5th annual exploration update...slide 31 600m 400m 200m nw se 200 metres 2003 drill holes proposed...
Post on 26-Jul-2020
1 Views
Preview:
TRANSCRIPT
5th Annual Exploration UpdateJanuary 29, 2004
Forward Looking StatementForward Looking StatementSlide 2
Certain statements set forth in this presentation constitute"forward looking statements" within the meaning of the
United States Private Securities Litigation Reform Act of 1995. Such statements involve risks, uncertainties and
other factors that may cause the actual results, performance or achievements to differ from those expressed or implied by such forward looking statements. Such risks and uncertainties are
described in periodic filings made by Kinross Gold Corporation with the U.S. Securities and Exchange Commission and Canadian
provincial securities regulatory authorities.
All dollar amounts used throughout this presentation are expressed in US dollars, unless otherwise noted.
OutlineOutlineSlide 3
Advanced Exploration/Development PropertiesAdvanced Exploration/Development Properties
RefugioRefugio
GurupiGurupi
Gold HillGold Hill
Fort KnoxFort Knox
Kettle RiverKettle River
La CoipaLa Coipa
Round MountainRound Mountain
MusselwhiteMusselwhite
PorcupinePorcupine
ParacatuParacatu
CrixasCrixas
George/Goose LakeGeorge/Goose LakeUluUlu
Precious Metals OperationsPrecious Metals Operations
KubakaKubaka
LupinLupin
Emanuel CreekEmanuel Creek
PurenPuren
BirkachanBirkachan
AquariusAquariusNew BritanniaNew Britannia
BlanketBlanket
2003 Achievements2003 AchievementsSlide 4
1. Replaced reserves at operating mines;
2. Added additional reserves / resources at advanced projects (Refugio, Pamour, Emanuel Creek, Birkachan, Tsokol, Gold Hill, Puren);
3. Assessed, prioritized and implemented exploration programs at newly acquired assets (Gurupi, Aquarius, Cominor JV);
4. Acquired new high-quality projects that fit the company’s growth strategy (Buckhorn, Wind River);
5. Continued to optimize the project pipeline portfolio by JV or sales of non-core assets (George – Goose Lake, Ulu, Youga);
Current Project PipelineCurrent Project PipelineExploration Pre-feasibility Feasibility Construction Production
Round Mountain UG Aquarius
Emanuel CreekRefugio
Pamour
Paracatu Expansion
Emanuel North
Tsokol
PQ Deeps
Birkachan
Puren
Gil
Gurupi
Forquila Sul
Gold Hill
New Discovery
Proven & Probable ReservesMeasured & Indicated Resources
Progress January to December 2003
BuckhornWind River
New Acquisition
Slide 5
Paracatu Mine, BrazilParacatu Mine, BrazilSlide 6
Paracatu Mine
Brazil
Rio de Janeiro
Town ofParacatu
300000
8100000
Brasilia210km
Pit Outline
ParacatuProperty
road
1 kilometre
Mine Grade Ore
Low Grade Ore
Paracatu Controls Mineral RightsSurface Access Agreements Pending
Paracatu Cross SectionParacatu Cross SectionSlide 7
1000 metres
