03
| 2
01
2
COMSOFT GmbH
FPL2012 Message Conversion and Migration
AIDA-FPL
FPL 2012 Flight Plan Conversion
SP/7 (Revised)
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 2
DOC 4444 – Amendment 1 – A global Issue
The new ICAO flight plan format is introduced world-wide
It will be distributed on international level ANSPs in all ICAO Regions are involved
Due Date: November 15, 2012According to ICAO State Letter AN 13/2.1-08/50, each ANSP is
obliged to receive flight plans according to ICAO amendment 1 to DOC 4444 15th Edition
Migration Phase April 2012 - November 2012During this phase the coexistence of the present and the new format
is tolerated
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 3
The present and the new Format
Meaning of items/coding within the new flight plan has significantly changed
Items 7, 8, 10,13,15,16, 18 and 22 are concerned Items 10 and 18 (and therefore 22) have experienced
the most considerable changes
Present and new format are incompatible
During Migration Phase:
Conversion “New Present” is required
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 4
Conversion - New to Present Format
Conversion may not lead to a loss of data ICAO has published guidelines for the conversion,
which can be used by states (ICAO state letter AN 13/2.1-09/9)
Regions have developed regional guidance material: EUR Region
EUROCONTROL has provided specific guidelines (CFMU v1.43)
ASIA/PACIFIC Region APANPIRG FPL&AM/TF has developed regional
guidance material (Guidance Material v3)
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 5
The Standard - ICAO Migration Phase (< November 15th 2012)
„Present“ FPL System
(not updated)
NEW FPL System
Accepts new and old format
ANSP Environment
NEW FPL SystemAccepts new and
old format
LAN
/WA
N
„Present“ FPL System
Conversion Present to NewDOF Handling
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 6
Potential Situation after November 15th 2012
„Present“ FPL System
(not updated)
(Only) NEW FPL System
ANSP Environment
(Only) NEW FPL System
LAN
/WA
N
„Present“ FPL System
(not updated)
Conversion Present to New
Conversion New to Present
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 7
COMSOFT – Support of the Bidirectional Conversion
New F10aNew F18
J1J3J4R PBN/C1R PBN/C2
Present F10a Present F18J DAT/V COM/J1J DAT/V COM/J3J DAT/V COM/J4
RNAV/RNAV2 C1
RNAV/RNAV2 C2
e.g. Asia/Pac. Specs.
COMSOFT
• COMSOFT supports the conversion in both directions• Conversion Present to NEW is based on the
information in field 18
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 8
Special Case of the Conversion: Date of Flight (DOF)
New Format allows to file flight plans 5 days in advance
Present Format allows to file flight plans 24 hrs in advance
Some existing Flight Data Processing System implementations do not understand the „Date of Flight“ (DOF) feature
Risk of misinterpretation of the flight date
The converter has to delay Flight Plans with DOF set for those end
systems that are not capable of the DOF feature.
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 9
Special Case of the Conversion: Date of Flight (DOF)
New Format allows to file flight plans 5 days in advance
Present Format allows to file flight plans 24 hrs in advance
Some existing Flight Data Processing System implementations do not understand the „Date of Flight“ (DOF) feature
Risk of misinterpretation of the flight date
The converter has to delay Flight Plans with DOF set for those end
systems that are not capable of the DOF feature.
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 10
DOF Handling – On Hold Queue
FPL System
DOC 4444
AIDA-NG FPL
Converter
On-hold Queue
FPL 1 DOF > 24 hours
CHG Message associated with FPL 1
„Association Building“ fully supported by AIDA-NG FPL Converter
FPL 2 DOF > 24 hours
CHG Message associated with FPL 2
New to Present
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 11
AIDA-NG FPL Conversion – Inconvertible Messages
FPL System
DOC 4444
AIDA-NG FPL
Converter
Inconvertible Queue
FPL 1
FPL 2
Operator Intervention
ü Configurable per Circuit
Inconvertible FPL
Direct Forwarding
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 12
AIDA-NG Converter – Extended Conversion
AIDA-NG FPL
Converter
FPL System
FPL2012 Amendment 1
FPL System
DOC 4444
FPL System
AIDC < 2.0
FPL System
AIDC 3.0
FPL System
OLDI FDE ICD
FPL System
OLDI FMTP
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 13
Management Framework
The AIDA-NG FPL Converter includes the outstanding features of COMSOFT’s Flagship Message Handling System AIDA-NG
Fully redundant system with shortest switchover times between operational and standby server (< 5 seconds)
Ultimate connectivity by LAN and WAN-based circuits (Async, TG, X.25, TCP/IP, FDE-ICD, FTMP, AIDC, OLDI, AFTN, AMHS )
Online configuration of all parameters Flexible AFTN routing features allowing to integrate the system in any environment Additional routing features for diverting or copying messages High sophisticated event and alarm handling for all system elements (Hardware
components, Circuits, Queues, conversion algorithm, etc.) High sophisticated message queue management Universal retrieval of incoming/outgoing messages using multiple filter criteria and
direct tracing of the conversion Configurable statistics
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 15
COMSOFT AIDA-FPL – The Universal Converter
AIDA-FPL Flight Plan ConverterMature solution applying elaborate algorithms for conversion and error handling mechanismsBased on COMSOFT‘s extremely reliable aeronautical message handling technologySupport of regional implementations (CFMU V1.4.1, Asia/Pacific V3)Conversion New to PresentConversion Present to NewSupport of DOF BufferingExtended conversion functions (AIDC, OLDI, ADEXP)Extensive testing and proof of concept with real-life test data
Now !!
It is available
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 16
References
▮ AIDA-FPL Contracted/Converter Systems in the Field
▮ United Arab Emirates▮ Egypt▮ Georgia▮ Trinidad/Tobago▮ Australia▮ Bosnia/Herzegowina▮ Morocco▮ Saudi Arabia▮ Singapore▮ Switzerland▮ France▮ Qatar
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 17
AIDA-FPL Deployment Options
AIDA-FPL is an integral part of COMSOFT’s AIDA-NG AFTN/AMHS System (for AIDA-NG-Customers)
AIDA-FPL inherits AIDA-NG‘s unrivalled maturity and connectivity options.
Alternatively, AIDA-FPL can be deployed as standalone front-end processing converter for one or several end systems.
AIDA-FPL can be deployed as a fully redundant or single solution
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 18
AIDA-NG Customers – SW Upgrade incl. FPL Conversion
ATM SystemFPL System FDPS System
Adjacent AFTN Centres
DOC 4444 FPL2012 Amendment 1
AIDA-NG incl. FPL Converter
New to Present
Present to New (if required)
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 19
AIDA-FPL as Stand-Alone System – Intermediary System
Existing AFTN Switch
FPL SystemFDPS
ATM System
Adjacent AFTN Centres
DOC 4444FPL2012 Amendment 1
MET
AIDA-NGFPL-Converter
AFTN
AFTN
Present to New(if required)
AFTN
New to Present
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 20
AIDA-FPL as Stand-Alone System – Minimized Impact
FPL SystemFDPS
ATM System
DOC 4444 FPL2012 Amendment 1
MET
AIDA-NGFPL-Converter
AFTNAFTN
Adjacent AFTN Centres
ü No change required
Existing Environment
Present to New(if required)
New to Present
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 21
© 2011 COMSOFT GmbH | FPL 2012 Conversion | Manila, Philippines, November 7-9, 2011 | Page 22
Your COMSOFT Resources.
Uwe Kurpat
uwe.kurpat@comsoft.aero
+49 721 9497 2600
top related