257002289 sp 2069 specification for pressure vessels 1 doc pdf
Post on 07-Aug-2018
304 Views
Preview:
TRANSCRIPT
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
1/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 1 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman L.L.C.
Specification for Pressure Vessels
Document ID SP-2069
Document Type Specification
Security Unrestricted
Discipline Mechanical_Static
Owner Abdulnabi Al-Balushi, UEP/1S
Issue Date 31-Dec 2012
Version 1.0
Keywords: This document is the property of Petroleum Development Oman, LLC. Neither the whole
nor any part of this document may be disclosed to others or reproduced, stored in a retrieval system,
or transmitted in any form by any means (electronic, mechanical, reprographic recording or
otherwise) without prior written consent of the owner.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
2/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 2 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
This page was intentionally left blank
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
3/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 3 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
i
Document Authorisation
Authorised For Issue
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
4/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 4 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
ii
Revision History
The following is a brief summary of the 4 most recent revisions to this document. Details ofall revisions prior to these are held on file by the issuing department.
Version No. Date Author Scope / Remarks
Verison 0 Sep 08 E.S. Mahadevan, UEP/12M Specification for Pressure Vessels -Initial issue.
Version 1 Dec 12 Basanagoud M Biradar,UEP121S
Second issue – Some requirementsmodified/added (See Appendix-9).
iii Related Business Processes
Code Business Process (EPBM 4.0)
EP.64 Design, Construct, Modify and De-Commission Facilities
iv
Related Corporate Management Frame Work (CMF)
Documents
The related CMF Documents can be retrieved from the Corporate Business ControlDocumentation Register TAXI.
Refer to Section 2 – Applicable Standards, Specifications and Codes of this Specification for
Related Corporate Frame Work (CMF) Documents
http://sww9.pdo.shell.om/dept/tsd/tcc/tcp/apps/taxi/index_sub.htmhttp://sww9.pdo.shell.om/dept/tsd/tcc/tcp/apps/taxi/index_sub.htmhttp://sww9.pdo.shell.om/dept/tsd/tcc/tcp/apps/taxi/index_sub.htmhttp://sww9.pdo.shell.om/dept/tsd/tcc/tcp/apps/taxi/index_sub.htm
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
5/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 5 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
TABLE OF CONTENTS
1 INTRODUCTION .............................................................................................................. 7
1.1 PURPOSE AND OBJECTIVES ................................................................................... 7
1.2 CHANGES TO THE SPECIFICATION ........................................................................ 7
1.3 DEFINITIONS AND ABBREVIATIONS ....................................................................... 8
1.4 USAGE ........................................................................................................................ 9
1.5 ADHERENCE TO SPECIFICATIONS ......................................................................... 9
1.6 HEALTH, SAFEY AND ENVIRONMENT .................................................................... 9
1.7 SUMMARY OF MAIN CHANGES ............................................................................. 10
2 APPLICABLE STANDARDS, SPECIFICATIONS AND CODES ..................................... 11
2.1 COMPANY STANDARDS ......................................................................................... 11
2.2 SHELL GROUP STANDARDS .................................................................................. 11
2.3 SHELL STANDARD DRAWINGS ............................................................................. 12
2.4 INTERNATIONAL STANDARDS .............................................................................. 14
2.5 COMPANY AND SHELL GROUP STANDARD DATA / REQUISITION SHEETS .... 14
2.6 LIST OF COMPANY APPROVED SUB-VENDORS ................................................. 14
2.7 COMPLIANCE WITH STANDARDS ......................................................................... 15
2.8 LANGUAGE AND UNITS OF MEASUREMENT ....................................................... 15
2.9 CONFLICTING REQUIREMENTS ............................................................................ 15
3 SCOPE OF SUPPLY....................................................................................................... 16
3.1 MECHANICAL EQUIPMENT .................................................................................... 16
3.2 SERVICES ................................................................................................................ 16 3.3 SPARE PARTS ......................................................................................................... 16
3.4 ENGINEERING SERVICES ...................................................................................... 17
3.5 GUARANTEE / WARRANTY .................................................................................... 17
3.6 EXCLUSIONS ........................................................................................................... 18
4 DESIGN .......................................................................................................................... 19
4.1 MECHANICAL REQUIREMENTS ............................................................................. 19
4.2 MATERIALS OF CONSTRUCTION .......................................................................... 22
4.3 SURFACE PREPARATION AND PAINTING ............................................................ 22
5 QUALITY ASSURANCE ................................................................................................. 23
5.1 GENERAL ................................................................................................................. 23
5.2 QUALITY SYSTEM ................................................................................................... 23
6 INSPECTION & TESTING REQUIREMENTS ................................................................ 24
6.1 INSPECTION REQUIREMENTS .............................................................................. 24
6.2 TESTING REQUIREMENTS ..................................................................................... 26
6.2.1 Hydrostatic Test ....................................................................................... 26
6.2.2 Site Supervision for Testing & Commissioning ....................................... 26
7 DOCUMENTATION REQUIREMENTS .......................................................................... 27 7.1 INFORMATION TO BE SUBMITTED ALONGWITH THE BID ................................. 27
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
6/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 6 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
7.2 INFORMATION TO BE SUBMITTED AFTER ORDER ............................................. 27
7.2.1 Drawings and Documents to be submitted after Order ........................... 27
7.2.2 Material Certificates ................................................................................. 27
7.2.3 Test Certificates ....................................................................................... 28
7.3
METHOD OF DOCUMENTATION TRANSMISSION ............................................... 28
7.4 IDENTIFICATION ...................................................................................................... 28
7.5 DATA ......................................................................................................................... 28
7.6 TRANSMITTAL ......................................................................................................... 28
7.7 MANUALS ................................................................................................................. 29
7.8 RECORD CARDS ..................................................................................................... 29
8 PACKAGING & PRESERVATION FOR SHIPMENT ...................................................... 30
8.1 PACKING REQUIREMENTS .................................................................................... 30
8.2 CRATING IDENTIFICATION ..................................................................................... 30
9 PLANNING & SCHEDULING .......................................................................................... 32
9.1 GENERAL ................................................................................................................. 32
9.2 MEETINGS ................................................................................................................ 32
9.2.1 Kick-off Meeting ....................................................................................... 32
9.2.2 Vendor pre-manufacturing Meeting ......................................................... 32
9.2.3 Review Meetings...................................................................................... 33
9.3 REPORTING ............................................................................................................. 33
9.4 PURCHASE ORDERS .............................................................................................. 33
APPENDICES :....................................................................................................................... 34
APPENDIX-1 ENVIRONMENTAL & SITE CONDITIONS .............................................. 35
APPENDIX-2 EQUIPMENT DATASHEETS & DRAWINGS .......................................... 36
APPENDIX-3 REQUISITION FOR ENGINEERING DOCUMENTS (RED FORMS) ..... 45
APPENDIX-4 TABLE OF COMPLIANCE ....................................................................... 55
APPENDIX-5 ALLOWABLE NOZZLE LOADS .............................................................. 58
APPENDIX-6 SPIR FORMAT ........................................................................................ 59
APPENDIX-7 USER FEEDBACK PAGE ....................................................................... 63
APPENDIX-8 INSPECTION AND TEST PLAN (ITP) FORMAT .................................... 64
APPENDIX-9 DOCUMENT CHANGE IDENTIFICATION TABLE ................................. 70
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
7/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 7 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
1 INTRODUCTION
1.1 PURPOSE AND OBJECTIVES
Specifications (SP) contain information/requirements on PDO facilities that are either usedrepeatedly, or that are retained for future reference. These documents are intended for useby the Company and its nominated Consultants and Contractors. It is the responsibility of theUser to ensure that he is using latest revision of this specification
The SP system is intended to:
Publish guidelines or codes of practice.Set the Company standards.Form a basis of technical specifications for the procurement of equipment or technicalservices.Disseminate and record engineering information, experience and procedures.
This Document is fully restricted for PDO. The accessibility for this document shall bemaintained by PDO Mechanical Corporate Functional Discipline Head (CFDH) and histechnical focal point.
