Environmental Business Council of New England

Energy Environment Economy

EBC Dam Management Program 

Up and Over, Around and Through:

Dam Management’s Role in FishPassage & Stream Restoration

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 2/261

Chad Cox, P.E.

Chair, EBC Dam Management Committee

Civil Engineer / Principal

GZA GeoEnvironmental, Inc.

Environmental Business Council of New England

Energy Environment Economy

Welcome

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 3/261

Chad Sumner

Program Chair & Moderator

Principal

SumCo Eco-Contracting

Environmental Business Council of New England

Energy Environment Economy

Introduction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 4/261

Beth Lambert

 Aquatic Habitat Restoration

Program Manager

Division of Ecological Restoration

Environmental Business Council of New England

Energy Environment Economy

Technical, Social, and Other

Challenges that May PreventDam Removal

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 5/261

Technical, Social, and Other Factors

That Prevent Dam Removal

(or, why some restoration projects

come to a screeching halt)

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 6/261

DER’s Aquatic Habitat Restoration Group 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 7/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 8/261

Outline

• DER prefers damremoval for river

restoration

• But that isn’t alwayspossible.

• Top 4 reasons why

high priority damsaren’t removed 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 9/261

 

Ecological Reasons for

Dam Removal

Dams• Damage ecosystem

processes that build habitat

• Cause lower DO; highertemp

• Block movement of fish and

wildlife

• Drown floodplains

• Removing the dam

eliminates these problems

immediately

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 10/261

Dams do more than block fish

• Low dissolved oxygen

• Drowned floodplain•  Aquatic invasive plants Warm water spillover

Fish and wildlife can’tmigrate upstream

This sediment should be

heading downstream to

build up salt marshes

Non-native species

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 11/261

Societal Reasons for Dam Removal

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 12/261

3000 dams and 20,000 culverts(Only) 40 Dams Have Been Removed in MA

3000 dams in MA

43 are flood control dams 44 licensed hydropower dams

164 water supply dams

Worcester County has highest density in USA

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 13/261

Reason #4: Dam has an Active UseDrinking water supply

Pumping Station Dam,

Greenfield, 2011

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 14/261

Kendall Company

No. 1 Dam, Colrain

Reason #4: Dam has an Active UseIndustrial water supply

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 15/261Mill Street Dam, Green River, Greenfield

Reason #3: Upstream Infrastructure

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 16/261

Dam / Bridge

Utility line

Over-steepened,

eroding banks

More Mill Street Dam infrastructure challenges

(Utility line issues are common to many projects)

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 17/261

Ipswich Mills Dam, Ipswich

Reason #3: Upstream Infrastructure

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 18/261

Contaminated Sediment

Baker Chocolate Dam

T&H Dam

Map by Neponset River Watershed Association

Reason #2: Expense of Managing

Contaminated Sediment

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 19/261

Baker Dam, Neponset River, Milton/Boston

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 20/261

Tileston & Hollingsworth Dam, Neponset River

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 21/261

Expense of Managing Contaminated Sediment

Columbia Mill Dam, Housatonic River, Lee

Reason #2: Expense of Managing

Contaminated Sediment

Th #1 f i d

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 22/261

Watertown Dam, Charles River

The #1 reason for not removing a dam:

Public Sentiment, Attachment, and Fear

Th #1 f t i d

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 23/261

Public SentimentThe #1 reason for not removing a dam:

Public Sentiment, Attachment, and Fear

Fyfeshire Dam, Bolton

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 24/261

Solutions

4. Dam has an active use money

3. Upstream infrastructure money

2. Contaminated sediment money1. Public sentiment / fear local advocacy

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 25/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 26/261

 

“…I caught my first wild

brook trout in the spot

where the dam oncestood. I believe you can

say the project was a

success…”

