV QC tests conducted for OGPC and Seal coat inbetween Km 0.000 to Km 1.930 and Prime and tack coat QC tests were conducted for cheking therate of binder spray.
5. From Km 0.460 to Km 0.660 both sides shoulder width is less than required because of land problem.
6. Guard stones are to be fixed along the outer edge of sharp curves and white wash is to be done toguard stones & pipe culvert body walls for the clear visibility to vehicular traffic.
7. CD Works: Pipe culverts 600mm dia 2no.s in KM 0/2 and Km.1/6 were completed.8. Parawise compliance report shall be furnished duly attending to the above remarks and earlierQCR.
Name ofWork:
Road from R&B Road to Danavaipeta
1. 30.00 % value of the work is completed. Total stretch of road 572Mts. WBM Gr-II is completed initially,Gr- III Completed recently2. Works to be done as per Milestone:
Mile stone 1 to the end of Dt: 06.12.11 - Earthwork, Pipe Culverts, GSB and Road Furniture - 3Months
MONTHLY REPORT
-
7/31/2019 7. March MPR 2012
34/52
33 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Mile stone 2 to the end of Dt: 06.03.11 - WBM Gr-II, Gr-III , Shoulders and CC Pavement - 3 MonthsMile stone 3 to the end of Dt: 06.06.12 - BT - 3 Months
3. 1 St Mile Stone Completed but Earth Work and Road Furniture Works are not Completed. Progress
needs to be improved4. The measurements like width and thickness of the WBM Gr.-III Layer from Km 0.000 to Km 0.572 are
verified and found to be fairly tallying with the required measurements. The details are given inAnnexure - 1.
5. Volumetric analysis tests were conducted for WBM Gr- III layer from Km 0/0 to Km 0/572 .QC testswere conducted for WBM GrII (field & Lab.)I.e Gredation, AIV, FIV and Water obsorption.The Detailsare givenin QC test summary. They are fairly tallying with the specfication requirements of clause405.13 of MORD.
6. While laying WBM simultaneously shoulders shall be also compacted.7. Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork:
Road from R&B Road to Gaddipeta of Thondangi Mandal in East Godavari District.
1. 28.75 % value of the work is completed. Total stretch of road is 457mts. WBM Gr-II and Pipe Culvert1no. Completed initially and WBM Gr - III is completed recently.
2. Works to be done as per Milestone:Mile stone 1 to the end of Dt: 06.12.11 - Earthwork, Pipe Culverts, GSB and Road Furniture - 3MonthsMile stone 2 to the end of Dt: 06.03.11 - WBM Gr-II, Gr-III , Shoulders and CC Pavement - 3 Months
Mile stone 3 to the end of Dt: 06.06.12 - BT - 3 Months3. 1st Milestone Completed but Earth Work and Road Furniture Works are not Completed. Progress
needs to be improved4. The measurements like width and thickness of the WBM Gr-III Layer from Km 0/0 to Km 0/457 are
verified and found to be fairly tallying with the required measurements. The details are given inAnnexure - 1.
5. Volumetric analysis tests were conducted for WBM Gr- III layer from Km 0/0 to Km 0/457. QC testswere conducted for WBM GrII (field & Lab.) i.e., Gradation, AIV, FIV and Water absorption. TheDetails are given in QC test summary. They are fairly tallying with the specfication requirements ofclause 405.13 of MORD.
6. While laying WBM shoulders shall be compacted simultaneously.7. Carriage width is not widened at curved portion. If radius of curve less than 60 m, extra width ofcarriage way shall be provided as per IRC:SP 20
8. Village name boards, cautionary and mandatory signboards at necessary points and sand stones allalong the outer edge of sharp curves, shall be provided.
9. Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork:
Road from R&B Road to Hukumpeta Cyclone Shelter
1. 50.00 % value of the work is completed. Total stretch of 630 mts, WBM Gr-II Completed2. Works to be done as per Milestone:
Mile stone 1 to the end of Dt: 06.12.11 - Earthwork, Pipe Culverts, GSB and Road Furniture - 3MonthsMile stone 2 to the end of Dt: 06.03.11 - WBM Gr-II, Gr-III , Shoulders and CC Pavement - 3 MonthsMile stone 3 to the end of Dt: 06.06.12 - BT - 3 Months
3. 1st Mile Stone Completed but Earth Work and Road Furniture Works are not Completed. Progressneeds to be improved.