This specification together with standard drawings, SPs, DEPs as mentioned in section 2sets out the minimum requirements for the design, engineering, supply of materials,fabrication, assembly, inspection, testing, transportation, installation, commissioningsupervision, functionality and supply of Pressure Vessel package. It has been written in aformat that enables the Project engineer and the Consultant to easily and uniformly prepare arequisition and purchase Pressure Vessels, storage (atmospheric) vessels, pressure parts offilters, shell & tube heat exchangers etc. for a variety of applications in PDO.
For a specific purchase the Project Engineer / Consultant shall:
Follow this specification in general and do not require to produce additional specification. Butin case of any project or equipment specific requirements, which are different from the onesspecified in this specification, shall be prepared and attached as an amendment/addition tothe particular sections of this specification.
Ensure that the Vendor receives the applicable documentation listed in subsections 2.1, 2.2,2.3 & 2.5.
Ensure that procedures for Vendor Drawings/Documentation are in accordance withSP-2047 'Preparation and Content of Engineering Drawings' and Section 7 of thisspecification.
This specification shall be used in conjunction with relevant equipment data sheets in theDEP format attached in Appendix-2 and Environmental & Site Conditions attached in
Appendix-1. The User shall complete/follow these data sheets as applicable.
1.2 CHANGES TO THE SPECIFICATION
Custodian of this document is specified in Document Authorisation section of this documentin page 3. Any user of this document, who encounters an inaccuracy or an ambiguity, isrequested to notify the Custodian, using the SP User Feedback Page included in Appendix-7.Reviews, modifications and adjustments to the document will normally be made by theCorporate Functional Discipline Head (CFDH) for Mechanical Engineering every four years or
earlier when justified.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
8/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 8 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
1.3 DEFINITIONS AND ABBREVIATIONS
The following Definitions, terms and abbreviations used in this document, are defined below:
GENERAL DEFINITIONS
Shall - The word 'shall' is to be understood as mandatory.
Should - The word 'should' is to be understood as strongly recommended.May - The word 'may' is to be understood as indicating a possible course of
action.Include, Includes,Including -
If the word “include” or “includes” or “including” is used in any document andthis specification, it shall be taken as having the meaning “including but notlimited to” and shall not be considered as creating or inferring any limitationon the description that follows if other components/equipments required
Company /Principal - Petroleum Development Oman L.L.C. Muscat, Sultanate of Oman.Consultant - A contracted party by the Company who is responsible for providing
design engineering and other related consultancy service under acontract.
EPC Contractor /Contractor -
A contracted party by the Company who is responsible for providingdesign engineering, procurement and construction service under a
contract.Purchaser - A party, who places the order on, or requests tender from, the Vendor/
Supplier. This can be the Company/ Contractor.Scope - All works executed and all services carried out by the Vendor/Supplier in
accordance with this Specification and its referenced standards and datasheets.
User - A responsible party who applies this Specification in the procurement ofspecified equipment.
Vendor/Supplier - A party responsible for the supply of equipment, materials or product-related services in accordance with this Specification and its referencedstandards and data sheets. All Sub-Vendors shall be subject to writtenapproval by the Company. All terms and conditions applicable to theVendor shall be applicable to the Sub-Vendor as well.
Sub-Vendor - A party appointed by the Vendor for supply of equipment, materials orproduct-related services in accordance with this Specification and itsreferenced standards and data sheets.
Inspector - Any person/party whom the Purchaser certifies as acting for and onbehalf of the Company to inspect items to be purchased and/or the workdone by the Vendor/Sub-Vendor.
Others - Any party contracted by the Purchaser to supply equipment, services,material which are not part of the scope mentioned in this specification.
GENERAL ABBREVIATIONS
API American Petroleum Institute
ASME American Society of Mechanical EngineersCSR Construction Site Representative
DEP Design and Engineering Practice (Shell Group standard)
E-SPIR Electronic Spare Parts Interchangeability Record (Companystandard)
HAZOP Hazard and Operability Analysis
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
PT Liquid Penetrant Testing
PMI Positive Material IdentificationMESC Materials and Equipment Standards and Code
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
9/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 9 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
MT Magnetic Particle Testing
NDT / NDE Non-Destructive Testing / Non-Destructive Examination
PDO Petroleum Development Oman LLC
PEFS Process Engineering Flow Scheme
PR ProcedurePWHT Post Weld Heat Treatment
RED Requisition for Engineering Documentation
RT Radiographic Testing
SP Specification (New Company standard)
TPI / TPIA Third Party Inspector / Third Party Inspection Agency or Authority
UT Ultrasonic Testing
NOTE: Contractors, Consultants, Suppliers, Vendors and users SHALL ensure the Companyis consulted for any deviations on "SHALL" and "SHOULD" requirements throughcompany variance tracking tool.
1.4 USAGE
This Specification together with the referenced standards and data sheets shall form thepurchase requisition package for Pressure Vessels, storage vessels, filters, etc. as requiredby the Company.
The Consultant / EPC Contractor may consider augmenting this SP under exceptionalcircumstances where it may not precisely meet either enquiry or purchase requirements (eg.In case of special equipment). Nominally it is anticipated that this SP and data requisitionsheets should finalise fully meaningful enquiry and purchase without generating additionaldocumentation. Under certain exceptional cases the additional requirements, project or
equipment specific special requirements/changes shall be specified as a separateamendment to this SP subjected to approval by the Company.
1.5 ADHERENCE TO SPECIFICATIONS
The Vendor shall provide an itemized list of any additional projects specific comments orexceptions to this specification and its appendices. These shall be listed on the Table ofCompliance provided in Appendix-4 for review & approval by Purchaser. Unless referred toin these listings, it will be assumed that all specifications are adhered to and that they do nothave implications with respect to cost, delivery and integrity of the plant. Only thosecomments/exceptions that are accepted by the Company, in writing, shall be incorporatedinto the Purchase Specification at time of order. Note that “lead times” will not be consideredby the Company as a justifiable reason for using alternate Vendors/deviations.
1.6 HEALTH, SAFEY AND ENVIRONMENT
The Vendor shall throughout the progress of the work have the strongest regard for theHealth Safety and Environment (HSE) of all persons and/or places upon and around theworksite and shall keep the worksite and the work in an orderly state appropriate to theavoidance of danger to all persons and properties and shall provide its personnel, at theVendor’s cost, with protective clothing and equipment as may be required for the work underthe PDO HSE regulations.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
10/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 10 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
1.7 SUMMARY OF MAIN CHANGES
This SP is a revision of the SP-2069 dated September 2008. Major Technical Changes arelisted in Appendix 9.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
11/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 11 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
2 APPLICABLE STANDARDS, SPECIFICATIONS AND
CODES
This SP shall be read in conjunction with the latest revision of the following Standards,Specifications and Codes.
The Vendor shall also consider all other relevant SPs, DEPs, Shell Standard Drawings andInternational Standards, which may not be mentioned here but are listed within these majorspecifications, standards and codes. The applicable editions shall be the editions in force atthe date of the enquiry requisition / order or as mutually agreed during purchase order. Theinternational standards shall be read in conjuction with the corresponding DEP amendment.
It should be noted that references to DEP's and International standards within this SP arebased on the current revision of those standards at the time of publication of this SP. TheVendor is deemed to be in possession and familiar with specifications, standards listed beinga regular supplier to Company. If any of the documents listed are not in the Vendor’spossession, same shall be obtained from the Consultant / Purchaser. Not possessing thereferred standards / specifications shall not be a cause for deviation or non-compliance.Including this SP the following engineering specifications shall be followed:
2.1 COMPANY STANDARDS
SP-1171Specification for Quality Management System Requirements for
Product and Service
SP-1173 Welding of Metals
SP-1246 (Part 1 to 5)Specification for Painting and Coating of Oil and Gas ProductionFacilities
SP-1275 Specification for Civil and Works - Design Criteria Manual
SP-2020 Flange connections Bolts Torquing & Tensioning
SP-2041 Specification for Selection of Cracking-Resistant Materials for H2SContaining Environments
SP-2047 Preparation and Contents of Engineering drawings
STD-2-3950-001 Foundation bolts (J type to be used for horizontal/vertical Vessels)
STD-4-0304-001 Earthing Boss of Steel Structures, Tanks, Vessels, etc.