- Jameson Bastarache

Beth Lambert

Aquatic Habitat

Restoration Program

Manager

617-626-1526

Beth.lambert@state.ma.us

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 27/261

Nils Wiberg, P.E., CFM

 Associate

Fuss & O’Neill  

Environmental Business Council of New England

Energy Environment Economy

Up & Over: Rock Ramps – 

Kenyon Mills Dam Rock Ramp

Fishway

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 28/261

Presentation to theEnvironmental Business Council

of New EnglandApril 28, 2015

Design and Construction ofKenyon Mill Dam Nature-Like

Rock Ramp Fishway

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 29/261

Presentation Overview

• Project Background• Site Constraints

• Fish Passage Design Alternatives

 – Full Dam Removal vs. Rock Ramp

• Construction Phase

• Test Flows and Completion

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 30/261

Pawcatuck River Fish Passage Restoration Projects

Lower Shannock FallsDam Removal (2010) 

Horseshoe Falls DamFish Ladder (2012) 

Kenyon Mill Dam Nature-Like Rock Ramp (2013)

Potter Hill Dam Fish Ladder 

White Rock DamRemoval (2015)

Bradford Dam FishLadder (2016)

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 31/261

Historic Kenyon Mill Dam

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 32/261

Kenyon Mill Dam - 1939

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 33/261

Existing Spillway (2009)

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 34/261

Dam Deficiencies

 – Partial Breach at End of Spillway on

River-Left

 – Spillway Section in Need of Repair

 – No Low-level Discharge Outlet

 – POOR Condition Structure –  Would

Need Major Repair or Reconstruction

if Fish Ladder or Bypass ChannelSelected

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 35/261

Source: August 2007

Malone and MacBroom Feasibility Study

2007 Feasibility Study Alternatives Evaluation

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 36/261

Dam

PumpHouse

Fire Suppression System Pump Intake Structure

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 37/261

Fire Suppression System Pump Intake Structure

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 38/261

Fish Passage Design Alternatives

• Rock Ramp Construction

 – Replaces Dam Spillway with a Rock Ramp (approx. 160-feet long)

 –   Minimal Water Level Change or Effect on Upstream WetlandResources

 –  Continued Use of River by Kenyon Industries’ Fire SuppressionSystem

 – Portage Path Planned for Recreational Boaters

• Full Dam Removal

 –  Spillway Removed, Potential Modifications to River Channel toOptimize Fish Passage

 – Water Level Lowered to Pre-Dam Levels, Some Effect onUpstream Wetland Resources

 –  River No Longer Used for Kenyon Industries’ Fire SuppressionSystem –  WOULD REQUIRE 200k GAL. REPLACEMENT WATERSTORAGE TANK/INFRASTRUCTURE (> $500K)

i l d

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 39/261

Extensive Upstream Wetland Resources

Kenyon Dam

Worden Pond

Great Swamp

Alt ti E l ti C it i

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 40/261

Alternatives Evaluation Criteria

• Kenyon Industries Fire Suppression System and Local Fire Water

Supply

• Potential Effects on Wetland Resource Alterations,

Rare/Endangered Species and Habitat, Historic Resources

• Potential Effects on Shallow Groundwater Wells

• Potential Sediment Migration (transitional)

• Potential Bridge and River Channel Scour/Instability

• Potential Effects on Recreational Users (boaters, hunters)

• Potential Flood Impacts/Benefits

• Construction Costs / Post-Construction Maintenance Costs

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 41/261

Base Flow Water Surface Elevation Modeling

E i ti W t S f P fil

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 42/261

Existing Water Surface Profile

Amtrak Overpass

Kenyon Dam

Route 2 Bridge

Biscuit City Rd

Bridge

Worden Pond Outlet

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 43/261

Rock Ramp Water Surface Profile

Amtrak Overpass

Kenyon Dam

Route 2 Bridge

Biscuit City Rd

Bridge

Worden Pond Outlet

F ll D R l W t S f P fil

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 44/261

Full Dam Removal Water Surface Profile

Amtrak Overpass

Kenyon Dam

Route 2 Bridge

Biscuit City Rd

Bridge

Worden Pond Outlet

P t ti l Sh ll G d t W ll I t

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 45/261

Potential Shallow Groundwater Well Impacts

Alt ti E l ti

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 46/261

• Rock Ramp vs. Dam Removal

 – Dam Removal is Best Option from Fish PassageStandpoint; Rock Ramp is Less than Optimal

 –  Alternatively, Dam Removal results in:

•  Lowered Upriver Water Surface Profile (Well Impacts)

•  Reduced Upriver Riverbank Widths

• Increased Potential Effects on Wetland Hydrology (Dependent onSoil Properties and Magnitude of Profile Change)

• Increased Potential Effects on Rare Species

• Increased Potential of Sediment Mobility and Riverbank Scour

 –  Dam Removal potentially Cost Prohibitive

 –  Other Considerations (Easements, etc.)

