Arkansas State Highway and
Transportation Department
Statewide Transportation
Improvement Program (STIP)
Presented by the
Arkansas State Highway Commission
In compliance with Title 23-United States Code-Section 135
October 1, 2012
2013-2016 Federal Fiscal Years
AHTD STIP
Arkansas State Highway and Transportation Department Statewide Transportation Improvement Program
2013-2016 Federal Fiscal Years
www.arkansashighways.com
TABLE OF CONTENTS
Introduction ........................................................................................................ i
Financial Summary Report
Federal Highway Administration Funds ........................................... v
Federal Transit Administration Funds .............................................. vi
Glossary of Terms / Abbreviations / Acronyms ............................ vii
Information on Grouped Categories .................................................. viii
Projects
State Projects Sorted by Route ........................................................... 1
Local Projects
Areas > 200,000 Population
Central Arkansas Regional Transportation Study Area .............................. 26
West Memphis-Marion Area Transportation Study ................................... 30
Areas < 200,000 Population ................................................................... 32
Statewide Generic Projects
FFY 2013 ................................................................................................ 34
FFY 2014 ................................................................................................ 36
FFY 2015 ................................................................................................ 38
FFY 2016 ................................................................................................ 40
Transit Projects
FFY 2013 ................................................................................................ 42
FFY 2014 ................................................................................................ 50
FFY 2015 ................................................................................................ 57
FFY 2016 ................................................................................................ 64
Eastern Federal Lands Highway Division ...................................... 71
State and Local Projects Sorted by Job Number .......................... 72
State and Local Projects Sorted by County ................................... 99
i
INTRODUCTION This Statewide Transportation Improvement Program (STIP) for Federal Fiscal Years (FFY) 2013 through 2016 has been prepared by the Arkansas State Highway Commission in response to 23 U.S.C. 135 - Statewide Planning, as amended by the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users. Authorization for the listed projects may be requested for any phase of development (i.e., preliminary engineering, right of way, utilities, or construction) during FFY 2013-2016. Authorization for pre-construction phases may be requested in advance of the year a project is scheduled for construction to assure the project can be advertised and let to contract as scheduled in this STIP. With respect to urban areas greater than 50,000 in population, projects listed in the Transportation Improvement Programs (TIPs) that have been developed by the various Metropolitan Planning Organizations (MPOs) are hereby included as part of the overall Federal-aid highway construction program. For additional information on projects located within a TIP Area, consult the following TIPs or contact the appropriate MPO.
CARTS - Central Arkansas Regional Transportation Study (Pulaski, Saline, Faulkner, & Lonoke Counties)
Metroplan Mr. Jim McKenzie, Executive Director 501 West Markham, Suite B Little Rock, AR 72201 Telephone: 501-372-3300
Frontier - Frontier Transportation Study
(Crawford & Sebastian Counties) Frontier Metropolitan Planning Organization Mr. John Guthrie, Executive Director 1109 South 16th Street Fort Smith, AR 72901 Telephone: 479-785-2651
ii
HSATS - Hot Springs Area Transportation Study (Garland & Hot Spring Counties)
Hot Springs Metropolitan Planning Organization Mr. David Watkins, City Manager City of Hot Springs 133 Convention Boulevard Hot Springs, AR 71901 Telephone: 501-321-4804
JATS - Jonesboro Area Transportation Study
(Craighead County)
Jonesboro Metropolitan Planning Organization The Honorable Harold Perrin Mayor of Jonesboro 515 West Washington Avenue Jonesboro, AR 72401 Telephone: 870-933-4623
NARTS - Northwest Arkansas Regional Transportation Study
(Washington & Benton Counties)
Northwest Arkansas Regional Planning Commission Mr. Jeff Hawkins, Executive Director 1311 Clayton Street Springdale, AR 72762 Telephone: 479-751-7125
PBATS - Pine Bluff Area Transportation Study
(Jefferson County)
Southeast Arkansas Regional Planning Commission Ms. Jerre George, Director 1300 Ohio Street Pine Bluff, AR 71601 Telephone: 870-534-4247
iii
TUTS - Texarkana Urban Transportation Study
(Miller County)
Texarkana Metropolitan Planning Organization Mr. George Shackleford, City Manager City of Texarkana 220 Texas Boulevard Texarkana, TX 75501 Telephone: 903-798-3927
WMATS - West Memphis-Marion Area Transportation Study (Crittenden County)
West Memphis Metropolitan Planning Organization The Honorable William Johnson Mayor of West Memphis 205 South Redding Street West Memphis, AR 72301 Telephone: 870-732-7500
Projects (including Federal Transit Administration Projects) utilizing funds set aside for rural areas were selected in consultation with the appropriate local officials. This program includes both the Federal-aid portion and the 100% State funded portion of the State's overall highway construction program and is financially constrained in accordance with federal regulations set forth in 23 CFR Part 450. The following financial summary demonstrates current and estimated revenues to fund the STIP, while the system as a whole is being adequately operated and maintained. Additional information regarding this program may be obtained by contacting: Lorie H. Tudor Assistant Chief Engineer - Planning Arkansas State Highway and Transportation Department P. O. Box 2261 Little Rock, Arkansas 72203 Telephone: (501) 569-2241
iv
NOTICE OF NONDISCRIMINATION
The Arkansas State Highway and Transportation Department (Department) complies with all civil rights provisions of federal statutes and related authorities that prohibited discrimination in programs and activities receiving federal financial assistance. Therefore, the Department does not discriminate on the basis of race, sex, color, age, national origin, religion or disability, in the admission, access to and treatment in Department’s programs and activities, as well as the Department’s hiring or employment practices. Complaints of alleged discrimination and inquiries regarding the Department’s nondiscrimination policies may be directed to EEO/DBE Section Head (ADA/504/Title VI Coordinator), P. O. Box 2261, Little Rock, AR 72203, (501) 569-2298, (Voice/TTY 711), or the following email address: EEO/DBE_Section_Head@ahtd.ar.gov
MOTOR FUEL & REGISTRATION FEES
4c DIESEL TAX - IRP
NATURAL GAS SEVERANCE TAX
REVENUES
EXPENDITURES (1)
STATE FUNDS REMAINING FOR
CONSTRUCTION
FUNDING CATEGORIES: APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED
INTERSTATE MAINTENANCE 95.1 123.9 97.0 103.7 98.9 99.3 100.9 91.5 392.0 418.4
2011 INT REHAB BOND PROGRAM 225.0 222.2 200.0 193.7 150.0 132.7 0.0 26.4 575.0 575.0
NATIONAL HIGHWAY SYSTEM 108.6 96.9 110.8 105.7 113.0 124.3 115.3 113.1 447.7 440.0SURFACE TRANSPORTATION 186.3 153.8 189.5 181.6 192.8 163.9 196.1 152.8 764.7 652.1CONGESTION MITIGATION & AIR QUALITY 12.2 11.2 12.5 22.4 12.7 2.0 13.0 15.7 50.4 51.3HIGHWAY SAFETY 22.9 22.7 23.3 26.6 23.8 22.2 24.3 32.2 94.3 103.7
RAIL-HWY CROSSING 3.5 3.4 3.6 3.5 3.7 3.7 3.8 8.3 14.6 18.9
SAFE ROUTES TO SCHOOL 1.5 1.4 1.5 1.4 1.6 1.4 1.6 1.4 6.2 5.6
BRIDGE REPLACEMENT 78.0 87.8 79.5 75.7 81.1 76.9 82.7 77.5 321.4 317.9
RECREATIONAL TRAILS 1.4 0.8 1.4 0.8 1.5 0.8 1.5 0.8 5.7 3.2
SUB-TOTAL 734.6 724.0 719.2 715.2 679.1 627.2 539.1 519.7 2,672.0 2,586.0
EARMARKED FUNDS 56.2 56.2 12.4 12.4 57.3 57.3 4.0 4.0 129.9 129.9
FEDERAL LANDS HIGHWAY PROGRAM 0.0 0.0 0.1 0.1 0.25 0.25 0.0 0.0 0.3 0.3
STATE MATCH 88.5 88.5 94.5 94.5 100.8 100.8 105.0 105.0 388.8 388.8
IRP DEBT SERVICE 17.5 17.5 17.5 17.5 17.5 17.5 17.5 17.5 70.0 70.0
OTHER MATCH(2) 93.0 93.0 16.8 16.8 11.1 11.1 18.3 18.3 139.2 139.2
TOTAL 989.8 979.2 860.6 856.5 866.0 814.1 683.9 664.4 3,400.3 3,314.3
FUNDING CATEGORIES: APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED
402-SAFETY 15.6 15.3 15.8 15.7 16.0 16.1 16.2 16.6 63.8 63.7
100% STATE 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 200.0 200.0
NATURAL GAS SEVERENCE TAX 25.0 25.0 30.0 30.0 30.0 30.0 30.0 30.0 115.0 115.0
TOTAL 90.6 90.3 95.8 95.7 96.0 96.1 96.2 96.6 378.8 378.7
GRAND TOTAL 1,080.4 1,069.6 956.4 952.2 962.0 910.2 780.1 761.0 3,779.1 3,693.0
NOTE: TOTAL MAY NOT BE ADDITIVE DUE TO ROUNDING
(1) INCLUDES FUNDS TO BE USED FOR MAINTENANCE AND OPERATIONS OF EXISTING SYSTEM
TOTAL2013
367.5
17.5
2015
376.5
17.5
385.0
17.5
2016
390.0
ESTIMATED STATE REVENUE ANALYSIS
2014
25.0
410.0
17.5
1,519.0
70.0
115.0
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
FINANCIAL SUMMARY REPORT FOR FEDERAL FISCAL YEARS 2013-2016(x $1 million)
30.0
OTHER AVAILABLE FUNDING ANALYSIS
432.5
122.3
FHWA FEDERAL FUNDING ANALYSIS
2013
(285.1)
424.0
30.0 30.0
124.9 125.3 125.6
(315.2)
(2) LOCAL, STATE AID, RAILROAD
20152014 2016
498.1
437.5
(298.7) (306.9) (1,205.9)
1,704.0
TOTAL
2013 2014 2015 2016 TOTAL
v
FUNDING CATEGORIES: APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED
FTA 5307 - URBANIZED AREAS $10,701 $10,701 $10,701 $10,701 $10,701 $10,701 $10,701 $10,701 $42,804 $42,804
FTA 5308 - CLEAN FUELS $4,746 $4,746 $4,746 $4,746
FTA 5309 - BUS & BUS FACILITIES $6,328 $6,328 $6,328 $6,328
FTA 5310 - ELDERLY & DISABLED $1,514 $1,514 $1,514 $1,514 $1,514 $1,514 $1,514 $1,514 $6,056 $6,056
FTA 5311 - NONURBANIZED AREAS $10,933 $10,933 $10,933 $10,933 $10,933 $10,933 $10,933 $10,933 $43,732 $43,732
FTA 5316 - JOB ACCESS & REVERSE COMMUTE $1,814 $1,814 $1,814 $1,814 $1,814 $1,814 $1,814 $1,814 $7,256 $7,256
FTA 5317 - NEW FREEDOM $974 $974 $974 $974 $974 $974 $974 $974 $3,896 $3,896
EARMARKED FUNDS $238 $238 $238 $238
SUB-TOTAL $37,248 $37,248 $25,936 $25,936 $25,936 $25,936 $25,936 $25,936 $115,056 $115,056
STATE FUNDS $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $15,000 $15,000
LOCAL MATCH $27,738 $28,738 $25,861 $25,861 $25,861 $25,860 $25,861 $25,861 $105,322 $106,320
GRAND TOTAL $68,736 $69,736 $55,547 $55,547 $55,547 $55,546 $55,547 $55,547 $235,378 $236,376
vi
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
FINANCIAL SUMMARY FOR FEDERAL FISCAL YEARS 2013-2016(x $1 thousand)
FTA FEDERAL FUNDING ANALYSIS
FY 2013 FY 2014 FY 2015 FY 2016 TOTAL
GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS
vii
402402402402----SafetySafetySafetySafety Funds set aside for safety improvements due to the lack of a state open container law.
JETSJETSJETSJETS Jonesboro Economical Transit System
4444----RRRR Resurfacing, Restoration, Rehabilitation and Reconstruction LULULULUZAZAZAZA Local Urbanized Area
BRBRBRBR Bridge Replacement Funds MPOMPOMPOMPO Metropolitan Planning Organization
Bs. & Surf.Bs. & Surf.Bs. & Surf.Bs. & Surf. Base and Surfacing NARTSNARTSNARTSNARTS Northwest Arkansas Regional Transportation Study
CARTSCARTSCARTSCARTS Central Arkansas Regional Transportation Study NHSNHSNHSNHS National Highway System Funds
CATACATACATACATA Central Arkansas Transit Authority PBATSPBATSPBATSPBATS Pine Bluff Area Transportation Study
CMAQ AQCMAQ AQCMAQ AQCMAQ AQ Congestion Mitigation and Air Quality Funds – Air Quality Use P.E.P.E.P.E.P.E. Preliminary Engineering
CMAQ FLEXCMAQ FLEXCMAQ FLEXCMAQ FLEX Congestion Mitigation and Air Quality Funds – Flexible Use Rec TrailsRec TrailsRec TrailsRec Trails Recreational Trail Funds
CRCRCRCR County Road RRRRRRRR Railroad
CSCSCSCS City Street RRPRRPRRPRRP Railway-Highway Crossing Program Funds
EarmarkEarmarkEarmarkEarmark Various Earmarked Funds in Previous Highway Acts RUZARUZARUZARUZA Regional Urbanized Area
EFLHDEFLHDEFLHDEFLHD Eastern Federal Lands Highway Division of the Federal Highway Administration
SRTSSRTSSRTSSRTS Safe Routes to School Funds
Eng.Eng.Eng.Eng. Engineering STPSTPSTPSTP Surface Transportation Program Funds
ENHENHENHENH Enhancement Funds STP > 200,000STP > 200,000STP > 200,000STP > 200,000 Surface Transportation Program funds for areas greater than 200,000 population
FRONTIERFRONTIERFRONTIERFRONTIER Frontier Metropolitan Planning Organization STP < 200,000STP < 200,000STP < 200,000STP < 200,000 Surface Transportation Program funds for areas less than 200,000 population
FTAFTAFTAFTA Federal Transit Administration Funds Str. & Apprs.Str. & Apprs.Str. & Apprs.Str. & Apprs. Structure and Approaches
Gr. & Strs.Gr. & Strs.Gr. & Strs.Gr. & Strs. Grading and Structures TIPTIPTIPTIP Transportation Improvement Program
HSAHSAHSAHSA----MPOMPOMPOMPO Hot Springs Area Metropolitan Planning Organization TDOTTDOTTDOTTDOT Tennessee Department of Transportation
HSIPHSIPHSIPHSIP Highway Safety Improvement Program Funds TUTSTUTSTUTSTUTS Texarkana Urban Transportation Study
IMIMIMIM Interstate Maintenance Funds U of AU of AU of AU of A University of Arkansas
IRPIRPIRPIRP Interstate Rehabilitation Program WMATSWMATSWMATSWMATS West Memphis-Marion Area Transportation Study
JATSJATSJATSJATS Jonesboro Area Transportation Study
viii
ARKANSAS’ STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FEDERAL FISCAL YEARS 2013-2016
INFORMATION ON GROUPED CATEGORIES
INTERSTATE MAINTENANCE
• VARIOUS RESURFACING / RESTORATION / REHABILITATION / RECONSTRUCTION – Projects in this category include improvements to the existing pavement condition of the Interstate System. The purpose of these improvements would be to improve the ride quality, to extend the life of pavements, or to improve traffic service on the Interstate System. Improvements could include interchange reconstruction and increasing lanes widths and/or shoulder widths to current standards, but do not include adding capacity.
• RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.
NATIONAL HIGHWAY SYSTEM
• VARIOUS RESURFACING / RESTORATION / REHABILITATION / RECONSTRUCTION – Projects in this category include improvements to the existing pavement condition of routes on the National Highway System. The purpose of these improvements would be to improve the ride quality or to extend the life of pavements on the National Highway System. Although projects may increase lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.
• RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.
SURFACE TRANSPORTATION PROGRAM
• VARIOUS RESURFACING / RESTORATION / REHABILITATION / RECONSTRUCTION – Projects in this category include improvements to the existing pavement condition of routes functionally classified above rural minor collector. The purpose of these improvements would be to improve the ride quality or to extend the life of pavements. Although projects may increase lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.
• RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.
• VARIOUS RESURFACING / RESTORATION / REHABITATION / RECONSTRUCTION / BRIDGE REPLACEMENT / BRIDGE REHABILITATION ON COUNTY ROADS– Eligible projects would include resurfacing, restoration, rehabilitation, reconstruction, signalization, increasing lanes widths and/or shoulder widths to current standards, intersection improvements such as the addition of turn lanes, pedestrian and bicycle improvements, bridge rehabilitation or replacement, and railroad crossing improvements. Projects to add capacity are not included in this category.
ix
SURFACE TRANSPORTATION PROGRAM – URBAN PROJECTS IN AREAS > 200,000
• LUZA/RUZA NON-CAPACITY PROJECTS – Projects in this category include improvements to maintain the system of eligible routes in Transportation Management Areas. Eligible projects would include resurfacing, restoration, rehabilitation, reconstruction, signalization, increasing lanes widths and/or shoulder widths to current standards, intersection improvements such as the addition of turn lanes, pedestrian and bicycle improvements, bridge rehabilitation or replacement, and railroad crossing improvements. Projects to add capacity are not included in this category.
SURFACE TRANSPORTATION PROGRAM – URBAN PROJECTS IN AREAS < 200,000
• SIGNALIZATION / INTERSECTION IMPROVEMENTS – Projects in this category include signalization, signal upgrades, signal coordination, and the addition of turn lanes to improve the flow of traffic through intersections.
SURFACE TRANSPORTATION PROGRAM – ENHANCEMENT
• VARIOUS ENHANCEMENT TYPE PROJECTS – Projects in this category include those eligible under the Federal Transportation Enhancement Program as listed in 23 USC 101(a)(35). These include:
� Provision of facilities for pedestrians and bicycles. � Provision of safety and educational activities for pedestrians and bicyclists. � Acquisition of scenic easements and scenic or historic sites (including historic battlefields). � Scenic or historic highway programs (including the provision of tourist and welcome center
facilities). � Landscaping and other scenic beautification. � Historic preservation. � Rehabilitation and operation of historic transportation buildings, structures, or facilities
(including historic railroad facilities and canals). � Preservation of abandoned railway corridors (including the conversion and use of the
corridors for pedestrian or bicycle trails). � Inventory, control, and removal of outdoor advertising. � Archaeological planning and research. � Environmental mitigation--
(i) to address water pollution due to highway runoff; or (ii) reduce vehicle-caused wildlife mortality while maintaining habitat connectivity.
� Establishment of transportation museums.
• RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.
BRIDGE REPLACEMENT
• VARIOUS BRIDGE REHABILITATION / REPLACEMENT – Projects in this category include the replacement or rehabilitation of eligible bridges. While improvements may include increasing lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.
• RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.
x
• BRIDGE PAINTING / GUARD RAIL / SCOUR CONTROL / INSPECTION – Projects in this category include the routine inspection of bridges, painting structural steel, adding or replacing guard rail at bridge ends, and improvements to columns to control scour.
• VARIOUS BRIDGE REHABILITATION / REPLACEMENT ON COUNTY ROADS – Projects in this category include the replacement or rehabilitation of eligible bridges. While improvements may include increasing lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.
HIGHWAY SAFETY IMPROVEMENT PROGRAM
• VARIOUS SAFETY TYPE IMPROVEMENTS – Highway safety improvement project means a project consistent with the State strategic highway safety plan (SHSP) that corrects or improves a hazardous road location or feature, or addresses a highway safety problem. Projects include, but are not limited to, the following:
� An intersection safety improvement. � Pavement and shoulder widening (including addition of a passing lane to remedy an unsafe
condition). � Installation of rumble strips or other warning devices, if the rumble strips or other warning
devices do not adversely affect the safety or mobility of bicyclists, pedestrians and persons with disabilities.
� Installation of a skid-resistant surface at an intersection or other location with a high frequency of crashes.
� An improvement for pedestrian or bicyclist safety or for the safety of persons with disabilities.
� Construction of any project for the elimination of hazards at a railway-highway crossing that is eligible for funding under 23 U.S.C. 130, including the separation or protection of grades at railway-highway crossings.
� Construction of a railway-highway crossing safety feature, including installation of highway-rail grade crossing protective devices.
� The conduct of an effective traffic enforcement activity at a railway-highway crossing. � Construction of a traffic calming feature. � Elimination of a roadside obstacle or roadside hazard. � Improvement of highway signage and pavement markings. � Installation of a priority control system for emergency vehicles at signalized intersections. � Installation of a traffic control or other warning device at a location with high crash potential. � Transportation safety planning. � Improvement in the collection and analysis of safety data. � Planning integrated interoperable emergency communications equipment, operational
activities, or traffic enforcement activities (including law enforcement assistance) relating to work zone safety.
� Installation of guardrails, barriers (including barriers between construction work zones and traffic lanes for the safety of road users and workers), and crash attenuators.
� The addition or retrofitting of structures or other measures to eliminate or reduce crashes involving vehicles and wildlife.
� Installation and maintenance of signs (including fluorescent yellow-green signs) at pedestrian-bicycle crossings and in school zones.
� Construction and operational improvements on high risk rural roads. � Conducting road safety audits.
xi
.
• RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.
RAILWAY-HIGHWAY CROSSING
• RAILROAD CROSSING PROTECTIVE DEVICES / SURFACING / HAZARD ELIMINATION – Projects in this category include adding or upgrading flashing lights and gates, crossbucks or surfaces at railroad crossings, and the construction of railroad overpasses.
CONGESTION MITIGATION AND AIR QUALITY
• NON-ATTAINMENT PROJECT – Projects in this category have been selected by the Metropolitan Planning Organization in an area designated by the Environmental Protection Agency as a non-attainment area for the National Ambient Air Quality Standards and have been documented to decrease vehicular emissions.
RECREATIONAL TRAILS
• VARIOUS TRAIL PROJECTS – Projects in this category will be approved through the solicitation of applications. Eligible projects include motorized and non-motorized trails and trail facilities.
SAFE ROUTES TO SCHOOL
• VARIOUS SAFE ROUTES TO SCHOOL PROJECTS – Projects in this category will be approved through the solicitation of applications. Eligible projects include infrastructure and non-infrastructure projects, as well as administration of a Safe Routes to School Program that benefits elementary and middle school children in grades K-8. Infrastructure-related projects include the planning, design, and construction of projects within public right of way that will substantially improve the ability of students to walk and bicycle to school. These include:
� Sidewalk improvements, � Traffic calming and speed reduction improvements, � Pedestrian and bicycle crossing improvements, � On-street bicycle facilities, � Off-street bicycle and pedestrian facilities, � Secure bicycle parking facilities, and � Traffic diversion improvements in the vicinity of schools. � Non-infrastructure-related activities include activities that will encourage walking and
bicycling to school, including: � Public awareness campaigns and outreach, � Traffic education and enforcement in the vicinity of schools, � Student sessions on bicycle and pedestrian safety, health, and environment, and � Funding for training, volunteers, and managers of SRTS Programs.
NATIONAL SCENIC BYWAYS
• SCENIC BYWAYS PROJECTS – Eligible projects in this category include: � An activity related to the planning, design, or development of a State or Indian tribe scenic
byway program;
xii
� Development and implementation of a byway corridor management plan; � Safety improvements to accommodate increased traffic; improvements that enhance
access; protection of resources adjacent to the byway; � Development and implementation of a marketing program; � Development and provision of tourist implementation; and construction of bicycle and
pedestrian facilities, interpretive facilities, overlooks and other enhancements for byway travelers.
State Highway Projects Sorted by Route
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
BB0301 Miller 030 Texas State Line-Hwy. 108 (S) Rehabilitation 7.10 2015State State TUTS5,852 - TOTAL
5,852 - Bond
�
BB0310 Miller 030 Hwy. 108-Hwy. 67 (S) Rehabilitation 4.40 2015State State7,253 - TOTAL
7,253 - Bond
�
BB0302 Miller 030 Hwy. 67-West of Red River (S) Rehabilitation 4.50 2016State State7,529 - TOTAL
7,529 - Bond
�
BB0303 Miller 030 Red River-East & West (F) Rehabilitation 1.80 2014State State17,745 - TOTAL
17,745 - Bond
�
BB0305 Hempstead 030 Hwy. 67-Sheppard (F) Rehabilitation 4.10 2016State State18,864 - TOTAL
18,864 - Bond
�
BB0306 Hempstead 030 Sheppard-Hwy. 278 (S) Rehabilitation 7.10 2014State State20,178 - TOTAL
20,178 - Bond
�
BB0702 Clark 030 Hwy. 26-Caddo River (F) Rehabilitation 8.30 2014State State6,577 - TOTAL
6,577 - Bond
�
BB0602 Saline 030 Hwy. 70-West (West Bound Lanes) (S) Rehabilitation 2.90 2015State State CARTS8,901 - TOTAL
8,901 - Bond
�
BB0403 Craw & Frank 040 Dyer-Cravens Creek (S) Rehabilitation 14.10 2013State State11,280 - TOTAL
11,280 - Bond
�
BB0804 Pope 040 Mill Creek-Hwy. 331(F) Rehabilitation 6.80 2013State State37,087
5,748 - IM
639 - State Match
- TOTAL
30,700 - Bond
�
BB1103 Frank & John 040 Ozark-Hwy. 164 (S) Rehabilitation 8.20 2014State State6,658 - TOTAL
6,658 - Bond
�
BB0803 John & Pope 040 Hwy. 64-Mill Creek (S) Rehabilitation 13.10 2015State State10,637 - TOTAL
10,637 - Bond
�
Page 1 of 125
An (F) or (S) following the termini indicates federal or state oversight.
INTERSTATE REHABILITATION PROJECTS
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
BB0805 Pope 040 Hwy. 331-Atkins (S) Rehabilitation 10.80 2014State State9,263
444 - HSIP
49 - State Match
- TOTAL
Includes Safety Funds for Cable Median Barriers
8,770 - Bond
�
BB0806 Pope & Con 040 Atkins-Plumerville (S) Rehabilitation 18.60 2013State State18,826
2,118 - HSIP
235 - State Match
- TOTAL
Includes Safety Funds for Cable Median Barriers
16,473 - Bond
�
BB0604 Pulaski 040 I-30/I-40 Intchng.-Hwy. 67 (F) Rehabilitation 1.70 2016State State CARTS22,749
20,474 - IM
2,275 - State Match
- TOTAL �
BB0610 Prairie 040 White River Str. & Apprs. (F) Str. & Apprs. 0.50 2015State State53,572
36,515
10,400
- IM
- BR
6,657 - State Match
- TOTAL
Bridge funds are for widening the bridge - Bond funds cannot be used for widening the bridge
�
BB0101 Monroe 040 Cache River-Bayou DeView (F) Rehabilitation 4.10 2013State State18,040 - TOTAL
18,040 - Bond
�
BB0104 St. Francis 040 Goodwin-Forrest City (S) Rehabilitation 11.62 2014State State12,161
2,453 - HSIP
273 - State Match
- TOTAL
Includes Safety Funds for Cable Median Barriers
9,435 - Bond
�
BB0105 St. Francis 040 Forrest City-East (F) Rehabilitation 8.28 2013State State41,925
37,733 - IM
4,193 - State Match
- TOTAL �
Page 2 of 125
An (F) or (S) following the termini indicates federal or state oversight.
