LD1 Report Date : 27-Mar-20 Day : Friday
Sl. Details Installed Available Lighting Minimum Morning Consum-
No. Capacity capacity Peak Load Peak ption
MW MW MW MW MW MU
Date 27-Mar-20 26-Mar-20 27-Mar-20 27-Mar-20 26-Mar-20
Time in Hrs. Hrs. 18:55 3:40 7:55
Frequency in HZ. HZ. 50.02 49.98 50.06
1 TNEB
a) Hydro MW 2321.9 900 935 316 920 9.987
(i) Kadamparai Generation MW 300 0 300 2.225
(ii) others MW 635 316 620 7.762
b) Thermal MW 4320.0 600 610 585 600 20.724
c) Gas 516.1 260 269 269 274 6.395
2 Independent Power Plant 746.5 360 385 376 379 8.036
(i) PP Nallur. 330.5 0 0 0 0 0.000
(ii) TAQA 250 250 250 250 250 4.972
(iii) LANCO 113.2 80 93 82 86 2.020
(iv) Pioneer 52.8 30 42 44 43 1.044
3 Captive Power Plant (Intra state) 150 41 44 45
(i) CPP (Purchase) 0 0 0 0 0
(ii) CPP (Wheeling) *986.18 986.18 150 41 44 45
4 Non-Conventional Energy Schemes
Co-Generation & Biomass 50 62 63 65
(i) Co-Generation *721.40 45 62 63 65
(ii) Biomass *265.59 5 0 0 0
Wind & Solar 400 363 248 708 23.991
(iii) Wind *8506.73 400 363 248 153 7.683
(iv) Solar *3759.896 0 0 0 555 16.308
5 6186 4651 3465 3859 4399 88.103
(i) Neyveli TS1 (BILATERAL) 180 180 180 180 4.780
(ii) NTPC (2600) + SIMHADRI (1000 ) 835
(iii) NlyTS2(1470) 472
(iv) NlyTS1 Expansion (420) 226
(v) NlyTS2 Expansion (500) 270
(vi)
(vii)
New Neyveli TPP (500) 350
(vii)
(vii)Talcher Stg2 (2000) 487
(vii) VALLUR (1500) 1066
(ix) NTPL (1000) 414
(x) MAPS (440) 331
(xi) KAPS (880) 226
(xii) KUDANKULAM(2000) 1151
(xiii) Kudgi(2400) 323
(xiv) Eastern region power 35 32 32 28 28 0.761
3580.0 3861 5048 3338 3345 82.753
Total TamilNadu Load 18656.66 11200 11177 9099 10735 243.074
(i) UI : OD(+) / UD (-) 178 214 -95
(ii) Kadamparai Pump 0 0 0 1.710
(iii) Load Shedding 0 0 0 0.000
(i) This day Last Year 15330 13054 14658 346.159
(ii) Load Shedding / R & C 0 0 0 0.000
(iii) Freq. in HZ. 49.93 49.98 49.98
Max Consumption 369.940 MU on 12-04-19
Max Demand 16151 MW on 03-04-19 19:05 Hrs. at 50.01
Yesterday's Sustained Peak 11,124 MW 19.00 Hrs at 50.02 Hz
Load shedding 0 MW
2564
:: Tamil Nadu Transmission Corporation Ltd ::
3.085
CGS (capacity) - Share for TNEB
6151 4439 3253 3651 4191 82.562
7 Power Purchase
(MTOA+LTOA+STOA+*Exchange)
8
9
Note: * All these items are not included in total Installed capacity.
# yesterday's solar generation(max): MW
LD2 27-Mar-20 Day : Friday
Inst. Cap in
Tamil Nadu
(MW)
Yesterday's
Lighting peak in
(MW)
Today's
Morning peak
in (MW)
Target for the
month
(MU)
Target for the
day
(MU)
Target till today
(MU)
Gen. for the day
(MU)
Gen. for the
month till today
(MU)
Pykara 59.2 0 0 0.000 0.000Pushep 150 150 150 1.175 28.319Moyar 36 19 19 0.355 9.690Kundah1 60 0 50 0.684 22.420Kundah2 175 160 130 1.813 51.629Kundah3 180 100 100 1.128 29.388Kundah4 100 50 50 0.210 5.786Kundah5 40 0 0 0.000 2.443Kundah6 30 0 0 0.000 0.278Mettur dam 50 11 11 0.254 7.343Mettur tunnel 200 0 0 0.000 0.000Lower Mettur 120 5 5 0.146 4.927BKB 1,BKB 2 & BKB 3 90 0 0 0.013 0.759Periyar 168 0 0 0.000 0.000Suruliyar 35 35 0 0.087 2.518Papanasam 32 16 16 0.384 6.713Servalar 20 14 14 0.108 2.053Sholayar 1 84 0 0 0.000 0.000Sholayar 2 25 0 0 0.000 0.000Aliyar 60 0 0 0.000 10.143Kadamparai 400 300 300 2.225 33.915Sarkarpathy 30 22 22 0.531 14.130Kodayar 1 60 20 20 0.480 11.601Kodayar 2 40 22 22 0.141 2.991BBR 1 10 0 0BBR 2 10 0 0Total Micro 57.7 11 11 0.252 7.221Hydro total 2321.9 935 920 350 11.290 293.548 9.987 254.445
NCTPS 1 630 190 180 400 12.903 335.484 6.745 224.880Tuticorin TPS 1050 210 210 530 17.097 444.516 7.086 446.663MTPS 1 840 210 210 400 12.903 335.484 6.893 337.830MTPS 2 600 0 0 400 12.903 335.484 0.000 223.920
NCTPS 2 1200 0 0 800 25.806 670.968 0.000 436.474
Thermal total 4320.0 610 600 2530 81.613 2121.935 20.724 1669.767
BBGTP 120 0 0 0 0.000 0.000 0.000 0.000
KovilKalappal 108 36 36 25 0.806 20.968 0.878 20.588Vazhudur Stage1 95 92 92 45 1.452 37.742 2.194 51.538Vazhudur Stage2 92 65 66 40 1.290 33.548 1.580 45.888
Kuttalam 101 76 80 40 1.290 33.548 1.743 9.138
Gas total 516.08 269 274 150 4.839 125.806 6.395 127.152TAQA 250 250 250 150 4.839 125.806 4.972 101.490PP.Nallur 331 0 0 0 0.000 0.000 0.000 0.000Lanco 113 93 86 50 1.613 41.935 2.020 56.298
Pioneer 53 42 43 25 0.806 20.968 1.044 22.623
IPP total 746.5 385 379 225 7.258 188.710 8.036 180.411
CPP (Purchase) 986.18 0 0 350 11.290 293.548
CPP (Others) * 986.18 41 45
Co-Generation * 721.40 62 65Biomass *265.59 0 0Wind Mill (EB+PVT)*8502.78 363 153 400 12.903 335.484 7.683 158.421Solar *3618.14 0 555 500 16.129 419.355 16.308 462.570
NCES Total 465 818 1550 50.000 1300.000 27.076 1154.832