Alternatives Evaluation

Selected Design Approach Rock Ramp

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 47/261

Selected Design Approach - Rock Ramp

• Eliminating River as Supply for Kenyon’s Fire

Suppression System deemed Cost Prohibitive; RockRamp Alternative Selected

• Rock Ramp Design Highlights

 ‒ Overall Layout (4% Avg. Longitudinal Slope)

 –  Primary Grade Control Weir

 –  Downgradient Fish Passage Weirs

 –  Riverbank Stabilization

 –   Minimal WSE Change, Wetland Impacts, and Sediment Migration

 –   Minimum WSE of El. 85.42 must be maintained upstream ofRamp during 7Q10 Conditions; Two Dry Hydrants Installed

R k R G li d P fil

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 48/261

Rock Ramp Generalized Profile

Grade Control Structure With6’ Wide Low-Level Notch

Inv. El.=84.48

Raised Arched WeirsSpaced Every 20’ (Typ.) 

Rock Ramp –  El. 84.48 To El. 80.32 (-3%-5% Longitudinal Slope)

Tailout –  El. 80.32 To El. 77.5(20% Longitudinal Slope)

Geotextile or Bentonite WaterproofingSheet/Membrane

TailwaterElevation

S l t d Alt ti R k R

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 49/261

Selected Alternative - Rock Ramp

S l t d Alt ti R k R

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 50/261

Selected Alternative - Rock Ramp

Selected Alternative Rock Ramp

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 51/261

Selected Alternative - Rock Ramp

Construction Phase Temporary Bypass Channel

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 52/261

Construction Phase –  Temporary Bypass Channel 

Construction Phase Temporary Bypass Channel

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 53/261

Construction Phase –  Temporary Bypass Channel 

Construction Phase Temporary Bypass Channel

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 54/261

Construction Phase –  Temporary Bypass Channel 

Construction Phase Weir Construction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 55/261

Construction Phase –  Weir Construction 

Construction Phase Weir Construction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 56/261

Construction Phase –  Weir Construction 

Construction Phase – Weir Construction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 57/261

Construction Phase –  Weir Construction 

Construction Phase – Weir Construction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 58/261

Construction Phase –  Weir Construction 

Construction Phase – Weir Construction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 59/261

Construction Phase –  Weir Construction 

Construction Phase – Weir Construction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 60/261

Construction Phase –  Weir Construction 

Construction Phase – Weir Construction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 61/261

Construction Phase –  Weir Construction 

Construction Phase – Test Flows

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 62/261

Construction Phase    Test Flows 

Construction Phase – Test Flows

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 63/261

Construction Phase   Test Flows 

Construction Phase – Test Flows

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 64/261

Construction Phase   Test Flows 

Construction Phase – Weir Construction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 65/261

Construction Phase    Weir Construction 

Construction Phase – Weir Construction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 66/261

Construction Phase    Weir Construction 

Construction Phase – Site Restoration

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 67/261

Construction Phase    Site Restoration 

Construction Phase – Site Restoration

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 68/261

Construction Phase    Site Restoration 

Completed Kenyon Mill Rock Ramp

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 69/261

Completed Kenyon Mill Rock Ramp 

Completed Kenyon Mill Rock Ramp

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 70/261

Completed Kenyon Mill Rock Ramp 

Completed Kenyon Mill Rock Ramp 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 71/261

Co p e ed e yo oc a p

U & O D il L dd & E l

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 72/261

Chad Cox, P.E.

Civil Engineer / Principal

GZA GeoEnvironmental, Inc.

Environmental Business Council of New England

Energy Environment Economy

Up & Over: Denil Ladders & Eel

Ramps – Upper Mystic Lake

Dam

EBC Fish Passage Forum 2015

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 73/261

Moving Fish and Eels overUpper Mystic Lake Dam

Fish Ladders and Eel Ramps

Chad W. Cox, P.E.

