3D Scan

We make digital copies of your reality

BIM Universe 2019

1,000

2

professionals

NNE is an international company

specialised in pharma engineering.

We operate only within the world of

pharma. Our expertise is tailored specifically

towards this highly GMP-regulated industry.

We bring best practicesto our customers through

1,500projects globally / year

Focused pharma engineering

40%new

productionfacilities

30%pharma

consulting

30%restructuring andfacility upgrades

Our pharma experience is built on:

We are

End-to-end engineering

services tailored to pharma

• Facility

• Process

• Automation and IT

Conventional approach vs 3D Scanning

Conventional Approach – More time consuming

Tolerance - +/- 25 to 50 mm

3D Scanning – Less time consuming

Tolerance - +/- 1.5 to 2 mm @ 50 m

3D Scanning workflow

.rcp with

photo

.rcp without

photo

3D Coordination model

Autodesk Plant

Autodesk Inventor Autodesk Recap

Autodesk Revit

Autodesk Navisworks

External Design External Design

Lessons learned

Benefits✓ Very high quality measurements in three dimensions.

✓ An accuracy of +/- 1,5mm at 50m, providing you with a precise virtual copy of reality.

✓ Preliminary measurement ability.

✓ Project communication and collaboration.

✓ Less down time due to plant shut down - plant can be scanned while still operational most times.

✓ Limit safety risks - reduce surveyor time in high traffic areas.

✓ Quick data access - engineers can access scan data prior to modeling to make preliminary

assessments and rough calculations.

✓ Reduce return visits to site - entire area scanned and captured digitally allowing unlimited "visits" to

the site.

Reality Capture Data

Level of Detailing (LOD 1)

Advantages

✓ Basic Model

✓ Generic Properties

✓ Level of piping

✓ Exact location of Piping header

✓ Pipe OD

Disadvantages

✓ No other services in model

except pipe

✓ No Supports of pipe

✓ No pipe valve and accessorises

✓ No Steel Structure

✓ No layer and colour

Revit Model

Point cloud linking in revit model

Advantages

✓ Piping support

✓ Pipe accessories and valves

(Generic)

✓ Layer and colour

✓ Basic steel structure platform

Disadvantages

✓ No other services in model except

pipe

Revit Model

Point cloud linking in revit model

Level of Detailing (LOD 2)

Advantages

✓ Complete model

✓ Other MEP services

Disadvantages✓ Generic family available in revit

library for valve and accessorises

Revit Model

Point cloud linking in revit model

Level of Detailing (LOD 3)

12

• High detailed Point cloud and HD photos.

• Large amount of data, storing capacity

• Limited access, only persons approved to work on projects will have access to the Point Cloud data.

Security and Confidentially

Copy design

Combining the existing design process with Augmented Reality

• Traditional design methods are

combined with new visualization

tools

• The solution enables broader user

involvement, driving right-first-time

design

• Several design optimizations that

would not have been found in the

traditional process are identified

• 3D model and the project schedule

are integrated to optimize shutdown

execution

Future possibilities include /1

14

Maintenance schedules

Long lead-time for components

SAP interface for easy

information

How-to instructions for

maintenance

Maintenance information

Operator position

80oC

2.4 Bar

• Maintenance schedules

• Long lead-time for components

• SAP interface for easy information

• How-to instructions for maintenance

• SatLine linkage

• Integration with operations parameters

• Pressure, Temperature, RPM

Real-time operations parameters

Key benefits from 3D laser scanning

16

• Can capture and document existing conditions of facilities very quickly

• Incredibly accurate, showing the true conditions of the scanned area.

• The brief period of on-site activity means there is less distribution for buildings owners

• Minimizing conflicts between new and existing components during facility upgrade projects.

• Permits team members to remotely view and evaluate facilities, minimizing mistakes done by

traditional registration.

17

• Minimize the use of incomplete or inaccurate as-built drawings for an existing building.

• Improved project delivery by accelerating construction progress, making construction more accurate

• Improved communication between key stakeholders e.g. owner, consultants and prefabricators

• Enhanced detection and identification of possible errors, in design, before construction

• Improved visualization of the different design options and potential utility conflicts.

• Work can be offshored.

Key benefits from 3D coordination model

For further information

Lars Albjerg

Global BIM Manager

+45 30 79 99 87

lsjx@nne.com

Thank you