INTERSTATE REHABILITATION PROJECTS
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
BB0106 St. Francis 040 Shearerville-West (S) Rehabilitation 16.50 2014State State82,607
2,453 - HSIP
273 - State Match
- TOTAL
Includes Safety Funds for Cable Median Barriers
79,881 - Bond
�
BB0107 Crittenden 040 Shearerville-Hwy. 77 (F) Rehabilitation 12.90 2015State State WMATS12,299 - TOTAL
12,299 - Bond
�
BB0108 Crittenden 040 Hwy. 77-I-55 (F) Rehabilitation 2.20 2013State State WMATS23,892 - TOTAL
23,892 - Bond
�
BB0109 Crittenden 055 I-40-Jericho (S) Rehabilitation 8.23 2013State State WMATS9,784 - TOTAL
9,784 - Bond
�
BB0110 Crittenden 055 Jericho-Lake David (S) Rehabilitation 8.00 2014State State6,496 - TOTAL
6,496 - Bond
�
BB1003 Mississippi 055 Hwy. 181-Hwy. 158 (F) Rehabilitation 7.90 2013State State31,600 - TOTAL
31,600 - Bond
�
BB1006 Mississippi 055 No. of Hwy. 18-Missouri St. Line (S) Rehabilitation 4.22 2015State State17,390 - TOTAL
17,390 - Bond
�
BB0611 Pulaski 440 I-30-Ark. River Bridge (F) Rehabilitation 3.00 2016State State CARTS25,042
22,538 - IM
2,504 - State Match
- TOTAL �
BB0613 Pulaski 530 I-30-Bingham Rd. (F) Rehabilitation 8.50 2014State State CARTS37,961 - TOTAL
37,961 - Bond
�
BB0614 Pulaski & Saline
530 Bingham Rd.-Grant Co. Line (S) Rehabilitation 7.50 2013State State CARTS9,111 - TOTAL
9,111 - Bond
�
BB0201 Jefferson 530 Jefferson-Hwy. 104 (S) Rehabilitation 6.10 2016State State PBATS6,284
5,656 - IM
628 - State Match
- TOTAL �
Page 3 of 125
An (F) or (S) following the termini indicates federal or state oversight.
INTERSTATE REHABILITATION PROJECTS
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
BB0405 Sebastian 540 Hwy. 271-Hwy. 71 (S) Rehabilitation 2.15 2015State State FRONTIER3,898
3,190 - IM
709 - State Match
- TOTAL �
BB0407 Seb & Craw 540 Hwy. 22-I-40 (F) Rehabilitation 8.05 2013State State FRONTIER67,300 - TOTAL
67,300 - Bond
�
BB0409 Craw & Wash 540 I-540 Pavement Rehabilitation (Sel. Secs.) (S) Rehabilitation 2015State State FRONTIER / NARTS
25,756 - TOTAL
25,756 - Bond
�
BB0410 Washington 540 Hwy. 62 Intchng. Impvts. (F) Interchange 2015State State NARTS25,375 - TOTAL
25,375 - Bond
�
BB0411 Washington 540 Hwy. 16/112 Spur Intchng. Impvts. (S) Interchange 2015State State NARTS19,285 - TOTAL
19,285 - Bond
�
BB0414 Washington 540 Porter Rd.-Hwy. 112/71B Widening & Intchng. Impvts. (F) Major Widening & Interchange
2.50 2015State State NARTS54,977
33,119
7,400
- STP
- IM
9,102 - State Match
5,356 - Local
- TOTAL
Bond funds are for interchange modifications only - Bond funds cannot be used for widening the main lanes. City of Fayetteville transferred partnering commitment from Job 040489, Hwy. 112 Spur-North (Hwy. 112) to this project.
�
BB0412 Washington 540 Greathouse Springs Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS1,500
1,350 - IM
150 - State Match
- TOTAL �
BB0413 Washington 540 Elm Springs Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS4,000
3,600 - IM
400 - State Match
- TOTAL �
BB0901 Benton 540 Wagon Wheel Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS1,523
1,371 - IM
152 - State Match
- TOTAL �
Page 4 of 125
An (F) or (S) following the termini indicates federal or state oversight.
INTERSTATE REHABILITATION PROJECTS
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
BB0902 Benton 540 Hwy. 264 Intchng. Impvts. (S) Interchange 2013State State NARTS4,000 - TOTAL
4,000 - Bond
�
BB0903 Benton 540 Hwy. 71B Intchng. Impvts. (F) Interchange 2015State State NARTS19,868
17,881 - IM
1,987 - State Match
- TOTAL �
235.75 825,045TOTAL
Page 5 of 125
An (F) or (S) following the termini indicates federal or state oversight.
INTERSTATE REHABILITATION PROJECTS
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
020538 Arkansas 001 La Grue Bayou Str. & Apprs. (S) Strs. & Apprs. 2015State State2,700
2,160 - BR
540 - State Match
- TOTAL �
110217 Lee & Phillips 001 Walnut Corner-Cypress Corner (S) Major Widening 7.03 2015State State35,500
28,400 - NHS
7,100 - State Match
- TOTAL �
110502 Lee 001 Cypress Corner-North (S) Major Widening 5.40 2013State State18,040
14,080
220
- NHS
- Earmarks
3,740 - State Match
- TOTAL �
061134 Saline 005 Hurricane Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS1,220
976 - BR
244 - State Match
- TOTAL �
061335 Saline 005 Springhill Rd.-Hwy. 183 (Bryant) (S) Major Widening 1.10 2015State State CARTS12,000
9,600 - STP
2,400 - State Match
- TOTAL �
090281 Baxter 005 North Fork River Str. & Apprs. (Norfork) (S) Strs. & Apprs. 2013State State5,200
4,160 - BR
1,040 - State Match
- TOTAL �
061309 Hot Spr & Garland
007 So. of Hot Spring/Garland Co. Ln.-Hwy. 290 (S) Widening 2016State State HSA-MPO10,000
9,000 - HSIP
1,000 - State Match
- TOTAL �
060432 Garland 007 Hwy. 290-Ouachita River Bridge (S) Major Widening 1.70 2015State State HSA-MPO6,000
4,800 - STP
1,200 - State Match
- TOTAL �
061329 Garland 007 Hot Springs-Hwy. 5 (Ph. I) (S) Improvements 6.20 2016State State HSA-MPO10,000
8,000 - STP
2,000 - State Match
- TOTAL �
Page 6 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
080439 Perry 007 Bear Creek & So. Fourche La Fave River Strs. & Apprs. (S) Strs. & Apprs. 2016State State5,150
4,120 - BR
1,030 - State Match
- TOTAL �
080441 Yell 007 Keeland Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,000
800 - BR
200 - State Match
- TOTAL �
080385 Yell 007 Little Rock & Western RR Str. & Apprs. (S) Strs. & Apprs. 2013State State1,550
1,240 - BR
310 - State Match
- TOTAL �
080377 Yell 007 Centerville-Dardanelle (Passing Lane) (S) Passing Lane 1.20 2013State State2,000
1,600 - STP
400 - State Match
- TOTAL �
080164 Pope 007 Hwy. 7 Improvements (Dover) (S) New Location 1.30 2014State State7,100
5,680 - STP
1,420 - State Match
- TOTAL �
080422 Pope 007 Dover-North (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000
4,000 - STP
1,000 - State Match
- TOTAL �
080392 Pope 007 Newton Co. Line-South (Passing Lane) (S) Passing Lanes 1.30 2013State State2,200
1,760 - STP
440 - State Match
- TOTAL �
080464 Pope 007 Newton Co. Line-South (Passing Lane) (Ph. II) (S) Passing Lane 1.20 2013State State2,200
1,760 - STP
440 - State Match
- TOTAL �
090169 Newton 007 Jasper-Co. Rd. 46 (Passing Lanes) (S) Passing Lanes 1.00 2014State State3,000
2,400 - STP
600 - State Match
- TOTAL �
Page 7 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
009784 Newton 007 Buffalo River Br. & Apprs. (Pruitt) (S) Strs. & Apprs. 2014State State2,600
2,080 - BR
520 - State Match
- TOTAL �
070363 Clark 008 Hwy. 53-Hwy. 51 (Rehab.) (S) Rehabilitation 13.10 2013State State13,755
11,004 - STP
2,751 - State Match
- TOTAL �
050271 Fulton 009 Creek at L.M. 3.10 Str. & Apprs. (S) Strs. & Apprs. 2015State State750
600 - BR
150 - State Match
- TOTAL �
061331 Pulaski 010 Taylor Loop Rd.-Pleasant Valley Dr. (Ph. 1) (S) Major Widening 3.20 2016State State CARTS15,000
12,000 - STP
3,000 - State Match
- TOTAL �
061194 Pulaski 010 Mississippi Ave.-Perryville Rd. (Hwy. 10) (L.R.) (S) Major Widening 0.65 2013State State CARTS3,000
2,700 - HSIP
300 - Local
- TOTAL
Partnering Project – City responsible for the 10% match of Safety funds.
�
020539 Arkansas 011 Bayou Meto Str. & Apprs. (S) Strs. & Apprs. 2016State State3,500
2,800 - BR
700 - State Match
- TOTAL �
090251 Benton 012 Hwy. 71B-Shell Rd. (Hwy. 12) (Bentonville) (S) Major Widening 2.70 2013State State NARTS12,200
10,400 - Local
- TOTAL
1,800 - 100% State
Partnering Project – City to provide up to $10.4 million.
�
090342 Marion 014 Mill Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,400
1,120 - BR
280 - State Match
- TOTAL �
050272 Jackson 014 Cache River-Amagon Strs. & Apprs. (S) Strs. & Apprs. 2016State State8,250
6,600 - BR
1,650 - State Match
- TOTAL �
Page 8 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
090282 Benton 016 Illinois River Str. & Apprs. (S) Strs. & Apprs. 2016State State NARTS5,000
4,000 - BR
1,000 - State Match
- TOTAL �
040569 Washington 016 West Fork White River Str. & Apprs. (Fayetteville) (S) Str. & Apprs. 2013State State NARTS6,900
5,520 - BR
1,380 - State Match
- TOTAL �
040641 Washington 016 Middle Fork White River Str. & Apprs. (Fayetteville) (S) Str. & Apprs. 2016State State NARTS4,600
3,680 - BR
920 - State Match
- TOTAL �
050262 Cleb & White 016 Hwy. 25-Pangburn (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000
4,000 - STP
1,000 - State Match
- TOTAL �
100567 Craighead 018 North of Black Oak-Monette Bypass (S) Major Widening 1.40 2013State State6,000
4,800 - STP
1,200 - State Match
- TOTAL �
100651 Craighead 018 Monette Bypass (Gr. & Strs.) (S) New Location 3.60 2014State State19,500
15,600 - STP
3,900 - State Match
- TOTAL �
100653 Craig & Miss 018 Monette Bypass-Manila (S) Major Widening 6.90 2013State State26,500
21,200 - STP
5,300 - State Match
- TOTAL �
100654 Mississippi 018 Hwy. 18 Improvements (Manila) (S) Major Widening 4.30 2014State State21,000
16,800 - STP
4,200 - State Match
- TOTAL �
090343 Madison 023 Hwy. 74-Huntsville Strs. & Apprs. (S) Strs. & Apprs. 2015State State5,000
4,000 - BR
1,000 - State Match
- TOTAL �
Page 9 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
080397 Faulkner 025 Hwy. 25 Relocation (I-40-North) (S) New Location 1.22 2014State State CARTS6,000
3,000 - STP
2,121 - Local
- STP > 200,000
- TOTAL
879
Partnering Project – City and County to provide 50% of project costs. Also shown in the CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA Section.
�
050261 Cleb & Indep 025 Hwy. 25 Spur-Locust Grove (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000
4,000 - STP
1,000 - State Match
- TOTAL �
080379 Montgomery 027 Ouachita River Str. & Apprs. (S) Strs. & Apprs. 2014State State3,000
2,400 - BR
600 - State Match
- TOTAL �
080428 Yell 027 Danville-Dardanelle (Passing Lanes) (S) Passing Lanes 2.40 2014State State5,000
4,000 - STP
1,000 - State Match
- TOTAL �
110541 Woodruff 038 Bayou DeView Str. & Apprs. (S) Strs. & Apprs. 2013State State2,400
1,920 - BR
480 - State Match
- TOTAL �
080411 Faulkner 040 Palarm Creek-West (Widening) (F) Major Widening 4.78 2013State State CARTS25,800
20,640 - STP
5,160 - State Match
- TOTAL �
012145 Faulk & Pulaski 040 Palarm Creek-Hwy. 365 (Widening) (F) Major Widening 4.31 2013State State CARTS18,200
4,560 - STP
3,640 - State Match
10,000 - CMAQ FLEX
- TOTAL
Funding Breakdown: District 6 - $17.0 M / District 8 - $1.2 M
�
Page 10 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
080395 Faulkner 040 Conway South Interchange-Hwy. 365 (Grading & Strs.) (F) New Location 0.84 2013Local State CARTS16,957
8,046
779
- NHS
- Earmarks
43 - State Match
6,918 - Local
- STP > 200,000
- TOTAL
1,171
Partnering Project – City to provide 50% of project costs. Also shown in the CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA Section.
�
080396 Faulkner 040 Conway South Interchange-Hwy. 365 (Base & Surf.) (S) New Location 0.84 2014Local State CARTS4,374
2,187 - NHS
2,187 - Local
- TOTAL
Partnering Project – City to provide 50% of project costs. Also shown in the CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA Section.
�
061317 Pulaski 040 Hwy. 365-I-430 (Widening) (Phase I) (F) Major Widening 5.63 2014State State CARTS23,000
8,400 - NHS
4,600 - State Match
10,000 - CMAQ FLEX
- TOTAL
This project will include modifications to the I-40/I-430 Interchange.
�
060897 Lonoke 040 I-40/Hwy. 89 Intchg. (Lonoke) (S) Interchange 2013State/Local State CARTS7,062
1,600
3,822
- NHS
- Earmarks
400 - State Match
1,012 - Local
- STP > 200,000
- TOTAL
228
�
030415 Little River 041 Little River Str. & Apprs. (S) Strs. & Apprs. 2016State State10,600
8,480 - BR
2,120 - State Match
- TOTAL �
110567 Crittenden 042 Deer Bayou Str. & Apprs. (S) Strs. & Apprs. 2016State State WMATS1,100
880 - BR
220 - State Match
- TOTAL
Page 11 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
110575 Phillips 044 Bee Bayou Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100
880 - BR
220 - State Match
- TOTAL
070364 Clark 051 Hwy. 26-Hwy. 8 (Rehab.) (S) Rehabilitation 4.80 2014State State4,000
3,200 - STP
800 - State Match
- TOTAL �
070240 Clark 051 Ouachita River Str. & Apprs. (Arkadelphia) (S) Strs. & Apprs. 2014State State7,800
6,240 - BR
1,560 - State Match
- TOTAL �
020419 Lincoln 054 Wells Bayou Str. & Apprs. (S) Strs. & Apprs. 2016State State1,300
1,040 - BR
260 - State Match
- TOTAL
040623 Crawford 059 Natural Dam-North Strs. & Apprs. (S) Strs. & Apprs. 2016State State4,750
3,800 - BR
950 - State Match
- TOTAL �
040521 Washington 062 Hwy. 62 Bypass (Bs. & Surf.) (Prairie Grove) (S) New Location 4.83 2013State State NARTS12,000
9,600 - STP
2,400 - State Match
- TOTAL �
090065 Benton 062 Avoca-North Garfield (S) Major Widening 6.43 2013State State NARTS29,300
23,440 - NHS
5,860 - State Match
- TOTAL �
090330 Carroll 062 East of Berryville-Hwy. 103 South (S) Major Widening 4.30 2015State State15,000
12,000 - STP
3,000 - State Match
- TOTAL �
090219 Carroll 062 Green Forest-Alpena (Phase I) (S) Major Widening 2.00 2015State State17,400
13,920 - STP
3,480 - State Match
- TOTAL �
Page 12 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
050230 Fulton 063 Hwy. 9-So. of Hwy. 342 (Mammoth Spring) (S) Major Widening 2014State State16,500
4,000
9,200
- NHS
- BR
3,300 - State Match
- TOTAL �
050274 Fulton 063 Gut Creek Str. & Apprs. (S) Strs. & Apprs. 2016State State2,000
1,600 - BR
400 - State Match
- TOTAL �
050266 Sharp 063 Hardy-East (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000
4,000 - NHS
1,000 - State Match
- TOTAL �
050275 Sharp 063 Hardy-Ozark Acres Strs. & Apprs. (S) Strs. & Apprs. 2016State State4,750
3,800 - BR
950 - State Match
- TOTAL �
100686 Lawrence 063 Black Rock-Portia (S) Major Widening 1.55 2013State State10,200
8,160 - NHS
2,040 - State Match
- TOTAL �
100672 Craighead 063 Hwy. 63 Interchange Impvts. (Jonesboro) (S) Safety & Traf Eng 2013Local State JATS595
466 - Earmarks
129 - Local
- TOTAL �
080443 Pope 064 White Oak Creek Str. & Apprs. (S) Strs. & Apprs. 2016State State1,700
1,360 - BR
340 - State Match
- TOTAL �
012155 Faulk & White 064 Vilonia Bypass-East (F) Major Widening 7.14 2015State State CARTS25,000
20,000 - NHS
5,000 - State Match
- TOTAL �
050263 White 064 Beebe-West (S) Major Widening 3.33 2016State State10,000
8,000 - NHS
2,000 - State Match
- TOTAL �
Page 13 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
050264 White 064 Hwy. 367-Woodruff Co. Line (Rehab.) (S) Rehabilitation 9.30 2016State State20,000
16,000 - STP
4,000 - State Match
- TOTAL �
080390 Van Buren 065 Hwy. 16 East-Hwy. 65B South (Clinton) (S) Major Widening 1.41 2013State State11,000
8,800 - NHS
2,200 - State Match
- TOTAL �
080423 Van Buren 065 Bee Branch-North (S) Major Widening 8.07 2016State State20,000
16,000 - NHS
4,000 - State Match
- TOTAL �
080391 Van Buren 065 N. of Bee Branch-Co. Rd. 28 (S) Major Widening 3.60 2013State State12,900
10,320 - NHS
2,580 - State Match
- TOTAL �
050231 Stone 066 Mt. View-West (Passing Lane) (S) Passing Lane 1.20 2013State State3,000
2,400 - STP
600 - State Match
- TOTAL �
070344 Clark 067 Gurdon-Oak Grove Strs. & Apprs. (S) Strs. & Apprs. 2015State State5,300
4,240 - BR
1,060 - State Match
- TOTAL �
070376 Clark 067 De Roche Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State2,400
1,920 - BR
480 - State Match
- TOTAL �
061084 Hot Spring 067 UPRR & Pine St. Str. & Apprs. (Donaldson) (S) Strs. & Apprs. 2015State State HSA-MPO3,800
3,040 - BR
760 - State Match
- TOTAL �
061334 Pul & Lonoke 067 Jacksonville-Cabot (Ph. I) (F) Capacity Impvts. 11.80 2016State State CARTS15,000
3,000 - State Match
12,000 - CMAQ FLEX
- TOTAL �
Page 14 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
061276 Pulaski 067 Redmond Rd. & Main St. Strs. & Apprs. (Jacksonville) (F) Strs. & Apprs. 2013State State CARTS17,300
13,840 - BR
3,460 - State Match
- TOTAL �
050260 White 067 Hwy. 157-Hwy. 167 (Ph. II) (S) Rehabilitation 4.56 2013State State12,000
9,600 - NHS
2,400 - State Match
- TOTAL �
100404 Lawrence 067 Hwy. 230-Hwy. 63 (Bs. & Surf.) (S) New Location 9.78 2013State State36,000
28,800 - NHS
7,200 - State Match
- TOTAL �
100759 Randolph 067 Black River Str. & Apprs. (Pocahontas) (S) Strs. & Apprs. 2016State State8,500
6,800 - BR
1,700 - State Match
- TOTAL �
020462 Drew 069 Monticello Bypass (F) New Location 2015State State68,970
55,176 - Earmarks
13,794 - State Match
- TOTAL �
061330 Gar & Saline 070 Hot Springs-I-30 (Ph. I) (S) Major Widening 17.60 2015State State HSA-MPO/CARTS
20,000
16,000 - NHS
4,000 - State Match
- TOTAL �
061277 Pulaski 070 Union Pacific RR Str. & Apprs. (Roosevelt Rd.) (LR) (S) Strs. & Apprs. 2014State State CARTS7,400
5,920 - BR
1,480 - State Match
- TOTAL �
061275 Pulaski 070 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) (F) Strs. & Apprs. 2013State State CARTS58,000
46,400 - BR
11,600 - State Match
- TOTAL �
110544 Monroe 070 Hwy. 17-St. Francis Co. Line Strs. & Apprs. (S) Strs. & Apprs. 2014State State4,900
3,920 - BR
980 - State Match
- TOTAL �
Page 15 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
030313 Miller 071 LA Line-Doddridge (Bs. & Surf.) (S) New Location 4.46 2013State State15,900
10,000
2,700
- NHS
- Earmarks
3,200 - State Match
- TOTAL �
030388 Miller 071 Broad St. Str. & Apprs. (Texarkana) (S) Strs. & Apprs. 2014State State TUTS7,750
6,200 - BR
1,550 - State Match
- TOTAL �
040376 Sebastian 071 Hwy. 71-Hwy. 22 (Base & Surf.) (S) New Location 6.04 2013State State FRONTIER23,000
12,101
6,299
- NHS
- Earmarks
4,600 - State Match
- TOTAL �
030X01 Sevier 071 DeQueen-East Strs. & Apprs. (S) Strs. & Apprs. 2016State State6,500
5,200 - BR
1,300 - State Match
- TOTAL �
090338 Benton 71B Dixieland Rd.-8th St. (Rogers) (S) Major Widening 1.00 2016Local State NARTS6,200
3,000 - STP
3,200 - Local
- TOTAL
Partnering Project – City to provide 50% of total project costs up to $5 million + additional $200,000 for 6' sidewalks. Amount shown - $6 M - is for construction only.
�
040024 Washington 074 White River Str. & Apprs. (Elkins) (S) Strs. & Apprs. 2015State State NARTS3,700
2,960 - BR
740 - State Match
- TOTAL
009831 Searcy VAR Gourd & Granney Creek Strs. & Apprs. (S) Strs. & Apprs. 2015State State750
600 - BR
150 - State Match
- TOTAL
Hwys. 74 and 377
100760 Mississippi VAR Left Hand Chute of Little River Strs. & Apprs. (S) Strs. & Apprs. 2015State State4,425
3,540 - BR
885 - State Match
- TOTAL
Hwys. 77 & 140
�
Page 16 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
070366 Col & Ouachita 079 Magnolia-Camden (Passing Lanes) (S) Passing Lanes 4.80 2015State State11,000
8,800 - STP
2,200 - State Match
- TOTAL �
110540 Monroe 079 White River Strs. Demo. & Removal (Clarendon) (S) Strs. & Apprs. 2015State State8,000
6,400 - BR
1,600 - State Match
- TOTAL �
030343 Lafayette 082 Hwy. 82 Improvements (Stamps) (S) Major Widening 1.94 2016State State6,000
4,800 - NHS
1,200 - State Match
- TOTAL �
070365 Columbia 082 Hwy. 79 No.-Hwy. 98 (Magnolia) (Ph. I) (S) Major Widening 13.00 2015State State20,000
16,000 - NHS
4,000 - State Match
- TOTAL �
070367 Union VAR Hwy. 82/82B/167B Improvements (El Dorado) (S) Major Widening 9.43 2016State State47,000
37,600 - STP
9,400 - State Match
- TOTAL
Hwys. 82, 82B and 167B
�
070377 Union 82B UPRR Str. & Apprs. (El Dorado) (S) Strs. & Apprs. 2016State State8,000
6,400 - BR
1,600 - State Match
- TOTAL
Coordinate with Job 070367
�
020534 Ashley 082 Co. Rd. 411-Hwy. 425 (East of Crossett) (S) Major Widening 6.10 2016State State23,000
18,400 - NHS
4,600 - State Match
- TOTAL �
020509 Ashley 082 Hwy. 165 Str. & Apprs. (Montrose) (S) Strs. & Apprs. 2014State State4,000
3,200 - BR
800 - State Match
- TOTAL �
Page 17 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
061214 Garland 088 Printers Place-Crawford St. (Higdon Ferry Rd.) (Hot Springs) (S) Major Widening 0.20 2013State State HSA-MPO3,800
1,216
1,824
- STP
- Earmarks
304 - State Match
456 - Local
- TOTAL
Partnering Project – City responsible for right of way acquisition and utility adjustments.
�
080457 Faulkner 089 UPRR Overpass & Realign. (Mayflower) (S) Strs. & Apprs. 2016State State CARTS15,000
8,000 - STP
2,500 - State Match
4,500 - RRP
- TOTAL
080387 Conway 095 Overcup Creek-North & South Grade Impvts. (S) Rehabilitation 1.20 2013State State3,400
2,720 - STP
680 - State Match
- TOTAL �
080386 Conway 095 East Fork Point Remove Creek-North & South Grade Impvts. (S) Rehabilitation 0.80 2013State State2,200
1,760 - STP
440 - State Match
- TOTAL �
080340 Johnson 103 Market St.-I-40 WB Ramps (Clarksville) (S) Major Widening 0.40 2013State State4,800
3,840 - STP
960 - State Match
- TOTAL �
080444 Johnson 123 Haw Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100
880 - BR
220 - State Match
- TOTAL
080389 Pope 124 Hob Nob Rd.-Crow Mtn. Rd. (Russellville) (S) Major Widening 1.00 2013Local State6,000
3,000 - STP
3,000 - Local
- TOTAL
Partnering Project – City to provide up to $3 million. Hwys. 124 and 326.
