amount approved for s/n state/region budget cost commitment …nddc.gov.ng/banners/bud.pdf · s/n...

431
S/N STATE/REGION BUDGET COST COMMITMENT AMOUNT APPROVED FOR 2015 AMOUNT APPROVED FOR 2016 =N= =N= =N= =N= 1 Head Office / Regional 1,187,146,910,933 139,630,771,793 78,216,964,400 70,375,844,199 2 Abia 83,438,829,250 13,261,767,746 8,717,841,269 7,719,950,879 3 Akwa Ibom 352,047,700,296 42,765,898,621 39,893,858,860 31,293,716,241 4 Bayelsa 363,668,754,563 44,539,395,711 28,341,382,889 21,869,133,664 5 Cross River 73,417,683,035 8,604,278,097 9,037,403,406 6,837,098,065 6 Delta 293,102,198,193 47,825,556,216 28,136,272,264 25,177,940,957 7 Edo 77,030,715,350 9,362,610,647 9,863,976,609 9,112,487,022 8 Imo 103,328,384,488 9,058,857,772 10,131,469,654 7,677,344,420 9 Ondo 109,038,761,001 705,938,234 13,091,276,930 9,965,861,297 10 Rivers 501,041,643,635 97,846,693,221 31,707,363,738 22,244,104,326 TOTAL CAPITAL: 3,143,261,580,745 413,601,768,058 257,137,810,020 212,273,481,070 2016 APPROPRIATION ACT NIGER DELTA DEVELOPMENT COMMISSION 2016 APPROPRIATION ACT 2016 APPROPRIATION ACT-SUMMARY NATIONAL ASSEMBLY Page 1 of 1

Upload: lamphuc

Post on 10-Apr-2018

593 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N STATE/REGION BUDGET COST COMMITMENT AMOUNT APPROVED FOR

2015

AMOUNT APPROVED FOR

2016

=N= =N= =N= =N=

1 Head Office / Regional 1,187,146,910,933 139,630,771,793 78,216,964,400 70,375,844,199

2 Abia 83,438,829,250 13,261,767,746 8,717,841,269 7,719,950,879

3 Akwa Ibom 352,047,700,296 42,765,898,621 39,893,858,860 31,293,716,241

4 Bayelsa 363,668,754,563 44,539,395,711 28,341,382,889 21,869,133,664

5 Cross River 73,417,683,035 8,604,278,097 9,037,403,406 6,837,098,065

6 Delta 293,102,198,193 47,825,556,216 28,136,272,264 25,177,940,957

7 Edo 77,030,715,350 9,362,610,647 9,863,976,609 9,112,487,022

8 Imo 103,328,384,488 9,058,857,772 10,131,469,654 7,677,344,420

9 Ondo 109,038,761,001 705,938,234 13,091,276,930 9,965,861,297

10 Rivers 501,041,643,635 97,846,693,221 31,707,363,738 22,244,104,326

TOTAL CAPITAL: 3,143,261,580,745 413,601,768,058 257,137,810,020 212,273,481,070

2016 APPROPRIATION ACT

NIGER DELTA DEVELOPMENT COMMISSION 2016 APPROPRIATION ACT

2016 APPROPRIATION ACT-SUMMARY NATIONAL ASSEMBLY Page 1 of 1

Page 2: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

1 Agric/Fisheries Agricultural Consultancy 360,000,000 - - 54,000,000

2 Agric/Fisheries Agricultural Skill Development. 1,360,243,594 - - 154,036,539

3 Agric/Fisheries NDDC Contact Farmer Programme 500,000,000 - - 75,000,000

4 Agric/Fisheries Agricultural/ Fisheries Retreat in Niger Delta region 300,000,000 - 45,000,000 45,000,000

5 Agric/Fisheries Rice Development Programm in Niger Delta 326,089,957 - 55,000,000 50,000,000

6 Agric/FisheriesAgricultural Exhibition / Showcashing of Agricultural

Products and Equipment. 100,000,000 - 30,000,000 30,000,000

7 Agric/Fisheries Total 2,946,333,551 - 130,000,000 408,036,539

8Canalisation/

ReclamationCanalisation of Oporoza Creek, Delta State 1,500,000,000 - 153,000,000 103,000,000

9Canalisation/

ReclamationPilling and reclamation of Okokodiagbene town 1,500,000,000 - 153,000,000 103,000,000

10Canalisation/

Reclamation

Canalization of 1km DDPA Canal in Effurun-Phase 2(

Lots 1 to 4) 940,000,000 - 47,000,000 47,000,000

11Canalisation/

Reclamation

Sandfilling of Ikorigho Ikorigho Zion in Ilaje Iga LGA,

Ondo State3,649,942,758 547,491,414 - -

12Canalisation/

Reclamation

Canalizationof Amasuomo Oyangbene, Esanmogbene,

Akparemogbene Creek (Lots 1-18) 4,500,000,000 675,000,000 -

13Canalisation/

Reclamation

Sandfilling of Bakana New Site Phase I, Degema LGA,

Rivers State3,459,642,758 2,292,570,846 68,000,000 68,000,000

14Canalisation/

Reclamation

Canalisation/Reclamation of Akpakpa-Ajudaibu

Communities-Lots 1-2 2,000,000,000 - 288,000,000 106,000,000

15Canalisation/

Reclamation

Canalisation of Akoloba Creek, Akugbene, Bomadi LGA,

Delta State (Lots 1-3) 2,890,000,000 - 416,160,000 216,160,000

16Canalisation/

Reclamation Reclamation Project at Burutu, Delta State 6,554,429,789 - 400,000,000 216,160,000

NDDC 2016 REGIONAL BUDGET

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 1 of 35

Page 3: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

17Canalisation/

Reclamation

Ayakromor Reclamation Project Burutu-DTS(LOTS 1 to

7) 6,500,000,000 - 975,000,000 216,160,000

18Canalisation/

Reclamation

Reclamation of Benikrukru in Warri South West-Lots 1-

6 5,000,000,000 - 306,000,000 206,000,000

19Canalisation/

Reclamation

Canalization/Desilting of Obana-Okposha-Oguta lake

water way-Lots 1-3 2,000,000,000 - 204,000,000 150,000,000

20Canalisation/

Reclamation

Ikuru Town Shore Protection and Reclamation with

drains-Lots 1 to 15 14,000,000,000 257,011,640 340,000,000 240,000,000

21Canalisation/

Reclamation

Sand Filling/Reclamation of Ogbe-Ijoh in Warri South

West LGA, DTS-Lots 1-16 15,000,000,000 - 700,000,000 600,000,000

22Canalisation/

Reclamation

Canalizationof Amasuomo Oyangbene, Esanmogbene,

Akparemogbene Creek (Lots 1-18) 4,500,000,000 675,000,000

23Canalisation/

Reclamation Dredging/Desilting of Igbo River Obokofia 990,000,000 - 100,980,000 100,980,000

24Canalisation/

Reclamation Dredging/Desilting of Igbo River Mkpataku-Elua 980,000,000 - 99,960,000 99,960,000

25Canalisation/

Reclamation

Construction of Ogobiri/Ezebiri shore protection

works, Delta State4,399,536,502 2,908,988,726 208,000,000 -

26Canalisation/

Reclamation

Canalisation Project in Isampou of Isampou, Ekeremor

LGA, Bayelsa State 1,713,410,931 - 136,000,000 -

27Canalisation/

Reclamation

Canalisation of River and dredging of Ogbudugbudu -

Opuama - Tsekelewu Creek and Land Reclamation and

Shore protection of parts of Tsekelewu Town

4,369,517,510 - - -

28Canalization

/Reclamation Total 86,446,480,248 6,006,062,625 5,945,100,000 2,472,420,000

29Community & Rural

Development

Oil Companies Relations including Joint Inspection of

Projects (NDDC/OPTS Collaboration)65,000,000 25,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 2 of 35

Page 4: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

30Community & Rural

Development

Project related conflict management and mitigation

programme200,000,000 30,000,000

31Community & Rural

DevelopmentCommunity needs assessment 200,000,000 30,000,000

32Community & Rural

Development

Value re-orientation and sensitization of communities

against project vandalization100,000,000 15,000,000

33Community & Rural

DevelopmentCommunity / stakeholder meetings 200,000,000 30,000,000

34Community & Rural

Development

Institutional strenghtening to support project

implementation 200,000,000 30,000,000

35Community & Rural

Development

Contractor Relations, TROMPCON Relations, and

Government Relations / NGOs, CBOs, Community

Leaders / Community Relations, Enterprise Devlopment

30,000,000 30,000,000

36Community & Rural

Development

Provision for Orientation, Conferencec and Regular

Summits with Stakeholders in the NDDC Region

including NASS

1,000,000,000 500,000,000

37Community & Rural

Dev. Total 1,995,000,000 - - 690,000,000

38 EcologicalInventorization and management of oil spill sites in the

Niger Delta Region (for completion of 9 old studies) 1,000,000,000 67,955,009 50,000,000 55,379,265

39 EcologicalBiodiversity Index Mapping & Wetland Conservation

(for completion of 1 old study) 150,000,000 99,356,075 50,000,000 39,202,940

40 Ecological

Flood and erosion control, regional design, studies

identification of site and research work (for completion

of 18 old studies)

2,000,000,000 423,642,350 67,071,200 53,656,960

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 3 of 35

Page 5: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

41 EcologicalAquifer Mapping and characterization in the Niger

Delta (for completion of 9 old studies) 1,000,000,000 81,000,000 50,000,000 88,560,171

42 EcologicalEnvironmental Information Database Management and

Platform upgrade (for completion of 2 old studies) 120,000,000 85,054,550 50,000,000 29,161,560

43 EcologicalEstablishment of NDDC/Universities reference and

linkage environmental laboratories (3 universities) 450,000,000 - 10,000,000

44 Ecological

Establishment of Integrated Waste

management/recycling plant and resource utilization

centres in the nine states of the region in partnership

with stakeholders and donor agencies

2,250,000,000 14,269,500 - 27,784,400

45 EcologicalEnvironmental Research Studies (for completion of 12

old studies) 600,000,000 135,737,595 - 76,455,055

46 EcologicalRemoval of wreckages along navigational channels in the

region (for completion of 14 old studies) 1,000,000,000 33,161,325 - -

47 EcologicalProvision for Environmental Impact Assessment (EIAs)

for projects (for completion of old projects) 2,800,000,000 1,243,404,029 125,000,000 125,000,000

48 Ecological

Development of NDDC Strategic Framework for

HSE/EMP, HSE Inspection/EMP monitoring of projects

(for completion of old projects)

1,800,000,000 101,805,860 - 170,000,000

49 EcologicalInstallations of Iron Removing Filter System in all Iron

infected borehole systems in the Region 1,000,000,000 150,000,000

50 Ecological

Production of Domestic Gas, Automotive Gas and

Generation of Electricity through the use of Water

Hyacinth plant and Sewage

1,000,000,000 - -

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 4 of 35

Page 6: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

51 EcologicalInternational conference on climate change and

biodiversity in the NDR/world environment day 200,000,000 - - 30,000,000

52 Ecological Oil spill sites remediation 450,000,000 - - 67,500,000

53 EcologicalClearing of invasive species in the Water Ways in the

Region - Water Hyacinth 6,000,000,000 664,000,000

54 EcologicalShore protection works at Famgbe/Ogbogolo/Yenagoa,

in Bayelsa 2,641,580,000 - 400,000,000 150,000,000

55 EcologicalErosion Control works, section 1 : Bende Road and

section 2 : Ariam Ikot Ekpene road6,022,865,484 360,854,957 257,463,391 120,000,000

56 Ecological Erosion Control works, at Otuan in Bayelsa State 2,622,046,534 - 143,306,980 50,000,000

57 EcologicalErosion Control works, at Oruama - Engenni in Ahoada -

West, Rivers State4,878,359,574 - 50,000,000 50,000,000

58 Ecological Total 37,984,851,592 3,310,241,249 1,252,841,571 1,282,700,351

59 Education 18 Model University Hostels in the 9 states 15,316,975,539 5,715,333,604 200,000,000 200,000,000

60 Education

NDDC Graduate/Post Graduate Scholarships in

Engineering , Medical engineering and selected

Science/technology Areas

4,509,000,000 - 1,306,640,000 1,237,637,552

61 EducationProvision of plastic desks for primary/secondary

schools in the 9 States of Niger Delta (Lots 1-15) 3,500,000,000 3,000,000,000

62 EducationModel Hostel building at Federal University Otueke

Bayelsa 1,935,583,683 46,660,041 190,037,552

63 EducationRenovation of schools (Primary & Secondary) in the

Niger Delta Region2,000,000,000 300,000,000

64 Education

Advancement of Girls in Engineering Mathematics and

Schience Competition (GEMS) in the nine States of

Niger Delta State

500,000,000 142,500,000

65 Education Capacity Building for Teachers 250,000,000 19,250,000 50,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 5 of 35

Page 7: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

66 Education

Provision of Tables containing all Subject with the

Nigerian Curriculum content, including 67,000 sample

questions formulae 60,000 examples etc. for Teachers

and Students of schools in the Niger Delta Region. (Lot

1-2)

560,000,000 84,000,000

67 Education

Construction & Equiping of Niger Delta Regional

Technical College/Craft Development Schools (Pilot

Scheme in Ondo, Bayelsa, Delta)

2,000,000,000 - 50,000,000

68 Education

Supply and distribution of 650 Educational Tablets per

State to pilot Secondary Schools in the Niger Delta for

Training/Capacity Building purposes (9 Lots)

445,500,000 200,000,000

69 EducationInter-Secondary schools quiz competition for core

science subjects and English language200,000,000 - 50,000,000

70 Education

Provision of Educational Equipment (1,000 Projectors)

for Secondary Schools in the Nine (9) States of the

Niger Delta. (Lots 1-5)

249,000,000 37,350,000

71 EducationRehabilitation of adult Literacy colleges.(pilot schemes-

one college per state)900,000,000 - 150,000,000

72 Education Total 48,530,910,814 6,142,098,601 2,847,447,924 5,201,487,552

73 Energy & Power Supply

Overhead Transmission Line For Electricity 33kv

Transmission Line Project - Opobo to Several

Communities in Ikot Abasi.

1,566,000,000 783,000,000 100,000,000 100,000,000

74 Energy & Power Supply11/33KV HT&LT Transmission and Distribution from

Nkoro to Kalaibiama to Opobo (Lot 1- 13)3,200,000,000 - 480,000,000 480,000,000

75 Energy & Power Supply

Construction of 132/ 33KVA transmission line from

Bomadi Town to Ogriagbene in Bomadi LGA,Delta state-

(Lots 1 to 8)

7,000,000,000 - 1,050,000,000 1,050,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 6 of 35

Page 8: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

76Burutu/Forcados Pilot Project for Provision of

Sustainable Electricity Project-Lots 1-52,800,000,000 - 400,000,000 50,000,000

77 Energy & Power Supply

Extension of Electricity power supply to Ivrogbo,

Onogbokor, Lagos Iyede, Iyede Ame and surrounding

Communities in Ndokwa East LGA and instalation of

Electricity 2no 2.5MVA injection transformer

substation, Delta State

300,000,000 - 45,000,000 45,000,000

78 Energy & Power Supply

Completion of the Relocation of Riverine

Electrification in Delta State (Furukama - Okoloba

Community)

914,022,503 137,103,375

79 Energy & Power Supply Extension of National Grid from Agadagba - Obon to

Arugbo Town, Ondo State Phase 1 980,000,000 - 150,000,000 150,000,000

80 Energy & Power SupplyCompletion of Riverine Electrification Relocation from

Okrika-Furukama975,000,000 - 146,250,000 116,250,000

81 Energy & Power Supply

Supply, installation and replacement of poles

30MVA/33/II Substation at Ozoro town, Isoko North,

Delta State (Lots 1-3)

750,000,000 112,500,000 112,500,000

82 Energy & Power Supply

Engineering, procurement and design of 1 mega watt

Solar off Grid village electrification in

Akugbene/Mapping and distribution of Solar Micro off

Grid of 1 mega watt Solar Power Generation in all the

homes in Akugbene town with metering technology,

commissioning and training (Lots 1-7)

1,600,000,000 240,000,000 240,000,000

83 Energy & Power SupplyCompletion of the Relocation of Riverine Electrification

Network from Okoloba to Esanma993,750,000 - 149,062,500 119,062,500

84 Energy/Power Supply Maintenance and rehabilitation of Solar Street Lights

in Niger Delta Region (Lots 1-28) 2,000,000,000 150,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 7 of 35

Page 9: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

85 Energy & Power Supply

Completion of Extension of 132KV line from Afiesera

substation to Ozoro Substation including Line Bays-Lots

1-3

3,000,000,000 - 300,000,000 200,000,000

86 Energy & Power Supply

Supply of Special Overhaed lines Materials specific to

the NDR to Withstand Harsh environment and Ultra

voilet sun rays fibre glass cross arma

989,000,000 - - 50,000,000

87 Energy & Power Supply Provision of 132/33KVA, 2x30MVA substation at

Oghara in Delta State2,500,000,000 802,666,098 200,000,000 100,000,000

88 Energy & Power Supply132 KVA line in Ughelli and 1x30MVA 132/33kv

substations at Ozoro2,818,000,000 1,507,030,989 200,000,000 100,000,000

89 Energy & Power SupplyExtension of 33kv line to riverine communities in Delta

State5,351,107,317 1,549,086,334 50,000,000 50,000,000

90 Energy/Power Supply

Construction and Installation of 3 Nos. 100KW Micro

Grid Hydro Power Plant at Akugbene, Bomadi LGA,

Delta State (Lots 1-4)

800,000,000 300,000,000

91 Energy & Power Supply

Provision of 132KVA/33KVA 2nos 40MVA transmission

Sub Station at Afaha Ekpenedi, Esit Eket, Ibino and

environs., Akwa Ibom State (Lots 1-3)

2,500,000,000 - 375,000,000 375,000,000

92 Energy & Power Supply

Feasibility study and Design of Centralised Solar

Water Farm with Distribution with Capacity of 20,000

Gallon per Day at Akugbene in Bomadi LGA Delta State.

30,000,000 - - -

93 Energy & Power Supply Construction of 132KV Line and 2 * 30MVA 132/33KV

Transmission Substation at Obehie, Ukwa, Abia State 4,100,000,000 1,151,570,685 100,000,000 100,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 8 of 35

Page 10: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

94 Energy & Power Supply Installation of transformers across the Niger Delta

Region 300,000,000 45,000,000

95 Energy & Power Supply Energy/Power Supply at Uduophani 1,000,000,000 - - -

96Energy & Power Supply

Total 47,366,879,819 5,793,354,105 4,247,812,500 4,069,915,875

97 ICTRegion-wide IT infrastructure and Enterprise Support,

including Wide Area Network and LAN 1,500,000,000 513,337,262 42,560,594 200,000,000

98 ICTEnterprise Resource Planning and Business Applications

including Licenses 1,500,000,000 - 36,929,300 200,000,000

99 ICT

Supply and distribution of 25,000 pieces of NDDC

patented students' personal mobile tutor(SPMT) to 300

secondary schools in the region Phase 1 @ 19,000 each

475,000,000

100 ICTRegion-wide IT Service Management & Incidence

Response including Access Control 1,000,000,000 150,000,000

101 ICT

Supply and distribution of 25,000 pieces of NDDC

patented students' personal mobile tutor(SPMT) to 300

secondary schools in the region Phase 2 @ 19,000 each

475,000,000

102 ICT Provision of IT Security 500,000,000 75,000,000

103 ICT

Supply and distribution of 25,000 pieces of NDDC

patented students' personal mobile tutor(SPMT) to 300

secondary schools in the region Phase 4 @ 19,000 each

475,000,000

104 ICT IT Infrastructure Service and Maintenance 500,000,000 75,000,000

105 ICTMaintenance of NDDC Website and Communication

Network 300,000,000 45,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 9 of 35

Page 11: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

106 ICT

Supply and distribution of 25,000 pieces of NDDC

patented students' personal mobile tutor(SPMT) to 300

secondary schools in the region Phase 3 @ 19,000 each

475,000,000 23,750,000

107 ICTRegion-Wide Information and Communication Assets

and Infrastructure1,000,000,000 150,000,000

108 ICT Total 8,200,000,000 513,337,262 79,489,894 918,750,000

109

Industrial and

Enterprise

Development

Enterprenueship Capacity Building Programme and

Expansion of Micro Small and Medium Scales

Enterprises in the Region

919,600,000 - 121,200,000 -

110

Industrial and

Enterprise

Development

NDDC Technical Aid corps programme (1000

unemployed graduates recruited and sent to SME's for

employment

1,083,650,000 - 50,000,000

111

Industrial and

Enterprise

Development

Comprehensive Assessment of NDDC Training and

Capacity Building Programmes 2002 - 2015 in the nine

(9) States of the Niger Delta Region (9 Lots) Phase 1

445,000,000 66,750,000

112

Industrial and

Enterprise

Development

Food processing skills and Franchise Programme 450,000,000 - 120,000,000 67,500,000

113

Industrial and

Enterprise

Development

Solar powered Equipment and Maintainance Technology 515,545,000 - 20,000,000 85,104,250

114

Industrial and

Enterprise

Development

Training in Maritime Technology(Local) 309,100,000 - 50,000,000 46,365,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 10 of 35

Page 12: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

115

Industrial and

Enterprise

Development

Oil spill Response Training (OSR) 700,000,000 - 50,000,000 105,000,000

116

Industrial and

Enterprise

Development

Training in home management tie & dye 50,000,000 - 50,000,000 7,500,000

117

Industrial and

Enterprise

Development

Creation of Database of all Skills Acquisition Projects

and Interface with the Industries (Employers of

Labour) (9 Lots)

400,000,000 150,000,000

118

Industrial and

Enterprise

Development

Synopsis of fibre and telecomms programme 700,000,000 105,000,000

119Industrial and

Enterprise Dev.Total 5,572,895,000 - 461,200,000 633,219,250

120

Strategic Planning,

Research Statistics &

Mgt. Infor. System

Partnership Schemes Fund - Feasibility Studies,

Analysis etc400,000,000 80,000,000 80,000,000

121

Strategic Planning,

Research Statistics &

Mgt. Infor. System

Gathering and building of spatial (GIS) data base of

communities and projects/programmes in the Niger

Delta Region (4 lots)

880,000,000 - 120,000,000 132,000,000

122

Strategic Planning,

Research Statistics &

Mgt. Infor. System

Institutionalization of Performance Management

System and Statutory Reporting170,000,000 - 70,000,000 70,000,000

123

Strategic Planning,

Research Statistics &

Mgt. Infor. System

Database of all Developmental Efforts in the NDR From

2000 - 2011350,000,000 185,935,302 50,000,000 50,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 11 of 35

Page 13: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

124

Strategic Planning,

Research Statistics &

Mgt. Infor. System

Development Needs Assessment of Oil Producing

Communiteis in the nine (9) States of the Niger Delta

Region (9 Lots)

442,800,000 66,420,000

125

Strategic Planning,

Research Statistics &

Mgt. Infor. System

Socio Economic Impact Assessment of Projects in the

Region and other Research Activities eg Database on

Oil Producing Communities

500,000,000 118,121,294 20,000,000 150,000,000

126

Strategic Planning,

Research Statistics &

Mgt. Infor. System

Mid Term review of the NDRDMP (36 lots) 1,900,000,000 - 150,000,000 150,000,000

127

Strategic Planning,

Research Statistics &

Mgt. Infor. System

Partners For Sustainable Development (PSD) Forum and

secretariate300,000,000 - 70,000,000 100,000,000

128

Strategic Planning,

Research Statistics &

Mgt. Infor. System

Development of Niger Delta Human Resource Data Base

(4 lots) PHASE 11864,000,000 14,502,917 150,000,000 100,000,000

129

Strategic Planning,

Research Statistics &

Mgt. Infor. System

TOTAL

5,806,800,000 318,559,513 710,000,000 898,420,000

130Projects Admin /

Others

Construction of NDDC Model State Offices in the Nine

(9) States of the Region and renovation of the existing

Office

4,750,000,000 128,178,895 200,000,000 200,000,000

131Projects Admin /

Others

Project Management Information System for Project

Management Department1,000,000,000 - 200,000,000 150,000,000

132Projects Admin /

Others

Maintenance & running of existing

Water/Electricty/Health centre projects for

sustainability

250,000,000 - 215,000,000 150,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 12 of 35

Page 14: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

133Projects Admin /

OthersProvision for projects inspections and commissioning 500,000,000 1,066,750,000 75,000,000

134Projects Admin /

Others

Provision For Special Consultancy Services for

Regional Development200,000,000 2,689,138,098 2,000,000 30,000,000

135Projects Admin /

Others

Niger Delta Housing Support Scheme in partnership

with staff co-operative society ( Provision of Acess

Roads/Electricity)

2,300,000,000 12,768,750 100,000,000 100,000,000

136Projects Admin /

Others

Completion of NDDC HQ Building at Eastern Bye-Pass

(Phase 1)4,900,000,000 1,518,728,100 500,000,000 500,000,000

137Projects Admin /

Others

Development and upgrading of Project

Management/Documentation /strengthening250,000,000 - 70,000,000 50,000,000

138Projects Admin /

Others

Provision for projects designs /Scoping /consultancy @

approx. 3% of total project cost8,359,470,000 3,711,198,574 250,000,000 250,000,000

139Projects Admin /

Others

Haulage and ancilliary expences for Procured

Structural Steel Tank Stanchions/accessories and

Braithwaite tank plates/accessories

100,000,000 - 50,000,000 10,000,000

140Projects Admin /

Others Total 22,609,470,000 9,126,762,417 1,587,000,000 1,515,000,000

141 Security Admin

Regional Security Surveys/ Pojects Security Checks

and Purchase of Project Vehicles For the 9States, 5

Consultants

13,000,000,000 5,755,943,756 1,000,000,000 1,200,000,000

142 Security AdminSecurity Related Expenses, Intelligence Gathering /

Management and Mitigation5,000,000,000 6,409,297,938 2,000,000 700,000,000

143 Security AdminProfessional Security Consultancies, Investigations ,

surveys & Regional Peace and Security Secretariat.2,000,000,000 1,093,625,192 300,000,000 200,000,000

144 Security Admin Total 20,000,000,000 13,258,866,885 1,302,000,000 2,100,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 13 of 35

Page 15: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

145 Health Special Medical Referrals and Check-up for the Region. 950,000,000 306,449,541 643,550,459 800,000,000

146 Health Training of Medical Personnel to handle Tube and

Treatment (Lot 1-9) 200,000,000 30,000,000

147 HealthSupply of Essential Medical Drugs to Primary Health

Care Centres in the Region800,000,000 - 120,000,000 200,000,000

148 Health

Supply of One thousand units of Power Tube for

malaria treatment to 185 LGA of the Niger Delta

Region (Lot 1-9)

1,700,000,000 255,000,000

149 Health

Construction of a General Hospital Complex with a

standard Paediatric Department and a modern

Phamarcy in Partnership with Cross River Govt in

Calabar

600,000,000 - 200,000,000 200,000,000

150 HealthCommunity Health Financing in Partnership with Health

and Mission International750,000,000 453,422,000 296,578,000 296,578,000

151 Health

M-Trigen PowerAire Hybrid Micro-power, treat and

cooling system to power hospital operating rooms,

children wards and key sections of hospitals in the

Niger Delta Region (100 Units) Lot 1-6

1,500,000,000 225,000,000

152 Health

Construction of Niger Delta Regional Specialist

Children & maternity/ Orthopedic/ Cardiovascular

Hospitals (Pilot Scheme in Rivers, Bayelsa & Akwa

Ibom)

3,000,000,000 128,111,341 200,000,000 250,000,000

153 HealthSupply of Medical Equipments to selected hospitals in

the Niger Delta Region1,600,000,000 240,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 14 of 35

Page 16: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

154 Health

Construction of Niger Delta Regional Specialist

Children & maternity/ Orthopedic/ Cardiovascular

Hospitals (Pilot Scheme in Delta, Ondo & Edo States)

3,000,000,000 - 100,000,000 230,000,000

155 Health

Awareness campaign on hypertension, Diabeties

Mellitus, Cancer and non-communicable diseases in the

region

650,000,000 550,000,000 70,000,000 70,000,000

156 Health

Supply and distribution of Hepatitis B and Typhoid

Vaccines to Primary Health Centres in the Senatorial

Districts of the Niger Delta Region (28 Lots)

1,400,000,000 500,000,000

157 Health

Supply and Installation of Medical Solar Direct Drive

Refrigerator, Medical Incinerators for Vaccine Cold

rooms for Niger Delta Region (Lot 1-24)

2,000,000,000 500,000,000

158 HealthSupply of Treated Mosquito Nets To All 185 LGAs and

Deworming programe (Primary/Secondary Schools)1,335,772,680 167,400,000 200,000,000 200,000,000

159 Health Supply of LASSA Fever Kits to the 185 LGAs of the

Niger Delta Region (23 Lots) 1,127,000,000 350,000,000

160 Health

Strengthening of Dialysis Services and Centers in

Selected Hospitals in the Niger Delta Region e.g.

Training Hopital.

500,000,000 - 150,000,000 150,000,000

161 Health

Immunization of School Children 9-13 years against

Cervical Cancer and Other Cancers using Gardicine 2, 4

& 9 in Bomadi and Isoko South LGAs (Lots 1-28)

1,500,000,000 225,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 15 of 35

Page 17: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

162 Health

Awareness Campaign on HIV/AIDS,Malaria, and

Endemic Diseases / Vacciness as per Policy HCS in

Niger Delta Region.

200,000,000 - 50,000,000 50,000,000

163 HealthSupport to Medical Institutions /Associations and

Facilities200,000,000 - 70,000,000 70,000,000

164 Health Total 23,012,772,680 1,605,382,881 2,100,128,459 4,841,578,000

165Jetty/Shore

ProtectionShore Protection At Aiyetoro 9,250,000,000 3,302,125,884 50,000,000 50,000,000

166Jetty/Shore

ProtectionSand Filling at Kalio-Ama-RV-(Lots 1 to 8) 7,000,000,000 - 300,000,000 150,000,000

167Jetty/Shore

ProtectionSand filling at Okrika-( Lots 1-9) 8,500,000,000 - 300,000,000 150,000,000

168Jetty/Shore

ProtectionSand Filling at Ogu/Bolou-(Lots 1 to 8) 7,000,000,000 - 300,000,000 150,000,000

169Jetty/Shore

Protection

Constructuion of Jetty and Shore Protection at Okpai

Ndokwa East LGA (4.25KM Shoreline) Delta State11,460,286,689 1,677,652,373 300,000,000 150,000,000

170Jetty/Shore

Protection

Gbekebor Shoreline Protection , Sand filling and pilling

in Burutu LGA, Delta State-( Lots 1 to 8)7,000,000,000 - 300,000,000 150,000,000

171Jetty/Shore

Protection

Construction of Shore Protection and Sandfilling of

Ataba to Aba Ijon9,996,134,956 1,524,633,831 300,000,000 150,000,000

172Jetty/Shore

ProtectionDredging of Oniyi River, Eziama Ikeduru 890,000,000 - 133,500,000 -

173Jetty/Shore

Protection

DESIGN OF Shoreline Protection and Land

Reclamation at Ogheye Eghoroke/Dimogun community

warri north

5,000,000,000 200,000,000

174 Jetty/shore protectionPilling of Kurutie Community in Gbaramantu Kingdom

Phase II, warri South west ,Delta state750,000,000 112,500,000 112,500,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 16 of 35

Page 18: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

175 Jetty/shore protectionConstruction of Palace Jetty with waiting shade and

concrete paving at Oporoza482,000,000 72,300,000 72,300,000

176 Jetty/shore protectionShore Reclamation at Tere-Ama I Port Harcourt Local

Government Area980,000,000 147,000,000 147,000,000

177 Jetty/shore protection Reclamation/sand filling of Okpokunu community 950,000,000 142,500,000 142,500,000

178Jetty/Shore

ProtectionCanalization of Creek at Toru-Ojobo( Lots 1 to 4) 1,000,000,000 - 50,000,000 50,000,000

179Jetty/Shore

Protection

Shore Protection and Reclamation Project at Adu

Island, Delta State.1,455,114,822 - 118,262,223 118,262,223

180Jetty/Shore

ProtectionSandFilling of Ozuboko-Abuloma in RV 2,500,000,000 - 450,000,000 450,000,000

181Jetty/Shore

ProtectionShore Protection Works at Koko 6,500,000,000 1,545,626,250 550,000,000 450,000,000

182Jetty/Shore

Protection

Shore Protection/Reclamation of Asarama/Egendem,

Rivers States 2,500,000,000 375,000,000 375,000,000

183Jetty/Shore

Protection

Construction of Thompson/Iganibo Polo Shore

Protection 1Km. Abalama(Asari-Toru), Rivers State 550,000,000 82,500,000

184Jetty/Shore

ProtectionNigeria Army Jetty in Effurun, Uvwie LGA, Delta State 4,731,900,048 709,785,007 300,000,000 300,000,000

185Jetty/Shore

Protection

Burutu town phase II reclamation project, Burutu,

Delta State (Lots 1-16) 6,000,000,000 900,000,000 900,000,000

186Jetty/Shore

Protection

Shore protection/sand filling of Okwagbe Waterside,

Ughelli South, Delta State (Lots 1-17) 5,000,000,000

187Jetty/Shore

Protection

Odimodi Reclamation project, Burutu LGA, Delta State

(Lots 1-17) 8,500,000,000 1,275,000,000 650,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 17 of 35

Page 19: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

188Jetty/Shore

Protection

Ugborodo Shore Protection, Warri Wouth West, Delta

StateLots 1 to 4 3,403,000,000 150,000,000

189Jetty/Shore

Protection

Reclamation/Construction of shore protection in Kunuku-

Ama, Warri South West LGA, Delta State (Lots 1-12) 2,500,000,000 375,000,000 375,000,000

190Jetty/Shore

Protection

Shore protection and reclamation at Miller Waterside,

Bulou-Ama 1 community, Warri South, Delta State (Lots

1-12) (Design)

3,000,000,000

191Jetty/Shore

Protection

Land Reclamation/Dredging of Okilo River-Adada-Ekago

Waterways in Rivers and Bayelsa State1,750,000,000 - 300,000,000 150,000,000

192Jetty/Shore

Protection

Shore Protection (Concrete pilling)/Reclamation works

at Akugbene in Delta State3,350,221,875 40,000,000 300,000,000 650,000,000

193Jetty/Shore

Protection

Construction of Foreshore Protection in Okerenkoko

Community, Warri South, Delta state2,972,999,437 1,951,691,020 300,000,000 150,000,000

194Jetty/Shore

Protection

Shore Protection extension and sandfilling at Soku in

Rivers state5,073,315,576 2,176,000,077 300,000,000 150,000,000

195Jetty/Shore

Protection

Land Reclamation, Shore Protection of Ogbeinama

Town, Bomadi LGA, Delta State3,254,471,000 122,880,000 300,000,000 150,000,000

196Jetty/Shore

Protection

Reclamation of Abigborodo Community and Housing

Units in Abigborodo-(Lots 1 to 8)7,000,000,000 - 300,000,000 150,000,000

197Jetty/Shore

Protection

Sand Filling, Shore Protection and Land Reclamation at

Ogriagbene Town 2,581,145,600 870,043,711 300,000,000 150,000,000

198Jetty/Shore

Protection

Shore Protection in Ojobo Community, Burutu LGA,

Delta State 5,499,079,997 1,601,827,068 300,000,000 150,000,000

199Jetty/Shore

Protection

Reclamation works in Ojobo Community, Burutu LGA,

Delta State Phase 2(Lots 1 to 10) 9,800,000,000 - 300,000,000 300,000,000

200Jetty/Shore

Protection

Reclamation and Shore Protection at kpakiama (Lots 1-

15) 4,500,000,000 - 200,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 18 of 35

Page 20: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

201Jetty/Shore

Protection

Reclamation/Sandfilling of Akugbene Town, Bomadi-

Lots 1-11 9,900,000,000 - 580,000,000 930,000,000

202Jetty/Shore

Protection

Sandfilling at Abonema Town-RV State-Phase 2-Lots 1

to 5 5,000,000,000 - 560,000,000 280,000,000

203Jetty/Shore

Protection

Sand Filling and Land Reclamation of Araya Town in

Isoko South LGA, Delta State (Lots 1-11)10,000,000,000 - 1,500,000,000 -

204Jetty/Shore

ProtectionForeshorewall/Reclamation at Abari (Lots 1-10) 3,500,000,000 - 300,000,000 525,000,000

205Jetty/Shore

Protection

Shore Protection/ Sandfilling at Esama Town, Bomadi-

Lots 1 to 43,000,000,000 - 450,000,000 280,000,000

206Jetty/Shore

Protection

Shore protection and canalisation with four foot

bridges Kula town Rivers State1,200,000,000 180,000,000 180,000,000

207Jetty/Shore

Protection

Tombia Shoreline Protection with Reclamation and

shore embarkment-Lots 1 to 32,000,000,000 - 300,000,000 300,000,000

208Jetty/Shore

Protection

Construction of Oboro Shore Protection Work in Delta

State2,816,589,905 755,375,855 300,000,000 300,000,000

209Jetty/Shore

Protection

Dredging and Reclamation work at Njaba River Imo

West (Lots 1-4)3,200,000,000 - 400,000,000 300,000,000

210Jetty/Shore

Protection

Shore protection and reclamation of strategic oil

producing community in the Cawthorne Channel Area,

Adamakiri community, Rivers State (Lots 1-3)

2,500,000,000 375,000,000 300,000,000

211Jetty/Shore

Protection

DESIGN OF Shoreline Protection and Land Reclamation

at Ogheye Eghoroke/Dimogun community warri north

(Lots 1-6)

5,000,000,000 - 50,000,000 50,000,000

212Jetty/Shore

Protection

Ugborodo shore protection, Warri South West LGA

(Lots 1 to 4)3,403,000,000 - 298,032,000 98,032,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 19 of 35

Page 21: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

213Jetty/Shore

Protection

Construction of Thomas Henshaw Essiet Ebom shore

protection950,500,000 - 142,575,000 40,390,719

214Jetty/Shore

Protection Total 215,149,759,904 16,277,641,078 14,986,669,223 11,308,484,942

215 Roads/BridgesDesign and Construction of Internal road Netwok

(Phase 1) at Federal university Otueke, Bayelsa State4,625,666,015 693,849,902 100,000,000 -

216 Roads/BridgesConstruction of Omadino -Okpoti-Aghiho Road,Tebu-

Ugbokoa-Jakpa, DT State-Phase 110,000,000,000 - 200,000,000 200,000,000

217 Roads/Bridges Construction of Bayelsa Palm Otueke road (13km) 2,167,486,789 300,000,000 25,123,018 -

218 Roads/Bridges Construction of Ubafan-Adakagbene-Setorubobou Road 8,976,265,831 1,767,166,942 400,000,000 200,000,000

219 Roads/Bridges Construction of Adiabo Eseku Road, CR state 4,366,411,760 654,961,764 200,000,000 200,000,000

220 Roads/Bridges Construction of Calabar - Adiabo - Creek town Road 3,000,000,000 - 450,000,000 250,000,000

221 Roads/BridgesConstruction of 5KM Access Road at Famgbe, Yanegoa,

Bayelsa State862,569,080 258,247,133 170,000,000 170,000,000

222 Roads/Bridges

Extension of Famgbe Road/Bridge Phase 2, from Ikolo

Overside across River Nun-Airport, Amassoma, BY

state

1,000,000,000 - 150,000,000 150,000,000

223 Roads/BridgesConstruction of okirigwe-Amukpe-Eku Agbo Road, DT

State2,000,000,000 - 200,000,000 200,000,000

224 Roads/BridgesEMOHUA - YENAGOA Expressway (42km,10 bridges)

DESIGN & STUDY50,000,000 - 50,000,000 -

225 Roads/BridgesConstruction of Mkpot - Okoroba - Ekang Road (28km +

88m Bridge)7,679,353,820 1,087,500,000 300,000,000 100,000,000

226 Roads/Bridges Construction of Ozoro drainage, Isoko North, Delta

State Phase II 800,000,000 120,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 20 of 35

Page 22: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

227 Roads/Bridges Construction of Daso Ama-Chukwu Ama Bridge in Ogu

Town, Ogu Bolo LGA, Rivers State (Lots 1-2) 1,500,000,000 - 225,000,000 125,000,000

228 Roads/Bridges Construction Of Asarama Internal Roads And Drains-

Rigid Pavement, Ndoni LGA, Rivers State (Lots 1-3) 2,126,873,240 148,293,273 148,293,273

229 Roads/Bridges Dualisation of Igwuruta - Etche Road & Bridges 7,218,374,242 2,034,890,282 100,000,000 100,000,000

230 Roads/BridgesConstruction of Ayama-Mission Road and environs-

Ataba960,000,000 11,090,000 460,000,000 160,000,000

231 Roads/Bridges Design and Construction of Asaba-Ase/Abari Road, in

Delta State 2,500,000,000 500,000,000 275,000,000 275,000,000

232 Roads/BridgesConstruction of Federal University road to Otuabula ll,

Bayelsa State (9KM) 4,000,000,000 - 600,000,000

233 Roads/Bridges

Construction of roads and bridges Ubeji Ifie and

Chevron Clinic road, Ubeji Ifie, Warri North Delta

State

1,780,000,000 267,000,000 67,000,000

234 Roads/Bridges Construction of 6km Old Ozoro-Ellu road, Ozoro, Isoko

North, Delta State (Phase 1) 600,000,000 90,000,000

235 Roads/BridgesConstruction of Amaogoke-Ezeoke-Nsu-Nzerem Ikpe-

Isiokwe Rd- Phase 1 6,400,676,859 2,287,544,991 150,000,000 100,000,000

236 Roads/BridgesConstruction of Ebiam Bridge Obrikom in Ogba/

Egbema/ Ndoni in Rivers State 3,364,909,284 180,000,000 150,000,000 100,000,000

237 Roads/Bridges Ogonokom - Degema Road and Bridge in Rivers State 5,727,365,491 1,044,255,076 100,000,000 100,000,000

238 Roads / Bridges Construction of Aladja-Isaba-Ogbe Ijoh-Ode Itsekiri

Road, Phase 1-(Lots 1 to 10)9,000,000,000 - 528,000,000 328,000,000

239 Roads/BridgesConstruction of Borokiri - Okrika Link Road in Rivers

State16,787,393,982 4,642,238,942 300,000,000 1,000,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 21 of 35

Page 23: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

240 Roads/BridgesConstruction of Otuasega-Obedum-Emirikpo-Anyu-

Emelego Road/Bridges (23.37km, 180m & 20m Bridges)10,000,000,000 2,337,974,228 2,803,821,046 200,000,000

241 Roads/Bridges Construction of Otuagila-Amuruto-Emago-Akanioadata

Road-24km-Design- Lots 1-14 13,000,000,000 - 400,000,000 200,000,000

242 Roads/Bridges

Construction of Upenekang/Esit Eket road junction -

Okposo - Unyenge - Orukim road, in Akwa Ibom State

(Phase 1)

7,575,048,996 600,000,000 100,000,000 100,000,000

243 Roads/BridgesConstruction of Shoreline Road(18km) and Bridges from

Ayama-Oka-Ama-Isi-Ita Phase 13,500,000,000 12,430,222 425,000,000 325,000,000

244 Roads/BridgesConstruction of Okpe Isikpo Palace Azagba road, Isoko

South, Delta State (7.7km)3,263,974,678 - 192,000,000 192,000,000

245 Roads/BridgesConstruction of 4km Water Front road from Ayama,

Ataba, Ama John and Isita, Rivers State Phase I960,000,000 144,000,000 180,000,000

246 Roads/Bridges Construction of 6km Old Ozoro-Ellu road, Ozoro, Isoko

North, Delta State (Phase 2) 600,000,000 90,000,000

247 Roads/BridgesConstruction of Kiagbodo/Ebikorogha &

Egodor/Agbodobri (7km)( lots 1-2)1,200,000,000 180,000,000 180,000,000

248 Roads/Bridges Construction of Obedum - Odau Link road 990,577,917 148,586,688 150,000,000

249 Roads/Bridges Construction of Ekago - Ebekekwerr link road 988,533,042 148,279,956 150,000,000

250 Roads/Bridges Construction of Ebekekwerr - Ogboloma link road 992,622,792 148,893,419 150,000,000

251 Roads/Bridges Construction of Emelogo - Adada Waterside road 986,488,167 147,973,225 150,000,000

252 Roads/Bridges Constructionof Adada - Esala River road 993,849,717 149,077,458 150,000,000

253 Roads/Bridges Cosntruction of Esala River - Akani link road 995,076,642 149,261,496 150,000,000

254 Roads/Bridges Constrution of Ogboloma - Adada link road 994,667,667 149,200,150 150,000,000

255 Roads/Bridges Construction of Emelogo - Opubhe road 994,258,692 149,138,804 150,000,000

256 Roads/Bridges Contruction of Opube - Ibarudum road 987,306,117 148,095,918 150,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 22 of 35

Page 24: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

257 Roads/Bridges Construction of Ibarudum Arkukwo waterside road 986,079,192 147,911,879 150,000,000

258 Roads/Bridges

Construction of Ogbia / Nembe Road Project in

Partnership with SPDC (Partnership with Donors and

other Stakeholders)

24,421,857,276 3,553,416,803 500,000,000 1,000,000,000

259 Roads/Bridges Omoku-Ebgeda-Uju-Awara-Ohuba-Obosima road. 1,905,600,000 1,427,853,665 80,672,400 80,672,400

260 Roads/Bridges

Reclamation and Construction of Midomer street and

environs with drains, Ika North East, Delta State (Lots

1-10)

2,500,000,000 375,000,000 375,000,000

261 Roads/BridgesConstruction of 3km (No Suggestions) township roads,

Isoko North, Delat State (Lots 1-3) 600,000,000 90,000,000 90,000,000

262 Roads/BridgesConstruction of Ubulu Uku township roads, Aniocha

South, Delta State (Lots 1-4) 970,000,000 145,500,000 145,500,000

263 Roads/BridgesConstruction of Shoreline Road(18km) and Bridges from

Ayama-Oka-Ama-Isi-Ita Phase 23,500,000,000 12,430,222 325,000,000 325,000,000

264 Roads/BridgesConstruction of Internal Roads in Araya Bible Site 6km

Road and environs with a lake in between-Isoko South 2,238,105,870 463,341,294 500,000,000 325,000,000

265 Roads/BridgesConstruction of Isrealo Zion-Torugbene Bridge linking

Bayelsa & Delta States.-(Lots 1 to 11)10,500,000,000 - 575,000,000 25,000,000

266 Roads/Bridges

Construction of East/West road - Onopa road (28km )

and bridges with spur to Yenaka Opokuma, Bayelsa

state

4,807,741,270 721,161,191 181,161,191 181,161,191

267 Roads/Bridges Emergency road repairs in the Niger Delta Region 2,000,000,000 300,000,000 955,000,000

268 Roads/BridgesConstruction of Opokuma-Polaku road junction-Koroama

Road in Bayelsa state1,544,484,769 - 231,672,715 231,672,715

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 23 of 35

Page 25: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

269 Roads/Bridges

Design of Amassoma/Tombia-Otuan-Oporoma-Ekowe-

Igbumatoru Road Project, an extension of East-West

Road,Bayelsa

50,000,000 - 50,000,000

270 Roads/BridgesConstruction of Ndoni - Aboh Road and bridge (1.65Km

bridge across River Niger) Linking Delta & Rivers state 15,000,000,000 - 200,000,000

271 Roads/BridgesDualisation of Ahoada - Izombe Road & Bridges Linking

Rivers & Imo State (Phases I )10,418,573,550 1,502,786,033 100,000,000 100,000,000

272 Roads/BridgesDualisation of Ahoada - Izombe Road & Bridges Linking

Rivers & Imo State (Phases II) 7,419,942,200 1,112,991,330 100,000,000 100,000,000

273 Roads/Bridges

Construction of East - West Coastal Rd, from Lagos to

Calabar; and Regional Railway line from Cross River

State to Ondo State (and eventually Lagos)

25,000,000,000 7,097,448,414 - -

274 Roads/BridgesDualization of Uzoukwu - Owaza - Igwuruta Road

(31.05km)14,181,169,366 1,460,342,254 100,000,000 100,000,000

275 Roads/Bridges

Construction of Ogheye – Koko – Escravos Road (approx.