2.2 SHELL GROUP STANDARDS
DEP 30.10.02.11-Gen Metallic Materials-Selected Standards
DEP 30.10.02.15-Gen Materials for use in H2S-containing environments in oil and gasproduction (amendments and supplements to ISO 15156:2009)
DEP 30.10.02.16-GenHydrogen induced cracking sensitivity test
(amendments/supplements to NACE TM0284)
DEP 30.10.02.17-GenWet H2S requirements for Downstream pressure vessels and
piping
DEP 30.10.02.31-Gen Metallic Materials-Prevention of Brittle Fracture in new assets
DEP 30.46.00.31-Gen
DEP 30.48.40.31-Gen
Thermal Insulation
Thermal Spray Coatings of Aluminium
DEP 31.10.00.10-Gen Material Traceability and Positive Material Identification (PMI)
DEP 31.10.03.10-Gen Symbols & Identification System – Mechanical
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
12/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 12 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
DEP 31.20.20.31-Gen Internals for Columns
DEP 31.22.05.11-Gen Gas/Liquid Separators – Type selection and design rules
DEP 31.22.05.12-GenLiquid/Liquid and Gas/Liquid/Liquid (three-phase) Separators – The selection and design rules
DEP 31.22.10.35-Gen. Manufacturing Reports for Pressure VesselsDEP 31.22.20.31-Gen Pressure Vessels(based on ASME Section VIII)
DEP 34.00.01.30-Gen Structural design and engineering
DEP 34.19.20.11-Gen Fire Proofing of Steel Structures
DEP 39.01.10.11-Gen
Selection of materials for life cycle performance (Upstreamfacilities) - Materials selection process
DEP 39.01.10.12-GenSelection of materials for life cycle performance (Upstream
facilities) - Equipment
DEP 74.00.10.10 Shop and field pressure testing of piping systemsDEP 70.10.90.11-Gen. Spare Parts.
2.3 SHELL STANDARD DRAWINGS
S 10.010 Vortex breakers for nozzles
S 10.016 Flanges for Non-Pressure Piping Connections Inside Vessels
S 10.030Lifting lug for Top covers (material: carbon steel, low alloy steel orstainless steel
S10.045 Anchor Bolt with sleeve for concrete foundations and structures
S10.056Typical details for insulation collar for carbon, low-alloy steel andstainless steel apparatus
S 10.070Davit for ANSI or BS flanges, DN 300-600mm (12” – 24”), classes150-600 incl.
S 10.101 Equipment Nozzles
S 10.103Typical details of bush-lined, overlay welded and clad steelnozzles
S 10.114Name plate with bracket for vessels and heat exchangeequipment
S 10.115 Typical details of lifting trunnion for vertical vessels
S 10.116 Bolting of Non-standard Flanges with Metric Screw Threads
S 10.119 Grab rungs and steps for Manways
S 20.001 Skirts, cylindrical and conical
S 20.002 Fireproof protection of Skirts
S 20.003 Support ring for insulation
S 20.004 Anchor bolt rings for lugs and base plate for columns
S 20.015 Typical details of Schoepentoeter (vane feed inlet) (type II)
S 20.016 Typical details of Schoepentoeter (vane feed inlet) (type III)
S 20.017 Typical details of Schoepentoeter (vane feed inlet) (type IV)S 20.019 Typical details of Schoepentoeter (vane feed inlet) Vane ladder-
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
13/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 13 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
supports and general notes
S 20.020Typical details of schoepentoeter (vane feed inlet) with single sectionvane ladder, max. height 800 mm (type 1A)
S 20.021Typical details of schoepentoeter (vane feed inlet) with catcher cap(type 1B)
S 20.022 Typical details of schoepentoeter (vane feed inlet) with multiplesection vane ladder (type 1C)
S 20.025 Typical details of schoepentoeter (vane feed inlet) (type Hi Fi)
S 20.026Typical details of schoepentoeter (vane feed inlet) (type Hi Fi) vanedistribution and general notes
S 20.028 Typical details of Demisters
S 20.029 Typical details of Demister attachments
S 20.030 Typical details of Demister supports
S 22.001Saddles for Horizontal vessels- Shell dia. Nom 150mm OD uptoand Including 1000mm OD.
S 22.002Saddles for Horizontal vessels- Shell dia. 1050mm OD upto andIncluding 3600mm OD.
S 22.003 Sliding plates for saddles of horizontal vessels.
S 22.005Supports for Vertical vessels shell dia. 350mm OD upto andIncluding 1500mm OD (half skirts).
S28.001 Stairways, general arrangement
S28.002 Stairways, stair details
S28.003 Stairways, hand railing connections
S28.004 Stairways, intermediate platform
S28.005 Stairways, top connections of stringers
S28.006 Hand railing, type A
S28.007 Hand railing, type B
S28.008 Hand railing, type C
S28.009 Hand railing, connection of railing to concrete type A
S28.010 Hand railing, connection of railing to concrete types B & C
S 28.011 Ladder General arrangement to columns, stacks and structures
S28.012 Ladder - typical details of sliding/fixed connections
S28.013
Platforms - cleats and brackets to columns (design load max 300
kg)
S28.014Platforms - cleats and brackets to columns (design load over 300kg)
S28.015 Davit general arrangement and typical details
S28.016 Grating typical of steel curb angles and cheqered plate
S28.020 Anchor bolts
S28.022-001 Grating, type I (sheet 1 of 3)
S28.022-002 Grating, type II (sheet 2 of 3)
S28.022-003 Grating, type III (sheet 3 of 3)
S28.022-004 Grating, type IV
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
14/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 14 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
S28.022-005 Grating, type V
S28.023 Fastening of apparatus to fireproofed beams
2.4 INTERNATIONAL STANDARDS
ASME Section VIII Div.1 ASME Boiler and Pressure Vessel Code – Rules for Construction
of Pressure Vessels
ASME Section VIII Div.2 ASME Boiler and Pressure Vessel Code – Alternative Rules for
Construction of Pressure Vessels
ASME Section V Non-Destructive Examination
ASME Section IX Welding and Brazing Qualification
ASME B 16.5 Pipe Flanges and Flanged Fittings
ASME B 16.47 Large diameter steel flanges NPS 26 thro’ NPS 60
NACE MR0175 / ISO
15156
Petroleum and natural gas industries - Materials for use in H2S
containing environments in oil and gas production, Part1, 2 & 3.
ISO 10474 Steel and Steel Products – inspection Documents.
BS/DS/DIN-EN 10204 Metallic products - Types of inspection documents
ISO 9001: 2008 ISO Quality Management System – Requirements.
2.5 COMPANY AND SHELL GROUP STANDARD DATA / REQUISITIONSHEETS
DEP 30.10.01.92-Gen. - Mass/Centre of Mass of Equipment
DEP 31.22.00.94-Gen. - Pressure Vessels (columns, reactors, accumulators etc.)
DEP 31.22.00.98 - Pressure vessels - ASME - User's design specification forgeneral service pressure vessel and engineered pressurevessel
DEP 31.22.05.93-Gen. - Demister Mat
DEP 31.20.41.93-Gen - Schoepentoeter
DEP 31.27.20.93-Gen. - Strainers/Filters (use this datasheet instead of PressureVessels datsheet only in case of Filters)
2.6 LIST OF COMPANY APPROVED SUB-VENDORS
The Vendor shall select sub-vendors from the list of relevant Company approved Vendor ’slist. The Vendor shall in respect of this order, procure third party material from sub-vendorslisted in the Company’s approved list, unless the particular type of material is not covered bythe list, or a special dispensation to deviate from the list has been granted in writing by theCompany during the technical evaluation and award stages. Any item not covered in thesub-vendor’s list shall be brought to the attention of the Company for agreement before anysub-order is placed. The Vendor shall ensure that the equipment proposed to meet thisspecification is designed and manufactured for the intended performance/servicerequirements, for safe operation and to achieve the highest possible level of reliability andavailability of the package.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
15/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 15 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
2.7 COMPLIANCE WITH STANDARDS
The Vendor/ Supplier shall complete the Table of Compliance (Appendix-4) and highlightdeviations if any from standards and specifications. The Purchaser shall obtain the writtenapproval from the technical authority within the Company for any deviations from thisSpecification.