Civil Engineer / Principal

GZA GeoEnvironmental, Inc.Norwood, MA

Presentation Outline

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 74/261

1. Dam and Site Setting

2. Fisheries Issues

3. Pre-Project Fisheries Management

4. Fish Passage Alternatives

5. Design

6. Construction

7. Completed Structures

8. O&M

9. System Performance

1. Dam & Site Setting

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 75/261

Upper Mystic Lake Dam

1. Dam & Site Setting

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 76/261

Upper Mystic Lake Dam

1. Dam & Site Setting

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 77/261

Upper Mystic Lake Dam

2. Species of Concern

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 78/261

American eel Anguilla rostrata 

Duane Raver/USFWS

American Shad Alosa sapidissima 

Alewife Alosa pseudoharengus 

Blueback Herring Alosa aestivalis 

Cornell University Cornell University

NOAA

3. Pre-Project Fisheries Management

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 79/261

BUCKET BRIGADE!

4. Fish Passage Alternatives

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 80/261

• Fish Ladder• Denil

• Alaska steeppass

• Pool and Weir

• Fish Elevator

• Nature-Like Bypass Channel• Eel Ramp

• Temporary

• Permanent

Upstream Passage

Downstream Passage

• Chute

• Weir and Plunge Pool

4a. Upstream Passage Alternatives

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 81/261

DENIL FISH LADDER

Diagram of a denil fishway.

Source: The Connecticut River Watershed Council, Inc.

4a. Upstream Passage Alternatives

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 82/261

ALASK STEEPPASS

FISH LADDER

4a. Upstream Passage Alternatives

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 83/261

POOL AND WEIR FISH LADDER

Diagram of a pool-and-weir fishway.

Source: The Connecticut River Watershed Council, Inc.

4a. Upstream Passage Alternatives

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 84/261

Fish Elevator Nature-Like Bypass Channel

Northeast Utilities

4a. Upstream Passage Alternatives

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 85/261

PERMANENT EEL LADDER

4a. Upstream Passage Alternatives

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 86/261

TEMPORARY EEL LADDER

4a. Upstream Passage Alternatives

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 87/261

TEMPORARY EEL LADDER

4b. Downstream Passage Alternatives

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 88/261

CHUTE

WEIR ANDPLUNGE POOL

5. Design

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 89/261

6. Construction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 90/261

6. Construction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 91/261

6. Construction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 92/261

6. Construction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 93/261

7a. Completed Fish Ladder

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 94/261

7a. Completed Fish Ladder

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 95/261

7b. Completed Eel Ramp

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 96/261

7b. Completed Eel Ramp

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 97/261

7b. Completed Eel Ramp

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 98/261

7c. Completed Downstream Passage

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 99/261

7c. Completed Downstream Passage

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 100/261

7c. Completed Downstream Passage

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 101/261

8. Operation and Maintenance

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 102/261

9. System Performance

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 103/261

Source: Mystic River Watershed Association

9. System Performance

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 104/261

Source: Mystic River Watershed Association

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 105/261

9. System Performance

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 106/261

M i Fi h d E l

EBC Fish Passage Forum 2015

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 107/261

Moving Fish and Eels over

Upper Mystic Lake DamFish Ladders and Eel Ramps

Chad W. Cox, P.E.

Civil Engineer / Principal

GZA GeoEnvironmental, Inc.

Norwood, MA

Up & Over: Denil Ladders & Eel

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 108/261

Chris Haker, P.E.

Principal Engineer

Tighe & Bond

Environmental Business Council of New England

Energy Environment Economy

Up & Over: Denil Ladders & Eel

Ramps – Stony Brook Fish

Passage

EBC Dam Management Program Series

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 109/261

Tighe&Bond

Stony Brook Fish Passage

Improvements Lower Mill Pond Dam

Rehabilitation

 April 28, 2015

Christopher D. Haker, P.E. 