4. The measurements like width and thickness of the WBM Gr.-II Layer from Km 0.000 to Km 0.630 areis verified and found to be fairly tallying with the required measurements. The details are given in
Annexure -1.5. Volumetric analysis tests were conducted for WBM Gr- II layer from Km 0.000 to Km 0.630 .QC tests
were conducted for WBM Gr -II (field & Lab.)I.e Gredation, AIV, FIV and Water obsorption.The Detailsare given in a QC test summary. They are fairly tallying with the specfication requirements of clause
MONTHLY REPORT
C lt S i f Thi d P t Q lit A dit (TPQA) f N ti l C l Ri k Miti ti P j t (NCRMP)
-
7/31/2019 7. March MPR 2012
35/52
34 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
405.13 of MORD.6. While laying WBM simultaneous compaction of shoulders shall be done.7. White wash is to be done to parapet walls of the existing culvert for the clear visibility of vehicular
traffic.8. The measurements like width and length of parapets and pipes of all the culverts are verified and
found tallying with the measurements in the drawing9. Village name boards, cautionary and mandatory signboards at necessary points and ground stones all
along the outer edge of sharp curves shall be erected.10. Para wise compliance report shall be furnished duly attending to the above remarks.
Name ofWork:
Road from R&B Road to K.Chodipallipeta
1. 27.82 % value of the work is completed. Total stretch of 720 Mts WBM Gr-II completed.2 Works to be done as per Milestone:
Mile stone 1 to the end of Dt: 06.12.11 - Earthwork, Pipe Culverts, GSB and Road Furniture - 3MonthsMile stone 2 to the end of Dt: 06.03.11 - WBM Gr-II, Gr-III , Shoulders and CC Pavement - 3 MonthsMile stone 3 to the end of Dt: 06.06.12 - BT - 3 Months
3 1st Mile Stone Completed but Earth Work and Road Furniture Works are not Completed. Progressneeds to be improved.
4 The measurements like width and thickness of the WBM Gr.-II Layer from Km 0/0 to Km 0.720 isverified and found fairly tallying with the required measurements. The details are given in Annexure -
1.5 Volumetric analysis tests were conducted for WBM Gr- II layer from Km 0.000 to Km 0.720 .QC tests
were conducted for WBM GrII (field & Lab.)I.e Gredation, AIV, FIV and Water obsorption.The detailsare givenin QC test summary. They are fairly tallying with the specfication requirements of clause405.13 of MORD.
6 While laying WBM simultaneously shoulders should to be done with proper compaction7 White washes to be done to parapet walls of the existing culvert for the clear visibility of vehicular
traffic.8 The measurements like width and length of parapets and pipes of all the culverts are verified and
found tallying with the estimate.
9 Village name boards, cautionary and mandatory signboards at necessary points and ground stones allalong the outer edge of sharp curves shall be erected.10 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork:
Road from R&B Road to P.Chodipallipeta
1. 20.68 % value of the work is completed. Total stretch of 670 mts WBM Gr-II completed2 Works to be done as per Milestone:
Mile stone 1 to the end of Dt: 06.12.11 - Earthwork, Pipe Culverts, GSB and Road Furniture - 3
MonthsMile stone 2 to the end of Dt: 06.03.11 - WBM Gr-II, Gr-III , Shoulders and CC Pavement - 3 MonthsMile stone 3 to the end of Dt: 06.06.12 - BT - 3 Months
3 1st Mile Stone Completed but Earth Work and Road Furniture Works are not Completed. Progressneeds to be improved.
4 The measurements like width and thickness of the WBM Gr II layer from Km 0.000 to Km 0.670 isverified and found to be fairly tallying with the required measurements. The details are given inAnnexure - 1.
5 Volumetric analysis tests were conducted for WBM Gr- II layer from Km 0.000 to Km 0.670 .QC testswere conducted for WBM Gr-II (field & Lab) i.e., Gradation, AIV, FIV and Water absorption. TheDetails are givenin QC test summary. They are fairly tallying with the specfication requirements ofclause 405.13 of MORD.
6 While laying WBM shoulders Shall be compacted simultaneously.7 Carriage width is not widened at curved portion. If radius of curve less than 60 mts, width of carriage
way shall be widened as per IRC SP-20.
