Multi Purpose Deep Tunnel (MPDT)Multi Purpose Deep Tunnel (MPDT)An Integrated Solution for Flood Control, Water Supply, Waste WaAn Integrated Solution for Flood Control, Water Supply, Waste Water, ter,
Road Tunnel and Public Utilities in the Jakarta Mega CityRoad Tunnel and Public Utilities in the Jakarta Mega City
Presented to :
Singapore International Water Week (SIWW) 2008
June 25, 2008
Suntec Singapore International Convention & Exhibition Centre -
Water Leaders Summit and South East Asia Business Forum
FIRDAUS ALI, PhD.FIRDAUS ALI, PhD.
Jakarta Water Supply Regulatory BodyJakarta Water Supply Regulatory Body
(JWSRB)(JWSRB)
P
E L
A Y A N A N
A I R
M I
N U
M
Environmental Serious Problems being faced byEnvironmental Serious Problems being faced byMega City of Jakarta.Mega City of Jakarta.
TOTAL IDR 18.7 Trillions
(eq. to USD 2.05 Billions)
1) Floods, paralyzing the city (Business, Industrial and Municipal damages);
a) 2002 Flood damages IDR 9.9 Trillions
b) 2007 ditto IDR 8.8 Trillions
2) Raw water scarcity and also badly polluted;
3) Water supply coverage ratio, only around 55 %;
4) Untreated waste water, causing water borne diseases due to e-colli;
5) Excessive abstraction of Ground Water, causing land subsidence and sea water
intrusion as well as worsening the flood control management;
6) Traffic congestion is severe, causing national loss IDR 43.3 T/annum (eq. to USD 4.76
B/annum);
7) Climate change worsen the situation.
Strategy to Solve Those Problems :Strategy to Solve Those Problems :
SERIOUS
PROBLEMS
STRUCTURALMEASURES
NON STRUCTURALMEASURES
INFRASTRUCTURE
Urban Integrated
Infrastructure Development
Solving ProblemsBy Stages
SocialEconomicPolitical
Land Acquisition
EfficientCost effectiveness
BEST EFFORTS
Key Words : 1)1) Land AcquisitionLand Acquisition2)2) Commitment on Urban Integrated Infrastructure Development by staCommitment on Urban Integrated Infrastructure Development by stagesges
MULTI PURPOSE DEEP TUNNEL (MPDT)MULTI PURPOSE DEEP TUNNEL (MPDT)An Integrated Solution for Flood Control, Water Supply, Waste Water,
Road Tunnel and Public Utilities in the Jakarta Mega City
With the Following Benefits;
1. Controlling peak flood;
2. Improving urban wastewater management, including Water Reclamation
Plants (WRPs) to :
� Supply clean water for the Northern part of Jakarta;
� Improve water quality in water bodies;
� Produce electric power (methane gas) and organic fertilizer.
3. Reducing ground water abstraction due to improved city piped water service
due to a more reliable supply of raw water;
4. Constructing of tunnel need no land acquisition except for holding pond and ingresses + egresses of toll road;
5. Utilizing the tunnel as toll roadway as in SMART project (KL) and utility shaft,
as in TARP project (Chicago).
Ciliwung River Basin
sws 08.11.2001
Balaraja
TANGERANG
Ci ra
rab
Cil
eule
u
s
K. Ta ha ng
Cim
an
ceu
ri
Ci d
ur ia
n
Sukarno - Hatta
Airport
Ciledug
Curug
Ranca
Sumur
CiputatCima n ceu ri
K.
An
gke
Serpong
Cis
adane
Parung
Cid
uri
an
Cim
atu
kCib
eure
um
ke Rangkasbitung
ke Serang
t olk e Mera k
ke Seran g
K.
Pes
an
ggra
han
K.
Gro
gol
K.
Kru
kut
K.
Ma
mpa
ng
Cil
iwu
ng
K.
Cip
ina
ng
K.
Bu
ara
n
K.
Ca
kung
K.
Bek
asi
BEKASI
Cileungsi
Cis
a da n
g
DEPOK
Cimanggis
Gunung Putri
Pondok Gede
Ci b
eet
Cibeet
KARAWANG
Cikarang
C.B.L .