�
080427 Pope 124 Crow Mtn. Rd.-Center Valley Rd. (S) Major Widening 2.15 2014State State7,000
5,600 - STP
1,400 - State Match
- TOTAL �
Page 18 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
080445 Van Buren 124 Cadron Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,900
1,520 - BR
380 - State Match
- TOTAL
110570 Lee 131 Ditch at L.M. 1.85 Str. & Apprs. (S) Strs. & Apprs. 2015State State2,125
1,700 - BR
425 - State Match
- TOTAL
020043 Chicot 144 Hwy. 144 Strs. & Apprs. (S) Strs. & Apprs. 2015State State2,100
1,680 - BR
420 - State Match
- TOTAL
110557 Crittenden 147 Hwy. 131-North (S) Rehabilitation 5.50 2015State State2,000
1,600 - STP
400 - State Match
- TOTAL
110571 Crittenden 149 Ditch at L.M. 2.30 Str. & Apprs. (S) Strs. & Apprs. 2016State State1,500
1,200 - BR
300 - State Match
- TOTAL
040456 Crawford 162 Hwy. 162 Improvements (Alma) (S) New Location 0.70 2014State State FRONTIER6,000
4,800 - STP
200 - State Match
1,000 - Local
- TOTAL
Partnering Project – City responsible for right of way acquisition, utility adjustments, $1 million toward cost of construction, and accepting responsibility for various highways upon completion of project.
�
020535 Chicot 165 Hwy. 208-Hwy. 65 (Rehab.) (Sel. Secs.) (S) Rehabilitation 4.36 2014State State3,000
2,400 - STP
600 - State Match
- TOTAL �
070280 Union 167 El Dorado-Hwy. 335 (S) Major Widening 5.04 2013State State18,500
13,437
1,363
- STP
- Earmarks
3,700 - State Match
- TOTAL �
Page 19 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
070281 Union 167 Hwy. 335-Ouachita River (S) Major Widening 2.97 2013State State10,600
8,480 - STP
2,120 - State Match
- TOTAL �
070282 Union & Calh 167 Ouachita River Str. & Apprs. (S) Major Widening 1.76 2014State State25,700
20,560 - NHS
5,140 - State Match
- TOTAL �
070283 Calhoun 167 Bangs Slough-Hwy. 172 (S) Major Widening 4.40 2016State State29,183
23,346 - NHS
5,837 - State Match
- TOTAL �
070284 Calhoun 167 Hwy. 172-Hampton (S) Major Widening 5.90 2016State State22,295
17,836 - NHS
4,459 - State Match
- TOTAL �
070289 Dallas & Cleve 167 Hwy. 273-Peters Rd. (CR 24) (F) Major Widening 5.30 2013State State26,600
21,280 - NHS
5,320 - State Match
- TOTAL �
050213 Independence 167 Hwy. 394-CR 80 (Antioch Road) (S) Major Widening 5.11 2014State State18,750
15,000 - NHS
3,750 - State Match
- TOTAL �
050214 Independence 167 CR 80 (Antioch Road)-South City Limits Cave City (F) Major Widening 4.57 2015State State17,500
14,000 - NHS
3,500 - State Match
- TOTAL �
040570 Washington 170 Branch of Illinois River Str. & Apprs. (S) Strs. & Apprs. 2015State State NARTS725
580 - BR
145 - State Match
- TOTAL
061349 Saline 183 Bauxite & Northern RR Spur Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS1,640
1,312 - BR
328 - State Match
- TOTAL �
Page 20 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
090319 Baxter 201 Hwy. 62-Hwy. 5 (Mountain Home) (S) Major Widening 1.51 2014State State8,000
6,000 - STP
2,000 - Local
- TOTAL
Partnering Project – City responsible for 20% of project costs (up to $2 million maximum) and accepting responsibility for various highways upon completion of project.
�
009814 Baxter 201 E. Pigeon Creek Strs. & Apprs. (S) Strs. & Apprs. 2016State State2,000
1,600 - BR
400 - State Match
- TOTAL
020542 Linc & Desha 212 Hwy. 212 Strs. & Apprs. (S) Strs. & Apprs. 2015State State2,500
2,000 - BR
500 - State Match
- TOTAL
100764 Poinsett 214 Bayou DeView Str. & Apprs. (S) Strs. & Apprs. 2015State State1,250
1,000 - BR
250 - State Match
- TOTAL
080446 Perry 216 Coffee Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,000
800 - BR
200 - State Match
- TOTAL
090346 Carroll 221 Town Branch Str. & Apprs. (S) Strs. & Apprs. 2016State State1,000
800 - BR
200 - State Match
- TOTAL
100643 Craighead 226 Cash Bypass (Gr. & Strs.) (S) Major Widening 2.92 2013State State10,500
8,400 - Earmarks
2,100 - State Match
- TOTAL �
100676 Craighead 226 Cash Bypass (Bs. & Surf.) (S) Major Widening 2.92 2014State State9,000
7,200 - Earmarks
1,800 - State Match
- TOTAL �
100X01 Craighead 226 Cash Bypass - Hwy. 49 (S) Major Widening 6.88 2014State State JATS55,000
44,000 - STP
11,000 - State Match
- TOTAL �
Page 21 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
110572 Phillips 242 Fletcher Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100
880 - BR
220 - State Match
- TOTAL
110573 St. Francis 261 L'Anguille River Str. & Apprs. (S) Strs. & Apprs. 2015State State1,125
900 - BR
225 - State Match
- TOTAL
090284 Benton 264 Hwy. 71B-Hwy. 265 (Springdale) (S) Major Widening 1.40 2013State State NARTS8,100
6,480 - STP
1,620 - State Match
- TOTAL �
090240 Benton 264 Hwy. 264 Impvts.(Lowell) (S) Capacity Impvts. 2016Local State/Local NARTS2,850
1,000 - STP
850 - Local
- STP < 200,000
- TOTAL
1,000
Partnering Project - City to provide $600,000 in local funds plus matching funds for STP<200,000 funds.
�
012153 Benton & Wash 265 Eastern North-South Corridor (Phase I) (S) Connectivity & Capacity Impvts.
1.00 2013State State NARTS5,000
4,000 - STP
1,000 - State Match
- TOTAL �
012153B Benton & Wash 265 Eastern North-South Corridor (Phase II) (S) Connectivity & Capacity Impvts.
3.80 2015State State NARTS20,000
16,000 - STP
4,000 - State Match
- TOTAL �
110147 Cross 284 Branch of Caney Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100
880 - BR
220 - State Match
- TOTAL �
080426 Faulkner 285 Bono-Hwy. 124 (Rehab.) (S) Rehabilitation 5.40 2014State State CARTS4,000
3,200 - STP
800 - State Match
- TOTAL
Page 22 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
020543 Grant 291 Moore's Slough Tributary Str. & Apprs. (S) Strs. & Apprs. 2015State State1,200
960 - BR
240 - State Match
- TOTAL
070368 Union 335 Hwy. 82-Hwy. 7 (Rehab.) (S) Rehabilitation 7.60 2016State State8,000
6,400 - STP
1,600 - State Match
- TOTAL
061348 Pulaski 365 UPRR/Parkway Dr. Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS6,000
4,800 - BR
1,200 - State Match
- TOTAL �
060395 Pulaski 367 Union Pacific RR Overpass (Arch St.) (LR) (S) Strs. & Apprs. 2014State State CARTS6,400
5,120 - BR
1,280 - State Match
- TOTAL �
005836 Jackson 367 White River Str. & Apprs. (Newport) (S) Strs. & Apprs. 2014State State22,600
18,080 - BR
4,520 - State Match
- TOTAL �
100708 Greene 412 Hwy. 412 West-Hwy. 49 (Gr. & Strs.) (S) New Location 5.23 2015State State10,600
8,480 - NHS
2,120 - State Match
- TOTAL �
100709 Greene 412 Hwy. 412 West-Hwy. 49 (Bs. & Surf.) (S) New Location 5.23 2016State State9,100
7,280 - NHS
1,820 - State Match
- TOTAL �
100711 Greene 412 Hwy. 49-Hwy. 412 East (Bs. & Surf.) (S) New Location 5.20 2014State State8,600
3,980
3,400
- NHS
- Earmarks
1,220 - State Match
- TOTAL �
061332 Pulaski 430 I-30/I-430 Interchange Impvt. (L.R.) (F) Interchange 2014State State CARTS12,000
2,400 - State Match
9,600 - CMAQ FLEX
- TOTAL �
Page 23 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
061333 Pulaski 430 I-430/Hwy. 10 Interchange Impvt. (L.R.) (F) Interchange 2014State State CARTS11,000
8,800 - NHS
2,200 - State Match
- TOTAL �
061--- Pulaski 440 Hwy. 67-I-40 West (North Belt Freeway Toll Feasibility Study) Planning 2013State State CARTS500
100 - State Match
- STP > 200,000
150 - CMAQ FLEX
- TOTAL
250
Partnering Project – Metroplan to provide 50% of project costs. Also shown in the LOCAL PROJECTS IN AREAS > 200,000 POPULATION Section.
�
040605 Washington 540 Hwy. 16-Porter Rd. (Widening) (S) Major Widening 1.35 2013State State NARTS9,400
7,520 - NHS
1,880 - State Match
- TOTAL �
090331 Benton 540 Wagon Wheel Rd.-Hwy. 264 (Widening) (S) Major Widening 2.56 2014State State NARTS15,700
12,560 - NHS
3,140 - State Match
- TOTAL �
090305 Benton 540 New Hope Rd.-Hwy. 62/102 Widening (Rogers) (F) Major Widening 2.66 2014State State NARTS16,000
12,800 - NHS
3,200 - State Match
- TOTAL �
090218 Benton 540 I-540/Hwy. 62/102 Intchng. & 8th Street Impvts. (Bentonville) (F) Interchange 2013Local Local NARTS53,000
4,000
28,812
- NHS
- Earmarks
20,188 - Local
- TOTAL
Partnering Project – AHTD to provide $5,597,323 (this includes $1,597,323 HPP plus State Match and $4 million in NHS funds that will require Local Match.)
�
050249 White NEW Hwy. 36-Hwy. 16 (Gr. & Strs.) (S) New Location 3.87 2016State State11,537
4,430 - STP
1,107 - State Match
6,000 - Local
- TOTAL
Partnering project – City and County to provide $6,000,000 of project costs.
Page 24 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:09:50 AM
APHN
050250 White NEW Hwy. 36-Hwy. 16 (Bs. & Surf.) (S) New Location 3.80 2016State State6,688
5,350 - STP
1,338 - State Match
- TOTAL
Partnering project – City and County to provide $6,000,000 of project costs.
050251 White NEW Hwy. 16-Hwy. 67 (S) New Location 4.04 2014State State12,787
10,230 - STP
2,557 - State Match
- TOTAL
Partnering project – City and County to provide $6,000,000 of project costs.
360.10 1,696,453TOTAL
Page 25 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
Local Projects in Areas > 200,000 Population Sorted by MPO Area and Job Number
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:10:12 AM
APHN
060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2014Local Local CARTS734
587 - Earmarks
147 - Local
- TOTAL
For Preliminary Engineering
060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2015Local Local CARTS2,500
500 - Local
- STP > 200,000
- TOTAL
2,000
For Right-of-Way and Utility Relocation
060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2016Local Local CARTS7,500
1,500 - Local
- STP > 200,000
- TOTAL
6,000
For Construction
061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2015Local Local CARTS11,000
2,200 - Local
- STP > 200,000
- TOTAL
8,800
For Construction
061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2014Local Local CARTS2,788
558 - Local
- STP > 200,000
- TOTAL
2,230
For Utility Relocation
061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2013Local Local CARTS1,065
213 - Local
- STP > 200,000
- TOTAL
852
For Right-of-Way and Preliminary Engineering of Utility Relocation.
061294 Pulaski CS McCain Rail Grade Separation (NLR) (S) Grade Seperation 2013Local Local CARTS11,185
2,893 - Earmarks
2,237 - Local
- STP > 200,000
- TOTAL
6,055
061295 Pulaski CS Maryland Ave. Impvts. & Extension (Sherwood) Widening 2013Local Local CARTS405
81 - Local
- STP > 200,000
- TOTAL
324
Page 26 of 125
An (F) or (S) following the termini indicates federal or state oversight.
CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:10:12 AM
APHN
080397 Faulkner 025 Hwy. 25 Relocation (I-40-North) (S) New Location 1.22 2014Local State CARTS6,000
3,000 - STP
2,121 - Local
- STP > 200,000
- TOTAL
879
Partnering Project – City and County to provide 50% of project costs. Also shown in the STATE PROJECTS SORTED BY ROUTE Section.
�
080395 Faulkner 040 Conway South Interchange-Hwy. 365 (Grading & Strs.) (F) New Location 0.84 2013Local State CARTS16,957
8,046
779
- NHS
- Earmarks
43 - State Match
6,918 - Local
- STP > 200,000
- TOTAL
1,171
Partnering Project – City to provide 50% of project costs. Also shown in the STATE PROJECTS SORTED BY ROUTE Section.
�
080396 Faulkner 040 Conway South Interchange-Hwy. 365 (Base & Surf.) (S) New Location 0.84 2014Local State CARTS4,374
2,187 - NHS
2,187 - Local
- TOTAL
Partnering Project – City to provide 50% of project costs. Also shown in the STATE PROJECTS SORTED BY ROUTE Section.
�
061--- Pulaski 440 Hwy. 67-I-40 West (North Belt Freeway Toll Feasibility Study) Planning 2013State State CARTS500
100 - State Match
- STP > 200,000
150 - CMAQ FLEX
- TOTAL
250
Partnering Project – Metroplan to provide 50% of project costs. Also shown in the STATE PROJECTS SORTED BY ROUTE Section.
�
080430 Faulkner Hwy. 365-Sturgis Rd (Gr. & Strs.) (S) New Location 2013Local Local CARTS6,140
6,140 - Local
- TOTAL
080431 Faulkner Hwy. 365-Sturgis Rd (Bs. & Surf.) (S) New Location 2014Local Local CARTS3,300
3,300 - Local
- TOTAL
060630 Various CARTS Planning Planning 2013Local Local CARTS225
45 - Local
- STP > 200,000
- TOTAL
180
060630 Various CARTS Planning Planning 2014Local Local CARTS250
50 - Local
- STP > 200,000
- TOTAL
200
Page 27 of 125
An (F) or (S) following the termini indicates federal or state oversight.
CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:10:12 AM
APHN
060630 Various CARTS Planning Planning 2015Local Local CARTS250
50 - Local
- STP > 200,000
- TOTAL
200
060630 Various CARTS Planning Planning 2016Local Local CARTS250
50 - Local
- STP > 200,000
- TOTAL
200
012152 Various CARTS Metro 2040 Long-Range Plan Consultants Widening 2013Local Local CARTS350
70 - Local
- STP > 200,000
- TOTAL
280
012--- Various CARTS Regional Strategic Network (Optimization Improvements)
2013Local Local CARTS313
63 - Local
- STP > 200,000
- TOTAL
250
012--- Various CARTS Regional Strategic Network (Optimization Improvements)
2014Local Local CARTS8,125
1,625 - Local
- STP > 200,000
- TOTAL
6,500
012--- Various CARTS Regional Strategic Network (Optimization Improvements)
2015Local Local CARTS375
75 - Local
- STP > 200,000
- TOTAL
300
012--- Various CARTS Regional Strategic Network (Optimization Improvements)
2016Local Local CARTS3,875
775 - Local
- STP > 200,000
- TOTAL
3,100
012--- Various Ozone Action Days 2013Local Local CARTS60
12 - Local
48 - CMAQ FLEX
- TOTAL
Page 28 of 125
An (F) or (S) following the termini indicates federal or state oversight.
CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:10:12 AM
APHN
012--- Various Ozone Action Days 2014Local Local CARTS60
12 - Local
48 - CMAQ FLEX
- TOTAL
012--- Various Ozone Action Days 2015Local Local CARTS60
12 - Local
48 - CMAQ FLEX
- TOTAL
012--- Various Ozone Action Days 2016Local Local CARTS60
12 - Local
48 - CMAQ FLEX
- TOTAL
2.90 88,701TOTAL
Page 29 of 125
An (F) or (S) following the termini indicates federal or state oversight.
CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:10:12 AM
APHN
110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2013Local Local WMATS250
250 - Earmarks
- TOTAL
For Environmental Assessment
110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2014Local Local WMATS450
450 - Earmarks
- TOTAL
For Preliminary Engineering
110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2015Local Local WMATS1,400
1,337 - Earmarks
63 - Local
- TOTAL
For ROW and Utility
110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2016Local Local WMATS7,900
3,169 - Earmarks
3,111 - Local
1,620 - CMAQ - AQ
- TOTAL
For Construction
110583 Crittenden CS Ingram Blvd.-East (Southland Dr.) (West Memphis) (S) Reconstruction 2013Local Local WMATS2,738
547 - Local
- STP > 200,000
- TOTAL
2,191
110XX1 Crittenden CS Ingram Blvd.-West (Southland Dr.) (West Memphis) (S) New Location 2014Local Local WMATS3,084
616 - Local
- STP > 200,000
- TOTAL
2,468
110XX2 Crittenden CS Harahan Bikeway Connector (West Memphis - Mississippi River) New Location 2014Local Local WMATS850
850 - CMAQ - AQ
- TOTAL
XX2014-16 Crittenden CMAQ Non-Attainment Project Improve Air Quality 2014Local Local WMATS955
191 - Local
764 - CMAQ - AQ
- TOTAL
XX2015-16 Crittenden CMAQ Non-Attainment Project Improve Air Quality 2015Local Local WMATS994
199 - Local
795 - CMAQ - AQ
- TOTAL
Page 30 of 125
An (F) or (S) following the termini indicates federal or state oversight.
WEST MEMPHIS-MARION AREA TRANSPORTATION STUDY
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:10:12 AM
APHN
XX2016-16 Crittenden CMAQ Non-Attainment Project Improve Air Quality 2016Local Local WMATS1,031
206 - Local
825 - CMAQ - AQ
- TOTAL
XX2013-22 Crittenden WMATS Planning Planning 2013Local Local WMATS285
57 - Local
- STP > 200,000
138 - CMAQ FLEX
- TOTAL
90
XX2014-22 Crittenden WMATS Planning Planning 2014Local Local WMATS288
58 - Local
- STP > 200,000
138 - CMAQ FLEX
- TOTAL
92
XX2015-22 Crittenden WMATS Planning Planning 2015Local Local WMATS290
58 - Local
- STP > 200,000
138 - CMAQ FLEX
- TOTAL
94
XX2016-22 Crittenden WMATS Planning Planning 2016Local Local WMATS293
58 - Local
- STP > 200,000
138 - CMAQ FLEX
- TOTAL
96
20,808TOTAL
Page 31 of 125
An (F) or (S) following the termini indicates federal or state oversight.
WEST MEMPHIS-MARION AREA TRANSPORTATION STUDY
Local Projects in Areas < 200,000 Population
Sorted by Job Number
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:10:47 AM
APHN
040272 Washington CS Johnson Road Reconst. (Springdale) Widening 3.24 2013Local Local NARTS10,409
7,327 - Earmarks
2,082 - Local
- STP < 200,000
- TOTAL
1,000
040581 Washington 112 Hwy. 180-Leroy Pond Dr. (Hwy. 112) (Fayetteville) (S) Major Widening 0.35 2013Local State NARTS1,250
250 - Local
- STP < 200,000
- TOTAL
1,000
�
040471 Sebastian CS Jenny Lind Rd. & Ingersoll Ave. Widening (Fort Smith) (S) Major Widening 3.00 2013Local Local FRONTIER8,980
7,184 - Earmarks
1,796 - Local
- TOTAL
040493 Franklin CS Hillbilly Lane-Hwy. 23 (Ozark) (S) New Location 0.90 2013Local State1,935
935 - Local
- STP < 200,000
- TOTAL
1,000
040527 Washington 540 I-540/Don Tyson Pkwy. Intchng. (Springdale) (F) Interchange 2013Local Local NARTS26,951
26,951 - Local
- TOTAL �
040535 Washington CS Fulbright Expwy./Hwy. 71B Flyover (Fayetteville) (S) Safety & Traf Eng 2013Local Local NARTS6,452
5,162 - Earmarks
1,290 - Local
- TOTAL
040618 Washington CS Maple St. & Lafayette St. Bridge Rehab. (Fayetteville) (S) Str. & Apprs. 2013Local State NARTS1,000
800 - BR
200 - Local
- TOTAL
040X02 Sebastian CS Western & Eastern Rail Trolley Ext (PE) (Ft. Smith) (S) PE 2013Local Local FRONTIER238
238 - Earmarks
- TOTAL
040X03 Crawford Van Buren Port Facility Miscellaneous 2013Local Local FRONTIER51
41 - Earmarks
10 - Local
- TOTAL
061312 Garland CS Hot Springs & Stokes Creeks Strs. & Apprs. (Hot Springs) (S) Str. & Apprs. 2013Local State HSA-MPO650
520 - BR
130 - Local
- TOTAL
Page 32 of 125
An (F) or (S) following the termini indicates federal or state oversight.
LOCAL PROJECTS AREAS < 200,000 POPULATION
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:10:47 AM
APHN
080157 Pope Intermodal Complex (Russellville) (S) Miscellaneous 2013Local Local2,908
2,326 - Earmarks
582 - Local
- TOTAL
080437 Johnson CS Hwy. 64-East (Massengale Rd.) (Clarksville) (S) Reconstruction 2014Local State973
195 - Local
- STP < 200,000
- TOTAL
778
090069 Benton NEW Northwest Arkansas Regional Airport Access (F) New Location 2013Local Local NARTS35,000
10,668 - Earmarks
24,332 - Local
- TOTAL
090269 Benton CS Cherry St.-Mt. Olive St. (Kenwood St.) (Siloam Springs) (S) Reconstruction 0.50 2014Local State NARTS1,100
220 - Local
- STP < 200,000
- TOTAL
880
XX2013-17 Various Various Signals and Intersection Improvements Safety & Traf Eng 2013State/Local State *All - See Note2,500
500 - State or Local
- STP < 200,000
- TOTAL
2,000
*Includes all MPOs with the exception inside the urbanized areas of WMATS & CARTS
XX2014-17 Various Various Signals and Intersection Improvements Safety & Traf Eng 2014State/Local State *All - See Note2,500
500 - State or Local
- STP < 200,000
- TOTAL
2,000
*Includes all MPOs with the exception inside the urbanized areas of WMATS & CARTS
XX2015-17 Various Various Signals and Intersection Improvements Safety & Traf Eng 2015State/Local State *All - See Note2,500
500 - State or Local
- STP < 200,000
- TOTAL
2,000
*Includes all MPOs with the exception inside the urbanized areas of WMATS & CARTS
XX2016-17 Various Various Signals and Intersection Improvements Safety & Traf Eng 2016State/Local State *All - See Note2,500
500 - State or Local
- STP < 200,000
- TOTAL
2,000
*Includes all MPOs with the exception inside the urbanized areas of WMATS & CARTS
7.99 107,897TOTAL
Page 33 of 125
An (F) or (S) following the termini indicates federal or state oversight.
