DEKRA INDUSTRIAL TURKEY

DEKRA INDUSTRIAL

2

I N

D U

S T

R I

A L

Our Services

EUROPEAN DIRECTIVES

THIRD PARTY INSPECTION AND CONTROL SERVICES

WELDING AND BRAZING TECHNOLOGY

CONSTRUCTION SUPERVISION & INSPECTION

MATERIAL TECHNOLOGY

TRAINING AND CONSULTANCY

CERTIFICATION OF ADEQUACY

DEKRA INDUSTRIAL TURKEY

3

I N

D U

S T

R I

A L

European Directives

-97/23/EC Pressure Equipment Directive

-2010/35/EU Transportable Pressure Equipment Directive

-2009/105/EC Simple Pressure Vessels Directive

-2006/42/EC Machinery Directive

-95/16/EC Lifts Directive

-94/9/EC Equipment and protective systems for potentially explosive atmospheres

DEKRA Turkey gives inspection and certification services with different notifications of DEKRA Group companies for CE and π marking of pressure vessels, steam boilers and other products according to below mentioned European Directives.

DEKRA INDUSTRIAL TURKEY

4

I N

D U

S T

R I

A L

European Directives

DEKRA INDUSTRIAL TURKEY

CE Marking According to 97/23/EC Pressure Equipment Directive for a Steam Boiler 31 Bar 7200 kg/h

CE Marking According to 97/23/EC Pressure Equipment Directive for a Steam Boiler 31 Bar 7200 kg/h

5

I N

D U

S T

R I

A L

European Directives

DEKRA INDUSTRIAL TURKEY

CE Marking According to 97/23/EC Pressure Equipment Directive for a Steam Boiler 40 Bar 100 Ton/h

CE Marking According to 97/23/EC Pressure Equipment Directive for a Steam Boiler 40 Bar 100 Ton/h

6

I N

D U

S T

R I

A L

European Directives

DEKRA INDUSTRIAL TURKEY

Marking According to 99/36/EC Transportable Pressure Equipment Directive for LPG Cylinders

Marking According to 99/36/EC Transportable Pressure Equipment Directive for LPG Cylinders

7

I N

D U

S T

R I

A L

European Directives

DEKRA INDUSTRIAL TURKEY

Marking According to 2010/35/EU and ADR for Tankers Marking According to 2010/35/EU and ADR for Tankers

8

I N

D U

S T

R I

A L

European Directives

DEKRA INDUSTRIAL TURKEY

Marking According to 2010/35/EU and ADR for Cylinder Valves Marking According to 2010/35/EU and ADR for Cylinder Valves

9

I N

D U

S T

R I

A L

European Directives

DEKRA INDUSTRIAL TURKEY

CE Marking According to 87/404/EEC Simple Pressure Equipment Directive for Truck Air Tanks

CE Marking According to 87/404/EEC Simple Pressure Equipment Directive for Truck Air Tanks

10

I N

D U

S T

R I

A L

Third Party Inspection and Control Services

DEKRA gives project approval, hazard analyze, production control, assembly control and certification services independently on below mentioned facilities and equipments on the base of national & international regulations, norms and technical specifications

-Power Plants-Petro - Chemical Facilities -Refineries -Pipe Production and Pipelines -Construction Sites -Steel Construction -Boilers -Pressure Vessels and Equipments -Pre-shipment -Material

-Destructive and non-destructive tests -Casting and Forging -Mechanical and electrical installations -Occupational health and safety -Cranes and conveyors

DEKRA INDUSTRIAL TURKEY

11

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Third Party Inspection and Control Services

135 t/h, 427 0C, 62 bar Natural Gas Firing Steam Boiler and equipments

135 t/h, 427 0C, 62 bar Natural Gas Firing Steam Boiler and equipments

12

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Third Party Inspection and Control Services

160 MW Thermal Power Plant With Circulating Fluidized Bed Boiler Manufacturing and Erection Control

160 MW Thermal Power Plant With Circulating Fluidized Bed Boiler Manufacturing and Erection Control

13

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Third Party Inspection and Control Services

2X600 MW Thermal Power Plant with Once-Through Π-type with Supercritical Boiler Manufacturing and Erection Control

2X600 MW Thermal Power Plant with Once-Through Π-type with Supercritical Boiler Manufacturing and Erection Control

14

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Third Party Inspection and Control Services

919 MW Gaz Burned Combined Cycling Power Plant

919 MW Gaz Burned Combined Cycling Power Plant

15

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Third Party Inspection and Control Services

220 MW Gaz Burned Combined Cycling Power Plant 220 MW Gaz Burned Combined Cycling Power Plant

16

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Third Party Inspection and Control Services

Control of Renovation Works for the Biggest Refinery In Turkey (Tupras)

Control of Renovation Works for the Biggest Refinery In Turkey (Tupras)

17

I N

D U

S T

R I

A L

Project Follow-Up (Bank Engineering)

DEKRA gives investment follow-up (abk engineering) control and certification services independently on below mentioned facilities and equipments on the base of credit agreement and investment plan.