126 km; bridges – 7.2km; Deck on Pile – 1km) – Phase

1(37km, 16 Bridges) of Project

14,897,943,538 5,441,586,773 500,000,000 1,225,000,000

276 Roads/Bridges

Construction of Gbaregolor – Gbekebor – Ogulagha Road

(approx. 26km inclusive of bridges and Deck on pile) –

Phase 1 (26km, 3 Bridges)

16,157,782,480 5,201,265,227 2,250,000,000 2,000,000,000

277 Roads/BridgesEtono - Biakpan - Asaga (Abia State) Central Road

(23km) 6,153,891,568 1,903,007,362 500,000,000 300,000,000

278 Roads / Bridges Construction of Flyover at Asaba - Ibusa Junction

(Lots 1 to 7)5,000,000,000 - 384,000,000 384,000,000

279 Roads / Bridges Construction of Owevwe-Otokutu-Agbarha Road,

Udu/ughelli South (12.5km) 1,657,774,324 461,759,222 306,000,000 303,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 24 of 35

Page 26: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

280 Roads/Bridges Construction of Bonny Ring Road 25,411,907,881 2,943,086,593 - -

281 Roads/BridgesConstruction / Reconstruction of Strategic Acess

roads across the Niger Delta Region 10,000,000,000 580,000,000 - -

282 Roads/BridgesConstruction of Oben – Umoghun Rd, Orhionmwon

LGA(11.07km) EDO STATE 3,984,132,730 1,253,683,778 200,000,000 200,000,000

283 Roads/BridgesConstruction of Link Road(22km) from Coast to Apoi

Creek in Southern Ijaw, Bayelsa-Phase 1-5.5km 36,795,000,000 - - -

284 Roads/BridgesConstruction of East West Road From Mbiama Junction

to Igbogene, Linking Bayelsa To Rivers State 3,551,756,811 - 100,000,000 100,000,000

285 Roads/BridgesConstruction of Obokofia Ring/Internal Road,

Ohaji/Egbema LGA, Imo State 2,667,805,051 - 112,418,495 112,418,495

286 Roads/Bridges

Dualisation of PHC / OWERRI RD JUNCTION - Avu -

Ada palm - Etekwuru road, Owerri West/Ohaji Egbema

LGA, Imo State.

6,448,062,762 812,500,000 - 200,000,000

287 Roads/BridgesConstruction of Ulakwo-Imerienwe-Umukwunne-27km-

Phase 2 (Lots 1-4) 3,200,000,000 - 400,000,000 200,000,000

288 Roads/BridgesConstruction of Obozogbe’niro – Abudu Rd EDO

STATE 5,945,328,061 2,771,497,764 50,000,000 50,000,000

289 Roads / Bridges Construction of Roads in Olero Creek Communities-Lots

1-108,000,000,000 - 528,000,000 328,000,000

290 Roads/BridgesConstruction of Bomadi - Tuomo - Tamigbe - Ojobo

Road and Bridges - Phase 18,941,574,469 1,328,944,494 638,662,979 328,000,000

291 Roads/BridgesConstruction of Ukoko-Mbokpu-Uko Akai Eyo Uya-Eyo

Okwong-Udung-Uwe-Etebi Road (16km)-(Lots 1 to 3)2,000,000,000 - 300,000,000 300,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 25 of 35

Page 27: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

292 Roads/Bridges

Rahabilitation of Okwelle Umueshi Isieke Nesi-Ntueke

Road and Erosion Control with Bridge, Imo State-(Lots

1-4)

3,000,000,000 - 450,000,000 300,000,000

293 Roads/BridgesRehabilitation of Awo-Omamma to Amiri and Nnempi

road, Imo State-(Lots 1 to 3)2,500,000,000 - 305,000,000 305,000,000

294 Roads/BridgesOkodi/Otegwe 1 road linked to Ekoli bridge (32km),

Bayelsa State (Phase 1) 1,500,000,000 - 225,000,000 225,000,000

295 Roads/BridgesConstruction of Oboma- Ulakwo-Imerienwe-Etche Road

Imo East in Imo State 1,000,000,000 - 150,000,000 150,000,000

296 Roads/BridgesConstruction of Emevor/Orogun 16.7km road (Phase 1)-

(Lots 1 to 4)3,800,000,000 - 350,000,000 350,000,000

297 Roads/Bridges

Rehabilitation of Oguta Junction -Mgbidi through

Umuhu Omuma to Solar Afor Akatta with 250 Street

Lights-(Lots 1 to 3)

2,000,000,000 - 300,000,000 300,000,000

298 Roads/Bridges Construction of Bateriko/Kakwe/Bumaji Road with

spur to Owambe-(Lots 1 to 2) 1,500,000,000 - 225,000,000 225,000,000

299 Roads/Bridges

Construction of 12km Abayi-Amaugwu/Umugaa/Abayi

Ogbuliga roads with a spur in Umugaa all in Issisioma-

Ngwa, Abia State-( Lots 1 to 2)

1,300,000,000 - 195,000,000 195,000,000

300 Roads / Bridges Construction of Abbi-Emu-Uno Road 900,000,000 - 142,500,000 142,500,000

301 Roads / Bridges Construction of Umuna-Afordioka-Isiokwe- Ogi (17km)

road Imo State Phase 1- Lots 1 to 3)2,000,000,000 - 300,000,000 300,000,000

302 Road/BridgeDesign and construction of Otrofani Ikpide-Irri road

with a bridge in DT and BY Phase 1900,000,000 - 135,000,000 135,000,000

303 Roads/Bridges Construction of Ochon-Etara road Phase 1 600,000,000 - 90,000,000 90,000,000

304 Roads/BridgesSafety signs and markings on NDDC constructed roads

within the Niger Delta region 950,000,000 - 300,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 26 of 35

Page 28: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

305 Roads/BridgesConstruction of Ujode road in Ughelli North LGA of

Delta State 700,000,000 - 70,000,000 70,000,000

306 Roads/Bridges

Reconstruction of Irrua-Agwu-Eidenu- Udowo-

Ugbokhare-Ibore- Atuagbo-Afuda-Ibhiolulu-Ohe road

(40KM)

4,000,000,000 - 600,000,000 300,000,000

307 Roads/Bridges

Reconstruction of Irrua-Agwu-Eidenu- Udowo-

Ugbokhare-Ibore- Atuagbo-Afuda-Ibhiolulu-Ohe road

(40KM) Phase 2

3,500,000,000 - - -

308 Road/BridgeConstruction of Lohom -Nkpa-Nmuezike (Enugu Express

Junction) 17km (Design)100,000,000 - 100,000,000

309 Roads / Bridges

Construction of Omadino – Okerenkoko – Escravos Road

(approx. 66km inclusive of 23 Bridges – 3km) – Section 1

(phases 1, 2 & 3) (34km, 11 Bridges)(In partnership with

other stakeholders), Warri South / Warri South West

LGAs

7,152,033,316 3,132,441,531 403,200,000 403,200,000

310 Roads / Bridges

Reconstruction of Eket - Etebi - James Town Road,

with street light in Eket/Esit Eket/Mbo Local

Government Areas, Akwa Ibom State

10,000,000,000 1,500,000,000 200,000,000

311 Roads/BridgesConstruction of east west-sampou-agbere-odoni-

Osakpenikwe Rivers/Bayelsa Border road10,800,000,000 - 611,000,000 611,000,000

312 Roads/BridgesConstruction of St. Saviour and other adjoining

Streets, Edo State 3,174,362,344 465,000,000 150,000,000 150,000,000

313 Roads/BridgesConstruction of Obiaruku-Umukuata-Ogume Road with

Bridges, Delta State 5,248,122,738 3,335,946,797 300,000,000 300,000,000

314 Roads/BridgesConstruction of Isinweke-Onicha Uboma, Imo River-

Umuahia Express Road in Imo and Abia States 5,603,357,408 2,710,830,307 500,000,000 300,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 27 of 35

Page 29: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

315 Roads/BridgesConstruction of Patani-Agoloma-Toru Apelebiri-Toru

Angiama-Udophori, Delta State 7,368,152,830 2,375,048,008 500,000,000 500,000,000

316 Roads/Bridges

Construction of Oguta Lake Bridge/Road through to

Nnebukwu to Oguta 1/Egwue- 9kms Motel Bridges-

38kms

2,389,439,195 815,243,205 158,415,879 158,415,879

317 Roads/BridgesConstruction of Gbaragolor - Gbekebor -Olugha Road(

Phase II)2,000,000,000 - 50,000,000 50,000,000

318 Roads/BridgesDesign of Road linking Uyo to Tinapa (Phase 1) approx.

35km of coastal terrain (design and study)50,000,000 - 50,000,000 50,000,000

319 Roads/BridgesInter State Road along Amaba - Ezere - Ozara / Acha-

Ivo Road Abia / Ebonyi States3,480,857,061 1,077,622,358 331,348,431 331,348,431

320 Roads/Bridges Construction of Oron-Calabar Link Road (Phase1) 10,000,000,000 50,000,000 50,000,000

321 Roads/BridgesRumuepirilkom Internal Roads (Phase I & II), Obio-

Akpor LGA, Rivers State 2,673,121,782 - 150,000,000 150,000,000

322 Roads/Bridges

Construction of Ikoko Road Linking St. Michael

Anglican Church and adjoining St. Emevon, Isoko North

LGA Delta State

350,000,000 - 52,500,000 52,500,000

323 Roads/Bridges Design and Construction of Otuabagi-Emago-Kugbo

Road ib Bayelsa State 6,000,000,000 - - -

324 Roads/Bridges Construction of Akugbene-Ogbeinama Road-Phase 1

Akugbene Bomadi Delta State 2,449,894,075 367,484,111 104,148,933 -

325 Roads/BridgesConstruction of Afara Ukwu radial road/bridge in

Umuahia Abia State (32km + 45m span bridge) 1,112,585,663 - 166,887,849 166,887,849

326 Roads/Bridges

Completion of Agip Transfer of Etekwuru 1/Etekwuru

II Bridge Construction of road to Umoji with spur to

Umudike and Etekwuru II in Ohaji/Egbema LGAs, Imo

State (Lots 1-3)

2,000,000,000 32,869,609 200,000,000 200,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 28 of 35

Page 30: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

327 Roads/Bridges

Construction of Udo - Ofunma - Ajakuroma Road with

Link Bridge across Ofuoma creek to connect Ofunma

and Ogbudu/ Ogbiribiri Communities

6,062,172,454 - 500,000,000 200,000,000

328 Roads/Bridges

Construction of Udo - Ofunma - Ajakuroma Road with

Link Bridge across Ofuoma creek Phase 2,to connect

Ofunma and Ogbudu/ Ogbiribiri Communities inn Delta

State-22km

16,500,000,000 - 500,000,000 400,000,000

329 Roads/Bridges Umuwanwa-Obizi Road linking Abia State and Imo

State 2,381,192,790 309,557,006 250,000,000 250,000,000

330 Roads/Bridges Road and bridge linking Iwofe to Ogbakiri in

partnership with RV state Govt 26,102,795,462 412,500,000 1,000,000 1,000,000

331 Roads/Bridges Design for dualization of Obehie-Uzoukwu-Uwaza-

Iguruta Road, Linking RV and Abia states 50,000,000 - 10,000,000 10,000,000

332 Roads/Bridges

Integrated Central Drainage System and Internal Road

Network at Omoku, Ogba/Egbema/Ndoni LGA, Rivers

State

12,000,000,000 - 500,000,000 300,000,000

333 Roads/BridgesConstruction of Owhelogbo-Abbi-Abraka Junction road-

9km 1,500,000,000 - 225,000,000 225,000,000

334 Roads/BridgesConstruction of Iko Atabrikang Akata-Oplom-Okot-Uti-

Iwoachang Road 1,944,888,409 291,733,261 200,000,000 200,000,000

335 Roads/Bridges Remedial works on Aba road-Eleme-Refinery 2,000,000,000 - 50,000,000 50,000,000

336 Roads/BridgesConstruction of Eso - Oheze - Evboehighae road in

Orhionmwon LGA Edo state (design) 3,390,626,363 480,000,000 150,000,000 150,000,000

337 Roads/Bridges Design of Sand filling at Torugbene Town, Burutu LGA 200,000,000 - 40,000,000 -

338 Roads/Bridges Total 629,605,865,878 74,267,528,093 33,043,745,200 25,761,570,233

339Youths Sports and

Women Empowerment

Trainig of youth in Welding/Post Training Equipment

Establishment340,000,000 - 51,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 29 of 35

Page 31: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

340Youths Sports and

Women EmpowermentMaterial support for disabled youth of the NDR 100,000,000 15,000,000

341Youths Sports and

Women Empowerment

Trainig of youth in furniture making/Post Training

Equipment Establishment200,000,000 30,000,000

342Youths Sports and

Women Empowerment

Trainig of youth in printing technology/Post Training

Equipment Establishment250,000,000 37,500,000

343Youths Sports and

Women Empowerment

Production and delivery of desk/benches to schools in

the NDR80,000,000 12,000,000

344Youths Sports and

Women Empowerment

Support to developmental programmes for

youth/women and other related activities300,000,000 45,000,000

345Youths Sports and

Women Empowerment

Capacity Building/ Training of Women and Youths in

Modern Printing Technology and Empowerment (Lot 1-8) 450,000,000 67,500,000

346Youths Sports and

Women Empowerment

Women in Development Workshops and Conference for

the Niger Delta Region in Benin, Owerri and Calabar.

For Over 3,000 Women. (Lot 1-8)

300,000,000 45,000,000

347Youths Sports and

Women Empowerment

Special Sports Competition for Physical Challenged

Persons, table tennis and Weightlifting250,000,000 37,500,000

348Youths Sports and

Women Empowerment

Talent hunt in football for secondary schools in the

NDR/career enhancement of talented footballers140,000,000 21,000,000

349Youths Sports and

Women Empowerment

MD/CEO's trophy for directorates/inter state football

competitions for men and women to foster physical

fitness, team spirit and staff motivation

100,000,000 15,000,000

350Youths Sports and

Women Empowerment

ND secondary schools handball competition/paritle

international meets200,000,000 30,000,000

351Youths Sports and

Women Empowerment

Production of enlightenment campaign jingles for radio

and TV against youth restiveness150,000,000 - 22,500,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 30 of 35

Page 32: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

352Youths Sports and

Women Empowerment2nd Edition of Niger Delta food cuisines/exibition 150,000,000 22,500,000

353Youths Sports and

Women Empowerment

Training of youths in the entertainment industry/post

training equipment establishment150,000,000 22,500,000

354Youths Sports and

Women Empowerment

Miss Niger Delta Peace cultural pageant competitions

and fashion exhibition150,000,000 22,500,000

355Youths Sports and

Women Empowerment

Awareness campaign on: drug abuse, prostitution, baby

factory business, ills of child trafficking and vices

against women (rape, wife battery, genital mutilation)

150,000,000 22,500,000

356Youths Sports and

Women Empowerment

Skill acquisition on fashion design, catering, and

confectionary/post training equipment establishment300,000,000 - 45,000,000

357

Youth Sports and

Women Empowerment

TOTAL

3,760,000,000 - - 564,000,000

358Governance & Social

Services

Engagement for legalizing of the Master Plan and Legal

Conferences / Environmental Compliance Issues150,000,000 - 50,000,000 50,000,000

359Governance & Social

Services Legal Issues from Projects 300,000,000 - 300,000,000 300,000,000

360Governance & Social

Services Provision For Compensation and Estate Valuers Fees 2,000,000,000 - 200,000,000 200,000,000

361Governance & Social

Services

Establishment of community resource centre in Akwa

Ibom and Delta State / Provision for completion of the

River State Centre

750,000,000 - 100,000,000 100,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 31 of 35

Page 33: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

362Governance & Social

Services

Regional Anti-corruption Sensitization & Awareness

Campaign for Contractors in the 9 States50,000,000 - 40,000,000 20,000,000

363Governance & Social

Services

Corporate, Social Responsibility & Projects &

Programmes 5,000,000,000 3,284,792,040 5,000,000,000 880,000,000

364Governance & Social

Services Regional Conflict Resolution Projects 6,000,000,000 7,000,000 100,000,000 2,000,000,000

365Governance & Social

Services Hosting of Niger Delta Sports Festival 300,000,000 300,000,000 300,000,000

366Governance & Social

Services

Construction and installation of 200KW of solar micro

grid at Ibo Amawha, Industrial Estate, Emede, Isoko

South LGA, Delta State

600,000,000 250,000,000

367Governance & Social

Services

Renovation/Rehabilitation of Officers Quatres at

Nigerian Army Barracks Bori camp, Port Harcourt Lots

1, 2 & 3

1,800,000,000 - 250,000,000 250,000,000

368Governance & Social

Services

Renovation/Rehabilitation of Corporal Below

Quartres(4 Storey building of 40 Flats, Nigerian Army

Barracks Bori camp, Port Harcourt

1,200,000,000 80,000,000 600,000,000 200,000,000

369Governance & Social

Services

Provision of Relief Materials for disaster victims in

the Region 150,000,000 - 150,000,000 150,000,000

370Governance & Social

Services

Renovation/Rehabilitation of Officers Quatres at

Nigerian Navy Barracks at NNS Pathfinder, Port

Harcourt, Lots 1, 2, 3, 4, 5 and 6 including

Rehabilitation of Access Roads, Rivers state

2,000,000,000 - 250,000,000 150,000,000

371Governance & Social

Services

Supply of Atomic Slicing Kits, Fibre Link Insulator,

Fibre Cross-Arms to Niger Delta Region 950,871,520 142,630,728

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 32 of 35

Page 34: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

372Governance & Social

Services

Renovation/Rehabilitation of Officers Quatres at

Nigerian Army Barracks Elele, Lots 1, 2 & 3 Rivers

state

1,800,000,000 - 200,000,000 150,000,000

373Governance & Social

Services

Pre-Feasibility studies,justification and Co-ordination

studies to include load flow analyses and Short circuit

calculations for the Niger Delta Region

989,000,000 - 148,350,000 50,000,000

374Governance & Social

Services

Detailed Surveys, analyses, project development,

production of information memorandum,

stakeholder/investors identification, attraction and

development for the Niger Delta Regional Power pool

998,000,000 - 149,700,000 50,000,000

375Governance & Social

Services

Development of Strategy and Business plan with the

operational and power market analysis and dynamics for

the proposed Niger Delta Regional Plan

975,000,000 - 146,250,000 50,000,000

376Governance & Social

Services

Renovation/Rehabilitation of Officers Quatres at

Nigerian Army Barracks , Ibagwa, Abak Akwa Ibom

State, Lots 1, 2 & 3

1,800,000,000 - 200,000,000 150,000,000

377Governance & Social

Services

Renovation of Nigerian Police Barrracks (special

protection unit - Base 6) miniokoro, Lots 1, 2, 3, 4, 5

and 6 including external works and lighting, Port

Harcourt

1,800,000,000 - 200,000,000 150,000,000

378Governance & Social

Services

Rural Telephony Support Drive for the underserved and

Served across the Niger Delta States- Lots 1-306,000,000,000 - 750,000,000 900,000,000

379Governance & Social

Services

Construction of High Performance Centre at the

University of PH, RV state150,000,000 - 80,000,000 -

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 33 of 35

Page 35: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

380Governance & Social

Services

Entrepreneur Training/Workshop for Niger Delta

Women-Lots 1-2500,000,000 - 75,000,000 -

381Governance & Social

Services Ogriagbene Composite Power Water Supply Scheme 500,000,000 - 75,000,000 -

382Governance & Social

Services

Rehabilitation of a Total of 200 Water Project at

Various Location within the Niger Delta Region (Lot 1-

100)

2,000,000,000 300,000,000

383Governance & Social

Services

Renovation/Rehabilitation of Officers Quatres at

Nigerian Army Barracks , Effurn Delta State1,800,000,000 - 250,000,000 200,000,000

384Governance & Social

Services Niger Delta Youth Volunteer Scheme 2,000,000,000 300,000,000

385Governance & Social

Services Regional Communication Strategy 500,000,000 75,000,000

386Governance & Social

Services Regional Conflict Resolution Projects (Phase 2) 410,000,000 - 30,000,000 30,000,000

387Governance & Social

Services

Supply of Silicon Rubber Insulator with Hydrophobic

Properties to Withstand Heavy Pollution Indix in the

Niger Delta Region

950,871,520 142,630,728

388Governance & Social

Services Servicom consultancy services 50,000,000 - 50,000,000 50,000,000

389Governance & Social

Services

Empowerment Program for the Handicapped and

vulnerable in the Niger Delta Region/Provision of

support facilities to Physically challenged in the Niger

Delta Region.Example; Hearing aids, sight aids, Braille

Machines, Wheel chairs, buses/Boats, Workshops etc

350,000,000 - 30,000,000 30,000,000

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 34 of 35

Page 36: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC 2016 REGIONAL BUDGET

390Governance & Social

Services

Support to selected Orphanage homes and Aged

peoples Home in the Niger Delta Region. Policy HC1 and

8. monitoring and Evaluation

200,000,000 - 50,000,000 50,000,000

391Governance & Social

Services

Empowerment programs for Widows in the Niger Delta

Region200,000,000 - 40,000,000 40,000,000

Governance & Social

Services Total 45,223,743,040 3,371,792,040 9,814,300,000 7,710,261,456

Sub-Total: Regional 1,187,146,910,933 139,630,771,793 78,216,964,400 70,375,844,199

2016 APPROPRIATION ACT- REGIONAL NATIONAL ASSEMBLY Page 35 of 35

Page 37: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

1 Education Asa Ukwa WestConstruction of 2 No, One Storey

Hostel Block at Asa High School Asa249,500,000 37,425,000 52,100,161 50,000,000

2 Education Umuahia UmuahiaCompletion of Modern Dining

Hall/Kitchen at F.G.G.C Umuahia99,975,175 15,000,000 15,000,000

3 Education OkaigaUmuahia

North

Rehabilitation of Okaiga-Nkwoegwu

primary/secondary school244,995,000 48,999,000 39,609,108 39,609,108

4 Education Various Various

Reconstruction and renovation of

Primary and Secondary Schools in Abia

State

500,000,000 200,000,000

5 Education Elu OhafiaConstruction of 2No. Six Classroom

Block at Primary School44,867,500 8,000,000 8,000,000

6 Education Asa Ukwa WestConsruction of Five (5) No. Staff

Quaters at Asa High Sch Asa46,405,727 24,974,339 21,431,388 21,431,388

7 Education Umuahia UmuahiaRenovation of 2Nos. Staff Quarters of

3 Bedrooms each100,000,000 15,000,000 15,000,000

8 EducationUmuabo/Miri/Az

ulo/Odike

Ukwa

East/West

Provision of school furniture in Ukwa

East and Ukwa West Primary Schools240,000,000 36,000,000 100,000,000

9 Education Asa Ukwa WestConstruction of a Hostel Block at Fed.

Govt. Technical Collage, Ohanso240,000,000 - - 36,000,000

10 Education Total 1,765,743,401 111,398,339 187,140,657 485,040,496

11Energy/Power

SupplyOgwe Ukwa west Solar street light 149,941,050 22,491,158 49,300,000 39,300,000

12Energy/Power

SupplyLekwesi umunneochi Obiagwu Solar street light 150,000,000 49,300,000 22,500,000

13Energy/Power

SupplyUmulolo

Umuahia

South

Solar Street Light in Umulolo-Agwu-

Ekwule-Ihie150,000,000 101,362,152 60,000,000 28,637,848

ABIA STATE 2016 BUDGET PROPOSAL

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 1 of 29

Page 38: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

14Energy/Power

SupplyUmuikukor Ukwa West Solar Street Light Umuikukor 149,941,050 63,709,251 53,950,000 25,000,000

15 Energy/Power

Supply Various Ukwa West

Solar Street Light Installation in

selected communities 240,000,000 40,071,237 36,000,000

16 Energy/Power

Supply Umuihie-Odo

Umuahia

South

Rehabilitation of Solar Powered

Water/ Street Light in Umuihie Odo-

Umulolo

150,000,000 22,500,000

17 Energy/Power

Supply

Ukwa West and

Isiala Ngwa

Ukwa West

and Isiala

Ngwa

Power improvement Project at

Ohanku,, Isiala, Nteke, Oborhia, in

Ukwa East and Umuobasi, Umuoka,

Umuorie, in Isiala Ngwa

233,629,846 35,044,477 23,886,089 35,000,000

18 Energy/Power

Supply Umuaku Ukwa West Rural Electrification Project 122,540,080 31,250,018 36,450,000 18,381,012

19Energy/Power

SupplyObehie Ukwa West Solar Street Light Obehie 149,442,500 22,416,375 45,176,205 35,000,000

20Energy/Power

SupplyUmuihie

Umuahia

SouthRural Electrification, Umuihie 100,000,000 15,000,000 20,000,000

21 Energy/Power

Supply Ohuhu Ekwuru

Isiala Ngwa

North Rural Electrification Project 51,263,220 16,575,624 38,950,000 34,687,596

22Energy/Power

SupplyAba Aba South

Construction of 1 X 15MVA 33KV/11KV

Injection substation at Aba, Aba South

LGA.

237,920,840 35,688,126 29,937,600 29,937,600

23Energy/Power

Supply

Umuokpa -

Umuiwo Uratta

Isiala Ngwa

NorthRural Electrification Project 200,000,000 30,000,000 25,873,155 25,873,155

24 Energy/Power

Supply Umuakpu

Isiala Ngwa

South

Power improvement / Electrification

of Umuapu / Umuakpor in Isialangwa 111,547,329 72,992,929 25,467,750 25,467,750

25Energy/Power

SupplyUmunteke Ukwa West Solar Street Light 150,000,000 79,886,259 - 22,500,000

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 2 of 29

Page 39: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

26Energy/Power

SupplyOkwe Junction ukwa east

Rural Electrification Project in Okwe

Junction-Obuohia-Obu159,807,126 28,918,861 23,971,069

27Energy/Power

SupplyAmapu

Isiala Ngwa

NorthRural Electrification of Amapu 100,000,000 15,000,000

28 Energy/power

Supply Osisioma Obingwa

Solar Street Light - Osisioma

Junction-Ekeakpara 61,471,060 56,342,791 - 5,128,269

29Energy/Power

SupplyUmuadienwe Ukwa West

Solar street Light at Umuadienwe-

Umuiku-Umunteke Township147,750,500 23,908,500 22,162,575

30 Energy /Powere Obehie-Akwete Ukwa WestSolar Powered Street Light at Obehie-

Akwete Phase I 159,807,125 23,971,069 23,908,500 23,908,500

31Energy/Power

SupplyOld Umuahia Umuahia

Electricity Transformers in Old

Umuahia, Ub kala and Umuahia Urban70,000,000 10,500,000 21,829,500 21,829,500

32Energy/Power

SupplyNkwunabo Tower Arochukwu

Solar street Light from Nkwunabor

Tower Road in Amannagwu villa to

EzeAro Palace Road,Orro villa

240,000,000 36,000,000 20,000,000

33 Energy/Power

Supply

Ikwuorieator

West/Azumini/O

hanku

Ukwa East Solar Street Light 200,000,000 31,185,000 20,000,000

34 Energy/Power

Supply

Ikwuorieator

East/Igubeachar

a-Ukwa East

Ukwa East Solar Street Light 200,000,000 30,000,000 20,000,000

35Energy/Power

SupplyLokpanta umunneochi

Electrification of Awgu - Lokpanta -

Obiagu - Lekwesi224,323,239 33,648,486 19,282,725 19,282,725

36Energy/Power

SupplyOwaza Ukwa west Solar street light 143,200,200 63,863,849 - 19,282,725

37Energy/Power

SupplyAmigo Okoko Bende Installation of Amigo Okoko Item 20,000,000 17,513,229 3,000,000

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 3 of 29

Page 40: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

38Energy/Power

SupplyAbaki Ohafia Solar Powered street light in Abaki 69,990,133 17,500,000 10,498,520

39Energy/Power

Supply

Okpuhu

Umueleke

Okaiuga

Nkwoegwu

Umuahia

NorthRural Electrification Project 70,000,000 - 10,500,000

40Energy/Power

SupplyOhuru Ukwa West Rural Electrification Project 70,000,000 17,500,000 10,500,000

41Energy/Power

SupplyOhanbele Ukwa East Solar powered Street light in Ohanbele 70,000,000 17,500,000 10,500,000

42Energy/Power

SupplyAlaoji - Okikpe

Aba North /

Ukwa WestAlaoji - Okikpe Electrification Project 100,000,000 15,000,000 15,000,000

43 Energy/Power

Supply

Mkporobe,Obunk

u,Ohanso-Obohia

Ukwa East

Provision of Solar Energy Street Light

in Mkporobe, Obunku, Ohanso-Obohia,

Ukwa East

200,000,000 37,422,000 10,000,000

44 Energy/Power

Supply

144 Battalion

Nigeria Army,

Asa

Ukwa West

and Isiala

Ngwa

Electrification of 144 Battalion

Nigeria Army, Asa 5,406,239 - - 810,936

45 Energy/Power

Supply okoko Bende Solar Street Light 51,263,220 7,689,483 20,158,456 2,563,161

46 Energy/Power

Supply Amokwe Bende Solar Street Light 51,263,220 33,018,995 - 2,563,161

47 Energy/Power

Supply Asa Amarator Osisioma Asa Amarator Electricity Project 24,000,000 3,600,000

48 Energy/Power

Supply Obiga, Asa Ukwa West

Construction of Solar Powered street

light at Obiga, Asa 80,000,000 - 12,000,000

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 4 of 29

Page 41: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

49Energy/Power

Supply

Umukabia

Umuagbom

Umuahia

North

Eletrification of Nkatalike to Umukabia

Umuagbom Communities50,000,000 7,500,000

50Energy/Power

Supply

Umukabia

Umuagbom

Umuahia

North

Construction of Solar Powered street

light at Umukabia - Umuagbom80,000,000 12,000,000

51 Energy/Power

Supply Aba/Umuahia

Umuahia

North

Construction of a 33kva line from Aba -

Umuahia and installation of 2 MVA

Transformer at Umuahia

244,628,588 36,694,288 25,987,500 -

52 Energy/Power

Supply

Umu - Osu -Ahia

-Morie

Umuahia

South

Solar Street Light in Umu -Osu- Ahia

Morie 150,000,000 22,500,000 22,500,000

53 Energy/Power

Supply

Umuorehi-

Amafor -

Isingwu

Umuahia

North

Solar Street Light in Umuoriehi -

Amafor - Isingwu road 150,000,000 22,500,000 22,500,000

54 Energy/Power

Supply

Amurie Village,

Ohafia Arochukwu

Electrification and Installation of

33/500KVA step down Transformer at

Amurie

150,000,000 22,500,000 -

55 Energy/Power

Supply lohum Bende

Solar Powered Street Lights along

Uzoakoli - Lohum junction, Akara

Junction, Alayi-Okoko Item

51,263,220 7,689,483 30,181,716 -

56 Energy/Power

Supply Bende Bende Solar Street Light Installation 100,000,000 22,500,000 -

57Energy/Power

SupplyOwaza Ukwa West

Rural Electrification of Umuegwusi-

Umuagalaba Owaza 34,938,144 8,000,000 -

58Energy/Power

Supply

Akoli, Amawom

and UkebeUgwunagbo

Electrification of Akoli, Amawom and

Ukebe 21,516,598 8,000,000 -

59Energy/Power

Supply

Ulonna Farm

Settlement

Umuahia

North

Electrification of Ulonna Farm

Settlement (1km) 21,516,598 8,000,000 -

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 5 of 29

Page 42: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

60Energy/Power

SupplyOsieke-Obegu Ugwunagbo

Electrification of Osieke-Obegu

(Umulenwa, Uzo Egbelu, Uzo Mary,

Okporomma-Arugwu)

21,516,598 8,000,000 -

61 ENERGY /

POWER TOTAL 5,939,887,725 784,834,812 1,029,158,023 787,386,101

62 Health Various VARIOUSSpecial Medical Referrals and Check-up

for the State200,000,000 30,000,000

63 Health Okeikpe Ukwa WestRehab/Equiping of Ukwa General

Hospital250,000,000 39,353,299 25,987,500 25,000,000

64 Health Umuaminu Obingwa Cottage Hospital 43,436,040 33,386,844 10,049,196 10,049,196

65 Health Umuogele Aba South Community Health Centre Umuogele 45,000,000 6,750,000 24,300,000 16,300,000

66 Health Afor Ukwu Oloko IkwanoConstruction of Cottage Hospital at

Afor Ukwu Oloko51,000,000 7,650,000 19,334,700 14,334,700

67 Health Umuejie Ngwa

Construction of Cottage Hospital at

Arongwa Autonomous Community in

Osisioma

200,000,000 - 30,000,000 19,334,700

68 Health Obokwe Ukwa WestConstruction of District Hospital at

Obokwe200,000,000 30,000,000 10,395,001 10,395,001

69 Health Mgboko ObingwaConstruction of Comprehensive Health

Center27,860,192 6,965,048 - 4,179,029

70 HEALTH

TOTAL 1,017,296,232 117,140,144 120,066,396 129,592,625

71 Roads/Bridges Ihie Ukwu Ukwa West Const of Ihie ukwu rd network 1,967,699,554 434,999,683 22,453,200 250,000,000

72 Roads/Bridges Elu-Aasga

Inter State Road Along Elu - Asaga -

Amuke - Amangwu (Ohafia) - Usukpani

Road in Abia State

2,280,421,869 536,382,689 - 212,302,913

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 6 of 29

Page 43: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

73 Roads/Bridges Obohia-Ohandu -

Ohuru-Aba Road

Aba North /

Ukwa West

Construction of Obohia-Ohanku -

Ohuru-Aba Road with spur to

Ohambele -Obeaku RD (46.50 km)

6,580,262,907 1,011,178,874 - 200,000,000

74 Roads/Bridges Uratta UrattaConstruction of Uratta Road, Abia

State1,239,249,986 185,800,000 185,887,498

75 Roads/Bridges Umuagwu UmuahiaConstruction of Amangwu Ogbodinibe-

Umunwawa Rd in Umuahia240,020,004 97,775,400 64,849,168 61,924,998

76 Roads/Bridges

Obahu-

Umuadienwe -

Ngwaiyekwe

Ugwunagbo /

Ukwa West

Obahu- Umuadienwe, Umuituru -

Umuiku-Owo Asa -Owo-Ala -

Ngwaiyekwe Rd (Phase 11) 24.2KM

966,681,570 378,005,165 - 100,000,000

77 Roads/Bridges Okaiuga-

Nkoegwu

Umuahia

North

Construction of Okaiuga-Nkwoegwu Rd

3km249,211,271 161,987,326 25,010,370 25,010,370

78 Roads/Bridges Okporoenyi BendeConstruction of 1KM Road Okporoenyi

Across Road Bende 100,000,000 15,000,000 39,933,000 35,000,000

79 Roads/Bridges OlokoroUmuahia

South

Construction of Olokoro Community

Road249,985,250 167,631,874 54,934,873 54,934,873

80 Roads/Bridges Owaza Ukwa WestDualization of Owaza Location Road

(1.9km) 468,605,515 70,290,827 70,290,827

81 Roads/Bridges Ohiya-Amangwu UmuahiaConstruction of Ohiya - Umulolo -

Amangwu163,724,000 24,558,600 19,792,782 20,000,000

82 Roads/Bridges Obehie Ukwa West

Construction of Foundation hotel road

with spur to Assemblies of God Church

Obelie Asa

250,000,000 37,500,000 37,500,000

83 Roads/Bridges Nkata-AlaikeUmuahia

North

Construction of Nkata-Alaike-

Amaogwugwu-Umuagu Ring Road (1km) 143,406,000 21,510,900 21,510,900

84 Roads/Bridges Avo-AfaraUmuahia

NorthConstruction of Avo road Afaraukwu 150,000,000 27,505,170 27,505,170

85 Roads/BridgesAmabo

UmuechimaBende

Construction of Amabo-Umuechima

Road (2.6km) 365,123,400 54,777,585 54,777,585

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 7 of 29

Page 44: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

86 Roads/Bridges Oborhia - Ihie Ukwa westOborhia - mkporobe - Ihie road

(PHASE II)2,644,717,352 396,707,603 23,068,872 23,068,872

87 Roads/Bridges Umuahala. Ukwa WestConstruction of Umuahala road (Phase

II)219,876,900 32,961,852 47,396,356 48,000,000

88 Roads/Bridges Okporoenyi BendeConstruction of Onuinyang-Okporoenyi

Road 2.5km Phase I244,900,000 36,735,000 40,733,609 40,000,000

89 Roads/Bridges Ugwati - Ozata Ukwa WestConstruction of Ugwati - Ozata Rd

(2km)159,736,500 23,960,475 47,619,450 40,619,450

90 Roads/Bridges Azumini Ukwa WestConstruction of 2km road from Chuta-

Azumini216,050,100 32,407,515 47,217,240 40,217,240

91 Roads/Bridges Obiga/

UmudobiaUkwa West

Construction of Obiga Asa-Umudobia

Road, Ukwa West (3.6km) 455,000,000 68,250,000 45,000,000

92 Roads/Bridges UmuleUmuahia

North

Constr of Umule-Obiohuru-Isigwurugwu-

Uhuocha240,500,000 23,807,178 23,807,178

93 Roads/Bridges Okagwe Ohafia Okagwe Ohafia Link Road 245,350,000 36,802,500 40,733,609 45,000,000

94 Roads/Bridges Obingwa OsisiomaConstruction of 1KM Umuene-Omoba

Road Obingwa/Osisioma97,716,927 14,657,539 40,015,551 32,015,551

95 Roads/Bridges Obokwe Ukwa WestConstruction of Obokwe Umuguru

internal road200,000,000 130,000,000 41,748,639 42,000,000

96 Roads/Bridges Ohanso-Oba-

MkpouhaUkwa West Construction of 2km road 240,000,000 147,274,371 40,733,609 40,733,609

97 Roads/Bridges Isiama-Uhuobu-

ObiohuruUkwa East

Construction of Isiama Uhuobu

Obiohuru Road 1.5 km245,000,000 36,750,000 40,733,609 40,733,609

98 Roads/Bridges AzuminiConstruction of Camp Acho road

Azumini200,000,000 30,000,000

99 Roads/Bridges Amapu Isiala NgwaConstruction of Egbelu-Mbutu-Amapu

link road 250,000,000 37,500,000

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 8 of 29

Page 45: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

100 Roads/Bridges Ehume Umuahia southConstruction of 2km Ehume-Umuanya

road in Umuokpara250,000,000 37,500,000

101 Roads/Bridges Umodiobia -

Umuaka Ukwa West

Construction of Umodiobia - Umuaka

Road 249,234,231 92,675,400 38,000,000 40,000,000

102 Roads/Bridges Ohanko ObaomkpuohaConstruction of Ohakno-Obaomkpuoha

Road in Ukwa West LGA227,640,200 58,029,784 40,015,551 40,000,000

103 Roads/Bridges UmuolaAba North/

Obingwa

Constructon of Umuola (7up) to Ahia

Nkwo to Ohuru Road.200,225,300 130,146,445 20,207,880 40,000,000

104 Roads/Bridges Uzo/Mumuahala Ukwa WestConstruction of Uzo to Umuahala/

Suzanna Motherless Babies Homes,99,213,198 56,325,609 29,149,875 30,000,000

105 Roads/Bridges Owaza Ukwa WestConstruction of Umuachalaba-Ekwuru

Roads, Ukwa West (2km) 264,051,850 39,607,778 39,607,778

106 Roads/Bridges Umuyogo Ukwa west

Construction of Umuyogo New Layout

road, Isimir-Umuoria autonomous

Community

48,997,788 38,651,732 38,651,732

107 Roads/Bridges IhieUmuntu-

Ekeoha1KM Road at Ihie Umuntu-Ekeoha 96,463,400 31,494,158 38,336,065 28,336,065

108 Roads/Bridges Umuahia Umuahia Construction of New Government House

Ring Roads 252,787,650 37,918,148 37,918,148

109 Roads/Bridges Umuahia UmuahiaConstruction of Okpuhu Umuohuru-

Umuajameze Umuokpara (2km) 252,787,650 - 37,918,148

110 Roads/Bridges Ameakpu Ohafia

Award Of Contract For The

Construction Of Igu-Igu/Chief Ete

Ukoha Igwe Avenue, Ameakpu - Ohafia

100,000,000 37,671,480 15,000,000

111 Roads/Bridges Owaza Ukwa WestConstruction of Umuegwusi (Galaxy)-

Umuakata Road (2km) 250,989,350 37,648,403 37,648,403

112 Roads/Bridges Umuokwom

Ohiya

Umuahia

SouthConstruction of Umuokwom Ohiya Road 250,000,000 37,500,000 37,500,000

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 9 of 29

Page 46: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

113 Roads/Bridges Uturu IsiikwuatoConstruction of Ukwunwangwu-

Nkwoachara-Amadi-Ogwahia road246,000,000 36,900,000 36,900,000

114 Roads/BridgesUmuikukoir –

OmumauzoUkwa West

Umuikukoir – Omumauzor Ariaria

Junction Road (25Km) 733,085,543 562,492,469 - 36,654,277

115 Roads/Bridges Umuaro-

UmuanunuObingwa

Construction of 1KM Road Umuaro-

Umuanunu-Ekwerazu-Ngwa100,000,000 15,000,000 36,412,449 26,412,449

116 Roads/BridgesNgwaiyiekwe/Ow

o/ Umuadienwe

Ugwunagbo/

Ukwa West

Reconstruction of Ngwaiyiekwe-Owo-

Umuadienwe Road (6.3km) 442,566,432 66,384,965 35,000,000

117 Roads/Bridges UmuanyaUmuahia

South

Construction Of Umuihie Odo-Umuanya-

Ogbodi Road, In Umuahia South LGA

Abia State

240,020,000 38,000,000 35,000,000

118 Roads/Bridges Obingwu-

Asannetu

Ukwa West /

Ugwunabo

Construction of Obingwu to Umugu to

Asannetu Road.248,985,000 37,347,750 33,487,057 33,387,057

119 Roads/Bridges Mkporobe Ukwa EastConstruction of Mkporoebe to Ohanku

Road.249,126,300 37,368,945 33,140,948 33,140,948

120 Roads/Bridges Asa Umunka/

AkanuUgwunabo

Construction of Asa Umunka to Akanu

Road.150,000,000 78,344,434 32,290,562 32,290,562

121 Roads/Bridges EgwunaelekeUmuahia

North

Construction of Amuzi-Okpuhu

Umueleke Road, Egwunaeleke Okaiuga

(1.5km)