C ika ran
g
Jonggol
Cibarusa
Ci ta
rum
Curug
Cil
e ma h
ab a
n g
ke Cika mpek
To l ke C ika mpek
Waduk
Jatiluhur
Katulampa
BOGOR
Empang
ke Cianjur
Gn. Pangrango
JAVA SEAU
Cakung D
rain
0 12 km2 4 6 8 10
K.
Sek
reta
ris
+ 6 .0 1
+ 1 6.46
+ 2 40 .9 7
+ 2 43 .3 3
K.
Sep
ak
Sa
l. M
eru
ya
K. K
ama l
K.
Ble
nco
ng
K.
Ma
run
da
K.
Jat
ikra
ma
t
K.
Cid
eng
Ci p
as eu
m
Cil
eun
gsi
Cik
eas
K. W
e tan
Banjir
Kan
al B
arat
JAKARTA
Ka
li B
aru
Tim
ur
Cengkareng D
rain
32 K
m +
3
Hou
rs
35
,5 K
m +
6
Ja
m
K.
Sun
ter
WEST FLOOD WAY NORMALIZATION
CISADANE RIVER IMPROVEMENT
PR OYEK PENGELOLAAN SUMBER AIR
DAN PENGENDALIAN BANJIR
CILIWUNG-CISADANE
CILIWUNG-CISADANE
RIVER BASIN
Note :
Ciliwung – Cisadane
Boundary
Road
River
Railway
River basin boundary
Drainage Network
DKI Provincial Government
Planned of Ciawi Dam
Flood control program (alternative 1 )
CENGKARENG DRAIN NORMALIZATION
Grogol Dam
Melati Attenuation
Pond
Setiabudi PondPejompongan WTP
Manggarai
Sluice Gate
Karet Sluice
Gate
Cideng Pumping
Station
MPDT Central Zone
Pluit Storage
Reservoir
To Sea Outfall
Holding BasinHeadworks
Toll Road
Balekambang - Manggarai
Egress Tanah Abang
Egress
Airport
Egress
Roxy
WRP
WestCentral
East
Grogol Dam
Karet Slui ce G at e
CidengPum pi ng St ation
Pe jo mp ong an
WTP
Map of MPDT
Concept
MelatiAtt enuati on
Pond
Set iabudi Pond
Pl ui t Stor age Reservoir
Sea O ut fa l l
Holdi ng Basi n
Headwor ks
M anggara iSlui ce Gat e
WR P
WestCentral
East
Grogol Dam
Karet Slui ce G at e
CidengPum pi ng St ation
Pe jo mp ong an
WTP
Map of MPDT
Concept
MelatiAtt enuati on
Pond
Set iabudi Pond
Pl ui t Stor age Reservoir
Sea O ut fa l l
Holdi ng Basi n
Headwor ks
M anggara iSlui ce Gat e
WR P
WestCentral
East
Grogol Dam
Karet Slui ce G at e
CidengPum pi ng St ation
Pe jo mp ong an
WTP
Map of MPDT
Concept
MelatiAtt enuati on
Pond
Set iabudi Pond
Pl ui t Stor age Reservoir
Sea O ut fa l l
Holdi ng Basi n
Headwor ks
M anggara iSlui ce Gat e
WestCentral
East
Grogol Dam
Karet Slui ce G at e
CidengPum pi ng St ation
Pe jo mp ong an
WTP
Map of MPDT
Concept
MelatiAtt enuati on
Pond
Set iabudi Pond
Pl ui t Stor age Reservoir
Sea O ut fa l l
Holdi ng Basi n
Headwor ks
M anggara iSlui ce Gat e
WestCentral
East
Grogol Dam
Karet Slui ce G at e
CidengPum pi ng St ation
Pe jo mp ong an
WTP
Map of MPDT
Concept
MelatiAtt enuati on