Existing drill hole
Lower Pyrrhotite Ore HorizonB2 Calha OreAs >2,500 ppmProposed Drill Hole
Inferred Mineralization
700m
PhylliteHydrothermally
Altered Ore Zone
surface
240° 060°Looking N30°W
500m
900m
CURRENT PIT LIMIT (369Mt)
WATER TABLE
SAG EXPANSION (161Mt)
350-400 Mt TARGET
Crixas Mine, BrazilCrixas Mine, BrazilSlide 8
5 kilometres
Town of Crixas
LateriteProterozoic schistGranitic rocksUltramafic rocksFelsic metavolcanic rocksMafic metavolcanic rocksMetasedimentary rocksGold mineralizationGold occurrence
Crixas PropertyBrazil
Rio de Janeiro
Crixas Property
Mina Nova
Mina IIICorpo Sul
Corpo IVCorpo V
Palmeiras
ForquilhaForquilha Sul
Crixas Cross SectionCrixas Cross SectionSlide 9
400 metres
-500m
surface
greywacke
schist
dolomite
basic
meta
volca
nics
284° 104°Looking N14°E
-1,000m
overburden
4.69/3
6.36/4.5 5.18/3
2.26/2.6
5.96/12
6.2/6
0.1/1
0.1/1
30.04/1.5
2.16/0.65117.76/0.9
792.0/0.59.88/4.38 20.56/2.89 + 4.98/4.16
Corpo 3.5
Corpo IV315° Plunge
Zona SuperiorMassive Sulphide
Mina III Quartz Vein290° Plunge
Note: not all intersections shown
Forquilha Sul is directly down plunge ofCorpo IV which is oblique to this section
Long Section is oblique to plunge trend of Ore shoot, so deepest holes are not intersecting the ore zone
Existing drill hole
> 2 g/t AuQuartz Veining
Mineralization
5.96/12 g/t Au / Interval (meters)
100 metres
8389600N
8389200N
610000E609600E
Forquilha Sul
Forquilha
Corpo IV
Intersection >3.0 g/t AuIntersection < 3.0 g/t Au
3.99/31.97/32.75/3
6.79/8.655.77/34.07/32.26/3
7.5/63.31/3
8.75/3
5.66 / 3
4.07/5.1
6.06/3
15.23/73.8/3
3.44/3
2.27/34.16/3
3.28/37.59/10
10.44/2.9
3.09/2.2
5.91/2.1
4.19/2
1.94/3
7.48/3
1.50/3
3.15/3
2.27/3
1.34/2
Grade (g/t Au) / Interval (metres)
3.9/36.49/3.5
3.58/3.5
4.42/4.2
5.56/3.5
Crixas – Forquilha SulSurface Projection
Crixas – Forquilha SulSurface Projection
Slide 10
Plunge17°
Note: holes in Corpo IV already existed
Forquilha Main Shoot
Upper Zone
Lower Forquilha Shoot
Lower Zone
Narrow barren zonebetween shootsAs in Mina III
5.25/3.5 6.94/5.0
Gurupi Project, BrazilGurupi Project, BrazilSlide 11
Deformed TonalitesGranitic RocksVolcanic RocksSedimentary RocksFaultGold Occurrence
10 kilometres
Gurupi PropertyBrazil
Rio de Janeiro
sedimentaryCover
Chega Tudo
Cipoeiro
Kinross Holdings
Goldfields S.A.
Goldfields S.A.
CVRD
Gurupi – Cipoeiro Section 80 - 6
Gurupi – Cipoeiro Section 80 - 6
Slide 12
Existing drill hole
> 1.5 g/t Au0.4 – 1.5 g/t Au
Inferred Mineralization
metasediments
tonalite
50 metres
Proposed Pit Outline
surface
260° 080°Looking N10°W
1.20 / 36
7.37 / 2
0.74 / 4
3.66 / 7
3.09 / 272.06 / 35
1.53 / 14
0.49 / 83.23 / 2
1.89 / 52
1.32 / 5
saprolite
Grade (g/t Au) / Interval (metres)
Gurupi – Cipoeiro Section 110 - 9
Gurupi – Cipoeiro Section 110 - 9
Slide 13
100 metres
290° 110°Looking N20°E