NNTPP 180 180 200 6.452 167.742 8.400 105.400
Neyveli TS1 (Bilateral) 0 0.000 0.000 4.780 138.018
Neyveli TS1 (Exp) 415 405 130 4.194 109.032 7.753 235.857
Neyveli TS2 1210 910 290 9.355 243.226 24.038 718.375
Neyveli TS2 ( Exp) 170 175 100 3.226 83.871 3.931 55.217
MAPS 180 165 90 2.903 75.484 4.267 109.937
NTPL 260 260 260 8.387 218.065 6.4 424.39
VALLUR 390 260 500 16.129 419.355 6.254 446.309
KUDANKULAM 1840 1835 300 9.677 251.613 44.673 791.537AP EXP/IMP 3160 2700 687 22.161 576.194 56.535 1765.503Karnataka EXP/IMP 1015 1205 343 11.065 287.677 16.875 720.232Kerala EXP/IMP -1365 -1147 0 0.000 0.000 -40.686 -881.778Pondy EXP/IMP 253 -185 0 0.000 0.000 -4.114 -189.738
CGS & Ext Ass 7528 6763 2900 93.548 2432.26 139.106 4393.859
NLY TS2 Mines(E) -25 -20 0 -0.860 -34.254
TTGS ICT 3.900 61.900
Total 18656.66 11177 10735 10605 342.097 8894.516 243.074 8803.298
Load shedding 0 0 0.000 0.000
HT R&C 0 0 0.000 0.000
5048 3345 2900 93.548 2432.258 82.753 2202.503
Kadam. Pump 0 0 0.000 0.000 1.710 44.095ILFS 865 855 20.510 577.100
Coastal Energen 340 305 9.050 416.050
:: Tamil Nadu Transmission Corporation Ltd ::
Report Date
0.001 0.178
3.085 533.841300 9.677 251.613
6186
0.000 0.000
Power Purchase
HYDRO DETAILS LD3
Report Date : 27-Mar-20 Day : Friday
Reservoir Name
Full reservoir
Storage (MU)
So far Max. Storage
15/8/18
(MU)
Storage This date
last year
(MU)
Storage 1st of
this month
(MU)
Storage today
(MU)
Inflow
today 0600-
0600 Hrs in
(MU)
Generation 0600-
0600 Hrs in
(MU)
Pykara 365.01 360.30 148.250 0.000 1.836
Kundah 1,158.09 1,132.18 640.099 0.219 4.652
Nilgiris Group 1,523.10 1,492.48 560.682 925.270 788.349 0.219 6.488
Parambikulam& Aliyar 256.77 255.56 99.313 0.000 2.755
Periyar 168.88 160.10 19.770 0.006 0.000
Suriliyar 37.95 32.76 2.437 0.000 0.087
Papanasam
&Servalar50.26 46.28 12.062 0.103 0.492
Kodayar 192.49 192.40 160.546 0.075 0.612
Except Nilgris Total 706.35 687.10 214.229 342.176 294.128 0.184 3.946
2,229.45 2,179.58 774.911 1,267.446 1,082.476 0.403 10.434
Mettur 210.20 210.20 38.500 145.120 137.680 0.029 0.379
Total 2,439.65 2,389.78 813.411 1,412.566 1,220.156 0.432 10.813
HYDRO GENERATION
01/04/19 TO 27-3-2020 3813.478 MU
01/04/18 TO 27-3-2019 5357.123 MU
Mettur level :-
Mettur level in Feet 103.17 / 120 feet
Nett Storage Mcft. 63993.00 / 88452 Mcft
Mettur 1,000 Periyar 100
Bhavani Sagar 500 Papanasam 800
Bhavani Sagar RBC 1,900 Sarkarpathy 1,100
Kadamparai Pumping Details
Total water Pumped (06:00 - 06:00 hrs )
Mcft M.U
31.48 1.140
:: Tamil Nadu Transmission Corporation Ltd ::
This Year
PWD Demand in Cusecs @ 6:00 hrs
Last Year
Inflow Cusecs 120
Discharge Cusecs 1,000
LD4 :: Tamil Nadu Transmission Corporation Ltd ::
Report Date: 27-Mar-20 Machines outage at 8 AM today
SL
No No MWFrom
dd/mm/yy
hh:mm
days hh:mm
HYDRO
1 Kadamparai PH 4 100 16-11-19 22:10 131 9:50Generator differential
protection tripF 31-03-20
2 BKB 2 2 15 08-03-20 08:15 19 23:45 AOH P 28-03-20
3 BKB 3 2 15 08-03-20 08:15 19 23:45 AOH P 28-03-20
4 42 01-03-20 10:30 25 21:30 AOH P 01-06-20
1 42 10-03-20 09:00 16 23:00 AOH P 08-04-20
5 Barriage PH 2 2 15 23-03-20 09:00 4 23:00 AOH P 11-04-20
6 Barriage PH 4 2 15 06-03-20 08:30 21 23:30 AOH P 28-03-20
7 MDPH 3 15 02-03-20 09:00 24 23:00 AOH P 29-03-20
8 MTPH 3 50 12-03-20 07:00 14 1:00 AOH P 31-03-20
9 Kundha PH 3 3 60 27-02-20 17:48 28 14:12 TGB temp high F 28-03-20
10 Moyar 2 12 20-03-20 13:45 6 18:15 Stator earth fault F 28-03-20
THERMAL
5 210 03-11-19 22:02 144 9:58High Chloride in hot well /
Turbine side problemF 15-04-20
1 210 24-03-20 16:11 2 15:49
3 210 26-03-20 12:30 0 19:30
4 210 24-03-20 22:33 2 9:27
1 210 26-03-20 22:57 0 9:03
2 210 24-03-20 22:05 2 9:55
4 210 24-03-20 12:06 2 19:54
3 MTPS 2 600 23-03-20 23:38 3 8:22
1 600 19-03-20 15:00 7 17:00
2 600 19-03-20 12:05 7 19:55
2 210 26-03-20 12:47 0 19:13
3 210 21-03-20 09:30 6 22:30
GAS
Nil
IPP
STG 100 05-12-16 21:03 1207 10:57
GTG 231 05-12-16 21:15 1207 10:45
CGS
1 MAPS1
(220 MW)166 30-01-18 16:30 786 15:30 Long outage from 30.01.18 F 31-03-20
1
(200 MW)48 24-03-20 11:36 2 20:24 Boiler tube puncture F 28-03-20
7
(500 MW)125 11-03-20 03:48 16 4:12 Turbine side problem F 28-03-20
3 NLY TS 2 (EXPN)1
(250 MW)135 19-03-20 12:12 7 19:48 Boiler tube puncture F 31-03-20
4 KAIGA2
(220 MW)60 26-03-20 05:37 0 2:23 Turbine side problem F 28-03-20
2
(500 MW)355 19-03-20 14:37 7 17:23 Turbine vibration high F 31-03-20
3
(500 MW)355 23-03-20 22:15 3 9:45
6 NTPL2
(500 MW)207 19-03-20 14:37 7 17:23
F FORCED
Planned P PLANNED
TANGEDCO 194
CGS 0
(Subsidiary of TNEB Ltd.)