192,529,525 - 30,409,138

122 Roads/Bridges Umuiku Ukwa WestConstruction of Ahia Eke - Oza -

Umuiku road240,020,000 135,452,301 - 30,000,000

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 10 of 29

Page 47: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

123 Roads/Bridges Umuocham/

Umule Aba South

Remedial works on court road

Umuocham/Umule Rd,Cameroun/ASA

Rd, Azikiwe/ASA Rd link and Jubilee

road, Aba south

150,000,000 - 22,500,000

124 Roads/BridgesUmuosoro-Nnono-

AmaobaIkwuano

Construction Umuosoro-Nnono-Amaoba

road249,000,000 37,350,000

125 Roads/Bridges Umuahia UmuahiaRemidia work on Abia State House of

Assembly Access Road, Umuahia 62,219,000 29,447,691 20,000,000

126 Roads/Bridges UmuaguUmuahia

North

Construction of Umuagu-Umungabi-

Okpuala-Umuekwule road149,926,625 22,488,994 44,777,536 30,000,000

127 Roads/Bridges Amaorji Isiala NgwaConstruction of Orie ukwu - Amaorji

road249,485,200 37,422,780 27,505,170 30,000,000

128 Roads/Bridges Oborhia Ukwa WestConstruction of Umuonwankwo Uzo Uko

road240,020,000 41,833,202 30,000,000

129 Roads/Bridges Idima Abam Arochukwu Construction of Idima Abam Road,

Umuahia - Ohafia Road 97,716,927 47,852,479 29,369,485 29,369,485

130 Roads/Bridges Umuahia UmuahiaConstruction of Umunemeze Okaiga

Road Nkwoegwu (1.5km) 192,529,525 28,879,429 28,879,429

131 Roads/Bridges Umudobia Umuaku Construction of Umudobia-Umuaka

Road 241,798,200 22,167,479 25,259,850 25,259,850

132 Road/Bridges Owo-AhaforConstruction of Owo-Ahafor-Umunkiri-

Nenu-Mgbokonta Rooad (10Km)200,000,000 30,000,000

133 Roads/Bridges Umuiku Ukwa West Construction of Umuiku Ozaa-Amaoji-

Obegi 12km Road-Phase 1 239,847,350 124,361,840 - 25,000,000

134 Roads/Bridges Ahia Ukwu Umuahia southConstruction of Ahia Ukwu Olokoro

Okwu Olokoro Umuahia South (2km) 200,000,000 30,000,000 25,000,000

135 Roads/Bridges UmuikaObingwa/Isial

angwa

Rehabilitation of Umuika Junction to

Mgboko Road.492,546,428 373,287,308 24,807,769 25,000,000

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 11 of 29

Page 48: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

136 Roads/Bridges Umuocham Ngwa

Construction of Kamalu Street,

Umuocham with spur at old Day Saints

Church, Okpuna-Umobo-Osisioma

120,000,000 10,000,000 34,443,831 25,000,000

137 Roads/Bridges Ukaegbu Road Aba NorthConstruction of 1KM Ukaegbu Road

,Ogbor Hill167,881,183 92,334,650 32,633,609 25,000,000

138 Roads/Bridges Idima-Abam ArochukwuConstruction of Idima-Abam road

Phase I needam Junction114,926,983 50,433,987 40,370,000 25,000,000

139 Roads/Bridges Okpuala Ngwa-

Nbawsi Rd

Isiala Ingwa

North

Construction of Okpuala Ngwa-Nbawsi

Road 5km Phase 1 150,000,000 - 22,500,000

140 Roads/Bridges Onuaku Uturu

Isukwuato

Construction of Onuaku Industrial

Layout road connecting Ngelebube road

to Ikpokoro in Onuaku Autonomous

Community

245,000,000 36,750,000

141 Roads/Bridges Obahu -

Umuituru Ukwa West

Construction of Obahu-Umuituru Road

(1.3km) 160,500,000 24,075,000 24,075,000

142 Roads/Bridges Umunteke,Asa Ukwa WestConstruction of Agalaba Ito Rd linking

Ohuru Mpkorobe, Umunteke89,787,475 43,180,071 - 13,468,121

143 Roads/Bridges Ikpoku Ukwa West Construction of Ikpoku- Owor Asa

Road 249,402,232 88,413,437 - 23,388,750

144 Roads/Bridges ORIE- Obokwe

UmuikukorUkwa West

Construction of ORIE- Obokwe

Umuikukor (2km)159,736,500 23,960,475 23,388,750 23,388,750

145 Roads/Bridges Bende Bende Amaokwe- Akanu/ Okai Item Raod 887,871,569 251,760,935 22,920,975 22,920,975

146 Roads/Bridges Abayi Aba AbaConstruction of Nwagboso-Ntagbu-

World Bank Road Abayi Aba 150,000,000 - 22,500,000

147 Roads/Bridges Express-Ezeleke

Primary School

Express-Ama Ogbenna-Mission-Ama

Agbaraoji Ezeleke Primary School-3km 352,500,000 - 22,387,479

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 12 of 29

Page 49: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

148 Roads/ Bridges Umuahia NorthUmuahia

North

Construction of Umunnemeze - Larinze

Avenue - Nkata Okpuala road245,000,000 36,750,000

149 Roads/Bridges Umugbueze Bende Construction of Akanu Umugbueze road 190,817,000 109,878,400 22,078,980 22,078,980

150 Roads/Bridges Umuola Road Aba Construction of Umuola Road

Ogborhill, Aba 150,000,000 40,900,161 - 21,985,425

151 Roads/Bridges Umuelendu Obingwa Conct. Of Umuelendu 7up Junction-

Ahiaba-Abala-Ohuru-Umuagu Road 99,017,270 14,852,591 40,000,000 21,985,425

152 Roads/Bridges Nkpa-Lohum Bende Lolum Amaohuru Nkpa Road 50,404,693 7,560,704 18,260,577 16,611,205

153 Roads/Bridges Ukwa West Ukwa West Construction of 25 km Asa Township

Road 1,800,000,000 157,297,940 21,517,650 21,517,650

154 Road/Bridges UmuoriehiUmuahia

North

Construction of Umuoriehi-Umuawa

road200,000,000 30,000,000

155 Roads/Bridges Umuahia Umuahia Construction of Ubani Ibeku Road 143,406,000 - 21,510,900

156 Roads/Bridges Ukwa East Ukwa East Constr of Ohanso - Obunku Road 240,020,000 21,049,875 21,049,875

157 Roads/Bridges Obiga Ukwa West

Construction of Okpulo Road, Linking

Owo-Asa-Ngwaiyiekwe Road Obiga

(1km)

135,000,000 20,250,000 20,250,000

158 Roads/ Bridges Uturu IsukwuatoErosion Control Works at Onuaku -

Amonye road Network200,000,000 30,000,000

159 Roads/Bridges Uzuaku Obuzor-

Obehie

Contract for the emergency Road

repair of Uzuaku-Obuzor-Obehie

Ezebeudele Roard

165,210,000 24,781,500 25,205,962 20,000,000

160 Road/Bridges UmuaroConstruction of Umuaro-Ntigha

Ekwereazu200,000,000 30,000,000

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 13 of 29

Page 50: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

161 Roads/Bridges Obuzor Ukwa WestConstruction of Umuwaga Link Road,

Phase II, Obuzor Asa (1km) 124,000,000 18,600,000 20,000,000

162 Roads/Bridges Ukwa West Ukwa East Construction of Akwete Cemetry Road

linking Ohanso-Obunkwu-2km 245,000,000 36,750,000 - 20,000,000

163 Roads/Bridges

Amuta - Umu

Obiala Afor

Umuada Road

Award Of Contract For Emergency Re-

Construction Of Amuta - Umu Obiala

Afor Umuada Road

100,000,000 50,487,032 16,289,863 20,000,000

164 Roads/Bridges Ukwa West Ukwa West Oborhia-Nkprobe-Ihie Road 880,430,211 717,849,741 - 20,000,000

165 Roads/Bridges Umuaka Ukwa WestConstruction of Umuodeke-Uzomkpuri-

Railway Road, Asa South Aut. (500m) 94,537,775 14,180,666 14,180,666

166 Roads/Bridges Okai. Bende construction of Okai internal road 247,658,100 132,251,929 52,494,740 20,000,000

167 Roads/Bridges Amokwe BendeConstruction of internal roads (Phase

ii)245,350,120 36,802,518 46,611,463 20,000,000

168 Roads/Bridges Onunkpo Ukwa westConstruction of Onunkpo Umunteke to

Egbelu road240,020,000 135,579,908 - 20,000,000

169 Roads/Bridges Ozu Item Bende Construction of Internal Road, Phase 1 240,000,000 12,251,691 20,000,000

170 Roads/Bridges Obiagu Umuneochi Construction of Obiagu-Lukwesi Road 231,250,110 27,785,835 20,000,000

171 Roads/ Bridges UburuConstruction of 3.5km Uburu-Atani-

Ibom road350,000,000 100,000,000

172 Roads/Bridges Obikabia

Obingwa/

Isialangwa

South/North

Construction of Obikabia Road 217,079,411 97,381,798 23,388,750 20,000,000

173 Roads/Bridges Amigbo-NsukweUmuahia-

South

Construction of Amigbo-Nsukwe Road

in Umuahia South215,500,000 72,003,816 - 20,000,000

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 14 of 29

Page 51: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

174 Roads/Bridges Asa township Ukwa west Asa township road Phase ii 200,000,000 15,943,993 20,000,000

175 Roads/Bridges

Umuokpara/

Umuekechi/

Omumauzor

Ukwa westConstruction of Umuokpara to

Umeekechi to Omumauzor Road200,000,000 73,431,212 36,424,728 20,000,000

176 Roads/BridgesOborhia-Ohandu-

UmuibeAba

Design of Oborhia-Ohandu-Umuibe

Road (10km) 10,000,000 - 5,000,000

177 Roads/Bridges Isieke Isieke - Ukome - Okwoyi - Amauzuro -

okwuta internal road100,000,000 23,388,750 15,000,000

178 Roads/Bridges Ahi - Umuhute Ahi - Eke - Umuhute road 100,000,000 - 15,000,000

179 Roads/Bridges Ludu Ludu - Aghbama Road 100,000,000 15,000,000 15,000,000

180 Roads/Bridges Umuana Umuana Road 100,000,000 - 15,000,000

181 Roads/Bridges Amuzukwu Amuzukwu - Umuezagwu road 100,000,000 15,000,000 15,000,000

182 Roads/Bridges Nkata Nkata Road 100,000,000 - 15,000,000

183 Roads/ Bridges UburuConstruction of Ukionwangiom-

Agukwon Road500,000,000 100,000,000

184 Roads/Bridges Umuchima Ossah Enugu/PHC Expressway - Umuchima

Ossah Road100,000,000 - 15,000,000

185 Roads/Bridges Mgbaja Mgbaja - Uzi - Afara road 100,000,000 15,000,000 15,000,000

186 Road/Bridges OgbodinibeUmuahia

South

Construction of Umuagwu-Ogbonibe-

Umunwawa road200,000,000 30,000,000

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 15 of 29

Page 52: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

187 Roads/Bridges Avonkwu -

OkwutaAvonkwu - Okwuta road 100,000,000 - 15,000,000

188 Roads/Bridges Nkporo Ohafia North Nkporo - Osso Edda Road 100,000,000 23,228,841 15,000,000

189 Roads/ Bridges Azumini Ukwa EastConstruction of Aba-Azumini road,

Phase I240,000,000 36,000,000

190 Roads/ Bridges Azumini Ukwa EastConstruction of Aba-Azumini road,

Phase II240,000,000 36,000,000

191 Roads/Bridges Owo Asa Ukwa WestConstruction of Owo Asa - Umuiku

Ozar road (3km) 404,487,700 60,673,155

192 Roads/Bridges Akwete Ukwa EastConstruction of Umuabuo road with a

spur to Uzo Miri-Azulo240,000,000 36,000,000 36,000,000

193 Roads/Bridges Akwete Ukwa EastConstruction of Akwete internal road

network 240,000,000 36,000,000 36,000,000

194 Roads/Bridges UmuleUmuahia

North

Construction of Umuosagha/ Azumiri

road with spur to Umule - Okpuala

Umukabia Azumiri road

240,000,000 36,000,000

195 Roads/Bridges

Umu - Ugba -

Umu - Kaonu -

Umu - Oke - Umu

- Kiriko

Umuahia

South

Construction of 1.2km Umu - Ugba -

Umu - Kaonu - Umu - Oke - Umu - Kiriko

road

225,000,000 33,750,000

196 Roads/Bridges Mkpa Bende Construction of Mkpa road (Lot 1-3) 350,000,000 52,500,000

197 Roads/Bridges Obehie Ukwa WestConstruction of Umuokomiri Internal

Road 240,000,000 36,000,000

198 Roads/Bridges Umukalu Ukwa WestConstruction of Umukalu Market -

Umudibia Road 240,000,000 36,000,000

199 Roads/Bridges Obiga/ Umuaka Ukwa West Construction of Obiga - Umuaka Road 150,000,000 22,500,000

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 16 of 29

Page 53: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

200 Roads/Bridges Nneato Umunneoche

Construction of Ahiaututu - Ikpabu-

Obulikpa - Umunze road with Spur to

Ndikpa in Eziama Nnato

150,000,000 22,500,000

201 Road/Bridges Nkata AkphiaUmuahia

North

Construction of 2Km Nkata Akpahia

Okpuala Road Umuahia North240,000,000 36,000,000

202 Roads/BridgesNkatalike,Umuka

bia Umuagbom

Umuahia

North

Emergency Rehabilitation of Nkatalike -

Umukabia- Umuagbom Road 102,500,000 15,375,000

203 Roads/Bridges Umuituru Ukwa WestConstruction of Umuituru -

Umuadienwae Road 150,000,000 22,500,000

204 Roads/Bridges Ohuhu Umuahia

Nkata-Amaogugwu- Umuagu road

(Ohuhu Internal roads, UmuahiaA

11.99km ) Abia state

728,161,302 601,820,874 - -

205 Roads/Bridges Akwete,

Umuagbai Ukwa East

CONSTRUCTION OF Akwete

Umuagbai Rd Phase 11: Construction of

Haed Shoulders (22km) with Spur to

Mkpororobe Junction (8.7km)

510,463,580 162,890,457 - -

206 Roads/Bridges Leru umunneochiConstruction of Concrete Asphalt Road

in Leru-6.5km900,000,000 - -

207 Roads/Bridges Ugwuezi Construction of Ugwuezi-Amabo-

Umuogu-Umuobasi Road, Lots 1-2 500,000,000 - -

208 Roads/Bridges Amauvi Arochukwu Construction of Rigid pavement road

from Amauvi to Market Road 1.8km 248,000,000 - -

209 Roads/Bridges Agwankuma Arochukwu

Construction of Rigid pavement road

from Agwankuma to Abagwu Rural Road

2km

248,000,000 - -

210 Roads/Bridges Umuiku Ukwa West Umuiku-Mkporobe 7.2km Road-Phase 1 200,000,000 - -

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 17 of 29

Page 54: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

211 Roads/Bridges Amaokwe-

Amaeke

Construction of road from Amaokwe-

Amaeke 150,000,000 - -

212 Roads/Bridges Umuojima OsisiomaConstruction of Umuojima- Omuma Link

Road and Drainages1,166,254,364 174,938,155 22,453,200 -

213 Roads/Bridges NeatoConstruction of Aro Ikpe - Ebelebe

(17km) 240,000,000 36,000,000 -

214 Roads/BridgesOrie Agalaba -

Umuahi NtiguzorObingwa

Construction of Orie Agalaba - Umuahi

Ntiguzor road 150,000,000 22,500,000 -

215 Roads/Bridges Umuagalaba Ukwa WestConstruction of Umuagalaba Umuisika

Ogboube Uzo Obuzo road in Owaza 250,000,000 37,500,000 -

216 Roads/Bridges Amurie Nkporo Ohafia

Amurie Nkporo Technical School,

Building of school blocks and Equipment

of Science Lab, Ohafia

100,000,000 18,711,000 -

217 Roads/Bridges Mgbarakuma Construction of Internal Roads 100,000,000 23,388,750 -

218 Roads/Bridges Akwete Tech

Sch Akwete

Okpuhu-Akwazu main road

construction (2km) 140,427,190 21,064,079 23,201,640 -

219 Roads/Bridges Ngwaiyiekwe Umuadiewe Contract for emergency repairs of

Ngwaiyiekwe-Umuadiewe Road 198,400,000 29,760,000 22,453,200 -

220 Roads/Bridges Isuochi - Nneato Design of 15km Isuochi - Nneato Road. 30,000,000 23,388,750 -

221 Roads/Bridges Amabo-ikentewe BendeConstruction of Amabo-Umuechima

Road 151,869,855 92,855,245 22,453,200 -

222 Roads/Bridges Isiala Nteke -

Ozar Ukwa west

Isiala Nteke - Ozar Internal Road

Network240,000,000 49,880,359 -

223 Roads/Bridges Okwe - Ahiaorie Umahia NorthOkwe - Obuohia - Umuemenike -

Ahiaorie road100,000,000 44,438,625 -

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 18 of 29

Page 55: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

224 Roads/Bridges Owaza/ Obibor Ukwa WestConstr of Umulolo - Umualaga -

Umuakata - Obibor Feeder Road200,000,000 24,898,104 -

225 Roads/Bridges Nkpa Ring Road Bende Construction of Nkpa Ring Road 250,000,000 - -

226 Roads/Bridges Construction of Isuochi -Nuneaton

Road600,000,000 90,000,000 -

227 Roads/Bridges Umuwaga Obuzo Ukwa WestConstruction of Umuwaga Link Road,

Obuzo (4Kms) 124,039,999 116,083,800 7,956,199 -

228 Roads/Bridges Ohankata Ukwa EastConstruction of Ohankata/Umuolu

stream settlement road 159,568,456 23,935,268 16,839,900 -

229 Roads/Bridges Obahu

UmuebulungwuUkwa West

Construction of Obahu Umuebulungwu

Rd (2km)160,000,000 24,000,000 46,370,000 -

230 Roads/Bridges Umuaka -

ObokweUkwa West Umuaka - Obokwe Asa Internal Road 249,000,000 37,350,000 23,341,973 -

231 Roads/Bridges Umuezenta

Nbawsi

Isiangwa

South

Construction of 1KM Road Umuezenta

Nbawi-Umuezeukwu Nuburu with

Erosion Control

100,000,000 15,000,000 25,108,311 -

232 Roads/Bridges Ugwuezi umunneochiConstruction of 1KM Road Ugwuezi-

Umuruechile-Umuogbo100,000,000 60,000,000 39,933,000 -

233 Roads/Bridges Ndiohiaowerri NjabaConstruction of Ndiohiaowerri, Amucha

- Umudioka - Eziachi Road150,000,000 39,078,411 -

234 Roads/Bridges Akwete Akwa EastConstructuion of Akwete Tech -

Okpuzu - Akwete Road100,000,000 28,066,500 -

235 Roads/Bridges Ihie/Obegu Ugwunabo Construction of Ihie to Obegu Road 150,000,000 25,052,166 -

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 19 of 29

Page 56: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

236 Roads/Bridges

Ibom Baraki-

Avia Ovu-

Obinkita/Amaikp

e Road

Construction of 3km road from Ibom

Baraki-Avia Ovu-Obinkita/Amaikpe

Road with Drains

200,000,000 30,000,000 -

237 Roads/Bridges Nma Avenue AbiribaConstruction of 2km Nma O Avenue,

off Amogudu, Abiriba Road200,000,000 30,000,000 -

238 Roads/Bridges Umuakeke-

UmuachigideUkwa West

Construction Umuakeke-Umuachigide

Link Road, Umuorie249,932,700 60,732,700 37,850,131 -

239 Roads/Bridges Obuohia Ukwa westConstruction of Internal Road Network

at Ndoki comm. Sec Sch.Road175,596,500 31,989,600 -

240 Roads/Bridges Long John

AvenueAba

Construction of Long John Avenue

Ogbor Hill197,553,750 46,247,400 -

241 Roads/Bridges Mbato Junction

Okpuhuite-OrieUmunngeochi

Construction of Mbato Junction

Okpuhuite-Orie Market Ugochukwu

Lomara Igwekuike road at Ngodo

203,598,124 44,028,824 -

242 Roads/Bridges Umuohuru,

Okaiuga

Umuahia

North

Construction of Iyiocha road Umuochi,

Umuohuru Okaiuga200,000,000 30,000,000 -

243 Roads/Bridges Ihube

Umuneochi

Extension of Ihube-Nkwoagu-Mgbala

Road in Ihube Umuneochi, Abia state 3,000,000,000 1,187,350,452 385,367,338 -

244 Roads/Bridges Umuadienwe-

UmuobiUkwa West

Remidial Works On Umuda-Isingwe-

Umuobi Junction (Umuiku-Asa "Section

A",

140,183,505 37,352,266 34,789,339 -

245 Roads/Bridges Obi Juction

(Umuiku)Ukwa West

Remedial Works On Road,From Umuobi

Juction (Umuiku), Linking Umunteke

Road,"Section B"

160,550,775 60,628,440 22,078,980 -

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 20 of 29

Page 57: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

246 Roads/Bridges Owaza Ukwa WestConstruction of Umuoyeke-Umualaga

Road, Owaza, Ukwa West LGA (2km) 264,075,100 39,611,265 -

247 Roads/Bridges Owaza Ukwa WestConstruction of Uzo Ekwuru Ukwu Rd,

Phase II, Owaza (2km) 263,369,350 39,505,403 -

248 Roads/Bridges Owaza Ukwa West

Construction of Umuagalaba-

Umuodikagu-Umualagha Rd, Owaza

(3km)

400,330,200 60,049,530 -

249 Roads/Bridges Owaza Ukwa WestConstruction of Uzongwu-Umueme to

Nkpa Umungede Rd, Owaza (1.6km) 203,309,350 30,496,403 -

250 Roads/Bridges Owaza Ukwa WestConstruction of Egbelu-Umungede Rd,

Owaza (5km) 609,847,315 91,477,097 -

251 Roads/Bridges UmuikukorUkwa West /

Osisioma Ngwa

Construction of Umuikukor-Omumauzor-

Ariaria Junction Road, Phase II, Abia

State (4.2km)

655,777,990 483,966,786 88,366,699 -

252 Roads/Bridges Bakassi-Ariria OsisiomaConstruction of Watch tower road

Bakassi shoe industrial market 150,000,000 45,300,000 -

253 Roads/Bridges Owaza Ukwa West

Rehabilitation of Ulorgu (Well 9)

Umuegwusi-Umuagalaba Road (3km) and

flood control

429,794,130 64,469,120 -

254 Roads/Bridges Uzuaku Ukwa WestConstruction of Central School Road to

Okwu Akami Road, Uzuaku (2km) 225,529,525 28,879,429 -

255 Roads/Bridges Okwe-Obohia IkwuanoConstruction of Okwe-Obohia-

Umuemenike Rd, Phase II (3km) 398,643,000 59,796,450 -

256 Roads/Bridges Uzuaku Ukwa WestConstruction of Chibuo-Egwudaelendu

Ring Road, Uzuaku (3km) 398,018,100 39,452,715 -

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 21 of 29

Page 58: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

257 Roads/Bridges Uzuaku Ukwa WestConstruction of Ikeala-Igbeala-Okpulo

Road, Uzuaku (2km) 264,393,100 39,658,965 -

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 22 of 29

Page 59: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

258 Roads/BridgesApunali Ntiguzor-

Amaeri 2km road Obingwa Construction of 2km road 250,000,000 37,500,000 -

259 Roads/Bridges Owaza-Obuzor Ukwa WestConstruction of Umuololo-Umuakata-

Obuzor Road Phase II (550m) 100,903,413 15,135,512 -

260 Roads/Bridges Owaza Ukwa WestConstruction of Umuegwusi-Umuachara-

Umueleleukwu Road, Owaza (2km) 252,787,650 37,918,148 -

261 Roads/Bridges Umuahia Umuahia Construction of Amaeke-Agbo Road 252,787,650 37,918,148 -

262 Roads/Bridges Aba Aba Construction of Onwuka Nail Road 143,406,000 - -

263 Roads/Bridges Aba AbaConstruction of Umuchichi-Seven-Up

Road 143,406,000 - -

264 Roads/Bridges Aba AbaConstruction of Crystal Park by Aba-

Owerri Road 192,529,525 - -

265 Roads/BridgesMkporobe-Ohuru-

OhankuAba

Construction of Mkporobe-Ohuru-

Ohanku Road 375,022,150 - -

266 Roads/Bridges Ukwa West Ukwa West Construction of Umuonyenaucheya Road 143,406,000 - -

267 Roads/Bridges Umueze/ IbekuUmuahia

North

Construction of Ikwuokwe Udide to

Umuakanu Emede Ibeku Road 150,000,000 - -

268 Roads/Bridges

Azumini-Ihuali-

Nkpukpuakanta

road

Ukwa EastConstruction of Azumini-Ihuali-

Nkpukpuakanta road 200,000,000 - -

269 Roads/Bridges Uzoinyi NdumeUmuahia

North

Construction of Uzoinyi Omeokwe Road,

Umuofia Ndume 150,000,000 - -

270 Roads/Bridges UmuekwuuleUmuahia

NorthConstruction of Internal Roads 1,000,000,000 - -

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 23 of 29

Page 60: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

271 Roads/BridgesObuzor-

UmuakparaOsisioma Ngwa

Construction of Mbutu Umuojima Ogbu

Obuzor-Umuakpara Road 250,000,000 - -

272 Roads/BridgesNkwo Elechi-

OhuruAba

Construction of 7UP-Nkwo-Elechi-

Ohuru Road (3.5km) 395,000,000 59,250,000 150,000,000

273 Roads/Bridges Ogborhill Aba Construction of Umuola Road 150,000,000 22,500,000 100,000,000

274 Roads/Bridges Umuahia UmuahiaConstruction of 2km road at Asaba

Street Umuahia Amuzukwu 220,000,000 33,000,000 -

275

ROADS /

BRIDGES

TOTAL

66,887,283,966 11,084,653,755 5,129,052,929 5,060,071,466

276

Governance,

Social Services

& Sports

Various VARIOUS Payement of Retention 300,000,000 45,000,000 45,000,000

277

Governance,

Social Services

& Sports

Umunteke ,Asa Ukwa west ICT Centre at Umunteke 502,615,694 75,392,354 90,242,923 40,000,000

278

Governance,

Social Services

& Sports

Various VARIOUS Establishment of Aquaculture training

centre (lots 1 & 2) 500,000,000 75,000,000 56,479,952 40,000,000

279

Governance

Social Services

& Sports

Abia State Abia State Skill Acquisition for Abia State 100,000,000 50,000,000 15,000,000

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 24 of 29

Page 61: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

280

Governance,

Social Services

& Sports

Obehie Ukwa West Asa Civic Centre /Multipurpose Hall 247,150,000 37,072,500 46,597,300 46,597,300

281

Governance,

Social Services

& Sports

Okoko item Bende Civic Centre /Multipurpose Hall at

Okoko Item 179,980,000 64,459,464 21,205,800 21,205,800

282

Governance,

Social Services

& Sports

Umuorgu Ukwa WestCompletion & Equiping of Umuorgu

Youth/Sports facilities (Phase II)199,985,000 29,997,750 22,349,250 30,000,000

283

Governance,

Social Services

& Sports

Umuihie-Odo Umuahia

south Construction of civic Centre 150,000,000 50,622,024 22,500,000

284

Governance,

Social Services

& Sports

Umudim-Ngodo Umunneochi Skill Acquisition Centre (design) 5,000,000 5,000,000 -

285

Governance,

Social Services

& Sports

All Senatorial

Districts

All Senatorial

Districts

Establishment of a Community

Development Foundation (CDF) in each

of the Senatorial Districts

15,000,000 15,000,000 -

286

Governance,

Social Services

& Sports

Umuosagba/

OpualaUkwa West Const& Equiping of Civic Center 70,000,000 10,613,935 -

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 25 of 29

Page 62: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

287

Governance,

Social Services

& Sports

UmuizuUmuahia

North

Construction of Multi - Purpose Civic

Centere at Umuizu Okwulaga Afarukwu

in Umuahia North LGA

150,000,000 22,500,000 -

288

Governance,

Social Services

& Sports

Afara UkwuUmuahia

North

Construction of Umuizu Okwulaga

Afarukwu access road to the

Community Hall

105,000,000 15,750,000 -

289

Governance,

Social Services

& Sports

Amaukwu Ozaa Ukwu Civic Centre 200,000,000 25,467,750 -

290

Governance,

Social Services

& Sports

Various Various Payment of certified IPC 1,000,000,000 855,121,582 134,510,048

291

Governance,

Social Services

& Sports

Obuzor Ukwa East Supply of ICT Ed/ Mat/Sch Upgrade

at Umulechi Primary School 200,000,000 30,000,000 30,000,000

292

Governance

Social Services

& Sports

Oloko IkwuanoCommunity Grammer School Oloko, Six

Classroom Block 11,433,750 10,000,000 -

293

Governance

Social Services

& Sports

Various Various Other Stakeholders 478,000,000 120,000,000

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 26 of 29

Page 63: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

294

GOVERNANCE,

SOCIAL

SERVICES &

SPORTS

TOTAL

4,414,164,444 281,922,068 1,371,950,517 544,813,148

295 Water Supply Afugiri Umuahia Afugiri water Rehabilitation 432,655,241 337,508,061 15,592,500 95,147,180

296 Water Supply Amuvi Arochukwu Improvement and Reticulation of

Amuvi Water Scheme 178,000,000 78,114,330 55,440,000 50,440,000

297 Water Supply Ukwa west Ukwa WestUkwa West LGA Regional Water

Scheme (phase II)249,500,350 53,950,000 25,000,000

298 Water Supply Amaukwu Ukwa West Motorised Borehole at Amaukwu, Ozaa 100,000,000 66,447,456 25,000,000

299 Water Supply Umuakpu Isiala Ngwa

South Solar Powered Water Project 178,000,000 26,700,000 46,279,676 46,279,676

300 Water Supply Mkporobe Ukwa East Solar powered water 48,086,366 7,212,955 31,729,125 31,729,125

301 Water SupplyEgwuneleke/

Umuohuru

Umuahia

NorthSolar Powered Water Scheme 94,004,768 14,100,715 30,561,300 30,561,300

302 Water Supply Eziukwu

Agbagwu Arochukwu Motorised Bore Hole 109,570,081 30,261,614 28,515,645 28,515,645

303 Water Supply Asa North Asa North Solar powered Water Project 47,968,482 21,568,208 26,400,274 26,400,274

304 Water Supply Isiala Ngwa Isiala Ngwa

North Solar Powered Water Project 39,753,782 5,963,067 25,623,675 25,623,675

305 Water Supply Umuadienwe Ukwa west solar powered water 48,240,424 26,153,623 24,948,000 22,086,800

306 Water Supply Avo-DimUmuahia

SouthSolar Powered Water Project 100,000,000 23,388,750 23,388,750

307 Water Supply Omoba Isiala Ngwa

North Solar Powered Water Project 42,305,333 6,345,800 22,772,000 17,772,000

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 27 of 29

Page 64: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

308 Water Supply UmunwanwaUmuahia

NorthSolar powered water 47,758,269 7,163,740 - 7,163,740

309 Water Supply Lekwesi Umunneochi Solar powered water, Obiagwu 57,758,269 15,546,210 22,512,171 17,512,171

310 Water Supply Umuiku-Ozar Ukwa west Solar powered water 50,000,000 21,205,800 7,500,000

311 Water Supply Umuikukor Ukwa West Solar powered Water Project 24,397,624 3,659,644 20,737,980 10,737,980

312 Water Supply Ndieke ugo Bende Solar powered water 57,758,269 20,612,857 8,663,740

313 Water Supply Amaorji Bende Solar powered water 47,758,269 20,612,857 7,163,740

314 Water Supply Akoli Imenyi Bende Solar powered Water Project 50,000,000 20,537,994 7,500,000

315 Water Supply Oberette Ukwa west Solar powered Water Project 50,000,000 23,940,122 20,325,847 15,325,847

316 Water SupplyUmuokobi

Avodim UbakalaUmuahia south Solar Powered Water Scheme 50,000,000 31,092,650 18,907,350 18,907,350

317 Water Supply Abiriba OhafiaMotorized Borehole in Egwena Girls'

Secondary Schl, Abiriba34,399,880 4,500,000 17,693,282 12,693,282

318 Water Supply Arochukwu

Construction of Motorised Borehole

with reticulation formation, Eziukwu

Compound, Asapa Village, Arochukwu

100,000,000 15,000,000

319 Water Supply Oborhia Asa Ukwa West Solar Powered Water Project 42,552,996 6,382,949 15,592,500 6,382,949

320 Water Supply Owo-elu Asa Ukwa West Solar powered Water Project 48,240,425 21,418,571 15,485,701 7,236,064

321 Water Supply Oborhia Asa Ukwa West Solar powered Water Project 50,000,000 7,500,000 15,237,000 7,500,000

322 Water Supply Agbagwu Arochukwu Motorized Borehole 100,000,000 13,860,000 15,000,000

323 Water Supply Ezejukwu Arochukwu Solar powered Water Project 109,570,081 13,860,000 15,000,000

324 Water SupplyAfor-Ukwu

OlokoIkwuano Solar powered water 48,240,424 36,180,318 13,075,412 12,060,106

325 Water Supply Akana Ohafia Solar powered Water Project 48,370,980 13,060,165 7,255,647

326 Water Supply amaba Bende Solar powered Water Project 57,272,460 12,118,500 13,000,000

327 Water Supply Obuzor Ukwa West Solar powered Water Project 50,000,000 16,912,342 - 7,500,000

328 Water Supply Umunneochi Umunneochi Solar powered Water Project 48,240,427 7,236,064 11,781,000 10,000,000

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 28 of 29

Page 65: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

ABIA STATE 2016 BUDGET PROPOSAL

329 Water Supply

Ohia

Ohu,Isingwa

autonomous

community

Isiala Ngwa

NorthSolar Water Project 50,000,000 7,500,000 7,500,000

330 Water SupplyMechanic Village,

OhiyaUmuahia Solar Powered Water 50,000,000 13,860,000 7,500,000

331 Water SupplyUmuogalaba

OwazaUkwa West Solar Powered Water 50,000,000 13,860,000 7,500,000

332 Water Supply Obahu Ukwa West Solar powered Water Project 48,178,370 7,226,755 7,437,906 7,500,000

333 Water Supply Okpualaro-

Isialaro Osisioma Solar Powered Water Project 39,753,782 5,963,067 25,623,675 3,000,000

334 Water Supply Okoko item Bende Solar powered Water Project 48,178,370 13,121,484 2,079,000 3,000,000

335 Water Supply Umuorgu Ukwa West

Ukwa West LGA Regional Water

Scheme at Umuorgu (Linking Ozaa Asa

Group &Ipu)

245,500,000 113,680,374 25,623,675 -

336 Water Supply Asa High School Ukwa West Solar powered Water Project 42,439,763 6,365,964 25,623,675 -

337 Water Supply total 3,414,453,482 881,818,629 880,472,748 713,047,042

TOTAL: ABIA 83,438,829,250 13,261,767,746 8,717,841,269 7,719,950,879

2016 APPROPRIATION ACT- ABIA NATIONAL ASSEMBLY Page 29 of 29

Page 66: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

1 Agriculture Oron

Provision of fishing nets, boats and out

board engine in Oron/ Mbo/ Okonbo/

Udung/ Uko/ Urue Offong-oruko

250,000,000 37,500,000

2 Agric Total 250,000,000 - - 37,500,000

3 Ecological Ibiono Ibom Ibiono Ibom Erosion Control at Ibiono Ibom 6,129,111,001 3,252,455,936 100,000,000 100,000,000

4 EcologicalEkpene Afaha

EketEket

River clearing for flood control at

Ekpene/Obuk, Afaha Eket 800,000,000 - 140,000,000 120,000,000

5 Ecological Ndua Ukpa Oron

Reconstruction of Land slide Disaster

site at Oron and Flood Control Works

at Ndua Ukpa Okpoto-Ete, Akwa Ibom

State

6,000,000,000 - 200,000,000 150,000,000

6 Ecological Various VariousClearing of waterways in Akwa Ibom

State (Lots 1-30) 1,500,000,000 325,000,000

7 Ecological IBENO IBENODredging of Okoro-Utip/ Atabrikang

Creek (design) 50,000,000 - 45,000,000 7,500,000

8 EcologicalOkopedi/

Oron roadOkobo

Flood/Erosion Control Works along

Okopedi/Oron Road300,000,000 - 45,000,000 35,000,000

9 Ecological Okoyong UruanClearing of Debris and deslting of

Okpoyong creek waterways 240,208,500 36,031,275 48,642,221 30,000,000

10 Ecological Ikpe Okon Eket Erosion Control at Ikpe Okon 100,000,000 - 32,400,000 15,000,000

11 Ecological Iquita Oron Erosion Control Works at Iquita 200,000,000 147,566,663 48,600,000 20,000,000

12 Ecological Ifiayong UruanClearing of Debris and desilting of

Ifiayong creek waterways 221,077,500 125,637,310 19,799,759 15,000,000

13 Ecological Total 15,540,397,001 3,561,691,184 679,441,980 817,500,000

14 Education Various Various

Provision of school pupils tables/desk

and benches for primary schools in

Eket/Esit Eket LGA (Lots 1-7)

1,600,000,000 240,000,000 200,000,000

AKWA IBOM STATE 2016 BUDGET PROPOSAL

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 1 of 55

Page 67: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

15 Education Utu Etim EkpoConstruction of Classroom at

Government Primary School, Utu.20,000,000 20,000,000

16 Education Oron Mbo

Provision of tables/chairs/desk and

benches for secondary schools in Oron

(Lots 1-7)

1,600,000,000 240,000,000 150,000,000

17 Education Udi Ika IkaConstruction of Government Primary

School Udi Ika, Ito Clan20,000,000 20,000,000

18 Education Various Various

Provision of 1500 desktop Computers

for supply to Secondary Schools in

Akwa Ibom State

240,000,000 140,000,000 36,000,000

19 Education Ikot Edet Etim EkpoConstruction of Classroom Block in

Ikot Edet, Etim Ekpo20,000,000 20,000,000

20 Education Various Varoius

Supply of Educational Materials to

Primary and Secondary Schools in

Akwa Ibom State

1,000,000,000 - 150,000,000 100,000,000

21 Education ORON ORON MBHS Assembly Hall 200,000,000 125,799,739 48,600,000 30,000,000

22 Education Afiah Nsit Nsit Ibom

Construction of Three Classroom in

Community Secondary school Afiah

Nsit Urua Nko in Nsit Ibom LGA, Akwa

Ibom State

80,000,000 - 12,000,000 12,000,000

23 Education Mbo MboConstruction of staff quarters at

Secondary Grammar School, Mbo LGA 200,000,000 30,000,000

24 Education Achan Ika

Construction of Classroom Block-

Primary School in Achan, Ika, Achan

Clan

20,000,000 20,000,000

25 EducationAfaha

EkpenediEsit Eket

Construction/Renovation of Primary

School in Afaha Ekpenedi 250,000,000 37,500,000 30,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 2 of 55

Page 68: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

26 Education Ikot Ekara Ikot Abasi

Renovation of 2 No. 6 Classrooms

Block/Head Master Residence at St.

Nicholas Primary School, Ikot Ekara

Edem Aya,

250,000,000 37,500,000 30,000,000

27 EducationIdung Uko

UdoUkanafun

Construction of classroom Block at

Government Primary School, Idung Uko

Udo

20,000,000 20,000,000

28 Education Mbiaso Ikot EkpeneConstruction of Urua Ekpa primary

school, Atai Essien juction, Mbiaso250,000,000 37,500,000 30,000,000

29 Education Oron Oron

Construction of Administrative block

and renovation of staff quarters at

Oron Boys High School

200,000,000 - 30,000,000 30,000,000

30 EducationMbiakpa

IbakesiIni

Construction of Classroom Blocks at

Primary School Mbiakpa Ibakesi20,000,000 20,000,000

31 Education Oyubia Oyubia

Construction of Oyubia Admin Block,

Offices and Ultra Modern Library at

Christian Technical Secondary School

College Oyubia

200,000,000 - 30,000,000 30,000,000

32 Education Esuk Oro OronRenovation of Methodist Boys High

School Phase II122,490,610 34,232,272 16,536,232 18,373,592

33 Education Esuk Oro OronRenovation of Methodist High School,

Oron Phase I123,135,050 54,687,825 16,623,232 18,470,258

34 Education Oron

Provision of Tables/Chairs/Desks and

Benches for Secondary Schools, Oron/

Mbo/ Okonbo/ Udung/ Uko/ Urue

Offong-oruko

250,000,000 37,500,000

35 Education Ibesit Ebong. Oruk AnamConstruction of Classroom Block at

Primary School, Ibesit Ebong.20,000,000 20,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 3 of 55

Page 69: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

36 Education Okobo Okobo

(a) Construction of Community Library

and Skill Acquisition Training Centre

(b) Library and Supply of Library books

(c) Supply of Furniture and Equipment

(d) Generator and Generator house

70,000,000 - 22,680,000 10,500,000

37 Education Various Various

Reconstruction and renovation of

Primary and Secondary Schools in

Akwa Ibom State

1,000,000,000 170,000,000

38 Education Onnion Etinan Construction of 2nos 6 classroom block 44,687,500 6,703,125 28,153,125 15,000,000

39 Education Afaha Ekpene Esit EketCompletion of Six Classroom Block

Abandoned by OMPADEC12,000,000 - 9,000,000 9,000,000

40 Education Obot Mme IniConstruction of Classroom Blocks at

Primary School Obot Mme20,000,000 20,000,000

41Education

Total 7,832,313,160 221,422,961 1,096,092,589 1,146,843,849

42Energy/ Power

SupplyIkot Ekpene Ikot Ekpene

Ching Station to Uyo Transmission,

Erection of 1x132 Line Bay Extension

at Uyo Substation, 132KV DC

transmission line from Ekparakwa to

Ikot Ekpene nd 2x132KV line bay

extension at the Substation-Lots 1 to

10

10,562,129,306 - - 200,000,000

43Energy/ Power

SupplyIkot Ekpene Ikot Ekpene

Construction of 330/133/33 KV

Transmission Substation at Ikot

Ekpene Associated Transmission Lines

7,139,223,123 - 200,000,000 200,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 4 of 55

Page 70: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

44Energy/ Power

Supply

Ikot Ekpene -

Ikot AbasiVarious

Construction of Double Circuit 132KV

Line from Ikot Ekpene to Ikot Abasi

with 2X30MVA Substation at

Ekparakwa

5,887,979,718 - 129,600,000 150,000,000

45Energy/ Power

SupplyIbino Itu

Electrification of Ibiono Eastern and

Central Itan 1,600,000,000 - 129,600,000 129,600,000

46Energy/ Power

SupplyCentral Itam Ibiono Ibom

Electrication of Ibiono Eastern/

Central/ Itam (Lots 1-4) 3,000,000,000 45,000,000 - 100,000,000

47Energy/ Power

SupplyUya Oron Oron

provision of 2nos 15MVA injection

substation at Uya Oron with dedicated

line to Nautical College and Ibom

International Airport.