Only those deviations that are approved by the Company shall be deemed to be part of thescope. In all cases the Company shall determine the compliance of the design carried outand works executed by the Vendor/Supplier in accordance with this Specification.
2.8 LANGUAGE AND UNITS OF MEASUREMENT
The English language and the SI system in accordance with DEP.00.00.20.10-Gen of unitsshall be used throughout for all documentation and drawings. Where necessary for a specificapplication, alternative units may be indicated in brackets together with the SI units.
2.9 CONFLICTING REQUIREMENTS
All conflicts between the requirements of this specification, related specifications, standards,codes, requisition data sheets and data sheets shall be referred to the Company forclarification before proceeding with the manufacture of the affected parts.
Vendor shall make a formal request with full supporting information when a deviation fromstandard is required.
Vendor is requested to notify any inaccuracy or ambiguity encountered in this document.
Nothing contained in this specification and related documents shall be construed as relievingthe Vendor of the responsibility for designing and manufacturing the equipment to meet thespecified operating conditions.
The general hierarchy of documents shall be followed as below:
First priority : The Contract / Purchase order
Second priority : This specification with attached datasheets
Third priority : Company SPs
Fourth priority : Company ERDs.Shell Group DEPs & Shell standarddrawings .
Fifth priority : International standards & codes
In case of conflict among documents or sections relating to this specification, the morestringent requirements shall apply, unless otherwise agreed in writing.
Where the Company technical specifications refer to or amend international codes andstandards, these international codes and standards shall be deemed to be part of thespecifications.
Where the technical specifications refer to other specifications, standards and codes, theseshall be deemed part of the specifications.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
16/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 16 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
3 SCOPE OF SUPPLY
The scope of supply shall include but not limited to the equipment and services defined below,
detailed in this specification, on the attached data or data/requisition sheets, standard
drawings and in accordance with the applicable standards, specifications and codes. The
Vendor shall supply complete, assembled and tested equipment including, but not limited to,
the scope of supply detailed below unless otherwise specified. Items which are optional andrequired only if specified are marked with an asterisk (*) below. The Supplier’s scope of supply
shall include, but not be limited to:-
3.1 MECHANICAL EQUIPMENT
a) The equipment complete with all parts including supports, spares etc..
b) All Internals viz. schoepentoeter, demister mat, internal dip/header pipe, vortexbreaker, baffles, column trays, plate packs etc. as applicable and specified in thespecification/datasheets including supports for internals.
c) Manhole with davit arrangement.
d) Lifting lugs / trunnions, cleats/clips for pipe support, ladder, platform, insulation, &fireproofing (if required) etc.
e) The vessels shall be provided with ASME code stamp.
f) Fabrication, supply, certification & guarantee of the equipment and internals.
g) Surface preparation and painting as per SP-1246 Part 1 to 5.
h) Minimum 2 Nos. of Earthing bosses for each equipment.
i) Nozzles with blind flanges and wherever counter flanges are in Vendor’s scope shallbe provided with gaskets and fasteners alongwith spares (10% bolts (min. 2nos.) and200% gaskets).
j) Nameplate & bracket for each Vessel.k) Foundation template for vertical skirt supported vessel.
l) Special tools, if any, for installation, commissioning, maintenance and start-up.
m) All buried vessel shall be supplied with external impressed current cathodic protection(by others – not by vessel vendor).
3.2 SERVICES
a) Transportation & Delivery to Project Site or as agreed in Purchase Order specifiedLocation.
b) Assistance/Supervision during installation & commissioning (*).
3.3 SPARE PARTS
a) Installation & Commissioning spares – 10% bolting (min. 2nos.) for each size and200% gaskets for each blinded flange joints including internal joints. These sparesshall be part of vessel supply and to be included in vessel offer.
b) Two years Trouble free operation spares – 10% bolting (min. 2nos.) for each size and300% gaskets for each blinded flange joints including internal joints.
The Vendor shall advise on the requirement of any additional spare parts & special tools andshall state the lead times and costs in the offer. Vendor shall submit the same by filling in the
SPIR format, attached in Appendix-6.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
17/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 17 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
The Vendor shall provide a separate itemized price list of spare parts for two years Trouble
free operation along with the bid.
The Vendor shall also complete the E-SPIR (Electronic Spare Parts and Interchangeability
Record, DEP 70.10.90.11) data for 2 years of operation in accordance with the instructions
for use of E-SPIR information. The E-SPIR information shall be submitted within the period
indicated in the RED form to enable processing and ordering spare parts such that these canbe delivered within the period of the purchase order.
3.4 ENGINEERING SERVICES
This specification shall in no way relieve the Vendor from final guarantee as to material,equipment, workmanship and performance of the vessel. The Vendor shall assume overallresponsibility for the design and engineering of all equipment supplied, as indicated in thisspecification. This shall include, but not necessarily be limited to:
a) Resolving engineering questions relating to equipment within the scope of supply.
b) Providing / coordinating the complete detailed mechanical design as specified in thisspecification and the referenced specification, standards and / or the datasheets forall equipment & components within the scope of supply (including foundation loads,design (size and number) of foundation bolts and design of internals likeSchoepentoeter, demister etc. as per DEP/other standards).
c) Inspection and Testing along with material certification.
d) Company approved 3rd
party inspection agency to be appointed by the Purchaser forinspection / testing & certification of all equipment and lifting appliances, in addition tothe authorized inspectors for design approval and code (ASME) stamping of vessels.
e) Installation of internals at Vendor’s shop and then if feels necessary (due to criticalityand to avoid damage during transportation and installation) remove the internals and
deliver as loose supply in separate cratings, alongwith site installation procedure.
f) Ensuring that all equipment supplied meet the requirements of the specifications andstandards referenced herein.
g) Providing design parameters for foundations and overhead lifting facilities.
h) Providing all documentation as per RED form attached in Appendix-3.
i) Furnishing progress reports, third party inspection reports etc.
j) Providing expediting services for all sub-Vendors and ensuring timely and properexecution of the job.
k) Attending Vendor coordination meeting / kick-off meeting / pre-inspection meeting atCompany / Purchaser / Consultant / Contractor’s office.
l) Coordinating with the Purchaser’s design Consultant for all design / technical matters.
m) Providing quality assurance for all sub-Vendors with respect to ISO 9001:2008.
n) When ever sizing of vessel is not specified in data sheet OR specified aspreliminary/check, contractor/vendor shall perform sizing calculation as per relevantDEP’s.
3.5 GUARANTEE / WARRANTY
The equipment shall perform satisfactorily under the operating conditions specified in thisSpecification and datasheets and shall be fit for the purpose intended. The guarantee /
warranty requirements are as per the General Terms and Conditions. The Vendor shallguarantee the equipment minimum as follows:
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
18/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 18 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
i) Process design (eg. Internals design) / performance as specified in data/requisitionsheet included in Appendix-2 of this specification.
ii) Mechanical design, structural integrity, material and workmanship.
iii) If any defect or mal-performance is observed during the guarantee period, the Vendorshall make all necessary alteration, repair or replacement free of charge.
Unless a specific exception is given in the Vendor ’s tender, it shall be understood that heguarantees and agrees to the above.
3.6 EXCLUSIONS
The following are excluded from the Vendor’s scope of supply, however, shall be part ofPurchaser’s scope:
Concrete foundation design based on Vendor supplied technical data.
External access ladder / operation platform / grating / handrailing / pipe supports (but
Vendor shall provide suitable support clip/cleats for these parts. Vendor shall quote
unit price on per kg. basis for ladder, cleats, supports and per sq. metre basis forplatform).
Supply of Anchor bolts.(sizing is in Vendor scope)
Lifting & hoisting (but Vendor shall provide weight of all equipment parts which are to
be removed / installed during installation & maintenance).