Pond
Set iabudi Pond
Pl ui t Stor age Reservoir
Sea O ut fa l l
Holdi ng Basi n
Headwor ks
M anggara iSlui ce Gat e
WestCentral
East
Grogol Dam
Karet Slui ce G at e
CidengPum pi ng St ation
Pe jo mp ong an
WTP
Map of MPDT
Concept
MelatiAtt enuati on
Pond
Set iabudi Pond
Pl ui t Stor age Reservoir
Sea O ut fa l l
Holdi ng Basi n
Headwor ks
M anggara iSlui ce Gat e
WestCentral
East
Grogol Dam
Karet Slui ce G at e
CidengPum pi ng St ation
Pe jo mp ong an
WTP
Map of MPDT
Concept
MelatiAtt enuati on
Pond
Set iabudi Pond
Pl ui t Stor age Reservoir
Sea O ut fa l l
Holdi ng Basi n
Headwor ks
WestCentral
East
Grogol Dam
Karet Slui ce G at e
CidengPum pi ng St ation
Pe jo mp ong an
WTP
Map of MPDT
Concept
MelatiAtt enuati on
Pond
Set iabudi Pond
Pl ui t Stor age Reservoir
Sea O ut fa l l
Holdi ng Basi n
Headwor ks
WestCentral
East
Grogol Dam
Karet Slui ce G at e
CidengPum pi ng St ation
Pe jo mp ong an
WTP
Map of MPDT
Concept
MelatiAtt enuati on
Pond
Set iabudi Pond
Pl ui t Stor age Reservoir
Sea O ut fa l l
Holdi ng Basi n
Headwor ks
WestCentral
East
Grogol Dam
Karet Slui ce G at e
CidengPum pi ng St ation
Pe jo mp ong an
WTP
Map of MPDT
Concept
MelatiAtt enuati on
Pond
Set iabudi Pond
Pl ui t Stor age Reservoir
Sea O ut fa l l
Holdi ng Basi n
Headwor ks
WestCentral
East
Grogol Dam
Karet Slui ce G at e
CidengPum pi ng St ation
Pe jo mp ong an
WTP
Map of MPDT
Concept
MelatiAtt enuati on
Pond
Set iabudi Pond
Pl ui t Stor age Reservoir
Sea O ut fa l l
Holdi ng Basi n
Headwor ks
M anggara iSlui ce Gat e
WR P
MPDT FOR CENTRAL ZONE (CILIWUNG, CIDENG, KRUKUT)
Existing pump
Sewage pipes
Java Sea
Egress Airport
Toll Road
Ingress Balekambang - PasarMinggu- Manggarai
Egress Roxy
Egress Tanah Abang
West Flood Way
Headwork MT Haryono
- Diversion Weir
- Off take S tructure
- Holding Pond (+ 4 Ha)
Pluit Reservoir Area : 80 Ha
(Half part is for WWTP/ Advanced Activated Sludge)
Sea Outfall (Pumped + Non Return Valve )
Drainage network
Setiabudi Ponds(area : 4.35 Ha)
KaretSluice Gate
Ciliwung Kota
Q = 0
ManggaraiSluice Gate
Plan of MPDT
(underneath Cil iwung River and West Flood Way)
h
Through DTRS
Peak Period
Safe Level (at “Normalized”Kali
Ciliwung and BKB)
t
Q DTRS (max) at peak Flood = 100 m3/s
(the flow is usuall y discharged into the exist ing urban drainagesystem to down town area at alert level !)
