668: APQP - Efficient Project Management with Control Plan
SAP Best Practices IM&C Package (China)
SAP Best Practices
Scenario Overview – 1
Purpose The scenario shows the full project management cycle following the
APQP standard.
Benefits Standardizes the development process by using templates Increase customer satisfaction Deliver quality products on time with the lowest possible costs Reduce nonconformity costs by recognizing necessary changes early Improve communication and decision making processes with internal
and external partners by using Web-based access Increase the transparency of projects by full integration between
project, documents and cFolders which enables direct access to all project-related documents
Integration of control plan and PLM backend system help the supplier raise the project management efficiency as well as quality management in future production
Purpose and Benefits:
Scenario Overview – 2
Project Manager Quality Manger Engineer
SAP Applications Required:
Company Roles Involved in Process Flows:
Key Process Flows Covered:
Project creation based on the APQP template using cProjects Roles and authorization definition for different parties in
cProjects Project Resource Planning Document uploading Checklist maintenance Checklist Items status maintenance Q-Gate: Initiating Phase Approval Project Evaluation Control Plan Collaboration via cFolders Q-Gate: Phase and project completion approval
SAP ECC 6.0 EhP3
Scenario Overview – 3
Detailed Process Description:
APQP - Efficient Project Management with Control Plan
The OEM requests a new product development from the supplier
The supplier creates the project by copying the APQP template. Changes are made to the project structure based on the OEM’s specific requirement. Resources are later assigned to the project, and the project is scheduled
For the first phase - Concept Design, a Q-Gate is defined. After creating the related template documents for the project, and changing the task status, the project manager creates an approval
The Quality Manager grants the approval, then the engineers start to create the control plan for the project
After the control plan is created, it is downloaded as a pdf file. The control plan is also transferred to the SAP ERP system, and an inspection plan in the SAP ERP system is generated automatically
The project manager transfers the related data during the project to cFolders, and the project is completed
Process Flow Diagram E
ng
ine
er
Ev
en
t
MRP = Material Requirements Planning, PPV = Purchase Price Variance
Confirm status for Checklist
Items
Create a collaboration
folder with the OEM
Create Project base on APQP
template
Complete Project
Maintain Checklist
Generate Object (Export Insp. Plan to
SAP ERP)
Roles and Authorization
Definition
Project Resource
Scheduling
Upload document to
project
Maintain Task Status
Create Control Plan
Pro
jec
t M
an
ag
er
Create Collaboration
Qu
ali
ty
Ma
na
ge
r
Q-Gate: Phase Approval
Project Evaluation
Print and Download
Control Plan
Maintain Designing FMEA Task
and Checklist
APQP - Efficient Project Management with Control Plan
Define type of APQP
Review/ Approval
Review/Approval
ReviewPre-ProductionRelease
ReviewSOP Release
1) Concept
Phase
RFQ / Businesscase
Development Plan
Regulations (Laws, Standards, Objectives)
Continuous Improvement
2) Product Design
Design FMEA
PreliminaryBill of Materials
Specification
Design collaboration
Control Plan(Prototype)
3) ProcessDesign
Process FMEA
Routing creation
Process flow diagram
Statistical processControl (SPC)
Control plan(Model)
4) Validation
Planning and production under real-life conditions
Control plan forseries production and inspection plan
Process audit
Production partapproval process
5) Product Launch
Quality Inspections during Production
Requalificationtests
Processoptimization
Advanced Product Quality Planning Phase Approach
A guideline for APQP is included in QS9000, which contains the general requirements on how the supplier should handle a new product development project to meet the customer requirements by planning the product and process quality in advance.
In this scenario, the basic requirements from the APQP manual are included in a project template, for preparing plans and checklists, to ensure that Advanced Product Quality Planning is actually carried out at the supplier.
APQP (Advanced Product Quality Planning) is a mandatory new product development process for suppliers in many Industries, in order to fulfill the requirements from QS9000.
To use APQP, OEM and Supplier have the following requirements:
Need a standard template for an APQP project
Different roles and authorization defined for the different parties involved
Detailed processing for the control plan
Transparency to the OEM
With the traditional SAP system, it is difficult to fulfill all the requirements and standards defined for APQP. But we can meet the requirements by using cProject as following:
A business scenario for APQP project management starts by creating a project following the APQP standard. Roles and authorization should be defined for different parties. Interactive operations between the QM, PM, and engineer at the supplier side are then processed.
A practical control plan should be created during the procedure, and be seamlessly linked to the quality execution system.
The OEM should also have the possibility to check the working procedures and related documentation through a certain system.