LOCAL PROJECTS AREAS < 200,000 POPULATION
Statewide Generic Projects
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:09 AM
APHN
XX2013-01 Statewide IRP Debt Service Various 2013State State All MPOs59,437
59,437 - IM
- TOTAL
XX2013-02 Statewide Various Resurf / Restoration / Rehab / Reconstruction 4-R 2013State State All MPOs5,200
1,600
1,600
1,000
- NHS
- STP
- IM
1,000 - State Match
- TOTAL
XX2013-03 Statewide Various Bridge Rehab / Replacement Str. & Apprs. 2013State/Local State/Local All MPOs2,000
1,600 - BR
400 - State or Local
- TOTAL
XX2013-04 Statewide Bridge Guard Rail / Scour Control / Inspection Miscellaneous 2013State/Local State All MPOs1,000
800 - BR
200 - State or Local
- TOTAL
XX2013-06 Statewide RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2013State/RR State/RR All MPOs3,310
331 - State Match
2,979 - RRP
- TOTAL
XX2013-07 Statewide Various Enhancement Type Projects Enhancement 2013State/Local State/Local All MPOs10,000
2,000 - State or Local
- TOTAL
8,000 - ENH
XX2013-08 Statewide Various Safe Routes to School Projects Enhancement 2013N/A State/Local All MPOs1,400 - TOTAL
1,400 - SRTS
XX2013-09 Statewide Scenic Byways Projects Miscellaneous 2013State/Local State/Local All except CARTS &
TUTS
1,000
800 - Earmarks
200 - State or Local
- TOTAL
XX2013-10 Statewide Various Trail Projects Enhancement 2013Local Local All MPOs1,000
200 - Local
800 - Rec Trails
- TOTAL
Page 34 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:09 AM
APHN
XX2013-11 Statewide Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads
4-R / Strs. & Apprs. 2013State State All MPOs7,459
5,967 - STP
1,492 - Local
- TOTAL
XX2013-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2013State State All MPOs4,625
3,700 - BR
925 - Local
- TOTAL
XX2013-13 Statewide Right-of-Way / Utilities / CENG Various 2013State/Local State All MPOs80,364
15,825
22,872
20,000
4,860
2,347
- NHS
- STP
- IM
- BR
- HSIP
402 - RRP
11,664 - State or Local
1,023 - CMAQ FLEX
- TOTAL
1,371 - 402-Safety
XX2013-14 Statewide Bridge Painting Miscellaneous 2013State State All MPOs3,000
2,400 - BR
600 - State Match
- TOTAL
XX2013-18 Statewide Motor Fuel Tracking System Miscellaneous 2013State State All MPOs300
300 - STP
- TOTAL
XX2013-19 Statewide VAR Various Statewide Safety Improvements 2013State State All MPOs31,455
15,500 - HSIP
2,007 - State Match
- TOTAL
13,948 - 402-Safety
211,550TOTAL
Page 35 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:09 AM
APHN
XX2014-01 Statewide IRP Debt Service Various 2014State State All MPOs77,974
77,974 - IM
- TOTAL
XX2014-02 Statewide Various Resurf / Restoration / Rehab / Reconstruction 4-R 2014State State All MPOs5,200
1,600
1,600
1,000
- NHS
- STP
- IM
1,000 - State Match
- TOTAL
XX2014-03 Statewide Various Bridge Rehab / Replacement Str. & Apprs. 2014State/Local State/Local All MPOs2,000
1,600 - BR
400 - State or Local
- TOTAL
XX2014-04 Statewide Bridge Guard Rail / Scour Control / Inspection Miscellaneous 2014State/Local State All MPOs1,000
800 - BR
200 - State or Local
- TOTAL
XX2014-06 Statewide RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2014State/RR State/RR All MPOs3,471
347 - State Match
3,124 - RRP
- TOTAL
XX2014-07 Statewide Various Enhancement Type Projects Enhancement 2014State/Local State/Local All MPOs10,000
2,000 - State or Local
- TOTAL
8,000 - ENH
XX2014-08 Statewide Various Safe Routes to School Projects Enhancement 2014N/A State/Local All MPOs1,400 - TOTAL
1,400 - SRTS
XX2014-09 Statewide Scenic Byways Projects Miscellaneous 2014State/Local State/Local All except CARTS &
TUTS
1,000
800 - Earmarks
200 - State or Local
- TOTAL
XX2014-10 Statewide Various Trail Projects Enhancement 2014Local Local All MPOs1,000
200 - Local
800 - Rec Trails
- TOTAL
Page 36 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2014
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:09 AM
APHN
XX2014-11 Statewide Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads
4-R / Strs. & Apprs. 2014State State All MPOs7,459
5,967 - STP
1,492 - Local
- TOTAL
XX2014-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2014State State All MPOs4,625
3,700 - BR
925 - Local
- TOTAL
XX2014-13 Statewide Right-of-Way / Utilities / CENG Various 2014State/Local State All MPOs78,754
15,825
22,872
18,390
4,860
2,347
- NHS
- STP
- IM
- BR
- HSIP
402 - RRP
11,664 - State or Local
1,023 - CMAQ FLEX
- TOTAL
1,371 - 402-Safety
XX2014-14 Statewide Bridge Painting Miscellaneous 2014State State All MPOs3,000
2,400 - BR
600 - State Match
- TOTAL
XX2014-18 Statewide Motor Fuel Tracking System Miscellaneous 2014State State All MPOs300
300 - STP
- TOTAL
XX2014-19 Statewide VAR Various Statewide Safety Improvements 2014State State All MPOs35,397
18,947 - HSIP
2,105 - State Match
- TOTAL
14,345 - 402-Safety
232,580TOTAL
Page 37 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2014
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:09 AM
APHN
XX2015-01 Statewide IRP Debt Service Various 2015State State All MPOs22,311
22,311 - IM
- TOTAL
XX2015-02 Statewide Various Resurf / Restoration / Rehab / Reconstruction 4-R 2015State State All MPOs5,200
1,600
1,600
1,000
- NHS
- STP
- IM
1,000 - State Match
- TOTAL
XX2015-03 Statewide Various Bridge Rehab / Replacement Str. & Apprs. 2015State/Local State/Local All MPOs2,000
1,600 - BR
400 - State or Local
- TOTAL
XX2015-04 Statewide Bridge Guard Rail / Scour Control / Inspection Miscellaneous 2015State/Local State All MPOs1,000
800 - BR
200 - State or Local
- TOTAL
XX2015-06 Statewide RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2015State/RR State/RR All MPOs3,639
364 - State Match
3,275 - RRP
- TOTAL
XX2015-07 Statewide Various Enhancement Type Projects Enhancement 2015State/Local State/Local All MPOs10,000
2,000 - State or Local
- TOTAL
8,000 - ENH
XX2015-08 Statewide Various Safe Routes to School Projects Enhancement 2015N/A State/Local All MPOs1,400 - TOTAL
1,400 - SRTS
XX2015-09 Statewide Scenic Byways Projects Miscellaneous 2015State/Local State/Local All except CARTS &
TUTS
1,000
800 - Earmarks
200 - State or Local
- TOTAL
XX2015-10 Statewide Various Trail Projects Enhancement 2015Local Local All MPOs1,000
200 - Local
800 - Rec Trails
- TOTAL
Page 38 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2015
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:09 AM
APHN
XX2015-11 Statewide Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads
4-R / Strs. & Apprs. 2015State State All MPOs7,459
5,967 - STP
1,492 - Local
- TOTAL
XX2015-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2015State State All MPOs4,625
3,700 - BR
925 - Local
- TOTAL
XX2015-13 Statewide Right-of-Way / Utilities / CENG Various 2015State/Local State All MPOs71,364
15,825
22,872
11,000
4,860
2,347
- NHS
- STP
- IM
- BR
- HSIP
402 - RRP
11,664 - State or Local
1,023 - CMAQ FLEX
- TOTAL
1,371 - 402-Safety
XX2015-14 Statewide Bridge Painting Miscellaneous 2015State State All MPOs3,000
2,400 - BR
600 - State Match
- TOTAL
XX2015-18 Statewide Motor Fuel Tracking System Miscellaneous 2015State State All MPOs300
300 - STP
- TOTAL
XX2015-19 Statewide VAR Various Statewide Safety Improvements 2015State State All MPOs36,827
19,863 - HSIP
2,207 - State Match
- TOTAL
14,757 - 402-Safety
171,125TOTAL
Page 39 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2015
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:09 AM
APHN
XX2016-01 Statewide IRP Debt Service Various 2016State State All MPOs39,411
39,411 - IM
- TOTAL
XX2016-02 Statewide Various Resurf / Restoration / Rehab / Reconstruction 4-R 2016State State All MPOs5,200
1,600
1,600
1,000
- NHS
- STP
- IM
1,000 - State Match
- TOTAL
XX2016-03 Statewide Various Bridge Rehab / Replacement Str. & Apprs. 2016State/Local State/Local All MPOs2,000
1,600 - BR
400 - State or Local
- TOTAL
XX2016-04 Statewide Bridge Guard Rail / Scour Control / Inspection Miscellaneous 2016State/Local State All MPOs1,000
800 - BR
200 - State or Local
- TOTAL
XX2016-06 Statewide RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2016State/RR State/RR All MPOs3,814
382 - State Match
3,432 - RRP
- TOTAL
XX2016-07 Statewide Various Enhancement Type Projects Enhancement 2016State/Local State/Local All MPOs10,000
2,000 - State or Local
- TOTAL
8,000 - ENH
XX2016-08 Statewide Various Safe Routes to School Projects Enhancement 2016N/A State/Local All MPOs1,400 - TOTAL
1,400 - SRTS
XX2016-09 Statewide Scenic Byways Projects Miscellaneous 2016State/Local State/Local All except CARTS &
TUTS
1,000
800 - Earmarks
200 - State or Local
- TOTAL
XX2016-10 Statewide Various Trail Projects Enhancement 2016Local Local All MPOs1,000
200 - Local
800 - Rec Trails
- TOTAL
Page 40 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2016
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:09 AM
APHN
XX2016-11 Statewide Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads
4-R / Strs. & Apprs. 2016State State All MPOs7,459
5,967 - STP
1,492 - Local
- TOTAL
XX2016-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2016State State All MPOs4,625
3,700 - BR
925 - Local
- TOTAL
XX2016-13 Statewide Right-of-Way / Utilities / CENG Various 2016State/Local State All MPOs62,739
15,825
22,872
2,375
4,860
2,347
- NHS
- STP
- IM
- BR
- HSIP
402 - RRP
11,664 - State or Local
1,023 - CMAQ FLEX
- TOTAL
1,371 - 402-Safety
XX2016-14 Statewide Bridge Painting Miscellaneous 2016State State All MPOs3,000
2,400 - BR
600 - State Match
- TOTAL
XX2016-18 Statewide Motor Fuel Tracking System Miscellaneous 2016State State All MPOs300
300 - STP
- TOTAL
XX2016-19 Statewide VAR Various Statewide Safety Improvements 2016State State All MPOs38,313
20,815 - HSIP
2,313 - State Match
- TOTAL
15,185 - 402-Safety
181,261TOTAL
Page 41 of 125
An (F) or (S) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2016
Transit Projects
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
031FTA Miller Operating Assistance Transit 2013Local Local TUTS256
128 - Local
128 - FTA-5307
FFY Transit 2013
- TOTAL
032FTA Miller Capital - Preventive Maintenance Transit 2013Local Local TUTS74
15 - Local
59 - FTA-5307
FFY Transit 2013
- TOTAL
033FTA Miller Capital - Paratransit Transit 2013Local Local TUTS35
7 - Local
28 - FTA-5307
FFY Transit 2013
- TOTAL
034FTA Miller Planning Transit 2013Local Local TUTS91
18 - Local
73 - FTA-5307
FFY Transit 2013
- TOTAL
110FTA Statewide Elderly Persons and Persons with Disabilities Transit 2013Local Local All MPOs1,893
378 - Local
1,514 - FTA-5310
FFY Transit 2012
- TOTAL
111FTA Statewide Non-Urbanized Transit 2013Local Local All MPOs18,222
7,289 - Local
10,933 - FTA-5311
FFY Transit 2012
- TOTAL
116FTA Statewide Job Access Reverse Commute Transit 2013Local Local All MPOs3,023
1,209 - Local
1,814 - FTA-5316
FFY Transit 2012
- TOTAL
Page 42 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
117FTA Statewide New Freedom Transit 2013Local Local All MPOs1,623
649 - Local
974 - FTA-5317
FFY Transit 2012
- TOTAL
109FTA Statewide Bus and Bus Facilities Transit 2013Local Local All MPOs3,750
750 - Local
3,000 - FTA-5309
FFY Transit 2012
- TOTAL
200PTF Statewide Public Transit Trust Fund Transit 2013Local Local All MPOs3,750
FFY Transit 2013
- TOTAL
3,750 - 100% State
201TLS Statewide Translease Transit 2013Local Local All MPOs775
775 - Local
FFY Transit 2013
- TOTAL
CATA01 Pulaski Rolling Stock Transit 2013Local Local CARTS1,355
271 - Local
1,084 - FTA-5307
FFY Transit 2013
- TOTAL
CATA02 Pulaski Bus Support Equipment/Facilities Transit 2013Local Local CARTS368
74 - Local
294 - FTA-5307
FFY Transit 2013
- TOTAL
CATA03 Pulaski Rail Support Equipment/Facilities Transit 2013Local Local CARTS71
14 - Local
57 - FTA-5307
FFY Transit 2013
- TOTAL
CATA04 Pulaski Transit Enhancement (Bus) Transit 2013Local Local CARTS75
15 - Local
60 - FTA-5307
FFY Transit 2013
- TOTAL
Page 43 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
CATA05 Pulaski Other Capital Items (Bus) - Prev Maint Transit 2013Local Local CARTS1,790
358 - Local
1,432 - FTA-5307
FFY Transit 2013
- TOTAL
CATA06 Pulaski Metropolitan Planning Transit 2013Local Local CARTS333
67 - Local
266 - FTA-5307
FFY Transit 2013
- TOTAL
CATA07 Pulaski Training Transit 2013Local Local CARTS19
4 - Local
15 - FTA-5307
FFY Transit 2013
- TOTAL
CATA08 Pulaski Signal & Communications (Bus) Transit 2013Local Local CARTS20
4 - Local
16 - FTA-5307
FFY Transit 2013
- TOTAL
CATA09 Pulaski Operating Assistance Transit 2013Local Local CARTS1,093
546 - Local
546 - FTA-5307
FFY Transit 2013
- TOTAL
CATA10 Pulaski Transit Operations Transit 2013Local Local CARTS8,500
8,500 - Local
FFY Transit 2013
- TOTAL
CATA11 Pulaski State of Good Repair - Training Room Equipment Transit 2013Local Local CARTS227
45 - Local
182 - FTA-5309
FFY Transit 2013
- TOTAL
CATA12 Pulaski Bus Livability - CNG Bus Purchase (8) Transit 2013Local Local CARTS3,790
644 - Local
3,146 - FTA-5309
FFY Transit 2013
- TOTAL
Page 44 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
CATA13 Pulaski Clean Fuels - CNG Bus Purchase (8) Transit 2013Local Local CARTS3,790
644 - Local
FFY Transit 2013
- TOTAL
3,146 - FTA-5308
CATA14 Pulaski CNG Fueling Station Transit 2013Local Local CARTS2,000
400 - Local
FFY Transit 2013
- TOTAL
1,600 - FTA-5308
CATA15 Pulaski Other Capital Items (Bus) - Paratransit Serv Transit 2013Local Local CARTS414
83 - Local
331 - FTA-5307
FFY Transit 2013
- TOTAL
FTS001 Sebastian Operating Assistance Transit 2013Local Local FRONTIER1,824
912 - Local
912 - FTA-5307
FFY Transit 2012
- TOTAL
FTS002 Sebastian Capital - Preventive Maintenance Transit 2013Local Local FRONTIER362
72 - Local
290 - FTA-5307
FFY Transit 2012
- TOTAL
FTS003 Sebastian Capital - Paratransit Service Transit 2013Local Local FRONTIER189
38 - Local
151 - FTA-5307
FFY Transit 2012
- TOTAL
FTS004 Sebastian Capital - Rolling Stock/Support Equipment Transit 2013Local Local FRONTIER206
41 - Local
165 - FTA-5307
FFY Transit 2012
- TOTAL
FTS005 Sebastian Fort Smith Trolley Extension - Design, Engineering Transit 2013Local Local Frontier238
238 - FTA-5309
FFY Transit 2009
- TOTAL
Page 45 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
HSIT01 Garland Operating Assistance Transit 2013Local Local HSA-MPO730
365 - Local
365 - FTA-5307
FFY Transit 2013
- TOTAL
HSIT02 Garland Capital - Preventive Maintenance Transit 2013Local Local HSA-MPO243
48 - Local
194 - FTA-5307
FFY Transit 2013
- TOTAL
HSIT03 Garland Capital - Paratransit Service Transit 2013Local Local HSA-MPO76
15 - Local
61 - FTA-5307
FFY Transit 2013
- TOTAL
JETS01 Craighead Operating Assistance Transit 2013Local Local JATS616
308 - Local
308 - FTA-5307
FFY Transit 2012
- TOTAL
JETS02 Craighead Capital - Preventive Maintenance Transit 2013Local Local JATS154
31 - Local
123 - FTA-5307
FFY Transit 2012
- TOTAL
JETS03 Craighead Capital - Paratransit Service Transit 2013Local Local JATS78
16 - Local
62 - FTA-5307
FFY Transit 2012
- TOTAL
JETS04 Craighead Capital - Rolling Stock/Support Equipment Transit 2013Local Local JATS154
31 - Local
123 - FTA-5307
FFY Transit 2012
- TOTAL
Page 46 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
NARTS01 Wash & Benton Operating Assistance Transit 2013Local-ORT Local-ORT NARTS1,110
555 - Local
555 - FTA-5307
FFY Transit 2012
- TOTAL
NARTS02 Wash & Benton Capital - Preventive Maintenance Transit 2013Local-ORT Local-ORT NARTS576
115 - Local
461 - FTA-5307
FFY Transit 2012
- TOTAL
NARTS03 Wash & Benton Capital - Paratransit Service Transit 2013Local-ORT Local-ORT NARTS146
29 - Local
117 - FTA-5307
FFY Transit 2012
- TOTAL
NARTS04 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2013Local-ORT Local-ORT NARTS41
8 - Local
33 - FTA-5307
FFY Transit 2012
- TOTAL
NARTS05 Wash & Benton Transit Operations (Urban) Transit 2013Local-ORT Local-ORT NARTS427
427 - Local
FFY Transit 2012
- TOTAL
NARTS06 Wash & Benton Operating Assistance Transit 2013Local-UofA Local-UofA NARTS1,190
595 - Local
595 - FTA-5307
FFY Transit 2012
- TOTAL
NARTS07 Wash & Benton Capital - Preventive Maintenance Transit 2013Local-UofA Local-UofA NARTS344
69 - Local
275 - FTA-5307
FFY Transit 2012
- TOTAL
NARTS08 Wash & Benton Capital - Paratransit Service Transit 2013Local-UofA Local-UofA NARTS94
19 - Local
75 - FTA-5307
FFY Transit 2012
- TOTAL
Page 47 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
NARTS09 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2013Local-UofA Local-UofA NARTS11
2 - Local
9 - FTA-5307
FFY Transit 2012
- TOTAL
NARTS10 Wash & Benton Transit Operations Transit 2013Local-UofA Local-UofA NARTS676
676 - Local
FFY Transit 2012
- TOTAL
NARTS11 Wash & Benton Capital - Planning Transit 2013Local-MPO Local-MPO NARTS125
25 - Local
100 - FTA-5307
FFY Transit 2013
- TOTAL
PBT001 Jefferson Operating Assistance Transit 2013Local Local PBATS688
344 - Local
344 - FTA-5307
FFY Transit 2012
- TOTAL
PBT002 Jefferson Capital - Preventive Maintenance Transit 2013Local Local PBATS344
69 - Local
275 - FTA-5307
FFY Transit 2012
- TOTAL
PBT003 Jefferson Capital - Paratransit Service Transit 2013Local Local PBATS98
20 - Local
78 - FTA-5307
FFY Transit 2012
- TOTAL
PBT004 Jefferson Capital - Rolling Stock/Support Equipment Transit 2013Local Local PBATS75
15 - Local
60 - FTA-5307
FFY Transit 2012
- TOTAL
PBT005 Jefferson Capital - Planning Transit 2013Local Local PBATS30
6 - Local
24 - FTA-5307
FFY Transit 2012
- TOTAL
Page 48 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
68,180TOTAL
Page 49 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
031FTA Miller Operating Assistance Transit 2014Local Local TUTS256
128 - Local
128 - FTA-5307
FFY Transit 2014
- TOTAL
032FTA Miller Capital - Preventive Maintenance Transit 2014Local Local TUTS74
15 - Local
59 - FTA-5307
FFY Transit 2014
- TOTAL
033FTA Miller Capital - Paratransit Transit 2014Local Local TUTS35
7 - Local
28 - FTA-5307
FFY Transit 2014
- TOTAL
034FTA Miller Planning Transit 2014Local Local TUTS91
18 - Local
73 - FTA-5307
FFY Transit 2014
- TOTAL
110FTA Statewide Elderly Persons and Persons with Disabilities Transit 2014Local Local All MPOs1,893
378 - Local
1,514 - FTA-5310
FFY Transit 2013
- TOTAL
111FTA Statewide Non-Urbanized Transit 2014Local Local All MPOs18,222
7,289 - Local
10,933 - FTA-5311
FFY Transit 2013
- TOTAL
116FTA Statewide Job Access Reverse Commute Transit 2014Local Local All MPOs3,023
1,209 - Local
1,814 - FTA-5316
FFY Transit 2013
- TOTAL
Page 50 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2014
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
117FTA Statewide New Freedom Transit 2014Local Local All MPOs1,623
649 - Local
974 - FTA-5317
FFY Transit 2013
- TOTAL
200PTF Statewide Public Transit Trust Fund Transit 2014Local Local All MPOs3,750
FFY Transit 2013
- TOTAL
3,750 - 100% State
201TLS Statewide Translease Transit 2014Local Local All MPOs775
775 - Local
FFY Transit 2013
- TOTAL
CATA01 Pulaski Rolling Stock Transit 2014Local Local CARTS1,355
271 - Local
1,084 - FTA-5307
FFY Transit 2014
- TOTAL
CATA02 Pulaski Bus Support Equipment/Facilities Transit 2014Local Local CARTS368
74 - Local
294 - FTA-5307
FFY Transit 2014
- TOTAL
CATA03 Pulaski Rail Support Equipment/Facilities Transit 2014Local Local CARTS71
14 - Local
57 - FTA-5307
FFY Transit 2014
- TOTAL
CATA04 Pulaski Transit Enhancement (Bus) Transit 2014Local Local CARTS75
15 - Local
60 - FTA-5307
FFY Transit 2014
- TOTAL
CATA05 Pulaski Other Capital Items (Bus) - Prev Maint Transit 2014Local Local CARTS1,790
358 - Local
1,432 - FTA-5307
FFY Transit 2014
- TOTAL
Page 51 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2014
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
CATA06 Pulaski Metropolitan Planning Transit 2014Local Local CARTS333
67 - Local
266 - FTA-5307
FFY Transit 2014
- TOTAL
CATA07 Pulaski Training Transit 2014Local Local CARTS19
4 - Local
15 - FTA-5307
FFY Transit 2014
- TOTAL
CATA08 Pulaski Signal & Communications (Bus) Transit 2014Local Local CARTS20
4 - Local
16 - FTA-5307
FFY Transit 2014
- TOTAL
CATA09 Pulaski Operating Assistance Transit 2014Local Local CARTS1,093
546 - Local
546 - FTA-5307
FFY Transit 2014
- TOTAL
CATA10 Pulaski Transit Operations Transit 2014Local Local CARTS8,500
8,500 - Local
FFY Transit 2014
- TOTAL
CATA15 Pulaski Other Capital Items (Bus) - Paratransit Serv Transit 2014Local Local CARTS414
83 - Local
331 - FTA-5307
FFY Transit 2014
- TOTAL
FTS001 Sebastian Operating Assistance Transit 2014Local Local FRONTIER1,824
912 - Local
912 - FTA-5307
FFY Transit 2013
- TOTAL
FTS002 Sebastian Capital - Preventive Maintenance Transit 2014Local Local FRONTIER362
72 - Local
290 - FTA-5307
FFY Transit 2013
- TOTAL
Page 52 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2014
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
FTS003 Sebastian Capital - Paratransit Service Transit 2014Local Local FRONTIER189
38 - Local
151 - FTA-5307
FFY Transit 2013
- TOTAL
FTS004 Sebastian Capital - Rolling Stock/Support Equipment Transit 2014Local Local FRONTIER206
41 - Local
165 - FTA-5307
FFY Transit 2013
- TOTAL
HSIT01 Garland Operating Assistance Transit 2014Local Local HSA-MPO730
365 - Local
365 - FTA-5307
FFY Transit 2014
- TOTAL
HSIT02 Garland Capital - Preventive Maintenance Transit 2014Local Local HSA-MPO243
48 - Local
194 - FTA-5307
FFY Transit 2014
- TOTAL
HSIT03 Garland Capital - Paratransit Service Transit 2014Local Local HSA-MPO76
15 - Local
61 - FTA-5307
FFY Transit 2014
- TOTAL
JETS01 Craighead Operating Assistance Transit 2014Local Local JATS616
308 - Local
308 - FTA-5307
FFY Transit 2013
- TOTAL
JETS02 Craighead Capital - Preventive Maintenance Transit 2014Local Local JATS154
31 - Local
123 - FTA-5307
FFY Transit 2013
- TOTAL
Page 53 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2014
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
JETS03 Craighead Capital - Paratransit Service Transit 2014Local Local JATS78
16 - Local
62 - FTA-5307
FFY Transit 2013
- TOTAL
JETS04 Craighead Capital - Rolling Stock/Support Equipment Transit 2014Local Local JATS154
31 - Local
123 - FTA-5307
FFY Transit 2013
- TOTAL
NARTS01 Wash & Benton Operating Assistance Transit 2014Local-ORT Local-ORT NARTS1,200
600 - Local
600 - FTA-5307
FFY Transit 2013
- TOTAL
NARTS02 Wash & Benton Capital - Preventive Maintenance Transit 2014Local-ORT Local-ORT NARTS701
140 - Local
561 - FTA-5307
FFY Transit 2013
- TOTAL
NARTS03 Wash & Benton Capital - Paratransit Service Transit 2014Local-ORT Local-ORT NARTS204
41 - Local
163 - FTA-5307
FFY Transit 2013
- TOTAL
NARTS04 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2014Local-ORT Local-ORT NARTS313
63 - Local
250 - FTA-5307
FFY Transit 2013
- TOTAL
NARTS05 Wash & Benton Transit Operations Transit 2014Local-ORT Local-ORT NARTS767
767 - Local
FFY Transit 2013
- TOTAL
NARTS06 Wash & Benton Operating Assistance Transit 2014Local-UofA Local-UofA NARTS1,264
632 - Local
632 - FTA-5307
FFY Transit 2013
- TOTAL
Page 54 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2014
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
NARTS07 Wash & Benton Capital - Preventive Maintenance Transit 2014Local-UofA Local-UofA NARTS375
75 - Local
300 - FTA-5307
FFY Transit 2013
- TOTAL
NARTS08 Wash & Benton Capital - Paratransit Service Transit 2014Local-UofA Local-UofA NARTS167
34 - Local
133 - FTA-5307
FFY Transit 2013
- TOTAL
NARTS09 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2014Local-UofA Local-UofA NARTS279
56 - Local
223 - FTA-5307
FFY Transit 2013
- TOTAL
NARTS10 Wash & Benton Transit Operations Transit 2014Local-UofA Local-UofA NARTS693
693 - Local
FFY Transit 2013
- TOTAL
NARTS11 Wash & Benton Capital - Planning Transit 2014Local-MPO Local-MPO NARTS125
25 - Local
100 - FTA-5307
FFY Transit 2014
- TOTAL
PBT001 Jefferson Operating Assistance Transit 2014Local Local PBATS688
344 - Local
344 - FTA-5307
FFY Transit 2013
- TOTAL
PBT002 Jefferson Capital - Preventive Maintenance Transit 2014Local Local PBATS344
69 - Local
275 - FTA-5307
FFY Transit 2013
- TOTAL
PBT003 Jefferson Capital - Paratransit Service Transit 2014Local Local PBATS98