-Power Plants-Petro - Chemical Facilities -Refineries -Constructions -Industrial Facilities

-Control of Feasibility Report-Monthly/Quarterly Project Progress Control-Cost Control of Project-Control of Project Permission Progress (exproportion, governmental license..etc) -Control of the Financial Inquiry of Investor

DEKRA INDUSTRIAL TURKEY

18

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Bank Engineering for the 2X600+165 MW Thermal Power Plant in Zonguldak

Bank Engineering for the 2X600+165 MW Thermal Power Plant in Zonguldak

Project Follow-Up (Bank Engineering)

19

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Project Follow-Up (Bank Engineering)

Bank Engineering for the 2X600 MW Thermal Power Plant in IskenderunBank Engineering for the 2X600 MW Thermal Power Plant in Iskenderun

20

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Project Follow-Up (Bank Engineering)

Bank Engineering for the 50 MW Thermal Power Plant in KutahyaBank Engineering for the 50 MW Thermal Power Plant in Kutahya

21

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Project Follow-Up (Bank Engineering)

Bank Engineering for the 60 MW Hydro Power Plant in MuglaBank Engineering for the 60 MW Hydro Power Plant in Mugla

22

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Project Follow-Up (Bank Engineering)

Bank Engineering for the 13 MW Hydro Power Plant in KatamonuBank Engineering for the 13 MW Hydro Power Plant in Katamonu

23

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Project Follow-Up (Bank Engineering)

Bank Engineering for the Biggest Wind Energy Power Plant 150 MWBank Engineering for the Biggest Wind Energy Power Plant 150 MW

24

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Project Follow-Up (Bank Engineering)

Bank Engineering for the 140 MW Wind Energy Power Plant

Bank Engineering for the 140 MW Wind Energy Power Plant

25

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Project Follow-Up (Bank Engineering)

Bank Engineering for 54,9 MW Poyraz Wind Energy Power Plant

Bank Engineering for 54,9 MW Poyraz Wind Energy Power Plant

26

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Project Follow-Up (Bank Engineering)

Bank Engineering for 30 MW Seyitali Wind Energy Power Plant

Bank Engineering for 30 MW Seyitali Wind Energy Power Plant

27

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Project Follow-Up (Bank Engineering)

Bank Engineering for 30 MW Kozbeyli Wind Energy Power Plant

Bank Engineering for 30 MW Kozbeyli Wind Energy Power Plant

28

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Project Follow-Up (Bank Engineering)

Bank Engineering for 30 MW Samurlu Wind Energy Power Plant

Bank Engineering for 30 MW Samurlu Wind Energy Power Plant

29

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Project Follow-Up (Bank Engineering)

Bank Engineering for 20 MW Sayalar Wind Energy Power Plant

Bank Engineering for 20 MW Sayalar Wind Energy Power Plant

30

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Project Follow-Up (Bank Engineering)

Bank Engineering for Electricity Distribution Investment for 5 cities Bank Engineering for Electricity Distribution Investment for 5 cities

31

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Project Follow-Up (Bank Engineering)

Bank Engineering for Capacity Extantion project of Biggest Woden Product Manufacturer

Bank Engineering for Capacity Extantion project of Biggest Woden Product Manufacturer

32

I N

D U

S T

R I

A L

DEKRA INDUSTRIAL TURKEY

Project Follow-Up (Bank Engineering)

Bank Engineering for Steel Manufacturer InvestmentBank Engineering for Steel Manufacturer Investment

33

I N

D U

S T

R I

A L

Welding and Brazing Technology

-Checking of welding and/or brazing procedure specifications (WPS, BPS) -Testing and certification of welding and/or brazing procedures (WPQR, BPQR) -Testing and certification of welding and/or brazing personnel (WPQ, BPQ) -Inspection and certification of manufacturers on the base of welding and/or brazing adequacy (EN 729-ISO 3834) -Training and certification of welding coordination personnel (EN 719-ISO 14731) -Welding Supervision

DEKRA gives training, consultancy, inspection and certification services according to relevant national & international norms (EN, ISO, ASME) for welding processes and personnel