Principal Engineer

Lay of the Land

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 110/261

Tighe&Bond

Lay of the Land

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 111/261

Tighe&Bond

Background

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 112/261

Tighe&Bond

■ Stony Brook watershed provides 386 acres of

herring spawning habitat

■ Five fresh water ponds, salt marsh, wetlands

■ Over 900 acres of protected open space

Lay of the Land

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 113/261

Tighe&Bond

Site Background

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 114/261

Tighe&Bond

■ Historic herring run in Brewster, MA

■ Known as the “Disney World” of herring runs 

■ Historic grist mill and museum – Stony Brook-Factory Village Historic District

 – National and State Registers of Historic Places

Stony Brook Improvements

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 115/261

Tighe&Bond

■ Replace culvert at Route 6A crossing

■ Repair dam and improve herring run channel

■ General brook cleanup

Lay of the Land

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 116/261

Tighe&Bond

Lay of the Land

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 117/261

Tighe&Bond

Lay of the Land

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 118/261

Tighe&Bond

Lay of the Land

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 119/261

Tighe&Bond

Lay of the Land

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 120/261

Tighe&Bond

Lay of the Land

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 121/261

Tighe&Bond

Lay of the Land

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 122/261

Tighe&Bond

Lay of the Land

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 123/261

Tighe&Bond

Dam Deficiencies

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 124/261

Tighe&Bond

■ Upstream stone masonry wall and outlet gate

deteriorated and leaking

■ Insufficient freeboard during spillway design flood

Dam Deficiencies

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 125/261

Tighe&Bond

■ Seepage at left (west) abutment■ Trees and brush on dam and abutments

Fish Passage Issues

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 126/261

Tighe&Bond

■ Some weirs required modification to meetrecommended flow depth, velocity, and slope criteria

Fish Passage Issues

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 127/261

Tighe&Bond

■ Fish orifice acted as confined opening (herringprefer swimming through notch with free surface)

Dam Rehabilitation

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 128/261

Tighe&Bond

Dam Rehabilitation

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 129/261

Tighe&Bond

Dam Rehabilitation

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 130/261

Tighe&Bond

Dam Rehabilitation

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 131/261

Tighe&Bond

Dam Rehabilitation

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 132/261

Tighe&Bond

Dam Rehabilitation

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 133/261

Tighe&Bond

Fish Passage Improvements

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 134/261

Tighe&Bond

Fish Passage Improvements

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 135/261

Tighe&Bond

Fish Passage Improvements

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 136/261

Tighe&Bond

Fish Passage Improvements

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 137/261

Tighe&Bond

Fish Passage Improvements

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 138/261

Tighe&Bond

Results

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 139/261

Tighe&Bond

■ The 2013 and 2014 runs were largest in 20+ years■ Estimated herring counts since 2007:

 – 2007: 22,300

 – 2008: 25,300

 – 2009: 11,100

Culvert replaced – 2010: 48,100

 – 2011: 37,100

 – 2012: 41,000

Dam and fish ladder

improvements – 2013: 153,300

 – 2014: 271,400

Results

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 140/261

Tighe&Bond

Results

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 141/261

Tighe&Bond

Results

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 142/261

Tighe&Bond

■ The restoration of the Stony Brook watershedreceived the President’s U.S. Coastal America

Partnership Award in 2012

Results

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 143/261

Tighe&Bond

http://youtu.be/4h2V-VAPc-o 

Acknowledgements

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 144/261

Tighe&Bond

Many thanks to:

Town of Brewster

Chris Miller, Director, Natural Resources Department

Charles Sumner, Town Administrator

Dana Condit, Alewife Committee/Dam Caretaker

Association to Preserve Cape Cod

Jo Ann Muramoto, Mass Bays Program Regional

Coordinator, Cape Cod

Division of Marine Fisheries

Brad Chase, Senior Marine Fisheries Biologist

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 145/261

Tighe&Bond

Questions?

Around: Fish Bypass Channels – 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 146/261

Bjorn Lake, Ph.D., P.E.

