mechanical electrical safety/security video surveillance fire safety access control enhanced...

Post on 15-Dec-2015

217 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Mechanical Electrical Safety/Security

Video surveillance Fire safety Access control

Enhanced Programming Roofing/Structural/Site Work

Mechanical New boiler system HVAC system and integrated temperature controls

Electrical New high-efficiency lighting systems Occupancy sensors

Safety/Security Fire system upgrades with auto 911 capabilities Intruder prevention door hardware Exterior door security Video surveillance Administrative offices relocated to control access

Enhanced Programming Additional classrooms Music room

Roofing/Structural/Site Work New energy efficient roofing Storm water upgrades

Electrical Occupancy sensors

Safety/Security Intruder prevention door hardware Exterior door security Video surveillance

Mechanical New boiler system HVAC system and integrated temperature controls

Electrical New high-efficiency lighting systems Occupancy sensors

Safety/Security Fire system upgrades with auto 911 capabilities Intruder prevention door hardware Exterior door security Video surveillance Administrative offices relocated to control access

Enhanced Programming Additional classrooms

Roofing/Structural/Site Work New energy efficient roofing Storm water upgrades

New 50,000+ square foot building Improve safety and security

Off street drop off/pick up Remain at current site Architecture to remain consistent with

neighborhood

Mechanical HVAC system and integrated temperature controls

Electrical New high-efficiency lighting systems Occupancy sensors

Safety/Security Fire system upgrades with auto 911 capabilities Intruder prevention door hardware Exterior door security Video surveillance Administrative office relocated to control access

Enhanced Programming Additional classrooms Music room

Roofing/Structural/Site Work New energy efficient roofing Storm water upgrades Gym floor mud jacking

Mechanical Boiler replacement HVAC integrated temperature controls

Electrical New high-efficiency lighting systems Occupancy sensors

Safety/Security Fire system upgrades with auto 911 capabilities Exterior door security Video surveillance Administrative office relocated to control access

Enhanced Programming Renovation of counseling area

Roofing/Structural/Site Work Additional parking Upgrade stairway railing

Mechanical HVAC integrated temperature controls

Electrical New high-efficiency lighting systems Occupancy sensors

Safety/Security Fire system upgrades with auto 911 capabilities Exterior door security Enhance video surveillance

Enhanced Programming New library

Roofing/Structural/Site Work Storm water upgrades

Enhanced Programming Additional classrooms Performing Arts Auditorium Events Stadium

Passage of the bond proposal will provide the funds necessary for facilities; therefore, allowing operating funds to be used towards curricular expenses.

Provide an environment that is conducive to learning…basic needs of education (lighting, safety and security, heating/cooling, appropriate space, technology capabilities).

Research indicates students involved in co-curricular activities achieve at higher levels and stay in school.

District has comprehensive measures in place improve student achievement and graduation rate.

District-wide pre school Summer school for PK-12 grade students After school tutoring at all building sites Local assessment program utilized to monitor student progress throughout the year Utilize an Academic Watch document to monitor students at-risk of academic failure Alternative Education Center expanded to serve sixth grade Social worker Utilize parent liaisons Show Me Scholars academic mentoring program for students in 8-12 grade Provide 7-12 academic intervention classes (PAS, ACE) Partner with United Way Education Solutions Team Partner with Big Brothers/Big Sisters High quality professional development activities GED Options Program

pre-paid debt low interest rates positive bidding climate

Bidding climate Favorable interest rates Creation of jobs Stimulate local economy

The issue has been studied internally and with our professional team.

The dollar amount generated by asking the voters to shift a portion of the debt service tax rate to the operating levy is minimal as compared to the increased cost of postponing facility projects.

Over the last ten years the district has taken advantage of a favorable lending environment and refinanced debt. Refinancing allowed for aggressive prepayment of debt.

Prepayment has placed the district in a position to propose a no tax rate increase bond issue.

Energy efficiency New roofs Deferred maintenance

Multipurpose Friday football Band competitions Track

Student participation Cost savings School and community pride Generate revenue

Enhanced curriculum Choir Orchestra Concert band Theatre productions Speech/Debate Assemblies Guest speakers Award presentations

Focus on future generations Cost comparison

Seismic standards ADA Mechanical, plumbing, electrical systems Asbestos

top related