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
-
7/31/2019 7. March MPR 2012
36/52
35 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
8 White wash is to be done to parapet walls of the existing culverts for the clear visibility of vehiculartraffic.
9 The measurements like width and length of parapets and pipes of all the culverts are verified and
found to be tallying with the measurements within the drawing.10 Village name boards, cautionary and mandatory signboards at necessary points and ground stones all
along the outer edge of sharp curves shall be erected.11 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork:
Road from LB Cheria CC road to Chillapalemm of LB Cheria of Narsapur Mandal inWest Godavari District.
1. 19.78 % value of the work is completed for this one work in the package which contains three no. ofworks under one agreement.
2 Works to be done as per Milestone:Mile stone 1 (i.e, Earth work, Pipe culverts, GSB) to the end of Dt: 08.09.2011 - 27.64 lakhs.(23.07%)Mile stone 2 (I.e, WBM Gr II, Gr III and Shoulders) to the end of Dt: 08.01.2011 - 47.66 lakhs.(39.80%)Mile stone 3 (i.e, BT, CC pavement and Road furniture) to the end of Dt: 08.05.2012 - 44.46 lakhs.(37.13%)
3 GSB of 890 meters & WBM Gr-II of 480 meters length is completed .Shoulders need to be compactedsimultaneously along with WBM layers.
4 The thickness of the GSB is observed which is varying from 100 to 103 mm as against the
requirement of 100mm & The thickness of the Gr-II is observed as varying from 75 to 77 mm asagainst the requirement of 75mm. Details are enclosed in annexure - 1.5 The 600mm dia single row pipe culvert (1 No's) not completed in 0/8.6 3rd milestone is in progress, but Pipe culverts & WBM Gr-III are not yet started. Progress needs to
Be improved.7 Widening earthwork formation and CD works is to be done prior to taking up WBM layers8 The project informatory boards with all details, Cautionary sign boards at necessary points and Village
name boards are not provided as per aggregement.The same shall be provided as per the guidelinesgiven by SPIU, NCRMP.
9 The Quality Control Lab is not provided at site for testing of material. The line department officers arerequested to take necessary action to establish Quality Lab at site at early stage.
Name ofWork:
Road from R&B road to Pedalanka of Narsapur Mandal in West Godavari District.
1. 23 % value of the work is completed for this one work in the package which contains three no. of worksunder one agreement.
2 Works to be done as per Milestone:Mile stone 1 (i.e, Earth work, Pipe culverts, GSB) to the end of Dt: 08.09.2011 - 27.64 lakhs.(23.07%)
Mile stone 2 (I.e, WBM Gr II, Gr III and Shoulders) to the end of Dt: 08.01.2011 - 47.66 lakhs.(39.80%)Mile stone 3 (i.e, BT, CC pavement and Road furniture) to the end of Dt: 08.05.2012 - 44.46 lakhs.(37.13%)
3 GSB of 1236 meters & WBM Gr-II of 1070 meters length is completed .Shoulders need to becompacted simultaneously along with GSB layers.
4 The thickness of the GSB is observed and varying from 100 to 103 mm as against the requirement of100mm. Details are enclosed in annexure - 1.
5 The thickness of the Gr-II is observed and varying from 75 to 78 mm as against the requirement of75mm. Details are enclosed in annexure - 1.
6 The 600mm dia single row pipe culvert (3 No's) not completed.7 3rd milestone is in progress, but Pipe culverts & WBM Gr-III is not yet started. Progress needs
To be improved.8 Widening of earthwork formation and CD works are to be done prior to taking up WBM layers9 he project informatory boards with all details, Cautionary sign boards at necessary points and Village
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
-
7/31/2019 7. March MPR 2012
37/52
36 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
name boards are not provided as per aggregement.The same shall be provided as per the guidelinesgiven by SPIU,NCRMP.
10 The Quality Control Lab is not provided at site for testing of material. The line department officers are
requested to take necessary action to establish Quality Lab at site at early stage.
Name ofWork:
Road from NH 214 A road to Harijanawada of Kothota of Mogalthuru Mandal in WestGodavari District.
1. 100 % value of the work is completed for this one work of the package which contains five no. of worksunder one agreement.