900,000,000 - 150,000,000 100,000,000

48Energy/ Power

SupplyIfa Atai Uyo

Provision of 2nos 15 MVA injection

substation at Ifa Atai in Uyo LGA with

dedicated line to Uyo Town and Nung

Udoe, Ibesikpo

900,000,000 - 150,000,000 100,000,000

49Energy/ Power

Supply

Ntafre,

AtabrikangIbeno

Extension of Opolum Okoroutip

Electrification to Ntafre and

Atabrikang Communities

249,540,000 37,431,000 150,531,850 50,000,000

50Energy/Power

SupplyAwa

Etinan / Nsit

Ibom

Upgrading/rehabilitation of power

transmission lines (high tension) with

three (3) sub-stations from Awa Ntong

to Mbiotto ad Electrification of Ikot

Akpan Obio Ekot and Ata Efa villages

in Etinan LGA

200,000,000 30,000,000 40,500,000 40,500,000

51 Energy Iwukem Etim EkpoProvision of Solar Street Light in

Iwukem Community 150,000,000 22,500,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 5 of 55

Page 71: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

52Energy/ Power

SupplyUyo Uyo

Conversion of Low Voltage Distribution

System (LVDS) in Uyo to High Voltage

Distribution System (HVDS) complete

with Aerial Bundle Conductors (ABC)

985,000,000 147,750,000

53Energy/Power

SupplyOku Iboku Itu

Provision of Solar Street light in Oku

Iboku Comunities of Ikot Antuen, Ikot

Eka Iko and Ikot Essien

380,000,000 - 51,300,000 35,000,000

54Energy/ Power

SupplyAbak Abak

Solar street light at Abak Federal

Constituency 250,000,000 62,706,666 33,750,000 35,000,000

55Energy/ Power

SupplyAkpautong Esit Eket

Electrification and construction of a

substation300,000,000 90,814,405 48,600,000 30,000,000

56Energy/Power

SupplyUyo Uyo LGA

Construction of 1x15MVA 33/11K

Injection Substation at Federal

Secretariat

246,667,000 37,000,155 43,000,000 30,000,000

57Energy/Power

Supply

Atak

Oro/Oruko

Communities

Urefong

/OrukoSolar street light 250,000,000 - 33,750,000 30,000,000

58Energy/Power

SupplyOkopedi Okobo

Provision and installation of solar

powered street light at Okopedi

Okobo, Okopedi in Okobo LGA (Phase

2)

250,000,000 37,500,000

59Energy/Power

Supply

Idua

CommunitiesOron Solar street light 200,000,000 - 30,000,000 30,000,000

60Energy/ Power

Supply

Uquo

communityEsit Eket

Provision of solar powered street light

complete with 600 x 600mm

reinforced concrete plinth in Uquo

community and environ (Lots 1-2)

490,000,000 490,000,000 30,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 6 of 55

Page 72: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

61Energy/ Power

Supply

Afaha

EkpenediEsit Eket

Provision of solar powered street light

complete with 600 x 600mm

reinforced concrete plinth in Afaha

Ekpenedi and environ

245,000,000 245,000,000 30,000,000

62Energy/ Power

SupplyVarious Various

Supply and Installation of

Transformers in Akwa Ibom State500,000,000 250,000,000

63Energy/Power

Supply

Asak-Ikang,

Ebughu to

Ibaka

MboProvision and Installation of Solar

powered street Light 250,000,000 37,500,000

64Energy/ Power

Supply

Akpanfuk-

Usung InyangUkanafun

Electrification of Akpanfuk-Afa Nsit

ikot Enang- Ase Edim Ikot Ede Inyang

Eti Usung Inyang

176,059,029 108,913,496 13,375,700 30,000,000

65Energy/ Power

SupplyOKOBO OKOBO

Electrification of six (6) Communities

in Okobo (Phase 1)299,000,000 148,508,088 32,814,344 30,000,000

66Energy/ Power

SupplyEdim-Esuk

Provision of solar street light at Edim -

Inyang - Udunghwo/Esuk road Phase I 250,000,000 37,500,000 30,000,000

67Energy/ Power

SupplyEtinan Etinan Completion of Etinan Town Substation 200,000,000 - 48,600,000 30,000,000

68Energy/ Power

Supply

Ukam group of

VillagesMkpat Enin Rural Electrification project 94,999,417 61,304,783 27,000,000 30,000,000

69Energy/ Power

SupplyIbiomin Eket

Solar street light for Ibiomin,Esit

Eket-Jamestown Rd 200,000,000 - 80,000,000 30,000,000

70Energy/Power

SupplyAbat Etim Ekpo

Solar powered street light at Abat

town, Etim Ekpo LGA 200,000,000 30,000,000

71Energy/ Power

Supply

A-Ikot

Okpudo, Nsit

ubium

Etinan Solar street light 200,000,000 - 200,000,000 30,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 7 of 55

Page 73: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

72Energy/ Power

SupplyIkot Ukpa - Ikot Ukpa electrification 205,000,000 59,962,500 120,000,000 30,000,000

73Energy/ Power

SupplyIkot Ekpene Ikot Ekpene Solar Street Light Phase 2 223,395,435 102,159,720 31,050,000 30,000,000

74Energy/ Power

SupplyIkot Mbat

Ikot Edor

VillageSolar street light 235,000,000 - 35,250,000 30,000,000

75Energy/ Power

SupplyEwang Mbo

Provision and installation of solar

powered street light at Mbo LGA H.Q ,

Ewang

250,000,000 - 122,500,000 30,000,000

76Energy/ Power

SupplyOron Oron

Provision and Installation of Solar

powered street light along Secretatiat

road and environs, Oron

250,000,000 - 100,000,000 30,000,000

77Energy/Power

SupplyUyo Uyo

Construction of 33KV lines to Uyo

Metropolis from Transmission

Substations 1 x 15MVA, 33/11KV

Substation at Idoro and 1 x 7.5MVA

Substation at University of Uyo

950,000,000 142,500,000

78Energy/ Power

SupplyUboro Isong udong Uko

Provision and installation of Solar

street light along Eyo Abasi-Ebughu

road Uboro Isong Inyang-Ebughu

250,000,000 - 100,500,000 30,000,000

79Energy/ Power

SupplyOkopedi Okobo

Provision and instalation of solar

powered street light at Okopedi Okobo250,000,000 - 75,000,000 30,000,000

80Energy/Power

SupplyEket Eket Solar Street Light at Eket 229,303,922 61,579,421 55,720,853 30,000,000

81Energy/Power

SupplyUyo Ibiono

Construction of 2Nos 132/33 Nos

60X40 MVA substation and

distribution at Uyo and Ibiono

500,000,000 - 67,500,000 30,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 8 of 55

Page 74: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

82Energy/Power

SupplyEbighi Nda Okobo

Electrification project: Ebighi Nda,

Atabong/Atak Oro Communities (Phase

11)

179,841,589 90,921,767 25,146,127 25,000,000

83Energy/Power

SupplyEwet Housing Uyo

Solar Street light at Ewet Housing and

Shelter Afrique Estate, Uyo 149,750,000 - 100,000,000 25,000,000

84Energy/ Power

SupplyAmmong Okobo

Solar Powered Street Light along

NDDC Community Centre Road and

Environs

260,000,000 - 90,000,000 20,000,000

85Energy/ Power

Supply

Minya, Ukpum

Minya clanMkpat Enin Electrification project 29,998,578 4,499,787 17,324,520 20,000,000

86Energy/Power

SupplyVarious Various

Rehabilitation of solar street lights

and feasibility study of total capacity

of installed Renewal Energy by the

NDDC

250,000,000 37,500,000

87Energy/ Power

SupplyMbak Atai Itu Solar Street Light Phase 2 100,000,000 - 75,000,000 15,000,000

88Energy/ Power

SupplyEket Eket

Solar Street light in Eket Federal

Constituency 75,000,000 - 75,000,000 11,250,000

89Energy/ Power

SupplyIkot Abasi Ikot Abasi

Solar Street light in Ikot Abasi

Federal Constituency 75,000,000 - 75,000,000 11,250,000

90Energy/ Power

SupplyUyo Uyo

Installation of 50 No., 50KVA,

11/0.415KV CSP, HVDS Transformers

Complete with Aerial Bundled

Conductors in Central Uyo, Akwa Ibom

State.

250,000,000 37,500,000

91Energy/ Power

SupplyOron Oron

Solar Street light in Oron Federal

Constituency 75,000,000 - 11,250,000 11,250,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 9 of 55

Page 75: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

92Energy/ Power

SupplyUyo Ibino Ibom Solar street light at Uyo, Itam-Ididep, 75,000,000 - 50,000,000 11,250,000

93Energy/ Power

SupplyIkot Ibok Etinan

Rural Electrification project in Ikot

Ibok Communities in Etinan LGA 50,461,551 30,555,842 16,349,542 7,569,233

94Energy/ Power

SupplyIkot Abasi Ikot Abasi

Connecting Ibom Power Plant

Electricity to Ikot Abasi Communities 150,000,000 15,000,000 15,000,000

95Energy/Power

SupplyOkopedi Okobo

Provision and installation of solar

powered street light at Okopedi

Okobo, Okopedi in Okobo LGA (Phase

1)

250,000,000 37,500,000

96Energy And

PowerIbiono Ibiono

Installation of solar powered street

lights in sundry Ibiono communities. 240,000,000 36,000,000 50,000,000 15,000,000

97Energy/ Power

SupplyAfia Nsit Nsit Ibom

Supply and instalation of 500/33KVA

transformer 3nos in Afiah Nsit Urua

Nko in Nsit Ibom

50,000,000 - 7,500,000 7,500,000

98Energy/ Power

SupplyAfaha Obong Abak

Electrification of Uruk Obong and Ikot

Ndue in Afaha Obong

99Energy/ Power

SupplyEdiene Ikono

Electrification of Ikot Akpan Udo in

Ediene

100Total Energy/

Power Supply 42,158,348,667 1,007,357,629 3,680,012,936 2,775,419,233

101 Health Uyo Uyo

Construction of 2 storey maternity

block for pregnant women and

provision of electricity services and

stand by generator at University of

Uyo teaching Hospital.

350,000,000 86,314,235 52,500,000 52,500,000

102 Health AKS3 Senatorial

district

Rehabilitation/Furnishing of Health

Facilities in the State 350,000,000 52,500,000 47,250,000 40,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 10 of 55

Page 76: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

103 Health Etip Ediene IkonoRehabilitation of Health Centre at Etip

Ediene 150,000,000 - 36,450,000 22,500,000

104 Health Ibekwe Ikot AbasiRehabilitation of General Hospital-Ikot

Abasi Urban 250,000,000 - 33,750,000 37,500,000

105 Health Okoroli Construction of Health Centre, Okoroli 150,000,000 22,500,000

106 Health Ibiono IbionoConstruction of NDDC standard

Hospital at Ibiono 100,000,000 - 13,500,000 15,000,000

107 Health Abak

Construction and Equipping of 50 Bed

Space Ward and Renovation of Offices

and Wards at Mercy Hospital

108 Total Health 1,350,000,000 138,814,235 183,450,000 190,000,000

109Jetty/Shore

ProtectionUyo Uyo

Sandfilling of Akwa Ibom State

University Site-(Lots 1 to 3) 3,000,000,000 - 600,000,000 120,000,000

110Jetty/Shore

Protection

Ibaka Naval

BaseMbo Jetty Construction at Mbo Naval Base 1,512,967,031 812,076,426 100,000,000 100,000,000

111Jetty/Shore

Protection

Idung

AtangedemEsit Eket

Canalisation/Embarkment of Idung

Atang Edem Beach 850,000,000 - 425,000,000 100,000,000

112Jetty/Shore

ProtectionEastern Obolo Mkpat Enin

Shoreline Protection/Reclamation at

Okoro-Ete/Mkpat Enin 6,000,000,000 - 410,000,000 100,000,000

113Jetty/Shore

Protection

Ekeya

CommunityOkobo

Gully Erosion control works at Ekeya

community and Ammong Okobo 700,000,000 - 105,000,000 75,000,000

114Jetty/Shore

ProtectionIko Eastern Obolo

Sand filling and shore protection in Iko

town in Eastern Obolo LGA (3ha

sandfilling + 1.65km shoreline)

2,220,469,674 555,530,635 100,000,000 50,000,000

115Jetty/Shore

ProtectionAmamong Okobo

Fencing , Landscaping and erosion

control at NDDC communities/ at

Amamong Okobo

300,000,000 - 45,000,000 35,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 11 of 55

Page 77: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

116Jetty/Shore

ProtectionIkot-Abasi Ikot-Abasi Jetty/Shore Protection 200,000,000 30,000,000 31,500,000 35,000,000

117Jetty/Shore

ProtectionAyadehe/itu Itu

Construction of Jetty at Ayadehe/Itu

Bridge 200,000,000 - 27,000,000 27,000,000

118Jetty/Shore

Protection

Ikpa Ibekwe

ClanIkot Abasi

Construction of a Shoreline Protection

& Jetty Facilities @ Uta Ewa, UAC

beach & its environs (design)

50,000,000 - 20,250,000 7,500,000

119

Total

Jetty/Shore

Protection

15,033,436,705 1,397,607,061 1,863,750,000 649,500,000

120 Roads/Bridges

Iko

Atabrikang

Akata - Iwuo

Ibeno/Easter

n Obolo

Iko Atabrikang- Akata – Opolom – Ikot

Inwang – Okot Utip – Iwuo Achang

road

2,500,000,000 1,642,208,873 104,338,454 200,000,000

121 Roads/Bridges Eket IbenoConstruction of Eket-Qit-Ibeno Road

in Partnership with Mobil and AKSG10,000,000,000 - 1,100,000,000 400,000,000

122 Roads/BridgesIdung

Atangedem

Esit

Eket/Ibeno

Construction of Idung Atangedem-Ine

Akpautong /Atlantic ocean road Lots 1-

Lots 7

6,000,000,000 - 500,000,000 400,000,000

123 Roads/ Bridges Essien UdimConstruction of Ukana Uwa East Via

Offok Via Annang (5Km) (Lot 1-3)500,000,000 80,000,000

124 Roads/Bridges

Oko Ita-Itu-

Mbak Atai-

Ikot Ntu-

Mkpeti-Oku

Iboku Road

Oku IbokuConstruction of Oko Ita-Itu-Mbak

Atai-Ikot Ntu-Mkpeti-Oku Iboku Road 4,720,000,000 - 440,500,000 300,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 12 of 55

Page 78: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

125 Roads/Bridges Ikot Ekwere Nsit UbiumConstruction of Ikot Ekwere

Ndukpoise road3,128,468,774 710,245,615 219,016,343 250,000,000

126 Roads/Bridges Ididep-IbionoItu/Ibiono

Ibom

Construction of Ididep-Ikot Odiong-

Ikot Ibiono road/bridge2,112,393,308 - 305,000,000 285,000,000

127 Roads/Bridges Orukim MboOrukim-Unyenge-Eto Esek-Okom Ita

Okposo Road/Bridge6,035,365,875 - 364,500,000 300,000,000

128 Roads/ BridgesIkot Uko-

Odoro

Ikot Essien

Udim

Construction of road network at Ikot

Uko-Odoro, Ikot Essien Udim LGA 200,000,000 30,000,000

129 Roads/Bridges Oku - Iboku Itu Construction of Internal Roads 850,000,000 - 103,275,000 127,500,000

130 Roads/Bridges Anua UyoConstruction of Anua/Ifa Ikot

Okpon/Isiet Beach in Uyo LGA900,000,000 - 135,000,000 135,000,000

131 Roads/Bridges Upenekang Ibeno

Construction of Upenekang / Esit Eket

road junction - Inua Eyet - Okposo

Road Phase 1

7,575,048,995 - - 300,000,000

132 Roads/Bridges Ikot Ekong Onna / IbenoConstruction of Ikot Ekong - Ntafre -

Opolom - Ikot Inioang Road 12,095,999,502 - - 300,000,000

133 Roads/ Bridges Uyo UyoConstruction of 1km Depfamco road

off General Akpan Avenue 100,000,000 15,000,000

134 Roads/BridgesOkobo/Urueo

ffong/OrukoMbo

Construction of Oyoku-Assang-Eweme-

Okiuso Road with Spure (18km)2,572,691,540 - 231,582,021 231,582,021

135 Roads/Bridges Nsasak Essien Udium

Construction of Nsasak - Urua Akpan -

Okon Urua Inyang, Es lga,in Akwa Ibom

State

5,819,165,841 4,546,272,357 500,000,000 200,000,000

136 Roads/Bridges Eket-EsitMbo/Esit

Eket

Rehabilitation/Reconstruction of Eket

James Town Road (Lots 1&2) with a

spur to Oruko (Lots 1-5)

4,000,000,000 107,325,345 750,000,000 200,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 13 of 55

Page 79: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

137 Roads/ Bridges

Ukpom Ita-

Ibakachi

Ukpom Unya

IkonoConstruction of Ukpom Ita-Ibakachi

Ukpom Unya road 245,000,000 36,750,000

138 Roads/Bridges odoro Atan Mkpat Enin

Construction of Odoro Atan-Ikot

Ekpang-Ikot Inyang-okop Odoro Ikot

baete Road

3,441,325,540 490,388,889 1,000,000,000 200,000,000

139 Roads/Bridges Various Various Emergency Road Repairs 1,000,000,000 708,691,375 1,000,000,000 200,000,000

140 Roads/Bridges Itu /Ibino Itu

Construction of Ikot Ebom-Afaha Obio

Eno-Okpoto -Uyuat-Nsan Road and

Bridges

2,855,474,332 1,356,867,153 168,925,307 200,000,000

141 Roads/Bridges Ikot nya UyoConstruction of Uyo Itam - Ekit Itam -

Ikot Nya Road,in Akwa Ibom State3,173,399,749 749,932,484 304,568,069 200,000,000

142 Roads/BridgesIdidep-

EkpenyongIbino Ibom

Construction of Ididep-Ekpenyoung-

Ikot Etim-Afaha Itiat Road2,587,086,259 1,024,395,177 162,000,000 200,000,000

143 Roads/Bridges Iko Ekwa EketConstruction of Iko Ekwa - Afaha Atai

road and three adjoirning streets 600,000,000 - 72,900,000 72,900,000

144 Road/ bridges

Ikom, Old

forestry

Quarters

Ikom

Construction of road with drainage at

Mansion crescent by old forestry

quarters 4 corner Ikom LGA

200,000,000 30,000,000

145 Roads/Bridges Urua Akpan Essium UdimConstruction of Urua-Akpan-Okon-Ikot

Osukpong Urua Inyang road 4,172,816,584 1,558,757,204 600,000,000 200,000,000

146 Roads/Bridges Oron Oron-MboConstruction of Oron-Ewang-Ibaka

Road6,500,000,000 - 450,000,000 175,000,000

147 Roads/BridgesMbikpong-

Ikot

Ibesikpo

Asutan

Construction of Mbikpong-Ikot Udo

Ekpo- Mbiokporo Road1,000,000,000 626,538,901 81,000,000 175,000,000

148 Roads/ Bridges Ikot EbokConstruction of 2km road network at

Ikot Ebok-Ekot-Idoro Ikot Road 250,000,000 37,500,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 14 of 55

Page 80: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

149 Roads/Bridges Iwuo Achang IbenoConstruction of Iwuochang -

Upenekang - QIT road junction3,780,739,260 - 510,399,800 150,000,000

150 Roads/Bridges Ikpa Esit EketIkpa Town - Ikot Akpeudo Ibiemem

Road. (22)ontrol Project Phase 1 4,991,282,489 748,692,373 235,838,098 150,000,000

151 Roads/Bridges

Okossi-

Mbokpu

Eyokan-

Ubudung

Etebi Road

UreffongOru

ko Esit Eket

and Okobo

Okossi-Mbokpu Eyokan-Ubudung Etebi

Road spur Ikpe - Udung Awana Okossi-

Mbokpu Oduobo Rd.

2,974,553,865 1,289,128,559 450,000,000 150,000,000

152 Roads/ Bridges Ikot-Ekpene Ikot-Ekpene

Construction of Ikot-Ekpene village

roads through NEPA line Nto-NNem

Villlage hall Layout Ituak-Abang in Ikot-

Ekpene L.G.A (Phase 1)

200,000,000 30,000,000

153 Roads/Bridges Ikot Esang OnnaConstruction of Ikot Esang -Ikot

Akpan Nko-Atiamkpat-Ikot Ese Isiet 850,000,000 - 103,275,000 150,000,000

154 Roads/Bridges Ikot isongConstruction of Ikot Isong Ekpere

Obom Ndon Eyo-Nya Odiong Road 3,377,567,118 2,116,002,447 350,000,000 150,000,000

155 Roads/Bridges Esit Eket Esit EketConstruction of Esit Eket Internal

roads phase 2 Lots 1 - Lots 53,897,000,000 1,064,255,537 198,863,910 150,000,000

156 Roads/Bridges Ikot Eka ItuConstruction of Ikot Eka Iko- Ikot

Essien Link road, Oku Iboku. 240,000,000 - 69,100,000 150,000,000

157 Roads/ Bridges Akpan Abia IbesikpoConstruction of Ikot Apkan Abia new

road, Ibesikpo LGA 200,000,000 30,000,000

158 Roads/Bridges Eket Urban EketConstruction of internal road network

in Eket Urban Lots 1-4 5,000,000,000 1,500,000,000 150,000,000

159 Roads/Bridges Eket Urban EketConstruction of internal road network

in Eket Urban, Phase 3, Lot 1-4 2,000,000,000 1,000,000,000 150,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 15 of 55

Page 81: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

160 Road/Bridges Various Various

Emergency Road

Repairs/Rehabilitation in Akwa Ibom

State

2,000,000,000 300,000,000 150,000,000

161 Roads/ Bridges Idoro-Ikot

Uyo, Uran,

Nsit Atai,

Ibesikpo

Asutan

Construction of Idoroko-ikot Idara

Itam Road (Phase1) 250,000,000 37,500,000

162 Roads/Bridges Uda - Oruko MboConstruction of Uda - Oduonim - Oruko

road (Lots 1-6) 1,500,000,000 225,000,000 150,000,000

163 Roads/Bridges Obong Itam Uyo/Uruan

Construction of Obong Itam - Ekit

Itam - Mbiaya Uruan - Ikpa -Mbiakong -

Idu Uruan road (Phase I)

950,000,000 142,500,000 142,500,000

164 Roads/ Bridges Idoro-Ikot

Uyo, Uran,

Nsit Atai,

Ibesikpo

Asutan

Construction of Idoroko-ikot Idara

Itam Road (Phase 2) 250,000,000 37,500,000

165 Roads/BridgesEkparakwa

NdiyaOruk Anam

Construction of Ekparakwa Ndiya Road

with Spur to Ikot Obi Eka - Ikot Ibok

Junction - Ikot Mfon

2,097,658,472 1,097,723,161 180,000,000 130,000,000

166 Roads/Bridges

Construction of Nduetong Ibiaku-

Mbiaya Uruan-Ikot Adaidem-Otoabasi-

Idoro road

1,400,000,000 - 130,100,000 130,000,000

167 Roads/Bridges Esit Eket Esit EketConstruction of internal Roads with

side drains in Esit-Eket(16.749km) 3,782,902,555 1,924,251,317 240,147,473 120,000,000

168 Roads/Bridges Eket Eket Eket internal roads 600,000,000 - 174,960,000 120,000,000

169 Roads/Bridges Awatong

Construction of Awantong -Oniong -

Ikot Akpan Obioekot-Nkana-Ikot

Nsung road

700,000,000 - 105,000,000 105,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 16 of 55

Page 82: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

170 Roads/Bridges Nditia EketConstruction of Nditia - Odio road

with bridges, Eket3,000,000,000 - 450,000,000 100,000,000

171 Roads/Bridges Ikot Andem ItuIdidep Junction-Ikot Andem –Itam-

Mbiatok 2,249,891,245 - - 100,000,000

172 Roads/ Bridges AfuaAkwa Ibom

North East

Construction of Afua-Idoro –Ikot-

Ekwere Road. (Lot 1-4)750,000,000 112,500,000

173 Roads/ BridgesShelter

Afrique Uyo

Construction of 2 km road at Shelter

Afrique Uyo, Akwa Ibom. 250,000,000 37,500,000

174 Roads/BridgesAtak

Oro/OkoboOkobo

Construction of Internal Roads in Atak

Oro and Okobo Development Areas800,000,000 11,984,000 120,000,000 100,000,000

175 Roads/Bridges Ibeno Ibeno Inuayet Ikot-Okposo road 2,838,618,466 425,792,770 - 100,000,000

176 Roads/Bridges Afia Nsit Nsit Ibom

Construction of Afia Nsit Ikot Abasi

Ufat - Ikot Mbang Road (13km + 45m

bridge)

2,461,067,735 821,730,983 350,000,000 100,000,000

177 Roads/Bridges Ikot Ayan Etinan

Construction of Ikot Ayan-Ikot

Ekpeyak-Ikot Ofon-Ikot Nsung-Ikot

Enyihe-Ikot Ebo-Anan Road

1,776,561,710 266,484,257 204,917,915 100,000,000

178 Roads/Bridges Afia Nsit Nsit Ubium Construction of Afia Nsit-Ofriyo 248,399,175 37,259,876 33,920,861 100,000,000

179 Roads/Bridges Eastern Obolo Eastern OboloConstruction of Internal roads in

Eastern Obolo Lot 1 2,858,563,500 583,007,845 252,080,550 100,000,000

180 Roads/Bridges Eastern Obolo Eastern OboloConstruction of Internal roads in

Eastern Obolo Lot 2 1,824,873,729 615,121,951 237,814,772 100,000,000

181 Roads/Bridges uyo Uyo Internal roads 600,000,000 - 109,350,000 100,000,000

182 Roads/Bridges Edemeya Ikot Abasi Internal roads 750,000,000 90,147,938 109,350,000 100,000,000

183 Roads/Bridges Edem-Urua IkonoConstruction of Edem Iyere-Edem

Urua-Usuk Obio Edere Road (10km)950,000,000 - 115,425,000 100,000,000

184 Roads/ Bridges Eyo Abasi Oron Construction of Eyo Abasi / Uya Oro

road, Oron LGA (2.5Km)250,000,000 50,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 17 of 55

Page 83: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

185 Roads/Bridges Ikot Abasi EtinanConstruction of Ikot Abasi no

1/Ekpene Obom road (5Km)2,568,000,000 - 131,045,040 100,000,000

186 Roads/BridgesIfiayong

Nwanibauruan

Construction of 1.1km multiple rural

roads network within Ifiayong 239,057,500 146,902,071 92,155,429 92,155,429

187 Roads/Bridges Ifiayong Uruan

Road 2A: Government School Road,

(Ifiayong Esuk Main park - Meridian

Border - Nwaniba)

196,566,150 29,484,923 75,028,891 58,969,845

188 Roads/ Bridges Uyo

Uyo, Uran,

Nsit Atai,

Ibesikpo

Asutan

Access road to Uyo Paramount ruler’s

house (Phase 1) 250,000,000 37,500,000

189 Roads/ Bridges ObotAkwa Ibom

North East

Construction of Obot-Ukom-Ntah-Ntan-

Mbet Beach Road. (Lot 1-4)750,000,000 112,500,000

190 Roads/Bridges Mbiabong IniConstruction of Mbiabong – Nkari road,

Ini LGA.700,000,000 105,000,000 80,000,000

191 Roads/Bridges Ikpe Ikot Nko Ini/IbionoConstruction of Ikpe Ikot Nkon - Ukpa

Okon - Ikpanya road700,000,000 105,000,000 80,000,000

192 Roads/Bridges Uya OronDualisation of 5km Uya Oro Junction

with Bridge to Oron Ferry Point 2,359,890,253 - 353,983,538 80,000,000

193 Roads/Bridges Ikot Ekpuk ituConstruction of Ikot Ekpuk Road off

Calabar-Itu Highway 214,762,250 131,626,681 83,135,569 80,000,000

194 Roads/ Bridges Uyo Uyo

Construction of 1km Paul Ekpo crescent

with Spur Shelter Afrique Housing

Estate

100,000,000 15,000,000

195 Roads/Bridges Ikot Akpeudo Nsit UbiumConstruction of Ikot Akpeudo link

Road, Nsit Ubium 175,000,000 26,200,000 - 80,000,000

196 Roads/Bridges Ewang Mbo Construction of Internal road at Ewang 400,000,000 28,258,003 54,000,000 75,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 18 of 55

Page 84: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

197 Roads/Bridges Uko Akpan MboRehabilitation of Uko Akpan Uyenge

road400,000,000 - 54,000,000 75,000,000

198 Roads/Bridges Ekim ItuConstruction of Ekim Itam Itu bridge -

Atan Onyom2,000,000,000 - 300,000,000 75,000,000

199 Roads/Bridges Enen Atai ItuConstruction of Enen Atai – Ikot Annie

Itam – Ikot Ayan road, 500,000,000 75,000,000 75,000,000

200 Roads/Bridges Essien Udim Essien UdimConstruction of internal road in Essien

Udim236,338,100 35,450,715 58,578,761 75,000,000

201 Roads/Bridges Ibiaku Ikono/Ibiono

Construction of Ibiaku-Ikot Udom-

Eshiet-Mbiabong Edik-Akrah

Communities

460,000,000 - 48,600,000 75,000,000

202 Roads/Bridges Atai Obio IkonoConstruction of Atai Obio Eiana-Idoro-

Ikot Onwa-IbahachiRoad(8km)850,000,000 - 103,275,000 75,000,000

203 Roads/Bridges Ibiaku IbionoConstruction of Ibiaku Ikot Udom

Eshiet-Edik road800,000,000 - 162,000,000 75,000,000

204 Roads/BridgesIfiayong

Nwanibauruan

Construction of 0.065m Multiple Rural

Roads network within Ifiayong-

Nwaniba Area of Uruan(Road 1A: Ifiat

Esuk Street(Nwaniba Post office-

Ifiayong)

144,602,350 76,334,582 68,267,768 68,267,768

205 Roads/Bridges Ibiono Ibiono Construction of Ibiono internal road 191,221,222 103,983,183 81,000,000 68,000,000

206 Roads/ BridgesOkorote

AmadakaConstruction of Okorote Amadaka road 240,000,000 36,000,000

207 Roads/Bridges Ikot Abasi Ikot Abasi1km road at Federal Housing Estate

Phase 2 136,508,635 68,523,542 67,473,000 67,473,000

208 Roads/Bridges Etinan EtinanConstruction of 1km Internal Road in

Etinan245,000,000 66,399,690 67,473,000 67,473,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 19 of 55

Page 85: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

209 Roads/BridgesUkana Ikot

Idem

Essien Udim

LGA

Construction of Community ring

Road/Drainage in Ukana Ikot Ideh245,000,000 36,750,000 67,473,000 67,473,000

210 Roads/BridgesIfiayong

Nwanibauruan

Construction of 0.065m Multiple Rural

Roads network within Ifiayong-

Nwaniba Area of Uruan(Road 1B: Ifiat

Esuk Street(Nwaniba Post office-

Ifiayong)

144,087,350 76,887,940 67,199,410 67,199,410

211 Roads/Bridges Ikot Ebo EtinanConstruction of Internal Roads in Ikot

Ebo230,000,000 166,466,126 63,342,000 63,342,000

212 Roads/Bridges Usoro EketConstruction of Usoro Usoro Street in

Eket248,870,550 37,330,583 61,685,055 61,685,055

213 Roads/Bridges Imuk Eket Construction of Udo Imuk road 248,870,550 37,330,583 61,685,055 61,685,055

214 Roads/Bridges Omumuyam Etim Ekpo Construction of Omumuya internal

roads242,667,840 36,400,176 60,147,651 61,685,055

215 Roads/Bridges Nto Nso UkanafunConstruction of Nto Nso II -

Umubueze I road245,000,000 36,750,000 60,725,700 61,685,055

216 Roads/Bridges Edem Iyere IkonoEdem Iyere - Ikono Road / Erosion

Control224,413,970 111,184,828 60,725,700 60,725,700

217 Roads/ BridgesAbat-town-

EsugEtim Ekpo

Construction of Abat-town- Esug road

in Etim Ekpo Local Govt. 200,000,000 30,000,000

218 Roads/Bridges IKOT NKO ITU IBIONO

Construction of Ikot – Nko Junction

–Obong Itam –Afua – Idoro –Usuk

Inyang road

400,000,000 60,000,000 60,000,000

219 Roads/Bridges Afi Eket

Construction of Access road to Afi-

Iwaad Ekid Hqtrs Building off Eket-

Ibeno Road phase 1

980,000,000 - 294,000,000 60,000,000

220 Roads/Bridges Edemaya Edemaya community roads Phase I 978,000,000 146,700,000

221 Roads/Bridges Edemaya Edemaya community roads Phase II 899,000,000 134,850,000

222 Roads/Bridges Edemaya Edemaya community roads Phase III 950,000,000 142,500,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 20 of 55

Page 86: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

223 Roads/Bridges OkoroliConstruction of 6km okoroli internal

roads700,000,000 105,000,000

224 Roads/Bridges IbekweConstruction of 2km Enobong Ufot

street, off Ike Oby road, Ibekwe250,000,000 37,500,000

225 Roads/Bridges Itam ItuConstruction of 25km Mbak Atai -

Afaha Itam 1 road, Itam, Itu LGA4,500,000,000 675,000,000

226 Roads/BridgesUtu Ikot

Ekpenyong

Construction of 3km Utu Ikot

Ekpenyong community road and spur350,000,000 52,500,000

227 Roads/BridgesUwa-Nto

EtomObot Akara

Construction of 6km Uwa-Nto Etom

road with spur700,000,000 105,000,000

228 Roads/BridgesMbia bum-

NdiyanIkono

Construction of internal road in

Mbiabum-Ndiyan -Okpo in Ikono400,000,000 - 60,000,000 60,000,000

229 Roads/Bridges Uyo UyoDualisation of University of Uyo

Internal Roads500,000,000 - 75,000,000 60,000,000

230 Roads/Bridges Atai Afaha ItuConstruction of Mbak I Atai Afaha

road (3km) in Itu370,000,000 - 55,500,000 55,500,000

231 Roads/Bridges Ikot Ebekpo OnnaConstruction of Ikot Akpatek Ikot

Ebekpo Ikot Enwang road 246,400,250 94,371,527 75,398,477 55,398,477

232 Roads/Bridges Eniong UyoConst. of Ini Okpon Udo, Off Udo Ekpo

in Eniong Community225,798,608 172,026,905 53,771,703 53,771,703

233 Roads/Bridges Edim Inyang MboConstruction of Edim Inyang-Udung

Who/Esuk Uda250,000,000 - 30,375,000 37,500,000

234 Roads/Bridges Upenekang IbenoConstruction of Internal Roads at

Ibeno headquarters - Upenekang 666,818,153 438,375,056 105,000,000 50,000,000

235 Roads/ Bridges Ikot-Ekpene Ikot-Ekpene

Construction of Ikot-Ekpene village

roads through NEPA line Nto-NNem

Villlage hall Layout Ituak-Abang in Ikot-

Ekpene L.G.A (Phase2)

100,000,000 15,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 21 of 55

Page 87: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

236 Roads/BridgesAkpautong/Af

ia EkpeneEsit Eket

Construction of Akpautong School

road, Adede- Afia Ekpene with Spurs

to Ikot Mbata (20Km)

600,000,000 - 90,000,000 50,000,000

237 Roads/Bridges Etinan EtinanConstruction of Internal Roads in

Etinan town 245,000,000 154,349,471 88,200,000 50,000,000

238 Roads/Bridges AsunaEtinan / Nsit

Ibom

Construction of Mkpafi Market - Ayam

- Assanga Usung Road 249,993,382 109,648,809 76,497,975 50,000,000

239 Roads/Bridges Ibiono ItuConstruction of 10 No. Culverts/mini

bridges at Ibiono/Itu axis 200,000,000 - 27,000,000 30,000,000

240 Roads/Bridges Uyo UyoConstruction of Nwaniba / Nsukara

Offor Rd 174,231,225 92,375,872 6,490,859 50,000,000

241 Road/ Bridges Essien Udim Essien UdimConstruction of internal road in Essien

Udim (phase II)247,338,100 37,100,715 75,685,459 50,000,000

242 Road/ Bridges Mbiaya Uruan Uruan Construction of Mbiaya Uruan - 200,000,000 - 72,000,000 50,000,000

243 Road/ Bridges Udo edong UyoConst. of Udo Edong Street in Ekamba

Nsukara - Offot 250,000,000 37,500,000 32,142,393 50,000,000

244 Road/ Bridges Ifiayong UruanConstruction of Holy Trinity Primary

School Road, Obot Ifiayong 212,997,250 98,106,434 58,659,443 50,000,000

245 Road/Bridges Abat Nya Mkpat Enin

Construction of 3km Abat Nya Ufet

Okoro Road with Drains in Mkpat Enin

LGA

248,000,000 37,200,000

246 Road/ Bridges Mbiakong Uruan Construction of Mbiakong Road,

Mbiakong 229,613,655 79,491,507 63,235,601 50,000,000

247 Road/ Bridges Ikot Ekpene Ikot Ekpene

Construction of School of Nursing

Road/walkway with spur to Essien Nton

road

249,350,000 37,402,500 61,803,891 50,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 22 of 55

Page 88: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

248 Road/ Bridges Ifiayong Nwaniba

Construction of multiple Rural Road

Network within Ifiayong-Nwaniba area

of Uruan( Road 2B: Government School

Road,Usuk Main Park-Meridian Boarder

184,765,000 - 19,949,347 27,714,750

249 Road/ Bridges Ifa Atai Etoi UyoConstruction of Mma Teacher Akpasak

Road off Ifa Ikot Obong Road 134,234,500 - 72,900,000 20,135,175

250 Road/ Bridges Atabong Eket Edu Close Off Editing Street 195,931,450 27,075,147 44,738,973 50,000,000

251 Road/ Bridges Eduo Okon

Usung Urun Udo Iyang Ikot Ekpene

Uso Ikot Ukodom road opposite

Apostolic Church

121,435,500 18,215,325 33,443,337 50,000,000

252 Road/ Bridges

Inen Ikot

Essien Ikpe

Akpa/ Obo

Nsehe

Ukanafun Construction of 1km road 100,000,000 - 32,400,000 15,000,000

253 Road/ Bridges Nto Edino NyateyinConstruction of Nyateyin Offiong Eto

Nto Udo Nto Edina Road240,000,000 - 37,260,000 36,000,000

254 Road/ Bridges Oruko Mbo Construction of 1km Road 180,000,000 - 21,870,000 50,000,000

255 Road/ BridgesMbak Atai /

Ikot EmaItu

Construction of Edere Mbak-Akpa

Utong-Edem Edik-Ikot Emah Road 249,000,000 212,685,151 36,314,849 36,314,849

256 Road/ Bridges OkoboUrueffong

/Mbo

Construction of boro-Oruko-Udesi

Road .90,000,000 13,500,000 24,786,000 50,000,000

257 Roads/BridgesOdiono/Isutib

eIkot Abasi Construction of Aba Eto Road 250,000,000 - 30,375,000 37,500,000

258 Roads/Bridges Ekpuk Inang Ikot Abasi Construction of Owok Akpan Rd 250,000,000 - 30,375,000 37,500,000

259 Roads/Bridges Ikot Ekpe. Mkpat Enin Construction of Ikot Ekpe Rd 250,000,000 - 30,375,000 37,500,000

260 Roads/Bridges Bassey Isoh Uyo Bassey Isoh Road, off Aka Item Road 205,000,000 - 102,500,000 30,750,000

261 Roads/Bridges Udung Eyo Mbo Udung Eyo Road at Uyenghe Road 230,000,000 - 115,000,000 34,500,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 23 of 55

Page 89: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

262 Roads/Bridges Ibaka Mbo East-West Ibaka Road 211,500,000 - 25,697,250 31,725,000

263 Roads/Bridges Ikot Uboh Nsit Atai Ikot Uboh 1.3km Road 231,000,000 - 28,066,500 34,650,000

264 Roads/Bridges Ikot Ubok Nsit AtaiIkot Ubok Udom-Ikot Abasi Road

1.2km245,000,000 - 29,767,500 36,750,000

265 Roads/Bridges Ekpo/NkoConstruction of Ekpo/Nko internal

Roads 500,000,000 - 60,750,000 50,000,000

266 Roads/Bridges Obong Itam ItuConstrction of Internal road at Obong

Itam Enobong Nkang 300,000,000 - 36,450,000 45,000,000

267 Roads/Bridges Aka Ikot IkonoConstruction of Aka Ikot Udo Eno

Ediene Ikono road 400,000,000 - 48,600,000 50,000,000

268 Roads/Bridges Mbak Atai Itu

Construction of Mbak Atai ring road

(Edere Mbak-Ikot Enwan-Akpa Utong-

Ekeng-Edem Edit

249,000,000 - 83,000,000 37,350,000

269 Roads/Bridges Afaha Uqua EketConstruction of Archibong street link

road in Afaha Uqua.230,000,000 - 35,000,000 34,500,000

270 Roads/Bridges Mkpot-Ukat OnnaConstruction of Mkpot-Ukat road,

Onna250,000,000 - 37,500,000 37,500,000

271 Roads/Bridges Uyo UyoConstruction of Ita Mbaba road and

environs, shelter Afrique Estate Uyo250,000,000 - 37,500,000 37,500,000

272 Road/ Bridges Etonk Iton IkonoConstruction of Etonk Iton road (Phase

1)246,000,000 - 29,889,000 36,900,000

273 Roads/Bridges Ndon Ebom uruan Ndon Ebom Internal Roads 300,000,000 - 36,450,000 45,000,000

274 Roads/Bridges Nung Atai Uyo Construction of Nung Atai Road 104,988,000 51,319,122 37,013,695 15,748,200

275 Roads/Bridges Obio Eka Etinan

Construction of Ikot Obio Eka - Ikot

Ibok-Ikot Mfon - Ikot Ibok - Efa

roads (Design)

900,000,000 50,000,000 50,000,000

276 Roads/Bridges Eket EketConstruction of Ikot Ibiok - Iko Nsong

- Ndito Eka Iba road (Design) 10,000,000,000 50,000,000 50,000,000

277 Roads/Bridges Abat Uyo Industrial Layout Road 175,450,310 26,317,547 48,319,015 50,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 24 of 55

Page 90: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

278 Roads/Bridges Etoi Uyo

Construction of Udobong St. Ukpe

Crescent Akpan street, Anna Offot,

Etoi

250,000,000 37,500,000 37,500,000

279 Roads/Bridges

Inyang -

Udunghwo/Es

uk Udo

Mbo

Constryction of Inyang -

Udunghwo/Esuk Udo road Phase II

(Lots 1-2)

500,000,000 75,000,000 50,000,000

280 Roads/Bridges Ifiayong Uruan

Construction of 0.9Km Multiple rural

roads network Ifiayong - Nwaniba area

of Uruan Road 4A

192,500,000 - - 28,875,000

281 Roads/Bridges Aneng Afaha UyoConstruction of Aneng Afaha Road off

Ekpene Road Nung Ukot Itam, Uyo 212,815,660 88,602,035 - 31,922,349

282 Roads/Bridges Fulga UyoConstruction of Fulga street off Ikot

Ekpene road 110,449,250 - - 16,567,388

283 Roads/BridgesAtadung -

AfahaEket

Construction of Atadung Afah-Etebi

Ikot Udita Afaha Road 196,517,750 39,745,516 - 29,477,663

284 Roads/Bridges Ikot Ubo

Akpe-Mkpa

Construction of Ikot Ubo Akpe-Mkpat

Enin Road 186,750,000 - - 28,012,500

285 Roads/Bridges Oron Oron

Construction of Interlocking Concrete

Road 0.9km with concrete side drains

at deeper life avenue, off PHCN oron

road or All stars clubhouse

218,000,000 - 26,487,000 32,700,000

286 Roads/ Bridges Atan Ikpe Ikot Abasi

Abandonment of Atan Ikpe Concrete

bridge project in Edemaya clan, Ikot

Abasi LGA of Akwa Ibom

250,000,000 37,500,000

287 Roads/BridgesAtia Mkpat

StreetUyo Construction Of Atia Mkpat Street 100,000,000 - - 15,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 25 of 55

Page 91: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

288 Roads/Bridges

Ikot Eka Iko

Road, Oku

Iboku

ItuConstruction Of Ikot Eka Iko Road,

Oku Iboku 100,000,000 - - 15,000,000

289 Roads/BridgesEkpenyong

Urua Street,Uyo

Construction Of Ekpenyong Urua

Street, Mbiabong Ikot Akpan 100,000,000 - - 15,000,000

290 Roads/Bridges Oruko Mbo Construction of 1km Road 180,000,000 - - 27,000,000

291 Roads/ Bridges UyoConstruction of 2KM Road in Shelter

Afrique in Uyo -

292 Roads/Bridges Afaha EtokIbesikpo

Asutan

Construction of Afaha Etok - Ikot

Obio Nkan Link Road 200,000,000 -

293 Roads/Bridges Afia Nsit UyoConstruction of Afia Nsit Nkara Ayan

Road 240,000,000 190,643,500 49,356,500 49,356,500

294 Roads/Bridges FHE Ikot AbasiFederal Low Cost Housing Estate, Road

(1Km) Ikot Etetuk 97,924,601 37,257,137 48,600,000 48,600,000

295 Roads/BridgesUdo Ekot

StreetUyo

Construction of Udo Ekot Street in

Mbiabong Etoi, Uyo 105,000,000 -

296 Roads/Bridges Etinan Etinan Construction of 4km Rd in Etinan

Urban200,000,000 30,000,000 55,080,000 45,080,000

297 Roads/Bridges Uyo UyoConstruction of Emco Lane, Uyo phase

283,075,850 12,461,378 20,591,180 45,000,000

298 Roads/Bridges Oku - Iboku ITUInternal Road Network in Oku - Iboku

(3Km)220,460,570 33,069,086 72,201,023 45,000,000

299 Roads/Bridges Esin Ufot Oron Construction of Esin Ufot Road 150,000,000 -

300 Roads/Bridges Atai Ndon EketConstruction of Atai Ndon Street,

Afaha Eket245,000,000 36,750,000 67,473,000 45,000,000

301 Roads/Bridges Ikono Idim Ikot-ayan Ediene road 200,000,000 30,000,000

302 Roads/Bridges Ikot Mbong OnnaConstruction of 2.5km road in Ikot

Mbong and its environs 249,000,000 37,350,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 26 of 55

Page 92: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

303 Roads/Bridges Ukpum Okon Ikotr AbasiConstruction of Atan - Ikot Umiang

Road Ukpum Okon , Ikot Abasi 247,899,992 - - 37,184,999

304 Roads/Bridges Ibiono Ewuro IniConstruction of Nna Enin-Ibiono Ewuro-

Ikot Ukpong Road-2km 250,000,000 - 37,500,000 37,500,000

305 Roads/Bridges Eden Inyang MboEden Inyang-ESK 1km Concrete

Pavement road240,000,000 - 29,160,000 36,000,000

306 Roads/Bridges Uko Akpan MboConstruction of Uko Akpan-Eyodombo

road Eyodombo294,000,000 - 44,100,000 44,100,000

307 Roads/Bridges Uyo UyoConstruction of Akpasak Estate road

with spur to Anie Essien street Uyo249,000,000 - 44,100,000 37,350,000

308 Roads/BridgesAkpansek,Aka

nimo Street, Etinan

Remedial Works On Akpansek Road,

Akanimo Street, And Adaha Enai Road 200,170,483 - - 30,025,572

309 Roads/Bridges Odoro Ndiye EketIdem Etanam Nsit idung Idem Essakwu

Odoro Ndiyen road 175,200,340 26,280,051 43,425,156 43,425,154

310 Roads/Bridges Ibiaku IkonoConstruction of Internal roads in

Ibiaku Community with drainage 350,000,000 34,690,091 42,525,000 42,525,000

311 Roads/Bridges Abat IkonoConstruction of Iton Abat internal

Road (2.5km), Ikon.-Phase 2 248,000,000 129,523,266 42,525,000 42,525,000

312 Roads/Bridges UkanaIbesikpo

AsutanMission road nung Udoe Ukana Road 153,679,000 23,051,850 42,323,197 42,323,197

313 Roads/ Bridges Ikot Akpan UyoRemedial works on Ikot Akpan Abia

New road 220,000,000 33,000,000

314 Roads/ Bridges Itu

Construction of 2.5km Atan Mbak Obio

Itam - Ekoi - Ikot Awa road with 1 no

culvert in Mbak Obio Tam village

245,000,000 36,750,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 27 of 55

Page 93: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

315 Roads/Bridges Esit Eket Esit Eket

Construction of Iko-Efak-Akpautong-

Iko Idim Idiang Farm Road in Esit Eket

LGA

137,648,204 80,052,195 42,120,350 42,120,350

316 Roads/Bridges Itam UyoConst of Road by specialist hospital

with spur to Iwok Close168,500,000 90,126,897 41,764,410 41,764,410

317 Roads/Bridges Ekpenebo Esit Eket Idung Okpo road 166,692,350 91,182,418 41,316,366 41,316,366

318 Roads/Bridges Abak Abak

Construction of Obot bstrt-off

Hospital road with spur to esteem

school

208,082,783 50,000,000 51,218,822 41,218,822

319 Roads/Bridges Ntiat ItuConstruction of Ntiat Itam Internal

roads in Itu 380,000,000 - 46,170,000 40,170,000

320 Roads/Bridges Ikot Essien Ikot AbasiCost of Ifa Ikot Akpabio - Ikot Abia

with Spur to Mbiabong249,000,000 167,829,332 72,608,400 40,000,000

321 Roads/Bridges Ayadehe/itu ItuConstruction of Strabag road in

Ayadehe200,000,000 - 70,000,000 40,000,000

322 Roads/BridgesMbioto

EkpeneEtinan

Construction of Internal road in

Mbioto Ekpene Ituen, Etinan500,000,000 - 75,000,000 40,000,000

323 Roads/Bridges Okobo OkoboIntenal road in Amamong Okobo (Phase

2)250,000,000 - 37,500,000 37,500,000

324 Roads/Bridges Ndon Ebom Uruan

Construction of 2km road in the Ndon

–Ebom linking Okobo/Oron Road in

Urauan LGA, Akwa Ibom State.