Station
Units Outage Duration
Reason
Forced
/
Planned
Commited
date by the
field
4 Periyar PH
1 TTPS Reserve shutdown due to less demand
Reserve shutdown due to less demand
Reserve shutdown due to less demand
2 MTPS 1
Reserve shutdown due to less demand
Reserve shutdown due to less demand
Reserve shutdown due to less demand
Reserve shutdown due to less demand
4 NCTPS 2
After attending the maintenance work, stand by
from 18:00 hrs on 23.03.2020
After attending the grid disturbance problem,
stand by from 9:30 hrs on 23.03.2020.
5 NCTPS 1
Reserve shutdown due to less demand
After attending Boiler tube puncture, stand by
from 00:35 hrs on 24.03.2020.
889 889
1 PPN Fuel not as per fuel supply agreement
2 RSTPS
5 Vallur
Reserve shutdown due to less demand
Total Outage 1365
Reserve shutdown due to less demand
Forced Total
282 476
LD 5 Date : 27-Mar-20 Friday
Date : 26-Mar-20 Thursday
14.0015.0016.0017.00
18.00
19.00
20.00
21.0022.0023.00
24.00
MAX
Load Curve
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Load met 9284 9204 8876 8926 8940 9338 10176 10875 10832 10996 10515 10228 9954 9720 9929 10168 10377 10524 11124 10821 10706 10835 10271 9995
Demand 9284 9204 8876 8926 8940 9338 10176 10875 10832 10996 10515 10228 9954 9720 9929 10168 10377 10524 11124 10821 10706 10835 10271 9995
8500
9000
9500
10000
10500
11000
11500
Lo
ad
in
MW
Time in Hrs
Load Curve
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Freq 49.95 50.09 50.02 50.00 49.99 50.09 49.95 50.05 50.02 50.12 50.04 50.08 50.08 50.05 49.88 50.00 49.89 50.09 50.02 50.04 50.04 50.15 49.99 50.00
49.70
49.80
49.90
50.00
50.10
50.20
50.30
Fre
qu
en
cy in
HZ
Frequency Curve
LD 5 Date : 27-Mar-20 Friday
Date : 26-Mar-20 Thursday Load Curve
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Wind 97 93 81 91 131 148 219 163 230 242 272 359 78 52 481 636 735 650 420 317 475 711 603 578
0
500
1000
Win
d G
ener
atio
n in
MW
Wind Curve
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Solar 0 0 0 0 0 0 234 921 1541 2289 2564 2288 2093 1831 1592 1238 770 169 0 0 0 0 0 0
0
500
1000
1500
2000
2500
3000
Sola
r G
ener
atio
n in
MW
Solar Curve
1) Performance of Thermal Stations:-
Load Energy generated on 26-Jan-19 Cumulative from
Sl Station Installed Morning During Maximum Actual for
No Name Capacity available Mor. Peak possible the day Actual
MW MW MW MU MU MU
1 NCTPS 1 630 420 180 15.120 6.745 2324.424 21.18%
2 TTPS 1050 420 210 25.200 7.086 3836.653 20.97%
3 MTPS 1 840 420 210 20.310 6.893 3344.262 22.85%
4 MTPS 2 600 0 0 14.400 0.000 1782.350 17.05%
5 NCTPS 2 1200 0 0 28.800 0.000 3769.129 18.03%
Stock No. of
Sl.No in (MT)
Days(As on
yesterday)
