1 of 2 · steel framing plan below composite deck slab (scale 1:250) down stream up stream...

Post on 26-Mar-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

X

PSC I-GIRDER

Y

LONGITUDINAL ELEVATION(SCALE 1:250)

RE WALLFOR DETAILSREFER RELEVANTROAD DRAWINGS<<

RE WALL FOR DETAILSREFER RELEVANTROAD DRAWINGS >>

GL 303.141

FRL 311.646

SHOWING HALF TOP PLAN HALF BOTTOM PLAN(SCALE 1:250)

HARIDWAR KASHIPUR

16+900

16+850

16+950

CLIENT :KEY PLAN PROJECT :

DRG. NO. :

CONSULTANT :

REVISION : PD

SAI-2983/FDPR/BR/EUP/GAD/01

CONSULTANCY SERVICESFOR

GAD FOR ELEPHANTUNDERPASS AT

PROPOSED CHAINAGE.16+900 (NH-74)

HARIDWAR KASHIPUR

KEY PLAN

PSC I-GIRDERPSC I-GIRDER

(SCALE: 1:100)

2.5%

(SCALE 1:100) ABUTMENT SECTION A-A

(SCALE: 1:100)

NOTES :-

(SCALE 1:100)PIER SECTION B - B

2.5%

CLIENT :KEY PLAN PROJECT :

DRG. NO. :

CONSULTANT :

REVISION : PD

SAI-2983/FDPR/BR/EUP/GAD/01

CONSULTANCY SERVICESFOR

GAD FOR ELEPHANTUNDERPASS AT

PROPOSED CHAINAGE.16+900 (NH-74)

STEEL FRAMING PLAN BELOW COMPOSITE DECK SLAB(SCALE 1:250)

DOWN STREAM

UP STREAM

FSL.265.680

PSC I-GIRDER

GL 300.202

EX BRIDGE FRL 307.011

FRL 314.701

Z

LONGITUDINAL ELEVATION

STEEL ARCH

(AS PER LHS CARRIAGEWAY)(SCALE 1:250)

CLIENT :KEY PLAN PROJECT :

DRG. NO. :

CONSULTANT :

REVISION : PD

SAI-2983/FDPR/BR/EUP/GAD/01

CONSULTANCY SERVICESFOR

GAD FOR ELEPHANTUNDERPASS AT

PROPOSED CHAINAGE.4+074 (NH-74)

MA

TCH

LIN

E-1

MA

TCH

LIN

E-2

HARIDWAR KASHIPUR

LONGITUDINAL ELEVATION

STEEL ARCH

RE WALL FOR DETAILSREFER RELEVANTROAD DRAWINGS >>

(AS PER LHS CARRIAGEWAY)(SCALE 1:250)

59.30°SKEWANGLE

SHOWING BOTTOM PLAN BELOW DECK SLAB(SCALE 1:250)

DOWN STREAM

CLIENT :KEY PLAN PROJECT :

DRG. NO. :

CONSULTANT :

REVISION : PD

SAI-2983/FDPR/BR/EUP/GAD/01

CONSULTANCY SERVICESFOR

GAD FOR ELEPHANTUNDERPASS AT

PROPOSED CHAINAGE.4+074 (NH-74)

MA

TCH

LIN

E-2

HARIDWAR KASHIPUR

SECTION A-A(SCALE 1:100)

GENERAL NOTES :-

Structural Steel

(SCALE 1:100)PIER SECTION B - B

2.5%

CLIENT :KEY PLAN PROJECT :

DRG. NO. :

CONSULTANT :

REVISION : PD

SAI-2983/FDPR/BR/EUP/GAD/01

CONSULTANCY SERVICESFOR

GAD FOR ELEPHANTUNDERPASS AT

PROPOSED CHAINAGE.4+074 (NH-74)

(SCALE: 1:100)

PSC I-GIRDERPSC I-GIRDER

(SCALE: 1:100)

2.5%

(SCALE 1:100) ABUTMENT SECTION C-C

(SCALE: 1:100)

4+000

4+100

4+200

HARIDWARKASHIPUR

CLIENT :KEY PLAN PROJECT :

DRG. NO. :

CONSULTANT :

REVISION : PD

SAI-2983/FDPR/BR/EUP/GAD/01

CONSULTANCY SERVICESFOR

GAD FOR ELEPHANTUNDERPASS AT

PROPOSED CHAINAGE.4+074 (NH-74)

KEY PLAN

FSL.265.680

PSC I-GIRDER

EX BRIDGE FRL 307.011

FRL 314.701

Y Z

LONGITUDINAL ELEVATION(AS PER LHS CARRIAGEWAY)

X

RE WALLFOR DETAILSREFER RELEVANTROAD DRAWINGS<<

(SCALE 1:250)

SHOWING TOP PLAN (SCALE 1:250)

STEEL FRAMING PLAN BELOW COMPOSITE DECK SLAB(SCALE 1:250)

UP STREAM

CLIENT :KEY PLAN PROJECT :

DRG. NO. :

CONSULTANT :

REVISION : PD

SAI-2983/FDPR/BR/EUP/GAD/01

CONSULTANCY SERVICESFOR

GAD FOR ELEPHANTUNDERPASS AT

PROPOSED CHAINAGE.4+074 (NH-74)

MA

TCH

LIN

E-1

HARIDWAR KASHIPUR