250,000,000 - 37,500,000 37,500,000

325 Roads/Bridges Ekiebong MboConstruction of Ekiebong - Ubotung

road245,000,000 - 36,750,000 36,750,000

326 Roads/Bridges Nduo Eduo EketConstruction of Nduo Eduo - Ikot Akpo

Enang road in Eket150,000,000 - 22,500,000 22,500,000

327 Roads/Bridges

Ataidung

Afaha- Ikot

Afaha

Eket

Construction of Ekpowong Street,off

Manila/Harrison Nyoho Street behind

INEC Eket Road

196,517,750 29,477,663 40,000,000 40,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 28 of 55

Page 94: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

328 Roads/Bridges Upenekang IbenoInyang Eto road with spur to Kinsley

mfon cresent 120,993,977 18,149,097 59,329,637 40,000,000

329 Roads/Bridges Amamong Okobo Constuction of Amamong Village road 105,000,000 32,192,449 34,020,000 40,000,000

330 Roads/Bridges New Edemaya Ikot AbasiConstruction of New Edemaya bridge

on Ete-Abak road 576,119,698 233,502,199 111,008,070 86,417,955

331 Roads/BridgesUti-Udim

EbughuMbo Construction of Uti-Udim Ebughu Road 214,967,000 - 29,020,545 40,000,000

332 Roads/BridgesIkot Akpa

Edok 2Ikono

Construction of Ikot Akpa Edok 2 Ikot

Akpa Edok 2 195,427,925 - - 29,314,189

333 Roads/Bridges Eket Eket Construction of Abisa Beach Road 248,870,550 - - 37,330,583

334 Roads/Bridges OdoroEnim Ibeno

Construction of OdoroEnim Raod with

Spur to Robert Mfon Cresecent,

Ukpnekang

120,168,978 - - 18,025,347

335 Roads/Bridgesnung Ukot

ItamUyo Construction of VVF Hospital Road 248,488,800 66,701,791 33,545,988 40,000,000

336 Road / Bridges

Ikot Ukpo

Inua-Udiduo

Ukan-Ikot

Efre

Ikot AbasiConstruction of Ikot Ukpo Inua-Udiduo

Ukan-Ikot Efre Road 212,708,000 - - 31,906,200

337 Road / Bridges Uyo Uyo Construction of Ifa Ikot Okpon Road 109,299,500 - - 16,394,925

338 Roads/Bridges Asa Road,

Esenam Road,

Remedial Works On Asa Road, Esenam

Road, Hospital Road, Q.I.C. Road,

Ibeno; Iwok-Nsie Road

249,998,000 - - 37,499,700

339 Roads/Bridges Church Road EketRemedial Works On Church Road And

Market Road, 150,000,000 - - 22,500,000

340 Roads/BridgesCalabar/Uwa

Street,Uyo

Remedial Works On Calabar/Uwa

Street, Nelson Mandela And Etoi

Timber Market Road, Uyo

166,198,220 - - 24,929,733

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 29 of 55

Page 95: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

341 Roads/Bridges Ikot Ebekpo OnnaIkot Akpatek Ikot Ebekpo Ikot Enwang

road 143,680,940 85,006,945 39,569,731 39,569,731

342 Roads/Bridges Ikot Etefia IkonoConstruction of Ikot Etefia-Mbiafun

Nkwongo road250,000,000 - 38,475,000 38,475,000

343 Roads/Bridges Ediene Ikono

Construction of Cooperative Drive,

Ediene Ikot Obio Imoh – Ikot Mbon

Ikano LGA.

250,000,000 37,500,000 37,500,000

344 Roads/Bridges Ikot Mkpene Nsit Atai

Design for theConstruction of Ikot

Mkpene -Aweme road with spur to

Akang Ofop

250,000,000 - 37,500,000 37,500,000

345 Roads/BridgesOsong - Oma

ExtensionUyo

Construction Timber market road,

Osong - Oma Extension 250,000,000 37,500,000 37,500,000

346 Roads/Bridges OkossiOffiong/Oruk

o

Construction of Internal road network

I Okosi Town in Urue Offiong /Oruko

LGA

249,000,000 37,350,000 37,350,000

347 Roads/Bridges Oron OronConstruction of Internal road network

in Oron Urban, Oron LGA. 249,000,000 - 37,350,000 37,350,000

348 Roads/Bridges Idua Eket EketMount Zion Light House Road, Idua

Eket (1km) 132,863,296 72,064,402 36,590,552 36,590,552

349 Roads/BridgesChampion

BrewryUyo

Construction of Champion breweries

Industrial Estate road. 240,000,000 36,000,000 36,000,000

350 Roads/Bridges Ikwa Ikot AbasiConst. of Ikwa Community Concrete

bridge99,977,775 14,996,666 36,000,000 36,000,000

351 Roads/Bridges Mbiooku IkonoConstruction of roads in Mbiooku Ikot

Odung, Ikono240,000,000 - 36,000,000 36,000,000

352 Roads/Bridges

Joy Prime

Nursery-Use

ikot Edio

Uyo

Construction of road Linking Joy Prime

Nursery School, Off Youth Avenue Use

Ikot Edio, Uyo

200,000,000 30,000,000 30,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 30 of 55

Page 96: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

353 Roads/Bridges URUA EKPA ITU

Construction of Urua Ekpa-Ikot-Obong

Akwa Ibom Broadcasting Corporation

(AKBC) Ntak Inyang Itam (Old Itu

road)

200,000,000 30,000,000 30,000,000

354 Roads/Bridges IKOT UYO Nsit AtaiConstruction of Ikot Uyo Health

Centre - Ikot Essien Nsit Village road, 240,000,000 36,000,000 35,000,000

355 Roads/Bridges Ukpum Okon Ikot Abasi Internal roads ( Lot 1, 2 and 3) 598,123,861 495,343,851 102,780,009 35,000,000

356 Roads/Bridges Ndukpoise Nsit UbiomConstruction of Ndukpoise Junction -

Ikot Essien Village, Nsit Ubiom220,000,000 - 35,000,000 35,000,000

357Energy/Power

SupplyOwen Eket

Construction of Owen Owen street,

off Ikot Udoma James Town road,

Eket

100,000,000 - 15,000,000 15,000,000

358 Roads/Bridges Amamong OkoboConstruction of access road to okobo

General Hospital-2.5km249,550,000 37,432,500 68,726,070 35,000,000

359 Roads/BridgesGoodland

AvenueUyo

Construction of Goodland Avenue &

Spur at Uyo 177,143,800 - - 26,571,570

360 Roads/Bridges Ikot Ekara Ikot abasi Rehabitation of Ikot Ekara in Edemaya 209,390,580 - - 31,408,587

361 Roads/Bridges Abat Ikot

EbidanbOnna

Construction of Abat Ikot Ebidanb

Road 120,900,000 - - 18,135,000

362 Roads/Bridges Nyara Eyin -

Offiong EtorIkot Ekpene

Construction of Nyara Eyin - Offiong

Etor Road, Phase II 249,500,000 - - 37,425,000

363 Roads/BridgesSecretariat

AvenueIbeno

Construction Of Secretariat

Avenue/Drains 100,000,000 - - 15,000,000

364 Roads/BridgesEdiene Abak-

Ikot EkanAbak/Etinan

Construction of Ediene Abak-Ikot Ekan

road 248,210,917 86,637,491 33,508,474 34,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 31 of 55

Page 97: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

AKWA IBOM STATE 2016 BUDGET PROPOSAL

365

Governance,

Social Services

& Sports

Ikpa

NungsungIkot Abasi

Construction of Ikot Osudo/Ikot

Etefia Rd249,999,292 12,348,001 33,750,000 33,750,000

366 Education Abak AbakRenovation of Wellington Bassey

Barracks and 5km road repairs- Abak 180,465,800 64,335,061 33,750,000 33,750,000

367 Roads/Bridges

Obiakpa -

Ikot Udo -

Nseghe

Ukanafun

Construction of Obiakpa - Ikot Udo -

Nseghe Road, Ukanafun L.G.A., (Phase

2)

108,890,000 63,769,456 33,320,340 33,320,340

368 Health Court Road Ikot AbasiConstruction of Court Road Okpot

Village-Ikaki Junction241,999,292 - 32,670,000 32,670,000

369 Water Supply Utu Nsekhe Abakconstruction of utu nsekhe-abat town-

esuk99,977,775 46,650,684 32,400,000 32,400,000

370 Roads/Bridges FHE, RD 2 Uyo Construction of Road 2, FHE Uyo 250,000,000 - 41,000,000 31,000,000

371 Water Supply

University Of

Uyo Teaching

Hospital, Uyo

Uyo

Construction Of Generator House And

Installation Of 1000kva Generating

Set At University Of Uyo Teaching

Hospital, Uyo,

30,674,700 - - 4,601,205

372Energy/Power

Supply

Idung Ekpene,

Idung

Atangedem,

Odoronkit

Esit Eket

Construction of Idung Ekpene, Idung

Atangedem, Odoronkit road and

environ.

2,000,000,000 681,596,827 180,000,000 30,000,000

373 Roads/BridgesIkot Edor

UkpanaOnna

Construction of road drainage Ikot

Edor - Ukpana road 250,000,000 96,250,000 67,500,000 30,000,000

374Road/Erosion

ControlIkot Nko Ibiono

Construction of Ikot Nko – Ikot

Offiong Ididep road, Ibiono Ibom LGA,

Akwa Ibom State.

200,000,000 - 30,000,000 30,000,000

2016 APPROPRIATION ACT- AKWA IBOM NATIONAL ASSEMBLY Page 32 of 55

Page 98: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST

(N) COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

1 Canalization Atubu Ogbia Dredging of Atubu creek 247,658,000 37,148,700 33,433,830 35,415,094

2 Canalization Biseni Yenagoa

Canalisation (Tein) opening of

Ogoba from Taylor Creek to Tuloba-

Lots 1-4

980,000,000 - 147,000,000 10,000,000

3 CanalizationOrashi creek/

BiseniYenagoa

Cannalisation of Orashi creek to

Biseni (Lots 1-4) 850,000,000 127,500,000 10,000,000

4 Canalization Ogbotobo Ekeremor Reclamation works 3,000,000,000 -

5 Canalization Amassoma S/IjawReclamation /Sandfilling of

Community (Lots 1 - 3) 2,480,000,000 - 50,000,000 50,000,000

6 Canalization Biseni Yenagoa

Canalisation (Egbebiri/Tuburu)

Opening of Obubu Creek from

Taylor creek to Orashi River-Lots 1-

4

950,000,000 - 142,500,000

7Total

Canalization 8,507,658,000 37,148,700 500,433,830 105,415,094

8 Education Otuoke OgbiaConst. of principal/vice principal

quarters at secondary school 116,500,780 17,475,117 22,000,000 20,107,699

9 Education Adagbabiri SagbamaConstruction of skill Acquisition

centre. 179,369,410 26,905,412 40,000,000 18,739,200

10 Education Okpoama Brass

Construction of NDDC Model Six

Classroom Block with an Office, A

store and VIP Toliet.

18,000,000 8,234,500 3,320,000 6,445,500

11 Education Ikorokosei Renovation of School Buliding 31,000,000 - 10,000,000 5,000,000

12 Education Various Various

Reconstruction and renovation of

Primary and Secondary Schools in

Bayelsa State

500,000,000 135,000,000

BAYELSA STATE 2016 BUDGET PROPOSAL

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 1 of 61

Page 99: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST

(N) COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

BAYELSA STATE 2016 BUDGET PROPOSAL

13 Education AzuzuamaSouthern

Ijaw

Construction of NDDC Model Six

Classroom Block with an Office, A

store and VIP Toliet.

18,000,000 3,125,000 7,000,000 4,000,000

14 Education OlugbogoroSouthern

Ijaw

Construction of NDDC Model Six

Classroom Block with an Office, A

store and VIP Toliet.

18,000,000 6,800,322 3,320,000 3,939,839

15 EducationFoutorugbene

1Ekeremor Completion of ^ Classroom Block 13,000,000 3,125,000 4,000,000 3,875,000

16 Education Odoni Sagbma

Construction of NDDC Model Six

Classroom Block with an Office, A

store and VIP Toliet.

18,000,000 6,510,130 4,000,000 3,575,000

17 Education Ogbosuwari Ekeremor

Construction of NDDC Model Six

Classroom Block with an Office, A

store and VIP Toliet.

18,000,000 3,125,000 4,000,000 3,575,000

18 Education Okolobiri YenagoaRenovation of 1 No Six Classroom

Block. 8,100,000 - - 3,575,000

19 Education Okoroba Nembe

Construction of NDDC Model Six

Classroom Block with an Office, A

store and VIP Toliet.

18,000,000 3,125,000 3,320,000 3,575,000

20 Education Ebedebiri Sagbama

Construction of NDDC Model Six

Classroom Block with an Office, A

store and VIP Toliet.

18,000,000 7,450,000 6,000,000 3,550,000

21 Education Ikerama Yenagoa

Construction of NDDC Model Six

Classroom Block with an Office, A

store and VIP Toliet.

18,000,000 7,452,430 4,000,000 3,547,570

22 Education Ewoama Nembe

Contruction of NDDC Model Six

Classromm Block wtth an office

and Vip toilet Block

15,500,000 7,200,000 5,000,000 3,300,000

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 2 of 61

Page 100: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST

(N) COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

BAYELSA STATE 2016 BUDGET PROPOSAL

23 Education Otuasega Ogbia

Construction of NDDC Model Six

Classroom Block with an Office, A

store and VIP Toliet.

18,000,000 5,900,344 3,320,000 3,267,793

24 Education Bassambiri NembeConstruction of 3no. 1 bedroom

flat staff quarters at GSS 17,381,629 2,607,244 4,000,000 3,232,315

25 Education Ebedebiri SagbamaRenovation of Five Classroom

Block. 13,000,000 5,837,000 4,000,000 3,000,000

26 Education Ologi Ogbia

Construction of NDDC Model Six

Classroom Block with an Office, A

store and VIP Toliet.

18,000,000 9,127,400 3,320,000 3,000,000

27 Education Otuasega OgbiaConstruction of Secince Block at

Otuasega Sec. Sch. 18,000,000 9,000,000 3,320,000 2,840,000

28 Education Amassoma Southern

Ijaw Construction of 6 classroom 15,000,000 2,250,000 4,000,000 2,625,000

29 Education Sangana Brass

Construction of NDDC Model Six

Classroom Block with an Office, A

store and VIP Toliet.

18,000,000 9,320,433 3,320,000 2,215,740

30 Education Kemenini Nembe

Construction of NDDC Model Six

Classroom Block with an Office, A

store and VIP Toliet.

18,000,000 10,642,352 7,357,648 2,000,000

31 Education OtuanSouthern

Ijaw

Renovation of Science Block at

Otuan Secondary School.13, 15,331,934 9,345,000 3,320,000 1,666,934

32 Education Okpoama BrassRenovation of Five Classroom Block

at Gov. Sec. Sch. 11,000,000 8,800,100 1,245,000 954,900

33 Education Ikibiri Southern

Ijaw

Construction of 1 No Six

Classroom Block. 10,000,000 6,234,499 3,000,000

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 3 of 61

Page 101: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST

(N) COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

BAYELSA STATE 2016 BUDGET PROPOSAL

34 Education Onuegbum Ogbia

Construction of perimeter

Fenceing of secondary School k

with an Office, A store and VIP

Toliet.

242,034,200 - -

35 Education Lobia 11Southern

Ijaw

Construction of NDDC Model Six

Classroom Block with an Office, A

store and VIP Toliet.

13,000,000 - -

36 Education Twon Brass BrassRenovation of Devotion / Dinning

Hall at Govt. Sec. Sch. 17,370,000 - -

37 EducationAgudama

EkpetiamaYenagoa

Rural Electrification Scheme for

Agudama Ekpetiama. 22,254,045 2,377,146 -

38 Education Foutorugbene Ekeremor

Construction of NDDC Model Six

Classroom Block with an Office, A

store and VIP Toliet.

18,000,000 - -

39 Education Gbarantoru Yenagoa

Construction of NDDC Model Six

Classroom Block with an Office, A

store and VIP Toliet.

11,000,000 - -

40 Education Okpoama BrassRenovation of Five Classroom Blks

Block 1 at Govt. Sec. Sch. 7,156,865 - -

41 Education Okpoama BrassRenovation of Five Classroom Blks

Block 2 at Govt. Sec. Sch. 7,760,945 - -

42 Education Ebedebiri SagbamaConstruction of Teachers

Quarters. 110,000,000 - -

43 Education Ogbia Ogbia

Supply of 500 pieces of Laptops

with bags to Secondary schools in

Ogbia Lga@ 350,000 each

175,000,000 - 43,750,000

44Education-

Total 1,802,759,808 181,969,428 199,912,648 246,607,490

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 4 of 61

Page 102: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST

(N) COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

BAYELSA STATE 2016 BUDGET PROPOSAL

45Energy/ Power

Supply

Various

CommunitiesVarious LGA's Transformer installations 486,748,143 73,012,221

46Energy/ Power

Supply

Brass/Southe

rn IjawBrass

Electrification & installation of

street light on Brass Iwoama

Okpoama in Brass LGA

1,301,406,435 - 166,000,000 166,000,000

47Energy/ Power

SupplyEbedebiri Sagbama

Electrification of Ebedebiri

community 148,920,000 22,338,000

48Energy/ Power

SupplyOtuabagi Ogbia solar street light 250,000,000 - - 37,500,000

49Energy/ Power

SupplyOtokolobiou

Kolokuma/

OpokumaSolar Street Light 250,000,000 37,500,000

50Energy/ Power

SupplyAmatolo

Southern

IjawSolar Street Light 250,000,000 37,500,000

51Energy/ Power

SupplyAnyama

Southern

IjawSolar Street Light 250,000,000 37,500,000

52Energy/ Power

Supply

Okpoama/Iwo

ama/TwonBrass

Electrification and Installation of

StreetLight in Okpoama, Iwoama

and Twon

2,000,000,000 - 166,000,000 60,000,000

53Energy/ Power

SupplyOpokuma

Supply and Installation of 2x40,

132/3kv Transmission Station and

double circuit 132kv line

2,000,000,000 - 166,000,000 55,750,000

54Energy/ Power

SupplyVarious Various

Installation of solar street light in

sagbama town, peretorugbemene &

Egbemo Angalabiri

450,000,000 150,749,866 67,230,000 50,000,000

55Energy/ Power

SupplyOfoni Solar Street Light Ofoni Phase 2 250,000,000 - 1,000,000 1,000,000

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 5 of 61

Page 103: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST

(N) COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

BAYELSA STATE 2016 BUDGET PROPOSAL

56Energy/ Power

SupplyOkpoma Brass Solar Street Light 180,000,000 27,000,000

57Energy/ Power

SupplyOtuegwe I Ogbia Electrification Otuegwe 1 350,000,000 52,500,000 42,500,000

58Energy/ Power

SupplyAyibabiri

Electrification/Reticulation of

Ayibabiri through Diesel

generators(2nos.) 500 KVA and a

standard Generator

house/installation and

commissioning

500,000,000 - 62,250,000 42,250,000

59Energy/ Power

Supply

Sagbama

TownSagbama

Solar street light at Sagbama

Town 240,000,000 - 53,784,000 40,000,000

60Energy/ Power

SupplyVarious Ekeremor

Provision and Installation of Solar

Powered Street Light in the

Communities in Ekeremor LGA

700,000,000 - 33,698,000 38,000,000

61Energy/ Power

SupplyYenagoa Yenagoa

construction of 60MVA

(132/33kvA) complete mobile

substation for emergency black out

prevention /AC/DC station units

with HV equipment

980,000,000 - 87,150,000 30,500,000

62Energy/ Power

SupplyIsampou Ekeremor Solar street light Esampou 150,000,000 - 33,615,000 30,000,000

63Energy/ Power

SupplyToru orua Sagbama Solar street light at Toru Orua 130,000,000 - 29,133,000 30,000,000

64Energy/ Power

SupplyAleibiri Town Ekeremor

Solar Street Light at Aleibiri Town

Phase 2, Ekeremor 250,000,000 - 31,125,000 26,831,250

65Energy/ Power

SupplyTungbabiri Solar Street Light 200,000,000 - 24,900,000 26,265,000

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 6 of 61

Page 104: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST

(N) COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

BAYELSA STATE 2016 BUDGET PROPOSAL

66Energy/ Power

SupplyElebele Ogbia Solar street light 164,970,950 69,185,961 36,969,990 25,550,000

67Energy/ Power

SupplyOkodi Ogbia Electrification of Okodi Community 218,014,830 167,739,824 - 25,275,006

68Energy/ Power

SupplyOtuoke Ogbia Relocation of hi-tension lines 150,000,000 - 33,615,000 22,500,000

69Energy/ Power

SupplyKiama Sagbama

Rehabilitation of the 33KV

Network from kiama to Adagbabiri

60Km route length

200,000,000 43,257,460 36,520,000 22,580,000

70Energy/ Power

SupplyIsaompou Ekeremor Solar Street Light Phase 3 230,000,000 - 28,635,000 21,204,750

71Energy/ Power

SupplyYenagoa Yenagoa

Conversion of Low Voltage

Distribution System (LVDS) in

Yenagoa to High Voltage

Distribution System (HVDS)

complete with Aerial Bundle

Conductors (ABC)

585,000,000 87,750,000

72Energy/ Power

SupplyEniwari S/Ijaw

Electrification & installation of

400KVA Generators in Eniwari and

kemengbene

111,798,726 32,293,353 37,350,000 20,000,000

73Energy/ Power

SupplyAleibiri Ekeremor Solar Light Phase 2 220,000,000 - 27,390,000 18,891,500

74Energy/ Power

SupplyEbedebiri Sagbama Solar Street Light 100,000,000 - 12,450,000 17,510,000

75Energy/ Power

SupplyOgu Solar street Light 249,000,000 - 11,205,000 17,500,000

76Energy/ Power

Supply

Ayama

CommunitiesEkeremor Solar Street Light 250,000,000 - 31,125,000 15,831,250

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 7 of 61

Page 105: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST

(N) COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

BAYELSA STATE 2016 BUDGET PROPOSAL

77Energy/ Power

SupplyAnyama- Ijaw S/Ijaw

HT/LT Electrification project

from Ogbogoro to Anyama Ijaw 245,188,000 - 30,525,906 15,525,906

78Energy/ Power

SupplyOtuaganga Ogbia Solar street Light 245,000,000 - 30,502,500 15,502,500

79Energy/Power

SupplyVarious Various

Rehabilitation of solar street

lights and feasibility study of total

capacity of installed Renewal

Energy by the NDDC

250,000,000 37,500,000

80Energy/ Power

SupplyOtuasega Ogbia

Construction of 1 × 15MVA

injection sub-station 248,334,969 136,584,233 58,100,000 15,500,221

81Energy/ Power

SupplyKpansia Yenagoa Solar Street Light at Kpansia 100,000,000 15,000,000 29,880,000 15,450,000

82Energy/ Power

Supply Sabagreia, Kolga

Solar street light at Sabagreia,

Kolga LGA, Bayelsa State. N249m 219,000,000 - 32,850,000 15,350,000

83Energy/ Power

Supply

Agobiri/Toru-

Orua/Ekerem

or

Southern

Ijaw/Ekerem

or LGA

construction of HT lines to Swali

through Anyama to Agobiri in

southern Ijaw & Toru-Orua to

Ekeremor Town in Ekeremor LGA

970,000,000 - 49,800,000 15,000,000

84Energy/ Power

SupplyToru Orua Sagbama

Electrification of Toru Orua

community 110,000,000 13,896,114 21,190,868 13,965,208

85Energy/ Power

SupplyOdi Town

Kolokuma/Op

okuma

Rural Electrification (kaiama

extension to Odi town) 149,760,532 110,642,729 14,342,960 10,387,421

86Energy/ Power

SupplyOx-bow lake Yenagoa Ox-bow Lake Electrification 60,000,000 - 17,928,000 10,250,000

87Energy/ Power

SupplyLalagbene Ekeremor

Provision of Solar street Light at

Lalagbene, Ogbobene and

Ogbosuware

250,000,000 - 31,125,000 10,150,000

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 8 of 61

Page 106: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST

(N) COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

BAYELSA STATE 2016 BUDGET PROPOSAL

88Energy/ Power

SupplyOsekwenike Sagbama

provision of Solar stret light at

Osekwenike250,000,000 - 31,125,000 10,150,000

89Energy/ Power

SupplyOnuegbum Ogbia Solar street light 231,169,550 34,675,433 25,902,548 10,000,000

90Energy/ Power

SupplyEdepie Yenagoa Edepie/sch to land Electrification 62,557,003 3,700,514 18,692,032 8,750,000

91Energy/ Power

SupplyAngiama Town Sagbama Solar street light at Angiama Town 150,000,000 139,596,483 10,403,517 8,700,000

92Energy/ Power

SupplyIgbedi

Kolokuma/Op

okumaSolar street Light 100,000,000 - 12,450,000 7,510,000

93Energy/ Power

SupplyKpansa II Yenagoa

Solar street light on Samphino

road Kpansia100,000,000 - 12,450,000 7,510,000

94Energy/ Power

Supply

Agudama -

Epie Royal FM

Yenagoa/

Bebelebiri

Provision of solar street light in

Agudama - Epie Royal FM road 240,000,000 36,000,000

95Energy/ Power

SupplyKalama Kolga

Electrification ,reticulation and

provision of streetlights in

Ayibabiri and Kalama

500,000,000 - 62,250,000 90,000,000

96Energy/ Power

SupplyOpollo Yenagoa

Installation of 50 No., 50KVA CSP

HVDS 11/0.415 KV Transformers

complete with Aerial bundled

Conductors in Opollo in Yenagoa,

Bayelsa State.

250,000,000 37,500,000

97Energy/ Power

SupplyElemiri Sagbama

Solar street light for Elemiri

Community 60,000,000 - 17,928,000 5,000,000

98Energy/ Power

SupplyOgbia Town

Electrification of Otuagbola 2 in

Ogbia 62,557,003 43,417,850 8,097,162 3,500,000

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 9 of 61

Page 107: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST

(N) COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

BAYELSA STATE 2016 BUDGET PROPOSAL

99Energy/ Power

SupplyOtueke

Electrification / reticulation of

Otueke through Diesel generators

(2nos) 1000KVA, a stand, and

Generator house / Instalation and

commissioning

1,000,000,000 - 124,500,000

100Energy/ Power

SupplyOpume Ogbia Low tension electrification 197,733,850 29,660,078 22,156,078

101Energy/ Power

SupplyOtuoke Ogbia

Emergency construction for

successful installation of 2Nos.

500kva Gen Sets/ street light

156,268,802 23,440,320 17,509,919

102Energy/ Power

Supply

Fikoruama

Isaiah-AmaNembe Solar street light 231,169,550 34,675,433 42,502,548

103Energy/ Power

SupplyOgbolomabiri Nembe Solar street Light 110,000,000 - -

104Energy/ Power

SupplyBassambiri Nembe Solar street Light 110,000,000 - -

105Energy/ Power

Supply

Agudama

EkpetiaamaYenagoa

Rural Electrification Scheme for

Agudama Ekpetiama. 22,254,045 - -

106Energy/ Power

Supply

Agoro

CommunityOgbia Installation of 2 Nos Transformer 15,000,000 - -

107Energy/ Power

Supply

Agoro

CommunityOgbia

Installation of Genset for Agoro

Community 15,892,169 - -

108Energy/ Power

SupplyOtuaganagu Ogbia Solar Powered Street Light 125,952,321 - -

109Energy/ Power

SupplyElemiri Sagbama Solar Powered Street Light 245,000,000 - -

110Energy/ Power

SupplyAkepilai Ogbia

Provision of Solar Street Light at

Akpelai 55,969,147 - -

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 10 of 61

Page 108: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST

(N) COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

BAYELSA STATE 2016 BUDGET PROPOSAL

111Energy/ Power

SupplyKolo Ogbia Electrification of community 150,000,000 - -

112Energy/ Power

SupplyOgobiri Sagbama Solar Powered Street Light 127,000,000 - -

113Energy/ Power

SupplyAbadani

Kolokuma

Opokuma

Extension of High tension

electricity line to Ebekule, Isedani,

Burudani and Otokolobiou

communities and suburbs

245,000,000 - -

114

Total

Energy/Power

Supply

21,456,666,025 1,048,515,651 1,951,857,029 1,605,240,233

115 Health Ekowe S/IjawConstruction and Equipping of 50

bed-Hospital at Ekowe town 1,155,557,448 173,333,617 83,000,000 199,000,000

116 Health Various VARIOUSSpecial Medical Referrals and

Check-up for the State250,000,000 37,500,000

117 HealthFMC

YENAGOAYENAGOA

Comprehensive Renovation of

Accident and Emmergency Block 200,000,000 30,000,000

118 Health Ekeremor EkeremorConstruction and Equipping of 50

bed-Hospital at Ekeremor town 1,155,557,448 173,333,617 83,000,000 50,500,000

119 Health Otuoke Ogbia Construction of Specialist Hospital 791,729,413 118,759,412 66,939,500 40,000,000

120 Health Ogbia Town Ogbia Town

Building & Equipping of library

complex for Bayelsa State school

of health Technology

240,000,000 - 42,164,000 40,000,000

121 Health Aleibiri EkeremorConstruction of comprehensive

medical Center in Aleibiri 199,864,750 29,979,713 44,820,000 30,450,000

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 11 of 61

Page 109: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST

(N) COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

BAYELSA STATE 2016 BUDGET PROPOSAL

122 Health Ogbia Town Ogbia

Building/Equipping of ICT building

at Bayelsa State School of health

Technology.

230,000,000 - 51,543,000 25,750,000

123 HealthIgbomotoru I

Town

Southern

Ijaw

Construction of Health Centre

building at Igbomotoru I Town,

Southern Ijaw Constituency.

250,000,000 37,500,000

124 Health Ogbia Town OgbiaPerimeter fencing of school of

Health Technology 240,000,000 118,596,758 53,784,000 20,550,000

125 Health Diebu Town S/Ijaw

Renovation, fencing, landscaping &

laying of stones in at the

Hospital/Nurses quarters – 2no 3

bedroom flats in Diebu Town

25,000,000 - 9,337,500 9,337,500

126 Health AmassomaSouthern

Ijaw

Construction of cottage Hospital at

Amassoma Phase II (Fencing of

Hospital Building and Building of

Doctors Quarters

220,000,000 33,000,000 3,135,000

127 Health Twon BrassConstruction of nurses / Doctors

Quarters at Twon Gen. Hospital 50,000,000 43,510,324 6,489,676

128 Health Amassoma AmassomaConstruction of cottage Hospital at

Amassoma 250,000,000 - 31,125,000

129 Health Aleibiri Ekeremor

Renovation of Generator House,

Reactivation of Borehole /Water

Treatment @ Health Centre.

7,754,279 - -

130 Health Aleibiri EkeremorRenovation of Doctors quarters,

fencing of health centre. 12,775,241 - -

131 Health Idema NembeMortuary Block, Walkway, Light,

Gen House 21,341,372 - -

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 12 of 61

Page 110: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST

(N) COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

BAYELSA STATE 2016 BUDGET PROPOSAL

132 Health Okumbiri SagbamaCompetion of Main Hospital

Complex. 29,781,051 - -

133 Health Sagbama Sagbama

Construction of OPD Lab & X-Ray

Block and External Works at the

Sagbama General Hospital.

35,000,000 - -

134 Health Sagbama Sagbama

Construction ofJunior Staff QRTS

& Mortuary Building at Sagbama

General Hospital

10,707,603 - -

135 Health Sagbama SagbamaConstruction of Nurses QRTS at

Sagbama General Hospital. 16,640,000 - -

136 Total Health 5,391,708,605 657,513,440 505,202,676 523,722,500

137Jetty/Shore

ProtectionOtuan

Southern

Ijaw

Erosion control and sandfilling

works 3,462,046,534 838,097,793 166,000,000 166,000,000

138Jetty/Shore

ProtectionEkeremor Ekeremor

Construction of shoreline

protection 3,876,287,082 1,793,244,922 125,697,742 125,697,742

139Jetty/Shore

ProtectionEkeremor Ekeremor

Shoreline Protection and Landing

jetty Toru Ndoro Community in

Ekeremor (Lots 1-16)

4,000,000,000 - 500,000,000 350,000,000

140Jetty/Shore

Protection

Asoama

/Okoloba

Asoama

/Okoloba

Foreshore Protection Works At

Asoama/Okoloba/ Seibokorogha 3,763,291,145 2,262,083,634 250,000,000 250,241,502

141Jetty/Shore

ProtectionOgbolomabiri Nembe

Construction of foreshore

protection works 7,973,336,025 1,983,053,502 400,000,000 200,000,000

142Jetty/Shore

ProtectionAyama Ogbia

Emergency Shore Protection Phase

2 2,500,000,000 - 205,000,000 195,000,000

143Jetty/Shore

ProtectionFamgbe Ogbia

Emergency Shore Protection Phase

2 2,500,000,000 455,496,785 205,000,000 195,000,000

144Jetty/Shore

Protectionopume Sandfilling of Opume 3,000,000,000 - 250,000,000 180,000,000

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 13 of 61

Page 111: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST

(N) COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

BAYELSA STATE 2016 BUDGET PROPOSAL

145Jetty/Shore

ProtectionOkpoama town Brass

Sand filling of Okpoama town (Lots

1-16) 4,000,000,000 600,000,000 150,000,000

146Jetty/Shore

ProtectionEkpenkiri Nembe

Shoreline protection and jetty for

Ekpenkiri Obama, Nembe 2,000,000,000 - 342,000,000 150,000,000

147Jetty/Shore

ProtectionOnuegbum Ogbia

Sand Filling and Link road to NDDC

Jetty/ Ferry Terminal 400,000,000 60,000,000

148Jetty/Shore

ProtectionKiama town Kolokuma

Construction of Kiama shore

protection – Extension of shore

protection works

5,585,016,300 5,204,400,455 200,000,000 105,693,174

149Jetty/Shore

Protection

Fantuo

communityNembe

Sand filling of Fantuo community

(Lots 1-14) 3,500,000,000 525,000,000 100,000,000

150Jetty/Shore

ProtectionOkpoma Brass

Sand filling of Inibomoyekiri

Okpoma, Brass (Lots 1-10) 2,500,000,000 375,000,000

151Jetty/Shore

ProtectionBassambiri Nembe

Construction Of Bassambiri Shore

Protection/Sandfilling 3,978,554,342 596,783,151 200,000,000 100,000,000

152Jetty/Shore

ProtectionOlugbobiri

Southern

Ijaw

Shore protection

works/Reclamation at

Olugbobiri(phase 1)

2,692,549,378 403,882,437 180,000,000 100,000,000

153Jetty/Shore

ProtectionSangana Brass

Construct Shoreline protection wall

and sand fill at Sangana 2,484,985,078 767,408,781 200,000,000 100,000,000

154Jetty/Shore

ProtectionOtuobhi Ogbia

Shore Protection at Otuobhi

Community 3,200,000,000 - 232,400,000 100,000,000

155Jetty/Shore

Protection

Otuedo

communityOtuedo

Shore protection in Otuedo

community 2,000,000,000 300,000,000 100,000,000

156Jetty/Shore

ProtectionOtuabagi Ogbia

Shore Protection and erosion

Control 1,459,572,415 - 150,000,000 78,500,000

157Jetty/Shore

Protection

Aguru

/EgbopuloSagbama

Construction of jetty at Aguru and

Egbopulogbene 150,000,000 - - 65,000,000

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 14 of 61

Page 112: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST

(N) COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

BAYELSA STATE 2016 BUDGET PROPOSAL

158Jetty/Shore

ProtectionAyama Ogbia

Shore protection works at Ayama-

Ogbia, in Bayelsa 2,131,580,000 - 405,789,600 60,850,000

159Jetty/Shore

ProtectionOpokuma KolOpok

Shore protection, Gbanranbiri(1)

Oyobu-Akaranbiri-Gbaranbiri(2)-

Ayibabira

5,235,102,246 1,045,242,726 83,000,000 50,000,000

160Jetty/Shore

ProtectionAgbere/Odoni Sagbama Shore protection/Reclamation 2,582,971,313 1,502,378,331 83,000,000 50,000,000

161Jetty/Shore

ProtectionEbedebiri Sagbama

Shore Protection / Land

Reclamation (Design) 50,000,000 7,500,000

162Jetty/Shore

Protection

Opume

CommunityOgbia

Shore protection for Opume

Community (Lots 1-12) 3,000,000,000 450,000,000

163Jetty/Shore

ProtectionOgobiri Sagbama Shore Protection (Design) 50,000,000 7,500,000

164Jetty/Shore

ProtectionOnuegbum Ogbia

Erosion control and sandfilling

works 2,679,452,580 132,484,500 83,000,000 50,000,000

165Jetty/Shore

ProtectionAgge Ekeremor

Construction of shoreline

protection 3,565,500,049 331,242,999 157,700,000 50,000,000

166Jetty/Shore

ProtectionObama Nembe Ekperikiri Erosion control works 2,730,984,195 124,647,195 265,600,000 50,000,000

167Jetty/Shore

ProtectionOgobiri Sagbama

Construction of landing jetty at

Ogobiri 70,000,000 - 20,916,000 49,000,000

168Jetty/Shore

ProtectionOpokuma KolOpok

Opokuma shore protection

extention (completion) 1,000,000,000 450,000,000 83,000,000 33,000,000

169Jetty/Shore

ProtectionAmassoma

Southern

IjawAmassoma Shore Protection 3,472,762,388 2,141,001,307 83,000,000 30,000,000

170Jetty/Shore

ProtectionTrofani Sagbama

Sandfilling and Land Reclamation.

(Studies and Design) 100,000,000 - 29,880,000 30,000,000

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 15 of 61

Page 113: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

2016 APPROPRIATION ACT- BAYELSA NATIONAL ASSEMBLY Page 16 of 61

Page 114: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

1 Education Calabar Calabar

Equipment Procurement and books for

center of indegenious studies, University

of Calabar

154,000,000 35,969,563 21,000,000 -

2 Education Enoghi IkomConstruction of Class room Block at

Enoghi Community 43,170,004 - 9,065,701 -

3 Education Various Various 350,000,000 70,000,000

4 Education Ibil Ogoja

Construction of 6 classrooms block with

toilets in St. Michael Primary School,

Ibil, Ogoja

60,000,000 9,000,000

5 Education Various Various

Supply of Generating plants to boost

ICT Trainning in Secondary Schools in

Cross Rivers Central Senatorial District

500,000,000 - - -

6Education

Total 1,107,170,004 35,969,563 30,065,701 79,000,000

7Energy/Power

SupplyAyughafa Ikom

Ayughafa to Nsak Electrification

Project involving both High and Low

Tension (Design)

250,000,000 6,220,171 24,500,000 24,500,000

8Energy/Power

SupplyMkpot Etung Rehabilitation of Mkpot Abidjan Line 247,540,078 37,131,012 21,000,000 21,000,000

9Energy/Power

SupplyEkorinim Calabar Mun.

Solar Street Light at Aqua Edem

Cresent 245,000,000 - 27,674,500 27,674,500

10Energy/Power

Supply

Omobe,

Agwagune Biase

HT Transmission Line from Agwagune

through Ikun Beach229,397,983 84,596,471 32,517,164 32,517,164

11Energy/Power

Supply

Imaje/Ekpriny

iYala

Rural Electrification Involving High and

Low Tension70,850,000 52,198,288 16,068,780 7,460,685

NDDC CROSS RIVER STATE 2016 BUDGET

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 1 of 29

Page 115: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

12Energy/Power

SupplyEssien/Umo Calabar South

Installation of Solar Street Light at

Essien/Umo Street122,772,275 36,831,683 20,883,564 20,883,564

13Energy/Power

SupplyUyi Odukpani

Rural Electrification Involving High and

Low Tension31,250,930 4,687,640 8,859,639 10,625,316

14Energy/Power

Supply

Ikot Effio

Enang/Ikot

Anasua

AkpabuyoRural Electrification Involving High and

Low Tension88,750,000 - 22,500,000 22,500,000

15Energy/Power

SupplyCal.Mun. Cal. Mun.

Solar Powered Street Light at Old

Marian and Joseph Mkpang

Street,Calabar

181,415,816 54,312,372 38,113,580 38,113,580

16Energy/Power

SupplyObubra Obubra Solar Powered Street Light 122,772,275 18,408,341 23,054,753 23,054,753

17Energy/Power

SupplyCal. Mun. Cal. Mun. External lighting of NDDC CRS office 3,639,340 545,901 2,165,407 2,165,407

18Energy/Power

SupplyEhom Biase Rural Electrification 230,000,000 - 34,500,000 10,000,000

19Energy/Power

Supply

Idere/Utuma/

Uburutu

Rural Electrification of

Idere/Utuma/Ukwa 250,000,000 - 37,500,000 10,000,000

20Energy/Power

SupplyAkamkpa Town Solar Powered Street Light 250,000,000 - 37,500,000 10,000,000

21Energy/Power

SupplyAkim Akim Odukpani

Electrification of Akim Akim Town

Distribution Network132,357,203 37,385,014 4,632,502 4,632,502

22Energy/Power

SupplyVarious Various

Rehabilitation of solar street lights and

feasibility study of total capacity of

installed Renewal Energy by the NDDC

250,000,000 37,500,000

23Energy/Power

SupplyEkong Anaku Akamkpa Electrification Project 74,778,503 11,216,775 25,000,000 10,000,000

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 2 of 29

Page 116: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

24Energy/Power

SupplyIkeichia Beten Bekwarra

Rural Electrification Involving High and

Low Tension49,820,430 - 14,123,900 10,000,000

25Energy/Power

SupplyYala Yala

Rural Electrification Involving High and

Low Tension49,850,000 - 14,595,000 10,000,000

26Energy/Power

SupplyUbambat Odukpani

Rural Electrification Involving High and

Low Tension 34,369,570 5,155,436 8,119,811 8,119,811

27Energy/Power

SupplyAkpet Central Biase

Solar Powered Street Light Akpet

Central 75,000,000 - 11,250,000 10,000,000

28Energy/Power

Supply

Inuakpa/Usun

g EsukOdukpani

Rural Electrification Involving High and

Low Tension69,320,000 41,410,435 2,426,200 2,426,200

29Energy/Power

SupplyAdadama Abi Adadama Abi

Solar powered street light in Adadama

Abi LGA 50,000,000 7,500,000 7,500,000

30Energy/Power

SupplyAbi Abi Solar powered street lights in Abi 50,000,000 7,500,000 7,500,000

31Energy/Power

Supply

Nyakasang /

Ekong AtanOdukpani

Rural Electrification Involving High and

Low Tension70,000,000 15,102,767 15,876,000 10,000,000

32Energy/Power

SupplyAdim Biase Solar Street Light 122,772,275 18,415,841 22,165,940 10,000,000

33Energy/Power

SupplyAkpap Biase Rural Electrification 43,000,000 - 12,190,500 10,000,000

34Energy/Power

Supply

Abredang

CommunityBiase

Rural Electrification Involving High and

Low Tension99,850,632 7,276,207 3,494,772 3,494,772

35Energy/Power

Supply

Bebi

Community/

Campus

Obanliku

Solar Street Light at Bebi Community

and Federal college of Education Obudu,

Bebi Campus

250,000,000 - 37,500,000 10,000,000

36Energy/Power

SupplyBakassi Bakassi

Rural Electrification Involving High and

Low Tension at Usung Esuk Efio Obom125,000,000 18,750,000 35,437,500 10,000,000

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 3 of 29

Page 117: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

37Energy/Power

SupplyCalabar Calabar Mun. Solar Street Light at INEC Street 234,321,000 184,884,582 39,858,002 10,000,000

38Energy/Power

SupplyCal.Mun. Cal.Mun.

Solar street light with 600 X 600mm

reinforced concreate pinth at state stae

Housing Calabar

200,000,000 - 30,000,000 10,000,000

39Energy/Power

SupplyEsuk Otu Road Calabar Mun.

Rural Electrification Involving High and

Low Tension60,000,000 - 13,608,000 10,000,000

40Energy/Power

SupplyOhong Obudu

Solar Street Light at Ohong, Betukwel

Igwo240,000,000 - 36,000,000 10,000,000

41Energy/Power

SupplyAbakpa Ogoja Abakpa/Igoli/Mbube Solar Light 240,000,000 - 36,000,000 10,000,000

42Energy/Power

SupplyIkun Biase

Rural Electrification Involving High and

Low Tension at Ikun 99,470,066 14,920,510 24,867,517 10,000,000

43Energy/Power

SupplyUkwa Eburutu Odukpani Rural Electrification (Inter Town) 50,500,000 7,575,000 12,625,000 10,000,000

44Energy/Power

SupplyBakassi Bakassi

Solar Powered Street Light at Ekpri

Ikang/Ikang, Bakassi 229,935,391 - 39,112,010 10,000,000

45Energy/Power

SupplyIgoli Ogoja

Solar Powered Street Light at Ogoja

Urban Center70,000,000 - 49,000,000 10,000,000

46Energy/Power

SupplySankwala Obanliku

Solar Powered Street Light at Obanliku

Urban Center70,000,000 - 15,876,000 10,000,000

47Energy/Power

SupplyEkpri Iko Biase Electrification Project at Ekpri Iko 70,000,000 17,624,988 15,876,000 10,000,000

48Energy/Power

Supply

Idere/Utuma/

Uburutu/

Biakpan

Odukpani/

BiaseSolar Street Light 250,000,000 - 41,250,000 10,000,000

49Energy/Power

SupplyAkim Akim Odukpani

Rural Electrification inter town

connection (ITC) phase 149,850,000 14,895,000 1,744,750 1,744,750

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 4 of 29

Page 118: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

50Energy/Power

SupplyEfraya Etung Solar Street Light 200,000,000 - 30,000,000 10,000,000

51Energy/Power

Supply

Ekori

AdadamaYakurr

Solar street lights in Ekori Adadama

road 230,000,000 34,500,000 10,000,000

52Energy/Power

SupplyUkwa Eburutu Odukpani

Rural Electrification (Inter Town

Connection) 30,032,119 4,504,818 8,514,106 8,514,106

53Energy/Power

Supply

Crospil Estate,

Calabar

Municpality

Calabar Mun.Construction of Solar Street Light at

Crospil Estate 90,000,000 13,500,000 33,138,000 10,000,000

54Energy/Power

SupplyMkpat Boki

Rural Electrification of Mkpat and

Orunghe Bawop Communities100,000,000 - 35,000,000 10,000,000

55Energy/Power

SupplyCalabar Cal. Mun Provision of Solar Powered Street Light 100,000,000 - 15,000,000 10,000,000

56Energy/Power

Supply

Lemna /Water

Intake Road,

Ikot Effanga

Calabar Mun.Construction of Solar Street Light at

Lemna /Water Intake Road 180,000,000 27,000,000 36,482,000 10,000,000

57Energy/Power

SupplyCal. Mun. Cal. Mun.