Flood Q100
ManggaraiSluice Gate=
750 m3/s
Melati Attenuation Ponds
(area : 3.5 Ha)
Pejompongan WTP
CILIWUNG RIVER
Ri ver Bed / West Flood Way / Surface
Wastewater
+ 15 m
+ 12 m
Full Pressuriz ed Flow
(100 m3 /s ) duri ng 7 hour
with R100
(emergency out let )
Length : + 22 Km
Diameter : + 12 m
Volume : + 2.5 mill ion m3
Fil ling Ti me : + 7 hour
U tili ty Shaft
+ 12 m
Ri ver Bed / West Flood Way / Surface
Wastewater
+ 15 m
+ 12 m
Full Pressuriz ed Flow
(100 m3 /s ) duri ng 7 hour
with R100
(emergency out let )
Length : + 22 Km
Diameter : + 12 m
Volume : + 2.5 mill ion m3
Fil ling Ti me : + 7 hour
U tili ty Shaft
+ 12 m
Ri ver Bed / West Flood Way / Surface
Wastewater
+ 15 m
+ 12 m
Full Pressuriz ed Flow
(100 m3 /s ) duri ng 7 hour
with R100
(emergency out let )
Length : + 22 Km
Diameter : + 12 m
Volume : + 2.5 mill ion m3
Fil ling Ti me : + 7 hour
U tili ty Shaft
+ 12 m
Ri ver Bed / West Flood Way / Surface
Wastewater
+ 15 m
+ 12 m
Full Pressuriz ed Flow
(100 m3 /s ) duri ng 7 hour
with R100
(emergency out let )
Length : + 22 Km
Diameter : + 12 m
Volume : + 2.5 mill ion m3
Fil ling Ti me : + 7 hour
U tili ty Shaft
+ 12 m
Ri ver Bed / West Flood Way / Surface
Wastewater
+ 15 m
+ 12 m
Full Pressuriz ed Flow
(100 m3 /s ) duri ng 7 hour
with R100
(emergency out let )
Length : + 22 Km
Diameter : + 12 m
Volume : + 2.5 mill ion m3
Fil ling Ti me : + 7 hour
U tili ty Shaft
+ 12 m
MT MT MT MT HaryonoHaryonoHaryonoHaryono Bell Mouth Bell Mouth Bell Mouth Bell Mouth IntakeIntakeIntakeIntakeHea dwork MT Ha ryono + Ho lding Bas in
Inl etInl etInl etInl etOff TakeOff TakeOff TakeOff Take MPDTMPDTMPDTMPDTHead worksHead worksHead worksHead works Hol ding BasinHol ding BasinHol ding BasinHol ding Basin++++4 Ha4 Ha4 Ha4 HaDiversi on WeirDiversi on WeirDiversi on WeirDiversi on WeirMT MT MT MT HaryonoHaryonoHaryonoHaryono Bell Mouth Bell Mouth Bell Mouth Bell Mouth IntakeIntakeIntakeIntakeHea dwork MT Ha ryono + Ho lding Bas in
Inl etInl etInl etInl etOff TakeOff TakeOff TakeOff Take MPDTMPDTMPDTMPDTHead worksHead worksHead worksHead works Hol ding BasinHol ding BasinHol ding BasinHol ding Basin++++4 Ha4 Ha4 Ha4 HaDiversi on WeirDiversi on WeirDiversi on WeirDiversi on WeirMT MT MT MT HaryonoHaryonoHaryonoHaryono Bell Mouth Bell Mouth Bell Mouth Bell Mouth IntakeIntakeIntakeIntakeHea dwork MT Ha ryono + Ho lding Bas in
Inl etInl etInl etInl etOff TakeOff TakeOff TakeOff Take MPDTMPDTMPDTMPDTHead worksHead worksHead worksHead works Hol ding BasinHol ding BasinHol ding BasinHol ding Basin++++4 Ha4 Ha4 Ha4 HaMT MT MT MT HaryonoHaryonoHaryonoHaryono Bell Mouth Bell Mouth Bell Mouth Bell Mouth IntakeIntakeIntakeIntakeHea dwork MT Ha ryono + Ho lding Bas in
Inl etInl etInl etInl etOff TakeOff TakeOff TakeOff Take MPDTMPDTMPDTMPDTHead worksHead worksHead worksHead works Hol ding BasinHol ding BasinHol ding BasinHol ding Basin++++4 Ha4 Ha4 Ha4 HaMT MT MT MT HaryonoHaryonoHaryonoHaryonoMT MT MT MT HaryonoHaryonoHaryonoHaryono Bell Mouth Bell Mouth Bell Mouth Bell Mouth IntakeIntakeIntakeIntakeHea dwork MT Ha ryono + Ho lding Bas in