Existing drill holeKinross drill hole
> 1.5 g/t Au0.4 – 1.5 g/t Au
Inferred Mineralization
metasediments
tonalite
saprolite
Grade (g/t Au) / Interval (metres)
2.02/50
1.38/161.00/10
1.18/16
1.73/7
0.68/10
0.51/11
1.90/19
1.10/161.19/41
KCP255 projected 60meters
Proposed Pit Outline
1.50/26
Planned Infill Hole
1.06/26
Gurupi – Chega TudoSection 1400N
Gurupi – Chega TudoSection 1400N
Slide 14
chlorite schist
dacite
gabbro
saprolite
50 metres
100m
0m
Looking N45°W225° 045°
meta-arkose
Existing drill holeKinross drill hole
> 2.5 g/t Au0.6 – 2.5 g/t Au0.2 - 0.6 g/t Au
Inferred Mineralization
0.69/ 7
1.19/ 29
0.67/ 20
0.68/ 11
Proposed Drill Hole
Grade (g/t Au) / Interval (metres)
Proposed Pit Outline
GurupiExploration Targets
GurupiExploration Targets
Slide 15
Airborne Magnetic Map Of The Central Portion Of The Gurupi Project
S c a l e
Low
High
N9,758,000N
352,
000E
9,740,000N
368,
000E
Cipoeiro Trend
Chega Tudo Trend
Serrinha
Sao Jose Leite
4Km
La Coipa Mine, ChileLa Coipa Mine, ChileSlide 16
CMCLCCMCLC
MDOMDO
CODELCOOPTION
CODELCOOPTION
LADERA FARALLON
BECHA NORTE
PUREN
POMPEYA
LAS COLORADA
COIPA NORTE
FARALLON BAJO
CAN CAN
INDAGUA
Dacites
Cretaceous FormationsJurassic FormationsTriassic Formations
Dacitic DomesDacite Flows
Instrusives
MARITZA
CODOCEDO
PUREN WEST
Chile
LaCoipa
Puren Area TargetsPuren Area TargetsSlide 17
CODOCEDOTARGET
POMPEYATARGET
PUREN DRILLING
PUREN WESTTARGET
2 km
Puren
Cominor
PropertyBoundary
Puren Prospect, ChilePuren Prospect, ChileSlide 18
1.46 / 58
0.34 / 429 / 146
1.68 / 93 / 154
g/t Au / g/t Ag / meters
0.80 / 527 / 146
1.03 / 268 / 176
1.41 / 6 / 124
0.89 / 51 / 212
0.81 / 33 / 230
0.27 / 412 / 70
Puren Long Section
Puren Long Section
Slide 19
g/t Au / g/t Ag / meters
1.31 / 187 / 158
1.10 / 186 / 136
0.60 / 180 / 128
0.80 / 4 / 130
0.97 / 3 / 174
1.10 / 7 / 212
2.04 / 10 / 122
0.81 / 528 / 1460.66 / 44 / 16
Puren Section 7039405N
Puren Section 7039405N
Slide 20
0.92 / 89 / 144
g/t Au / g/t Ag / meters
1.10 / 186 / 136
1.26 / 71 / 166
1.03 / 268 / 1761.32 / 81 / 178
2.05 / 5 / 62
2.44 / 12 / 48
2.58 / 253 / 136
Puren Section 7039800N
Puren Section 7039800N
Slide 21
1.05 / 332 / 206
1.04 / 890 / 60
g/t Au / g/t Ag / meters
0.91 / 529 / 164
0.60 / 180 / 128
1.68 / 8 / 361.14 / 20 / 62
0.34 / 429 / 146
1.73 / 4 / 118
Cominor Project, La Coipa District
Cominor Project, La Coipa District
Slide 22
JOINT VENTURE (50:50)COMINOR AND
KINROSS GOLD CORP.
Cominor Puren, Au Geochemistry
Cominor Puren, Au Geochemistry
Slide 23
Puren
Puren South
Codocedo
CominorPuren, As Geochemistry
CominorPuren, As Geochemistry
Slide 24
Puren
Puren South
Codocedo
Refugio Mine, ChileRefugio Mine, ChileSlide 25
Buffer Zone
Leach Pad
Process Plant
Verde Volcanic andIntrusive Complex
Laguna Tuff
RefugioVolcanics
(undivided)
MesozoicRocks
Pancho Diorite& Volcanics
0 2km
