103552090 instruction manual for rtn 950

Post on 28-Apr-2015

292 Views

Category:

Documents

20 Downloads

Preview:

Click to see full reader

TRANSCRIPT

HUAWEI TECHNOLOGIES CO., LTD. Page 1

Configuring RTN 950 Series for

Smart POC and FTK project

(Instruction Manual)

HUAWEI TECHNOLOGIES CO., LTD.

www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD. Page 2

1. Setting of IP address on your Laptop

1.1 Right Click on

icon of Local Area

Connection (LAN)

1.2 Click on Properties

1.3 Go to Internet

Protocol (TCP/IP)

then click

Properties

HUAWEI TECHNOLOGIES CO., LTD. Page 3

1.4 Type in IP Address then click on OK

ALWAYS USE THE FOLLOWING:

IP Address: 129.9.0.99

Subnet mask: 255.255.0.0

(No need to filed-up the Default gateway

and DNS)

HUAWEI TECHNOLOGIES CO., LTD. Page 4

2. Open the U2000 Web LCT application (pre-installed)

3. Type in your user name and password to Login

User Name: admin

Password: admin

HUAWEI TECHNOLOGIES CO., LTD. Page 5

4. To Search for a NE (Network Element), click NE Search

4.1 Click on NE SEARCH first

before you Add NE

HUAWEI TECHNOLOGIES CO., LTD. Page 6

4.2 Click on

SEARCH

Note: Domain is

automatically set

(no need to input

HUAWEI TECHNOLOGIES CO., LTD. Page 7

Web LCT will search and detect available NEs

4.3 Available NE will appear

4.4 Click Add NE

HUAWEI TECHNOLOGIES CO., LTD. Page 8

4.6 After pressing OK, all

available NE will be added on

the screen (Communication

Status will be NORMAL)

4.5 Then click on OK

HUAWEI TECHNOLOGIES CO., LTD. Page 9

5. To Login into the NE

5.1 Highlight the NE you want to login

5.2 Click on NE Login

HUAWEI TECHNOLOGIES CO., LTD. Page 10

5.3 Enter Password: password

5.4 Then press Apply and OK

HUAWEI TECHNOLOGIES CO., LTD. Page 11

6. To configure the NE, check if the Login Status then click on NE Explorer

6.1 Highlight the NE you want to

configure

Status will be already Logged in

6.2 Click on NE Explorer

HUAWEI TECHNOLOGIES CO., LTD. Page 12

7. Web LCT will automatically detect the available board/card on the Slot Layout

(with color ) 8. To install the cards, right click on the board then pressed “ADD”

Note: PIU, FAN and

CSH card will

automatically running

installed. Also slot 23

and 25 for ODU will

not detect until you

finished add the IFU2

boards.

8.1 Click add Physical

Boards

HUAWEI TECHNOLOGIES CO., LTD. Page 13

8.2 After you add all the

physical boards, slot 23

and 25 for ODU board

will appear.

8.3 Right click

the ODU board

then click the

add physical

board

HUAWEI TECHNOLOGIES CO., LTD. Page 14

9. Configuring NE attribute Site Name and Modifying NE

9.1 Highlight NE name

9.2 Highlight

NE attributes

9.3 Double click box under

NAME and type SITE NAME.

Then click apply and query.

HUAWEI TECHNOLOGIES CO., LTD. Page 15

9.4 Click Modify NE ID and a

dialog box will appear.

9.5 Type Site ID based on plan

assigned by TNP. Then click OK

NOTE: ID is a unique number.

HUAWEI TECHNOLOGIES CO., LTD. Page 16

10. Configuring 1+1 Protection

10.1 Highlight NE name

10.2 Highlight Link

Configuration

10.3 Click IF 1+1

Protection

10.4 Click New

HUAWEI TECHNOLOGIES CO., LTD. Page 17

Working Mode : HSB

Revertive Mode : Revertive

WTR : 300

Enable Reverse Switching :

Disable

Working Board : 3-IFU2-1

Protection Board : 5-IFU2-1

10.5 Click ok

HUAWEI TECHNOLOGIES CO., LTD. Page 18

11. Configuring Hybrid/AM configuration

11.1 Highlight 3-IFU2

11.2 Highlight

Hybrid/AM

Configuration

11.3 Click Hybrid/AM

Configuration

HUAWEI TECHNOLOGIES CO., LTD. Page 19

11.4 Double Click the

box of IF Channel

Band and change the

band according to the

plan

11.5 Double Click the

box of Manually

Specified Module and

change the module

according to the plan

11.6 Double Click the box

of E1 Capacity and change

the capacity according to

the plan

11.7 Click Apply then

Query

HUAWEI TECHNOLOGIES CO., LTD. Page 20

12. Configuring Transmit Frequency and Transmit Power

12.4 Click apply then

query

12.3 Double click the

box of transmit

frequency and type the

frequency according to

link budget given by

TNP

12.2 Highlight ODU

interface

12. 1 Highlight 23-ODU

HUAWEI TECHNOLOGIES CO., LTD. Page 21

12.5 click the

power

attributes

12.6 Double click the box of transmit power and

type the power according to link budget given by

TNP 12.7 Click apply

and query

HUAWEI TECHNOLOGIES CO., LTD. Page 22

13. Configuring Cross-Connection

13.1 Highlight NE name

13.2 Highlight cross connection

configuration

13.3 Click New

HUAWEI TECHNOLOGIES CO., LTD. Page 23

HUAWEI TECHNOLOGIES CO., LTD. Page 24

Thank You

www.huawei.com

top related