Engineering Team Leader

Kleinschmidt

Environmental Business Council of New England

Energy Environment Economy

yp

Howland Dam Bypass Channel

Around: Fish Bypass Channels – 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 147/261

George P. Aponte Clark

Deputy Director

Penobscot River Restoration Trust

Environmental Business Council of New England

Energy Environment Economy

yp

Howland Dam Bypass Channel

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 148/261

EBC – DAM MANAGEMENT PROGRAM

PLIMOUTH PLANTATIONAPRIL 28, 2015

George Aponte Clarke

Deputy Director

Penobscot River Restoration Trust

Bjorn A. Lake, PhD, PE

Engineering Team Leader

Dept. of Ecological Services

PENOBSCOT RIVER RESTORATION PROJECT 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 149/261

Restoring Sea-runFisheries and

Rebalancing

Hydropower on the

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 150/261

• Penobscot Basin is the second

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 151/261

• Penobscot Basin is the second

largest river system in New

England

• One of the largest freshwater

sources to the Gulf of Maine

• Historic fish community hasbeen severely altered

• Penobscot River supports the

largest run of Atlantic salmon in

the U.S.

Over 100 dams located in the

Penobscot Basin

1000s of road crossingsMap Courtesy of Tara Trinko Lake, NOAA

Dams, water pollution and over fishing have virtually

eliminated sea-run fish above Bangor in the Penobscot River

“After  this the Great Works dam was built, and in 1834 or 1835 the Veazie

Dam. The latter dam was closed in the winter. When the fish came in the

spring they found an impassable barrier across their way; they gathered in

ltit d b l th d d t i i t t it A t

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 152/261

American shad 3-5 million Near 1000 1.5 million

Species Historic Current Potential

River herring 14-20 million Below 1,000 ~ 15 million

Atlantic salmon 75 – 100,000 1,300 (10 yr. avg.) 10,000-12,000

multitudes below the dam and strove in vain to surmount it. . . . A great many

shad and alewives lingered about the dam and died there, until the air was

loaded with the stench.” Maine Commissioner of Fisheries, Charles Atkins, 1869

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 153/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 154/261

 Atlantic salmon fishing at the Bangor

Salmon Pool in June of 1926.

Bangor Salmon

Pool in April of1912.

Delivery of the presidential

salmon to President Hoover .

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 155/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 156/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 157/261

Lower

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 158/261

Lower

Penobscot RiverDams

Factors contr ibu t ing to

the reduction in DFS

num bers inc lud e the

cumulative impact of

mult ip le dams, a

signi f icant known yet

unaddressed impact.

(Laser ‘09 and NRC ’04)

Partners in the Penobscot River Restoration Project

Penobscot River

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 159/261

Restoration Trust

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 160/261

Removed Two Dams

closest to sea – Veazie & Great Works

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 161/261

Bypass Howland Dam

for inland habitat access

Improved Fish passage

at four other dams

Increased Energyto maintain power generation. 

Enhanced Habit Access

1,000 miles of historic habitat

Help Restore

11 species of native sea-run fish

associated traditions, culture, and

economic opportunities

  enobscot River Restoration roject

Before and After Habitat Access

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 162/261

Existing Access for

Sea-Run Fish

Significantly Improved

Access for Sea-Run Fish to

Nearly 1,000 Miles

Restored use of upriver

spawning habitat for

salmon, shad, alewife,

blueback herring, and eels

Mattawa mkeag River 

East Branch Penobscot River 

Piscataquis River 

Pleasan t River 

Bangor 

Orono Old Town

West Enfield

Howland

Penobscot River 

Bucksport

M att awamkeag Riv er 

East Branch Penobscot R iver 

Piscataquis River 

P leasant R iver 

Bangor 

OronoOld Town

West Enfield

Howland

Penobscot River 

Bucksport

M att awamkeag Riv er 

East Branch Penobscot River 

Piscataquis River 

P leasant R iver 

Bangor Orono

Old Town

West Enfield

Howland

Penobscot River Bucksport

Diminished use of

upstream spawning

habitat by salmon

and eels

Underused state

of the artupstream fish

 passage

Little or no

commercial,

recreational,

or tribal

sustenance

fisheries

Little if any passage of

shad, alewife, blueback

herring, striped bass,

sturgeon, smelt, and

tomcod, impaired passage of eels

Restored use of

upriver spawning

habitat for salmon,

shad, alewife,

 blueback herring,

and eels

State of the art

 passage for salmon,

alewife, shad,

 blueback herring,

and eels

Restored

commercial,

recreational,

and tribal

sustenance

fisheries

Full restoration of

historical habitat and

access for salmon, shad,

alewife, blueback herring,

eel, striped bass, sturgeon,

smelt, and tomcod

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 163/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 164/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 165/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 166/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 167/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 168/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 169/261