1 195,516 10.6
0
2 Mettur TPS IND 100,552 #REF!
0 7.3
1,312
3 32,129
ARR 15,522 2.2
24,989 10.3
4 NCTPS I IND 88,113
IMP 39
5 NCTPS II IND
6 166,477
33,748
431,832
26,340
3) Performanceof IPPs/Captive plants:
Energy gen. on 26-Mar-20
Sl Station Installed Availa. Load during Max. Actual for
No Name MW MW mor. peak possible the day MU PLF
1 PPN 331 0 0 0.00 0.00 0.00 0%
2 TAQA 250 250 250 6.00 4.97 7689.54 355%
3 LANCO 113 113 86 2.71 2.02 13863.15 1414%
4 PIONEER 53 53 43 1.27 1.04 25481.91 5549%
Total 747.2 416 379 9.98 8.04 47034.60 2439%
For the day For the month
1 0.30 4.78
2 -0.98 -6.74
3 -0.26 3.35
4 -2.40 -2.93
5 0.78 27.30
6 -0.44 3.11
4 b) Grid Highlights :
50.02 Hz
Capacity
Actual 01-Apr-19
PLF for PLF
the day
Report Date: Friday, March 27, 2020
45%
28%
34%
0%
0%
2) Daily coal stock at thermal
stations :- Receipt (MT) Consumption (MT)
Station 25-Mar-20 25-Mar-20
Tuticorin TPS IND 8,032 3,67610.6
IMP 2,880 2,880
12,562 7,182
7.4
ARR 0 0
IMP 1,312 0
MTPP IND 2,388 0
0 0
IMP 4,035 0
7,144 6,763
2.9
0 0
0 0
IMP 0 0
NCTPS ECHS IND 23,876 7,603
IMP 8,227 2,880
Capacity Cum. from
IMP 0 7,131
TOTAL IND 30,126
Actual 01-04-19
PLF of the day
0%
6.417,621
83%
74%
82%
80%
4 a) Interstate Share / Drawal in (MU) :-Slno. State Share for the day Drawal for the day Excess/deficit
From 01/04/19
Tamil Nadu 168.140 168.440 27.98
Pondy 5.120 4.140 -68.55
Andhra Pradesh 82.180 81.920 53.11
Karnataka 67.090 64.690 23.66
Kerala 52.650 53.430 271.54
Telengana 109.930 109.490 20.75
Maximum Sustained Demand in MW Time in Hrs Frequency in Hz
11,124 19.00
Maximum Frequency 6:02 50.24
MIinimum Frequency 0:11 49.77
TAMILNADU UI in M.U. 0.30
Average Frequency 50.03
Rate at Average frequency in Rs. 0.00
Report Date:
1a) Power from Eastern Region:-(Special allocation) 26-Mar-20
SlNo.From
Hrs.To Hrs.
Firm Power
in MW
For the
day
MU1 Eastern Region 0:00 21:45 32.11 0.761
21:45 23:30 27.75 23:30 24:00 27.91
2 URS Power ( Eastern Region) 0:00 24:00 0.00 0.0000.00
1b) Purchase for the day:-
1 TNEB <-- IEX & PXIL 0:00 18:00 0 0.55018:00 18:15 20018:15 19:00 50019:00 19:15 30019:15 19:30 20019:30 24:00 0
2 TNEB <--MTOA 0:00 0:15 147 5.0550:15 0:30 176
JINDAL - 200 Mw 0:30 0:45 206
LANCO -100 Mw 0:45 1:00 235
1:00 1:15 2651:15 1:30 294
1:30 5:00 3255:00 5:15 2945:15 5:30 265
3 TNEB <-- LTA 0:00 0:15 2518 51.238a.JINDAL - 400 MW 0:15 0:30 2488
b. KSK MAHANADI - 500 MW 0:30 0:45 2459c. DB Power - 208 MW 0:45 1:00 2430
d. OPG - 74MW 1:00 1:15 2401 e. Balco - 200 MW 1:15 1:30 2372f. IL&FS - 540 MW 1:30 1:45 2342
d. Dhariwal - 100 MW 1:45 2:00 2313e. Adunik - 100 MW 2:00 2:15 2287f.EMCO - 145 MW 2:15 2:30 2258
g. COASTAL - 558MW 2:30 2:45 22292:45 3:00 2200
3:00 3:15 2168
3:15 7:15 2099
7:15 8:00 2105
8:00 11:15 2104
11:15 14:15 2099
14:15 16:45 2115
16:45 24:00 2099
0
202.505
1573.755
Friday, March 27, 2020
For the month MU
19.430
0.000
11.574
0:00 24:00 11
Report Date:
8) Comparative Group wise inflow :-
Nilgiris
Excl.Mettur
For Mettur
for the day
06-06 hrs
from
01/04/18
for the
day
06-06 hrs
from
01/04/18
Pykara
L. Kodayar
Periyar
U.Kodayar
Mukuruthy
Moyar FB& Maravakandy
Suriliyar
Pegumbahalla
Porthimund
Parsons Valley
Avl& Emerald
Kundah Palam
Sholayar
Sholayar Spillway
Pillur
Kadamparai
Thunakadavu
Glenmargon
Upper Aliyar
SandiNallah
Parambikulam
Mettur
Papanasam Dam & FB
Upper Bhavani --
10) Rainfall (above 25 mm) Details :-
26-03-20
Sl. No. MM sl.No Reservoir MM
1 0
Unit No. Date Duration
Qty. of
water
Pumped
Energy
Consumed in
MU
1 26.03.20 11:40 15:25 3:45 10.77 0.390
2 26.03.20 14:50 15:45 0:55 2.62 0.095
2 27.03.20 0:25 3:25 3:00 8.70 0.315
3 27.03.20 0:05 3:15 3:10 9.39 0.340
Friday, March 27, 2020
Reservoir
Cummulative inflow for the water Year upto
yesterday
(July - June)
Inflow this day last year
Last year (MU) This year (MU) in M.U
303.030 612.952 10.109
561.260 717.896 0.034
122.277 261.580 0.007
9) Surplus/ discharge details:-
Reservoir Name Water surplused (MU) Water discharged (MU) Remarks
Bypass discharge
Dam surplus
Papanasam & Servalar Karayar dam disharge
Scourvent discharge and
forebay spill
Bypass discharge
dam surplus
Surplus
Bypass discharge
CBE drinking water
dam surplus /Bypass
discharge
dam surplus
For the day
Reservoir
0
11) Details of operation of Kadamparai PH Pump :-
Time in hrs.
7) IPP ACTUAL GENERATION SCHEDULE :- For the day: 26-Mar-20
From To From To From To From To
Hrs Hrs Hrs Hrs. Hrs Hrs. Hrs Hrs.
PPN 0 0:00 24:00 0 0:00 24:00 1day 00:00
330.5
1703:50 5:30
TAQA
250250 0:00 2:00 250 0:00 2:00 0day 02:00
170 2:00 6:45 170 2:00 6:45 0day 04:45 250 6:45 9:55 250 6:45 9:55 0day 03:10
170 9:55 17:15 170 9:55 17:15 0day 07:20 250 17:15 24:00 250 17:15 24:00 0day 06:45
LANCO 113 0:00 24:00 90 0:00 24:00 1day 00:00
113.2
(GTG+STG)
(64.8+48.4)
PIONEER 52.8 0:00 24:00 30 0:00 24:00 1day 00:00
52.8
(GTG+STG)
(38+14.8)
PPN - Fuel not as per fuel supply agreement
Dur.