Site installation and commissioning (optional).
Any instrumentation.
Any electrical connection.
Insulation (but cleats / supports for insulation attached to vessel shall be provided).
Fire proofing (but fire proofing supports attached to skirts/legs shall be provided).
Process piping from vessel nozzle flanges, unless otherwise specified.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
19/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 19 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
4 DESIGN
4.1 MECHANICAL REQUIREMENTS
4.1.1 The equipment shall be designed, fabricated and tested in-accordance with DEP31.22.20.31-Gen., ASME VIII Div 1 / Div.2, as indicated on the datasheets attachedin Appendix-2. In addition to the design approval and code stamping by theauthorized inspection agency, the Purchaser shall appoint a Company approved 3
rd
party inspection agency, who are different from the authorized inspection agency forcertification of design and inspection.
4.1.2 Process design (calculation) for internals, mechanical design of all parts of the vesselare responsibility of the Vendor.
4.1.3 All equipment shall be designed for a service life of 30 years OR as specified inproject design basis which ever is lower.
4.1.4 All the internals shall be assembled at the Vendor’s works to check f or proper fit andalignment. To avoid damage during transportation/installation, the internals shall beremoved prior to transportation and delivered loose in separate cratings alongwithsite installation procedure. Generally, internals shall be of removable type and shouldbe bolted to the internal supports and direct welding to equipment wall should beavoided, but whenever internals are required to be welded to equipment wall, Vendorto obtain necessary approval from the Company.
4.1.5 All of the equipment internals shall be designed and constructed so that it is possibleto remove them through the manhole.
4.1.6 All nozzle flanges and body flanges shall be welding neck raised face (WNRF) orlong weld neck raised face (LWNRF) type, 3.2-6.3 microns face finish as per ASMEB 16.5, unless otherwise specified on the datasheets.
4.1.7 Bolting and threads shall comply with ISO metric standards, except for ASME flange
connections, which shall be in-accordance ASME B16.5.
4.1.8 Bolt holes on all nozzle flanges shall straddle to natural centre line.
4.1.9 Lifting lugs shall be provided and attached to pressure containing parts via doublerplates. The doubler/reinforcement plates shall be provided with ¼” NPT tapped tell-tale holes and these holes shall be closed by filling with non-corrosive compoundafter testing and final painting. Lifting lugs and associated supports and bracing shallbe designed for transportation and installation of the equipment considering aminimum impact factor of 2. Plates to which lifting lugs are attached shall beultrasonically examined over an area extending 100mm beyond the edges of theattachment welds to ensure that it is free from laminations/defects. All lifting lugs andthe lifting lug welds (where possible) shall be ultrasonically tested, 100% MT/PT andvisual testing.
4.1.10 All nozzle openings shall be flush with the inside of the vessel and sharp edges shallbe rounded off to a radius of 3mm unless otherwise specified. Nozzles shall beprovided with reinforcing pads required as per design code and for the preliminaryallowable nozzle loads specified in Appendix-5. The Purchaser will advise the Vendoron the actual nozzle loads during detailed design (after award of Purchase Order).Vendor to design the nozzles/vessel for these loads.
4.1.11 Body flanges shall be provided for Compressor Scrubbers and vessels withremovable type internals, viz.Shoepentoeter, Mistmat, Swirldeck, trays, etc., whichare less than or equal to 1200mm vessel inside diameter and as specified in thedatasheet. Location of the body flange shall be agreed with the Company.
4.1.12 Horizontal vessels shall be saddle supported with one saddle fixed and the othersliding alongwith sliding plate as per Shell standard drawing S.22.003. Vendor shallconsider saddle friction factor 0.3 for Steel plate to concrete/steel and 0.1 for Steelplate to PTFE/NYLON plates in ZICK analysyis.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
20/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 20 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
4.1.13 Vertical vessels shall be either full skirt supported with inspection / access openingsand skirt vents or leg supported or lug/bracket supported as specified in thedatasheets.
4.1.14 All bottom head piping which penetrate vertical pressure vessels inside the skirt shallbe extended outside the skirt with pipe flanged in the horizontal run. Welding ofnozzles or piping to vessel skirts shall not be permitted. Skirt penetration point shall
be reinforced with a sleeve three (3) sizes larger than the bottom head piping.Gusset plates shall be provided to the bottom head piping at the skirt penetrationpoint, and in no case shall the gusset plates be welded to the sleeve. Adequateopenings shall be provided for maintenance access to the Skirt
4.1.15 Flange inside diameter shall be same as that of mating nozzle neck/shell insidediameter.
4.1.16 Nozzles shall not be located on longitudinal weld seams and shall avoid girth seams.
4.1.17 Nuts for all external flange joints shall be of heavy hexagonal type. Any externalcoating requirements on fasteners shall be as per the applicable piping class.
4.1.18 The equipment supports shall be designed to withstand all induced stresses bytransportation & installation, wind load, operating conditions and pressure testing.
4.1.19 The material and inspection test certification shall be minimum according to ISO10474 - 3.1B / EN 10204 – 3.1. All pressure retaining materials shall be certified toISO 10474, 3.1C/EN 10204, 3.2 for supplementaory tests viz. Impact, HIC, corrosion,etc.
4.1.20 Vendor shall provide complete calculation to demonstrate the integrity of allcomponents including but not limited to Code calculations, nozzle local loading, liftinglugs, hold down bolting, transportation and wind loading.
4.1.21 Asbestos in any form shall not be used as material for any item, including thepackaging. Molybdenum disulphide compounds shall not be used for any screweditem.
4.1.22 Minimum nozzle size on all equipment shall be DN50. Smaller size requirement shall
be reduced in piping.
4.1.23 All equipment shall be fitted with two nos. of earthing boss each in accordance withthe drawing STD-4-0304-001.
4.1.24 Nameplate and nameplate bracket as per Shell standard drawing S.10.114. Thenameplate shall be clearly die-stamped with the tag number and other data as perthe standard drawing.
4.1.25 Manway/Access openings shall be provided with blind flange and davit arrangementas per drawing S.10.070, unless the equipment is provided with cold insulation, inwhich case hinge with handle shall be provided to facilitate blind flange/coveropening. Internal ladder rungs and hand grip shall be provided for easy internalaccess to the vessel through manholes.
4.1.26 Proper electrical isolation shall be provided between dissimilar metals (stainless steelinternals, if any, and mating carbon steel parts / supports) to prevent formation ofgalvanic corrosion.
4.1.27 Vendor shall indicate the requirements of Impact testing, PWHT, and heat treatmentrequirements for the entire equipment / dished ends, if any, in the quotation &fabrication drawings.
4.1.28 Vendor shall follow the exact location & orientation of nozzles andrequirement/dimensions of cleats/clips for pipe supports, platform, ladder, if any,provided by Purchaser later during detail engineering.
4.1.29 If a vessel is subject to PWHT then on completion of all painting activities thefollowing statement shall be stencilled onto the vessel adjacent to the manway(s) in
letters of 50mm high minimum. "Stress Relieved Vessel - No Welding Permitted".
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
21/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 21 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
4.1.30 All gaskets fitted to the equipment shall be new and service gaskets shall be used forhydrotesting. On no account gaskets shall be reused after hydro-testing.
4.1.31 For vessels with internal weld overlay, the undiluted chemical compositionrequirement of the overlay shall be ensured by using a two-layer technique in whichthe first layer is applied with a low heat input.
4.1.32 The equipment data sheets are included in Appendix-2. Vendor shall submit updatedcompleted data sheet along with the offer.
4.1.33 Vendor shall consider Project environmental wind data OR wind speed defined inthe environmental and site condition in Appendix-1 which ever is stringent. Windpressure shall be designed according to SP-1275 and DEP 34.00.01.30-Gen,considering 3-second gust wind speed in the design.
4.1.34 Vendor shall consider sizing of anchor bolts with maximum allowable tensile stressof bolt material as 100 N/mm
2 only.
4.1.35 The Vendor shall provide all details required for the foundation design such asfoundation loads, lay-out and positioning of foundation bolts alongwith template,requirement of leveling plates, etc. the Vendor shall provide clear drawings andinstructions well in advance.