Solar Powered Street Light at Winners

Chapel Road, Shanem Hotel 140,077,413 21,011,612 39,518,893 10,000,000

58Energy/Power

SupplyCal. South Cal. South

Electrification involving High and Low

Tension within Calabar South (Etim

Effiom/Nyatowo

145,500,000 21,825,000 24,749,550 10,000,000

59Energy/Power

Supply

Ekumba

KakwagomBoki Electrificcation of Ekumba Kakwagom 40,000,000 - 23,800,000 10,000,000

60Energy/Power

Supply

Obot Oko/

Inua AkpaOdukpani

Rehab Of Electricity Supply Line

Okurikang Okoyong, Obot Oko & Inua

Akpa

116,383,344 - 18,000,000 10,000,000

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 5 of 29

Page 119: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

61Energy/Power

Supply

Afokang

StreetrCal. South

Construction os 1x15MVA/33KVA/11KVA

Injection Sub-station at Afokang 245,500,000 - 20,000,000 10,000,000

62Energy/Power

Supply

Okundi

PlantationIkom

Construction of Solar Street Light at

Okundi Plantation in Ikom 80,000,000 - 15,000,000 10,000,000

63Energy/Power

Supply

Busi 1-6

CommunitiesObanliku Solar Street Light 250,000,000 - 37,500,000 10,000,000

64Energy/Power

Supply

Okundi –

BansanBoki

Rehabilitation of existing rural

electrification along Okundi – Bansan- -

Nsadop road

249,000,000 37,350,000 10,000,000

65Energy/Power

Supply

SFU

CommunityIkom

Solar Powered Electrification Project at

SFU/Nde Community100,000,000 15,000,000 10,000,000

66Energy/Power

SupplyNyahasang Cal. Mun

Construction of Powered Street Light at

Dr. Edem Street Through Cannan

Avenue Nyahasang

120,000,000 83,284,197 18,000,000 10,000,000

67Energy/Power

Supply

Eburutu

BarracksCal. Mun.

Rehab. Of Electricity Supply at Eburutu

Barracks 51,226,770 10,195,991 7,700,000 7,700,000

68Energy/Power

Supply

Afokang/ Ene

NdemCal. South

Provision of Solar Street Light at

Afokang Street & Ene Ndem Street 120,000,000 - 18,000,000 10,000,000

69Energy/Power

Supply

Mkpara Otop

EkpoOdukpani

Rural Electrification at Mkpara Otop

Ekpo 20,000,000 - 14,000,000 10,000,000

70Energy/Power

Supply Total 8,341,303,413 870,866,050 1,405,719,339 739,627,110

71 Health Calabar CalabarEquipment Procurement for General

Hospital, Calabar147,355,936 88,523,360 26,195,400 26,195,400

72 Health Okoroba

VillageEtung Construction of Health Center 43,436,040 14,615,654 10,261,764 10,261,764

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 6 of 29

Page 120: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

73 Health Ovonum

VillageObubra Construction of Health Centre 43,436,040 15,676,821 10,261,764 10,261,764

74 Health Ikom

Construction of perimeter fencing, gate

House and generator House at specialist

Hospital Ikom

100,000,000 - 15,000,000 15,000,000

75 Health Ekukunela Ikom Comprehensive Health Centre 43,436,041 16,244,572 10,261,765 10,261,765

76 Health Ikom IkomConstruction of General/Specialist

Hosiptal 1,214,847,452 370,920,395 35,000,000 35,000,000

77 Health Okpecha BekwarraConstruction of Comprehensive Health

Centre 43,436,040 6,515,406 12,314,117 12,314,117

78 Health Calabar Calabar

Procurement of Laparoscopic /

Endoscopic Equipment and other Medical

Equipment to General Hospital Calabar

100,000,000 - 22,680,000 22,680,000

79 Health University of

Calabar Calabar Mun.

Construction of Central Store at

University of Calabar Teaching Hospital200,000,000 - 33,508,622 33,508,622

80 Health Akparabong

FarmIkom

Comprehensive Health

Centre/Procurement of Hospital

equipments

64,108,332 - 13,462,750 13,462,750

81 Health Okondi Farm Ikom

Comprehensive Health

Centre/Procurement of Hospital

equipments

65,800,540 - 13,818,113 13,818,113

82 Health Various VARIOUSSpecial Medical Referrals and Check-up

for the State200,000,000 30,000,000

83 Health Total 2,265,856,421 512,496,209 202,764,296 232,764,296

84Jetty/Shore

ProtectionIfiang Ayong Bakassi

Construction of Landing Jetty and

Dredging 495,438,976.56 254,771,492 110,000,000 50,000,000

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 7 of 29

Page 121: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

85Jetty/Shore

ProtectionNde Ikom

Erosion control and drainage works at

Steady flow-Aranganfam Knowlwege

Village Nde Ikom

199,875,323 - 90,000,000 40,000,000

86Jetty/Shore

ProtectionAnantigha Calabar South Construction of Landing Jetty 65,123,869 9,768,580 14,770,093 14,770,093

87Jetty/Shore

ProtectionEshi Babsa Boki

Erosion Control and bridging works at

Eshi Bansa Community 100,000,000 - 15,000,000 15,000,000

88Jetty/Shore

ProtectionAyak

Erosion control works at Ayak, Takon

presbitarian communities in Ikom 100,000,000 59,511,882 15,000,000 15,000,000

89Jetty/Shore

ProtectionEsuk Odot Odukpani

Erosion control at Heritage Estate, Esuk

Odot 250,000,000 37,500,000 15,000,000

90Jetty/Shore

ProtectionAkparabong Ikom

Erosion control and Internal road

network at SFCENTUROKIM Community

Akparabong

200,000,000 - 90,000,000 15,000,000

91Jetty/Shore

Protection

Calabar

Marina/Hope

Waddell

Calabar

MunicipalityErosion Control (Design) 30,000,000 - 7,000,000 7,000,000

92Jetty/Shore

Protection

Ewa Ekpo

CloseCal. Mun. Erosion Control 500,000,000 - 56,700,000 15,000,000

93

Jetty/Shore

Protection

Total

1,940,438,169 324,051,954 435,970,093 186,770,093

94 Road/BridgesNew Airport

AbituCalabar South

Construction of New Airport Abitu

Street, Calabar South242,668,067 182,800,063 6,728,626 6,728,626

95 Road/Bridges Bumaji Culverts/Opening of Abo-Bumaje Road 249,933,500 - 26,250,000 26,250,000

96 Road/Bridges Itam Street Calabar SouthConstruction of 1KM Road at Itam

Street100,000,000 53,552,569 22,680,000 18,578,973

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 8 of 29

Page 122: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

97 Road/BridgesNsidung -

Idebe Bakassi

Construction of Short Span Bridge /

Culverts and link Road, from Nsidung -

Idebe

1,382,053,310 705,961,454 8,830,277 8,830,277

98 Road/Bridges Odukpani OdukpaniConstruction of Efiok/Okoyong road

(1.5km), Odukpani231,650,900 34,747,635 34,747,635

99 Road/Bridges Ikom Agbokim Ikom

Construction of Ikom Agbokim waterfall

Road in Ikom Cross River State-(Lots 1

to 3)

4,053,443,330 1,590,277,492 166,877,227 50,266,335

100 Road/Bridges Calabar CalabarEsuk Atu/ Imperial College road,

Satelite Town, Calabar,198,050,000.00 - 30,000,000 30,000,000

101 Road/Bridges Ikot Effanga Cal. Mun.Construction of Mix Use Development

Layout241,178,364.17 98,250,002 27,674,500 27,674,500

102 Road/Bridges Dr. Dean Cal. SouthConstruction of Okon Ene Street and

Drainage 150,000,000 - 25,515,000 25,515,000

103 Road/Bridges

Adiabo

Okurikang -

Ukem

OdukpaniErosion Control Works at Adiabo

Okurikang - Ukem, Odukpani 535,112,567 - 34,739,731 34,739,731

104 Road/Bridges Biase BiaseConstruction of Internal Flexible

Pavement Road Phase 2224,980,000 33,747,000 23,058,875 23,058,875

105 Road/Bridges Kakun Obudu

Construction of St. Theresa Primary

School Road via Kakun roundabout to

Ohong Town with spur to Owei in Obudu

240,000,000 80,666,519 35,910,000 43,733,392.50

106 Road/Bridges Okwei ObuduConstruction of Okwei Obudu to

Bebuagba Road240,000,000 - 35,910,000 43,733,392.50

107 Road/Bridges Okoyong OdukpaniConstruction of Palace Kabengta of

Okoyong153,689,125 23,053,369 43,032,955 43,733,392.50

108 Road/Bridges Enebong Cal.Mun. Construction of Enebong Layout 130,650,630 67,362,407 36,582,176 25,315,289.20

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 9 of 29

Page 123: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

109 Road/Bridges Ikot Okon BakassiConstruction of Ikot Okon Idem -ikot

edet Nsa-Ikot Anansa Road231,431,226 - 32,400,372 52,572,490.33

110 Road/Bridges obubra ObubraConstruction of Obubra Internal Roads

Phase II213,582,263 25,712,189 29,901,517 52,572,490.33

111 Road/Bridges Akim Akim Odukpani Construction of Akim Akim Road 603,188,040 250,200,104 140,050,952 140,050,952

112 Road/Bridges Calabar Cal. South Construction of Abua Street 240,000,000 53,871,185 26,824,000 26,824,000

113 Road/BridgesCreek Town /

Okoyong Odukpani

Rehabilitation of Creek Town - Okoyong

Road. 1,950,000,000 377,812,662 105,000,000 105,000,000

114 Road/Bridges Ebom AbiConstruction of 3km Rehumomet

Junction-Secondary School Road250,000,000 - 37,500,000 37,500,000

115 Road/BridgesIgoli-Abakpa

Junction RoadOgoja

Construction of Igoli-Abakpa Junction

Road250,000,000 - 37,500,000 37,500,000

116 Road/Bridges Nde Ikom Ikom

Erosion control and drainage works at

Steady flow-Aranganfam Knowlwege

Village Nde Ikom (Phase 2)

200,000,000 - 30,000,000 30,000,000

117 Roads/Bridges Esuk Atu Raod Calabar Mun. Construction of Esuk Atu 217,516,100 30,000,000 34,020,000 34,020,000

118 Roads/Bridges BetuKwel Betukwel-Ohong 1.5km Road 240,000,000 - 25,200,000 35,200,000

119 Roads/Bridges Plot 151-Ntibi Polt 151-Ntibi Close 1.5km 250,000,000 - 26,250,000 36,250,000

120 Road/Bridges OkorotungConstruction of Okorotung/Amukwong 1

km road250,000,000 - 26,250,000 36,250,000

121 Road/Bridges Udayi 1.5km Udayi-Akpabuyou Estate Road 250,000,000 - 26,250,000 36,250,000

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 10 of 29

Page 124: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

122 Road/BridgesEfio Okogho

StreetCalabar South Construction of Efio Okogho Road 195,893,493 65,663,797 33,321,483 36,250,000

123 Road/Bridges Bendeghe EtungConstruction of Bendeghe Ekiem-

Effraya Road250,000,000 - 26,250,000 36,250,000

124 Roads/Bridges Bakwui River

BridgeEtung

Completion of Bakwui River Bridge along

Agbokim - New Jerusalem Road80,000,000 - 18,144,000 18,144,000

125 Roads/Bridges Okpoma

IshayaYala Construction of Okpoma Ishaya Road 199,999,475 120,585,863 34,020,000 36,250,000

126 Roads/Bridges Utugwan Mkt

to Uti Agbas Obudu

Construction of Utugwan to Uti Agbas

Palace Road175,720,868 85,552,462 29,890,120 36,250,000

127 Roads/Bridges Kakum 1.5km Kakum Bebuabia Larry Agim Road 240,000,000 37,575,835 25,200,000 36,250,000

128 Road/Bridges Bendi Bendi/Upan/Adede 1.5km Road 240,000,000 - 25,200,000 36,000,000

129 Road/Bridges AnsaotiAnsaoti Ext-Akpagu Parliamentary 1.5km

Road240,000,000 - 25,200,000 36,000,000

130 Road/Bridges Bashua BokiRehabilitation of Bashua Biajua

Community Road, Boki115,978,840 17,396,826 22,680,000 22,680,000

131 Roads/Bridges Ekori YakurrConstruction of Okonobongha Ugbekuma

Anong road, Ekori 240,000,000 36,000,000 36,000,000

132 Roads/Bridges Ugep YakurrConstruction of Ijom Hospital road,

Ugep 240,000,000 36,000,000 36,000,000

133 Roads/Bridges Ediba Abi Construction of Ediba Market road 200,000,000 30,000,000 30,000,000

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 11 of 29

Page 125: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

134 Road/Bridges Cal. Mun. Cal. Mun.construction of road at Ituokon

extention through Brookes street243,500,000 26,876,091 105,000,000 36,250,000

135 Road/Bridges

Adiabo

Okurikang -

Ukem

OdukpaniConstrcution of Adiabo Okurikang -

Ukem Road497,700,704 233,434,939 100,000,000 36,250,000

136 Road/Bridges Essien/Umo Calabar SouthConstruction of Esiet Ebom Street

1.3km197,500,508 - 33,594,836 36,250,000

137 Road/Bridges Betukwel ObuduConstruction of 3km Betukwel Ring road

(Lots 1-2) 250,000,000 37,500,000 36,250,000

138 Road/BridgesAmukwong/

OkikwoObudu

Construction of 3km Amukwong/Okikwo

road (Lots 1-2) 250,000,000 37,500,000 36,250,000

139 Road/Bridges Utugwan ObuduConstruction of 2km Utugwan Ring road

(Lots 1-2) 250,000,000 37,500,000 16,250,000

140 Road/Bridges Atan Okoyong Cal. Mun.Construction of Atan Okoyong Rural

Road125,000,000 - 13,125,000 16,250,000

141 Road/BridgesEdem Effiom

StrtCal. Mun. Construction of Edem Effiom Street 250,000,000 - 26,250,000 16,250,000

142 Road/Bridges Nsung Akpabuyo Construction of Internal Roads 150,000,000 - 15,750,000 15,750,000

143 Road/BridgesEkpenyong -

EkpenyongCalabar North

Construction of 2km Ekpenyong -

Ekpenyong street, off Barracks road 200,000,000 30,000,000 16,250,000

144 Road/Bridges Anating Calabar SouthConstruction of Anating street off

Target road 166,700,000 25,005,000 16,250,000

145 Road/Bridges Edem Odo Calabar SouthConstruction of 2km Edem Odo street,

off Bogobiri 200,000,000 30,000,000 16,250,000

146 Road/Bridges CalabarCalabar

Municipal

Construction of Oyo Ita street/Ambo

Lane, Calabar Municipal 139,643,818 - 20,946,573 16,250,000

147 Road/Bridges Ikom IkomConstruction of Internal road network

at F.G.C Ikom 150,000,000 - 22,500,000 16,250,000

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 12 of 29

Page 126: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

148 Road/Bridges Calabar SouthConstrction of Balantine and Richard

Henshaw Street in Calabar south 100,000,000 - 15,000,000 15,000,000

149 Road/Bridges Okuku Yala Construction Okuku-Okpoma Road 200,000,000 - 30,000,000 16,250,000

150 Road/Bridges Ukele YalaConstruction of Yahe -Wanahen road in

Ukelle 200,000,000 - 30,000,000 16,250,000

151 Road/Bridges Utikeb ObuduConstruction of Utikeb-Ohong-

Bebeatsuan road 200,000,000 - 30,000,000 16,250,000

152 Road/Bridges Egeiti YakurrConstruction of Egeiti-Ominiji road,

Ugep Urban. (2km) 200,000,000 - 30,000,000 16,250,000

153 Road/Bridges CalabarCalabar

Municipal

Construction of Custom Line, Ikot

Ansar, Calabar Municipal (Phase 1) 223,955,000 - 33,593,250 16,250,000

154 Road/Bridges Bebuabie Obudu

Construction of Bebuabie - Bewatsuan

Road with a spur to Kakun inclusive side

drains

500,000,000 - 75,000,000 16,250,000

155 Road/Bridges Eshi Bansan BokiErosion control and bridging works at

Eshi Bansan in Boki LGA CRS. (Phase II) 120,000,000 18,000,000 16,250,000

156 Road/BridgesOld forestry

quartersIkom

Construction of roads with draignage at

Mansion cresent by Old forestry

quarters 4 corners Ikom LGA

200,000,000 30,000,000 16,250,000

157 Road/Bridges Esuk Atu Calabar

Construction of new Esuk Atu Diaspora

road with spur to Esuk Atu Beach

Calabar, Cross River State. (1.5KM).

200,000,000 30,000,000 16,250,000

158 Road/BridgesKakwagom –

IrruanBoki

Errosion control and Internal roads

network in Kakwagom – Irruan Boki LGA,

Cross River State.

200,000,000 30,000,000 16,250,000

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 13 of 29

Page 127: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

159 Roads/ Bridges

Akpap-

Oboroko-

Okurikang

OdukpaniConstruction of Akpap-Oboroko-

Okurikang Road 150,000,000 22,500,000

160 Road/Bridges Ebom Yakurr

Construction of Egeiti road by Ekumini

streem Ijom , Ugep – Yakurr, Cross

River State. 1km.

200,000,000 30,000,000 16,250,000

161 Roads/Bridges Edim Ewa Ikom

Construction of Edim Ewa street with

spur to Osim Atanba street off Ogbudu

road Ikom

120,000,000 18,000,000 16,250,000

162 Roads/Bridges Nde Ikom Ikom

Erosion control and drainage works at

Steady flow-Aranganfam Knowlwege

Village Nde Ikom (Phase 2)

200,000,000 30,000,000 16,250,000

163 Road/Bridges Monaya OgojaConstruction of Ikaptang by Monaya

Afrike Road 200,000,000 30,000,000 16,250,000

164 Road/Bridges Ishibori Ogoja

Construction of Isibori Market road

with spure to Agiga new Latout

Extension road

200,000,000 30,000,000 16,250,000

165 Road/Bridges Imaje Yala Construction of Imaje Road 200,000,000 30,000,000 16,250,000

166 Road/Bridges Abuochiche BekwarraConstruction of Abuochiche - Ubepa -

Echimofuna road 200,000,000 30,000,000 16,250,000

167 Road/Bridges Akwurinyi Bekwarra Construction of Akwurinyi Abukpem road 200,000,000 30,000,000 16,250,000

168 Road/Bridges Nyanya BekwarraConstruction of Nyanya TownHall - AYA

road 200,000,000 30,000,000 16,250,000

169 Road/Bridges Ablasang Obanlikwu Construction of Ablasang-Buya road 200,000,000 30,000,000 16,250,000

170 Road/Bridges Obudu Ranch ObanlikwuRahabilitation of old Obudu Sankwula

road in Obanlikwu 200,000,000 30,000,000 16,250,000

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 14 of 29

Page 128: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

171 Road/Bridges Bayaga ObanlikwuConstruction of Bayaga-Sankwula road in

Obanlikwu 200,000,000 30,000,000 16,250,000

172 Road/Bridges Mile 15 IkomErosion control and internal road

network at SFCE Mile 15 Nturokin, 200,000,000 30,000,000 16,250,000

173 Road/BridgesCalabar

municipalCalabar

Construction of Internal road by

Solomon Okpa Layout Calabar municipal 200,000,000 30,000,000 16,250,000

174 Road/Bridges Calabar CalabarConstruction of water Board intake road

Calabar Municipal 200,000,000 30,000,000 16,250,000

175 Road/Bridges CalabarCalabar

Municipal

Construction of 2km Effiom Abasi

Street, Calabar 240,000,000 36,000,000

176 Road/Bridges Calabar Cal. South Construction of Bonny Street 249,080,500 - 37,362,075 16,250,000

177 Road/Bridges Monaya OgojaConstruction of Ikaptang by Monaya

Afrike Road 200,000,000 - 30,000,000 16,250,000

178 Road/Bridges Bebuabie ObuduConstruction of Bebuabie road with spur

through Bebuagam to Bebuabung road. 200,000,000 - 33,170,152 16,250,000

179 Road/Bridges Ishibori Ogoja

Construction of Isibori Market road

with spure to Agiga new Latout

Extension road

200,000,000 - 30,000,000 16,250,000

180 Road/Bridges Imaje Yala Construction of Imaje Road 200,000,000 - 30,000,000 16,250,000

181 Road/Bridges Abuochiche BekwarraConstruction of Abuochiche - Ubepa -

Echimofuna road 200,000,000 - 30,000,000 16,250,000

182 Road/Bridges Akwurinyi Bekwarra Construction of Akwurinyi Abukpem road 200,000,000 - 30,000,000 16,250,000

183 Roads/Bridges Nyanya BekwarraConstruction of Nyanya TownHall - AYA

road 200,000,000 - 30,000,000 16,250,000

184 Road/Bridges Ablasang Obanlikwu Construction of Ablasang-Buya road 200,000,000 - 30,000,000 16,250,000

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 15 of 29

Page 129: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

185 Road/Bridges Obudu Ranch ObanlikwuRahabilitation of old Obudu Sankwula

road in Obanlikwu 200,000,000 - 30,000,000 16,250,000

186 Road/Bridges Bayaga ObanlikwuConstruction of Bayaga-Sankwula road in

Obanlikwu 200,000,000 - 30,000,000 16,250,000

187 Road/Bridges Okoyong Construction of Idim-Iko road, Okoyong 200,311,920 - 30,046,788 16,250,000

188 Road/Bridges Itu EbangeCalabar

Municipal

Construction of Itu Ebange Street with

Spurs, off Canaan Avenue (2km) 200,000,000 - 30,000,000 16,250,000

189 Road/Bridges Henshaw TownCalabar

Central

Construction of Access road and Landing

Jetty at Henshaw Town Beach 200,000,000 - 30,000,000 16,250,000

190 Road/Bridges Obio Edik BakassiConstruction of Obio Edik Community

road 200,000,000 - 30,000,000 16,250,000

191 Road/Bridges Construction of Atan Okoyong Road 50,000,000 - 5,250,000 5,250,000

192 Road/BridgesConstruction of Edem Efion (Ogour

Guest House) Road 40,000,000 - 4,200,000 4,200,000

193 Road/Bridges Mile 15 IkomErosion control and internal road

network at SFCE Mile 15 Nturokin, 200,000,000 - 30,000,000 16,250,000

194 Road/BridgesOdukpani

Close off TTCCal. Mun.

Construction of Odukpani Close, off TTC

and Akiba Street, Ikot Ansa (1Km Road)70,500,000 50,607,960 15,989,400 16,250,000

195 Road/Bridges

Old Marian

Road/Mt. Zion

Lane

Cal. Mun.Constrcution of Old Marian Road/Mt.

Zion Lane. 108,885,216 46,495,985 25,547,737 16,250,000

196 Road/Bridges OkirikaConstruction of Sonny Soap /Cluster

Communities Road 150,000,000 22,500,000

197 Road/BridgesEdet Eyo

Cresent Cal. Mun.

Construction of Edet Eyo Cresent

(0.7KM Road) 70,000,000 20,936,075 15,876,000 16,250,000

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 16 of 29

Page 130: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

198 Road/BridgesIkot Eneobong

New LayoutCal. Mun.

Construction of Access Road to Ikot

Eneobong New Layout (1KM Road) 130,650,630 19,597,595 18,519,727 16,250,000

199 Road/BridgesUyanga-Ekpri

Ibami RdUyanga Construction of Uyanga to Ekpri Ibami 250,000,000 - 24,937,500 16,250,000

200 Road/BridgesAyaebam to

Awi Rd

Construction of Road from Ayeabam to

Awi Rd 250,000,000 - 24,937,500 16,250,000

201 Road/BridgesAlike-Ebranta

RdBoki

Construction of Alike-Ebranta Road,

Isobeneghe150,000,000 22,500,000 19,950,000 16,250,000

202 Road/BridgesAtaobong

StreetCal. South

Construction of Oyo Ita/Ambo Lane

Street200,000,000 - 32,319,000 16,250,000

203 Road/Bridges Okuku YalaConstruction of Maryknoll-Abakaliki

1.5km ring road200,000,000 - 30,000,000 16,250,000

204 Road/BridgesIman-Ene

Edet- FrazerCal. South

Construction of Iman Ene Edet-Frazer

Road100,000,000 - 21,546,000 16,250,000

205 Roads/ Bridges CalabarCalabar

Municipal

Construction of 1km Enima Street off

Adiabo road and 300m road at 8 Miles,

Calabar

240,000,000 36,000,000

206 Road/Bridges Biase BiaseConstruction of Internal Flexible

Pavement Road231,281,111 111,572,949 37,373,871 16,250,000

207 Road/Bridges Uduak Ekanim Uduak Orok Daniel Ogan Ekanim Road 200,903,050 - 69,160,000 16,250,000

208 Road/Bridges Lasley Duke CalabarConstruction of (Ekeng Abia/Adjoining

Streets)300,000,000 26,295,038 45,000,000 16,250,000

209 Road/BridgesOchubi

AkporokoYala

Construction of Ochubi Akporoko Road,

Yala124,500,750 18,675,113 20,118,699 16,250,000

210 Road/Bridges Calabar Cal. South Construction of Iboku Street 245,220,123 91,741,499 32,976,346 16,250,000

211 Road/Bridges Atakpa Cal. SouthConstruction of Atakpa / Atamunu Lane

/Etim Effiom248,432,786 91,766,612 33,495,496 16,250,000

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 17 of 29

Page 131: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

212 Road/Bridges CICC Layout CalabarConstruction of 2km CICC layout, off

New Quarters 250,000,000 37,500,000

213 Road/BridgesIkun -

Abanwan Biase

Construction of Ikun-Abanwan Road

(8KM)1,042,421,909 23,145,367 33,250,000 33,250,000

214 Road/Bridges Calabar Cal. Mun. Rehab/Overlay of selected Roads 3,000,000,000 - 53,200,000 80,000,000

215 Road/Bridges Ifiang Ayong BakassiConstruction of New Amadung /Market

Road244,543,400 36,681,510 39,772,322 16,250,000

216 Road/Bridges Adim BiaseConstruction of Adim Internal Road

(Phase II)167,500,236 25,125,035 27,067,201 16,250,000

217 Road/Bridges Edem Otop Cal. Mun.Construction of 1km Road at Edem Otop

Stream Road120,000,000 - 19,391,400 16,250,000

218 Road/BridgesMbarakom

AnikingAkamkpa Construction of Mbarakom Aniking Road 245,000,000 36,750,000 26,290,775 16,250,000

219 Road/BridgesAnike

EgbarantaBoki

Construction of Anike Egbaranta Road,

Boki150,000,000 - 24,239,250 16,250,000

220 Road/BridgesSankwala

Bayaga Obanliku

Construction of Sankwala Bayaga Ketung

Road100,000,000 - 21,546,000 16,250,000

221 Road/BridgesOgochubi-

OlanchoYala Construction of Ogochubi Olancho Road 124,250,000 18,637,500 13,715,625 13,715,625

222 Road/Bridges Ntan Afuafua YakurrConstruction of Ntan Afuafua Road in

Ikori, Yakurr200,000,000 30,000,000 19,019,000 16,250,000

223 Road/BridgesEkpenyong

OminCal. Mun.

Construction of Ekpenyong Omin Street

Road52,614,482 7,892,172 11,336,316 11,336,316

224 Road/Bridges Akpet BiaseConstruction of Okurike Internal Road

to Akpet, Biase LGA 219,938,512 134,619,923 28,500,000 16,250,000

225 Road/Bridges Babuagba ObuduConstruction of Babuagba via Babuabie

to Kutiang Road240,000,000 - 35,910,000 16,250,000

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 18 of 29

Page 132: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

226 Road/Bridges Babuagbong ObuduConstruction of Babuagbong to Kakum

Village Square in Obudu240,000,000 37,619,905 29,260,000 16,250,000

227 Road/Bridges Ashikem ObuduConstruction of Ashikem Ufono junction

to Bewatswan Road245,000,000 36,750,000 30,008,125 16,250,000

228 Road/Bridges Ajere Yakurr Construction of Ajere Beach Road, Ekori 247,000,000 - 36,957,375 16,250,000

229 Road/Bridges Ogoja OgojaConstruction of 1.6Km Union Bank road,

Igoli Ogoja in Cross River 250,000,000 37,500,000

230 Road/Bridges Adiabo Odukpani

Construction of Drainage and Erosion

Control at Adiabo, Akanni Obio- Urua

Etak Uyo in Odukpani

700,000,000 - 56,558,250 250,000,000

231 Road/Bridges Ikom Ikom Erosion Control works at Ikom 300,000,000 84,032,927 32,319,000 16,250,000

232 Road/Bridges Abayong Adim Biase Construction of Abayong-Adim Road 842,585,500 226,490,749 47,745,595 16,250,000

233 Road/Bridges Market Road obuduConstruction of Market/Port Harcourt

Road in Obudu248,500,000 37,275,000 40,156,358 16,250,000

234 Road/Bridges Calabar Cal. Mun.Construction of Johnson Ebokpo-Erori

nini close at Calabar Minicipality200,000,000 - 19,950,000 16,250,000

235 Road/Bridges

Abanyong/

Usumutong

Ebomi

Biase/AbiConstruction of Abanyong Usumutong

and Abayong - Ebom Road1,911,451,549 - 100,000,000 16,250,000

236 Road/BridgesUkim Ita -

IbondaOdukpani Construction of Ukim Ita Ibonda Road 247,500,000 37,125,000 33,328,969 16,250,000

237 Road/Bridges Egabeti Ntan Ekori Yakurr Construction of Egabeti Ntan road 250,000,000 37,500,000 16,250,000

238 Road/BridgesAkamkpa

Urban WardAkamkpa

Construction of Island-Bassey Ntui road

in Akamkpa Urban Ward 230,000,000 34,500,000 16,250,000

239 Road/Bridges Iko Ward AkamkpaConstruction of Ibogo-Iko Experiment -

Iko Esai road 240,000,000 36,000,000 16,250,000

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 19 of 29

Page 133: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC CROSS RIVER STATE 2016 BUDGET

240 Road/Bridges Uyanga Ward AkamkpaConstruction of Akwa Ibami - Ekpri

Ibami - Uwet road 250,000,000 37,500,000 16,250,000

241 Road/Bridges Okurike BiaseRehabilitation of 2.6km Road from

Okurike to Akpet219,938,512 126,199,658 32,595,964 16,250,000

242 Road/BridgesSt. Patricks

CollegeCal. Mun.

Construction of Road Network in St

Patrick's College174,000,000 47,764,813 28,117,530 16,250,000

243 Road/BridgesIkot Offiong

AmbaiAkpabuyo

Construction of Internal Road at Nigeria

Navy Sec. Sch200,000,000 - 32,319,000 16,250,000

244 Road/Bridges Cal. South Cal. SouthConstruction of Mammy Market to

Diamond Bank Road 194,022,348 29,103,352 31,353,041 16,250,000

245 Road/Bridges Cal. South Cal. SouthConstruction of Hart Street and

Neigbouring Roads227,078,745 34,061,812 30,044,790 16,250,000

246 Road/Bridges Iyata Street Cal. Mun. Construction of Iyata Street 70,000,000 - 15,876,000 16,250,000

247 Road/BridgesJoseph Mkpag

StreetCal. Mun. Construction of Joseph Mkpang Street 90,239,800 13,535,970 23,326,632 16,250,000

248 Road/Bridges Obubra Obubra Internal road 189,767,000 71,389,145 35,239,866 75,634,000

249 Road/Bridges Ikot Effanga Cal.Mun.Construction of Technical College Road

at Ikot Effanga Mkpa229,416,924 - 32,118,369 16,250,000

250 Road/Bridges Itu-Okon Cal. Mun.Construction of Road at Okon extension

through Brooks street in Calabar167,690,490 - 23,476,669 16,250,000

251 Road/Bridges Satelite Town

Construction of Victory way(Lowerside

from Drainage line to Graceland

Crescent Satelite Town

239,542,925 - 33,536,010 16,250,000

252 Road/Bridges Odukpani Odukpani Rehabitation of Odukpani Town Road 208,748,100 158,355,881 29,224,734 16,250,000

253 Road/Bridges Akampa Construction of internal road at Akampa 245,470,511 - 34,365,872 16,250,000

2016 APPROPRIATION ACT- CROSS RIVER NATIONAL ASSEMBLY Page 20 of 29

Page 134: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

1Canalisation/

ReclamationKurutie

Warri South

West

Sand filling of Kurutie community

phase 2950,000,000 - 136,800,000 150,000,000

2Canalisation/

Reclamation

Ebeberegbene

townBurutu Sand filling of Ebeberegbene town 1,600,000,000 240,000,000 0.00

3Canalisation/

ReclamationKantu Warri North

Re-canalisation of Kantu creek,

(Phase II)300,000,000 45,000,000 0.00

4Canalisation/

Reclamation

Seitorou-Bolou-

Ekamtagbene

Town

Canalisation/Reclamation of

Seitorou-Bolou-Ekamtagbene Town-

(Lots 1 to 2

1,940,000,000 - 300,000,000 0.00

5Canalisation/

ReclamationUrhie- ewu Ugheli North

Clearing and channeling of Urhie -

Ewu River770,664,400 595,570,909 22,176,000 0.00

6Canalisation/

ReclamationEffurun Uvwie

Reclamation of Ijakpa Primary

school land Onire, Ijakpa Qtrs-

Phase 1

250,000,000 - 36,000,000 36,000,000

7Canalisation/

ReclamationEffurun Uvwie

Reclamation of Ijakpa Primary

school land Onire, Ijakpa Qtrs-

Phase 2

250,000,000 - 36,000,000 36,000,000

8Canalisation/

Reclamation

Ogbinbiri/Ogb

udugbudu-

Opuama-

Tsekelewu

Warri NorthOgbinbiri/Ogbudugbudu-Opuama-

Tsekelewu canalization 1,200,000,000 600,000,000 44,210,880 0.00

9Canalisation/

ReclamationOgbe Ijoh

Warri South

West

Canalisation of General Hospital

creek 200,000,000 - 28,800,000 0.00

10Canalisation/

Reclamation

Ebrohimi /

Tisun

Warri South

West

Reclamation of Ebrohimi - Tisun

Community (design)30,000,000 - 907,200 0.00

11Canalisation/

ReclamationKokodiagbene

warri south

west

Shore protection/sandfilling of

kokodiagbene (design)30,000,000 - - 0.00

NDDC DELTA STATE 2016 BUDGET

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 1 of 94

Page 135: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

12Canalisation/

ReclamationKantu Warri North Re-canalisation of Kantu creek, 249,000,000 - 38,400,000 -

13Canalization/Re

clamation Total7,769,664,400 1,195,570,909 928,294,080 222,000,000

14 Ecological Abraka Ethiope EastErosion Control (Drainage) at Delta

State University, Abraka155,868,563 31,103,950 43,200,000

15 Ecological Aradhe Isoko NorthConstruction of Aradhe township

drainage 100,000,000 15,000,000

16 Ecological Ellu Isoko NorthConstruction of 3km Ellu township

drainage 400,000,000 60,000,000

17 Ecological Total 655,868,563 31,103,950 43,200,000 75,000,000

18 Education Ogbe KwaleRehabilitation of Utagba-Ogbe

Technical college building193,586,938 - 36,000,000 29,038,041

19 Education Oghara Ethiope west

Construction of 500 students

capacity hostel at western delta

university Oghara

400,000,000 - 57,600,000 50,000,000

20 Education Oghara Ethiope west

Construction of Two (2) blocks of 12

lecture room each for two (2)

faculties at western delta university

Oghare

250,000,000 - - 50,000,000

21 Education Oto-OgorRehabilitation of Oto-Ogor

Technical College. 240,000,000 36,000,000

22 EducationOghara,

Agbarha-OtorUghelli North

Rehab./Provision of Facilities at

Oghara Secondary Sch, Oghara,

Agbarha-Otor

147,974,399 - - 40,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 2 of 94

Page 136: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

23 Education Patani PataniConstruction of Student Hostel at

Ayama Quarters, Patani 240,000,000 36,000,000 36,000,000

24 Education Agbor Ika NorthRehabilitation of Agbor Technical

College 240,000,000 36,000,000 36,000,000

25 Education Ekakpampre Ughelli NorthRehabilitation of Majovo Primary

School Ekakpampre 220,000,000 33,000,000 33,000,000

26 Education Agbarha Ughelli NorthRenovation of Ibru College

Building,Hostel and Fence 99,217,349 46,225,918 14,400,000 15,000,000

27 Education Delta North Oshmili NorthRehabilitation / Re construction of

Anioboshi Primary School. 100,000,000 48,000,000

28 Education BenikrukruWarri South

West

Construction Of 1no.6 Classroom

Block & Staff Quarters At

Benikrukru Community Secondary

School

200,000,000 - 28,800,000 28,800,000

29 Education Oleh Campus Isoko North

Supply of furniture, laboratory

equipment and computers to Delta

State University, Oleh Campus

200,000,000 30,000,000

30 Education Aviara Isoko southRehabilitation of Orode primary

school99,725,438 74,794,079 21,772,800 15,000,000

31 Education Toru Angiama PataniStaff quarters at Toru Angiama

Secondary School70,000,000 - 10,080,000 10,500,000

32 Education Orerokpe Okpe

Construction of six (6 No.)

classroom block and administrative

block at I.C.E, Orerokpe

50,000,000 - - 15,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 3 of 94

Page 137: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

33 Education Ogo-eze Bomadi

Construction of Perimeter Fencing

of Ogo-Eze Secondary Commercial

School

220,000,000 186,872,713 11,000,000 11,000,000

34 Education Bomadi Town BomadiRenovation of St. Brendan’s

Secondary School, Bomadi 150,000,000 22,500,000

35 Education Ogriagbene Bomadi

Construction Of 2 N0. Six

Classroom / Admin Block And 2 N0.

Staff Quarters At Onurun Primary

School Ii.

249,000,000 - 35,856,000

36 Education AbrakaConstruction of Faculty of

Engineering1,000,000,000 - 144,000,000

37 Education Kaigbodo Burutu

Construction of NDDC Prototype

University Hostel Block at the Dr.

Edwin Clark's University

990,000,000 - 142,560,000

38 Education Gbokoda Warri NorthConstruction of Ginuwa Grammar

School, Gbokoda-Lots 1-31,000,000,000 - 96,000,000

39 Education Abraka Ethiope East

Completion & Equipping of

Instructional Technology

Library/Science and Physiology

Research Laboratory in Delta State

University, Abraka

112,575,000 - 25,288,848

40 Education Oghara Ethiope-WestConstruction of Lecture Theatre at

Western Delta University, Oghara230,000,000 26,976,806 16,315,572

41 Education Ukpude Isoko NorthRenovation of Aka Primary School in

Upude, Aviara Isoko100,000,000 15,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 4 of 94

Page 138: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

42 Education BOMADI BOMADI

REHABILITATION/

MAINTENANCE OF SAINT

BREDAN'S GOVERNMENT

COLLEGE, BOMADI

220,000,000 33,000,000

43 Education Ukpude Isoko North

construction of a six block

classroom and headmaster office at

Ellu primary school Ellu

100,000,000 15,000,000

44 Education Aviara Isoko North

construction of a six block

classroom and headmaster office at

Ukpede school Aviara

100,000,000 15,000,000

45 Education

Egwe,

Eghoma,Owa

Alero

Ika North

East

Rehabilitation/Reconstruction of

Egwe Primary School/Eghoma

Primary School, Owa-Alero

150,000,000 - 21,600,000

46 Education

Delta State

Polytechnic

Ozoro

Isoko NorthICT Center/ One Storey Complex

with Offices (2) 225,000,000 - 13,698,720 100,000,000

47 Education Kiagbodo BurutuConstrution of lecture theatre, E.K

clarke University Kiagbodo250,000,000 - 36,000,000

48 Education Egborode OkpeFencing of Egborode Primary School

with Gate and Administrative Block100,000,000 - 14,400,000

49 Education Sapele Sapele

Construction of Ultra Modern 10

Classroom Blocks and Perimeter

Fence at St. Malachy's Grammar

School

245,000,000 - 52,800,000

50 Education Sapele SapeleRenovation/Construction of St.

Malachy Secondary School-Lots 1-2998,000,000 - 105,312,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 5 of 94

Page 139: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

51 Education Ezionu UkwaniDevelopment of Ezionum Grammer

School, Ezionum 100,000,000 - 14,400,000

52 Education Akugbene

Expansion and upgrade of Facilities

in Akugbene Grammar School

including Corper's Lodge, Staff

quarters,borehole power& sports

Facilities-Lots 1-2

500,000,000 - 80,000,000 80,000,000

53 Education Effurun Uvwie

Construction of 35-room Hostel

with Courtyard at Petroleum

Training Institute, Effurun

100,000,000 34,193,999 21,772,800

54 Education Effurun Warri

Constructon of Engineering

Workshop in University of

Petroleum

100,000,000 - 21,772,800

55 Education Utagba-Ogbe Kwale

Supply of chairs and computers to

Utagba-Ogbe Grammar School and

Utagba-Ogbe Girls Grammar School

50,000,000 7,500,000 7,500,000

56 EducationOkogho

communityWarri North

Construction of six classrooms

block/office admin building,

teachers quarters at Okogho

community

250,000,000 37,500,000

57 Education Oto-ogor Ughelli NorthRehabilitation of Oto-ogor Technical

College 250,000,000 37,500,000

58 Education Total 10,540,079,124 369,063,515 1,286,929,540 693,338,041

59Energy and

Power supplyVarious Various

Installation of transformers in

Delta State450,000,000 52,295,786 - 50,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 6 of 94

Page 140: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

60Energy Power

Supply

Amukpe

CommunitySapele

Construction of 1x 15MVA, 33/11KV

Injection Substation 247,562,893 - 35,649,057 35,649,057

61Energy Power

SupplyOghara Ethiope West

Extension of 33kv line from Oghara

132/33 substation to Western

Niger Delta University,Delta state

university teaching hospital and koko

987,000,000 - 103,728,000 103,728,000

62Energy/Power

SupplyKalafiogbene Bomadi

Installation/Extension of solar

street light at Kalafiogbene 150,000,000 22,500,000

63Energy/Power

SupplyOkwighele Okpe

Electrification Project in Okwighele

Communities (Construction of

2X7.5MVA 33/11KV Substation)

228,855,329 - 36,000,000 36,000,000

64Energy/Power

SupplyAkugbene Bomadi

Installation of solar street light at

Chief Agbede Sam Link road 150,000,000 22,500,000

65Energy/Power

SupplyEzebiri town Bomadi

Installation of solar street light at

Chief Bozimo street 150,000,000 22,500,000

66Energy Power

SupplyIsiokolo Ethiope East

Procurement/Installation of Solar

Street Light of 7.5km in Ekrebo

Road, Isiokolo

200,000,000 163,979,870 13,343,976 36,020,130

67Energy Power

SupplyAbraka Ethiop-East

Solar Powered Street light at Oria-

Abraka100,000,000 - 6,350,400 6,350,400

68Energy Power

SupplyNaifor Gbene Warri South Solar Street Light in Naifor Gbene 99,985,000 43,994,750 6,701,151 6,701,151

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 7 of 94

Page 141: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

69Energy Power

Supply

Ogriagbene

CommunityBomadi

Design of Construction of Double

Circuits 132KV Transmission Line

Bays at Afiesere Transmission

Station, Extension of 33KV OHL

Network/ Constructikon of

2x300KVA, 33/0.415KV Distribution

Substations at Ogriagbene

Community, Bomadi LGA of Delta

State

90,000,000 13,500,000

70Energy Power

SupplyEsama Town Bomadi Solar Street Light Phase 2 190,250,800 - 27,396,115 27,396,115

71Energy/Power

SupplyTuomo Burutu

PROVISION OF SOLAR POWERED

STREET LIGHT AT TUOMO TOWN 200,000,000 - 35,712,000 35,712,000

72Energy/Power

Supply Utagba-Uno Ndoka West

Solar Powered Street Light at

Utagba-Uno100,000,000 50,000,000 4,800,000 4,800,000

73Energy/Power

Supply Ovade-Otefe

Electrification of Ovade-Otefe

road (33KVA-8km) 250,000,000 - 1,000,000 1,000,000

74Energy Power

Supply

Afiesere/

IyedeUghelli North

The Design & Supervision of

Construction of 132KVA

Transmission Line from Afiesere

Substation to Iyede in Delta State

80,000,000 12,000,000

75Energy/Power

Supply

Idere/Utuma/

Uburutu

Rural Electrification of

Idere/Utuma/Ukwa 250,000,000 - 36,000,000 36,000,000

76Energy/Power

SupplyWarri Warri

Solar Street Light at lower Erejuwa

road44,560,660 11,140,165 6,478,468 6,478,468

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 8 of 94

Page 142: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

77Energy/Power

SupplySokebolou Burutu

Installation of Solar-Powered

Street Lights at Sokebolou town/

Ogula Dobotobo

250,000,000 37,500,000

78Energy/Power

Supply

Etua

CommunityNdokwa West

Re-inforcement of Electricity supply

to Etua Community. 65,000,000 9,750,000

79Energy/Power

Supply

Edieba-Diode

CommunitiesUghelli North

Electrification of Edieba to Diode

communities46,309,047 - 9,318,581 9,318,581

80 Energy and

Power supply Eku Ethipe East

Construction of 1 No. 7.5 MVA

33/11KV Injection Substation at

Eku

150,000,000 22,500,000 22,500,000

81Energy Power

SupplyEmevor Isoko North

Provision of 2nd circuit 33KV over

Head transmission line from Emevor

to link Ozor with sub station and HT

Line and 300kv transformer at

Ikoko street

200,000,000 - 28,800,000 20,000,000

82Energy Power

SupplySapele Sapele Provision of street lights in Sapele 200,000,000 30,000,000

83Energy Power

SupplyAfiesere Ughelli North

Provision of street lights in

Afiesere 200,000,000 30,000,000

84 Energy and

Power supply Agoloma Patani

Extension of Patani Electrification

to Agoloma 60,252,051 39,163,833 8,676,295 8,676,295

85 Energy and

Power supply

Osoguo Village -

OrhomudiaJesse

Drawing of Electrification from

Osoguo Village to Orhomudia Village

in Jesse

60,000,000 18,000,000 9,000,000 9,000,000

86Energy/Power

SupplyAkugbene Bomadi

Construction of 2Nos. 50KW Solar

Power Plant at Akugbene, Bomadi

LGA

250,000,000 37,500,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 9 of 94

Page 143: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

87Energy/Power

SupplyAgbarho Ughelli North

Provision of Street Light at

Market/Ovie Palace Road, Agbarho 50,000,000 7,500,000

88Energy and

Power supplyOkparabe Ughelli South

Extension of Electricity Supply to

Okparabe (13km) 45,000,000 26,368,719 11,022,480 11,022,480

89 Energy and

Power supply Ikpide-Irri Isoko south

Provision Of Solar Street Light At

Ikpide-Irri, 235,720,000 - 33,943,680 11,500,000

90Energy Power

SupplyOleh Isoko South

Electrification of Oleh Streets,

Delta State102,102,053 66,366,334 6,936,711 5,000,000

91Energy Power

Supply

Orhuwhorun

Town Udu Solar Street Light 49,754,000 41,210,669 8,486,338 3,980,320

92Energy Power

SupplyEvwreni Ughelli

Extension of HT/LT electricity

supply and substations to Evwreni

10km Ring Road

247,000,000 37,050,000

93Energy/ Power

SupplyIbusa Oshimili North

Construction of street lights in

Ibusa (Lot 1-2) 400,000,000 100,000,000

94Energy Power

SupplyEgborode Okpe

Solar Street Light at Egborode

Town 250,000,000 - 36,000,000

95Energy Power

SupplyUruabe Isoko south Solar Street Light 245,000,000 - 35,280,000

96Energy/Power

SupplyEnokroagha Burutu

Provision and Installation of Pole

mounted Solar Powered street

Lighting at Enokroagha community.