Friday, March 27, 2020
Name of the
plant & inst.
Cap in MW
Backing down to (MW) Picking up to (MW)
Requested Actual Requested Actual
MW MW Dur. MW MW
RESERVOIR CONDITION AS AT 06.00 AM ON : Report Date: 27-Mar-20 Friday
Nett. Rainfall At this rate of Present
SL. Name of the FRL (MDDL) Capacity Level Nett. 24 hrs. inflow & discharge storageNo. Reservoir at FRL in Storage Inflows Dis. till 6 AM the reservoir will as % of
in today get filled up in FRL(Feet) (Mcft) (Feet) (Mcft) (Mcft) (Mcft) (mm) ...… days (%)
1 Mukurthy 6884 (6804) 1785 6847.10 638.400 3.36 12.96 -- --- 35.8
2 Pykara 6799 (6710) 1945 6764.90 660.40 0.00 10.16 -- ----- 34.0
3 Sandyanallah 7039 (6995) 768 7028.60 512.831 7.78 7.78 -- ---- 66.8
4 Glenmorgan Dam 6623 (6616.1) 9.33 6622.50 8.88 0.00 7.78 -- --- 95.2
5 Glenmorgan FB 6470 (6456.5) 91.7 6463.70 47.44 0.00 20.37 -- ----- 51.7
6 Upper Bhavani 7470 (7372) 3012 7291.00 0.00 0.76 0.76 -- >100 days 0.0
7 Porthimund 7285 (7181.8) 1849.5 7264.30 1256.73 0.00 0.00 -- ----- 67.9
8 Parson Valley 7250 (7201) 475 7240.80 303.00 1.76 0.26 -- --- 63.8
9 AV & Emerald 6515 (6375) 5436.8 6504.30 4615.40 1.01 40.01 -- >100 days 84.9
6504.30
10 Kundha Palam 5330 (5310) 31.57 5322.00 15.750 1.80 46.81 -- ----- 49.9
11 Pegumbahallah 2852 (2800) 24.37 2842.00 17.70 0.41 48.99 -- ----- 72.6
12 Pillur 1400 (1335) 991 1387.50 713.00 11.12 65.86 -- ----- 71.9
13 Parambikulam 1825 (1781) 12311 1798.00 6527.75 4.32 90.46 -- ----- 53.0
14 Thunnakkadavu 1770 (1748) 319 1769.50 310.38 0.43 81.32 -- --- 97
15 Kadamparai 1149 (1112) 940.38 1145.05 781.38 0.00 80.13 -- ----- 83.1
WP :31.48
16 Upper Aliyar 2525 (2396) 914.89 2482.70 463.23 7.01 0.00 -- 64 50.6
17 Sholayar 3290 (3145) 4869.95 3159.49 216.59 5.01 0.00 -- --- 4.4
18 Periyar 142 (108) 6755 114.85 790.80 0.24 8.64 -- >100 days 11.7
19 Manalar 1492 (1470.4) 11.82 1471.40 0.10 0.00 0.04 -- ---- 0.8
(M) (MCM)
20 Highwavys 1506 (1486) 2.38 1486.00 0.000 0.00 0.00 -- ----- 0.0
(M) (MCM) WP :
21 Eravangalar 1472 (1459.5) 1.42 1469.95 0.905 0.00 0.00 -- ----- 63.7(M) (MCM)
22 Papanasam Dam 868 (720) 5270 797.20 1486.80 4.655 1.73 -- ---- 28.2
23 Servalar 265 (235) 1135.2 240.98 182.78 0.000 58.26 -- ----- 16.1
(M)
24 Upper Kodayar 4350 (4250) 2578.8 4344.00 2150.76 0.79 7.92 -- >100 days 83.4
25 Lower Kodayar 1150 (1065) 24.07 1141.00 20.23 1.15 9.50 -- ---- 84.0
26 Mettur 790 (670) 88452 103.17 63993 10.37 86 -- ----- 72.3
Cusecs Cusecs
120120 1000
EXECUTIVE ENGINEER / SLDC ,
TANTRANSCO / CHENNAI - 2.
:: Tamil Nadu Transmission Corporation Ltd ::
(Subsidiary of TNEB Ltd.)
For Previous
day
.
Reservoir As On :- 27-Mar-19 As On :- 27-Mar-20Gross Nett Gross Nett
1. Upper Bhavani 1362.810 802.810 15.210 0.000
2. Porthimund 273.000 0.000 1529.730 1256.730
3. Parson Valley 261.600 56.600 508.000 303.000
4. Avalanchee & 3689.300 3589.300 4715.400 4615.400
Emerald
5. Pykara Group 1424.467 1194.467 2041.631 1811.631
TOTAL 7011.177 5643.177 8809.971 7986.761
FRL. & Nett. Level Nett. StorageAs on 27-Mar-20 Storage (Feet) (Mcft)
1. Kerala Sholayar 2663 2638.200 3191.400
(5297)
2. Lower Aliyar 1050 997.500 823.370
(3829)
3. Lower Bhavani 920 912.350 26178.000
(32273)
4. Vaigai Dam 71 49.150 1500.400
(6496)
5. Pechiparai 302 284.000 2041.000
(4350)
6. Perunchani 306 274.700 705.300
(2890)
7. Chittar-1 269 261.360 192.100(393)
8. Chittar-2 269 261.460 305.100. (600)
(8233)
Storage in Mcft.