20 - Local
78 - FTA-5307
FFY Transit 2013
- TOTAL
Page 55 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2014
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
PBT004 Jefferson Capital - Rolling Stock/Support Equipment Transit 2014Local Local PBATS75
15 - Local
60 - FTA-5307
FFY Transit 2013
- TOTAL
PBT005 Jefferson Capital - Planning Transit 2014Local Local PBATS30
6 - Local
24 - FTA-5307
FFY Transit 2013
- TOTAL
55,733TOTAL
Page 56 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2014
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
031FTA Miller Operating Assistance Transit 2015Local Local TUTS256
128 - Local
128 - FTA-5307
FFY Transit 2015
- TOTAL
032FTA Miller Capital - Preventive Maintenance Transit 2015Local Local TUTS74
15 - Local
59 - FTA-5307
FFY Transit 2015
- TOTAL
033FTA Miller Capital - Paratransit Transit 2015Local Local TUTS35
7 - Local
28 - FTA-5307
FFY Transit 2015
- TOTAL
034FTA Miller Planning Transit 2015Local Local TUTS91
18 - Local
73 - FTA-5307
FFY Transit 2015
- TOTAL
110FTA Statewide Elderly Persons and Persons with Disabilities Transit 2015Local Local All MPOs1,893
378 - Local
1,514 - FTA-5310
FFY Transit 2014
- TOTAL
111FTA Statewide Non-Urbanized Transit 2015Local Local All MPOs18,222
7,289 - Local
10,933 - FTA-5311
FFY Transit 2014
- TOTAL
116FTA Statewide Job Access Reverse Commute Transit 2015Local Local All MPOs3,023
1,209 - Local
1,814 - FTA-5316
FFY Transit 2014
- TOTAL
Page 57 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2015
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
117FTA Statewide New Freedom Transit 2015Local Local All MPOs1,623
649 - Local
974 - FTA-5317
FFY Transit 2014
- TOTAL
200PTF Statewide Public Transit Trust Fund Transit 2015Local Local All MPOs3,750
FFY Transit 2014
- TOTAL
3,750 - 100% State
201TLS Statewide Translease Transit 2015Local Local All MPOs775
775 - Local
FFY Transit 2014
- TOTAL
CATA01 Pulaski Rolling Stock Transit 2015Local Local CARTS1,355
271 - Local
1,084 - FTA-5307
FFY Transit 2015
- TOTAL
CATA02 Pulaski Bus Support Equipment/Facilities Transit 2015Local Local CARTS368
74 - Local
294 - FTA-5307
FFY Transit 2015
- TOTAL
CATA03 Pulaski Rail Support Equipment/Facilities Transit 2015Local Local CARTS71
14 - Local
57 - FTA-5307
FFY Transit 2015
- TOTAL
CATA04 Pulaski Transit Enhancement (Bus) Transit 2015Local Local CARTS75
15 - Local
60 - FTA-5307
FFY Transit 2015
- TOTAL
CATA05 Pulaski Other Capital Items (Bus) - Prev Maint Transit 2015Local Local CARTS1,790
358 - Local
1,432 - FTA-5307
FFY Transit 2015
- TOTAL
Page 58 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2015
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
CATA06 Pulaski Metropolitan Planning Transit 2015Local Local CARTS333
67 - Local
266 - FTA-5307
FFY Transit 2015
- TOTAL
CATA07 Pulaski Training Transit 2015Local Local CARTS19
4 - Local
15 - FTA-5307
FFY Transit 2015
- TOTAL
CATA08 Pulaski Signal & Communications (Bus) Transit 2015Local Local CARTS20
4 - Local
16 - FTA-5307
FFY Transit 2015
- TOTAL
CATA09 Pulaski Operating Assistance Transit 2015Local Local CARTS1,093
546 - Local
546 - FTA-5307
FFY Transit 2015
- TOTAL
CATA10 Pulaski Transit Operations Transit 2015Local Local CARTS8,500
8,500 - Local
FFY Transit 2015
- TOTAL
CATA15 Pulaski Other Capital Items (Bus) - Paratransit Serv Transit 2015Local Local CARTS414
83 - Local
331 - FTA-5307
FFY Transit 2015
- TOTAL
FTS001 Sebastian Operating Assistance Transit 2015Local Local FRONTIER1,824
912 - Local
912 - FTA-5307
FFY Transit 2014
- TOTAL
FTS002 Sebastian Capital - Preventive Maintenance Transit 2015Local Local FRONTIER362
72 - Local
290 - FTA-5307
FFY Transit 2014
- TOTAL
Page 59 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2015
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
FTS003 Sebastian Capital - Paratransit Service Transit 2015Local Local FRONTIER189
38 - Local
151 - FTA-5307
FFY Transit 2014
- TOTAL
FTS004 Sebastian Capital - Rolling Stock/Support Equipment Transit 2015Local Local FRONTIER206
41 - Local
165 - FTA-5307
FFY Transit 2014
- TOTAL
HSIT01 Garland Operating Assistance Transit 2015Local Local HSA-MPO730
365 - Local
365 - FTA-5307
FFY Transit 2015
- TOTAL
HSIT02 Garland Capital - Preventive Maintenance Transit 2015Local Local HSA-MPO243
48 - Local
194 - FTA-5307
FFY Transit 2015
- TOTAL
HSIT03 Garland Capital - Paratransit Service Transit 2015Local Local HSA-MPO76
15 - Local
61 - FTA-5307
FFY Transit 2015
- TOTAL
JETS01 Craighead Operating Assistance Transit 2015Local Local JATS616
308 - Local
308 - FTA-5307
FFY Transit 2014
- TOTAL
JETS02 Craighead Capital - Preventive Maintenance Transit 2015Local Local JATS154
31 - Local
123 - FTA-5307
FFY Transit 2014
- TOTAL
Page 60 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2015
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
JETS03 Craighead Capital - Paratransit Service Transit 2015Local Local JATS78
16 - Local
62 - FTA-5307
FFY Transit 2014
- TOTAL
JETS04 Craighead Capital - Rolling Stock/Support Equipment Transit 2015Local Local JATS154
31 - Local
123 - FTA-5307
FFY Transit 2014
- TOTAL
NARTS01 Wash & Benton Operating Assistance Transit 2015Local-ORT Local-ORT NARTS1,200
600 - Local
600 - FTA-5307
FFY Transit 2014
- TOTAL
NARTS02 Wash & Benton Capital - Preventive Maintenance Transit 2015Local-ORT Local-ORT NARTS701
140 - Local
561 - FTA-5307
FFY Transit 2014
- TOTAL
NARTS03 Wash & Benton Capital - Paratransit Service Transit 2015Local-ORT Local-ORT NARTS204
41 - Local
163 - FTA-5307
FFY Transit 2014
- TOTAL
NARTS04 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2015Local-ORT Local-ORT NARTS313
63 - Local
250 - FTA-5307
FFY Transit 2014
- TOTAL
NARTS05 Wash & Benton Transit Operations Transit 2015Local-ORT Local-ORT NARTS767
767 - Local
FFY Transit 2014
- TOTAL
NARTS06 Wash & Benton Operating Assistance Transit 2015Local-UofA Local-UofA NARTS1,264
632 - Local
632 - FTA-5307
FFY Transit 2014
- TOTAL
Page 61 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2015
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
NARTS07 Wash & Benton Capital - Preventive Maintenance Transit 2015Local-UofA Local-UofA NARTS375
75 - Local
300 - FTA-5307
FFY Transit 2014
- TOTAL
NARTS08 Wash & Benton Capital - Paratransit Service Transit 2015Local-UofA Local-UofA NARTS167
34 - Local
133 - FTA-5307
FFY Transit 2014
- TOTAL
NARTS09 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2015Local-UofA Local-UofA NARTS279
56 - Local
223 - FTA-5307
FFY Transit 2014
- TOTAL
NARTS10 Wash & Benton Transit Operations Transit 2015Local-UofA Local-UofA NARTS693
693 - Local
FFY Transit 2014
- TOTAL
NARTS11 Wash & Benton Capital - Planning Transit 2015Local-MPO Local-MPO NARTS125
25 - Local
100 - FTA-5307
FFY Transit 2015
- TOTAL
PBT001 Jefferson Operating Assistance Transit 2015Local Local PBATS688
344 - Local
344 - FTA-5307
FFY Transit 2014
- TOTAL
PBT002 Jefferson Capital - Preventive Maintenance Transit 2015Local Local PBATS344
69 - Local
275 - FTA-5307
FFY Transit 2014
- TOTAL
PBT003 Jefferson Capital - Paratransit Service Transit 2015Local Local PBATS98
20 - Local
78 - FTA-5307
FFY Transit 2014
- TOTAL
Page 62 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2015
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
PBT004 Jefferson Capital - Rolling Stock/Support Equipment Transit 2015Local Local PBATS75
15 - Local
60 - FTA-5307
FFY Transit 2014
- TOTAL
PBT005 Jefferson Capital - Planning Transit 2015Local Local PBATS30
6 - Local
24 - FTA-5307
FFY Transit 2014
- TOTAL
55,733TOTAL
Page 63 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2015
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
031FTA Miller Operating Assistance Transit 2016Local Local TUTS256
128 - Local
128 - FTA-5307
FFY Transit 2016
- TOTAL
032FTA Miller Capital - Preventive Maintenance Transit 2016Local Local TUTS74
15 - Local
59 - FTA-5307
FFY Transit 2016
- TOTAL
033FTA Miller Capital - Paratransit Transit 2016Local Local TUTS35
7 - Local
28 - FTA-5307
FFY Transit 2016
- TOTAL
034FTA Miller Planning Transit 2016Local Local TUTS91
18 - Local
73 - FTA-5307
FFY Transit 2016
- TOTAL
110FTA Statewide Elderly Persons and Persons with Disabilities Transit 2016Local Local All MPOs1,893
378 - Local
1,514 - FTA-5310
FFY Transit 2015
- TOTAL
111FTA Statewide Non-Urbanized Transit 2016Local Local All MPOs18,222
7,289 - Local
10,933 - FTA-5311
FFY Transit 2015
- TOTAL
116FTA Statewide Job Access Reverse Commute Transit 2016Local Local All MPOs3,023
1,209 - Local
1,814 - FTA-5316
FFY Transit 2015
- TOTAL
Page 64 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2016
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
117FTA Statewide New Freedom Transit 2016Local Local All MPOs1,623
649 - Local
974 - FTA-5317
FFY Transit 2015
- TOTAL
200PTF Statewide Public Transit Trust Fund Transit 2016Local Local All MPOs3,750
FFY Transit 2015
- TOTAL
3,750 - 100% State
201TLS Statewide Translease Transit 2016Local Local All MPOs775
775 - Local
FFY Transit 2015
- TOTAL
CATA01 Pulaski Rolling Stock Transit 2016Local Local CARTS1,355
271 - Local
1,084 - FTA-5307
FFY Transit 2016
- TOTAL
CATA02 Pulaski Bus Support Equipment/Facilities Transit 2016Local Local CARTS368
74 - Local
294 - FTA-5307
FFY Transit 2016
- TOTAL
CATA03 Pulaski Rail Support Equipment/Facilities Transit 2016Local Local CARTS71
14 - Local
57 - FTA-5307
FFY Transit 2016
- TOTAL
CATA04 Pulaski Transit Enhancement (Bus) Transit 2016Local Local CARTS75
15 - Local
60 - FTA-5307
FFY Transit 2016
- TOTAL
CATA05 Pulaski Other Capital Items (Bus) - Prev Maint Transit 2016Local Local CARTS1,790
358 - Local
1,432 - FTA-5307
FFY Transit 2016
- TOTAL
Page 65 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2016
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
CATA06 Pulaski Metropolitan Planning Transit 2016Local Local CARTS333
67 - Local
266 - FTA-5307
FFY Transit 2016
- TOTAL
CATA07 Pulaski Training Transit 2016Local Local CARTS19
4 - Local
15 - FTA-5307
FFY Transit 2016
- TOTAL
CATA08 Pulaski Signal & Communications (Bus) Transit 2016Local Local CARTS20
4 - Local
16 - FTA-5307
FFY Transit 2016
- TOTAL
CATA09 Pulaski Operating Assistance Transit 2016Local Local CARTS1,093
546 - Local
546 - FTA-5307
FFY Transit 2016
- TOTAL
CATA10 Pulaski Transit Operations Transit 2016Local Local CARTS8,500
8,500 - Local
FFY Transit 2016
- TOTAL
CATA15 Pulaski Other Capital Items (Bus) - Paratransit Serv Transit 2016Local Local CARTS414
83 - Local
331 - FTA-5307
FFY Transit 2016
- TOTAL
FTS001 Sebastian Operating Assistance Transit 2016Local Local FRONTIER1,824
912 - Local
912 - FTA-5307
FFY Transit 2015
- TOTAL
FTS002 Sebastian Capital - Preventive Maintenance Transit 2016Local Local FRONTIER362
72 - Local
290 - FTA-5307
FFY Transit 2015
- TOTAL
Page 66 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2016
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
FTS003 Sebastian Capital - Paratransit Service Transit 2016Local Local FRONTIER189
38 - Local
151 - FTA-5307
FFY Transit 2015
- TOTAL
FTS004 Sebastian Capital - Rolling Stock/Support Equipment Transit 2016Local Local FRONTIER206
41 - Local
165 - FTA-5307
FFY Transit 2015
- TOTAL
HSIT01 Garland Operating Assistance Transit 2016Local Local HSA-MPO730
365 - Local
365 - FTA-5307
FFY Transit 2016
- TOTAL
HSIT02 Garland Capital - Preventive Maintenance Transit 2016Local Local HSA-MPO243
48 - Local
194 - FTA-5307
FFY Transit 2016
- TOTAL
HSIT03 Garland Capital - Paratransit Service Transit 2016Local Local HSA-MPO76
15 - Local
61 - FTA-5307
FFY Transit 2016
- TOTAL
JETS01 Craighead Operating Assistance Transit 2016Local Local JATS616
308 - Local
308 - FTA-5307
FFY Transit 2015
- TOTAL
JETS02 Craighead Capital - Preventive Maintenance Transit 2016Local Local JATS154
31 - Local
123 - FTA-5307
FFY Transit 2015
- TOTAL
Page 67 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2016
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
JETS03 Craighead Capital - Paratransit Service Transit 2016Local Local JATS78
16 - Local
62 - FTA-5307
FFY Transit 2015
- TOTAL
JETS04 Craighead Capital - Rolling Stock/Support Equipment Transit 2016Local Local JATS154
31 - Local
123 - FTA-5307
FFY Transit 2015
- TOTAL
NARTS01 Wash & Benton Operating Assistance Transit 2016Local-ORT Local-ORT NARTS1,200
600 - Local
600 - FTA-5307
FFY Transit 2015
- TOTAL
NARTS02 Wash & Benton Capital - Preventive Maintenance Transit 2016Local-ORT Local-ORT NARTS701
140 - Local
561 - FTA-5307
FFY Transit 2015
- TOTAL
NARTS03 Wash & Benton Capital - Paratransit Service Transit 2016Local-ORT Local-ORT NARTS204
41 - Local
163 - FTA-5307
FFY Transit 2015
- TOTAL
NARTS04 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2016Local-ORT Local-ORT NARTS313
63 - Local
250 - FTA-5307
FFY Transit 2015
- TOTAL
NARTS05 Wash & Benton Transit Operations Transit 2016Local-ORT Local-ORT NARTS767
767 - Local
FFY Transit 2015
- TOTAL
NARTS06 Wash & Benton Operating Assistance Transit 2016Local-UofA Local-UofA NARTS1,264
632 - Local
632 - FTA-5307
FFY Transit 2015
- TOTAL
Page 68 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2016
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
NARTS07 Wash & Benton Capital - Preventive Maintenance Transit 2016Local-UofA Local-UofA NARTS375
75 - Local
300 - FTA-5307
FFY Transit 2015
- TOTAL
NARTS08 Wash & Benton Capital - Paratransit Service Transit 2016Local-UofA Local-UofA NARTS167
34 - Local
133 - FTA-5307
FFY Transit 2015
- TOTAL
NARTS09 Wash & Benton Capital - Rolling Stock/Support Equipment Transit 2016Local-UofA Local-UofA NARTS279
56 - Local
223 - FTA-5307
FFY Transit 2015
- TOTAL
NARTS10 Wash & Benton Transit Operations Transit 2016Local-UofA Local-UofA NARTS693
693 - Local
FFY Transit 2015
- TOTAL
NARTS11 Wash & Benton Capital - Planning Transit 2016Local-MPO Local-MPO NARTS125
25 - Local
100 - FTA-5307
FFY Transit 2016
- TOTAL
PBT001 Jefferson Operating Assistance Transit 2016Local Local PBATS688
344 - Local
344 - FTA-5307
FFY Transit 2015
- TOTAL
PBT002 Jefferson Capital - Preventive Maintenance Transit 2016Local Local PBATS344
69 - Local
275 - FTA-5307
FFY Transit 2015
- TOTAL
PBT003 Jefferson Capital - Paratransit Service Transit 2016Local Local PBATS98
20 - Local
78 - FTA-5307
FFY Transit 2015
- TOTAL
Page 69 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2016
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:36 AM
APHN
PBT004 Jefferson Capital - Rolling Stock/Support Equipment Transit 2016Local Local PBATS75
15 - Local
60 - FTA-5307
FFY Transit 2015
- TOTAL
PBT005 Jefferson Capital - Planning Transit 2016Local Local PBATS30
6 - Local
24 - FTA-5307
FFY Transit 2015
- TOTAL
55,733TOTAL
Page 70 of 125
An (F) or (S) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2016
Eastern Federal Land Highway Division
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:11:57 AM
APHN
EFLHD10 Various Repairs to structures and roadways damaged by flooding and storms (AR2008-1-FS)
3R 2012EFLHD EFLHD1,400 - TOTAL
EFLHD11 White Rehabilitate Norton Road 3R 2015EFLHD EFLHD54 - TOTAL
EFLHD12 Searcy Woolum Road Landslide Repair 3R 2012EFLHD EFLHD400 - TOTAL
EFLHD13 Sebastian Resurface of Frisco station parking lot (50 visitor spaces and four handicap accessible spaces) and access road (concrete).
3R 2012EFLHD EFLHD FRONTIER200 - TOTAL
EFLHD14 Cleburne Rehab Parking lot, Rte 900 (SAMMS WO# 2006429705) 3R 2014EFLHD EFLHD45 - TOTAL
EFLHD15 Cleburne Rehab Entrance Parking Lot Rte 010 (SAMMS WO# 2006429698)
3R 2014EFLHD EFLHD45 - TOTAL
EFLHD3 Ashley Rehabilitate Hdqtr/VC Turn Lane off Hwy 82 3R 2015EFLHD EFLHD200 - TOTAL
EFLHD5 Howard & Polk Phase 1 - (Bridge and Grading) Realignment of 1.4 miles of County Road 64 near Shady Lake. New alignment for beginning of Route 159. Ties to existing Route 159 at RIP MP 2.75
New Construction 2012EFLHD EFLHD2,650 - TOTAL
EFLHD6 Garland Repair/Rehabilitate West Mountain Drive and West Mountain Summit Drive
3R 2012EFLHD EFLHD HSA-MPO1,500 - TOTAL
EFLHD8 Various Rehabilitate Howell Unit Access Road (SAMMS WO# 20099544650)
3R 2012EFLHD EFLHD38 - TOTAL
6,532TOTAL
Page 71 of 125
An (F) or (S) following the termini indicates federal or state oversight.
EASTERN FEDERAL LANDS HIGHWAY DIVISION
State and Local Projects Sorted by Job Number
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
110147 Cross 284 Branch of Caney Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100
880 - BR
220 - State Match
- TOTAL
110217 Lee & Phillips 001 Walnut Corner-Cypress Corner (S) Major Widening 7.03 2015State State35,500
28,400 - NHS
7,100 - State Match
- TOTAL
110502 Lee 001 Cypress Corner-North (S) Major Widening 5.40 2013State State18,040
14,080
220
- NHS
- Earmarks
3,740 - State Match
- TOTAL
110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2013Local Local WMATS250
250 - Earmarks
- TOTAL
For Environmental Assessment.
110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2014Local Local WMATS450
450 - Earmarks
- TOTAL
For Preliminary Engineering.
110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2015Local Local WMATS1,400
1,337 - Earmarks
63 - Local
- TOTAL
For Right-of-Way and Utility Relocation.
110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2016Local Local WMATS7,900
3,169 - Earmarks
3,111 - Local
1,620 - CMAQ - AQ
- TOTAL
For Construction.
110540 Monroe 079 White River Strs. Demo. & Removal (Clarendon) (S) Strs. & Apprs. 2015State State8,000
6,400 - BR
1,600 - State Match
- TOTAL
Page 72 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
110541 Woodruff 038 Bayou DeView Str. & Apprs. (S) Strs. & Apprs. 2013State State2,400
1,920 - BR
480 - State Match
- TOTAL
110544 Monroe 070 Hwy. 17-St. Francis Co. Line Strs. & Apprs. (S) Strs. & Apprs. 2014State State4,900
3,920 - BR
980 - State Match
- TOTAL
110557 Crittenden 147 Hwy. 131-North (S) Rehabilitation 5.50 2015State State2,000
1,600 - STP
400 - State Match
- TOTAL
110567 Crittenden 042 Deer Bayou Str. & Apprs. (S) Strs. & Apprs. 2016State State WMATS1,100
880 - BR
220 - State Match
- TOTAL
110570 Lee 131 Ditch at L.M. 1.85 Str. & Apprs. (S) Strs. & Apprs. 2015State State2,125
1,700 - BR
425 - State Match
- TOTAL
110571 Crittenden 149 Ditch at L.M. 2.30 Str. & Apprs. (S) Strs. & Apprs. 2016State State1,500
1,200 - BR
300 - State Match
- TOTAL
110572 Phillips 242 Fletcher Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100
880 - BR
220 - State Match
- TOTAL
110573 St. Francis 261 L'Anguille River Str. & Apprs. (S) Strs. & Apprs. 2015State State1,125
900 - BR
225 - State Match
- TOTAL
110575 Phillips 044 Bee Bayou Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100
880 - BR
220 - State Match
- TOTAL
Page 73 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
110583 Crittenden CS Ingram Blvd.-East (Southland Dr.) (West Memphis) (S) Reconstruction 2013Local Local WMATS2,738
547 - Local
- STP > 200,000
- TOTAL
2,191
110XX1 Crittenden CS Ingram Blvd.-West (Southland Dr.) (West Memphis) (S) New Location 2014Local Local WMATS3,084
616 - Local
- STP > 200,000
- TOTAL
2,468
110XX2 Crittenden CS Harahan Bikeway Connector (West Memphis - Mississippi River)
New Location 2014Local Local WMATS850
850 - CMAQ - AQ
- TOTAL
BB0101 Monroe 040 Cache River-Bayou DeView (F) Rehabilitation 4.10 2013State State
18,040
18,040
- Bond
- TOTAL
BB0104 St. Francis 040 Goodwin-Forrest City (S) Rehabilitation 11.62 2014State State
9,435
12,161
- Bond
2,453 - HSIP
273 - State Match
- TOTAL
Includes Safety Funds for Cable Median Barriers.
BB0105 St. Francis 040 Forrest City-East (F) Rehabilitation 8.28 2013State State41,925
37,733 - IM
4,193 - State Match
- TOTAL
BB0106 St. Francis 040 Shearerville-West (S) Rehabilitation 16.50 2014State State
79,881
82,607
- Bond
2,453 - HSIP
273 - State Match
- TOTAL
Includes Safety Funds for Cable Median Barriers.
BB0107 Crittenden 040 Shearerville-Hwy. 77 (F) Rehabilitation 12.90 2015State State WMATS
12,299
12,299
- Bond
- TOTAL
BB0108 Crittenden 040 Hwy. 77-I-55 (F) Rehabilitation 2.20 2013State State WMATS
23,892
23,892
- Bond
- TOTAL
Page 74 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
BB0109 Crittenden 055 I-40-Jericho (S) Rehabilitation 8.23 2013State State WMATS
9,784
9,784
- Bond
- TOTAL
BB0110 Crittenden 055 Jericho-Lake David (S) Rehabilitation 8.00 2014State State
6,496
6,496
- Bond
- TOTAL
020043 Chicot 144 Hwy. 144 Strs. & Apprs. (S) Strs. & Apprs. 2015State State2,100
1,680 - BR
420 - State Match
- TOTAL
020419 Lincoln 054 Wells Bayou Str. & Apprs. (S) Strs. & Apprs. 2016State State1,300
1,040 - BR
260 - State Match
- TOTAL
020462 Drew 069 Monticello Bypass (F) New Location 2015State State68,970
55,176 - Earmarks
13,794 - State Match
- TOTAL
020509 Ashley 082 Hwy. 165 Str. & Apprs. (Montrose) (S) Strs. & Apprs. 2014State State4,000
3,200 - BR
800 - State Match
- TOTAL
020534 Ashley 082 Co. Rd. 411-Hwy. 425 (East of Crossett) (S) Major Widening 6.10 2016State State23,000
18,400 - NHS
4,600 - State Match
- TOTAL
020535 Chicot 165 Hwy. 208-Hwy. 65 (Rehab.) (Sel. Secs.) (S) Rehabilitation 4.36 2014State State3,000
2,400 - STP
600 - State Match
- TOTAL
020538 Arkansas 001 La Grue Bayou Str. & Apprs. (S) Strs. & Apprs. 2015State State2,700
2,160 - BR
540 - State Match
- TOTAL
020539 Arkansas 011 Bayou Meto Str. & Apprs. (S) Strs. & Apprs. 2016State State3,500
2,800 - BR
700 - State Match
- TOTAL
Page 75 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
020542 Linc & Desha 212 Hwy. 212 Strs. & Apprs. (S) Strs. & Apprs. 2015State State2,500
2,000 - BR
500 - State Match
- TOTAL
020543 Grant 291 Moore's Slough Tributary Str. & Apprs. (S) Strs. & Apprs. 2015State State1,200
960 - BR
240 - State Match
- TOTAL
BB0201 Jefferson 530 Jefferson-Hwy. 104 (S) Rehabilitation 6.10 2016State State PBATS6,284
5,656 - IM
628 - State Match
- TOTAL
030313 Miller 071 LA Line-Doddridge (Bs. & Surf.) (S) New Location 4.46 2013State State15,900
10,000
2,700
- NHS
- Earmarks
3,200 - State Match
- TOTAL
030343 Lafayette 082 Hwy. 82 Improvements (Stamps) (S) Major Widening 1.94 2016State State6,000
4,800 - NHS
1,200 - State Match
- TOTAL
030388 Miller 071 Broad St. Str. & Apprs. (Texarkana) (S) Strs. & Apprs. 2014State State TUTS7,750
6,200 - BR
1,550 - State Match
- TOTAL
030415 Little River 041 Little River Str. & Apprs. (S) Strs. & Apprs. 2016State State10,600
8,480 - BR
2,120 - State Match
- TOTAL
030X01 Sevier 071 DeQueen-East Strs. & Apprs. (S) Strs. & Apprs. 2016State State6,500
5,200 - BR
1,300 - State Match
- TOTAL
BB0301 Miller 030 Texas State Line-Hwy. 108 (S) Rehabilitation 7.10 2015State State TUTS
5,852
5,852
- Bond
- TOTAL
BB0302 Miller 030 Hwy. 67-West of Red River (S) Rehabilitation 4.50 2016State State
7,529
7,529
- Bond
- TOTAL
Page 76 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
BB0303 Miller 030 Red River-East & West (F) Rehabilitation 1.80 2014State State
17,745
17,745
- Bond
- TOTAL
BB0305 Hempstead 030 Hwy. 67-Sheppard (F) Rehabilitation 4.10 2016State State
18,864
18,864
- Bond
- TOTAL
BB0306 Hempstead 030 Sheppard-Hwy. 278 (S) Rehabilitation 7.10 2014State State
20,178
20,178
- Bond
- TOTAL
BB0310 Miller 030 Hwy. 108-Hwy. 67 (S) Rehabilitation 4.40 2015State State
7,253
7,253
- Bond
- TOTAL
040024 Washington 074 White River Str. & Apprs. (Elkins) (S) Strs. & Apprs. 2015State State NARTS3,700
2,960 - BR
740 - State Match
- TOTAL
040272 Washington CS Johnson Road Reconst. (Springdale) Widening 3.24 2013Local Local NARTS10,409
7,327 - Earmarks
2,082 - Local
- STP < 200,000
- TOTAL
1,000
040376 Sebastian 071 Hwy. 71-Hwy. 22 (Base & Surf.) (S) New Location 6.04 2013State State FRONTIER23,000
12,101
6,299
- NHS
- Earmarks
4,600 - State Match
- TOTAL
040456 Crawford 162 Hwy. 162 Improvements (Alma) (S) New Location 0.70 2014State State FRONTIER6,000
4,800 - STP
200 - State Match
1,000 - Local
- TOTAL
Partnering Project – City responsible for right of way acquisition, utility adjustments, $1 million toward cost of construction, and accepting responsibility for various highways upon completion of project.