Grade (g/t Au) / core length (metres) 1.02g/116m
Chile
REEFUGIO
Verde WestEast & Mines
Pancho Deposit
Guanaco Compania Minera Maricunga Claims130 claims for 650 hectares
P21A 1.02g/116m
Refugio Pancho Deposit
Refugio Pancho Deposit
Slide 26
PitOutline
Pancho HillEl.4550m
69500 E
54000 N
0 200 400
metres
0.80/78
2.13/47
0.89/84
0.88/126
Grade (g/t Au) / Core Length (metres)Proposed Drill Hole (13)
0.75/494
Mineralized Zone>0.5 g/t Au>1.0 g/t Au
Pancho Deposit Section 5NE
Pancho Deposit Section 5NE
Slide 27
218° 038°0 50 100
metres4400m
4200m
4300m
4100m
Intersection (g/t Au) /Core Length (metres)
4000mMineralized Zone>0.5 g/t Au>1.0 g/t Au
0.96/231
0.87/60
1.01/71
0.92/102
0.90/1801.79/60
0.78/82
1.07/269
1.19/218
1.17/150
0.88/126
Pit Outline
Previous DrillingRecent DrillingProposed Drill Hole
1.12/38
1.07/269OPEN
OPEN
OPEN
0 100 m
Intersection (g/t Au)Core Length (metres)
Previous DrillingRecent DrillingProposed Drill HoleSoil Geochem Anomaly
StockworkZoneDiorite Porphyry
Volcanic Cap
outcrop
outcrop
Drill road
RefugioGuanaco Prospect
RefugioGuanaco Prospect
1.02 / 116
1.02 / 116
Slide 28
Kubaka District, RussiaKubaka District, RussiaSlide 29
64°N
OmolonRiver
KedonRiver
133°E
25 kilometres
Birkachan
Kubaka
Oroch
Yolochka
Magnitny
Zakharenko
TummannyYuny
Kubaka Area
Russian FederationMagadan
Kubaka Mine, RussiaKubaka Mine, RussiaSlide 30
KubakaOpen Pit Mine
614m Level AditUnderground Mine
Tailings Pond
KubakaRiver
Tsokol ZoneAnd Drilled Area
Veins
Vein
Kubaka Project Area
Overburden Stockpiles
Mill, ShopsAdministration
1 kilometre
baseline
Tsokol LongitudinalOrebody 11
Tsokol LongitudinalOrebody 11
Slide 31
600m
400m
200m
NW SE
200 metres2003 Drill HolesProposed Drill Holes
dacite tuff
Korbashale
alluvium
faults>200 (gxm) Au100 - 200 (gxm) Au50 - 100 (gxm) Au20 - 50 (gxm) Au10 - 20 (gxm) Au
looking northeast
50 55 60 65 70 75 80
34.9/4.4
g/t Au/horizontal thickness
20.0/10.1
19.0/7.3
28.9/7.2
33.2/6.9
35.1/5.4
29.2/2.1
OPEN
Tsokol LongitudinalOrebody 12
Tsokol LongitudinalOrebody 12
Slide 32
600m
400m
200m
NW SE
200 metres2003 Drill HolesProposed Drill Holes
dacite tuff
Korbashale
alluvium
faults
dacite tuff
rhyodaciterhyolite
>200 (gxm) Au100 - 200 (gxm) Au50 - 100 (gxm) Au20 - 50 (gxm) Au10 - 20 (gxm) Au
looking northeast
55 60 65 70 75 80g/t Au/horizontal thickness
56.9/2.7 383.8/0.425.0/10.1
15.1/6.9
25.9/7.423.8/3.5
OPEN
Birkachan Location, RussiaBirkachan Location, RussiaSlide 33
4 kilometresBirkachan
Kubaka
Winter Road
71500000N
540000E
MunugudzhakRiver
OmolonRiver
BirkachanRiver
QuaternaryPermian-Triassic, siltstone and carbonatesCarboniferous, shalesDevonian, rhyolites and dacitesArchean, gneissesCretaceous, granites and syenites
Birkachan Longitudinal Birkachan Longitudinal Slide 34
600m
400m
200m
240° 60°
>200 (gxm) Au100 - 200 (gxm) Au50 - 100 (gxm) Au20 - 50 (gxm) Au10 - 20 (gxm) Au