Inl etInl etInl etInl etOff TakeOff TakeOff TakeOff Take MPDTMPDTMPDTMPDTHead worksHead worksHead worksHead works Hol ding BasinHol ding BasinHol ding BasinHol ding Basin++++4 Ha4 Ha4 Ha4 HaInl etInl etInl etInl etOff TakeOff TakeOff TakeOff Take MPDTMPDTMPDTMPDTHead worksHead worksHead worksHead works Hol ding BasinHol ding BasinHol ding BasinHol ding Basin++++4 Ha4 Ha4 Ha4 HaDiversi on WeirDiversi on WeirDiversi on WeirDiversi on Weirh
Thr ough MP DT
Peak P er iod
Safety Level
(at “Normalized ”Kali Ciliwung and B KB)
t
Q MP DT (max) at Peak Flood = 100 m3/s
(the flow is us ua lly d isc ha rge d into the e xis ting u rba n d rainage sy stem to downtown
a rea a t Alert Lev el 1)
Flood Q100
Manggarai Sluice Ga te= 750 m3/s
25 0 m3/s
River Bed / West Flood Way / Su rface
Wastewater
+ 15 m
+ 12 m
F ully P ressurized Flow
(250 m3/s) dur in g 3 with
R 100 (emerg en cy ou tlet)
Length : + 22 Km
Diameter : + 12 m
Volume : + 2.5 million m3
Filling Time : + 3 hour
Utility Shaft
+ 12 m
Stor m Water
River Bed / West Flood Way / Surface
Wastewater
+ 15 m
+ 12 m
Fully Pressurized Flow
(250 m3/s) during 3 hour
with R100
(emergency outlet)
Length : + 22 Km
Diameter : + 12 m
Volume : + 2.5 million m3
Filling Time : + 3 hour
Utility Shaft
+ 12 m
Storm Water
�����Technology8.
����� �Cost7.
�����Integrated Urban Water Resources9.
���usdUSDPotential Revenue10.
�����Land acquisition6.
�����Improvement of surface water quality5.
� (SG)�(DG)���Ground water conservation4.
�����Sewage 3.
�����Scarcity of Raw water resource2.
�����Flood control 1.
Ground Water Recharge
Ancient River
CanalDAMMPDTJakarta Water Resources Management
(problems & solutions)
No.
MPDT & Other Alternative TechnologyMPDT & Other Alternative Technology
Note : in addition to matters mentioned above, MPDT also benefits in improving toll road & utility network
����= appropriate; ���� = how?; ���� = not possible; ���� = not effective; ���� = unnecessary;
���� = a must; ���� = relatively expensive; ���� = inexpensive; USD = potential; usd = slightly potential; ���� =relatively easy
““Flow Diagram of MPDT Concept Flow Diagram of MPDT Concept ””FLOW DIAGRAM OF MPDT CONCEPT IMPLEMENTATIONFLOW DIAGRAM OF MPDT CONCEPT IMPLEMENTATION
I.I. PrePre--Feasibility Study (FS) to Feasibility Study (FS) to Basic DesignBasic Design
This phase comprises of :This phase comprises of :
1) Technical Aspect, for Geological aspect and Hydro Geology, Soil
Investigation, Flood Control, Traffic System Engineering and
Management, Waste Water Management and its Reclamation Plant,
Utility Shaft, Civil/Structural Engineering Mechanical and Electrical
Engineering, Health and Safety Engineering.
2) Economical Aspect, economical aspect is needed to observe to what
extent investment is economically feasible to mitigate the impact of
flood damages and address economical benefit.
3) Ecological and social culture aspect, which comprises of :
4) Financial aspect, is needed in identifying to what extent private sector
including BUMN and BUMD both national and foreign investment are
financially feasible (FIRR, schematic fund and concession period)
B. Cultural social aspect, especially for those community reside
along side Ciliwung river and west flood way including
acceptability level.
I.I. PrePre--Feasibility Study (FS) to Feasibility Study (FS) to Basic DesignBasic Design
Continued..Continued..
A. Environmental/ecological impact in development phase and
operation and maintenance phase.