Business Background
Supplier
Project Manager Quality Manager Engineer
OEM
New Product Development
Request
Supplier - cProjects
APQP Project
Create Project basedOn APQP template
Resources Planning
Create Project basedOn APQP template
Project Scheduling
Q-Gate Setting
Resources Planning
Project Scheduling
Q-Gate Setting
APQPtemplate
Upload Documents
Concept Design
Maintain Task Status
Upload Documents
Copy/Maintain Checklistand confirm Status
Maintain Task Status Project Evaluation
Q-Gate:Phase Approval
Create/Download/PrintControl Plan
Export Inspection PlanTo R/3Create Collaboration
Complete Project
Copy/Maintain Checklistand confirm Status
Project Evaluation
Q-Gate:Phase Approval
Create/Download/PrintControl Plan
cFolders
APQP Project Folders
Export Inspection PlanTo R/3
Product Design
Concept Design
Design FMEABOM
Control Plan
Monitor
Product Design
Process Design
Validation
Product Launch
Design FMEA, BOM, Control Plan, Process Flow, Diagram, Process FMEA, PPAP Design
Process Design
Validation
Product Launch
Create Collaboration
Complete Project
Information Synchronization Solution for OEM and Supplier in SAP BP
cProjects is used to control the project, especially the pre-BOM phase
The template is pre-defined in SAP Best Practices for IM&C
Project Template in c-Project
Control Plan created in cProjects can be downloaded as a pdf file
Control Plan created in cProjects can be transferred to the SAP ERP system
An Inspection Plan in the SAP ERP system can be automatically generated based on the Control Plan
Control Plan in pdf Format
cFolders is linked with cProjects
Related information during the project can be published to the cFolders
The OEM has the possibility to monitor the project remotely
cFolders Linked to the cProjects
Legend
Symbol Description Usage Comments
Band: Identifies a user role, such as Accounts Payable Clerk or Sales Representative. This band can also identify an organization unit or group, rather than a specific role.
The other process flow symbols in this table go into these rows. You have as many rows as required to cover all of the roles in the scenario.
Role band contains tasks common to that role.
External Events: Contains events that start or end the scenario, or influence the course of events in the scenario.
Flow line (solid): Line indicates the normal sequence of steps and direction of flow in the scenario.Flow line (dashed): Line indicates flow to infrequently-used or conditional tasks in a scenario. Line can also lead to documents involved in the process flow.
Connects two tasks in a scenario process or a non-step event
Business Activity / Event: Identifies an action that either leads into or out of the scenario, or an outside Process that happens during the scenario
Does not correspond to a task step in the document
Unit Process: Identifies a task that is covered in a step-by-step manner in the scenario
Corresponds to a task step in the document
Process Reference: If the scenario references another scenario in total, put the scenario number and name here.
Corresponds to a task step in the document
Sub-Process Reference: If the scenario references another scenario in part, put the scenario number, name, and the step numbers from that scenario here
Corresponds to a task step in the document
Process Decision: Identifies a decision / branching point, signifying a choice to be made by the end user. Lines represent different choices emerging from different parts of the diamond.
Does not usually correspond to a task step in the document; Reflects a choice to be made after step execution
Symbol Description Usage Comments
To next / From last Diagram: Leads to the next / previous page of the Diagram
Flow chart continues on the next / previous page
Hardcopy / Document: Identifies a printed document, report, or form
Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines
Financial Actuals: Indicates a financial posting document
Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines
Budget Planning: Indicates a budget planning document
Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines
Manual Process: Covers a task that is manually done
Does not generally correspond to a task step in a document; instead, it is used to reflect a task that is manually performed, such as unloading a truck in the warehouse, which affects the process flow.
Existing Version / Data: This block covers data that feeds in from an external process
Does not generally correspond to a task step in a document; instead, this shape reflects data coming from an external source; this step does not have any incoming flow lines
System Pass / Fail Decision: This block covers an automatic decision made by the software
Does not generally correspond to a task step in the document; instead it is used to reflect an automatic decision by the system that is made after a step has been executed.
<F
unct
ion>
Ext
erna
l to
SA
P
Business Activity /
Event
Unit Process
Process Reference
Sub-Process
Reference
Process
Decision
Diagram Connection
Hardcopy / Document
Financial Actuals
Budget Planning
Manual Proces
s
Existing Version /
Data
System Pass/F
ail Decisio
n
Copyright 2009 SAP AGAll Rights Reserved
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.
Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.
Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.
IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation.
Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.
Oracle is a registered trademark of Oracle Corporation.
UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.
Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.
HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.
Java is a registered trademark of Sun Microsystems, Inc.
JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.
SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP Business ByDesign, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.
Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Business Objects S.A. in the United States and in other countries. Business Objects is an SAP company.
All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.
These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warrant.
top related