040471 Sebastian CS Jenny Lind Rd. & Ingersoll Ave. Widening (Fort Smith) (S) Major Widening 3.00 2013Local Local FRONTIER8,980
7,184 - Earmarks
1,796 - Local
- TOTAL
Page 77 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
040493 Franklin CS Hillbilly Lane-Hwy. 23 (Ozark) (S) New Location 0.90 2013Local State1,935
935 - Local
- STP < 200,000
- TOTAL
1,000
040521 Washington 062 Hwy. 62 Bypass (Bs. & Surf.) (Prairie Grove) (S) New Location 4.83 2013State State NARTS12,000
9,600 - STP
2,400 - State Match
- TOTAL
040527 Washington 540 I-540/Don Tyson Pkwy. Intchng. (Springdale) (F) Interchange 2013Local Local NARTS26,951
26,951 - Local
- TOTAL
040535 Washington CS Fulbright Expwy./Hwy. 71B Flyover (Fayetteville) (S) Safety & Traf Eng 2013Local Local NARTS6,452
5,162 - Earmarks
1,290 - Local
- TOTAL
040569 Washington 016 West Fork White River Str. & Apprs. (Fayetteville) (S) Str. & Apprs. 2013State State NARTS6,900
5,520 - BR
1,380 - State Match
- TOTAL
040570 Washington 170 Branch of Illinois River Str. & Apprs. (S) Strs. & Apprs. 2015State State NARTS725
580 - BR
145 - State Match
- TOTAL
040581 Washington 112 Hwy. 180-Leroy Pond Dr. (Hwy. 112) (Fayetteville) (S) Major Widening 0.35 2013Local State NARTS1,250
250 - Local
- STP < 200,000
- TOTAL
1,000
040605 Washington 540 Hwy. 16-Porter Rd. (Widening) (S) Major Widening 1.35 2013State State NARTS9,400
7,520 - NHS
1,880 - State Match
- TOTAL
040618 Washington CS Maple St. & Lafayette St. Bridge Rehab. (Fayetteville) (S) Str. & Apprs. 2013Local State NARTS1,000
800 - BR
200 - Local
- TOTAL
040623 Crawford 059 Natural Dam-North Strs. & Apprs. (S) Strs. & Apprs. 2016State State4,750
3,800 - BR
950 - State Match
- TOTAL
Page 78 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
040641 Washington 016 Middle Fork White River Str. & Apprs. (Fayetteville) (S) Str. & Apprs. 2016State State NARTS4,600
3,680 - BR
920 - State Match
- TOTAL
040X02 Sebastian CS Western & Eastern Rail Trolley Ext (PE) (Ft. Smith) (S) PE 2013Local Local FRONTIER238
238 - Earmarks
- TOTAL
040X03 Crawford Van Buren Port Facility Miscellaneous 2013Local Local FRONTIER51
41 - Earmarks
10 - Local
- TOTAL
BB0403 Craw & Frank 040 Dyer-Cravens Creek (S) Rehabilitation 14.10 2013State State
11,280
11,280
- Bond
- TOTAL
BB0405 Sebastian 540 Hwy. 271-Hwy. 71 (S) Rehabilitation 2.15 2015State State FRONTIER3,898
3,190 - IM
709 - State Match
- TOTAL
BB0407 Seb & Craw 540 Hwy. 22-I-40 (F) Rehabilitation 8.05 2013State State FRONTIER
67,300
67,300
- Bond
- TOTAL
BB0409 Craw & Wash 540 I-540 Pavement Rehabilitation (Sel. Secs.) (S) Rehabilitation 2015State State FRONTIER / NARTS
25,756
25,756
- Bond
- TOTAL
BB0410 Washington 540 Hwy. 62 Intchng. Impvts. (F) Interchange 2015State State NARTS
25,375
25,375
- Bond
- TOTAL
BB0411 Washington 540 Hwy. 16/112 Spur Intchng. Impvts. (S) Interchange 2015State State NARTS
19,285
19,285
- Bond
- TOTAL
BB0412 Washington 540 Greathouse Springs Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS1,500
1,350 - IM
150 - State Match
- TOTAL
BB0413 Washington 540 Elm Springs Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS4,000
3,600 - IM
400 - State Match
- TOTAL
Page 79 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
BB0414 Washington 540 Porter Rd.-Hwy. 112/71B Widening & Intchng. Impvts. (F) Major Widening & Interchange
2.50 2015State State NARTS54,977
33,119
7,400
- STP
- IM
9,102 - State Match
5,356 - Local
- TOTAL
Bond funds are for interchange modifications only - Bond funds cannot be used for widening the main lanes. City of Fayetteville transferred partnering commitment from Job 040489, Hwy. 112 Spur-North (Hwy. 112) to this project.
005836 Jackson 367 White River Str. & Apprs. (Newport) (S) Strs. & Apprs. 2014State State22,600
18,080 - BR
4,520 - State Match
- TOTAL
050213 Independence 167 Hwy. 394-CR 80 (Antioch Road) (S) Major Widening 5.11 2014State State18,750
15,000 - NHS
3,750 - State Match
- TOTAL
050214 Independence 167 CR 80 (Antioch Road)-South City Limits Cave City (F) Major Widening 4.57 2015State State17,500
14,000 - NHS
3,500 - State Match
- TOTAL
050230 Fulton 063 Hwy. 9-So. of Hwy. 342 (Mammoth Spring) (S) Major Widening 2014State State16,500
4,000
9,200
- NHS
- BR
3,300 - State Match
- TOTAL
050231 Stone 066 Mt. View-West (Passing Lane) (S) Passing Lane 1.20 2013State State3,000
2,400 - STP
600 - State Match
- TOTAL
050249 White NEW Hwy. 36-Hwy. 16 (Gr. & Strs.) (S) New Location 3.87 2016State State11,537
4,430 - STP
1,107 - State Match
6,000 - Local
- TOTAL
Partnering project – City and County to provide $6,000,000 of project costs.
Page 80 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
050250 White NEW Hwy. 36-Hwy. 16 (Bs. & Surf.) (S) New Location 3.80 2016State State6,688
5,350 - STP
1,338 - State Match
- TOTAL
Partnering project – City and County to provide $6,000,000 of project costs.
050251 White NEW Hwy. 16-Hwy. 67 (S) New Location 4.04 2014State State12,787
10,230 - STP
2,557 - State Match
- TOTAL
Partnering project – City and County to provide $6,000,000 of project costs.
050260 White 067 Hwy. 157-Hwy. 167 (Ph. II) (S) Rehabilitation 4.56 2013State State12,000
9,600 - NHS
2,400 - State Match
- TOTAL
050261 Cleb & Indep 025 Hwy. 25 Spur-Locust Grove (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000
4,000 - STP
1,000 - State Match
- TOTAL
050262 Cleb & White 016 Hwy. 25-Pangburn (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000
4,000 - STP
1,000 - State Match
- TOTAL
050263 White 064 Beebe-West (S) Major Widening 3.33 2016State State10,000
8,000 - NHS
2,000 - State Match
- TOTAL
050264 White 064 Hwy. 367-Woodruff Co. Line (Rehab.) (S) Rehabilitation 9.30 2016State State20,000
16,000 - STP
4,000 - State Match
- TOTAL
050266 Sharp 063 Hardy-East (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000
4,000 - NHS
1,000 - State Match
- TOTAL
050271 Fulton 009 Creek at L.M. 3.10 Str. & Apprs. (S) Strs. & Apprs. 2015State State750
600 - BR
150 - State Match
- TOTAL
Page 81 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
050272 Jackson 014 Cache River-Amagon Strs. & Apprs. (S) Strs. & Apprs. 2016State State8,250
6,600 - BR
1,650 - State Match
- TOTAL
050274 Fulton 063 Gut Creek Str. & Apprs. (S) Strs. & Apprs. 2016State State2,000
1,600 - BR
400 - State Match
- TOTAL
050275 Sharp 063 Hardy-Ozark Acres Strs. & Apprs. (S) Strs. & Apprs. 2016State State4,750
3,800 - BR
950 - State Match
- TOTAL
060395 Pulaski 367 Union Pacific RR Overpass (Arch St.) (LR) (S) Strs. & Apprs. 2014State State CARTS6,400
5,120 - BR
1,280 - State Match
- TOTAL
060432 Garland 007 Hwy. 290-Ouachita River Bridge (S) Major Widening 1.70 2015State State HSA-MPO6,000
4,800 - STP
1,200 - State Match
- TOTAL
060897 Lonoke 040 I-40/Hwy. 89 Intchg. (Lonoke) (S) Interchange 2013State/Local State CARTS7,062
1,600
3,822
- NHS
- Earmarks
400 - State Match
1,012 - Local
- STP > 200,000
- TOTAL
228
060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2014Local Local CARTS734
587 - Earmarks
147 - Local
- TOTAL
For Preliminary Engineering.
060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2015Local Local CARTS2,500
500 - Local
- STP > 200,000
- TOTAL
2,000
For Right-of-Way and Utility Relocation.
Page 82 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2016Local Local CARTS7,500
1,500 - Local
- STP > 200,000
- TOTAL
6,000
For Construction.
061084 Hot Spring 067 UPRR & Pine St. Str. & Apprs. (Donaldson) (S) Strs. & Apprs. 2015State State HSA-MPO3,800
3,040 - BR
760 - State Match
- TOTAL
061134 Saline 005 Hurricane Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS1,220
976 - BR
244 - State Match
- TOTAL
061194 Pulaski 010 Mississippi Ave.-Perryville Rd. (Hwy. 10) (L.R.) (S) Major Widening 0.65 2013State State CARTS3,000
2,700 - HSIP
300 - Local
- TOTAL
Partnering Project – City responsible for the 10% match of Safety funds.
061214 Garland 088 Printers Place-Crawford St. (Higdon Ferry Rd.) (Hot Springs) (S)
Major Widening 0.20 2013State State HSA-MPO3,800
1,216
1,824
- STP
- Earmarks
304 - State Match
456 - Local
- TOTAL
Partnering Project – City responsible for right of way acquisition and utility adjustments.
061275 Pulaski 070 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) (F) Strs. & Apprs. 2013State State CARTS58,000
46,400 - BR
11,600 - State Match
- TOTAL
061276 Pulaski 067 Redmond Rd. & Main St. Strs. & Apprs. (Jacksonville) (F) Strs. & Apprs. 2013State State CARTS17,300
13,840 - BR
3,460 - State Match
- TOTAL
061277 Pulaski 070 Union Pacific RR Str. & Apprs. (Roosevelt Rd.) (LR) (S) Strs. & Apprs. 2014State State CARTS7,400
5,920 - BR
1,480 - State Match
- TOTAL
Page 83 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
061294 Pulaski CS McCain Rail Grade Separation (NLR) (S) Grade Seperation 2013Local Local CARTS11,185
2,893 - Earmarks
2,237 - Local
- STP > 200,000
- TOTAL
6,055
061295 Pulaski CS Maryland Ave. Impvts. & Extension (Sherwood) Widening 2013Local Local CARTS405
81 - Local
- STP > 200,000
- TOTAL
324
061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2013Local Local CARTS1,065
213 - Local
- STP > 200,000
- TOTAL
852
For Right-of-Way and Preliminary Engineering of Utility Relocation.
061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2014Local Local CARTS2,788
558 - Local
- STP > 200,000
- TOTAL
2,230
For Utility Relocation
061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2015Local Local CARTS11,000
2,200 - Local
- STP > 200,000
- TOTAL
8,800
For Construction
061309 Hot Spr & Garland
007 So. of Hot Spring/Garland Co. Ln.-Hwy. 290 (S) Widening 2016State State HSA-MPO10,000
9,000 - HSIP
1,000 - State Match
- TOTAL
061312 Garland CS Hot Springs & Stokes Creeks Strs. & Apprs. (Hot Springs) (S) Str. & Apprs. 2013Local State HSA-MPO650
520 - BR
130 - Local
- TOTAL
Page 84 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
061317 Pulaski 040 Hwy. 365-I-430 (Widening) (Phase I) (F) Major Widening 5.63 2014State State CARTS23,000
8,400 - NHS
4,600 - State Match
10,000 - CMAQ FLEX
- TOTAL
This project will include modifications to the I-40/I-430 Interchange.
061329 Garland 007 Hot Springs-Hwy. 5 (Ph. I) (S) Improvements 6.20 2016State State HSA-MPO10,000
8,000 - STP
2,000 - State Match
- TOTAL
061330 Gar & Saline 070 Hot Springs-I-30 (Ph. I) (S) Major Widening 17.60 2015State State HSA-MPO/CARTS
20,000
16,000 - NHS
4,000 - State Match
- TOTAL
061331 Pulaski 010 Taylor Loop Rd.-Pleasant Valley Dr. (Ph. 1) (S) Major Widening 3.20 2016State State CARTS15,000
12,000 - STP
3,000 - State Match
- TOTAL
061332 Pulaski 430 I-30/I-430 Interchange Impvt. (L.R.) (F) Interchange 2014State State CARTS12,000
2,400 - State Match
9,600 - CMAQ FLEX
- TOTAL
061333 Pulaski 430 I-430/Hwy. 10 Interchange Impvt. (L.R.) (F) Interchange 2014State State CARTS11,000
8,800 - NHS
2,200 - State Match
- TOTAL
061334 Pul & Lonoke 067 Jacksonville-Cabot (Ph. I) (F) Capacity Impvts. 11.80 2016State State CARTS15,000
3,000 - State Match
12,000 - CMAQ FLEX
- TOTAL
061335 Saline 005 Springhill Rd.-Hwy. 183 (Bryant) (S) Major Widening 1.10 2015State State CARTS12,000
9,600 - STP
2,400 - State Match
- TOTAL
061348 Pulaski 365 UPRR/Parkway Dr. Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS6,000
4,800 - BR
1,200 - State Match
- TOTAL
Page 85 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
061349 Saline 183 Bauxite & Northern RR Spur Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS1,640
1,312 - BR
328 - State Match
- TOTAL
BB0602 Saline 030 Hwy. 70-West (West Bound Lanes) (S) Rehabilitation 2.90 2015State State CARTS
8,901
8,901
- Bond
- TOTAL
BB0604 Pulaski 040 I-30/I-40 Intchng.-Hwy. 67 (F) Rehabilitation 1.70 2016State State CARTS22,749
20,474 - IM
2,275 - State Match
- TOTAL
BB0610 Prairie 040 White River Str. & Apprs. (F) Str. & Apprs. 0.50 2015State State53,572
36,515
10,400
- IM
- BR
6,657 - State Match
- TOTAL
Bridge funds are for widening the bridge - Bond funds cannot be used for widening the bridge.
BB0611 Pulaski 440 I-30-Ark. River Bridge (F) Rehabilitation 3.00 2016State State CARTS25,042
22,538 - IM
2,504 - State Match
- TOTAL
BB0613 Pulaski 530 I-30-Bingham Rd. (F) Rehabilitation 8.50 2014State State CARTS
37,961
37,961
- Bond
- TOTAL
BB0614 Pulaski & Saline 530 Bingham Rd.-Grant Co. Line (S) Rehabilitation 7.50 2013State State CARTS
9,111
9,111
- Bond
- TOTAL
070240 Clark 051 Ouachita River Str. & Apprs. (Arkadelphia) (S) Strs. & Apprs. 2014State State7,800
6,240 - BR
1,560 - State Match
- TOTAL
070280 Union 167 El Dorado-Hwy. 335 (S) Major Widening 5.04 2013State State18,500
13,437
1,363
- STP
- Earmarks
3,700 - State Match
- TOTAL
Page 86 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
070281 Union 167 Hwy. 335-Ouachita River (S) Major Widening 2.97 2013State State10,600
8,480 - STP
2,120 - State Match
- TOTAL
070282 Union & Calh 167 Ouachita River Str. & Apprs. (S) Major Widening 1.76 2014State State25,700
20,560 - NHS
5,140 - State Match
- TOTAL
070283 Calhoun 167 Bangs Slough-Hwy. 172 (S) Major Widening 4.40 2016State State29,183
23,346 - NHS
5,837 - State Match
- TOTAL
070284 Calhoun 167 Hwy. 172-Hampton (S) Major Widening 5.90 2016State State22,295
17,836 - NHS
4,459 - State Match
- TOTAL
070289 Dallas & Cleve 167 Hwy. 273-Peters Rd. (CR 24) (F) Major Widening 5.30 2013State State26,600
21,280 - NHS
5,320 - State Match
- TOTAL
070344 Clark 067 Gurdon-Oak Grove Strs. & Apprs. (S) Strs. & Apprs. 2015State State5,300
4,240 - BR
1,060 - State Match
- TOTAL
070363 Clark 008 Hwy. 53-Hwy. 51 (Rehab.) (S) Rehabilitation 13.10 2013State State13,755
11,004 - STP
2,751 - State Match
- TOTAL
070364 Clark 051 Hwy. 26-Hwy. 8 (Rehab.) (S) Rehabilitation 4.80 2014State State4,000
3,200 - STP
800 - State Match
- TOTAL
070365 Columbia 082 Hwy. 79 No.-Hwy. 98 (Magnolia) (Ph. I) (S) Major Widening 13.00 2015State State20,000
16,000 - NHS
4,000 - State Match
- TOTAL
Page 87 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
070366 Col & Ouachita 079 Magnolia-Camden (Passing Lanes) (S) Passing Lanes 4.80 2015State State11,000
8,800 - STP
2,200 - State Match
- TOTAL
070367 Union VAR Hwy. 82/82B/167B Improvements (El Dorado) (S) Major Widening 9.43 2016State State47,000
37,600 - STP
9,400 - State Match
- TOTAL
Hwys. 82, 82B and 167B
070368 Union 335 Hwy. 82-Hwy. 7 (Rehab.) (S) Rehabilitation 7.60 2016State State8,000
6,400 - STP
1,600 - State Match
- TOTAL
070376 Clark 067 De Roche Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State2,400
1,920 - BR
480 - State Match
- TOTAL
070377 Union 82B UPRR Str. & Apprs. (El Dorado) (S) Strs. & Apprs. 2016State State8,000
6,400 - BR
1,600 - State Match
- TOTAL
Coordinate with Job 070367.
BB0702 Clark 030 Hwy. 26-Caddo River (F) Rehabilitation 8.30 2014State State
6,577
6,577
- Bond
- TOTAL
080157 Pope Intermodal Complex (Russellville) (S) Miscellaneous 2013Local Local2,908
2,326 - Earmarks
582 - Local
- TOTAL
080164 Pope 007 Hwy. 7 Improvements (Dover) (S) New Location 1.30 2014State State7,100
5,680 - STP
1,420 - State Match
- TOTAL
080340 Johnson 103 Market St.-I-40 WB Ramps (Clarksville) (S) Major Widening 0.40 2013State State4,800
3,840 - STP
960 - State Match
- TOTAL
Page 88 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
080377 Yell 007 Centerville-Dardanelle (Passing Lane) (S) Passing Lane 1.20 2013State State2,000
1,600 - STP
400 - State Match
- TOTAL
080379 Montgomery 027 Ouachita River Str. & Apprs. (S) Strs. & Apprs. 2014State State3,000
2,400 - BR
600 - State Match
- TOTAL
080385 Yell 007 Little Rock & Western RR Str. & Apprs. (S) Strs. & Apprs. 2013State State1,550
1,240 - BR
310 - State Match
- TOTAL
080386 Conway 095 East Fork Point Remove Creek-North & South Grade Impvts. (S)
Rehabilitation 0.80 2013State State2,200
1,760 - STP
440 - State Match
- TOTAL
080387 Conway 095 Overcup Creek-North & South Grade Impvts. (S) Rehabilitation 1.20 2013State State3,400
2,720 - STP
680 - State Match
- TOTAL
080389 Pope 124 Hob Nob Rd.-Crow Mtn. Rd. (Russellville) (S) Major Widening 1.00 2013Local State6,000
3,000 - STP
3,000 - Local
- TOTAL
Partnering Project – City to provide up to $3 million. Hwys. 124 and 326.
080390 Van Buren 065 Hwy. 16 East-Hwy. 65B South (Clinton) (S) Major Widening 1.41 2013State State11,000
8,800 - NHS
2,200 - State Match
- TOTAL
080391 Van Buren 065 N. of Bee Branch-Co. Rd. 28 (S) Major Widening 3.60 2013State State12,900
10,320 - NHS
2,580 - State Match
- TOTAL
080392 Pope 007 Newton Co. Line-South (Passing Lane) (S) Passing Lanes 1.30 2013State State2,200
1,760 - STP
440 - State Match
- TOTAL
Page 89 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
080395 Faulkner 040 Conway South Interchange-Hwy. 365 (Grading & Strs.) (F) New Location 0.84 2013Local State CARTS16,957
8,046
779
- NHS
- Earmarks
43 - State Match
6,918 - Local
- STP > 200,000
- TOTAL
1,171
Partnering Project – City to provide 50% of project costs.
080396 Faulkner 040 Conway South Interchange-Hwy. 365 (Base & Surf.) (S) New Location 0.84 2014Local State CARTS4,374
2,187 - NHS
2,187 - Local
- TOTAL
Partnering Project – City to provide 50% of project costs.
080397 Faulkner 025 Hwy. 25 Relocation (I-40-North) (S) New Location 1.22 2014State State CARTS6,000
3,000 - STP
2,121 - Local
- STP > 200,000
- TOTAL
879
Partnering Project – City and County to provide 50% of project costs.
080411 Faulkner 040 Palarm Creek-West (Widening) (F) Major Widening 4.78 2013State State CARTS25,800
20,640 - STP
5,160 - State Match
- TOTAL
080422 Pope 007 Dover-North (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000
4,000 - STP
1,000 - State Match
- TOTAL
080423 Van Buren 065 Bee Branch-North (S) Major Widening 8.07 2016State State20,000
16,000 - NHS
4,000 - State Match
- TOTAL
080426 Faulkner 285 Bono-Hwy. 124 (Rehab.) (S) Rehabilitation 5.40 2014State State CARTS4,000
3,200 - STP
800 - State Match
- TOTAL
080427 Pope 124 Crow Mtn. Rd.-Center Valley Rd. (S) Major Widening 2.15 2014State State7,000
5,600 - STP
1,400 - State Match
- TOTAL
Page 90 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
080428 Yell 027 Danville-Dardanelle (Passing Lanes) (S) Passing Lanes 2.40 2014State State5,000
4,000 - STP
1,000 - State Match
- TOTAL
080430 Faulkner Hwy. 365-Sturgis Rd (Gr. & Strs.) (S) New Location 2013Local Local CARTS6,140
6,140 - Local
- TOTAL
080431 Faulkner Hwy. 365-Sturgis Rd (Bs. & Surf.) (S) New Location 2014Local Local CARTS3,300
3,300 - Local
- TOTAL
080437 Johnson CS Hwy. 64-East (Massengale Rd.) (Clarksville) (S) Reconstruction 2014Local State973
195 - Local
- STP < 200,000
- TOTAL
778
080439 Perry 007 Bear Creek & So. Fourche La Fave River Strs. & Apprs. (S) Strs. & Apprs. 2016State State5,150
4,120 - BR
1,030 - State Match
- TOTAL
080441 Yell 007 Keeland Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,000
800 - BR
200 - State Match
- TOTAL
080443 Pope 064 White Oak Creek Str. & Apprs. (S) Strs. & Apprs. 2016State State1,700
1,360 - BR
340 - State Match
- TOTAL
080444 Johnson 123 Haw Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100
880 - BR
220 - State Match
- TOTAL
080445 Van Buren 124 Cadron Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,900
1,520 - BR
380 - State Match
- TOTAL
080446 Perry 216 Coffee Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,000
800 - BR
200 - State Match
- TOTAL
Page 91 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
080457 Faulkner 089 UPRR Overpass & Realign. (Mayflower) (S) Strs. & Apprs. 2016State State CARTS15,000
8,000 - STP
2,500 - State Match
4,500 - RRP
- TOTAL
080464 Pope 007 Newton Co. Line-South (Passing Lane) (Ph. II) (S) Passing Lane 1.20 2013State State2,200
1,760 - STP
440 - State Match
- TOTAL
BB0803 John & Pope 040 Hwy. 64-Mill Creek (S) Rehabilitation 13.10 2015State State
10,637
10,637
- Bond
- TOTAL
BB0804 Pope 040 Mill Creek-Hwy. 331(F) Rehabilitation 6.80 2013State State
30,700
37,087
- Bond
5,748 - IM
639 - State Match
- TOTAL
BB0805 Pope 040 Hwy. 331-Atkins (S) Rehabilitation 10.80 2014State State
8,770
9,263
- Bond
444 - HSIP
49 - State Match
- TOTAL
Includes Safety Funds for Cable Median Barriers.
BB0806 Pope & Con 040 Atkins-Plumerville (S) Rehabilitation 18.60 2013State State
16,473
18,826
- Bond
2,118 - HSIP
235 - State Match
- TOTAL
Includes Safety Funds for Cable Median Barriers.
009784 Newton 007 Buffalo River Br. & Apprs. (Pruitt) (S) Strs. & Apprs. 2014State State2,600
2,080 - BR
520 - State Match
- TOTAL
009814 Baxter 201 E. Pigeon Creek Strs. & Apprs. (S) Strs. & Apprs. 2016State State2,000
1,600 - BR
400 - State Match
- TOTAL
Page 92 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
009831 Searcy VAR Gourd & Granney Creek Strs. & Apprs. (S) Strs. & Apprs. 2015State State750
600 - BR
150 - State Match
- TOTAL
Hwys. 74 and 377
090065 Benton 062 Avoca-North Garfield (S) Major Widening 6.43 2013State State NARTS29,300
23,440 - NHS
5,860 - State Match
- TOTAL
090069 Benton NEW Northwest Arkansas Regional Airport Access (F) New Location 2013Local Local NARTS35,000
10,668 - Earmarks
24,332 - Local
- TOTAL
090169 Newton 007 Jasper-Co. Rd. 46 (Passing Lanes) (S) Passing Lanes 1.00 2014State State3,000
2,400 - STP
600 - State Match
- TOTAL
090218 Benton 540 I-540/Hwy. 62/102 Intchng. & 8th Street Impvts. (Bentonville) (F)
Interchange 2013Local Local NARTS53,000
4,000
28,812
- NHS
- Earmarks
20,188 - Local
- TOTAL
Partnering Project – AHTD to provide $5,597,323 (this includes $1,597,323 HPP plus State Match and $4 million in NHS funds that will require Local Match.)