Name of the Reservoir
TOTAL (Items 5 to 8)
25-03-20
Sl. Name of CB
No. Sub-Station Mvar Max Min Max Min Max Min
1 Acharapakkam -- -- -- 0 0 0 0
2 Alagarkoil 2x24 -- -- 238 224 112 108
3 Alamathy 400KV 2x24 425 416 243 238 117 115
4 Aliyar 230 KV 2x24 -- -- 242 234 117 112
5 Amuthapuram 230KV -- -- -- 242 236 -- --
6 Anupankulam 2x24 -- -- 238 233 118 114
7 Arasur 3x24 -- -- 242 234 116 112
8 Arni 2x24 -- -- 0 0 0 0
9 Arumuganeri -- -- -- -- -- 114 110
10 Basinbridge ss -- -- -- 0 0 0 0
11 Chekkanoorani -- 0 0 239 232 -- --
12 CMRL -- -- -- 237 226 114 110
13 Coimbatore 1x24 -- -- -- -- 0 0
14 Cuddalore 2x24 -- -- 231 222 110 102
15 Deviakuruchi 2x24 -- -- 227 213 112 102
16 Eachangadu 1x24 -- -- 228 218 109 104
17 Erode 2x24 -- -- -- -- 114 107
18 Gobi 2x24 -- -- 240 229 113 107
19 Gummidipoondi -- -- -- 241 236 117 106
20 Hosur 2x24 -- -- 236 227 118 113
21 Ingur 2x24 -- -- 235 225 115 110
22 Kadalangudi -- -- -- 220 215 105 103
23 Kadaperi 2x24 -- -- 243 233 115 110
24 Kanthamangalam -- -- -- 229 218 113 107
25 Karaikudi -- -- -- 245 235 113 106
26 KARAMBIYAM 230/110KV -- - - 224 213 112 105
27 Kavanoor 2x24 -- -- 245 238 113 109
28 Kayathar 2x24 -- -- 237 232 113 110
29 Kilpauk -- -- -- 237 228 115 111
30 KITZ Park -- -- -- 0 0 0 0
31 Kodikurichi -- -- -- 241 227 116 112
32 Korattur 2x24 -- -- 238 231 112 108
33 Koyambedu 2x24 -- -- 0 0 0 0
34 Mambakkam -- -- -- 239 230 121 108
35 Manali -- 424 411 238 230 113 109
36 MAPS -- -- -- 233 221 -- --
37 Mettur -- -- -- 238 229 113 108
38 Mosur 2x24 -- -- 230 225 113 110
39 Mylapore -- -- -- 237 229 115 111
40 Myvadi 400KV -- 0 0 242 234 -- --
41 Neyveli TS1 (Bilat.) -- -- -- 0 0 0 0
42 Neyveli TS1 EXPN -- 420 412 -- -- -- --
43 Neyveli TS2 -- 415 409 232 225 -- --
44 NOKIA -- -- -- 239 231 118 114
45 OK Mandapam -- -- -- 245 234 114 109
46 Oragadam -- -- -- 234 225 234 225
47 Palladam -- -- -- 242 233 114 109
48 Pasumalai 1x24 -- -- 238 232 113 109
49 Perambalur 2x24 -- -- 235 226 113 107
50 Ponnavaram -- -- -- 243 236 115 111
51 Pudanchandai -- -- -- 232 222 112 106
52 Pudukotttai -- -- -- 234 228 114 107
53 Pugalur 2x24 -- -- 240 232 112 109
54 Renganathapuram -- -- -- 238 230 114 109
55 Salem 230KV 2x24 -- -- 227 217 114 107
56 Salem 400KV -- 424 410 237 230 117 111
57 Samayapuram -- -- -- 230 221 113 108
58 Sanganeri -- -- -- 242 234 120 115
59 Sembatty -- -- -- 230 223 112 108
60 Singarapet 2x24 -- -- 234 227 112 106
61 Sipcot 1x24 -- -- 241 235 116 114
62 Siruseri -- -- -- 0 0 0 0
63 SP.Koil 2x24 -- -- 240 230 114 109
64 SR Pudur 2x24 -- -- 236 232 116 113
65 Sriperumpudur 2x24 427 411 240 231 115 110
66 Sterlite 2x24 -- -- 242 235 0 0
67 SVChathiram -- 416 404 240 232 117 113
68 Tanjore 2x24 -- -- 233 223 112 107
69 Tharamani 2x24 -- -- 233 225 116 112
70 Theni 1x24 -- -- 229 219 115 104
71 Thiruchengode(Unjanai) 2x24 -- -- 230 220 112 106
72 Thiruvalam 2x24 -- -- 232 223 114 110
73 Thiruvarur 2x24 -- -- 223 214 111 105
74 Thudiyalur 2x24 -- -- 244 235 117 111
75 Tondiarpet 1x24 -- -- 238 231 114 110
76 Trichy 230KV -- -- -- 234 226 109 105
77 Trichy 400KV(Alandur) 2x24 410 398 236 229 113 109
78 TV Malai -- -- -- 223 211 110 103
79 Udayathur 230/33KV -- -- -- 239 233 115 111
80 Udumalpet 4x24 -- -- 237 212 117 103
81 Vazhudur -- -- -- 245 238 119 116
82 Veeranam 230/33KV -- -- -- 237 229 -- --
83 Veerapuram -- -- -- 238 227 116 111
84 Villupuram 2x24 -- -- 222 206 105 95
85 Vinamangalam -- -- -- 232 222 117 111
86 Thiruvalam 400KV -- 423 407 234 224 0 0
Sl.No. Sub-Station Mvar Max Min Max Min Max Min
1 GMR -- -- -- -- -- 0 0
2 0 0 0 0 0 0 0 0
2 PP Nallur -- -- -- 228 220 -- --
4 0 0 0 0 0 0 0 0
3 STCMS -- -- -- 235 232 -- --
4 TCPL -- -- -- -- -- 108 0
14.Bus Voltage
400 KV 230 KV 110KV
Date : 26-03-20
Sl.No. Station Rated cap. of
unit on bars
(MW)
Active power
generation
(MW)
Reactive
power
generation
(MVAR)
Percentage
MVAR / MW
(Rated cap of
unit on bars)
Hydro P
1 Sholayar PH1 0 0 0 NIS
2 Kadamparai 0 0 0 NIS
3 Pykara 0 0 0 NIS
4 Mettur TPH 0 0 0 NIS
5 Periyar 0 0 0 NIS
6 Kundah PH5 0 0 0 NIS
7 BKB 1 0 0 0 NIS
8 L.Mtr PH4 0 0 0 NIS
9 L.Mtr PH3 0 0 0 NIS
10 Aliyar 60 0 6 Condenser
11 Sholayar PH2 25 0 14 Condenser
12 Suruliyar 35 35 8 22.86%
13 Kodayar PH1 60 20 12 20.00%
14 Papanasam 30 16 6 20.00%
15 PUESHEP 150 150 18 12.00%
16 Moyar 36 29 4 11.11%
17 Kundah PH2 175 155 14 8.00%
18 Kundah PH3 180 100 8 4.44%
19 Mettur Dam 50 5 2 4.00%
20 Kundah PH4 100 49 3 3.00%
21 L.Mtr PH1 30 2.5 0 0.00%
22 Kundah PH1 60 60 0 0.00%
23 Servalar 20 14 0 0.00%
24 Parsons Valley 30 30 0 0.00%
25 L.Mtr PH2 30 3 0 0.00%
26 Kodayar PH2 40 22 0 0.00%
27 Sarkarpathy 30 12 0 0.00%
Thermal Stations
1 Ennore 0 0 0 NIS
2 Neyveli TS2 1470 1179 268 18.23%
3 Mettur TPS 840 210 45 5.36%
4 Tuticorin TPS 1050 212 14 1.33%
5 Neyveli TS1 600 180 0 0.00%
6 North Chennai TPS 420 180 -11 -2.62%
7 Neyveli TS1 EXPN 420 392 -120 -28.57%
Atomic Power Stations
1 MAPS 210 215 10 4.76%
Gas Power Stations
1 Basin Bridge 120 0 20 Condenser
2 Koilkalapal GTS 69 35 22 31.88%
3 Kuttalam GTS 113 77 14 12.39%
4 Valathur GTS 95 92 10 10.53%
IPP Stations
PP Nallur 0 0 0 NIS
1 TCPL 0 0 0 NIS
2 Penna 52.8 42.4 14.2 26.89%
3 ABAN 113 87.704865 26 23.01%
4 STCMS 250 252 34 13.60%
5
Total in MW 6964 3856.604865 441.2 Mvar
Percentage Mvar / MW 6.34%
12.Generation and MVAR in all Generating Stations at 1900 Hrs.
Report dated : Friday
Details for : Thursday 26-03-20Sl.
No. Description
Cu.Till
Prev Day
For the
day
For the
month
Sl.