Photo by R.W. Estella

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 170/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 171/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 172/261

ATLANTIC SALMON  255RIVER HERRING  187,429

AMERICAN SHAD  805

STRIPED BASS  18SEA LAMPREY  641

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 173/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 174/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 175/261

 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 176/261

Howland Dam… 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 178/261

IN-LINE BYPASS CHANNEL ALTERNATIVE

STREAMSIDEPARK

INLINE

BYPASS

CHANNEL

Retain brick building if

desired

POND ELEV.

TO REMAIN AS IS

HOWEVER FLASH-

BOARDS MAY BE

REMOVED

DAM

EXTENSION

REMOVE EXISTING

FISH LADDER

AND HYDRO

FACILITY

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 179/261

UPLAND BYPASS CHANNEL ALTERNATIVE

UPLAND

BYPASS

CHANNEL

STREAMSIDE

PARK

Retain brick building if

desired

Example of a bypass

channel in Austria

POND ELEV.

TO REMAIN AS IS

HOWEVER FLASH-

BOARDS MAY BE

REMOVED

REMOVE EXISTING

FISH LADDER

AND HYDRO

FACILITY

Nature-like Fish Bypass

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 180/261

PROJECT GOALS AND OBJECTIVES 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 181/261

Provide safe, timely, and effective upstream and downstream passageof all species that historically had access at the site

Maintain or enhance in-stream habitat value

Reconnect the Penobscot River and its watershed to the Gulf of Maine

Restore the fishery and cultural heritage of the Penobscot Nation

Provide appropriate opportunities for recreation, public access, andriver-related economic development

Address environmental and permitting considerations by avoiding orminimizing impacts

Achieve the objectives at a reasonable cost

Avoid unnecessary work

Manage permitting challenges

Address difficult construction

Minimize O&M demands

DESIGN TEAM 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 182/261

•Project Management•Powerhouse Modifications•Bridge

•Soils Management•Geotechnical

•Hydraulics•Channel Design

•Soils Management•Construction Oversight

SITE HISTORY 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 183/261

1952 1997

EXISTING CONDITIONS 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 184/261

UPSTREAM FISH PASSAGE 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 185/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 186/261

FISH PASSAGE DESIGN CRITERIA 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 187/261

Operational Range

250 to 10,600 cfs

April 15th to

December 1st

  Velocity should be 6

fps or less

Minimum depth of

1.5 feet Six diadromous

species

DESIGN PROCESS & OBJECTIVES 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 188/261

1. Balancing fish passage effectiveness withchannel stability and impoundment levels

2. Minimize operation and maintenance3. Minimize construction cost

Design Team Agency Staff

UPSTREAM ATTRACTION FLOW 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 189/261

BYPASS CHANNEL DESIGN 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 190/261

BYPASS CHANNEL DESIGN 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 191/261

250 cfs

1,000 cfs

4,000 cfs

8,000 cfs

FLOW SPLIT 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 192/261

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000

   F   l  o  w    S  p   l   i   t   P  e  r  c  e

  n   t  a  g  e

   P

  e  r  c  e  n   t   E  x  c  e  e   d  a  n  c  e   i  n   P   i  s  c  a   t  a  q  u   i  s   R   i  v  e  r

Flow in the Piscataquis River (cfs)

Channel

Spillway

Peak Salmon Immigration

DOWNSTREAM PASSAGE 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 193/261

CHANNEL CONSTRUCTION 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 194/261

www.penobscotriver.org

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 195/261

  www.facebook.com/PenobscotRiver

Through: Dam Removal & River

Restoration – Whittenton Dam

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 196/261

Nick Nelson

Fluvial Geomorphologist

Inter-Fluve, Inc.

