1 jaxa agency report may 25, 2007 satoko horiyama miura jaxa/eorc may 25, 2007 satoko horiyama miura...
Post on 27-Mar-2015
215 Views
Preview:
TRANSCRIPT
1
JAXA Agency JAXA Agency ReportReport
JAXA Agency JAXA Agency ReportReport
May 25, 2007May 25, 2007
Satoko Horiyama MIURASatoko Horiyama MIURAJAXA/EORCJAXA/EORC
May 25, 2007May 25, 2007
Satoko Horiyama MIURASatoko Horiyama MIURAJAXA/EORCJAXA/EORC
2
Office of Space Applications
Program Management and Integration Department
Space Application Program Systems Engineering Office
Safety and Mission Assurance Office
Satellite Operations Engineering Department
Satellite Applications and Promotion Center
Earth Observation Research Center (EORC)
GOSAT Project Team
GCOM Project Team
GPM/DPR Project Team
Organization relating to EO
http://www.jaxa.jp/about/org/index_e.html
Satellite Operation,Incl. Mission operation
International Charter "Space and Major Disasters", Sentinel Asia, CEOS Plenary/SIT, GEO, Satellite data promotion
Development for data receiving/recording/processing/archiving system,[Aqua/AMSR-E, TRMM, ALOS, GOSAT, GPM, Earthcare, GCOM-W…]CEOS/WGISS, CEOS/WGCV, data analysis, etc
16 staffs
3
ALOS / DaichiJapanese Earth
Resources Satellite-1 (JERS-1)
© JAXA
ALOS
Enhanced land-observation technology
© JAXA
© JAXA
PRISMPanchromatic Remote sensing Instrument for Stereo Mapping
PALSAR Phased Array type L-band Synthetic Aperture Radar
© JAXA AVNIR-2 Advanced Visible and Near Infrared Radiometer type 2
• Disaster monitoring• Cartography• Regional observation• Resources surveying
Advanced Earth Observing Satellite
(ADEOS)
4
ALOS Observation for disasters (1)
Earthquake in Noto Peninsular , Japan [March 25, 2007(JST)]
The change of distance between ALOS and the Earth in 47 days (between Feb. 23 and April 10) is indicated by the two-dimensional colors in the image.
A maximum of 45 centimeters of rise
5
ALOS Observation for disasters (2)
Earthquake in Solomon Islands [April 2, 2007]
<< PALSAR interferometry>>
The maximum uplift in 47 days (between April 16 and March 1) to the satellite direction within the New Georgia island is measured 2.2 meter.
6
ALOS Data Distribution (1)
For “English (=non Japanese) usersAUIG(ALOS User Interface Gateway) ver1.0 is available
https://auig.eoc.jaxa.jp/auigs/en/top/index.htmlCatalog is open to public
7
ALOS Data Distribution (2)For Japanese usersAUIG(ALOS User Interface Gateway) ver2.0 is now available
https://auig2.eoc.jaxa.jp/auig2s/jp/top/index.htmlCatalog is open to public
English version will be released in early of next JFY !
9
Contribution to GEO
1. “Architecture Implementation Pilot Call for Participation (CFP)”
• Catalog server and WCS, ready to be tested before Kick-off meeting (June, 5-6)
2. Sentinel Asia
3. Precipitation Constellation (GPM/DPR)
4. …
10
Contribution to IPY
• Target : Release of ALOS mapping data for south-polar region 3 times On- going !
© METI, JAXA
top related