CONTINUOUS INSULATIONSHEATHING USAGE

Presented by:  Ron Jackson and Sam HatchellDanis Building Construction Company and Jaynes Corporation

ACIG Quality Summit 2016

DOW THERMAX XARMORCONTINUOUS INSULATIONEXTERIOR INSULATION

Director of Quality AssuranceDanis Building Construction Company

Ron Jackson

KETTERING CANCER CENTER

Lessons Learned and Best Practices

DOW Thermax XArmor ( ci ) Exterior Insulation

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

PROJECT DESCRIPTION• 5‐Story Steel Framed Construction including Connector Bridge to Main Campus

• Primary Architect is Cannon Design with local Partner LWC Incorporated

• 120,000 Sq.Ft. ( Levels 2 and 3 are Shelled Space for Future Fit‐Out )

• $ 40,500,000

• DOW Thermax XArmor ( ci ) Exterior Insulation

• Brick and Cast Stone Veneers

• Composite Metal Panels

• Full Height Curtain Walls and Punched Openings

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

PROJECT RENDERING

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

PROJECT DESIGN HISTORY• Initial Exterior Envelope Design was 2 3/8” Spray Polyurethane Foam Insulation over 5/8” Exterior Sheathing

• Third Party Consultant Wiss, Janney, Elstner conducted a Peer Review based on this design

• Delay’s in receiving 100% Design Documents would have dictated trying to apply the SPF Insulation in January in Ohio which would have required fully tenting and heating the structure to meet the SPF Insulation temperature requirements

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

PROJECT DESIGN HISTORY• Architect(s) and Owner asked for alternatives to keep the project on schedule

• Exterior Sheathing Sub‐Contractor had experience with installing the DOW Thermax Systems and offered it as an Alternative

• Owner and Architect accepted the proposed Alternative to stay on schedule

• Wiss, Janney, Elstner conducted a “ Commentary Only “ review of DOW Thermax System

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

PRODUCT DESCRIPTION AND COMPOSITION• 4’ x 8’ x 12’ panels with ship lap configuration at top and bottom of panel

• Exterior face of panel:  glass‐fiber reinforced polyisocyanurate foam core faced with a nominal 4 mil embossed thermoset‐coated aluminum.  Exterior face serves as a drainage plane and a water‐resistive barrier

• Interior face of panel:  1.25 mil embossed aluminum

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

FASTENING PATTERN

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

FASTENER ACCESSORIES – DOW PANEL TO STUD

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

FAST BUILDING DRY‐IN POTENTIAL

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

MASONRY ACCESSORIES – BRICK TIES

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

LIQUID FLASHING MATERIAL• Elastomeric Spray that forms a tight, seamless 

barrier**

• Surface and Ambient Temperatures should be 35F and rising and below 120F during application

• Applied at 50 mils +/‐ 5 mils

• Build up to 50 mils with two passes, one to fill the joint, the next to build the thickness and achieve proper joint coverage

• Joint coverage is 3” +/‐ 1”

• Coverage into rough openings is 3” onto the face and 3” into the opening

• Penetration coverage is 2” onto the face and 2” onto the penetration

**  When applied correctly per Manufacturers Instructions

LESSONS LEARNED

DOW Thermax XArmor ( ci ) Exterior Insulation

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

PRODUCT DAMAGE IS TO BE EXPECTED

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

GAPS GREATER THAN ¼” WIDE MUST BE TREATED

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

GAPS AT STRAP BLOCKING FOR STONE

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

SEQUENCING OF GAP TREATMENT BEFORE SPRAYING• Encourage Installer to provide two 

crews such that Gap Treatment can 

stay ahead of Spraying Operations

• Drying Times of Gap Treatment need 

to be factored into Scheduling of 

Spraying

• Coordination of other Trades Work 

being held up waiting on Gap 

Treatment and Spraying

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

CLEAR COMMUNICATION TO NEW SITE WORKERS• Trade Worker who began initial 

start of spraying on West Elevation was not at the Pre‐Installation Meeting

• 1st Work Inspection revealed that he did not understand extent of spraying detailing at vertical soffit to roof transition 