No. Description
Cu.Till
Prev Day
For the
day
For the
month
1 Pykara 85 PONDY(I) 4 NNTPP-Pondy
2 PUSHEP 27.144 1.175 28.319 86 PONDY(I) 4 SVCM-Pondy 15.747 3.375 19.122
3 Moyar 9.335 0.355 9.690 87 PONDY(I) NLY2-Viliyanur
4 Kundah 1 21.736 0.684 22.420 88 PONDY(I) NLY2 - KARAIKAL 0.002 0.002
5 Kundah 2 49.816 1.813 51.629 89 Kolar-tvlm(I) 5.260 2.160 7.420
6 Kundah 3 28.260 1.128 29.388 90 Total imp. / pur. 7727.214 260.336 7921.150
7 Kundah 4 5.576 0.210 5.786
8 Kundah 5 2.443 2.443 Gross. 9741.472 297.442 9972.514
9 Kundah 6 0.278 0.278 91 4SPDR-Chittore (E)
10 Total Nilgiris 144.588 5.365 149.953 92 4SPDR-Nellore -1&2# (E)
11 Kadamparai 31.690 2.225 33.915 93 4 DHPURI - MADUKURI (E)
12 Aliyar 10.143 10.143 94 2GPD-Sulurpet(E) 2.601 2.601
13 Suriliyar 2.431 0.087 2.518 95 Kolar-Tvlm(E) 28.880 28.880
14 BBR 1 & 2 0.177 0.001 0.178 96 4Sulagiri-Kolar(E)
14 Non Irrigation 189.029 7.678 196.707 97 4Chittore-Tvlm(E) 26.770 3.630 30.400
15 Sarkarpathy 13.599 0.531 14.130 98 4Shoolagiri-Bangalore(E) 0.030 0.030
16 Sholayar 1 99 2Hosur-Erandahalli(E) 32.522 0.853 33.375
17 Sholayar 2 100 4MYV-Trichur(E) 335.580 9.680 345.260
18 Mettur dam 7.089 0.254 7.343 101 4ABKPatty-Trivandrum 229.520 8.240 237.760
19 Mettur Tunnel 102 2Theni-Sabaragiri(E) 13.157 0.522 13.679
20 L M P H -1 1.291 0.032 1.323 103 2Abishegapa-Edamon(E) 230.570 8.170 238.740
21 L M P H -2 1.346 0.030 1.376 104 2UDPT-Iddky 27.068 1.044 28.112
22 L M P H -3 1.170 0.036 1.206 105 KLA(E) K.THUR 5.969 0.230 6.199
23 L M P H -4 0.974 0.048 1.022 106 4KURNOOL-TVLM (E)
24 B K B - 1 0.746 0.013 0.759 107 PONDY(E) NNTPP-Pondy 96.920 6.490 103.410
25 Periyar 108 PONDY(E) SVCM-Pondy 62.982 62.982
26 Papanasam 6.329 0.384 6.713 109 PONDY(E) NLY2-Viliyanur 29.019 0.836 29.855
27 Servalar 1.945 0.108 2.053 110 PONDY(E) NLY2 - KARAIKAL 12.452 0.163 12.615
28 Kodayar 1 11.121 0.480 11.601 111 4Nellore-Tvlm (E) 0 0 0
29 Kodayar 2 2.850 0.141 2.991 112 4 DHMPRI - SMNHLI (E) 10.3 0 10.30
30 Total irrigation 48.460 2.057 50.517 113 Total Export. 1134.410 52.658 1184.568
31 Total Micro 6.969 0.252 7.221 114 Nett 8607.062 244.784 8787.946
32 Total Hydro 244.458 9.987 254.445 115 KPSHEP Pump 42.385 1.710 44.095
33 Ennore TPS 116 Export to TS2 Mines 33.394 0.860 34.254
34 NCTPS 1 218.135 6.745 224.880 DAY 26 th Net(-)pump
35 NCTPS 2 436.474 436.474 TNEB aveg. cons. 337.998 MU. 243.074
36 Tuticorin TPS 439.577 7.086 446.663 Sustained Load 11124.400 MW.
37 MTPS 1 330.937 6.893 337.830 Time 19.00 Hrs.
38 MTPS 2 223.920 223.920 Frequency 50.020 HZ. For the month
39 TNEB Thermal 1649.043 20.724 1669.767 Hydro aveg.Gen 416.125 MW. Net(-)pump
40 Basin Bridge GTP Thermal aveg. Gen. 863.500 MW. 8743.85
41 Koilvilkalappal GTP 19.710 0.878 20.588 TS1 average relief. 199.167 MW.
42 Vazhathur GTP (Stg1) 49.344 2.194 51.538 TS2 average relief. 1001.583 MW.
43 Vazhathur GTP (Stg2) 44.308 1.580 45.888 MAPS average relief 177.792 MW.
44 Kuttalam GTP 7.395 1.743 9.138 I.STATE imp. average. 2225.333 MW.
45 Total gas 120.757 6.395 127.152 I.STATE exp. average. 1509.500 MW.