100,000,000 15,000,000

97Energy/Power

SupplyVarious Various

Rehabilitation of solar street lights

and feasibility study of total

capacity of installed Renewal Energy

by the NDDC

250,000,000 37,500,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 10 of 94

Page 144: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

98Energy Power

SupplyUghelli Isiokolo

Extension of 33kv lines from

Afiesere 132/33kv substation to

Ughelli and Isiokolo

957,000,000 - - 50,000,000

99Energy Power

SupplyMCC Uvwei

Solar street light at 1st and 2nd

sido close MCC road Effurun200,000,000 65,481,708 30,000,000 30,000,000

100Energy Power

SupplyOZORO Isoko North

Extension of 33kv lines from ozoro

132/33kv substation to communities 985,000,000 - - 50,000,000

101Energy/Power

SupplyOzoro Isoko North

Supply and Installation of 415KVA

transformer for Basil Edhere str,

Ozoro

250,000,000 37,500,000

102Energy/Power

SupplyOzoro Isoko North

Supply and Installation of 33 KVA

/415KVA Step down transformer at

Acha Street, Etevie Quarters,

Ozoro.

200,000,000 30,000,000

103Energy Power

SupplyEmevor/Ozoro Isoko North

Maitanance of NDDC solar powered

street light in Emevor and Ozoro200,000,000 30,000,000

104Energy Power

SupplyUzere Isoko South

Provision of solar powered street

light at Oturo and Paris Quarters

Uzere

150,000,000 22,500,000

105Energy Power

SupplyEmevor Isoko North

Provision of solar powered street

liht of Emovor phase 3230,000,000 34,500,000

106Energy and

Power supplyOtor Iyede Isoko North

Ptovision of solar powered street

light at at Otor Iyede 200,000,000 30,000,000

107Energy Power

SupplyNNS DELTA

Warri South

West

Provision of solar powered street

light at nigeria naval base NNS200,000,000 30,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 11 of 94

Page 145: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

108Energy Power

SupplyEnerhen Uwvie

Provision of solar powered street

light at Ocan Drive/Meibi street off

Sedico road, Enerhen

200,000,000 30,000,000

109Energy Power

SupplyUgiliamai Ndokwa west

Solar Powered Street Light At

Ugiliamai, Ndokwa West Lga, Delta

State

70,000,000 - 3,360,000

110Energy Power

Supply

Patani-

Township Patani Solar Street Light 104,000,000 11,925,939 7,212,808

111Energy Power

SupplyEnuru Isoko south Solar Street Light 245,000,000 - 35,280,000

112Energy Power

Supply

Obi- Ayagha

Road Ughelli South Solar Street Light 100,000,000 - 21,504,000

113Energy Power

Supply Ase Town Ndokwa East Solar Street Light 100,000,000 - 14,400,000

114Energy Power

Supply

Ohoeo1 &

Adagbrasa Uvwie & Okpe Solar Street Light 100,000,000 - 19,595,520

115Energy Power

Supply Ugbuwangue Warri South

Solar Powered Street Light in

Ugbuwangue 80,000,000 65,805,271 5,517,044

116Energy and

Power supplyEbrumede Uvwei

Solar street light in Ebrumede

roads200,000,000 - 28,800,000

117Energy Power

SupplyBurutu Burutu Solar Powered Street Light 70,000,000 8,157,025 24,133,369

118Energy/Power

SupplyMosogar Ethiope west Solar Street Light 5km 101,026,440 87,044,613 13,981,827

119Energy/Power

SupplyEkuoma

Ika North

East

Solar Street Light at old Ekwuoma

Road100,000,000 - 4,800,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 12 of 94

Page 146: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

120Energy Power

SupplyOzoro Isoko North

Upgrading of Ozoro injection

substation112,090,321 22,362,026 26,775,464

121Energy Power

SupplyOwhelogbo Isoko North

Provision of Solar-powered Street

Light (4km)80,000,000 68,811,391 3,840,000

122Energy/Power

Supply Owhelogbo Isoko North Solae Street Light 160,000,000 11,023,381 23,040,000

123Energy and

Power supplyOfagbe Isoko South

Solar Powered Street Light at

Ofagbe Street 70,000,000 8,172,612 4,942,796

124Energy Power

SupplyEdhede Owhe Isoko North Solar Street Light 200,000,000 - 28,800,000

125Energy Power

SupplyEmede Isoko South

Replacement of electric Poles with

Concrete poles and provision of

transfermer

180,000,000 27,567,790 11,764,271

126Energy Power

SupplyOlomoro Isoko Solar Street Light 200,000,000 - 28,800,000

127Energy Power

Supply

Egolugbene

CommunityBurutu Solar Street Light 200,000,000 - 28,800,000

128Energy Power

SupplyBomadi Bomadi

150 units Solar Powered Str Light

at Bomadi overside300,000,000 - 43,200,000 43,200,000

129Energy Power

Supply

Bobi

Community

Solar Street Light at Bobi

Community 50,000,000 - 7,200,000

130Energy Power

Supply

Overe

Community

Solar Street Light at Overe

Community 50,000,000 - 7,200,000

131Energy Power

Supply Ibusa Ibusa

Solar street light in Hon. Peter

Nwaoboshi street and environs 200,000,000 - 28,800,000 200,000,000

132Energy Power

Supply

Kandanghan/Pu

pugbene/Tamig

be

Forcados solar street light 200,000,000 - 28,800,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 13 of 94

Page 147: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

133Energy Power

SupplyOtor Owhe Isoko North Solar Street Light 245,000,000 - 36,048,000

134Energy Power

SupplyOdurubu Patani Solar Street Light in Odurubu Town 102,102,053 - 4,900,899

135Energy Power

SupplyEgudor Burutu

Installation of solar powered street

light 120,000,000 - 17,280,000

136Energy/Power

SupplyBurutu Burutu

Installation of solar powered street

light 240,000,000 - 20,352,000

137Energy/Power

Supply

Edherie,Aberu

o& OkpareIsoko South

Installation of solar powered street

light 200,000,000 - 28,800,000

138Energy/Power

SupplyOkuama Ugheli South Solar Powered Street Light 82,876,160 13,207,155 5,744,012

139Energy and

Power supplyUgborikoko Uvwie

Provision Of Solar Street Light At

24th, 25th Street And Environs,

Ddpa Estate,

120,000,000 - 10,886,400

140Energy Power

Supply

Okiribi Road,

EffurunUvwie

Installation of Solar Powered

Street Light at WellHead Street by

Okoiribi Road Effurun

97,289,180 14,593,377 4,202,893

141Energy/Power

SupplyMereje Okpe Solar Street Light at Mereje Town 200,000,000 - 28,800,000

142Energy/Power

SupplyOkorobiri Uvwie Solar Powered Street Light 70,000,000 - 13,716,864

143Energy Power

SupplyIsi Isoko North

Provision Of Solar Street Light In

Isi Communities, 240,000,000 - 34,560,000

144Energy/Power

SupplyWarri Warri

Solar Street Light at lower Gbiaye

Street 100,000,000 84,880,989 43,635,619

145Energy and

Power supply Akpakpa

Warri South

West Solar Street Light 50,000,000 - 7,200,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 14 of 94

Page 148: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

146Energy Power

Supply Agogboro

Warri South

West Solar Street Light 50,000,000 - 7,200,000

147Energy/Power

SupplyUmuedafe Uvwei

Solar Street Light In Umuedafe

And Oil Mill Roads200,000,000 - 28,800,000

148Energy Power

SupplyKurutie

Warri South

West

Provision Of Solar Street Light At

Kurutie Town,146,000,000 - 21,024,000

149Energy/Power

SupplyEnekorogha Burutu

Provision Of Solar Powered Street

Light At Enekorogha Town248,000,000 - 35,712,000

150Energy and

Power supply

Collins

Esemo/Yangi/

Safugba Rd

DDPA

Warri Solar Powered Street Light 82,876,160 - 48,384

151Energy Power

SupplyOlomu - Koko Warri North Solar Street Lights 101,026,440 19,682,315 11,914,654

152Energy Power

Supply

Isi

Community Isoko North Solar street light- Phase 2 248,999,298 - 35,856,000

153Energy Power

SupplyUbeji Warri South Solar Street Light 101,026,440 58,500,040 29,131,705

154 Energy/Power Abraka Ethiop-EastSolar Powered Electrification

Project at Umiaghwa Abraka 100,000,000 - 14,400,000

155Energy Power

Supply

Bright Hope

StrtWarri south Solar Powered Street Light 122,772,275 59,500,000 30,587,760

156Energy/Power

SupplyAntarex Uvwie

Solar street light at antarex road

and environs off Okoribi road

(Phase 2)

130,000,000 19,500,000 19,500,000

157Energy/Power

Supply Orere

Warri South

West Solar Street Light 50,000,000 - 7,200,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 15 of 94

Page 149: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

158Energy/Power

SupplyOzoro Isoko north

Solar street Light at Ozoro

Polytechnic 200,000,000 - 18,144,000

159Energy/Power

SupplyOzoro Isoko north

Solar street light at Ozoro-NDC

phase 2 220,000,000 35,978,630 21,759,875

160Energy and

Power supplyOgbe-Ijoh

Warri South

WestSolar Street Light 101,026,440 - 14,297,585

161Energy Power

SupplyTuomo Tuomo Solar street Light 200,000,000 - 28,800,000

162Energy and

Power supplyEmevor Isoko North

PROVISION OF SOLAR STREET

LIGHT AT EMEVOR PHASE 2240,000,000 - 21,772,800

163Energy/Power

Supply

Bubougbene

Town,Ayakoro

mor

BurutuInstallation of solar powered street

light 135,000,000 - 19,440,000

164Energy/Power

Supply Orubu

Warri South

West Solar Street Light 50,000,000 - 7,200,000

165Energy/Power

Supply

Eruesegbefe/

Jigbale Street-

Effurun

Uvwie Solar Street Light 250,000,000 - 36,000,000

166Energy/Power

Supply

Abeki/Tobowei Patani Solar street light 150,000,000 - 21,600,000

167Energy Power

SupplyKwale/Ashaka Kwale/ Ashaka

Supply and installation of 7.5MVA

transformer 200,000,000 30,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 16 of 94

Page 150: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

168Energy/Power

SupplyEffurn Uvwie

Solar street Light at Bishop Onyekw

Onyeke - Akpoevwa/Etajeruo Layout

Km 1, Effurun

230,000,000 - 33,120,000

169Energy Power

Supply Igbide Isoko South

Solar Street Light at

Owodokpokpor-Igbide Community 100,000,000 - 14,400,000

170Energy/Power

SupplyAgbarho Ughelli South Solar Street Light 6km 150,815,760 - 33,879,252

171Energy/Power

SupplyNdokwa Ndoka/Ukwani Solar street light 200,000,000 - 28,800,000

172Energy/Power

SupplyOgorode Sapele

Installation of solar water project

at Ogorode community 50,000,000 7,500,000

173Energy/Power

SupplyAll LGAs Delta State

INSTALLATION OF

TRANSFORMERS IN DELTA

STATE

174Energy/Power

Supply Total20,393,278,799 1,175,214,389 2,014,885,052 1,381,832,998

175 Health Various VARIOUSSpecial Medical Referrals and Check-

up for the State200,000,000 30,000,000

176 Health Evwreni Ughelli NorthFurnishing and Equiping of NDDC

Built Hospital in Evwreni149,818,812 - 21,228,480 21,228,480

177 Health Ogbole-Ogume Ndokwa West Health care centre 67,286,409 10,092,961 12,806,552 12,806,552

178 Health Erowha Isoko South

Construction and Equipment of

comprehensive Health Centre at

Erowha.

196,286,283 98,143,142 16,633,392 16,633,392

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 17 of 94

Page 151: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

179 Health Delta North Oshmili NorthRehabilitation / Renovation of Ibusa

General Hospital. 249,000,000 50,000,000

180 Health Okuruokpe Ethiope EastConstruction of Primary Healh care

center 54,037,992 24,317,096 11,835,236 11,835,236

181 Health Bomadi BomadiConstuction of Male Ward at

Bomadi General Hospital 60,000,000 - 13,063,680 13,063,680

182 Health Bomadi BomadiRenovation of General Hospital

Phase II 205,000,000 - 19,958,400 30,750,000

183 Health Delta North Oshmili NorthSupply of Medical Equipments to

Ibusa General Hospital. 150,000,000 100,000,000

184 Health Otorigho Isoko Comprehensive Health Centre 179,983,817 161,985,436 29,156,141 17,998,382

185 Health Odurubu Patani Cottage Hospital at Odurubu, Patani 76,000,000 64,190,479 34,374,001 9,000,000

186 Health Ezi Aniocha-NorthConstruction of Cottage Hospital

and Nurses Quarters75,520,250 - 16,442,873

187 Health Bomadi BomadiRenovation of General Hospital

Phase 1 220,000,000 - 19,958,400 19,958,400

188 Health Ozoro Isoko NorthConstruction of 50 Bed Hospital

Ward in Ozoro General Hospital 249,500,000 - 35,928,000

189 Health Emevor Isoko NorthConstruction of Cottage

Hospital/Equipping at Emevor220,000,000 - 19,958,400

190 Health Okwele - Abbi Ndokwa WestConstr. Of 1 no. main block of NDDC

model basic health centre 13,610,111 - 3,704,128

191 Health Patani PataniRenovation of General Hospital

Phase 1185,000,000 - 1,000,000

192 Health Ughelli town Ughelli North

Construction of two Km road at

Ogbe Ekuwo to Akpotu lane , off

Uduophori street

223,456,700 33,518,505

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 18 of 94

Page 152: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

193 Health Kurutiewarri south

west

Construction of Kurutie Community

hospital250,000,000 37,500,000

194 Health Ewhen Ika SouthConstruction ond equiping of cottage

hospital Ewhen, Isoko200,000,000 30,000,000

195 Health Emevor Isoko North

Upgrading of Cottage Hospital

Emevor to modern Hospital with

fencing

200,000,000 30,000,000

196 Health Koko Warri NorthRehab and furnishing/equiping of

koko general hospital500,000,000 - -

197 Health state capitalConstruction of Mother and child

Hospital 750,000,000 - 192,000,000

198 Health Ozoro Isoko NorthRehabilitation of General Hospital

Ozoro 120,000,000 - 17,280,000

199 Health Total 4,794,500,375 358,729,114 596,346,189 333,274,123

200Jetty/Shore

ProtectionOKPELLE-AMA

Warri South

West

Shore Protection Works and

Reclamation at Okpelle-ama1,913,094,355 1,595,778,626 40,320,000 60,000,000

201Jetty/Shore

ProtectionAboh Ndokwa east

Construction of shore protection of

Okiri River950,000,000 - - 100,000,000

202Jetty/Shore

ProtectionGbaraman Warri South

Construction of Shore Protection

and Reclamation at Egwu Community

Gbaraman Clan

240,000,000 - 28,870,733 60,000,000

203Jetty/Shore

ProtectionSokebolou Burutu

Construction of a Concrete Landing

Jetty at Sokebolou town 200,000,000 30,000,000

204Jetty/Shore

ProtectionOrere

Warri South

West

Construction of Foreshore Walls at

Orere (Design)100,000,000 - 21,772,800 25,000,000

205Jetty/Shore

ProtectionEgbo-Ide Ughelli-South

Construction of Landing Jetty at

Egbo-Ide93,675,000 - 20,395,670 20,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 19 of 94

Page 153: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

206Jetty/Shore

ProtectionOjobo Burutu

Construction of Concrete Jetty at

Sawei 2, Ojobo Town 149,855,880 - 21,228,480 30,000,000

207Jetty/Shore

ProtectionOkoloba Bomadi

Construction of Foreshorewalls at

Okoloba98,000,000 14,700,000 14,700,000 14,700,000

208Jetty/Shore

ProtectionAdobu Patani

Construction of Erosion/Shore

protection works in Adobu 150,000,000 75,000,000 22,500,000 22,500,000

209Jetty/Shore

ProtectionAbadiama Ughelli South

Construction of 2Nos Concrete

Landing jetty 87,170,000 30,509,738 13,074,821 13,074,821

210Jetty/Shore

ProtectionOfougbene BURUTU

Construction of Concrete Landing

Jetty at Ofougbene 85,224,571 70,649,700 12,841,476 12,841,476

211Jetty/Shore

ProtectionOko Oshimili South

Construction of Shoreline

Protection at Oko( Lot 1-2) 350,000,000 52,500,000

212Jetty/Shore

ProtectionObotobe town Burutu

Dredging of Obotobe town (Lots 1-

16) 350,000,000 52,500,000

213Jetty/Shore

ProtectionToru-Angiama Patani Foreshore walls at Toru-Angiama 115,500,050 80,959,805 5,304,818 -

214Jetty/Shore

ProtectionOkoloba Bomadi

Construction of Concrete Jetty at

Okoloba100,020,045 90,018,041 19,100,276 10,002,005

215Jetty/Shore

ProtectionOgriagbene Bomadi Concrete Jetties (2 )at Ogriagbene 177,895,300 109,878,759 56,486,472 5,000,000

216Jetty/Shore

ProtectionEzebiri Bomadi

Construction of Concrete Landing

Jetty at Ezebiri Bomadi LGA85,193,552 34,679,820 26,781,930 -

217Jetty/Shore

Protection

Udo

Community

Shore Protection/Internal

Roads/Housing projects at Udo

Community

1,000,000,000 - 96,000,000

218Jetty/Shore

Protection

Elohim City

ZionBomadi

Construction of Landing and waiting

shed at Elohim city zion 240,000,000 - 34,560,000 34,560,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 20 of 94

Page 154: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

219Jetty/Shore

ProtectionTuomo Burutu

Construction Of Shoreline

Protection And Erosion Control At

Tuomo

2,264,399,419 1,044,716,614 100,800,000

220Jetty/Shore

ProtectionOgulagha Burutu

Shore Protection Project At

Ogulagha 5,012,988,000 4,297,938,433 -

221Jetty/Shore

ProtectionEnekorogha Burutu

Constructuion of Concrete Landing

Jetty at Enekorogha Town 86,000,000 57,022,196 18,724,608

222Jetty/Shore

ProtectionOghara Ethiope West

Construction of Concrete Jetty at

CTC Oghara 70,000,000 - 15,240,960

223Jetty/Shore

ProtectionAgbor

Ika North

East

Erosion control at the General

Hospital road and environs 150,000,000 - 9,132,480

224Jetty/Shore

ProtectionAboh village Ndokwa East

Construction of Concrete Landing

Jetty at Aboh village in Ndokwa

East LGA

69,540,721 76,640,806 2,000,000

225Jetty/Shore

ProtectionAdobu Patani

Construction of Concrete Jetty at

Adobu212,830,500 179,836,370 32,994,130

226Jetty/Shore

ProtectionOkuama Ughelli Foreshore Wall/Concrete Jetty 200,000,000 128,137,781 28,304,640

227Jetty/Shore

ProtectionOde Ugborodo Warri south

Construction of 50 &20 metre

Concrete Jetty at ode Ugborodo

Facing seashore & Creek

245,000,000 - 29,472,206

228Jetty/Shore

Protection

Orugbo main

townWarri South

Reclamation of Orugbo Water Front

from Gray to Orugbo main town 500,000,000 75,000,000 75,000,000

229Jetty/Shore

ProtectionOgbinbiri

Warri South

West

Canalisation / Reclamation of

Ogbinbiri/ Ogbudu /Opaum/

Tsekelewu

1,200,000,000 - 65,318,400

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 21 of 94

Page 155: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

230Jetty/Shore

ProtectionOkoroware Bomadi

Construction of concrete landing

jetty with shield at Fabugha boad

yard Okoroware Quarters,

Ogriagbene, Bomadi

240,000,000 - 34,560,000

231Jetty/Shore

ProtectionGbokoda Warri North

Construction of concrete jetty,

Gbokoda 150,000,000 22,500,000

232Jetty/Shore

Protection

Utonlile

communityWarri North

Reclamation and sand filling of

Utonlile community 1,000,000,000 150,000,000

233Jetty/Shore

ProtectionEdjeba Warri South

Sand filling and shore protection at

Edjeba 250,000,000 37,500,000

234Jetty/Shore

Protection

Ugbegungun

community

Warri South

West

Reclamation and san filling of

Ugbegungun community 1,000,000,000 150,000,000

235Jetty/Shore

Protection

Ugbegungun

community

Warri South

West

Shore protection of Ugbegungun

community 250,000,000 37,500,000

236Jetty/Shore

ProtectionAjudiabo

Warri South

WestOgogoro shore protection, Ajudiabo 750,000,000 90,000,000

237Jetty/Shore

Protection

Okiri River,

Aboh

NDOKWA

EAST

DESIGN AND CONSTRUCTION OF

SHORE PROTECTION OF OKIRI

RIVER, ABOH

950,000,000

238Jetty/Shore

Protection

New Anieware

Quarters

Construction of landing jetty at new

Anieware quarters , Ogodobiri100,000,000 - 14,400,000

239Jetty/Shore

Protection21,186,387,392 7,886,466,688 1,347,384,901 617,678,302

240 Roads / Bridges Egbokodo/Ube

ji Township Warri South

Construction of Egbokodo Township

Road1,069,584,080 657,018,663 67,200,000 300,565,417

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 22 of 94

Page 156: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

241 Roads / Bridges Ugbodede Warri South

Construction of Orugbo-Ajigba-

Inorin-Usele-Ugbodede Rd with a

spur to Ode itsekiri (Phase 1)

2,295,245,568 116,302,614 10,315,556 400,000,000

242 Roads / Bridges Uzere - PataniIsoko South /

Patani

Construction of Uzere - Patani

Road 6,031,749,070 3,199,663,119 192,000,000 300,000,000

243 Roads / Bridges Ozoro Isoko NorthConstruction of 28km Ozoro

Township Roads2,431,686,006 529,252,377 194,688,000 250,000,000

244 Roads / Bridges Erhuwaren Ughelli South Construction Of Erhuwaren Ring

Road, Erhuwaren (Phase 11) 250,000,000 37,500,000

245 Roads / Bridges Effurn Uvwie Construction of Kodesoh street off

Sokoh estate road, 200,000,000 30,000,000

246 Roads / Bridges Ogidigben

Communities

Warri South

West

Construction of Roads in Ogidigben

Communities- Lots 1-21,700,000,000 - 244,800,000 124,800,000

247 Roads / Bridges Orere Ughelli South Construction of Orere Bridge- Lots

1 to 2 1,575,000,000 - 226,800,000 106,800,000

248 Roads / Bridges Ibusa Oshimili NorthConstruction Of Ibusa Internal

Roads-Lots 1-61,500,000,000 - 216,000,000 216,000,000

249 Roads / Bridges Osubi OkpeConstruction of 4km road at Osubi

New layout-Okoukoko link road 750,000,000 - - 100,000,000

250 Road/Bridges Ogbe-IjohWarri South

West

Construction Of Oweisana Street,

Ogbe-Ijoh, 237,125,775 - 21,772,800 35,568,866

251 Road/Bridges OkokodiagbeneWarri South

West Construction Of Concrete Pavement

At Okokodiagbene Town

235,100,450 - 21,328,313 50,000,000

252 Roads/ Bridges Ubulubu Aniocha NorthConstruction of Ubulubu-Obomkpa

Road (Lot 1-2) 400,000,000 60,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 23 of 94

Page 157: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

253 Roads/ BridgesExpress-Abah

Unor RoadAniocha South

Construction of Express-Abah Unor

Road (Lot 1-8) 800,000,000 120,000,000

254 Roads/ Bridges Owhelogbo Isoko NorthConstruction of Owhelogbo Ring

road, Phase III 200,000,000 30,000,000

255 Roads/Bridges Ifie Warri SouthConstruction of Petrochemical Link

Road to Ifie Community172,810,000 - 24,456,624 32,810,000

256 Roads/Bridges Ugbuwangue Warri southConstruction of Internal Roads and

Drainage Channels- Lots 1-2998,000,000 - 105,312,000 140,000,000

257 Roads / Bridges Orugbo Warri SouthOrugbo shore protection and

clearing 1,000,000,000 150,000,000 100,000,000

258 Roads/ BridgesOkerenkoko

town

Warri South

West

Construction of 3km internal roads

in Okerenkoko town 250,000,000 37,500,000

259 Roads/ Bridges

Sanubi-

Orhomuru

Orogun

Ughelli NorthReconstruction of 2km Sanubi-

Orhomuru Orogun road 242,000,000 36,300,000

260 Roads/BridgesOviri Court -

OhaOkpe

Construction of Oviri Court junction

by Effurun-Sapele road to Oha

junction by Effurun-Eku road (12km)

2,744,098,678 686,024,670 96,000,000 100,000,000

261 Roads / Bridges Asaba Construction of Umuada layout

Asaba internal roads1,115,944,203 613,769,311 134,400,000 150,000,000

262 Roads / Bridges Ugbuwangue Warri south

Construction of Agbowosi street

and drainages, new world city,

Ugbuwangue

235,000,000 - 14,400,000 50,000,000

263 Roads / Bridges Koko Warri NorthTarring of Iwerre College Road &

other Adjoining Rds-1.5km 150,000,000 - 21,228,480 50,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 24 of 94

Page 158: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

264 Roads/ Bridges Otor-Olomu Ughelli SouthConstruction of 1.7km Effurun Otor-

Olomu link road and culvert 248,000,000 37,200,000

265 Roads/ Bridges Delta North Oshmili North

Construction of Magistrate

Court/Police Station road and

Environ with drainage and street

lights.

250,000,000 50,000,000

266 Roads / Bridges Ubeji Warri south Construction of Ubeji Access Road 980,000,000 - 75,569,760 50,000,000

267 Roads / Bridges Alihagwu/oki Construction of Alihagwu-Oki Road 170,978,750 25,646,813 25,646,813 43,045,305

268 Roads/BridgesAghalokpe/Aja

guoyiboOkpe

Construction of

Aghalokpe/Ajaguoyibo Roads-Lots 1-

2

1,000,000,000 - 144,000,000 44,000,000

269 Roads/ Bridges EfeizomorIka North

East

Construction of Efeizomor-Onyeibe

Street, Boji Boji 200,000,000 30,000,000

270 Roads/ Bridges Ellu Isoko NorthConstruction of 2km Ellu Township

road Ellu 400,000,000 60,000,000

271 Roads / Bridges Effurun UvwieConstruction o Effurun internal

roads-Lots 1-31,000,000,000 - 144,000,000 44,000,000

272 Roads / Bridges Warri Warri SouthConstruction/Rehabilitation of 2km

Okumagba Layout Roads164,871,150 140,140,478 24,730,673 60,140,478

273 Roads / Bridges Koko Warri NothConstruction of Egbelemeji

road/bridge Koko 900,000,000 135,000,000 35,000,000

274 Roads/ Bridges Sapele SapeleConstruction of Sapele Township

roads 240,000,000 36,000,000

275 Roads/ Bridges Afiesere Ughelli NorthConstruction of Afiesere Township

roads 250,000,000 37,500,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 25 of 94

Page 159: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

276 Roads / Bridges

Jakpa

Daleketa

Ogheye

Warri NorthConstruction of Jakpa Daleketa

Ogheye road 900,000,000 135,000,000 35,000,000

277 Roads / Bridges Ogbe-IjohWarri South

West

Rehabilitation and widening of Ogbe-

Ijoh to Aladja Road, Ogbe-Ijoh172,558,100 61,163,289 26,998,469 51,394,811

278 Roads / Bridges Ogwashi-ukwu Aniocha SouthConstruction of Agidiase/Ogbe-

Isheagwu road (phase 1)550,000,000 - 79,200,000 50,000,000

279 Roads/ Bridges Ogbeinama Bomadi

Construction/Extension of

Ogbeinama internal road with

drainage

200,000,000 30,000,000

280 Roads/ Bridges Agoloma PataniConstruction of internal link road

and drainage in Agoloma 200,000,000 30,000,000

281 Roads / Bridges Araya Isoko SouthConstruction of 2km Araya main

town road 244,707,500 208,001,275 8,190,402 50,000,000

282 Roads / Bridges Kpakiama Bomadiconstruction of Heavenly street

Osibiri Quarters198,500,000 - 28,800,000 30,000,000

283 Roads/ Bridges Ojobo BurutuInstallation of solar street llight at

Ojobo Phase IV 150,000,000 22,500,000

284 Roads / Bridges Torugbene

TownBurutu

Constructuion of Rigid Pavement at

Torugbene 212,830,500 31,924,575 38,613,212 30,000,000

285 Roads / Bridges Arun Uton

EbrohimiWarri North

Construction of Arun Uton

Obaghoro - Obaghoro town -

Ebrohimi - Arun Uton Ebrohimi road

and bridge

1,000,000,000 150,000,000 50,000,000

286 Roads/ Bridges Abari PataniConstruction of internal road with

pavement in Abari town 200,000,000 30,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 26 of 94

Page 160: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

287 Roads/ Bridges Adaurherhe Sapele Construction of Adaurherhe road 176,976,975 26,546,546

288 Roads / Bridges Afor Ndokwa EastCompletion of Afor- Ogbodigbo

Road124,992,100 - 17,690,400 30,000,000

289 Roads / Bridges Imode Ugheli SouthConstruction of Imode township

road 249,383,675 - 17,236,800 30,000,000

290 Roads / Bridges Ododegho Ughelli south Construction of Ododegho internal

roads 205,210,000 61,563,000 18,616,651 20,000,000

291 Roads / Bridges Umutu Ukwuani Construction of Umutu/Akaoku road 195,268,287 47,717,809 18,144,000 40,000,000

292 Roads/ Bridges Uduophori PataniConstruction of Bruno road,

Uduophori 200,000,000 30,000,000

293 Roads / Bridges Ogbein-ama Bomadi Construction of Internal Roads in

Ogbein-ama in DT 949,552,600 197,796,451 136,800,000 100,000,000

294 Roads / Bridges Aghalopke/Aja

ugoyiboOkpe

Construction of

Aghalopke/Ajaugoyibo road 1,000,000,000 - 144,000,000 50,000,000

295 Roads / Bridges Ekereokosu

OsubiOkpe

Construction of Ekereokosu Osubi

Road off Opposite Airport Junction,

Osubi

99,727,625 52,526,063 27,002,599 49,727,625

296 Roads / Bridges Warri Warri southConstruction of warri internal

roads-Lots 1-3 1,000,000,000 - 96,000,000 96,000,000

297 Roads/ Bridges Kpakiama Bomadi

Construction of 1km Kpakiama

internal road, pavement and

drainage

100,000,000 15,000,000

298 Roads / Bridges Ibrede Ndokwa East

Construction of Odhi, Okotoro,

Aboh, Egbedi linking Otuloho

Streets

242,994,375 82,497,188 29,230,940 45,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 27 of 94

Page 161: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

299 Roads / Bridges Orugbo main

townWarri south

Construction of concrete pavement

from grey Community jetty 234,541,400 140,724,840 2,000,000 43,816,560

300 Roads/ Bridges Esama BomadiConstruction 1km Esama internal

road Phase II 100,000,000 15,000,000

301 Roads / Bridges Koko Warri North

Construction of Rigid Pavement Road

including concrete Drainage in Koko

Town

107,966,756 16,195,013 24,261,120 21,771,743

302 Roads / Bridges Otie Isoko NorthConstruction of Otie Otibio-Emevor

Road (4km)225,189,825 33,778,474 90,441,863 30,000,000

303 Roads/ BridgesEmede/Owodo

kpokpor IgbideIsoko North

Rehabilitation of

Emede/Owodokpokpor Igbide road 200,000,000 30,000,000

304 Roads / Bridges Issele Uku Aniocha North Tarring of Nwaonye Street 228,786,120 - 34,560,000 45,000,000

305 Roads / Bridges Olomoro Isoko SouthConstruction of Eteso Street in

Olomoro163,030,000 28,634,690 71,238,893 41,000,000

306 Roads / Bridges Okwagbe Ugheli SouthConstruction of Baptist clinic

road1km 130,818,825 50,200,032 42,450,118 40,618,793

307 Roads / Bridges Asaba AsabaConstruction of Frank Oputa

Street, Asaba108,879,425 58,147,272 15,426,029 30,000,000

308 Roads/ Bridges IsiborIka North

East

Construction of Isibor-Ika Street,

Umunede. 150,000,000 22,500,000

309 Roads/ Bridges Emede Isoko SouthConstruction of 2km Emede Ring

road 400,000,000 60,000,000

310 Roads/ Bridges Oyede Isoko North Construction of 1km Iye-Ovo street 200,000,000 30,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 28 of 94

Page 162: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

311 Roads / Bridges Kiagbodo BurutuConstruction of internal Roads at

Kiagbodo in Burutu LGA 204,953,825 140,375,991 36,451,631 40,000,000

312 Roads / Bridges Oyaitai/Okodi

zimorBurutu

Construction of 2km

Oyaita/Okodizimor internal road

proejct

249,080,590 36,750,000 37,500,000 40,000,000

313 Roads / Bridges Obulu Onor ndokwa SouthConstruction of 3km Road from

Ubulu-Unor-Ashama244,969,800 36,745,470 29,472,206 40,000,000

314 Roads / Bridges Okwe Oshimili southConstruction of 3km Road from

Okwe-Oko244,897,150 60,797,338 17,032,727 40,000,000

315 Roads/ Bridges Okpanam Oshimili NorthConstruction of Madona School of

Handicap road 250,000,000 50,000,000

316 Roads/ Bridges Uko SapeleConstruction of Uko Road, Gana

sapele 100,000,000 15,000,000

317 Roads / Bridges Odorobu/Adob

uPatani

Construction of Odorobu/Adobu

Road in Patan, Phase III 248,457,000 - 29,888,065 40,000,000

318 Roads / Bridges Erhuwaren Ughelli South Costruction of Erhuwaren ring road 239,984,525 71,995,358 28,870,733 40,000,000

319 Roads / Bridges Akorugbene Burutu

Construction of Rigid

Pavement/drians at Akorugbene

town

249,825,290 - 35,974,842 40,000,000

320 Roads / Bridges Ogriagbene BomadiConstruction of Modern Market /

link roads road at Ogriagbene 550,000,000 - 79,200,000 79,200,000

321 Roads / Bridges Jesse Ethiope WestConstruction of Atiwor-Idjeoaka-

Adjavwini Road2,702,526,354 - 76,985,566 76,985,566

322 Roads/ Bridges Ogbeojeoba OshimiliConstruction of Ogbeojeoba Road

Ukala. 200,000,000 50,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 29 of 94

Page 163: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

323 Roads/ BridgesEdegbrode

Elume

Construction of Internal Road, in

Edegbrode Elume 2km 200,000,000 30,000,000

324 Roads / Bridges Udo Jakpa Warri North Construction of Udo Jakpa road 750,000,000 76,001,925 76,001,925

325 Roads / Bridges Ilo-Umuese Aniocha North

Construction Of Ilo-Umuese

Internal Roads At Aniocha North

Lga

249,180,500 94,188,817 51,408,000 75,000,000

326 Roads / Bridges Ayakoroma

TownBurutu

Construction of Rigid Pavement at

Ayakoroma Town 135,000,000 20,250,000 19,922,024 75,000,000

327 Roads / Bridges Esama BomadiConstruction of Esama internal

roads, (Lots 1-2) 250,000,000 75,000,000 35,000,000

328 Roads / Bridges Erowha Isoko SouthConstruction of 2.5km Erowho-

Patani road (Lots 1-2) 250,000,000 75,000,000 35,000,000

329 Roads / Bridges Ubeyi Warri South

Reconstruction of collapse bridge

along Uyi, Efiekporo, Ijalla WRPC

Jetty road, Ubeyi

250,000,000 75,000,000 35,000,000

330 Roads/ Bridges Cemetery road Ukwuani Construction of Cemetery Road

Umukwata (430 Metres) 50,000,000 20,000,000

331 Roads/ BridgesErhowa

Township

Construction of Erhowa Township

Road- 4Km (Phase 1) 250,000,000 37,500,000

332 Roads / Bridges Ugbuwangwue Warri SouthConstruction of Ugbuwangwue

internal roads Phase II 250,000,000 75,000,000 35,000,000

333 Roads / Bridges AruntonWarri South

West

Construction of community centre

Arunton 250,000,000 75,000,000 35,000,000

334 Roads / Bridges Effurun Army

BarrackUvwie

Internal Roads/Renovation of

Primary School-Lots 1-2 250,000,000 - 72,000,000 32,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 30 of 94

Page 164: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

335 Roads/ Bridges Andy Iyama Ika SouthConstruction of Andy Iyama Street,

Boji Boji, Agbor. 200,000,000 30,000,000

336 Roads/ Bridges Ozoro Isoko NorthConstruction of 1km Duke Okezie

street 200,000,000 30,000,000

337 Roads/ Bridges Ovrode Isoko NorthConstruction of 2km Ovrode Ring-

road 400,000,000 60,000,000

338 Roads / Bridges Isoko North

&South

Construction of Internal Roads in

Isoko North and South 250,000,000 - 72,000,000 32,000,000

339 Roads / Bridges UmunedeIka North-

EastConstruction of Umunede Ring road 250,000,000 - 71,280,000 35,000,000

340 Roads / Bridges Sapele Sapele

Construction of Flexible

Pavement/Drains, Ugberikoko

Akinoyu Street in sapele

220,332,000 130,939,859 67,313,563 30,000,000

341 Roads / Bridges Emadadja

ObubuUdu

Construction of Emadadja Obubu

Road/Drains, Udu LGA 198,210,815 29,731,622 50,605,072 30,000,000

342 Roads/ Bridges AjukworIka North

East

Construction of Ajukwor street,

Ilabor (100 Meters) 100,000,000 15,000,000

343 Roads/ Bridges Otor-Owhe Isoko NorthConstruction of 2km Otor-owhe

township road 400,000,000 60,000,000

344 Roads / Bridges DSC Udu

Construction Of Priority Housing

Estate Road, Dsc, Udu Lga, Delta

State

205,772,600 174,906,710 30,865,890 30,000,000

345 Roads / Bridges Ododegho Ughelli North

Construction of Eruemukohwarien

Junction-Ododegho-Emetaka Rd

(3.5km)

120,821,220 18,123,183 17,099,006 20,000,000

346 Roads / Bridges Ubagboro

communitiesWarri North

Construction of bridge and access

road with drains linking Okogbo,

Ubagboro communities

450,000,000 67,500,000 37,500,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 31 of 94

Page 165: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

347 Roads / Bridges Akugha Isoko SouthConstruction of Akugha road (Igbide

- Owodokpokpo) 450,000,000 67,500,000 37,500,000

348 Roads / Bridges Warri Warri SouthConstruction of Warri internal

roads Phase II 450,000,000 67,500,000 37,500,000

349 Roads/ Bridges Ogbe OnichaIka North

East

Construction of Ogbe-Onicha, Owa-

Ekei road. 250,000,000 37,500,000

350 Roads/ Bridges Ofagbe Isoko NorthConstruction of 2km Ofagbe

township road 400,000,000 60,000,000

351 Roads/ Bridges Ofagbe Isoko NorthConstruction of 3km Ofagbe Ibrede

road Phase I 600,000,000 90,000,000

352 Roads / Bridges UvwieWarri South

West

Construction of Uvwie internal road

Phase II 450,000,000 67,500,000 37,500,000

353 Roads / Bridges Sapele SapeleConstruction of Sapele Internal

roads 248,870,550 167,689,718 75,000,000 25,000,000

354 Roads / Bridges Sapele SAPELEConstruction of I. Ikoyo Road

Sapele198,995,938 51,922,170 76,724,874 25,000,000

355 Roads / Bridges Orere Ughelli South Construction of Orere Internal

Roads 425,000,000 - 61,200,000 61,200,000

356 Roads / Bridges Jesse Ethiope West EJENESA-IRHODO,UGBOMAYA -

JESSE INLAND ROAD 423,718,640 321,972,049 60,477,027 60,477,027

357 Roads / Bridges Akugbene Bomadi

Construction of Internal Concrete

Pavement 1.7km Rd in Akugbene

Phase II

236,966,916 156,550,056 63,244,178 60,000,000

358 Roads / Bridges Enhwe Isoko SouthCompletion of the construction of

2km Enhwe-Olomoro road (Lots 1-2) 400,000,000 60,000,000 60,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 32 of 94

Page 166: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

359 Roads / Bridges Umeh Isoko SouthConstruction of 2km Umeh township

roads (Lots 1-2) 400,000,000 60,000,000 60,000,000

360 Roads/Bridges Ovrode Isoko NorthConstruction of 2km Ovrode

township roads (Lots 1-2) 400,000,000 60,000,000 60,000,000

361 Roads / Bridges Ellu Isoko NorthConstruction of Ellu Radial Roads

(4km)249,522,000 37,428,300 76,159,491 35,000,000

362 Roads/ Bridges Eku Ethiope EastConstruction of Internal Roads in

Eku. (Lot 1-2) 300,000,000 45,000,000

363 Roads/ Bridges Ndemili Ndokwa WestProposed Ndemili Civic Centre,

Ndokwa West LGA, Delta State. 200,000,000 50,000,000

364 Roads/ Bridges Agbarho Ughelli North

Construction of Esiso street, Onome

Okpalefe Okorn Street, Ekeravwen

Ubrughelli Road, Agbarho. (3KM)

200,000,000 30,000,000

365 Roads / Bridges Ovrode Isoko North

Construction Of Iyedhegu And Evro

Streets, Ovrode, Isoko North Lga,

Delta State

159,431,800 101,342,464 52,098,134 20,000,000

366 Roads / Bridges Aradhe Isoko North

Construction Of Edegbu Street And

Market Road In Aradhe At Isoko

North Lga Delta State

193,835,400 87,225,930 51,206,658 20,000,000

367 Roads / Bridges Avwrioko Ugheli North

Construction of 2km Road at

Avwrioko Street along Asadjere

Estate

235,000,000 197,392,199 37,607,801 20,000,000

368 Roads / Bridges Igun town Ethiope eastConstruction of Township road in

Igun town 224,950,000 - - 35,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 33 of 94

