· 2020-01-12 · the policy of elster amco water, llc is one of continuous improvement and the...

Post on 09-Feb-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

6"

3"

2"

4"

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

0.1 1.0 10.0 100.0 1000.0 10000.0

Pre

ssu

re L

oss (

PS

I)

Flow rate (GPM)

evoQ4 pressure loss

8" 1.5

10" & 12"

10D or more

Elbow

10D or more

Check optical communication protective gasket Prior to work, check that an optical communication protective gasket is mounted on MX35-2.

Mounting method of MX39 / MX42 onto

Check optical communication protective gasket Prior to work, check that an optical communication protective gasket is mounted on MX39/42.

OK NG

「 」

「 」

「 」

「 」

www.elsteramcowater.com

Copyright © 2016 Elster AMCO Water, LLC. All rights reserved. No part

of the publication may be reproduced in any material form without the

written permission of Elster AMCO Water except in accordance with the

provisions of the Copyright, Designs and Patents Act 1988.

The policy of Elster AMCO Water, LLC is one of continuous improvement

and the right is reserved to modify the specifications without notice.

top related