4.1.36 The Vendor shall indicate the location, weight, and space requirements forequipment parts, to be removed for normal maintenance. This will enable the designof hoisting facilities above the equipment (by others).
4.1.37 Wherever corrosion allowance is specified in the datasheet for vessel, one corrosionallowance thickness shall be added to vortex breaker specified in shell standarddrawing S.10.010.
4.1.38 The weld clearance between two adjacent pressure part welding shall be 2 times thethickness of thinner part or 50mm, which ever is higher. For non pressure parts, theweld clearance shall be 5 times thickness of thinner part or 50mm (max). Thedistances are measured from the toe of the weld.
4.1.39 All vessels opearating at atmospheric pressure and designed for less than or equal
to 3.5 bar shall be designed as per the requirement of “Minimum Service PressureVessels” as mentioned in DEP 31.22.20.31.
4.1.40 All other ASME section VIII div 1 pressure vessels shall be designed as per therequirement of “General Service Pressure Vessels” as mentioned in DEP31.22.20.31.
4.1.41 All ASME section VIII div 2 pressure vessels shall be designed as per therequirement of “Engineered Pressure Vessels” as mentioned in DEP 31.22.20.31.
4.1.42 No backing strip welding is allowed in pressure parts.
4.1.43 Plates above 16mm and forgings above 50mm thick shall be subjected to UT tocheck for any lamination defects.
4.1.44 Minimum of 1.5 mm (1/16 in) corrosion allowance shall be applied for skirt/legsupports.
4.1.45 All pressure vessels shall be designed with 100% radiography.
4.1.46 All presure vessels designed according to ASME section VIII div 2 shall have integralreinforced nozzles with extended lips to have butt weld joints to facilitate proper NDT.
4.1.47 Contractor/Consultant/Vendor shall Prepare User Defined Specification (UDS) for all ASME Section VIII Div.2 designed pressure vessels/equipment. Required Input datafor UDS shall be provided by Purchaser/Company. Approval of UDS from RegisteredProfessional Engineer (RPE) is in contractors/Consultants/Vendor scope, howeverPurchaser/Company shall endorse all input data before RPE approval.
4.1.48 All cold formed statinless steel dished heads shall be subjected to solution annealing.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
22/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 22 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
4.2 MATERIALS OF CONSTRUCTION
All materials shall be as specified in the datasheets with any additional Requirementsspecified in material selection Report. Format of data sheet is attached in Appendix-2.However, Consultant/ Contractor to confirm the suitability of the specified materials for theprocess conditions.
All pressure retaining carbon steel materials shall be supplied in normalized condition.
All materials for sour service and HIC requirements shall be in accordance with requirements
of latest editions of NACE-MR-01-75/ISO 15156, DEP 30.10.02.15 and SP 2041.
All stainless steel and nickel based alloy materials shall be pickled and passivated as perDEP 30.10.60.31 and SP-1173. Galvanized steel components shall not be used in theproximity of stainless steel materials.
The material for the vessel and internals shall be fully in accordance with the materialsspecified in the datasheet.
Vendor shall take all necessary steps to avoid change of materials during manufacturing and
shall do so only with Company / Purchaser ’s approval.
4.3 SURFACE PREPARATION AND PAINTING
All equipment surfaces shall be prepared and painted in accordance with the requirements of
SP-1246 (Part 1 to 5) ‘Specification for Painting and Coating of Oil and Gas Production
Facilities’. For proprietary equipment, the Vendor may offer their standard painting system for
approval by the Company / Purchaser, but this shall be at least equal to the paint system
detailed in SP-1246 (Part 1 to 5) ‘Specification for Painting and Coating of Oil and Gas
Production Facilities’ .
All exposed stainless steel/DSS parts subjected to temperatures above 60oC upto 100
oC
shall be painted as per PCS-6 of SP-1246. For temperature more than 100°C, SS/DSS partsshall be protected against external pitting and crevice corrosion by means of coating with
Thermally Sprayed Aluminium (TSA) according to DEP 30.48.40.31.
The Equipment Tag numbers shall be clearly stenciled on all equipment, in a prominent
location.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
23/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 23 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
5 QUALITY ASSURANCE
5.1 GENERAL
The Vendor shall comply with the requirements of Company’s Specification for QualityManagement System Requirements for Product and Service SP-1171.
The Vendor shall appoint an Authorized Inspection Agency. The Vendor shall submit with the
bid, the name of the Authorized Inspection (AI) agency that will be contracted to provide
inspection services, in accordance with the requirements of the specifications, codes and SP-
1171.
The Purchaser shall nominate a Third Party Inspection Authority (TPIA) to carry out the
Quality Assurance function on the Purchaser’s behalf. The Purchaser’s TPIA shall have the
same access as the Purchaser to the Vendor’s Quality System and the manufacturer’s
premises to carryout inspection activities.
5.2 QUALITY SYSTEM
The Vendor shall maintain and use a Quality System, which is based on ISO 9001:2008, to
control the work and assure the quality.
The Vendor selected sub-contractors, or suppliers-shall demonstrate that they operate
Quality Systems based on ISO 9001:2008.
The Vendor shall give his sub-contractors or suppliers assistance in attaining the required
standard if necessary. This shall not relieve the Vendor of his responsibility for the quality of
the finished work.
The Purchaser reserves the right to audit the Vendor’s Quality System and this can be
carried out by the Purchaser or its nominee.
The Vendor shall assign sufficient full time personnel to the project to ensure the Quality Assurance / Quality Control System, documented in a Quality Assurance / Control manual, is
maintained and kept up-to-date throughout the duration of any purchase order.
A kick-off / co-ordination meeting shall be held between the Vendor and Purchaser, after thepurchaser order placement at design Consultants/Purchasers office in Oman.
At the discretion of the Purchaser the kick-off meeting may be waived.
At the kick-off meeting the Vendor and Purchaser shall review the Inspection and Test Plan
(ITP) submitted with the Tender and shall agree a date for issuing final ITP with Vendor.
The Vendor shall organize a prefabrication meeting to be attended by the Vendor, theVendor’s TPI, the Purchaser and the Purchaser’s TP IA.
A provisional notice of 10 working days is the minimum required by the Purchaser to attendthe inspection meetings.
Vendor shall keep a material control book, to which the Purchaser shall have access to any
time they wish. The book shall contain Sub-Vendor’s contact details, purchase orders,
equipment tag no., make/model nos., date of order, delivery and documentation required.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
24/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 24 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
6 INSPECTION & TESTING REQUIREMENTS
6.1 INSPECTION REQUIREMENTS
Inspection and testing requirements shall be in accordance with the applicable Company,Shell Group and International standards, with the relevant sections of this specification and
the data sheets.
The Vendor shall specify all of the inspection and testing requirements in the ITP which shall
identify the activities requiring the Purchaser's approval, review, witnessing etc. Vendor shall
submit Separate ITP for sub-vendor activities for Purchaser's approval, review, witnessing
etc. For sour service company shall identify additional Witness/hold points in ITP without any
impact on delivery and purchase Terms and conditions. A typical general ITP is attached in
Appendix-8.
Purchaser reserves the right to inspect every component or item, which will form part of the
pressure vessel. The responsibility for the inspection, certification, etc. of all materials, parts,
etc. lies with the Vendor.
Not withstanding the above, the Purchaser or his authorized representative shall have free
access to all parts of the Vendor's and his Sub-Vendor’s works at all times during the
manufacturing period.
The Vendor shall be responsible for coordinating the inspection and testing of Sub-Vendor
supplied equipment, and for ensuring that the Purchaser's representatives are given the
necessary access for inspection, and adequate warning of inspection and witness tests.
The Vendor (and all Sub-Vendors) shall give the Company, as required, without charge, all
reasonable facilities for the purpose of inspecting the equipment to ensure that it is
manufactured in accordance with the requisition, drawings and technical specification andQA/QC procedures and practices.
The Purchaser shall be given a minimum of 21 days notice prior to carrying out any tests on
the equipment covered by this specification.