Environmental Business Council of New England

Energy Environment Economy

Removal

Whittenton Dam Removal

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 197/261

Environmental Business Council Dam Management ProgramPlymouth, MA

April 28, 2015

Nick Nelson, Inter-Fluve

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 198/261

 

Site Background

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 199/261

Mill River Dams

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 200/261

Taunton River:

Wild & Scenic

Mill River

Morey’sBridge Dam

Mill River Restoration

MA Di i i f E l i l R t ti

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 201/261

• MA Division of Ecological Restoration

• The Nature Conservancy

• American Rivers

• NOAA

• USFWS

• Save the Bay

• Southeast Regional Planning and EconomicDevelopment District

• MA Audubon

• Dam owners – MA Department of Mental Health,Jefferson Development Partners, Reed & Barton

Goals

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 202/261

• Remove owner liability associated withdilapidated dams

• Improve fish passage

• Improve water quality• Restore hydrologic and sedimentologic flow

conditions

Morey’s Bridge Dam – Replaced in 2013with Eel Ramp and Fish Ladder

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 203/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 204/261

 

Whittenton – Removed in 2013

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 205/261

2010

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 206/261

 

2013

West Britannia Dam – In Designs forRemoval

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 207/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 208/261

 

1896

West Britannia Dam

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 209/261

West Britannia Designs

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 210/261

Hopewell Mills Dam – Removed in 2012

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 211/261

Hopewell Mills/State Hospital

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 212/261

 

Hopewell Mills/State Hospital

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 213/261

 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 214/261

Hopewell Mills Dam Looking Upstream June, 2012

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 215/261

Hopewell Mills Dam Looking Upstream May, 2013

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 216/261

 

Hopewell Mills Dam Looking West June, 2012

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 217/261

 

Hopewell Mills Dam Looking West High Flows, June, 2013

Whittenton Dam

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 218/261

 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 219/261

 

2005

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 220/261

 

2005

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 221/261

 

2005

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 222/261

2005

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 223/261

 

2005

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 224/261

 

2005

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 225/261

 

2005

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 226/261

 

2005

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 227/261

2013

Components of Whittenton Dam Removal

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 228/261

• Sediment Management• Endangered Species

• Historical Buildings

• Crazy landowners• Channel Construction

• Plantings

Sediment Management

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 229/261

Hopewell Mills – Sediment Removal and Disposal

Whittenton Impoundment:

Low Flows

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 230/261

FullImpoundment

Edge

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 231/261

Stumps

Longitudinal Profile

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 232/261

Whittenton DamMorey’s Bridge 

Endangered Mussels - Relocated

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 233/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 234/261

Historical Buildings/Resources

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 235/261

 

Landowners

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 236/261

Landowners

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 237/261

Dam Demolition/Channel Construction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 238/261

2010

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 239/261

 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 240/261

 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 241/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 242/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 243/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 244/261

Channel and Bank Construction

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 245/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 246/261

 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 247/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 248/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 249/261

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 250/261

2013

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 251/261

2013

 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 252/261

2013

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 253/261

2014

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 254/261

2012

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 255/261

2014

 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 256/261

2013

 

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 257/261

2013

Th k Y

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 258/261

Thank You

Nick Nelson

Inter-Fluve, Inc.617-714-5537

nnelson@interfluve.com

www.interfluve.com

Networking Break

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 259/261

Environmental Business Council of New England

Energy Environment Economy

Panel Discussion

Moderator: Chad Sumner, SumCo Eco-Contracting

Speakers

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 260/261

Environmental Business Council of New England

Energy Environment Economy

Speakers• Beth Lambert, MA Div. of Ecological Restoration

• Nils Wiberg, Fuss & O’Neill  

• Chad Cox, GZA GeoEnvironmental, Inc.

• Chris Haker , Tighe & Bond

• Bjorn Lake, Kleinschmidt

• George P. Aponte Clarke, Penobscot River Restoration Trust

• Nick Nelson, Inter-Fluve, Inc.

EBC Dam Management Program 

Up and Over Around and Through:

7/18/2019 4-28-15 Dam Management Program - Fish Passage

http://slidepdf.com/reader/full/4-28-15-dam-management-program-fish-passage 261/261

Up and Over, Around and Through:Dam Management’s Role in Fish

Passage & Stream Restoration

Thank you for attending.