400 metres
Zone 6
Zone 5
Zone 3
Zone 2
Proposed Pit 92.0, 72.2/3.3
147.4, 175.7/2.6
55.0, 207.0/5.4
33.7/9.8
57.0/12.1
31.3/23.3
23.2/15.1
43.0/5.9
33.7/4.18.0/16.3
40.0, 227.2/3.0
88.3, 44.7/2.5
55.3, 57.9/3.0
5E 10E 15E 20E 25E 30E
52.7, 300.3/3.137.3, 972.5/1.8
27.4, 55.2/3.7
Existing Drill Holes2003 Drill Holes2004 Proposed Drill Holes
g/t Au, g/t Ag/horizontal thickness
BirkachanBirkachan
River
VeinPlacerMajor faultGrab sample locationg/t AuProposed drill holes
211.0
3 kilometres
211.0
149.4
20.5
54.2
25.2
Skalisty Creek
Labazny
Gornik Creek
Cretaceous granitePermian limestoneCarboniferous korbashaleUpper Devonian rhyoliteUpper Mid-Devonian dacites, ignimbrites
Birkachan District Gold Prospects
Birkachan District Gold Prospects
Slide 35
OrochGeology Plan
OrochGeology Plan
Slide 36
EpochRiver
500 metres
Carbonate Quartz VeinSample LocationTrenchDrill Holes
7.3, 1009.4 / 8.0m
Zone 5
g/t Au, g/t Ag/horizontal thickness
3.1, 376.0 / 3.6m
14.7, 1026.0
4.6, 199.8 / 2.0m
5.3, 170.4
1.8, 94.7
11.5, 1218.9 / 0.8m
5.6, 563.9 / 0.6m
CrossSection
Alluvial rubbleGlacial boulderRhyodacite intrusiveRhyodaciteAndesite
OrochCross Section
OrochCross Section
Slide 37
Carbonate Quartz Vein
Veinlet Zone
600m
550m
500m
450m 50 metres
9.6, 574.6 / 41.7
3.5, 106.8 / 32.1m
Zone 5
S N
g/t Au, g/t Ag / Core length
looking west
2.6, 65.7 / 8.3m
4.2, 43.3 / 2.6m
1.8, 50.4 / 5.1m
0.8, 54.5 / 5.5m
1.2, 17.5 / 3.7m
0.8, 14.3 / 12.4m
1.0, 11.4 / 10.0m
3.3, 30.1 / 0.7m
OverburdenRhyodacite intrusiveRhyodaciteAndesiteFault
Timmins, CanadaPorcupine JV & Aquarius
Timmins, CanadaPorcupine JV & Aquarius
Slide 38
Hoyle Pond Mine
Pamour
HollingerMcIntyre
Dome Mine
PJV ClaimGroup
Kinross (100%)
Aquarius
Timmins
Targets
PorcupineJV
Ontario
Thunder Bay
Toronto
Pominex
Hoyle Pond Mine, CanadaHoyle Pond Mine, CanadaSlide 39
Diabase Dikes Sediments
Mafic Volcanics Ultramafics
Porphyry
2003/4 Targets
S2
B3
B1N
B1B1S
‘N ZONE
1250
mL
850
920m
L
720m
L
UP / LP
Plun
ging
1060
Sys
tem
720m Level
HP “Deeps”
720 A Vein
100m
N
B Veins & UP / LP
Hoyle Pond 720 – A VeinLongitudinal Section
Hoyle Pond 720 – A VeinLongitudinal Section
Slide 40
Ultramafic
50.56 /1.2m
43.56/1.2m
44.35/1.2m
VG
29.09/1.2mVG
30.44 (cut)/1.2m
2.64/1.2m
VG VG
VG VG
VG
59.44 / 1.2m
MaficVolcanic
Open to 420m Level
Open
Diabase56.39/1.2m
47.20/1.2m
T200
E
550m el
600m el
66.2/0.3m CL
64.40/0.75m CL
720 XC
T300
E
VG
VG
13.88/0.3m
50cm QV VG
99.00/0.3m
443.05/0.25m
(Looking NW)
ExplanationVG – Visible Gold,
Assays Pending
Musselwhite Mine, OntarioMusselwhite Mine, OntarioSlide 41
P r o
p e r
t y
B o u
n d a
r y
Weagamow - North CaribouGreenstone Belt
Mineralized ZoneBanded Iron Formation
PQ Deposit
T-Antiform Deposit
MusselwhiteMine
Ontario
Thunder Bay
TorontoEsker Zone
West Anticline
MusselwhiteLongitudinal Section