All equipment shall be inspected for compliance with :
a. Approved for Construction drawings, latest revision.
b. Requirements of the Purchaser's requisition and correspondence thereafter.
c. Applicable standards, which shall also include the sub-referenced standards therein.
d. Inspection and Test plans (ITP) produced by the Vendor.
e. Approved process control procedures.
f. Welding of Metals as per SP-1173
Except as approved by the Purchaser, all equipment shall be presented for inspection in an
unpainted condition.
All measuring instruments required for shop testing shall be furnished by the Vendor, and be
supported by valid calibration certification.
All spare parts shall be subject to the same inspection standards and full material certification
as the purchase order.
Inspectors have the right to request additional inspections or tests to ensure that theequipment complies with this specification and all relevant codes and standards.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
25/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 25 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
All welds shall be continuous and wherever sound back welding is not feasible due toinaccessibility, single side welded joints with GTAW root pass shall be used.
All welding and welding consumables shall be in accordance with SP-1173, unless indicatedotherwise in this specification. Only Low Hydrogen welding consumables shall be used.Diffusible Hydrogen level shall be less that 10ml/100g weld metal, unless agreed andapproved by the Purchaser. All welding consumables shall have specified mechanicalproperties equal to or greater than the material being welded, unless agreed and approved bythe Purchaser.
The Vendor shall supply all necessary equipment and record welding variables during theProcedure Qualification Record (PQR) Test, production welding and weld qualification tests.Prior to the start of production welding all WPS with supporting PQR shall be submitted forapproval to the Purchaser. Wherever PWHT is specified, PQR shall be established with 3cycle PWHT and results shall meet deisgn code requirements.
All pressure retaining butt welds shall be 100% radiographed/UT.
All components including plates, forgings, fittings, welding consumables etc. shall be
checked for impact test requirements to the specified lower design temperature (LDT) as theminimum design metal temperature (MDMT) to meet the applicable codes and standards.Vendor shall confirm with the material supplier the required impact test value at specifiedLDT conform to the specified impact value as per DEP 30.10.02.31-Gen and applicablecodes and standards. Certified Material Test Report shall clearly specify the test results.
PWHT shall be performed as per the code requirements and as specified in the equipment
datasheet.
Positive Material Identification (PMI) shall be carried out on all wetted parts made of low alloyand high alloy steels. Extent of PMI shall be carried out as per DEP 31.10.00.10-Gen.Vendor shall submit PMI procedure with the bid for Company/Purchaser review. .
Vendor shall furnish Inspection Test Plan (ITP) specifying the responsibility, scope of Authorized Inspection Agency in accordance with SP-1171. The minimum requirements of
inspections for Purchaser are:
a) The verification of materials and certification of the equipment for conformity with thespecification requirements.
b) The Hydrostatic test.
c) The verification of welding procedures, welder’s qualifications, NDT personnelqualification, NDT results, heat treatment charts.
d) Visual examination.
e) NDT witness / review.
f) Witness / review of PWHT.
g) The dimensional check of the equipment as per approved drawing.
h) The surface preparation and painting application.
i) The testing of the lifting frame for the transportation of the equipment. The lifting frameshall be certified by TPIA.
j) The completeness of shipment including checking of supply of spares andaccessories, Manufacturer’s Data Book, name plate details.
k) Material test certification in accordance with ISO 10474/EN 10204 and any additionalrequirements of the requisition.
Mill and shop inspection shall not relieve the Vendor from his contractual responsibility for
replacing any defective material and for repairing any defective workmanship that may bediscovered in the field.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
26/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 26 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Any defects found by the TPIA shall be rectified in his presence. Where this is not possible or
practical, checklists shall be prepared and signed by the TPIA stating all 'pending items'.
Copies of these lists shall be sent to the Purchaser to enable their subsequent checking.
The equipment shall not be tested or leave the factory before all discovered defects have
been rectified.
6.2 TESTING REQUIREMENTS
This section describes the minimum requirements for the testing of the equipment. This
testing shall be performed in the Vendor ’s works.
The Purchaser reserves the right to observe any of the testing, dismantling, inspection and
reassembly of equipment as specified.
Unless otherwise specified, all testing equipment required shall be provided by the Vendor.
Purchaser’s witnessing of shop test results shall not constitute a waiver of the Vendor ’sobligation to provide equipment which meets all specified operating conditions.
6.2.1 Hydrostatic Test
Hydro testing shall be as per the code, this specification, applicable DEPs, data sheets and
Inspection & Testing Plan. Inspector shall witness all hydrostatic tests. Drainage / flushing /
drying of the equipment shall strictly follow immediately after the hydrostatic testing as
specified in DEP 74.00.10.10. The water to be used for the hydrostatic test apart from the
requirements as to chloride content shall be free from sediment, i.e. un-dissolved solids of
any description and as specified in DEP 74.00.10.10.
The equipment shall be cleaned prior to final assembly and hydrostatic testing. After thehydrostatic test, the equipment shall be drained, dried and cleaned thoroughly of all grease,
loose scale, rust, flux, etc.
6.2.2 Site Supervision for Testing & Commissioning
Purchaser will install and commission the equipment at site. The Vendor shall detail in the bid
the extent of specialist supervision and commissioning, if any, deemed necessary to satisfy
Vendor that installation and operation of the equipment meets the specification and warranty
requirements, the Vendor representative shall satisfy himself that the installation is
acceptable for commissioning of the equipment. For field tesing / commissioning, if any, the
Vendor shall provide the results of any shop tests executed prior to shipment.
The Vendor as an option shall include for supervision during pre-installation of the equipment
to ensure all quality requirements for the installation is within acceptable limits. These may
include but not be limited to
i) Checking of foundations,
ii) Anchor bolt type, installation & positioning in foundations.
The above measures should be reflected in the installation section of the manuals. The
Purchaser will commission the system under the direct supervision of the Vendor’s
specialists, if required. Provision of specialist services at site for installation checks and
commissioning for an estimated period if required, which will be subject to service contract
agreement with the Vendor. The Purchaser will give a minimum of 2 weeks advance notice
for the mobilization of the Vendor’s specialists in such cases.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
27/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 27 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
7 DOCUMENTATION REQUIREMENTS
Requirements for Vendor documentation are listed in the Requisition for Engineering
Documents (RED) form included in Appendix-3 and sections below. The Vendor shall prepare
a Vendor Document Register (VDR) or Suppliers Document Schedule (SDS) in the Company
standard format using the above information as a guide. The Vendor shall submit theDocument Register to Purchaser for review and approval together with document delivery
schedule after award and prior to submission of any other documentation. The Document
Register will thereafter form the basis of submission and control of all documents. The
Company title block/drawing number can be included on the front sheet. All documentation
shall be submitted for review/approval to the Purchaser within the committed schedule. It shall
be the responsibility of the Vendor to ensure that the production schedule takes into account
documentation submission, including a two weeks review period by the Purchaser, which
includes document delivery time.
7.1 INFORMATION TO BE SUBMITTED ALONGWITH THE BID
Vendor shall submit all the required documents as specified/identified in the RED formattached in Appendix-3. In addition to this Vendor shall submit the following:
1. Table of Compliance, Appendix-4 duly completed, signed and stamped.
2. Unit rates for nozzles with flange rating as mentioned in datasheets for sizes NPS2to NPS 24 and any higher sizes if specified in the datasheets.
3. Unit rate for cleats & ladders on per kg basis and platform on per m2 basis.
4. Commissioning assistance rate per day per person including mobilization and de-mobilisation charges.
7.2 INFORMATION TO BE SUBMITTED AFTER ORDER
7.2.1 Drawings and Documents to be submitted after Order
The documents/drawings shall be provided as outlined on the RED form, Appendix-3. It is the
Vendor's responsibility to ensure drawings are brought up to 'as built' level. Additional
drawings not specifically listed but of value, shall also be provided in the final package. All
drawings and documents shall be prepared in accordance with DEP 02.00.00.10.The
drawing shall be prepared in AutoCAD latest version and final drawings shall be submitted in
electronic form in addition to the hard copies as part of final document submission.