DEKRA INDUSTRIAL TURKEY

34

I N

D U

S T

R I

A L

Welding and Brazing Technology

DEKRA INDUSTRIAL TURKEY

Welder and Welding Procedure Qualification Tests and Sertification acc. 97/23/EC Pressure Equipment Directive for 160 MW Power Plant Erection

Welder and Welding Procedure Qualification Tests and Sertification acc. 97/23/EC Pressure Equipment Directive for 160 MW Power Plant Erection

35

I N

D U

S T

R I

A L

Welding and Brazing Technology

DEKRA INDUSTRIAL TURKEY

Welder and Welding Procedure Qualification Tests and Sertification acc. 97/23/EC Pressure Equipment Directive for 20 MW Power Plant Erection

Welder and Welding Procedure Qualification Tests and Sertification acc. 97/23/EC Pressure Equipment Directive for 20 MW Power Plant Erection

36

I N

D U

S T

R I

A L DEKRA gives inspection, project management, controlling and

certification services for each stage of construction projects according to customer specifications and related standards

-Project control and approval-Auditing of the construction companies and certification of the adequacy -Construction site control -Hazard Analyze -Mechanical installation (Heating, cooling, air conditioning and plumbing) control -Fire safety system control -Electrical installation control -Control of automation and communication systems -Occupational safety audits

Construction Supervision & Inspection

DEKRA INDUSTRIAL TURKEY

37

I N

D U

S T

R I

A L ECE Turkey 200.000 m2 Marmarapark Shopping Center Firefighting,

Mechanical Electrical Systems Acceptance Control

ECE Turkey 200.000 m2 Marmarapark Shopping Center Firefighting, Mechanical Electrical Systems Acceptance Control

Construction Supervision & Inspection

DEKRA INDUSTRIAL TURKEY

38

I N

D U

S T

R I

A L ECE Turkey 120.000 m2 Espark Shopping Center Electrical and

Mechanical Systems Acceptance Tests

ECE Turkey 120.000 m2 Espark Shopping Center Electrical and Mechanical Systems Acceptance Tests

Construction Supervision & Inspection

DEKRA INDUSTRIAL TURKEY

39

I N

D U

S T

R I

A L

Construction Supervision & Inspection

DEKRA INDUSTRIAL TURKEY

METRO Cash and Carry Antalya Hipermarket Steel Structure Alteration Works

METRO Cash and Carry Antalya Hipermarket Steel Structure Alteration Works

40

I N

D U

S T

R I

A L

Construction Supervision & Inspection

DEKRA INDUSTRIAL TURKEY

METRO Cash and Carry Karagandy-Kazakhstan Hipermarket Steel Structure Alteration Works

METRO Cash and Carry Karagandy-Kazakhstan Hipermarket Steel Structure Alteration Works

41

I N

D U

S T

R I

A L

Construction Supervision & Inspection

DEKRA INDUSTRIAL TURKEY

Static Examinations and Soil Investigation for Carrefour TurkeyStatic Examinations and Soil Investigation for Carrefour Turkey

42

I N

D U

S T

R I

A L

-EN 10204 3.2 Certificate -Batch acceptance tests and certification -Casting / Forging controlling -Optimization and inspection of forming processes -Preparation and inspection of heat treatment processes -Analysis and evaluation of macro and micro structures -Witnessing the mechanical and technological tests and reporting -Determination of remaining life of equipments and materials

Certification of conformity of materials, which will be used for production of equipments according to European Directives and/or ASME,

Material Technology

DEKRA INDUSTRIAL TURKEY

43

I N

D U

S T

R I

A L

Training and Consultancy

-European Directives-Harmonize Standards -Pressure equipment regulations (AD 2000, CODAP 2000,…) -ADR -Welding and brazing technology -Welding coordination personnel -Material technology -DT and NDT tests-Occupational health and safety -Fire protection and safety

DEKRA gives training and consultancy services with highly experienced experts to provide qualified personnel, which are in need by the industrial fields, about;

DEKRA INDUSTRIAL TURKEY

44

I N

D U

S T

R I

A L

Certification of Adequacy

Our experts perform audits of production process and quality systems of pressure equipment manufacturers and their material manufacturers within taking into consideration the capability of them. If the results of audits are in conform with the related regulation and standard, certificates will be issued according to;

-AD2000 HP0-EN729-AD2000 W0

DEKRA INDUSTRIAL TURKEY

45

I N

D U

S T

R I

A L

YOUR RELIABLE PARTNER for QUALITY and SAFETY