MusselwhiteLongitudinal Section
Slide 42
>60 and <80 gxm
>20 and <40 gxm
> 80gxm
>40 and <60 gxm
<20 gxm
ISLANDESKER
PQ
PQ Deeps
APPROX IRON FORMATIONFOLD KEEL
MusselwhitePQ Deeps
MusselwhitePQ Deeps
Slide 43
Inf. Inf.Indicated Indicated Inferred
C Block (Hidden) - Inferred
B Block - Inferred
A1 Block – Indicated
See Detail BelowA2 BlockT Antiform
T Antiform – S Zone
Existing Development
PQD A2 – 03-PQU-006 – 11.3m @ 10.2g/t
Planned Development for S Zone
PQD A2 – 03-PQU-123 – 11.3m @ 7.6g/t
PQD A2 – 03-PQU-124 – 10.0m @ 11.1g/t
PQD A1 – 03-PQU-155 – 21.8m @ 5.2g/t
PQD C – 03-PQU-156 – 31.0m @ 3.4g/t
PQD A1 – 03-PQU-142 – 6.3m @ 5.6g/t
PQ DeepsSection 11400N
PQ DeepsSection 11400N
Slide 44
T Antiform – S Zone
PQD B – 02-185 – 10.8m @ 4.7g/t
PQD A1 – 02-181 – 8.8m @ 9.5g/t
PQD A1 – 02-179 – 4.1m @ 1.7g/t
PQD A1 – 02-183 – 14.1m @ 4.9g/t
PQD A1 – 02-185 – 40.1m @ 11.1g/t
Unknown – 03-PQU-005 – 50.0m @ 7.6g/t
Proposed Exploration Drift
PQ DeepsSection 11775N
PQ DeepsSection 11775N
Slide 45
Fort Knox, AlaskaClaim Plan
Fort Knox, AlaskaClaim Plan
Slide 46
Fort Knox Mine 2004 Targets
Fort Knox Mine 2004 Targets
Slide 47
Fort Knox MineSection 9100ft E
Fort Knox MineSection 9100ft E
Slide 48
Fort Knox MineSection 10300ft E
Fort Knox MineSection 10300ft E
Slide 49
Fort Knox, AlaskaClaim Plan
Fort Knox, AlaskaClaim Plan
Slide 50
U D
U D
U D
UD
Republic
Curlew
R.3
3 E.
Kettle River, USAKettle River, USASlide 51
Tert
iary
Mes
ozoi
cPa
leoz
oic
Volcanics
Intrusive
Greenstone
High Grade Metamorphic
Claim Block(s)
0 10 miles
Buckhorn Mt
Kettle Mine
Emanual Creek
K2 Mine & East Veins
Lamefoot Mine
Key East & West Pits
Kettle River Mill Site
Overlook MineRepublic District(Golden Eagle)
Portland, OR
Seattle
UNITED STATESCANADA
W A S H I N G T O N
Spokane
KETTLE RIVEROPERATIONS
Note : Host Rock is Sanpoil Andesite
Emanual CreekOrebody
0 200 ft
0.534 Au OPT for 39.5 FT
In Cross Cut
Emanuel Creek Orebody
Host Rock isSanpoil Andesite
100 FEET
SCALE
0.534 / 39.5
0.405 / 100.0
0.973 / 70.0
0.298 / 217.7
990 Level Workings
To K2 Portal
at 2100 Level
West ZoneOrebody
Kettle River Plan View
Kettle River Plan View
0.298 / 217.7 OPT Au / Interval (feet)
Slide 52
0.385 / 56.00.734 / 70.0
Kettle River Emanuel NorthKettle River Emanuel North
Slide 53
Mineralized ZoneDrill Hole TraceIntervals >0.2 Au opt
46800 N
A-A’
o p e n
o p e n
o p e n d o w n d i p
0 400 ft
EN
ECo p e n
u p d i p
10.5’ / 0.599 opt
11.0’ / 2.905 opt
79.8’ / 0.216 opt
53.0’ / 0.331 opt
24.2’ / 0.429 opt
9.0’ / 0.552 opt
50.1’ / 0.201 opt
39.0’ / 0.303 opt
41.3’ / 0.219 opt
53.9’ / 0.312 opt
22.0’ / 0.264 opt
198.3’ / 0.905 opt
Emanuel North fault
Kettle River – Emanuel North Cross Section 48 600 FTN
Kettle River – Emanuel North Cross Section 48 600 FTN
Slide 54
Emanuel North Fault
A A’o p e n
0 100 ft
o p e n
Sinter
Klondike Mountain Fm.