1) After Pre-Fs is accepted by the government, the stages of FS and
detailed design shall be continued by the proponent;
2) The result of FS and detailed design shall become a basis for
negotiation process based on BOT scheme, or tendering process under
PPP scheme between Government and Private sector;
3) The negotiation or tender result as mentioned above, shall become a
baseline for entering the contract agreement between government and
related private sector, based on pre determined of concession period.
II. Feasibility Study (FS) to Detailed Design II. Feasibility Study (FS) to Detailed Design
III. MPDT Implementation III. MPDT Implementation
Once FS and Detailed Design are completely done, next phase is to implement
MPDT by the investor consortium through EPC system (Engineering,
Procurement, & Construction) which consist of work items as follow:
A. Deep Tunnel 22 km including Holding Pond, Flood Forecasting
and Warning Center, Weather Radar and Rain gauge Station,
Sea Outfall Turbine Pump plus Surge Chamber;
B. Toll Road 18 km including Ingress and Egress, Motorway
Control Center, Safety Features including Escape Routes and
Fire Hydrants ;
C. Sewerage system consist of Main Trunk, Secondary, Tertiary
Pipe Networks and Water Reclamation Plant;
D. Utility Shaft.
IV. Operational ManagementIV. Operational Management
1) This phase is not only expected by public at large but also by government
and investor.
2) Considering that MPDT is a multi purpose, integrated and accurate
monitoring and controlling are crucially important (for instance :
integration among the SOP of flood control, toll road operational
management and its safety features, sewerage system, etc)
3) Controlling of each component, consist of :
a. Revenue Collection
b. OM Costs
c. Tariff adjustment
d. etc.
Development Cost (based price 2008)
1. MPDT : IDR 12.7 T ≈ USD 1,396 Millions
� Deep Tunnel (including Holding Pond, Flood Forecasting
and Warning Center, Weather Radar and Rain gauge Station,
Sea Outfall Turbine Pump plus Surge Chamber); double deck
toll road (including motorway control center and safety
features inside tunnel) : IDR 11.7 T ≈ USD 1,286 Millions
(unit price MPDT including double deck toll road is estimated IDR 650 Billions per km length)
� Waste Water Trunk Main : IDR 0.5 T ≈ USD 550 Millions
� Utility Shaft : IDR 0.5 T ≈ USD 550 Millions
2. Waste Water System : IDR 4.3 T ≈ USD 472 Millions� Secondary &Tertiary
� Water Reclamation Plant /WRP
(Recycle)
Total : IDR 17 T ≈ USD 1,868 Millions
Potential Revenue from Toll Road� Estimated LHR (Daily Average of Traffic Amounts) : 51,000 vehicles/day
► captive market 25% of Sedyatmo toll road users
► based on LHR sedyatmo toll road data until December 2005 is 203,138 vehicles/day
� Captive market :►short route (manggarai – tanah abang) ± 4 km : 20%►medium route (manggarai – roxy) ± 8.5 km : 20%►far route (manggarai – Soeta airport) ± 18 km : 60%
� Tariff per km (assumption) : IDR 1,000/km → (tariff in 2008)►based on SMART-KL, Malaysia data, assumption tariff/km = IDR 1,666/km
� Effective days used : 350 days
� Potential revenue from toll road is IDR 237,405,000,000 per annum, or IDR 237,000,000,000 (rounded down)eq. to USD 26,000, 000 per annum
237,405,000,000 678,300,000 10,167 100%51,000 10.17
192,780,000,000 550,800,000 18,000 60%30,600 18far3
30,345,000,000 86,700,000 8,500 20%10,200 8.5medium2
14,280,000,000 40,800,000 4,000 20%10,200 4short1
(IDR/annum)(IDR/day)(IDR/vehicles)%(vehicles/day)(km)
Potential Revenueestimated tariffDaily Av erage of Traffic