46 IL & FS (U1&2) 556.590 20.510 577.100 TNEB ave. demand 9849.333 MW.
47 TTGS-ICT(CTU CONN WIND) 58.000 3.900 61.900 Chennai Demand 1982.000 22:00
48 Madurai PCL(I) Chennai Consumption 36.567 MU.
49 ST-CMS 96.518 4.972 101.490
50 P.P.Nallur(I) Load factor 88.538 %
51 ABAN (I) 54.278 2.020 56.298 Nil. Gen. Today 5.365 MU.
52 PENNA(I) 21.579 1.044 22.623 Nil. Gen. Month 149.953 MU.
53 IPP Total 230.375 8.036 180.411 Nil. Gen. Aver. (month) 5.767 MU.
54 Chennai Others 355.192 1.812 357.004 KLA (nett) -23.955 MU.
55 Erode Others 18.504 0.377 18.881 Pondy (nett) 4.114 MU.
56 Madurai Others 157.060 0.896 157.956 TNDrawal 167.786 MU.
57 Wind Mill (Total) 150.738 7.683 158.421
58 Solar 446.262 16.308 462.570 PYKARA 0.0039 MU.
59 Neyveli TS1(BI-LAT) 133.238 4.780 138.018 MARAVAKANDI 0.0041 MU.
60 Neyveli TS1 (Exp) 228.104 7.753 235.857 BHAVANISAGAR 0.1603 MU.
61 Neyveli TS2 694.337 24.038 718.375 VAIGAI 0.0000
62 NLY TS2 Expansion 51.286 3.93100 55.21700 POONACHI 0.0000
63 Kalpakkam APS 105.670 4.267 109.937 AMARAVATHI 0.0000
64 Vallur 440.055 6.254 446.309 LOWER ALIYAR 0.0000
65 Coastal Energy (U1 &2) 407.000 9.050 416.050 THIRUMOORTHY 0.0000
66 NTPL 417.990 6.400 424.390
67 KUDANKULAM (U1&U2) 746.864 44.673 791.537 PERUNCHANI 0.0000
68 4SPDR-Chittore (I) 82.800 3.480 86.280 PECHIPARAI 0.0000
69 4Nellore-SPDR 2# (I) 128.760 4.455 133.215 MUKURTHY 0.0000
70 2GPD-Sulurpet(I) 5.028 0.740 5.768 TUKLAPATTI 0.0000
71 2TVLM-Chittore(I) 52.001 1.435 53.436 SATHANUR 0.0000
72 4CUDDAPAH-TVLM (I) 595.480 18.370 613.850 L.BHAVANI RBC 0.0839 MU.
73 4Sulagiri-Kolar (I) 430.920 9.868 440.788 PYR BRG-1 0.0000
74 4Shoolagiri-Bangalore(I) 43.609 1.500 45.109 PYR BRG-2 0.0000
75 2Hosur-Erandahalli PYR BRG-3 0.0000
76 4MYV-Trichur(I)
77 4ABKPatty-Trivandrum TOTAL MICRO 0.2522 MU.
78 2Theni-Sabaragiri(I) 0.751 0.751
79 2Abisheg-Edamon (I) R&C & HT Relief 0.000
80 2Udumalpet-Iddiky(I) 0.021 0.021 Load Shedding 0
81 2K.Thurai(I) Total Relief 0.000
82 4Spdr-Nellore - 1# (I) 128.760 4.455 133.215 Demand 0
83 4Chittore-Tvlm (I) 44.800 44.800
84 4Nellore-Tvlm (I) 700.710 27.230 727.940 23.807
84A 4 DHPURI - MADUKURI (I) 226.400 3.500 229.900 23.957
84B 4 DHMPRI - SMNHLI (I) 68.900 0.700 69.600
84C TVNL - KOCHI 1 (Imp)
84D TVNL - KOCHI 1 (Exp) 198.600 6.400 205.000
84E TVNL - KOCHI 2 (Imp)
84F TVNL - KOCHI 2 (Exp) 198.600 6.400 205.000
84G NNTPP 97.000 8.400 105.400
16.Daily Energy Generated. 27-03-20
KUDANKULAM (U1)
KUDANKULAM (U2)
230 KV Maximum & Minimum Voltages
13
Date: 25-03-20
S.No Name of the Thermal Station /SubstationMaximum Voltage in kVTime hrs Minimum Voltage in kVTime hrs
1 ETPS 235 20 228 9
2 NCTPS 229 3 224 8
3 TTPS 242 4 235 10
4 MTPS 236 17 226 11
5 Neyveli TS1 0 0 0 0
6 Neyveli TS2 232 0 225 0
7 MAPS 233 0 221 12
8 SR Pudur 230 kV 233 24 223 9
9 Kayathar 230 kV 237 1 232 8
10 Udumalpet 230 kV237 3 212 19
11 Trichy 230 kV 234 1 226 9
12 Theni 230 kV 229 6 219 8
13 Arani 230 kV 0 0 0 0
14 Singarapet 230 kV234 14 227 11
15 Thiruvarur 230 kV245 3 238 9
16 Paramakudi 230 kV228 1 218 8
17 Korattur 230 kV 238 0 231 0
18 Aliyar 230 kV 242 234