2 Works to be done as per Milestone for the package:Mile stone 1 (i.e, Earth work, Pipe culverts, GSB) to the end of Dt: 26.09.2011 - 16.24 lakhs.(9.03%)
Mile stone 2 (I.e, WBM Gr II, Gr III and Shoulders) to the end of Dt: 26.02.2012 - 76.44 lakhs.(42.51%)Mile stone 3 (i.e, BT, CC pavement and Road furniture) to the end of Dt: 26.07.2012 - 87.13 lakhs.(48.46%)
3 C.C Road of 300 meters length is completed out of 380 meters length including Key walls.4 GSB of 80 meters length is completed .Shoulders Completed for 300 mts.5 The 600mm dia single row pipe culvert (1 No's) completed.6 The thickness of the GSB Layer is observed and varying from 100 to 107 mm as against the
requirement of 100mm. Details are enclosed in annexure - 1.7 The Quality Control Lab is not provided at site for testing of material. The line department officers are
requested to take necessary action to establish Quality Lab at site at early stage.8 Cores will be taken to verify depth and compressive strength after 28 days of lying.9 MORD Specifications and IRC: SP-62-2004, Guidelines for the construction and design of Cement
Concrete roads for low volume roads, need to be followed in cutting and spacing of joints and curingthe CC road as mentioned below.
(i) Construction of joints shall be mechanically sawn joints spaced 2.5 m to 3.75 m(ii) Length of the panel in the direction of traffic shall not be less than the width of the pavement.(iii) Joints shall be cut when the pavement is neither too soft nor too hard and able to bear the
weight of the machine and crew. Normally it may vary from 8 to 12 hrs depending on weatherconditions
10 Construction joints shall be butt joints and placed after a days work is over or when work is suspendedfor more than 30 minutes
11 Expansion joints shall be provided near bridges and slab culverts and consists of bitumen impregnatedjoints/ premoulded synthetic joints filler board about 20 mm thick.
12 (i)After completion of the finishing operations, the surface of the pavement shall be covered with wetHessain cloth, burlap or jute mats. They shall be maintained fully wetted and in position for 24 hrs(ii) Upon the removal of the wet covering out the end of 24 hrs, the slab shall be thoroughly wetted andcured by ponding or sprinklers.
13 After minimum 28 days after casting the concrete pavement ,joints groove at contraction joint shall bewidened to a 10 mm width and to a depth 18 to 20mm and shall be sealed
Name ofWork:
Road from NH 214 A at Ranga statue center to Harijanawada of Kalipatnam (E) ofMogalthuru Mandal in West Godavari District.
1. 55.41 % value of the work is completed for this one work in the package which contains five no. ofworks under one agreement.
2 Works to be done as per Milestone:Mile stone 1 (i.e, Earth work, Pipe culverts, GSB) to the end of Dt: 26.09.2011 - 16.24 lakhs.(9.03%)Mile stone 2 (I.e, WBM Gr II, Gr III and Shoulders) to the end of Dt: 26.02.2012 - 76.44 lakhs.(42.51%)
Mile stone 3 (i.e, BT, CC pavement and Road furniture) to the end of Dt: 26.07.2012 - 87.13 lakhs.(48.46%)
3 3rd milestone is in progress, but WBM Gr-III is not yet started. Progress needs to be improved.4 GSB of 890 meters, WBM Gr-II of 600 meters, CC Pavement of 290 meters length is completed
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
-
7/31/2019 7. March MPR 2012
38/52
37 | P a g e
Co su ta cy Se ces o d a ty Qua ty ud t ( Q ) o at o a Cyc o e s t gat o oject ( C )
.Shoulders need to be compacted simultaneously along with WBM layers. But shoulder work is not yetstarted.
5 The thickness of the GSB is observed which is varying from 100 to 106 mm as against the requirement
of 100mm, The thickness of the Gr-II is observed and varying from 75 to 76 mm as against therequirement of 75mm & The thickness of the CC Pavement is observed and varying from 200 to 201mm as against the requirement of 200mm. Details are enclosed in annexure - 1.
6 Widening earthwork formation and CD works are to be done prior to taking up WBM layers7 Cores will be taken to verify depth and compressive strength after 28 days of lying.8 MORD Specifications and IRC: SP-62-2004, Guidelines for the construction and design of Cement
Concrete roads for low volume roads, need to be followed in cutting and spacing of joints and curingthe CC road as mentioned below.