The text on all drawings and data shall be in English language. Text in the language of theVendor may also be shown, provided the English translation is shown in prominent location.
All data, calculations and drawings shall utilize SI metric units.
The design verification by TPIA is required and shall be the Vendor ’s responsibility. The
verification agency shall be subject to Purchaser approval. The documents required by TPIA
are not covered under this specification. The Vendor shall provide all the drawings and
documents required by the TPIA for the approval of design and manufacturing in compliance
with the code.
7.2.2 Material Certificates
Material certificates shall be furnished in accordance with the relevant DEP, ASME, ASTM,
EN 10204 and ISO 10474 standards as amended by this specification and as identified in
RED form, Appendix-3. All pressure retaining materials shall be certified to ISO 10474,
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
28/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 28 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
3.1C/EN 10204, 3.2 for vessels operating in high sour service with HIC testing and for high
alloy materials.
7.2.3 Test Certificates
Certificates for each mechanical, performance or calibration test, as applicable shall befurnished, including hydrostatic test certificates and as identified in RED form, Appendix-3.
7.3 METHOD OF DOCUMENTATION TRANSMISSION
All documentation for review/approval shall be transmitted via internet (soft copy) or hard
copy by use of courier services and shall be sent to the Purchaser, the details of which shall
be discussed during the bid clarification meeting. Final documentation shall be in the form of
hard copy as well as electronic form as specified in RED form, Appendix-3.
7.4 IDENTIFICATION
Each drawing and document shall be identified with the following information (for drawings atitle block shall be used):
a) Identity and signature of originator, checker and approver.
b) Title
c) Purchase order number
d) The item/tag number or equipment number
e) Official name of Vendor ’s company
f) Vendor ’s drawing number.
g) Latest revision by means of a number or letter in triangle with that number or letteradjacent to the alterations.
h) Company drawing number.
7.5 DATA
Vendor shall provide full information to enable completion of the data sheets, first for “as
purchased”, and then “as built”, within the confines of the supply. Preferably this should be
done by correcting and filling out the data sheet and submitting copies, both hard copy as
well as electronic copy (in CDs). Additional data as required by this specification shall also be
provided.
The Vendor shall maintain a record of shop test data for at least 36 months from date of
shipment.
All revised data must be resubmitted in its entirety. Revised data should state control
numbers and indicate, where appropriate, which drawings/data the revised document
supersedes. Revised data / changes shall be clearly highlighted by clouding and proper
revision mark for easy identification. The drawings / documents submitted without highlighting
the changes with clouding or identification revision mark, the documents shall be rejected
and returned to Vendor without checking / review.
7.6 TRANSMITTAL
All documentation for review/approval shall be transmitted via internet (soft copy) or hard
copy by use of courier services and shall be sent to the Purchaser.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
29/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 29 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
The Vendor shall submit the required documents and CDs for comment and approval by the
Purchaser under the cover of a transmittal form, Review Document Transmittal (RDT).
The Purchaser will review and may comment on all drawings, calculations and documents
submitted.
Corrections will be marked on the drawings. Marked-up copies of the drawings will bereturned to the Vendor under cover of the appropriate transmittal form.
The Vendor shall at all times be responsible for review and correction of Sub-Vendor ’s
drawings and documents prior to submittal to Purchaser for approval.
The Purchaser will clearly indicate on the documents which parts, if any, are ‘hold’. The
Purchaser will inform the parties concerned, of the reasons for placing “hold”, and the date(s)
on which release of these “holds” can be expected. The Vendor shall not delay
manufacturing of released parts because of “hold” placed on other parts.
Upon approval of the Vendor ’s drawings by the Purchaser, the Vendor shall forward to the
Purchaser the required number of approved documents, prints and diskettes as stated on the
RED form under cover of a transmittal form, Final Document Transmittal (FDT).
Manuals shall also be submitted to Purchaser under cover of a FDT.
7.7 MANUALS
The manual with all the relevant details to install, commission and operate/maintain the
equipment shall be provided, with all the applicable drawings and details. The manual shall
include all instructions on specific safety procedures for the installation and start-up of the
equipment.
Installation, operation and maintenance instructions including Sub-Vendor manuals. Technical design data and test results (Manufacturer databook).
Certification data.
The information presented in the manual shall be specific to the equipment being supplied.
All manuals shall be A4 size. Drawings shall be reduced to A3 and folded to A4 size so that
the title block is visible. All manuals shall also be provided in software form on CD ROM
compatible with Microsoft Word for Windows application and all drawings on Auto CAD latest
version (version 2012 or higher).
7.8 RECORD CARDS
The Vendor shall submit duly completed SAP PM Master Data forms as per the Requisition
for Engineering Documents (RED form, Appendix-3). An electronic copy of these forms shall
be provided to the Vendor for completion and return to the Purchaser, during engineering
stage after order, as indicated in the RED forms.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
30/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 30 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
8 PACKAGING & PRESERVATION FOR SHIPMENT
The preparation for shipment of equipment and materials shall be in accordance with project
specific requirement, DEP 70.10.70.11-Gen and additional requirements as defined in this
section. Special care should be taken for the packaging of delicate equipments / parts.
8.1 PACKING REQUIREMENTS
All nozzles and open ends of the equipment shall be treated with Shell Ensis Fluid SDC and
closed off by wooden or plastic blanks and taped. Small bore connections shall be taped
over.
Preservation of the packages shall be suitable for a storage period of at least 6 months.
All equipment under sea shipment and those with Cr-Mo or higher alloy steel material shall
be cleaned, dried and then purged with nitrogen and sealed with nitrogen with a small
positive pressure not less than 0.7 bar(g). Nitrogen bottles shall be provided and secured to
the shipping saddles for refilling. All associated valves and gauges shall be provided tomonitor the nitrogen pressure inside the vessel.
The equipment shall be packed in a seaworthy close boarded case with a waterproof lining.
The case shall be sufficiently strong to withstand handling and storage.
For transportation of any equipment in Sultanate of Oman, the maximum height including the
trailer (standard height of low bed trailer 1.3 metres, special low bed trailer height 1 metre)
shall be 5.5 metres. The Vendor shall critically review this requirement and obtain necessary
approvals from local authorities / Purchaser prior to transportation. The equipment shall be
completely shop fabricated and transported in a single piece to site as far as possible.
All lifts should be single point unless adequately demonstrated by the Vendor that single pointlifts are not possible. Adequate lifting accessories such as lifting beam/frame, slings,
shackles etc. (as part of the shipment) shall be included, if required and agreed during order.
Completeness of shipment shall be witnessed by the 3rd
party inspection agency and a
certificate of complete shipment issued by the Vendor will be verified against the packing
lists. A detailed, itemized packing list shall be sent to the Purchaser prior to dispatch. A copy
of the same signed packing list shall be included with the freight. Any shortages at site shall
be air freighted by Vendor at his expense within the scheduled delivery time.
Spares shall be packaged in a separate rigid box placed in the case containing the main
equipment.
All special tools are to be supplied in sectionalized purpose built cases with hinged lids.
In general, within Oman, all items shall be transported to site by truck. The majority of roadsare rough, corrugated, dusty desert graded roads. The equipment and packing must be ableto withstand rougher than normal treatment, with greater use made of shock absorbentmaterials.
8.2 CRATING IDENTIFICATION
The exterior of all crated equipment shall be identified in accordance with the purchase order
and, as a minimum, shall include the following:
Crate dimensions and gross weight
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
31/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 31 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Specific lifting and/or storage instructions
Crate identification
Supplier and Purchaser details
Brief material specification
Purchase order number
Final destination
A complete packing list in a waterproof sleeve shall be firmly attached to the outside of each
crate. An identical list shall be attached to the inside of the crate.
-
8/20/2019 257002289 SP 2069 Specification for Pressure Vessels 1 Doc PDF
32/71
Petroleum Development Oman LLC
Revision: 1Effective: Dec-12
Page 32 Specification for Pressure Vessels SP-2069 Printed 01/01/13
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
9 PLANNING & SCHEDULING
9.1 GENERAL
This section covers the
top related