• Corrective Action was implemented

• New Trade Worker to site repeated the same deficiency on South Elevation

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

STRUCTURAL LINTEL CONDITION SNAF‐OOO• Architectural Detail showed bolted 

Lintel Connection with bolt head on exterior side of metal stud

• Transition from 2 ½” Thermax to narrower section without reducing drainage cavity

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

STRUCTURAL LINTEL CONDITION ADJUSTMENT

BEST PRACTICES

DOW Thermax XArmor ( ci ) Exterior Insulation

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

PROPER FLASHING OF PENETRATIONS

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

THOROUGH INSPECTION OF SPRAYED AREAS PRIORTO MOVING TO NEXT AREA

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

GOING THE EXTRA MILE AT METAL PANELS

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

VERIFY SEALANT COMPATIBILITY WITH DOW

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

ENGAGE DOW TECHNICAL STAFF EARLY WITHPROJECT SPECIFIC DETAILS AND QUESTIONS

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

REQUEST DOW TECHNICAL FIELD OBSERVATION AT1ST WORK INSPECTION

Copy

right ©

 2016 Am

erican

 Con

tractors In

surance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

Ron JacksonDirector of Quality AssuranceDanis Building Construction Company

Direct: 937‐228‐1225

Cell: 937‐673‐0978

ron.jackson@danis.com

JOHNSMANVILLECONTINUOUS INSULATIONFOAM SHEATHING

Corporate Quality ManagerJaynes Corporation

Sam Hatchell

MARIE HUGHES ELEMENTARY

Jonhsmanville AP Foil Faced Polyisocyanurate Foam Sheathing

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

PROJECT DESCRIPTION

• 2 story elementary school

• Structural steel framed construction

• 87,000 Sq/.ft

• $15,000,000 contract price

• Johnsmanville Foil Faced Polyiso Rigid Insulation 1.5 Inch (exterior sheathing)

• Cladding Systems

• 3 coat Portland Cement Plaster (Stucco)

• Flat Metal Panels

• Porcelain Tile

• Storefront punch openings

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

PROJECT MODEL

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

WALL SYSTEM DESIGN (STUCCO)

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

WALL SYSTEM DESIGN (PORCELAIN TILE)

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

WALL SYSTEM DESIGN (METAL PANEL)

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

CI PRODUCT

• Foil Faced 1.5 Inch Polyiso insulation

• Attached with large capped fasteners

• All seams and corners taped

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

SEAM TAPE PRODUCT

• DOW Weathermate used instead of JM recommended  3M Tape

• Blue polypropylene film facer with butyl adhesive

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

FASTENER PRODUCT

• UltraFast Fastener

• #12 steel, polymer‐coated

• 3” Round Locking Blue Plastic Plate

• Fastening Pattern: 16 inch O.C. vertically and horizontally when over steel stud directly

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

MOCK‐UP

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

MOCK‐UP

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

MOCK‐UP

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

MOCK‐UP

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

DETAILS

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

DESIGN DETAILS

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

DETAILS

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

PENETRATIONS

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

PENETRATIONS

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

ITEMS TO CONSIDER DURING INSTALL

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

ITEMS TO CONSIDER DURING INSTALL

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

ITEMS TO CONSIDER DURING INSTALL

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

WORK IN PROGRESS

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

WORK IN PROGRESS

Copyright © 2016 American Contractors Insurance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

WORK IN PROGRESS

Copy

right ©

 2016 Am

erican

 Con

tractors In

surance Group

COMPLIANCE to COMMITMENTClaims  •  Risk Management  •  Safety  •  Quality

Sam HatchellCorporate Quality ManagerJaynes Corporation

Direct:   505‐345‐8591

Cell:   505‐235‐3098

sam.hatchell@jaynescorp.com

Building Better Builders

top related