(i) Construction of joints shall be mechanically sawn joints spaced 2.5 m to 3.75 m(ii) Length of the panel in the direction of traffic shall not be less than the width of the pavement.(iii) Joints shall be cut when the pavement is neither too soft nor too hard and able to bear the
weight of the machine and crew. Normally it may vary from 8 to 12 hrs depending on weatherconditions
9 Construction joints shall be butt joints and placed after a days work is over or when work is suspendedfor more than 30 minutes
10 Expansion joints shall be provided near bridges and slab culverts and consists of bitumen impregnatedjoints/ premoulded synthetic joints filler board about 20 mm thick.
11 After minimum 28 dys after casting the concrete pavement ,joints groove at contraction joint shall bewidened to a 10 mm width and to a depth 18 to 20mm and shall be sealed.
12 Cautionary sign boards at necessary points and Village name boards are not provided as peraggregement.The same shall be provided as per the guidelines given by PIU,NCRMP.
13 The Quality Control Lab is not provided at site for testing of material. The line department officers arerequested to take necessary action to establish Quality Lab at site at early stage.
Name ofWork:
R&B Road at Panchayat office to Pulaparthivarithota via Badava of MogalthuruMandal in West Godavari District.
1. 48.50 % value of the work is completed for this one work in the package which contains five no. ofworks under one agreement.
2 Works to be done as per Milestone:Mile stone 1 (i.e, Earth work, Pipe culverts, GSB) to the end of Dt: 26.09.2011 - 16.24 lakhs.(9.03%)Mile stone 2 (I.e, WBM Gr II, Gr III and Shoulders) to the end of Dt: 26.02.2012 - 76.44 lakhs.(42.51%)Mile stone 3 (i.e, BT, CC pavement and Road furniture) to the end of Dt: 26.07.2012 - 87.13 lakhs.(48.46%)
3 3rd milestone is in progress, but WBM Gr-II & Gr-III is not yet started. Progress needs to be improved.4 GSB of 1490 meters length is completed .Shoulders need to be compacted simultaneously along with
GSB layers. But shoulder work is not yet started.5 The thickness of the GSB is observed which is varying from 100 to 104 mm as against the requirement
of 100mm & The thickness of the CC Pavement is observed which is varying from 200 to 202 mm asagainst the requirement of 200mm. Details are enclosed in annexure - 1.
6 The 600mm dia single row pipe culvert 1 No. is completed against 2 Nos. and balance 1 No. has to betaken up before WBM.
7 White wash shall be done to parapet walls of the existing culvert for the clear visibility of vehiculartraffic.
8 Cores will be taken to verify depth and compressive strength after 28 days of lying.9 MORD Specifications and IRC: SP-62-2004, Guidelines for the construction and design of Cement
Concrete roads for low volume roads, need to be followed in cutting and spacing of joints and curingthe CC road as mentioned below.
(iv) Construction of joints shall be mechanically sawn joints spaced 2.5 m to 3.75 m(v) Length of the panel in the direction of traffic shall not be less than the width of the pavement.(vi) Joints shall be cut when the pavement is neither too soft nor too hard and able to bear the
weight of the machine and crew. Normally it may vary from 8 to 12 hrs depending on weatherconditions
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
-
7/31/2019 7. March MPR 2012
39/52
38 | P a g e
10 Construction joints shall be butt joints and placed after a days work is over or when work is suspendedfor more than 30 minutes
11 Expansion joints shall be provided near bridges and slab culverts and consists of bitumen impregnated
joints/ premoulded synthetic joints filler board about 20 mm thick.12 After minimum 28 dys after casting the concrete pavement ,joints groove at contraction joint shall bewidened to a 10 mm width and to a depth 18 to 20mm and shall be sealed.
13 The project informatory boards with all details, Cautionary sign boards at necessary points and Villagename boards are not provided as per aggregement.The same shall be provided as per the guidelinesgiven by PIU,NCRMP.
14 The Quality Control Lab is not provided at site for testing of material. The line department officers arerequested to take necessary action to establish Quality Lab at site at early stage.
Name ofWork: Mogaltur Vempa R&B Road at Uchintha kalava Bridge to Gogulamma Harijanapeta ofMogalthuru Mandal in West Godavari District.1. 67.43 % value of the work is completed for this one work in the package which contains five no. of
works under one agreement.2 Works to be done as per Milestone:
Mile stone 1 (i.e, Earth work, Pipe culverts, GSB) to the end of Dt: 26.09.2011 - 16.24 lakhs.(9.03%)Mile stone 2 (I.e, WBM Gr II, Gr III and Shoulders) to the end of Dt: 26.02.2012 - 76.44 lakhs.(42.51%)Mile stone 3 (i.e, BT, CC pavement and Road furniture) to the end of Dt: 26.07.2012 - 87.13 lakhs.