090219 Carroll 062 Green Forest-Alpena (Phase I) (S) Major Widening 2.00 2015State State17,400
13,920 - STP
3,480 - State Match
- TOTAL
090240 Benton 264 Hwy. 264 Impvts.(Lowell) (S) Capacity Impvts. 2016Local State/Local NARTS2,850
1,000 - STP
850 - Local
- STP < 200,000
- TOTAL
1,000
Partnering Project - City to provide $600,000 in local funds plus matching funds for STP<200,000 funds.
Page 93 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
090251 Benton 012 Hwy. 71B-Shell Rd. (Hwy. 12) (Bentonville) (S) Major Widening 2.70 2013State State NARTS12,200
10,400 - Local
- TOTAL
1,800 - 100% State
Partnering Project – City to provide up to $10.4 million.
090269 Benton CS Cherry St.-Mt. Olive St. (Kenwood St.) (Siloam Springs) (S) Reconstruction 0.50 2014Local State NARTS1,100
220 - Local
- STP < 200,000
- TOTAL
880
090281 Baxter 005 North Fork River Str. & Apprs. (Norfork) (S) Strs. & Apprs. 2013State State5,200
4,160 - BR
1,040 - State Match
- TOTAL
090282 Benton 016 Illinois River Str. & Apprs. (S) Strs. & Apprs. 2016State State NARTS5,000
4,000 - BR
1,000 - State Match
- TOTAL
090284 Benton 264 Hwy. 71B-Hwy. 265 (Springdale) (S) Major Widening 1.40 2013State State NARTS8,100
6,480 - STP
1,620 - State Match
- TOTAL
090305 Benton 540 New Hope Rd.-Hwy. 62/102 Widening (Rogers) (F) Major Widening 2.66 2014State State NARTS16,000
12,800 - NHS
3,200 - State Match
- TOTAL
090319 Baxter 201 Hwy. 62-Hwy. 5 (Mountain Home) (S) Major Widening 1.51 2014State State8,000
6,000 - STP
2,000 - Local
- TOTAL
Partnering Project – City responsible for 20% of project costs (up to $2 million maximum) and accepting responsibility for various highways upon completion of project.
090330 Carroll 062 East of Berryville-Hwy. 103 South (S) Major Widening 4.30 2015State State15,000
12,000 - STP
3,000 - State Match
- TOTAL
090331 Benton 540 Wagon Wheel Rd.-Hwy. 264 (Widening) (S) Major Widening 2.56 2014State State NARTS15,700
12,560 - NHS
3,140 - State Match
- TOTAL
Page 94 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
090338 Benton 71B Dixieland Rd.-8th St. (Rogers) (S) Major Widening 1.00 2016Local State NARTS6,200
3,000 - STP
3,200 - Local
- TOTAL
Partnering Project – City to provide 50% of total project costs up to $5 million + additional $200,000 for 6' sidewalks. Amount shown - $6 M - is for construction only.
090342 Marion 014 Mill Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,400
1,120 - BR
280 - State Match
- TOTAL
090343 Madison 023 Hwy. 74-Huntsville Strs. & Apprs. (S) Strs. & Apprs. 2015State State5,000
4,000 - BR
1,000 - State Match
- TOTAL
090346 Carroll 221 Town Branch Str. & Apprs. (S) Strs. & Apprs. 2016State State1,000
800 - BR
200 - State Match
- TOTAL
BB0901 Benton 540 Wagon Wheel Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS1,523
1,371 - IM
152 - State Match
- TOTAL
BB0902 Benton 540 Hwy. 264 Intchng. Impvts. (S) Interchange 2013State State NARTS
4,000
4,000
- Bond
- TOTAL
BB0903 Benton 540 Hwy. 71B Intchng. Impvts. (F) Interchange 2015State State NARTS19,868
17,881 - IM
1,987 - State Match
- TOTAL
100404 Lawrence 067 Hwy. 230-Hwy. 63 (Bs. & Surf.) (S) New Location 9.78 2013State State36,000
28,800 - NHS
7,200 - State Match
- TOTAL
100567 Craighead 018 North of Black Oak-Monette Bypass (S) Major Widening 1.40 2013State State6,000
4,800 - STP
1,200 - State Match
- TOTAL
Page 95 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
100643 Craighead 226 Cash Bypass (Gr. & Strs.) (S) Major Widening 2.92 2013State State10,500
8,400 - Earmarks
2,100 - State Match
- TOTAL
100651 Craighead 018 Monette Bypass (Gr. & Strs.) (S) New Location 3.60 2014State State19,500
15,600 - STP
3,900 - State Match
- TOTAL
100653 Craig & Miss 018 Monette Bypass-Manila (S) Major Widening 6.90 2013State State26,500
21,200 - STP
5,300 - State Match
- TOTAL
100654 Mississippi 018 Hwy. 18 Improvements (Manila) (S) Major Widening 4.30 2014State State21,000
16,800 - STP
4,200 - State Match
- TOTAL
100672 Craighead 063 Hwy. 63 Interchange Impvts. (Jonesboro) (S) Safety & Traf Eng 2013Local State JATS595
466 - Earmarks
129 - Local
- TOTAL
100676 Craighead 226 Cash Bypass (Bs. & Surf.) (S) Major Widening 2.92 2014State State9,000
7,200 - Earmarks
1,800 - State Match
- TOTAL
100686 Lawrence 063 Black Rock-Portia (S) Major Widening 1.55 2013State State10,200
8,160 - NHS
2,040 - State Match
- TOTAL
100708 Greene 412 Hwy. 412 West-Hwy. 49 (Gr. & Strs.) (S) New Location 5.23 2015State State10,600
8,480 - NHS
2,120 - State Match
- TOTAL
100709 Greene 412 Hwy. 412 West-Hwy. 49 (Bs. & Surf.) (S) New Location 5.23 2016State State9,100
7,280 - NHS
1,820 - State Match
- TOTAL
Page 96 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
100711 Greene 412 Hwy. 49-Hwy. 412 East (Bs. & Surf.) (S) New Location 5.20 2014State State8,600
3,980
3,400
- NHS
- Earmarks
1,220 - State Match
- TOTAL
100759 Randolph 067 Black River Str. & Apprs. (Pocahontas) (S) Strs. & Apprs. 2016State State8,500
6,800 - BR
1,700 - State Match
- TOTAL
100760 Mississippi VAR Left Hand Chute of Little River Strs. & Apprs. (S) Strs. & Apprs. 2015State State4,425
3,540 - BR
885 - State Match
- TOTAL
Hwys. 77 & 140
100764 Poinsett 214 Bayou DeView Str. & Apprs. (S) Strs. & Apprs. 2015State State1,250
1,000 - BR
250 - State Match
- TOTAL
100X01 Craighead 226 Cash Bypass - Hwy. 49 (S) Major Widening 6.88 2014State State JATS55,000
44,000 - STP
11,000 - State Match
- TOTAL
BB1003 Mississippi 055 Hwy. 181-Hwy. 158 (F) Rehabilitation 7.90 2013State State
31,600
31,600
- Bond
- TOTAL
BB1006 Mississippi 055 No. of Hwy. 18-Missouri St. Line (S) Rehabilitation 4.22 2015State State
17,390
17,390
- Bond
- TOTAL
012145 Faulk & Pulaski 040 Palarm Creek-Hwy. 365 (Widening) (F) Major Widening 4.31 2013State State CARTS18,200
4,560 - STP
3,640 - State Match
10,000 - CMAQ FLEX
- TOTAL
Funding Breakdown: District 6 - $17.0 M / District 8 - $1.2 M.
012153 Benton & Wash 265 Eastern North-South Corridor (Phase I) (S) Connectivity & Capacity Impvts.
1.00 2013State State NARTS5,000
4,000 - STP
1,000 - State Match
- TOTAL
Page 97 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:21 AM
012153B Benton & Wash 265 Eastern North-South Corridor (Phase II) (S) Connectivity & Capacity Impvts.
3.80 2015State State NARTS20,000
16,000 - STP
4,000 - State Match
- TOTAL
012155 Faulk & White 064 Vilonia Bypass-East (F) Major Widening 7.14 2015State State CARTS25,000
20,000 - NHS
5,000 - State Match
- TOTAL
061--- Pulaski 440 Hwy. 67-I-40 West (North Belt Freeway Toll Feasibility Study) Planning 2013State State CARTS500
100 - State Match
- STP > 200,000
150 - CMAQ FLEX
- TOTAL
250
Partnering Project – Metroplan to provide 50% of project costs.
BB1103 Frank & John 040 Ozark-Hwy. 164 (S) Rehabilitation 8.20 2014State State
6,658
6,658
- Bond
- TOTAL
Page 98 of 125
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
State and Local Projects Sorted by County
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:42 AM
020538 Arkansas 001 La Grue Bayou Str. & Apprs. (S) Strs. & Apprs. 2015State State2,700
2,160 - BR
540 - State Match
- TOTAL
020539 Arkansas 011 Bayou Meto Str. & Apprs. (S) Strs. & Apprs. 2016State State3,500
2,800 - BR
700 - State Match
- TOTAL
020509 Ashley 082 Hwy. 165 Str. & Apprs. (Montrose) (S) Strs. & Apprs. 2014State State4,000
3,200 - BR
800 - State Match
- TOTAL
020534 Ashley 082 Co. Rd. 411-Hwy. 425 (East of Crossett) (S) Major Widening 6.10 2016State State23,000
18,400 - NHS
4,600 - State Match
- TOTAL
009814 Baxter 201 E. Pigeon Creek Strs. & Apprs. (S) Strs. & Apprs. 2016State State2,000
1,600 - BR
400 - State Match
- TOTAL
090281 Baxter 005 North Fork River Str. & Apprs. (Norfork) (S) Strs. & Apprs. 2013State State5,200
4,160 - BR
1,040 - State Match
- TOTAL
090319 Baxter 201 Hwy. 62-Hwy. 5 (Mountain Home) (S) Major Widening 1.51 2014State State8,000
6,000 - STP
2,000 - Local
- TOTAL
Partnering Project – City responsible for 20% of project costs (up to $2 million maximum) and accepting responsibility for various highways upon completion of project.
090065 Benton 062 Avoca-North Garfield (S) Major Widening 6.43 2013State State NARTS29,300
23,440 - NHS
5,860 - State Match
- TOTAL
090069 Benton NEW Northwest Arkansas Regional Airport Access (F) New Location 2013Local Local NARTS35,000
10,668 - Earmarks
24,332 - Local
- TOTAL
Page 99 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
090218 Benton 540 I-540/Hwy. 62/102 Intchng. & 8th Street Impvts. (Bentonville) (F)
Interchange 2013Local Local NARTS53,000
4,000
28,812
- NHS
- Earmarks
20,188 - Local
- TOTAL
Partnering Project – AHTD to provide $5,597,323 (this includes $1,597,323 HPP plus State Match and $4 million in NHS funds that will require Local Match.)
090240 Benton 264 Hwy. 264 Impvts.(Lowell) (S) Capacity Impvts. 2016Local State/Local NARTS2,850
1,000 - STP
850 - Local
- STP < 200,000
- TOTAL
1,000
Partnering Project - City to provide $600,000 in local funds plus matching funds for STP<200,000 funds.
090251 Benton 012 Hwy. 71B-Shell Rd. (Hwy. 12) (Bentonville) (S) Major Widening 2.70 2013State State NARTS12,200
10,400 - Local
- TOTAL
1,800 - 100% State
Partnering Project – City to provide up to $10.4 million.
090269 Benton CS Cherry St.-Mt. Olive St. (Kenwood St.) (Siloam Springs) (S) Reconstruction 0.50 2014Local State NARTS1,100
220 - Local
- STP < 200,000
- TOTAL
880
090282 Benton 016 Illinois River Str. & Apprs. (S) Strs. & Apprs. 2016State State NARTS5,000
4,000 - BR
1,000 - State Match
- TOTAL
090284 Benton 264 Hwy. 71B-Hwy. 265 (Springdale) (S) Major Widening 1.40 2013State State NARTS8,100
6,480 - STP
1,620 - State Match
- TOTAL
090305 Benton 540 New Hope Rd.-Hwy. 62/102 Widening (Rogers) (F) Major Widening 2.66 2014State State NARTS16,000
12,800 - NHS
3,200 - State Match
- TOTAL
090331 Benton 540 Wagon Wheel Rd.-Hwy. 264 (Widening) (S) Major Widening 2.56 2014State State NARTS15,700
12,560 - NHS
3,140 - State Match
- TOTAL
Page 100 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
090338 Benton 71B Dixieland Rd.-8th St. (Rogers) (S) Major Widening 1.00 2016Local State NARTS6,200
3,000 - STP
3,200 - Local
- TOTAL
Partnering Project – City to provide 50% of total project costs up to $5 million + additional $200,000 for 6' sidewalks. Amount shown - $6 M - is for construction only.
BB0901 Benton 540 Wagon Wheel Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS1,523
1,371 - IM
152 - State Match
- TOTAL
BB0902 Benton 540 Hwy. 264 Intchng. Impvts. (S) Interchange 2013State State NARTS
4,000
4,000- Bond
- TOTAL
BB0903 Benton 540 Hwy. 71B Intchng. Impvts. (F) Interchange 2015State State NARTS19,868
17,881 - IM
1,987 - State Match
- TOTAL
012153 Benton & Wash 265 Eastern North-South Corridor (Phase I) (S) Connectivity & Capacity Impvts.
1.00 2013State State NARTS5,000
4,000 - STP
1,000 - State Match
- TOTAL
012153B Benton & Wash 265 Eastern North-South Corridor (Phase II) (S) Connectivity & Capacity Impvts.
3.80 2015State State NARTS20,000
16,000 - STP
4,000 - State Match
- TOTAL
070283 Calhoun 167 Bangs Slough-Hwy. 172 (S) Major Widening 4.40 2016State State29,183
23,346 - NHS
5,837 - State Match
- TOTAL
070284 Calhoun 167 Hwy. 172-Hampton (S) Major Widening 5.90 2016State State22,295
17,836 - NHS
4,459 - State Match
- TOTAL
090219 Carroll 062 Green Forest-Alpena (Phase I) (S) Major Widening 2.00 2015State State17,400
13,920 - STP
3,480 - State Match
- TOTAL
Page 101 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
090330 Carroll 062 East of Berryville-Hwy. 103 South (S) Major Widening 4.30 2015State State15,000
12,000 - STP
3,000 - State Match
- TOTAL
090346 Carroll 221 Town Branch Str. & Apprs. (S) Strs. & Apprs. 2016State State1,000
800 - BR
200 - State Match
- TOTAL
020043 Chicot 144 Hwy. 144 Strs. & Apprs. (S) Strs. & Apprs. 2015State State2,100
1,680 - BR
420 - State Match
- TOTAL
020535 Chicot 165 Hwy. 208-Hwy. 65 (Rehab.) (Sel. Secs.) (S) Rehabilitation 4.36 2014State State3,000
2,400 - STP
600 - State Match
- TOTAL
070240 Clark 051 Ouachita River Str. & Apprs. (Arkadelphia) (S) Strs. & Apprs. 2014State State7,800
6,240 - BR
1,560 - State Match
- TOTAL
070344 Clark 067 Gurdon-Oak Grove Strs. & Apprs. (S) Strs. & Apprs. 2015State State5,300
4,240 - BR
1,060 - State Match
- TOTAL
070363 Clark 008 Hwy. 53-Hwy. 51 (Rehab.) (S) Rehabilitation 13.10 2013State State13,755
11,004 - STP
2,751 - State Match
- TOTAL
070364 Clark 051 Hwy. 26-Hwy. 8 (Rehab.) (S) Rehabilitation 4.80 2014State State4,000
3,200 - STP
800 - State Match
- TOTAL
070376 Clark 067 De Roche Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State2,400
1,920 - BR
480 - State Match
- TOTAL
BB0702 Clark 030 Hwy. 26-Caddo River (F) Rehabilitation 8.30 2014State State
6,577
6,577- Bond
- TOTAL
Page 102 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
050261 Cleb & Indep 025 Hwy. 25 Spur-Locust Grove (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000
4,000 - STP
1,000 - State Match
- TOTAL
050262 Cleb & White 016 Hwy. 25-Pangburn (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000
4,000 - STP
1,000 - State Match
- TOTAL
070366 Col & Ouachita 079 Magnolia-Camden (Passing Lanes) (S) Passing Lanes 4.80 2015State State11,000
8,800 - STP
2,200 - State Match
- TOTAL
070365 Columbia 082 Hwy. 79 No.-Hwy. 98 (Magnolia) (Ph. I) (S) Major Widening 13.00 2015State State20,000
16,000 - NHS
4,000 - State Match
- TOTAL
080386 Conway 095 East Fork Point Remove Creek-North & South Grade Impvts. (S)
Rehabilitation 0.80 2013State State2,200
1,760 - STP
440 - State Match
- TOTAL
080387 Conway 095 Overcup Creek-North & South Grade Impvts. (S) Rehabilitation 1.20 2013State State3,400
2,720 - STP
680 - State Match
- TOTAL
100653 Craig & Miss 018 Monette Bypass-Manila (S) Major Widening 6.90 2013State State26,500
21,200 - STP
5,300 - State Match
- TOTAL
100567 Craighead 018 North of Black Oak-Monette Bypass (S) Major Widening 1.40 2013State State6,000
4,800 - STP
1,200 - State Match
- TOTAL
100643 Craighead 226 Cash Bypass (Gr. & Strs.) (S) Major Widening 2.92 2013State State10,500
8,400 - Earmarks
2,100 - State Match
- TOTAL
Page 103 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
100651 Craighead 018 Monette Bypass (Gr. & Strs.) (S) New Location 3.60 2014State State19,500
15,600 - STP
3,900 - State Match
- TOTAL
100672 Craighead 063 Hwy. 63 Interchange Impvts. (Jonesboro) (S) Safety & Traf Eng 2013Local State JATS595
466 - Earmarks
129 - Local
- TOTAL
100676 Craighead 226 Cash Bypass (Bs. & Surf.) (S) Major Widening 2.92 2014State State9,000
7,200 - Earmarks
1,800 - State Match
- TOTAL
100X01 Craighead 226 Cash Bypass - Hwy. 49 (S) Major Widening 6.88 2014State State JATS55,000
44,000 - STP
11,000 - State Match
- TOTAL
BB0403 Craw & Frank 040 Dyer-Cravens Creek (S) Rehabilitation 14.10 2013State State
11,280
11,280- Bond
- TOTAL
BB0409 Craw & Wash 540 I-540 Pavement Rehabilitation (Sel. Secs.) (S) Rehabilitation 2015State State FRONTIER / NARTS
25,756
25,756
- Bond
- TOTAL
040456 Crawford 162 Hwy. 162 Improvements (Alma) (S) New Location 0.70 2014State State FRONTIER6,000
4,800 - STP
200 - State Match
1,000 - Local
- TOTAL
Partnering Project – City responsible for right of way acquisition, utility adjustments, $1 million toward cost of construction, and accepting responsibility for various highways upon completion of project.
040623 Crawford 059 Natural Dam-North Strs. & Apprs. (S) Strs. & Apprs. 2016State State4,750
3,800 - BR
950 - State Match
- TOTAL
040X03 Crawford Van Buren Port Facility Miscellaneous 2013Local Local FRONTIER51
41 - Earmarks
10 - Local
- TOTAL
Page 104 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2013Local Local WMATS250
250 - Earmarks
- TOTAL
For Environmental Assessment.
110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2014Local Local WMATS450
450 - Earmarks
- TOTAL
For Preliminary Engineering.
110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2015Local Local WMATS1,400
1,337 - Earmarks
63 - Local
- TOTAL
For Right-of-Way and Utility Relocation.
110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2016Local Local WMATS7,900
3,169 - Earmarks
3,111 - Local
1,620 - CMAQ - AQ
- TOTAL
For Construction.
110557 Crittenden 147 Hwy. 131-North (S) Rehabilitation 5.50 2015State State2,000
1,600 - STP
400 - State Match
- TOTAL
110567 Crittenden 042 Deer Bayou Str. & Apprs. (S) Strs. & Apprs. 2016State State WMATS1,100
880 - BR
220 - State Match
- TOTAL
110571 Crittenden 149 Ditch at L.M. 2.30 Str. & Apprs. (S) Strs. & Apprs. 2016State State1,500
1,200 - BR
300 - State Match
- TOTAL
110583 Crittenden CS Ingram Blvd.-East (Southland Dr.) (West Memphis) (S) Reconstruction 2013Local Local WMATS2,738
547 - Local
- STP > 200,000
- TOTAL
2,191
110XX1 Crittenden CS Ingram Blvd.-West (Southland Dr.) (West Memphis) (S) New Location 2014Local Local WMATS3,084
616 - Local
- STP > 200,000
- TOTAL
2,468
Page 105 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
110XX2 Crittenden CS Harahan Bikeway Connector (West Memphis - Mississippi River)
New Location 2014Local Local WMATS850
850 - CMAQ - AQ
- TOTAL
BB0107 Crittenden 040 Shearerville-Hwy. 77 (F) Rehabilitation 12.90 2015State State WMATS
12,299
12,299- Bond
- TOTAL
BB0108 Crittenden 040 Hwy. 77-I-55 (F) Rehabilitation 2.20 2013State State WMATS
23,892
23,892- Bond
- TOTAL
BB0109 Crittenden 055 I-40-Jericho (S) Rehabilitation 8.23 2013State State WMATS
9,784
9,784- Bond
- TOTAL
BB0110 Crittenden 055 Jericho-Lake David (S) Rehabilitation 8.00 2014State State
6,496
6,496- Bond
- TOTAL
110147 Cross 284 Branch of Caney Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100
880 - BR
220 - State Match
- TOTAL
070289 Dallas & Cleve 167 Hwy. 273-Peters Rd. (CR 24) (F) Major Widening 5.30 2013State State26,600
21,280 - NHS
5,320 - State Match
- TOTAL
020462 Drew 069 Monticello Bypass (F) New Location 2015State State68,970
55,176 - Earmarks
13,794 - State Match
- TOTAL
012145 Faulk & Pulaski 040 Palarm Creek-Hwy. 365 (Widening) (F) Major Widening 4.31 2013State State CARTS18,200
4,560 - STP
3,640 - State Match
10,000 - CMAQ FLEX
- TOTAL
Funding Breakdown: District 6 - $17.0 M / District 8 - $1.2 M.
012155 Faulk & White 064 Vilonia Bypass-East (F) Major Widening 7.14 2015State State CARTS25,000
20,000 - NHS
5,000 - State Match
- TOTAL
Page 106 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
080395 Faulkner 040 Conway South Interchange-Hwy. 365 (Grading & Strs.) (F) New Location 0.84 2013Local State CARTS16,957
8,046
779
- NHS
- Earmarks
43 - State Match
6,918 - Local
- STP > 200,000
- TOTAL
1,171
Partnering Project – City to provide 50% of project costs.
080396 Faulkner 040 Conway South Interchange-Hwy. 365 (Base & Surf.) (S) New Location 0.84 2014Local State CARTS4,374
2,187 - NHS
2,187 - Local
- TOTAL
Partnering Project – City to provide 50% of project costs.
080397 Faulkner 025 Hwy. 25 Relocation (I-40-North) (S) New Location 1.22 2014State State CARTS6,000
3,000 - STP
2,121 - Local
- STP > 200,000
- TOTAL
879
Partnering Project – City and County to provide 50% of project costs.
080411 Faulkner 040 Palarm Creek-West (Widening) (F) Major Widening 4.78 2013State State CARTS25,800
20,640 - STP
5,160 - State Match
- TOTAL
080426 Faulkner 285 Bono-Hwy. 124 (Rehab.) (S) Rehabilitation 5.40 2014State State CARTS4,000
3,200 - STP
800 - State Match
- TOTAL
080430 Faulkner Hwy. 365-Sturgis Rd (Gr. & Strs.) (S) New Location 2013Local Local CARTS6,140
6,140 - Local
- TOTAL
080431 Faulkner Hwy. 365-Sturgis Rd (Bs. & Surf.) (S) New Location 2014Local Local CARTS3,300
3,300 - Local
- TOTAL
080457 Faulkner 089 UPRR Overpass & Realign. (Mayflower) (S) Strs. & Apprs. 2016State State CARTS15,000
8,000 - STP
2,500 - State Match
4,500 - RRP
- TOTAL
Page 107 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
BB1103 Frank & John 040 Ozark-Hwy. 164 (S) Rehabilitation 8.20 2014State State
6,658
6,658- Bond
- TOTAL
040493 Franklin CS Hillbilly Lane-Hwy. 23 (Ozark) (S) New Location 0.90 2013Local State1,935
935 - Local
- STP < 200,000
- TOTAL
1,000
050230 Fulton 063 Hwy. 9-So. of Hwy. 342 (Mammoth Spring) (S) Major Widening 2014State State16,500
4,000
9,200
- NHS
- BR
3,300 - State Match
- TOTAL
050271 Fulton 009 Creek at L.M. 3.10 Str. & Apprs. (S) Strs. & Apprs. 2015State State750
600 - BR
150 - State Match
- TOTAL
050274 Fulton 063 Gut Creek Str. & Apprs. (S) Strs. & Apprs. 2016State State2,000
1,600 - BR
400 - State Match
- TOTAL
061330 Gar & Saline 070 Hot Springs-I-30 (Ph. I) (S) Major Widening 17.60 2015State State HSA-MPO/CARTS
20,000
16,000 - NHS
4,000 - State Match
- TOTAL
060432 Garland 007 Hwy. 290-Ouachita River Bridge (S) Major Widening 1.70 2015State State HSA-MPO6,000
4,800 - STP
1,200 - State Match
- TOTAL
061214 Garland 088 Printers Place-Crawford St. (Higdon Ferry Rd.) (Hot Springs) (S)
Major Widening 0.20 2013State State HSA-MPO3,800
1,216
1,824
- STP
- Earmarks
304 - State Match
456 - Local
- TOTAL
Partnering Project – City responsible for right of way acquisition and utility adjustments.