5300
E
Sanpoil Andesite
NB03-11 53.9’ / 0.312 opt
NB03-1024.2’ / 0.429 opt
NB03-14 53.0’ / 0.331 opt
Buckhorn Mountain, USABuckhorn Mountain, USASlide 55
5300 N5600 N
Look
out F
ault
Perm
ian-
Tria
ssic
Andesite
Cre
tace
ous
-Ter
tiary
Tert
iary
Marble
Skarn – gold bearing
Porphyry Dikes
Diorite
Granodiorite 65.6 Ma
Older Andesite
Clastic Rocks
0 2000 ft
Portland, OR
Gold Deposit
SW Zone
Gold Bowl Zone
Seattle
UNITED STATESCANADA
W A S H I N G T O N
Spokane
BUCKHORN MOUNTAIN PROJECT
Buckhorn Mountain Section 5,300 N
Buckhorn Mountain Section 5,300 N
1.10 / 17’ 2.26 / 15.5’
Lookout Fault
1.52 / 20’
W E
200 ftAssay (opt Au) / Interval (feet)1.42 / 20’
OLDER ANDESITE AND SKARN
MARBLECLASTIC ROCKS
AND SKARN
CLASTIC ROCKS
AND SKARN0
(Looking North)
0.89 / 10’
2.03 / 10’ 1.42 / 20’
1.28 / 10’
0.96 / 15’0.48 / 5’
0.31 / 35’
0.35 / 30’
0.29 / 35’
0.43 / 20’
0.36 / 6’
0.46 / 30’
0.28 / 30’0.19 / 5’
Slide 56
SOURCE: Crown Resources Corp. - Annual Report 2002, p. 6.
Lookout Fault
W E
Assay (opt Au) / Interval (feet)0.85 / 30’
OLDER ANDESITE AND SKARN
marble
CLASTIC ROCKS AND SKARN
CLASTIC ROCKS AND SKARN
200 ft0
0.86 / 17’
0.82 / 36.5’
0.40 / 20’
1.21 / 10’
0.81 / 11’
0.17 / 5’
0.50 / 50’
0.95 / 35’
0.57 / 15’
0.12 / 5’
0.57 / 3’
0.45 / 10’
0.41 / 20’
0.54 / 30’
0.71 / 22.5’
0.26 / 5’
0.39 / 25’
0.21 / 10’
0.20 / 5’
0.29 / 14’0.82 / 55’
0.38 / 12.5’
Buckhorn Mountain Section 5,600 N
Buckhorn Mountain Section 5,600 N
(Looking North)
Slide 57
0.57 / 15’
0.10 / 5’
0.85 / 30’
0.10 / 5’
SOURCE: Crown Resources Corp. - Annual Report 2002, p. 6.
Wind River – USAWind River – USASlide 58
Portland, OR
Seattle
UNITED STATESCANADA
W A S H I N G T O N
Spokane
WIND RIVER PROJECT
Au Quartz Vein
Alluvium
0 1000 ft
Andesite
Longitudinal SectionN - S
Longitudinal SectionA - A’
Note : 500 foot Grid
Wind RiverLong Section
Wind RiverLong Section
Slide 59
WR 2002 RC Hole
Youngquist Core Hole
Delano Core HoleContours are true thickness in feetPosted grades are Au opt
0 400 ft
(Looking West) 0.825 / 33’
0.351 / 25’
0.366 / 30’0.468 / 30’
0.38 / 7.7’
0.546 / 50’
0.68 / 19.5’
0.90 / 20’
0.21 / 11’
0.27 / 8’
0.25 / 8’
0.76 / 5’
2.22 / 2.5’
0.43 / 10’
0.574 / 20’
0.35 / 10’
0.64 / 19’
0.35 / 10’
0.51 / 16’
0.19 / 14’
0.53 / 17’0.20 / 11’
0.325 / 12.5’
0.32 / 11’
Wind River Looking N 15 EWind River Looking N 15 E
Slide 60
VEI
N N
o. 5
VEIN
NO
. 6
0 250 ft
A'A
0.430 Au OPT 10ft(True Thk)
0.680 Au OPT 20ft(True Thk)
0.351 Au OPT 25ft(True Thk)
0.510 Au OPT 16ft(True Thk)
0.900 Au OPT 20ft(True Thk)
Round Mountain, NevadaRound Mountain, NevadaSlide 61
ROUNDMOUNTAINMINE
GOLD HILLDISCOVERY
Area of Mutual Interest
Round Mountain
!Las Vegas
!Reno
Nevada
South Gold Hill
Manhattan DistrictWhite Caps
Palo Alto
Jefferson District
Baxter Spring
Corcoran Canyon
Antone Canyon
North Manhattan
Gold Occurrence
Gold Wedge
Manhattan Caldera
Shoshone Mtn Granite
Dry Canyon Caldera
Moores Creek Caldera
Mt Jefferson Caldera
Round Mountain Caldera
Trail Canyon Caldera
Sediments
