10/24/2010 distributed software development. 10/24/2010 content recommendation and reuse current...

Post on 15-Dec-2015

212 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

10/24/2010

Distributed Software Development

10/24/2010

Content Recommendation and Reuse

Current state – Beta Prototype

Hamid Riaz, Loredana Baračić

10/24/2010

Contents

• Current status • Project process• Important events• Experiences• Demo• Conclusion

10/24/2010

Current status(1)

Time lines:

Working Hours:

10/24/2010

Current status (2)• Milestones

10/24/2010

Project process• iterative and incremental development• summary week reports• un/scheduled meetings, SVN, Google groups

Alphapoint

Beta pointFinal result

10/24/2010

Important events• New co-worker Tin Stavinoha

oBuilding and extension for OpenOffice Impress

oConnecting on server through server’s interface

oSupport for displaying links regarding user’s content

10/24/2010

Important events• Meeting with Ivica

oSuggestions to improve o Instead of one should have two weekly

meetingsoVoice conversationoStart work on integration parallel to the

internal functionality of each moduleoNo (we and them) One team

10/24/2010

Experiences

• Experiences

o Clearly identify task of everyoneo Start integration as soon as possibleo Communicate on regular basiso Inform other team members about your

work

10/24/2010

Demo

• Still facing Client side oFirefox add-on interfaceoAdditional chrome extension

• Server side oConnecting to ZemantaoReceiving keywordsoAssigning priority to keywordsoCollecting URLS from Wikipedia

10/24/2010

Client side

• improvement of GUI• extension for Chrome browser• collecting content from generic forms

o  textboxes and text areas• collecting basic context from Mediawiki

o title and categories• copying selection to user's tool

10/24/2010

Client side - Firefox add-on

10/24/2010

Client side - Chrome extension 

10/24/2010

Server side

10/24/2010

Conclusion

• Start integration as soon as possible• Improve current state of project• Improve weak points• Improve organization• Try to solve upcoming tasks• Face current problems • Code some more :)

10/24/2010

Questions?

Squirrel!

top related