Page 108 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
061312 Garland CS Hot Springs & Stokes Creeks Strs. & Apprs. (Hot Springs) (S) Str. & Apprs. 2013Local State HSA-MPO650
520 - BR
130 - Local
- TOTAL
061329 Garland 007 Hot Springs-Hwy. 5 (Ph. I) (S) Improvements 6.20 2016State State HSA-MPO10,000
8,000 - STP
2,000 - State Match
- TOTAL
020543 Grant 291 Moore's Slough Tributary Str. & Apprs. (S) Strs. & Apprs. 2015State State1,200
960 - BR
240 - State Match
- TOTAL
100708 Greene 412 Hwy. 412 West-Hwy. 49 (Gr. & Strs.) (S) New Location 5.23 2015State State10,600
8,480 - NHS
2,120 - State Match
- TOTAL
100709 Greene 412 Hwy. 412 West-Hwy. 49 (Bs. & Surf.) (S) New Location 5.23 2016State State9,100
7,280 - NHS
1,820 - State Match
- TOTAL
100711 Greene 412 Hwy. 49-Hwy. 412 East (Bs. & Surf.) (S) New Location 5.20 2014State State8,600
3,980
3,400
- NHS
- Earmarks
1,220 - State Match
- TOTAL
BB0305 Hempstead 030 Hwy. 67-Sheppard (F) Rehabilitation 4.10 2016State State
18,864
18,864- Bond
- TOTAL
BB0306 Hempstead 030 Sheppard-Hwy. 278 (S) Rehabilitation 7.10 2014State State
20,178
20,178- Bond
- TOTAL
061309 Hot Spr & Garland
007 So. of Hot Spring/Garland Co. Ln.-Hwy. 290 (S) Widening 2016State State HSA-MPO10,000
1,000 - State Match
- TOTAL
9,000 - HSIP
Page 109 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
061084 Hot Spring 067 UPRR & Pine St. Str. & Apprs. (Donaldson) (S) Strs. & Apprs. 2015State State HSA-MPO3,800
3,040 - BR
760 - State Match
- TOTAL
050213 Independence 167 Hwy. 394-CR 80 (Antioch Road) (S) Major Widening 5.11 2014State State18,750
15,000 - NHS
3,750 - State Match
- TOTAL
050214 Independence 167 CR 80 (Antioch Road)-South City Limits Cave City (F) Major Widening 4.57 2015State State17,500
14,000 - NHS
3,500 - State Match
- TOTAL
005836 Jackson 367 White River Str. & Apprs. (Newport) (S) Strs. & Apprs. 2014State State22,600
18,080 - BR
4,520 - State Match
- TOTAL
050272 Jackson 014 Cache River-Amagon Strs. & Apprs. (S) Strs. & Apprs. 2016State State8,250
6,600 - BR
1,650 - State Match
- TOTAL
BB0201 Jefferson 530 Jefferson-Hwy. 104 (S) Rehabilitation 6.10 2016State State PBATS6,284
5,656 - IM
628 - State Match
- TOTAL
BB0803 John & Pope 040 Hwy. 64-Mill Creek (S) Rehabilitation 13.10 2015State State
10,637
10,637- Bond
- TOTAL
080340 Johnson 103 Market St.-I-40 WB Ramps (Clarksville) (S) Major Widening 0.40 2013State State4,800
3,840 - STP
960 - State Match
- TOTAL
080437 Johnson CS Hwy. 64-East (Massengale Rd.) (Clarksville) (S) Reconstruction 2014Local State973
195 - Local
- STP < 200,000
- TOTAL
778
080444 Johnson 123 Haw Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100
880 - BR
220 - State Match
- TOTAL
Page 110 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
030343 Lafayette 082 Hwy. 82 Improvements (Stamps) (S) Major Widening 1.94 2016State State6,000
4,800 - NHS
1,200 - State Match
- TOTAL
100404 Lawrence 067 Hwy. 230-Hwy. 63 (Bs. & Surf.) (S) New Location 9.78 2013State State36,000
28,800 - NHS
7,200 - State Match
- TOTAL
100686 Lawrence 063 Black Rock-Portia (S) Major Widening 1.55 2013State State10,200
8,160 - NHS
2,040 - State Match
- TOTAL
110502 Lee 001 Cypress Corner-North (S) Major Widening 5.40 2013State State18,040
14,080
220
- NHS
- Earmarks
3,740 - State Match
- TOTAL
110570 Lee 131 Ditch at L.M. 1.85 Str. & Apprs. (S) Strs. & Apprs. 2015State State2,125
1,700 - BR
425 - State Match
- TOTAL
110217 Lee & Phillips 001 Walnut Corner-Cypress Corner (S) Major Widening 7.03 2015State State35,500
28,400 - NHS
7,100 - State Match
- TOTAL
020542 Linc & Desha 212 Hwy. 212 Strs. & Apprs. (S) Strs. & Apprs. 2015State State2,500
2,000 - BR
500 - State Match
- TOTAL
020419 Lincoln 054 Wells Bayou Str. & Apprs. (S) Strs. & Apprs. 2016State State1,300
1,040 - BR
260 - State Match
- TOTAL
030415 Little River 041 Little River Str. & Apprs. (S) Strs. & Apprs. 2016State State10,600
8,480 - BR
2,120 - State Match
- TOTAL
Page 111 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
060897 Lonoke 040 I-40/Hwy. 89 Intchg. (Lonoke) (S) Interchange 2013State/Local State CARTS7,062
1,600
3,822
- NHS
- Earmarks
400 - State Match
1,012 - Local
- STP > 200,000
- TOTAL
228
090343 Madison 023 Hwy. 74-Huntsville Strs. & Apprs. (S) Strs. & Apprs. 2015State State5,000
4,000 - BR
1,000 - State Match
- TOTAL
090342 Marion 014 Mill Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,400
1,120 - BR
280 - State Match
- TOTAL
030313 Miller 071 LA Line-Doddridge (Bs. & Surf.) (S) New Location 4.46 2013State State15,900
10,000
2,700
- NHS
- Earmarks
3,200 - State Match
- TOTAL
030388 Miller 071 Broad St. Str. & Apprs. (Texarkana) (S) Strs. & Apprs. 2014State State TUTS7,750
6,200 - BR
1,550 - State Match
- TOTAL
BB0301 Miller 030 Texas State Line-Hwy. 108 (S) Rehabilitation 7.10 2015State State TUTS
5,852
5,852- Bond
- TOTAL
BB0302 Miller 030 Hwy. 67-West of Red River (S) Rehabilitation 4.50 2016State State
7,529
7,529- Bond
- TOTAL
BB0303 Miller 030 Red River-East & West (F) Rehabilitation 1.80 2014State State
17,745
17,745- Bond
- TOTAL
BB0310 Miller 030 Hwy. 108-Hwy. 67 (S) Rehabilitation 4.40 2015State State
7,253
7,253- Bond
- TOTAL
Page 112 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
100654 Mississippi 018 Hwy. 18 Improvements (Manila) (S) Major Widening 4.30 2014State State21,000
16,800 - STP
4,200 - State Match
- TOTAL
100760 Mississippi VAR Left Hand Chute of Little River Strs. & Apprs. (S) Strs. & Apprs. 2015State State4,425
3,540 - BR
885 - State Match
- TOTAL
Hwys. 77 & 140
BB1003 Mississippi 055 Hwy. 181-Hwy. 158 (F) Rehabilitation 7.90 2013State State
31,600
31,600- Bond
- TOTAL
BB1006 Mississippi 055 No. of Hwy. 18-Missouri St. Line (S) Rehabilitation 4.22 2015State State
17,390
17,390- Bond
- TOTAL
110540 Monroe 079 White River Strs. Demo. & Removal (Clarendon) (S) Strs. & Apprs. 2015State State8,000
6,400 - BR
1,600 - State Match
- TOTAL
110544 Monroe 070 Hwy. 17-St. Francis Co. Line Strs. & Apprs. (S) Strs. & Apprs. 2014State State4,900
3,920 - BR
980 - State Match
- TOTAL
BB0101 Monroe 040 Cache River-Bayou DeView (F) Rehabilitation 4.10 2013State State
18,040
18,040- Bond
- TOTAL
080379 Montgomery 027 Ouachita River Str. & Apprs. (S) Strs. & Apprs. 2014State State3,000
2,400 - BR
600 - State Match
- TOTAL
009784 Newton 007 Buffalo River Br. & Apprs. (Pruitt) (S) Strs. & Apprs. 2014State State2,600
2,080 - BR
520 - State Match
- TOTAL
090169 Newton 007 Jasper-Co. Rd. 46 (Passing Lanes) (S) Passing Lanes 1.00 2014State State3,000
2,400 - STP
600 - State Match
- TOTAL
Page 113 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
080439 Perry 007 Bear Creek & So. Fourche La Fave River Strs. & Apprs. (S) Strs. & Apprs. 2016State State5,150
4,120 - BR
1,030 - State Match
- TOTAL
080446 Perry 216 Coffee Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,000
800 - BR
200 - State Match
- TOTAL
110572 Phillips 242 Fletcher Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100
880 - BR
220 - State Match
- TOTAL
110575 Phillips 044 Bee Bayou Str. & Apprs. (S) Strs. & Apprs. 2015State State1,100
880 - BR
220 - State Match
- TOTAL
100764 Poinsett 214 Bayou DeView Str. & Apprs. (S) Strs. & Apprs. 2015State State1,250
1,000 - BR
250 - State Match
- TOTAL
080157 Pope Intermodal Complex (Russellville) (S) Miscellaneous 2013Local Local2,908
2,326 - Earmarks
582 - Local
- TOTAL
080164 Pope 007 Hwy. 7 Improvements (Dover) (S) New Location 1.30 2014State State7,100
5,680 - STP
1,420 - State Match
- TOTAL
080389 Pope 124 Hob Nob Rd.-Crow Mtn. Rd. (Russellville) (S) Major Widening 1.00 2013Local State6,000
3,000 - STP
3,000 - Local
- TOTAL
Partnering Project – City to provide up to $3 million. Hwys. 124 and 326.
080392 Pope 007 Newton Co. Line-South (Passing Lane) (S) Passing Lanes 1.30 2013State State2,200
1,760 - STP
440 - State Match
- TOTAL
Page 114 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
080422 Pope 007 Dover-North (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000
4,000 - STP
1,000 - State Match
- TOTAL
080427 Pope 124 Crow Mtn. Rd.-Center Valley Rd. (S) Major Widening 2.15 2014State State7,000
5,600 - STP
1,400 - State Match
- TOTAL
080443 Pope 064 White Oak Creek Str. & Apprs. (S) Strs. & Apprs. 2016State State1,700
1,360 - BR
340 - State Match
- TOTAL
080464 Pope 007 Newton Co. Line-South (Passing Lane) (Ph. II) (S) Passing Lane 1.20 2013State State2,200
1,760 - STP
440 - State Match
- TOTAL
BB0804 Pope 040 Mill Creek-Hwy. 331(F) Rehabilitation 6.80 2013State State
30,700
37,087- Bond
5,748 - IM
639 - State Match
- TOTAL
BB0805 Pope 040 Hwy. 331-Atkins (S) Rehabilitation 10.80 2014State State
8,770
9,263- Bond
49 - State Match
- TOTAL
444 - HSIP
Includes Safety Funds for Cable Median Barriers.
BB0806 Pope & Con 040 Atkins-Plumerville (S) Rehabilitation 18.60 2013State State
16,473
18,826- Bond
235 - State Match
- TOTAL
2,118 - HSIP
Includes Safety Funds for Cable Median Barriers.
BB0610 Prairie 040 White River Str. & Apprs. (F) Str. & Apprs. 0.50 2015State State53,572
36,515
10,400
- IM
- BR
6,657 - State Match
- TOTAL
Bridge funds are for widening the bridge - Bond funds cannot be used for widening the bridge.
Page 115 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
061334 Pul & Lonoke 067 Jacksonville-Cabot (Ph. I) (F) Capacity Impvts. 11.80 2016State State CARTS15,000
3,000 - State Match
12,000 - CMAQ FLEX
- TOTAL
060395 Pulaski 367 Union Pacific RR Overpass (Arch St.) (LR) (S) Strs. & Apprs. 2014State State CARTS6,400
5,120 - BR
1,280 - State Match
- TOTAL
060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2014Local Local CARTS734
587 - Earmarks
147 - Local
- TOTAL
For Preliminary Engineering.
060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2015Local Local CARTS2,500
500 - Local
- STP > 200,000
- TOTAL
2,000
For Right-of-Way and Utility Relocation.
060907 Pulaski CS Geyer Springs R.R. Grade Separation (Little Rock) (S) RR Xing 2016Local Local CARTS7,500
1,500 - Local
- STP > 200,000
- TOTAL
6,000
For Construction.
061--- Pulaski 440 Hwy. 67-I-40 West (North Belt Freeway Toll Feasibility Study) Planning 2013State State CARTS500
100 - State Match
- STP > 200,000
150 - CMAQ FLEX
- TOTAL
250
Partnering Project – Metroplan to provide 50% of project costs.
061194 Pulaski 010 Mississippi Ave.-Perryville Rd. (Hwy. 10) (L.R.) (S) Major Widening 0.65 2013State State CARTS3,000
300 - Local
- TOTAL
2,700 - HSIP
Partnering Project – City responsible for the 10% match of Safety funds.
061275 Pulaski 070 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) (F) Strs. & Apprs. 2013State State CARTS58,000
46,400 - BR
11,600 - State Match
- TOTAL
Page 116 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
061276 Pulaski 067 Redmond Rd. & Main St. Strs. & Apprs. (Jacksonville) (F) Strs. & Apprs. 2013State State CARTS17,300
13,840 - BR
3,460 - State Match
- TOTAL
061277 Pulaski 070 Union Pacific RR Str. & Apprs. (Roosevelt Rd.) (LR) (S) Strs. & Apprs. 2014State State CARTS7,400
5,920 - BR
1,480 - State Match
- TOTAL
061294 Pulaski CS McCain Rail Grade Separation (NLR) (S) Grade Seperation 2013Local Local CARTS11,185
2,893 - Earmarks
2,237 - Local
- STP > 200,000
- TOTAL
6,055
061295 Pulaski CS Maryland Ave. Impvts. & Extension (Sherwood) Widening 2013Local Local CARTS405
81 - Local
- STP > 200,000
- TOTAL
324
061317 Pulaski 040 Hwy. 365-I-430 (Widening) (Phase I) (F) Major Widening 5.63 2014State State CARTS23,000
8,400 - NHS
4,600 - State Match
10,000 - CMAQ FLEX
- TOTAL
This project will include modifications to the I-40/I-430 Interchange.
061331 Pulaski 010 Taylor Loop Rd.-Pleasant Valley Dr. (Ph. 1) (S) Major Widening 3.20 2016State State CARTS15,000
12,000 - STP
3,000 - State Match
- TOTAL
061332 Pulaski 430 I-30/I-430 Interchange Impvt. (L.R.) (F) Interchange 2014State State CARTS12,000
2,400 - State Match
9,600 - CMAQ FLEX
- TOTAL
061333 Pulaski 430 I-430/Hwy. 10 Interchange Impvt. (L.R.) (F) Interchange 2014State State CARTS11,000
8,800 - NHS
2,200 - State Match
- TOTAL
061348 Pulaski 365 UPRR/Parkway Dr. Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS6,000
4,800 - BR
1,200 - State Match
- TOTAL
Page 117 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
BB0604 Pulaski 040 I-30/I-40 Intchng.-Hwy. 67 (F) Rehabilitation 1.70 2016State State CARTS22,749
20,474 - IM
2,275 - State Match
- TOTAL
BB0611 Pulaski 440 I-30-Ark. River Bridge (F) Rehabilitation 3.00 2016State State CARTS25,042
22,538 - IM
2,504 - State Match
- TOTAL
BB0613 Pulaski 530 I-30-Bingham Rd. (F) Rehabilitation 8.50 2014State State CARTS
37,961
37,961- Bond
- TOTAL
BB0614 Pulaski & Saline 530 Bingham Rd.-Grant Co. Line (S) Rehabilitation 7.50 2013State State CARTS
9,111
9,111- Bond
- TOTAL
100759 Randolph 067 Black River Str. & Apprs. (Pocahontas) (S) Strs. & Apprs. 2016State State8,500
6,800 - BR
1,700 - State Match
- TOTAL
061134 Saline 005 Hurricane Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS1,220
976 - BR
244 - State Match
- TOTAL
061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2013Local Local CARTS1,065
213 - Local
- STP > 200,000
- TOTAL
852
For Right-of-Way and Preliminary Engineering of Utility Relocation.
061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2014Local Local CARTS2,788
558 - Local
- STP > 200,000
- TOTAL
2,230
For Utility Relocation
061297 Saline CS I-30-Sidell Road (Alcoa Rd.)(Saline Co.) Widening 2015Local Local CARTS11,000
2,200 - Local
- STP > 200,000
- TOTAL
8,800
For Construction
Page 118 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
061335 Saline 005 Springhill Rd.-Hwy. 183 (Bryant) (S) Major Widening 1.10 2015State State CARTS12,000
9,600 - STP
2,400 - State Match
- TOTAL
061349 Saline 183 Bauxite & Northern RR Spur Str. & Apprs. (S) Strs. & Apprs. 2015State State CARTS1,640
1,312 - BR
328 - State Match
- TOTAL
BB0602 Saline 030 Hwy. 70-West (West Bound Lanes) (S) Rehabilitation 2.90 2015State State CARTS
8,901
8,901- Bond
- TOTAL
009831 Searcy VAR Gourd & Granney Creek Strs. & Apprs. (S) Strs. & Apprs. 2015State State750
600 - BR
150 - State Match
- TOTAL
Hwys. 74 and 377
BB0407 Seb & Craw 540 Hwy. 22-I-40 (F) Rehabilitation 8.05 2013State State FRONTIER
67,300
67,300- Bond
- TOTAL
040376 Sebastian 071 Hwy. 71-Hwy. 22 (Base & Surf.) (S) New Location 6.04 2013State State FRONTIER23,000
12,101
6,299
- NHS
- Earmarks
4,600 - State Match
- TOTAL
040471 Sebastian CS Jenny Lind Rd. & Ingersoll Ave. Widening (Fort Smith) (S) Major Widening 3.00 2013Local Local FRONTIER8,980
7,184 - Earmarks
1,796 - Local
- TOTAL
040X02 Sebastian CS Western & Eastern Rail Trolley Ext (PE) (Ft. Smith) (S) PE 2013Local Local FRONTIER238
238 - Earmarks
- TOTAL
BB0405 Sebastian 540 Hwy. 271-Hwy. 71 (S) Rehabilitation 2.15 2015State State FRONTIER3,898
3,190 - IM
709 - State Match
- TOTAL
030X01 Sevier 071 DeQueen-East Strs. & Apprs. (S) Strs. & Apprs. 2016State State6,500
5,200 - BR
1,300 - State Match
- TOTAL
Page 119 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
050266 Sharp 063 Hardy-East (Passing Lanes) (S) Passing Lanes 2.40 2015State State5,000
4,000 - NHS
1,000 - State Match
- TOTAL
050275 Sharp 063 Hardy-Ozark Acres Strs. & Apprs. (S) Strs. & Apprs. 2016State State4,750
3,800 - BR
950 - State Match
- TOTAL
110573 St. Francis 261 L'Anguille River Str. & Apprs. (S) Strs. & Apprs. 2015State State1,125
900 - BR
225 - State Match
- TOTAL
BB0104 St. Francis 040 Goodwin-Forrest City (S) Rehabilitation 11.62 2014State State
9,435
12,161- Bond
273 - State Match
- TOTAL
2,453 - HSIP
Includes Safety Funds for Cable Median Barriers.
BB0105 St. Francis 040 Forrest City-East (F) Rehabilitation 8.28 2013State State41,925
37,733 - IM
4,193 - State Match
- TOTAL
BB0106 St. Francis 040 Shearerville-West (S) Rehabilitation 16.50 2014State State
79,881
82,607- Bond
273 - State Match
- TOTAL
2,453 - HSIP
Includes Safety Funds for Cable Median Barriers.
050231 Stone 066 Mt. View-West (Passing Lane) (S) Passing Lane 1.20 2013State State3,000
2,400 - STP
600 - State Match
- TOTAL
070280 Union 167 El Dorado-Hwy. 335 (S) Major Widening 5.04 2013State State18,500
13,437
1,363
- STP
- Earmarks
3,700 - State Match
- TOTAL
Page 120 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
070281 Union 167 Hwy. 335-Ouachita River (S) Major Widening 2.97 2013State State10,600
8,480 - STP
2,120 - State Match
- TOTAL
070367 Union VAR Hwy. 82/82B/167B Improvements (El Dorado) (S) Major Widening 9.43 2016State State47,000
37,600 - STP
9,400 - State Match
- TOTAL
Hwys. 82, 82B and 167B
070368 Union 335 Hwy. 82-Hwy. 7 (Rehab.) (S) Rehabilitation 7.60 2016State State8,000
6,400 - STP
1,600 - State Match
- TOTAL
070377 Union 82B UPRR Str. & Apprs. (El Dorado) (S) Strs. & Apprs. 2016State State8,000
6,400 - BR
1,600 - State Match
- TOTAL
Coordinate with Job 070367.
070282 Union & Calh 167 Ouachita River Str. & Apprs. (S) Major Widening 1.76 2014State State25,700
20,560 - NHS
5,140 - State Match
- TOTAL
080390 Van Buren 065 Hwy. 16 East-Hwy. 65B South (Clinton) (S) Major Widening 1.41 2013State State11,000
8,800 - NHS
2,200 - State Match
- TOTAL
080391 Van Buren 065 N. of Bee Branch-Co. Rd. 28 (S) Major Widening 3.60 2013State State12,900
10,320 - NHS
2,580 - State Match
- TOTAL
080423 Van Buren 065 Bee Branch-North (S) Major Widening 8.07 2016State State20,000
16,000 - NHS
4,000 - State Match
- TOTAL
080445 Van Buren 124 Cadron Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,900
1,520 - BR
380 - State Match
- TOTAL
Page 121 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
040024 Washington 074 White River Str. & Apprs. (Elkins) (S) Strs. & Apprs. 2015State State NARTS3,700
2,960 - BR
740 - State Match
- TOTAL
040272 Washington CS Johnson Road Reconst. (Springdale) Widening 3.24 2013Local Local NARTS10,409
7,327 - Earmarks
2,082 - Local
- STP < 200,000
- TOTAL
1,000
040521 Washington 062 Hwy. 62 Bypass (Bs. & Surf.) (Prairie Grove) (S) New Location 4.83 2013State State NARTS12,000
9,600 - STP
2,400 - State Match
- TOTAL
040527 Washington 540 I-540/Don Tyson Pkwy. Intchng. (Springdale) (F) Interchange 2013Local Local NARTS26,951
26,951 - Local
- TOTAL
040535 Washington CS Fulbright Expwy./Hwy. 71B Flyover (Fayetteville) (S) Safety & Traf Eng 2013Local Local NARTS6,452
5,162 - Earmarks
1,290 - Local
- TOTAL
040569 Washington 016 West Fork White River Str. & Apprs. (Fayetteville) (S) Str. & Apprs. 2013State State NARTS6,900
5,520 - BR
1,380 - State Match
- TOTAL
040570 Washington 170 Branch of Illinois River Str. & Apprs. (S) Strs. & Apprs. 2015State State NARTS725
580 - BR
145 - State Match
- TOTAL
040581 Washington 112 Hwy. 180-Leroy Pond Dr. (Hwy. 112) (Fayetteville) (S) Major Widening 0.35 2013Local State NARTS1,250
250 - Local
- STP < 200,000
- TOTAL
1,000
040605 Washington 540 Hwy. 16-Porter Rd. (Widening) (S) Major Widening 1.35 2013State State NARTS9,400
7,520 - NHS
1,880 - State Match
- TOTAL
Page 122 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
040618 Washington CS Maple St. & Lafayette St. Bridge Rehab. (Fayetteville) (S) Str. & Apprs. 2013Local State NARTS1,000
800 - BR
200 - Local
- TOTAL
040641 Washington 016 Middle Fork White River Str. & Apprs. (Fayetteville) (S) Str. & Apprs. 2016State State NARTS4,600
3,680 - BR
920 - State Match
- TOTAL
BB0410 Washington 540 Hwy. 62 Intchng. Impvts. (F) Interchange 2015State State NARTS
25,375
25,375- Bond
- TOTAL
BB0411 Washington 540 Hwy. 16/112 Spur Intchng. Impvts. (S) Interchange 2015State State NARTS
19,285
19,285- Bond
- TOTAL
BB0412 Washington 540 Greathouse Springs Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS1,500
1,350 - IM
150 - State Match
- TOTAL
BB0413 Washington 540 Elm Springs Rd. Intchng. Impvts. (S) Interchange 2014State State NARTS4,000
3,600 - IM
400 - State Match
- TOTAL
BB0414 Washington 540 Porter Rd.-Hwy. 112/71B Widening & Intchng. Impvts. (F) Major Widening & Interchange
2.50 2015State State NARTS54,977
33,119
7,400
- STP
- IM
9,102 - State Match
5,356 - Local
- TOTAL
Bond funds are for interchange modifications only - Bond funds cannot be used for widening the main lanes. City of Fayetteville transferred partnering commitment from Job 040489, Hwy. 112 Spur-North (Hwy. 112) to this project.
050249 White NEW Hwy. 36-Hwy. 16 (Gr. & Strs.) (S) New Location 3.87 2016State State11,537
4,430 - STP
1,107 - State Match
6,000 - Local
- TOTAL
Partnering project – City and County to provide $6,000,000 of project costs.
Page 123 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
050250 White NEW Hwy. 36-Hwy. 16 (Bs. & Surf.) (S) New Location 3.80 2016State State6,688
5,350 - STP
1,338 - State Match
- TOTAL
Partnering project – City and County to provide $6,000,000 of project costs.
050251 White NEW Hwy. 16-Hwy. 67 (S) New Location 4.04 2014State State12,787
10,230 - STP
2,557 - State Match
- TOTAL
Partnering project – City and County to provide $6,000,000 of project costs.
050260 White 067 Hwy. 157-Hwy. 167 (Ph. II) (S) Rehabilitation 4.56 2013State State12,000
9,600 - NHS
2,400 - State Match
- TOTAL
050263 White 064 Beebe-West (S) Major Widening 3.33 2016State State10,000
8,000 - NHS
2,000 - State Match
- TOTAL
050264 White 064 Hwy. 367-Woodruff Co. Line (Rehab.) (S) Rehabilitation 9.30 2016State State20,000
16,000 - STP
4,000 - State Match
- TOTAL
110541 Woodruff 038 Bayou DeView Str. & Apprs. (S) Strs. & Apprs. 2013State State2,400
1,920 - BR
480 - State Match
- TOTAL
080377 Yell 007 Centerville-Dardanelle (Passing Lane) (S) Passing Lane 1.20 2013State State2,000
1,600 - STP
400 - State Match
- TOTAL
080385 Yell 007 Little Rock & Western RR Str. & Apprs. (S) Strs. & Apprs. 2013State State1,550
1,240 - BR
310 - State Match
- TOTAL
080428 Yell 027 Danville-Dardanelle (Passing Lanes) (S) Passing Lanes 2.40 2014State State5,000
4,000 - STP
1,000 - State Match
- TOTAL
Page 124 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
10/3/2012 9:12:43 AM
080441 Yell 007 Keeland Creek Str. & Apprs. (S) Strs. & Apprs. 2015State State1,000
800 - BR
200 - State Match
- TOTAL
Page 125 of 125
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (F) or (S) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.