Cretaceous Granite Porphyry
Cretaceous Granite
Gold Hill2003 Drilling
Gold Hill2003 Drilling
Slide 62
Mt. Jefferson Caldera
Margin Fault
Mt. Jefferson Caldera
Gold Hill Deposit
Ore zone >0.006 opt2003 DrillingPrevious Drilling
Alluvium
1500’
∗
A A’
Gold Hill Long Section 136100N
Gold Hill Long Section 136100N
Slide 63
500’
SinterSinter
AlluviumAlluviumOxide/SulfideOxide/Sulfide
BoundaryBoundary
OpenOpen
A’A
Section 136,100N
Looking North
Tertiary Tertiary RhyoliteRhyoliteTuffTuff
RhyoliteRhyolite TuffTuff
>0.006 opt >0.006 opt OutlineOutline
RhyoliteRhyolite IntrusiveIntrusive
Range Front FaultRange Front Fault
North Gold North Gold Hill FaultHill Fault
Gold Hill MineGold Hill Mine
0.027/430’
0.039/665’0.054/375’
0.019/220’
0.011/460’
0.012/140’
0.063/225’Drill Intercepts - opt Au / feet
0.024/135’
0.024/98’0.024/215’
Gold Hill2004 Targets
Gold Hill2004 Targets
Slide 64
Untested Caldera Margin
Mt. Jefferson Caldera
Margin Fault
Mt. Jefferson Caldera
Gold Hill Deposit
Ore zone >0.006 opt2003 DrillingPrevious Drilling
Alluvium
Paleozoic/Carlin-Type Target
Untested Structural Corridors
Open
Open
Open1500’
∗
M-Ace Target
A A’
South Gold Hill (opt)SGH03-13: 25’@0.013 (280-305’)
10’@0.009 (330-340’)50’@0.025 (400-450’)5’@0.034 (580-585’)5’@0.053 (740-745’)
Mt. Jefferson Caldera Margin (opt)GH03-401: 25’@0.01(895-920’)
230’@0.012 (975-1205’)
Round Mountain Targets
Round Mountain Targets
Slide 65
Current Pit CrestAlluvium
Rhyolite Tuff
Paleozoic Sediments
Shoshone Granite
Ultimate Pit
Round Mountain Caldera Margin
Faults
1000’
∗South Pit
Wall
Deep Northwest
Northwest Pit Wall
Potential Pit Expansion
Round Mountain U/G Longitudinal
Round Mountain U/G Longitudinal
Slide 66
Existing Pit ShellExisting Pit Shell
DEEP NORTHWESTDEEP NORTHWESTTARGETTARGET
NORTHWEST PITWALLNORTHWEST PITWALLTARGETTARGET SOUTH PITWALLSOUTH PITWALL
TARGETTARGET
0.375/25’
0.493/40’
3.26/5’
0.215/180’
0.165/100’
0.183/60’
4.14/10’
Drill Intercepts - opt Au / feet
N S
1000’Looking Northeast
0.10/360’
0.172/125’
Round MountainU/G Zone
Round MountainU/G Zone
Slide 67
Deep Northwest
South Pit Wall
Ultimate Pit Design
Proposed Decline
Northwest Pit Wall
Proposed Drill Program to drill out resource on 100’ centers
Looking North500’
2004 Exploration Outlook2004 Exploration OutlookSlide 68
• $20M Exploration Budget• $20M Exploration Budget
Kinross Operations - $9.0MKinross Operations - $9.0M
Project Exploration - $6.0MProject Exploration - $6.0M
Joint Venture Operations - $5.0M
Joint Venture Operations - $5.0M
Current Project PipelineCurrent Project PipelineExploration Pre-feasibility Feasibility Construction Production
Round Mountain UG Aquarius
Emanuel CreekRefugio
Pamour
Paracatu Expansion
Emanuel North
Tsokol
PQ Deeps
Birkachan
Puren
Gil
Gurupi
Forquila Sul
Gold Hill
New Discovery
Proven & Probable ReservesMeasured & Indicated Resources
Progress January to December 2003
BuckhornWind River
New Acquisition
Slide 69
5th Annual Exploration UpdateJanuary 29, 2004
top related