AmountsLength
Toll Road Route
Potential Revenue from Waste Water, Water Reclamation, Electricity,
Fertilizer, and Utility Shaft
► Area of Central Zone : 6,932 ha
► Population : 450 People/hectare
► Total Population served : 3,119,400 nos
► Waste water production
per people : 100 lt/people/day
► Total Waste Water : 311,940 m3/day
: 113,858,100 m3/annum
: 114,000,000 m3/annum ( rounded up)
Potential Revenue from Waste Water
IDR/annum (rounded up)217,000,000,000 :
IDR/annum216,600,000,000● Potential Revenue :
USD/annum 24,000,000 eq. to :
(2008)→IDR/m31,900● Average Charges :
►Waste Water Charges (sources data : JWDP, 2000)
IDR/annum (rounded up)242,000,000,000:
USD/annum 26,600,000 :Eq. to
IDR/annum241,948,462,500:● Potential Revenue
m3/annum96,779,385 :
85% of total waste→m3/day265,149 :
● Volume of water
Produced
2008→IDR/m32,500 :● Estimated Tariff
Potential Revenue from Water Supply
Potential Revenue from Organic Fertilizer
IDR/annum (rounded down)54,000,000,000 :
IDR/annum54,037,054,400 :● Potential Revenue
Estimated price in 2008IDR/kg 1,400:
USD/annum 6,000,000 :Eq. to
kg/annum38,597,896 :
0.20%:● Percentage of fertilizer
from waste
kg/annum19,298,947,950 :
ton/annum19,298,948 :
m3/annum17,078,715 :● Total Waste to be
Treated
ton/m31.13 :● Specific Gravity
Based on current urea prices per kg in 2006IDR/kg1,200 :● Estimated price
Milwauke, USA can produce 2 kg organic fertilizer from 1
ton of waste
Assumption of waste to be treated for organic fertilizer is
15% of total waste (113,858,100 m3/annum)
Potential Revenue from Methane Gas (Electricity)
IDR/annum (rounded down)38,000,000,000 :
IDR/annum38,211,916,941 :● Potential Revenue
USD/annum 4,000,000 :
kg/annum8,491,537 :● Total methane gas
for electricity
IDR/kg4,500 :● Estimated Price Based on current retail price of LPG : IDR 55,000/12kg =
IDR 4,583/kg
Based on assumption of CH4 (gas methan) = 0.22 x
biosolid
Note :
1. Potential revenue from methane gas could also achieve through Carbon Finance Scheme;
2. This scheme is being implemented by Bekasi local government through methane gas conversion sale from TPA Sumur
Batu to Dutch Government with 15 year concession period.
Potential Revenue from Utility Shaft
● Length of Utility Shaft : 22 km
● no. of users (assumption)* : 7 operators
● Potential Revenue : 23,000,000,000 IDR/annum
Eq. to: 2,500,000 USD/annum
*) assumption no of user
water : 1 → palyja/tpj
electricity : 1 → pln
gas : 1 → pgn
telecommunication : 4 → telkom, indosat, xl,cdma
total : 7
1. Toll Road = IDR 237 B ≈ USD 26 Millions
2. Waste Water = IDR 551 B ≈ USD 60.6 Millions - Waste Water Service Charges : IDR 217 B ≈ USD 24 Millions
- Water from Reclamation : IDR 242 B ≈ USD 26.6 Millions- Electricity : IDR 38 B ≈ USD 4 Millions
- Fertilizer : IDR 54 B ≈ USD 6 Millions
3. Utility Shaft = IDR 23 B ≈ USD 2.5 Millions
Total Revenue per annum = IDR 811 B ≈ USD 89.1 Millions
Estimated Revenue per Year(based price 2008)
Operation and Maintenance Cost per Year (based price 2008)
� Toll Road : 20% x IDR 237 B = IDR 47.4 B ≈ USD 5.2 Millions
� Waste Water : 20% x IDR 551 B = IDR 110.2 B ≈ USD 12.1 Millions
� Utility Shaft : 5% x IDR 23 B = IDR 1.15 B ≈USD 0.2 Millions
Total Operation & Maintenance cost = IDR 158.75 B= IDR 159 B (rounded up)
Eq. to = USD 17.5 Millions
Flood Damages Prevention (FDP) Government
Flood Damages Prevention (FDP)
0.5 x 1/3 x IDR 18.7 T = IDR 3.11 T (for 5 year)
Eq. to = USD 342 Millions
or approximately = IDR 623 B (per annum )
Eq. to = USD 68 Millions