(48.46%)3 WBM Gr-II of 595 meters length is completed & GSB layer completed from CH. 595 to 1190m.Shoulders need to be compacted simultaneously along with WBM layers. But shoulder work is notyet started.
4 Gradation is conducted for GSB & WBM Gr-II material and results are within the specified limits as peragreement specification.
5 The thickness of the GSB is observed, which is varying from 100 to 104 mm as against therequirement of 100mm & Gr-II is observed, which is varying from 75 to 82 mm as against therequirement of 75mm. Details are enclosed in annexure - 1.
6 C.C Road of 595 meters length is completed including Key walls. Shoulders work is not yet started.The thickness of the CC Road is observed as 200 to 205mm.
7 The 600mm dia single row pipe culvert (2 No's) completed in 0/6.8 White wash shall be done to parapet walls of the existing culverts for the clear visibility of vehicular
traffic.9 The measurements like width and length of parapets and pipes of all the culverts are verified and
found to be tallying.Construction joints shall be butt joints and placed after a days work is over or when work is suspendedfor more than 30 minutes
10 Expansion joints shall be provided near bridges and slab culverts and consists of bitumen impregnatedjoints/ premoulded synthetic joints filler board about 20 mm thick.
11 After minimum 28 dys after casting the concrete pavement ,joints groove at contraction joint shall be
widened to a 10 mm width and to a depth 18 to 20mm and shall be sealed.12 The Quality Control Lab is not provided at site for testing of material. The line department officers are
requested to take necessary action to establish Quality Lab at early stage.
Name ofWork:
Improvements to Road from Konada Ramatheertham (R&B) Road to Konathalapalem(Via) Pasupam, Yerukonda, Kollayavalsa from Km 12/0 to 16/5 (Km 0/0 to 4/0 i.e. up toNH-5 crossing) in Vizianagaram District.
1. 100.00 % value of the work is completed.2 Works to be done as per Combined Milestone:Mile stone 1 to the end of Dt: 07.06.11- Forming Embankment and GSB.Mile stone 2 to the end of Dt: 07.12.11- WMM, Surface dressing, Emulsion spraying and B.T.Mile stone 3 to the end of Dt: 07.03.12- Gravel Shoulders.
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
-
7/31/2019 7. March MPR 2012
40/52
39 | P a g e
3 The field officers have not furnished the bills for Bitumen used for the road. The same shall befurnished to the TPQA staff for verification.
4 The field officers have furnished the test results for Soil, GSB, WMM and B.T obtained from
Department of Civil Engineering, Andhra University Visakhapatnam.5 BM and SDBC samples are collected on 14.06.2011 and got tested for bitumen content and gradation.The result are found to be fairly satisfying the specification requirement as per Mirth. The result werecommunicated in the 1st QCR
6 The formation widths are verified from Km: 12/000 to Km 13/500, Km: 13/850 to Km 15/200m and Km:15/400 to Km 15/760m and found to be varying from 6.0m to 7.0m. The field officers are requested tofurnish the reasons for not providing the full width. The field officers are requested to explore thepossibility of mocking up the required formation width.
7 At some locations the outer edges of BT Road are not maintained true to line8 The embankment formation requires trimming of side slopes as specified in Mort & H sections 301 &
305.9 The measurements like width and thickness of the BM and SDBC layer from KM 12/000 to KM 15/200
and KM 15/400 to 15/900 are verified and found to be tallying with the required measurements.The approved letters of quarries like earth and aggregates have not been produced by field officersfor verification
10 Village name boards, Guard stones, cautionary and mandatory signboards at necessary points allalong the outer edge of sharp curves and at school locations shall be erected.
11 The Project informatory boards were erected with all details at site as per the guide lines given bySPIU, NCRMP.
12 Para wise compliance report shall be furnished for this QCR and First QCR dated 15-07-2011 dulyattending to the above remarks.
Name ofWork:
Construction of cyclone shelter at Bangarampeta in Nakkapalli Mandal
1. Three works are there in this package:1) Construction of cyclone shelter at Bangarampeta in Nakkapalli Mandal,2) Construction of cyclone shelter at Mullaparra in Nakkapalli Mandal and3) Construction of cyc