Page 167: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

369 Roads / Bridges Ugiliami -

OgumeNdokwa west

Construction of

Ugiliama/Eweshi/Ogume/Abbi Road

with Bridges - Spur to Utagba-Uno(

PHASE 1) - 18.5km

4,061,478,009 2,242,210,891 57,600,000 57,600,000

370 Roads/ Bridges Emu Ebendo Ndokwa WestConstruction of Obi-Anwu Street,

Emu Ebendo 80,000,000 12,000,000

371 Roads/ Bridges Idumu OnataIka North

East

Construction of Idumu Onata

Internal roads (300 meters) 200,000,000 30,000,000

372 Roads/ Bridges IdumuesahIka North

East

Tarring and Drainage of Idumuesah

Palace road, (Stretching from

market round about to new palace

Idumuesah

200,000,000 30,000,000

373 Roads / Bridges Ogbopena PataniConstruction of Rigid Payment and

Drains at Ogbopena Road, Patani103,266,850 46,470,083 99,455 36,796,768

374 Roads / Bridges Mosogar Ethiope West Construction of Urhokpokpor/

Akpobome Township road 146,596,144 40,932,076 56,293,117 36,293,117

375 Roads / Bridges Effurun-Otor Ughelli southConstruction of Effurun-Oto Ughelli

road/bridge99,931,575 44,519,905 37,929,304 35,411,670

376 Roads / Bridges Mosogar Ethiope WestConstruction of 3-5km road in

Mosogar, Ethiope West LGA 350,000,000 52,500,000 52,500,000

377 Roads/ Bridges Ogume Ndokwa WestConstruction of Ogume-Abbi road.

(Lot 1-8) 1,500,000,000 225,000,000

378 Roads/ Bridges Omegbe Ndokwa WestConstruction of Omegbe-Ufie

street, Kwale. 200,000,000 50,000,000

379 Roads / Bridges

EXISTING/

IMPROVED

FUNDING

Warri south

Canalisation / Reclamation of

Ogbinbiri/ Ogbudu /Opaum/

Tsekelewu

245,000,000 - 51,408,000 51,408,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 34 of 94

Page 168: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

380 Roads / Bridges Issele-Azagba Aniocha North

Construction Of Internal Roads -

Issele-Azagba-Otulu Road, Aniocha

Lga,

234,644,000 35,196,600 48,101,790 50,000,000

381 Roads / Bridges Kpakiama BomadiConstruction of Amalasa/Cherubim

Internal Road Kpakiama180,949,752 65,579,266 48,896,280 10,000,000

382 Roads / Bridges Owhelogbo

OrogunIsoko North

Construction of Owhelogbo-Orogun

Road 240,673,464 36,101,020 64,440,320 50,000,000

383 Roads / Bridges Kokori Ethiope East Construction of Kokori internal road 99,736,550 44,881,448 50,000,000

384 Roads / Bridges Ute-Okpu ClanIka North

South

Construction of 2km Road linking

Ekuku-Agbor 211,187,226 179,509,142 31,678,084 20,000,000

385 Roads / Bridges Ovu Ikwegu Ethiope eastConstruction of Ovu- Ikwuegu-

Agbarho (phse 1) 867,307,350 36,491,495 9,863,040 50,000,000

386 Roads / Bridges Kokori inland Ethiope EastConstruction of Kokori internal

road, 2-4km 200,000,000 - 28,800,000 50,000,000

387 Roads / Bridges Kokori Ethiope EastConstruction of Akpovoka Afisere

Ofuma Kokoro Road249,000,000 - 35,856,000 50,000,000

388 Roads / Bridges Otor-Owhe Isoko-North Construction of Township Road 218,970,490 133,915,214 34,560,000 40,000,000

389 Roads / Bridges Enwhe Isoko SouthConstruction of 1.5km College Road

in Enwhe151,602,655 129,102,655 20,897,345 20,000,000

390 Roads/ Bridges Mission road UkwuaniRehabilitation of Mission Road (Old

Sapele/ Agbor road) Umulu (3Km) 250,000,000 50,000,000

391 Roads/ BridgesErhowa

Township

Construction of Erhowa Township

Road- 4Km (Phase 2) 250,000,000 37,500,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 35 of 94

Page 169: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

392 Roads/ Bridges Eku Ethiope East

Construction of 2Km road and

Drainage off Barr. Arthur

Akpowowo Street, Eku

200,000,000 30,000,000

393 Roads / Bridges Jeddo OkpeConstruction of By-Pass Road in

Jeddo Town104,698,000 - 23,519,359 20,000,000

394 Roads / Bridges Uko Road SapeleRigid pavement/drains in Uko Road

in Sapele LGA 141,643,140 40,578,340 31,028,744 30,000,000

395 Roads / Bridges Owtrode UdiConstruction of Owhrode-Usiefrun

Road 163,675,869 - 14,848,675 20,000,000

396 Roads / Bridges Otovwodo Ughelli NorthConstruction of Mudiaga-E road

Otovwodo 149,456,050 - 21,228,480 20,000,000

397 Roads/Bridges Effurun Uvwie Construction of Emuedate Strt, off

Alegbo Strt 247,500,000 15,000,000 15,000,000 50,000,000

398 Roads / Bridges Ugolo/Osubi OkpeConstruction of Ugolo/Osubi road

(3Km) 350,000,000 - - 20,000,000

399 Roads / Bridges Warri Warri South

Construction of Oti Street, Willie

Street Okumagba Avenue linked to

1st Marine Gate Rd, Warri (1.2km)

226,101,251 192,186,063 33,915,188 20,000,000

400 Roads / Bridges Warri Warri SouthConstruction of internal roads of

Hussey College, Warri121,247,500 34,866,644 17,159,334 40,000,000

401 Roads / Bridges Oviri-Olomu Ughelli SouthConstruction of 2km internal road

and drains at Oviri-Olomu275,000,000 - - 40,000,000

402 Roads/Bridges Oviri-Olomu Ughelli South

Construction of 1.5km internal road

and drains at Oviri-Olomu

town/Okparabe town linking Road

150,000,000 - - 30,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 36 of 94

Page 170: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

403 Roads / Bridges

Ebrumede/Oku

atata-

Ugbomoro New

Layout Road

Construction of Ebrumede/Okuatata-

Ugbomoro New Layout Road with

drainage

200,000,000 - 28,800,000 35,000,000

404 Roads / Bridges Emu-ObodettiNDOKWA

EAST

Construction Of Emu-Obodetti

Internal Road,Emu-Obodetti250,000,000 35,000,000

405 Roads / Bridges Erhuwaren Ughelli SouthConstruction Of Erhuwaren Ring

Road, Erhuwaren (Phase Ii)250,000,000 35,000,000

406 Roads / Bridges Orhunworun UDUConstruction Of Orhuworun -

Owhrode Road, Udu Lga400,000,000 50,000,000

407 Roads / Bridges Warri Warri

Construction of Omarikevwe stret B

off Kosoni Road by twin fountain

School

110,449,250 62,092,113 26,256,682 28,357,137

408 Roads / Bridges Odorubu Patani

Construction of 1km concrete rd at

Odorubu from the main road to the

customary court

96,463,400 48,231,700 23,471,165 28,231,700

409 Roads / Bridges Ubeji Warri SouthConstruction of J. K. Nana Street,

Ubeji96,098,310 49,033,632 17,280,000 27,064,678

410 Roads / Bridges Effurun Uvwie

Construction of Road at 24 to Close

C DPPA Housing Estate, Ugborikoko

Effurun 1.3km Road with Drains

180,000,000 90,382,645 46,463,910 26,463,910

411 Roads / Bridges Ogbein ama BomadiConstruction Of Concrete Pavement

At Ebiowou Road                      245,100,450 - 36,000,000 35,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 37 of 94

Page 171: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

412 Roads / Bridges Okpokunu BurutuConstruction of Okpokunu Internal

Road Network and access road 107,498,312 14,469,510 17,387,295 25,000,000

413 Roads / Bridges Agbor Ika SouthConstruction of 3km internal roads

in Alibuba layout 300,000,000 45,000,000 45,000,000

414 Roads / Bridges Ajagbodudu Warri NorthConstruction of internal roads

Ajagbodudu 300,000,000 45,000,000 25,000,000

415 Roads/ Bridges Ozoro Isoko North Construction fo 1.5km Etereva road 300,000,000 45,000,000

416 Roads/ Bridges Ozoro Isoko NorthConstruction of 1km Jay Ogor

Street 200,000,000 30,000,000

417 Roads/ Bridges Amai UkwuaniConstruction of Amai-Aragba road.

(Lot 1-2) 350,000,000 60,000,000

418 Roads / Bridges Odorobu/Adob

uPatani

Construction of Odorobu/Adobu

Road in Patan, Phase II 248,457,000 86,959,950 29,888,065 25,000,000

419 Roads / Bridges Eruesegbefe UvwieConstruction of Eruesegbefe

str.Off PTI road phase 1 249,000,000 - 22,680,000 35,000,000

420 Roads / Bridges Ekpan UvwieConst of Jumu Jayen layout off

NTA expressway 245,123,568 35,594,209 43,423,052 45,000,000

421 Roads / Bridges Effurun Uvwie

Construction of Ogbe avenue, KME

lane and Efetobor street, off Jakpa

road, Effurun

186,813,000 14,944,973 32,330,250 45,000,000

422 Roads / Bridges WellHead UwvieConstruction of Well Head str off

Okorobiri 213,830,500 131,407,861 24,514,832 45,000,000

423 Roads / Bridges Nsukwa Aniocha SouthConstruction of Internal roads

(2km)167,658,590 78,398,304 47,458,008 44,630,143

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 38 of 94

Page 172: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

424 Roads / Bridges Matthew

Abude StreetUvwie

Construction of Matthew Abude

Street 222,805,000 86,775,487 44,609,542 44,609,542

425 Roads/ Bridges Otor-Igho Isoko NorthConstruction of 2km Otor-Igho

township roads 400,000,000 60,000,000

426 Roads/ Bridges Idheze Isoko SouthConstruction of 3km Idheze

township roads 600,000,000 90,000,000

427 Roads/ Bridges Ushie Ndokwa EastConstruction of Ushie Internal Road

(Lot 1-2) 500,000,000 75,000,000

428 Roads / Bridges Issele-Uku Aniocha NorthConstruction of Isele-Uku -Onicha

Road69,032,150 56,965,326 12,066,824 10,000,000

429 Roads / Bridges Bomadi Town Bomadi Construction of Winners Church

Road with Drainage 199,760,675 6,991,623 80,228,881 30,000,000

430 Roads / Bridges Akugbene BomadiConstruction of Concrete Pavement

(Rigid) Esrubo Street at Akugbene 239,636,525 112,917,836 100,467,501 40,000,000

431 Roads / Bridges Bomadi Town BomadiConstruction of James Manager

Close Bomadi Town 103,266,850 - 23,362,560 30,000,000

432 Roads / Bridges Igbo Ika North Construction of Igbodo Internal

Road 250,000,000 - 36,000,000 30,000,000

433 Roads / Bridges Toru Angiama PataniConstruction of Toru-Angiama Rd

Phase II 98,754,842 60,356,531 31,028,085 30,000,000

434 Roads/ BridgesExpress-Holy

Family CathAniocha South

Construction of Express-Holy Family

Catholic-Ubulu Unor junction

Ogwashi-uku

250,000,000 37,500,000

435 Roads/ Bridges Agidiasei Aniocha SouthConstruction of Agidiasei-Edo-Otulu

road, Ogwashi 250,000,000 37,500,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 39 of 94

Page 173: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

436 Roads / Bridges Effurun Uvwie construction of Nnewi/small market

road 246,059,590 123,029,795 - 30,000,000

437 Roads / Bridges Effurun Uvwie

Construction of Eke Avenue and link

roads, Off Jakpa Road, Warri Phase

2

160,000,000 24,000,000 22,643,712 40,000,000

438 Roads / Bridges KOKO Warri North AJA-ETIE-AKPA-KOKA ROAD

KOKO 334,021,590 188,858,265 16,898,288 40,000,000

439 Roads / Bridges Obubu UduConstruction of Obubu internal

roads 2.5km250,000,000 - 36,000,000 40,000,000

440 Roads/ Bridges Ughelli Ughelli North

Bill of Engineering Measurement and

Evaluation for the Construction of

Igwreanwarre Abovwe Road, Ughelli

248,694,750 37,304,213

441 Roads/ Bridges Okpokunou BurutuConstruction of 2 KM Internal

Roads in Okpokunou Town 200,000,000 30,000,000

442 Roads / Bridges OporozaWarri South

West

Construction Of Concrete Pavement

At Oporoza Town, Warri South

West (Phase 1)

200,000,000 - 18,144,000 40,000,000

443 Roads / Bridges Enerhen UvwieConstruction of Esievo lane in

Enerhen 245,000,000 - 35,280,000 40,000,000

444 Roads / Bridges UghelliUGHELLI

NORTH

Construction of old Ogor road,

Ughelli linking Eya vwetatha Street

Ugheli

148,750,000 22,313,500 20,160,000 25,000,000

445 Roads / Bridges Ovu InlandETHIOPE

EAST

Construction Of Obukoene

Crescent, Ovu Inland180,000,000 20,000,000

446 Roads / Bridges Owhaha-

OkwagbeUghelli South

Construction Of Owhaha - Okwagbe -

Otutuama Road250,000,000 25,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 40 of 94

Page 174: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

447 Roads / Bridges Arogbo Uduconstruction of Arogbo internal

roads (phase 2) 500,000,000 - 38,556,000 38,556,000

448 Roads / Bridges Emervor Isoko North

Construction of Otobo Ugbome

Streetand Adjoining street at

Emevor

250,000,000 37,500,000 37,500,000

449 Roads/ Bridges Okwagbe Ughelli South

Construction of Okwagbe Internal

Roads, from PB Djebah Junction to

Baba Ido Primary School. (2KM)

200,000,000 30,000,000

450 Roads/ Bridges OkrenkokoWarri South

West

Construction of Okrenkoko Internal

Road projects (3Km) 250,000,000 37,500,000

451 Roads/ Bridges BenikrukruWarri South

West

Construction of Benikrukru Internal

Road project (1.5Km) 250,000,000 37,500,000

452 Roads / Bridges Emede Isoko South

Grading and tarring of Urhuoriokpu

Amawha layout to Ibo Amawha

(2km) road

250,000,000 37,500,000 37,500,000

453 Roads / Bridges Boji - Boji OwaIka North

EastConstruction of Udu Layout, Phase I 250,000,000 37,500,000 37,500,000

454 Roads / Bridges Boji - Boji OwaIka North

EastConstruction of Doherty street 250,000,000 37,500,000 37,500,000

455 Roads / Bridges Agbor Ika SouthConstruction of 2km Alihame new

layout, Zone C 250,000,000 37,500,000 37,500,000

456 Road/Bridges Patani PataniConstruction of Hudson Zua road,

Ekise Quarters, Patani 250,000,000 37,500,000 37,500,000

457 Road/Bridges Ozoro Isoko NorthConstruction of 1.5km Opute

Crescent road 250,000,000 37,500,000 37,500,000

458 Road/Bridges Torugbene BurutuConstruction of F.F. Tabai internal

road 250,000,000 37,500,000 37,500,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 41 of 94

Page 175: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

459 Road/Bridges Bubougbene BurutuConstruction of Concrete pavement

road/drainage, phase II 250,000,000 37,500,000 37,500,000

460 Roads/ Bridges Asaba Oshimili SouthConstruction of Phase 2 Asaba GRA

Oshimili South LGA, Asaba 250,000,000 37,500,000

461 Roads/ Bridges Oghara Asaba

Construction of 1 km Oghara Street

Behind DBS, off DDPA Estate,

Okpana road, Asaba

150,000,000 22,500,000

462 Roads/ Bridges DDPA Agbor IkaConstruction of Internal Road in

DDPA Agbor in Ika LGA 150,000,000 22,500,000

463 Road/Bridges Effurun UrivieConstruction of Oyibo street

internal road (2km) Eneberi layout 250,000,000 37,500,000 37,500,000

464 Road/Bridges Bomadi BomadiConstruction of Chief Fidelis street

off Polytechnic road 250,000,000 37,500,000 37,500,000

465 Road/Bridges Okoloba BomadiConstruction of internal roads,

Okoloba phase III 250,000,000 37,500,000 37,500,000

466 Road/Bridges Bulu-Angiama PataniConstruction of 3km concrete road

at Bulu Angiama 250,000,000 37,500,000 37,500,000

467 Road/Bridges Ovwian Udu Reconstruction/maintenance of

Ovwian community main road 250,000,000 37,500,000 37,500,000

468 Roads/ Bridges Ezebiri town BomadiConstruction of rigid pavement in

Obubu, Ezebiri town Phase II 200,000,000 30,000,000

469 Roads/ BridgesOkpokunou

townBurutu

Concrete pavement road at

Eyorokeye Avenue 200,000,001 30,000,000

470 Roads/ Bridges Gbeki layout Ovwian UduBuilders of Faith road in Gbeki

layout 200,000,002 30,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 42 of 94

Page 176: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

471 Road/Bridges Amai Ukwuani Construction of internal roads Amai 250,000,000 37,500,000 37,500,000

472 Road/Bridges Ohore UvwieConstruction of Ohore dump site

road, NUPA road Effurun 250,000,000 37,500,000 37,500,000

473 Road/Bridges Orogun Ughelli NorthConstruction of Imodje-

Orhokpokpor road, Orogun 250,000,000 37,500,000 37,500,000

474 Road/Bridges BaterWarri South

West

Construction of internal roads in

Bater 250,000,000 37,500,000 37,500,000

475 Road/Bridges Amukkpee SapeleConstruction of Vitaform road, off

Warri - Sapele road Amukkpee 250,000,000 37,500,000 37,500,000

476 Roads/ Bridges Beneku Ndokwa EastConstruction of Umu Edem 2Km Link

Agip Road, Beneku Community 250,000,000 37,500,000

477 Roads/ Bridges Ozoro Isoko NorthConstruction of 1km Ofakpor

Erosive street 200,000,000 30,000,000

478 Roads/ Bridges Emevor/Issi Isoko North Construction of Emevor/Issi road 200,000,000 30,000,000

479 Road/BridgesEkurede

UrhoboUvwie

Construction of roads and drains

within Warri Metropolis - (Isiekaro

extension/Isibovbe and its adjoining

street Ekurede Urhobo

250,000,000 37,500,000 37,500,000

480 Road/BridgesEkurede

ItsekiriWarri South

Construction of right street/1st

Ajuya street/Egbe street/College

road in Ekurede Itsekiri

250,000,000 37,500,000 37,500,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 43 of 94

Page 177: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

481 Road/Bridges Mayuku Warri SouthConstruction of Esimaje Awani,

Mayuku, High Court road 250,000,000 37,500,000 37,500,000

482 Road/Bridges Nana Sapele Construction of 1km Nana road 250,000,000 37,500,000 37,500,000

483 Road/Bridges Enerhen Uvwie

Provision of solar street light at

Ocan drive/Meibi street, off Sedico

road, Enerhen

250,000,000 37,500,000 37,500,000

484 Road/Bridges Olomoro Isoko South Reconstruction of old Olomoro road 250,000,000 37,500,000 37,500,000

485 Road/Bridges

Eku - Obadie

Boboroku/Ago

r

Ethipe EastConstruction of Eku - Obagie

Boboroku/Agor road 250,000,000 37,500,000 37,500,000

486 Road/Bridges TUOMO BURUTUConstruction Of Ayaoba Bridge

Tuomo260,000,000 - 37,440,000 37,440,000

487 Road/Bridges Patani PataniConstruction of Tego road, Ayama

Quarters, Patani 249,000,000 37,350,000 37,350,000

488 Road/Bridges Adano Street Isoko Construction of Adano street, off

Nigerian Police Station, Isoko 104,988,000 68,242,200 21,600,000 36,000,000

489 Road/Bridges Agbarho Ughelli SouthConstruction of Tiger crescent Road

and drains in Upper Agbarho 250,000,000 - 36,000,000 36,000,000

490 Road/Bridges Oleh Isoko SouthConstruction of Eriye Eruovo Avenue

and drainage in Oleh 250,000,000 - 36,000,000 36,000,000

491 Road/Bridges OVWIAN UDU

Construction Of Asigo Road

Opposite Ovwian Grammar School,

Demesi Estate,

250,000,000 - 36,000,000 36,000,000

492 Road/Bridges Efunrun VwieConstruction of 2km road at

Okominu Princess street Efunrun 250,000,000 - 36,000,000 36,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 44 of 94

Page 178: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

493 Road/Bridges Kiagbodo BurutuConstruction of 2KM road at

Kiagbodo town 250,000,000 - 36,000,000 36,000,000

494 Roads/ Bridges AgbarhoConstruction of Agbarho Township

Road 245,000,000 36,750,000

495 Roads/ Bridges Ogriagbene Bomadi

Construction of Inner Concrete

Pavement Road, at Anduoware

Quarters to Palace Annex,

Ogriagbene Town, Bomadi.

240,000,000 36,000,000

496 Roads/ Bridges Onyah Ndokwa EastReclamation of Onyah Town. (Lot 1-

12) 1,500,000,000 225,000,000

497 Road/Bridges Ughelli Ugheli NorthExtension of Ughelli to Aghara-Otor

road in Ughelli North 250,000,000 - 36,000,000 36,000,000

498 Roads/Bridges OKPAKA UDU

Construction Of Okpaka

/Ohrunwhorun Link Road Off Dsc

Expressway

250,000,000 - 36,000,000 36,000,000

499 Roads/Bridges ENIKOGO UVWIEConstruction Of Enikogho Road

Phase 2 250,000,000 - 36,000,000 36,000,000

500 Roads/Bridges Bomadi BomadiConstruction of Concrete pavement

in Bomadi Polytechnic Campus Road 249,000,000 - 35,928,000 35,928,000

501 Roads/Bridges Ogriagbene Bomadi

Permeter

Fencing/Construction&Equipping of

Science Laboratory/1no. 6

Classroom block at Ramos Creek

Secondary Schools

248,000,000 - 35,712,000 35,712,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 45 of 94

Page 179: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

502 Roads/Bridges UGBORIKOKO UVWIE

Reconstruction/Maintenance Of

Nnpc Junior Staff Club Road With

Drains79th Street Bendel Estate

248,000,000 20,417,536 35,712,000 35,712,000

503 Roads/Bridges UGBORIKOKO UVWIE

Reconstruction/Maintenance Of

Custom Barracks Road/Ijaw

Quarters Road, Ddpa Estate

248,000,000 - 35,712,000 35,712,000

504 Roads/ Bridges AlegweIka North

East

Construction of Alegwe/ Idumu Ebu

Road, Owa Alero 1.8Km. 200,000,000 30,000,000

505 Roads/ Bridges Obiarukku Ukwuani L.G.A

Construction and Rehabilitation of

Obiaruku-Umuebu Road in Ukwuani

L.G.A.

150,000,000 22,500,000

506 Roads/ Bridges Jesse Ethiope WestConstruction of Atighwor Road in

Jesse Town 2 KM 250,000,000 37,500,000

507 Roads/Bridges UGBORIKOKO UVWIE

Construction Of Eejuku

Street/Umukoro Street/Okpako

Street & Ajiri Close, Ugbolokposo

248,000,000 - 35,712,000 35,712,000

508 Roads/Bridges UGBORIKOKO UVWIEConstruction Of Anchor Of

Hope/Usiayor Road248,000,000 - 35,712,000 35,712,000

509 Roads/Bridges Ojobo BurutuConstruction of rigid pavement at

sand-filled area at Ojobo245,000,000 - 35,280,000 35,280,000

510 Roads/BridgesOverside

BomadiBomadi Construction of 1km road 136,902,350 47,915,805 21,228,480 35,000,000

511 Roads/Bridges Oruche Odudu Sapele

Construction of Oruche Odudu

crescent/drainage Shell road linking

Okirigbaga road

250,000,000 37,500,000 35,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 46 of 94

Page 180: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

512 Roads/Bridges Oteri Ugheli NorthConstruction of Prince Pius Labo

Road in Oteri in Ughelli North141,906,125 77,037,301 16,735,841 35,000,000

513 Roads/Bridges Gbomoro Uvwie Construction of Gbomoro road 244,879,975 48,975,995 36,852,021 35,000,000

514 Roads/Bridges Ugborikoko WarriConstruction of Aris Strt in

Ugborikoko 98,799,800 - 21,772,800 35,000,000

515 Roads/Bridges OKOLOBA BomadiConstruction Of Rigid Pavement At

Okoloba Town,240,000,000 - 34,560,000 34,560,000

516 Roads / Bridges Osian Ika North Construction of Osian Street 240,000,000 - 34,560,000 34,560,000

517 Roads / Bridges OGRIAGBENE BOMADIConstruction Of Corper Lodge

240,000,000 - 34,560,000 34,560,000

518 Roads / Bridges OGODOBRI BOMADIConstruction Of Oputuru-Ogodobri

Road , Ogodobri230,000,000 34,500,000 34,500,000

519 Roads / Bridges Emervor Isoko NorthConstruction of OGOBA/origho

street Erara quarters.240,000,000 31,500,000 34,500,000

520 Roads / Bridges Effurun Uvwie

Construction of rigid pavement at Pa

Aze Ezo street and it's environs

from the end of the road to Uti

road

230,000,000 34,500,000 34,500,000

521 Roads / Bridges Ogborode SapeleConstruction of old Ogborode

road/drainage 230,000,000 34,500,000 34,500,000

522 Roads / Bridges OJOBO BURUTU

Construction Of Rigid Pavement At

Gbesa Grammar School Premises

Ojobo Town

235,000,000 - 33,840,000 33,840,000

523 Roads / Bridges EKPAN

Construction Of

Ogelegbainowei/Raymond

Street,Ogodor Layout, Ekpan-Warri

235,000,000 - 33,840,000 33,840,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 47 of 94

Page 181: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

524 Roads / Bridges Agishoni Ugheli NorthConstruction of Agishoni/UBE

street Ughelli 230,000,000 - 33,120,000 33,120,000

525 Roads / Bridges Ogriagbene BomadiConstruction of Internal road at

Government hospital 230,000,000 - 33,120,000 33,120,000

526 Roads / Bridges Bulou-

Apelebiri townPatani

Construction of Bulou-Apelebiri

town internal roads, Phase II 220,000,000 33,000,000 33,000,000

527 Roads / Bridges Ovwian Udu Construction of Ezomo rd, ovwian,

in Udu 104,985,000 72,164,199 19,850,020 32,820,801

528 Roads / Bridges Akugbene

Construction of Nelson Gbe

Street(Concrete pavement) at

Akugbene

220,000,000 - 31,680,000 31,680,000

529 Roads / Bridges EKPAN UVWIEConstruction Of Regent

International School Close,Ogbodu

Street Off Refinery Road

220,000,000 - 31,680,000 31,680,000

530 Roads / Bridges Ugborikoko-

Bendel EstateUvwie

Reconstruction/Rehabilitation of

NNPC Junior Staff Road to MC Gil

Ugwu Crescent, Ugborikoko

200,000,000 4,986,004 30,000,000 30,000,000

531 Roads / Bridges Okpanam Asaba

Construction of Nicholas Crescent

(Garden Eden, Garden) , Off High

Court Road, Okpanam

200,000,000 - 30,000,000 30,000,000

532 Roads / Bridges Ugborikoko Effurn

Construction of 2km road at

24/25th Street, DDPA Housing

Estate

230,000,000 - 33,120,000 30,000,000

533 Roads/BridgesOkpara Water

SideEthiope East

Construction of 3km Road Internal

Road in Okpara Water side300,000,000 30,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 48 of 94

Page 182: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

534 Roads/Bridges Agbor Ika SouthConstruction of Edike street, Agbor

– Obi, Ika South LGA, Delta State.200,000,000 30,000,000 30,000,000

535 Roads/Bridges Agbor Ika SouthConstruction of second street DDP

Housing Estate, Agbour. 200,000,000 30,000,000 30,000,000

536 Roads/Bridges OkerenkokoConstruction of Chief Dennis street

road Okerenkoko1KM 200,000,000 30,000,000 30,000,000

537 Roads/Bridges Ogboroke Construction of river road Ogboroke 200,000,000 30,000,000 30,000,000

538 Roads/Bridges Ozoro Isoko NorthConstruction of Grace Akome,

Ogboka and Ezuzu street Ozoro200,000,000 30,000,000 30,000,000

539 Roads/Bridges Ozoro Isoko NorthConstructio of Imonekiro street

Uruto Quarters Ozoro200,000,000 30,000,000 30,000,000

540 Roads/Bridges Olomoro Ika SouthRehabilitation of Olomaro/Igbide

road200,000,000 30,000,000 30,000,000

541 Roads/Bridges Uzere Isoko SouthConstruction of Ultra Modern Civic

Centre /Acess road Uzere200,000,000 30,000,000 30,000,000

542 Roads/Bridges Bomadi Town BomadiConstruction Of Second Phase, Don-

Ray Avenue 107,482,488 69,668,712 12,676,055 30,000,000

543 Roads/Bridges Bomadi Town Bomadi Construction of Funtare/Engr Stow

Roads with Drainage 149,360,300 126,956,255 67,985,075 22,404,045

544 Roads/Bridges Patani PataniConstruction of internal Road in

Patani99,633,150 84,688,178 45,350,519 14,944,973

545 Roads/Bridges Akugbene Bomadi

Construction of Concrete Pavement

(Rigid) Agbede M lane at Akugbene-

Phase 2

200,000,000 - 30,000,000 30,000,000

546 Roads/Bridges Embellegha BomadiEmbelegha Road Kpakiama

Community 150,000,000 - 22,500,000 30,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 49 of 94

Page 183: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

547 Roads/Bridges Ezeibiri BomadiConstruction of 2km Obubu

concrete pavement road 200,000,000 - 30,000,000 30,000,000

548 Roads/Bridges Ogodobiri Bomadi Rigid pavement Internal Road 200,000,000 - 30,000,000 30,000,000

549 Roads/Bridges Obotebe BurutuConstruction Of Concrete Pavement

At Obotebe Town. 230,000,000 - 33,120,000 30,000,000

550 Roads/Bridges Abiniko Ethiope West

Construction of New bypass at

Abinoko Garri Market road Mosical

Town

200,000,000 - 30,000,000 30,000,000

551 Roads/Bridges Asaba OshimiliConstruction Obioha Uzor JP Street

off Okpanam road 200,000,000 30,000,000 30,000,000

552 Roads/Bridges Warri UvwieConstruction of Chief Ogbetue

close, off Water Resources road 200,000,000 30,000,000 30,000,000

553 Roads/BridgesBoji - Boji

Agbor

Ika North

EastConstruction of 1.5km Hill Street 200,000,000 30,000,000 30,000,000

554 Roads/Bridges Boji - Boji OwaIka North

East

Construction of 1.8km Deeper Life

road 200,000,000 30,000,000 30,000,000

555 Roads/Bridges Boji - Boji OwaIka North

East

Construction of 1.3km Word of

Faith street 200,000,000 30,000,000 30,000,000

556 Roads/Bridges Issele - Uku Aniocha NorthConstruction of 1.5km

Market/Ogbofu road 200,000,000 30,000,000 30,000,000

557 Roads/Bridges Cable Oshimili SouthConstruction of Ani - Ahaba street,

Cable 200,000,000 30,000,000 30,000,000

558 Roads/Bridges Asaba Oshimili SouthConstruction of 1.5km road, F.A

Onwuachi Drive link road 200,000,000 30,000,000 30,000,000

559 Roads/BridgesEkametagbene

townBomadi

Construction of internal roads at

Ekametagbene town 200,000,000 30,000,000 30,000,000

560 Roads/Bridges Torugbene BurutuConstruction of Foukunou Internal

Road 200,000,000 30,000,000 30,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 50 of 94

Page 184: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

561 Roads/Bridges Ogwashi Uku Aniocha South

Construction of 2km Family Catholic

Church road to Ubulu-Unor road,

Ogwashi Uku

200,000,000 30,000,000 30,000,000

562 Roads/Bridges Ofagbe Isoko NorthConstruction of Ofagbe-Ibrede

Road phase 11248,475,320 35,511,957 21,477,632 30,000,000

563 Roads/Bridges Gbosien Sokoh UduConstruction of Gbosien Sokoh

street 200,000,000 30,000,000 30,000,000

564 Roads/Bridges Aboh street Warri SouthConstruction of Aboh street with

one side drain 200,000,000 30,000,000 30,000,000

565 Roads/Bridges Ajojigwo SapeleConstruction of Happy Mene road,

Ajojigwo, off New Ogorode road 200,000,000 30,000,000 30,000,000

566 Roads/Bridges Ogorode SapeleRehabilitation of old Ogorode

road/drainage 200,000,000 30,000,000 30,000,000

567 Roads/Bridges Emevor Isoko North

Construction Of Umoru Road At

Emevor At Isoko North Lga, Delta

State

169,019,950 65,921,117 8,061,046 30,000,000

568 Roads/Bridges Jakpa Mereje OkpeConstruction of Jakpa Mereje

Community in Okpe 248,829,292 - 35,836,800 30,000,000

569 Roads/Bridges Akwukwu Oshimili NorthConstruction of Akwukwu Igbo

Ukala Road 239,218,625 114,375,294 18,605,398 30,000,000

570 Roads/Bridges Akpanam Oshimili SouthConstruction of 3km Road from

Okpanam-Ibusa Link Road244,320,500 73,296,150 29,472,206 30,000,000

571 Roads/Bridges Abari Patani Construction Abari Road 242,120,000 72,636,000 29,472,206 30,000,000

572 Roads/BridgesPatani -

ErowhaPatani

Construction of Patani - Erowha

Road96,327,968 35,900,991 31,739,030 30,000,000

573 Roads/Bridges Patani PataniConstruction of Boys Model Road

Patani Town108,022,236 64,813,342 29,056,448 30,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 51 of 94

Page 185: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

574 Roads/BridgesAngiama

/Amatebe Patani Concrete Road 165,989,069 41,288,881 67,568,471 30,000,000

575 Roads/Bridges Egwuono UduConstruction of Egwuono/Oba group

link Road in Udu 247,829,292 - 22,483,440 30,000,000

576 Roads/Bridges Igborikoko Uvwie

Construction of Collins Eselemo

close eyingi roadDDPD Estate,

effurun

82,876,160 12,431,242 12,431,424 30,000,000

577 Roads/ Bridges Okwe Oshimili SouthConstruction of Okwe road, Okwe 1

Km 150,000,000 22,500,000

578 Roads/ Bridges Bomadi Town BomadiTarring of 2Km Bomadi Township

road in Bomadi Town 250,000,000 37,500,000

579 Roads/ Bridges Owhelogbo Isoko NorthConstruction of Owhelogbo, Emu

road, Phase I 200,000,000 30,000,000

580 Roads/Bridges Ugboroke Uvwie Construction of Victory Close,

Ugboroke,Effurun 99,678,800 39,871,520 604,800 30,000,000

581 Roads/Bridges Olare Layout WarriConstruction of Olare Layout

Internal Road 105,000,000 21,866,610 10,646,099 30,000,000

582 Roads/Bridges Ovu Ethiope east Construction of Ovu ring road 100,000,000 - - 30,000,000

583 Roads / Bridges Okoro Lane Warri South

Construction of Okoro lane/Aballa

street in Warri South and Uvwie

LGAs

99,633,150 27,524,770 37,485,110 30,000,000

584 Roads / Bridges Ode-Itsekiri Warri South Construction of Internal Roads 210,971,850 31,645,778 24,881,176 30,000,000

585 Roads / Bridges Osubi Okpe Construction of Ekaka street Osubi 99,102,000 - - 30,000,000

586 Roads / Bridges Ughelli Ughelli northConstruction of 1km

ovuokoroyeberhie street, ughelli100,000,000 - - 30,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 52 of 94

Page 186: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

587 Roads / Bridges Otor-Owhe Isoko NorthConstruction of Market road Otor-

Owhe isoko 149,807,330 - 21,600,000 30,000,000

588 Roads / Bridges Okpokunou BurutuConstruction Of Okpokunu Internal

Road Network And Access Road99,633,150 14,944,973 14,400,000 30,000,000

589 Roads / Bridges Azagba TownNDOKWA

EAST

Construction Of Internal Road In

Azagba Town (Concrete Pavement)150,000,000 22,500,000

590 Roads / Bridges Sapele SapeleConstruction Of Okparavero Close,

Sapele150,000,000 22,500,000

591 Roads / Bridges Ovokoroyeber

he, Agbarho

UGHELLI

NORTH

Construction Of Ovokoroyeberhe,

Upper Agbarho250,000,000 30,000,000

592 Roads / Bridges Urhowhorun UduConstruction of Urhowhorun By Pass

Road, Linking East West Road 243,000,000 - 29,231,617 29,231,617

593 Roads / Bridges Otefe / Ovade Ethiope WestConstruction of Otefe - Ovade Road

1.5km- with Drains Phase 2202,000,000 5,184,000 29,088,000 29,088,000

594 Roads / Bridges Owhahwa Ughelli SouthConstruction of Otor Owhahwa Main

Road, Owhahwa 241,001,200 105,350,979 28,991,172 28,991,172

595 Roads/ Bridges Bomadi Town BomadiConstruction of Access road to the

Cathedral 150,000,000 22,500,000

596 Roads/ BridgesKoloware

CommunityPatani

Construction of Akposuo road of

Koloware Community, Patani 250,000,000 37,500,000

597 Roads / Bridges TORUGBENE BurutuCONSTRUCTION OF CONCRETE

PAVEMENT AT DEBAKEME 200,000,000 - 28,800,000 28,800,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 53 of 94

Page 187: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

598 Roads / Bridges Ilabor Ika North

East

Construction of Internal road,

tarring with drains on both sides in

Ilabor community

200,000,000 90,928,095 28,800,000 28,800,000

599 Roads / Bridges Cemetery StreetIka North

East

Construction of 1.5km cemetery

street200,000,000 - 28,800,000 28,800,000

600 Roads / Bridges Idumu-UgboIka North-

East

Construction of Idumu-

Ugbo/Owarre road, Ute-Okpu

(1.5km)

200,000,000 - 28,800,000 28,800,000

601 Roads / Bridges Ozoro Isoko North Construction of Ozoro-Oleh-Emede-

Igbide-Owodo Kpoko Road (Design) 200,000,000 - 28,800,000 28,800,000

602 Roads / Bridges Uzere Isoko South Construction of Uzere Internal road 200,000,000 - 28,800,000 28,800,000

603 Roads / Bridges Igbidi Isoko South Construction of Igbidi Internal road 200,000,000 - 28,800,000 28,800,000

604 Roads / Bridges Igodo Ika north east

Construction of Ilabor

Comprehensive High School Old

market road Igodo

200,000,000 - 28,800,000 28,800,000

605 Roads / Bridges Ekrehavwe Ugheli North

Construction of

Ekrehavwe/Oguname/Ophori/Agbar

ho road

200,000,000 - 28,800,000 28,800,000

606 Roads / Bridges Bomadi Bomadi

Construction of concreate pavement

at High Court/ Police Station road

Bomadi town

200,000,000 - 28,800,000 28,800,000

607 Roads / Bridges UGBORIKOKO UVWIEConstrution Of Yingi/Freeborn

Street Linking Olare Layout200,000,000 - 28,800,000 28,800,000

608 Roads / Bridges Obiaruku UkwuaniConstruction of Obiaruku Internal

Roads (2km) 202,096,400 - 28,601,329 28,601,329

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 54 of 94

Page 188: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

609 Roads / Bridges Aboh Ndokwa SouthConstruction of Aboh Township road

with drainage99,934,375 71,695,085 8,625,683 28,239,290

610 Roads / Bridges Olomoro Isoko SouthConstruction of 2km Olomoro

township roads (Lots 1-2) 400,000,000 60,000,000 28,000,000

611 Roads / Bridges Ekewuan Benin

CityBenin City

Construction of Jemide Drive, off

Godswill road, Ekewuan Benin City 180,000,000 27,000,000 27,000,000

612 Roads / Bridges Effurun Uvwie

Construction of road to Catholic

Church by Enerhen Junction,

Effurun

94,999,144 68,446,155 18,083,271 26,552,989

613 Roads / Bridges Agbor Ika South Tarring of Odeh Street, Agbor 180,000,000 - 25,920,000 25,920,000

614 Roads / Bridges Emervor Isoko North

Construction of Omoba

,Akenoma,Emevotha &Chief

Ogedegbe streets

180,000,000 - 25,920,000 25,920,000

615 Roads / Bridges Amiekpa Ugheli NorthConstruction of 1km Road/Drains at

Mukoro Rd, Ameikpa Community102,943,325 77,207,494 33,429,243 25,735,831

616 Roads / Bridges Enakeyarhe

StreetUvinie

Construction of MC Gil Ugwu

Crescent off Enakeyarhe Street

Opposite NNPC Junior Staff Club

Road with Drains, Ugborikoko

100,000,000 74,474,705 25,525,295 25,525,295

617 Roads / Bridges Ofurobiri Bomadi

Construction of Road with

Interlocking Paving Stones/Drains

at Ofurobiri Street

130,052,670 15,000,000 18,398,016 25,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 55 of 94

Page 189: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

618 Roads / Bridges Ugbegungun

community

Warri South

West

Construction of road in Ugbegungun

community 250,000,000 37,500,000 25,000,000

619 Roads / Bridges Warri Warri SouthConstruction of Ekurede Itsekiri

internala roads in Warri 250,000,000 37,500,000 25,000,000

620 Roads / Bridges Warri Warri SouthConstruction of Angle Park and

Emiko roads in Warri 250,000,000 37,500,000 25,000,000

621 Roads / Bridges Illah Oshimili NorthConstruction of Internal access

road 189,969,675 28,495,451 14,586,530 25,000,000

622 Roads / Bridges

Agadagada/Ug

besia/Adjnugh

rure Layout

Uvwei Culverts and and Flood Control

Drainages 250,000,000 - 22,680,000 22,680,000

623 Roads / Bridges Ebrumede

CommunityUvwie Construction of 2km Road 250,000,000 - 22,680,000 22,680,000

624 Roads / Bridges Ugborikoko Uwvie Construction of Enikogho Road 250,000,000 - 22,680,000 22,680,000

625 Roads / Bridges Omoyone

EduwayeWarri South

Construction of Omoyone Eduwaye

street off Enuhe 150,000,000 22,500,000 22,500,000

626 Roads / Bridges Ovwian UduConstruction of Ovie street and old

Ekete road, Ovwian 150,000,000 22,500,000 22,500,000

627 Roads / Bridges Asaba Oshimili North

Construction of Infant Jesus

Academy Road off Anwai road,

Asaba

150,000,000 22,500,000 22,500,000

628 Roads / Bridges Alihagwu Ika SouthProvision of solar powered water

project at Alihagwu 150,000,000 22,500,000 22,500,000

629 Roads / Bridges Sapele SapeleConstruction of Adams Road and

Environs 247,986,125 225,892,558 20,515,598 22,093,568

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 56 of 94

Page 190: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

630 Roads / Bridges Tamigbe Burutu

Construction of 1.5km Rigid

Pavement/drains internal roads in

Tamigbe Phase II

150,000,000 - 21,600,000 21,600,000

631 Roads / Bridges Agoloma PataniConstruction of Marine road in

Agoloma town 150,000,000 - 21,600,000 21,600,000

632 Roads / Bridges Ofagbe Isoko NorthConstruction of Hospital road

Ofagbe 150,000,000 - 21,600,000 21,600,000

633 Roads / Bridges Akiewhe Isoko North

CONSTRUCTION OF AKIEWHE

COMMUNITY ROAD, AKIEWHE

OWHE,

148,000,000 - 21,312,000 21,312,000

634 Roads / Bridges Esevo Uvwie Construction of 1km Esievo Lane 150,000,000 - 21,228,480 21,228,480

635 Roads / Bridges Ozoro Isoko North

CONSTRUCTION OF ALUA

STREET LINKING JETEJETE

CLOSE, URUDE, OZORO,

145,000,000 - 20,880,000 20,880,000

636 Roads / Bridges Oyede Isoko North construction of Efue street Oyede 140,000,000 - 20,160,000 20,160,000

637 Roads/Bridges Oleh Isoko South

Construction of Phillip Ojogho

street off Dr. Paul Oweh street off

Dr. Paul Oweh street Oleh

140,000,000 - 20,160,000 20,160,000

638 Roads / Bridges Bomadi BomadiConstruction of 1km Bishop Access

Road in Bomadi Town62,183,900 27,982,755 33,523,200 20,000,000

639 Roads / Bridges Ozoro Isoko SouthConstructio of Etevie Eribo road

Ororo150,000,000 22,500,000 20,000,000

640 Roads / Bridges Kiagbodo BurutuConstruction of Ogedegbe/Orherhe

road Kiagbodo150,000,000 22,500,000 20,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 57 of 94

Page 191: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

641 Roads / Bridges Asaba Oshimili

Construction of Dr. Louise Odogwu

street Off WAEC road, behind CBN

GRA Asaba

150,000,000 22,500,000 20,000,000

642 Roads / Bridges OJOBO BurutuConstruction of Concrete pavment

at Ojobo Community water front200,000,000 30,000,000 20,000,000

643 Roads / Bridges Agolomo PataniConstruction of Bunamazi - Agoloma

road220,000,000 33,000,000 20,000,000

644 Roads / Bridges Agbor Ika SouthConstruction of Hill street Lane Boji

Boji Agbor200,000,000 30,000,000 20,000,000

645 Roads / Bridges Achope UduConstruction of Achope road off

D.S.C express way Ovwian 220,000,000 33,000,000 20,000,000

646 Roads / Bridges BenekrukruWarri South

West

Construction of Concete pavement

road and two side drainage in

Benekrukru Baramatu Kingdom

200,000,000 30,000,000 20,000,000

647 Roads / Bridges Bomadi Ojobo BomadiConstruction of 1km Rd at Setraco

Back Rd 96,463,400 81,993,890 43,907,728 14,469,510

648 Roads / Bridges Ororekpe OkpeConstruction of MC Nero Hotel

Road50,000,000 - 7,200,000 20,000,000

649 Roads / Bridges Dale keta Warri North

Construction of 1km Interlocking

tiles from Ogunaja to Dale keta

Town

248,000,830 - 29,833,190 20,000,000

650 Roads / Bridges Igbogidi UduConstruction of peter doro street,

Igbogidi extension, igbogidi100,000,000 - - 20,000,000

651 Roads / Bridges Ekiugbo Ughelli northConstruction of Ogbe Eki-Dumez

Link Road150,000,000 - 21,600,000 20,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 58 of 94

Page 192: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

652 Roads / Bridges Ogedegbe

AvenueWarri South

Construction of 1km Ogedegbe

Avenue/Edukagho Street, off Iyare

Road

100,000,000 70,702,995 29,103,823 20,000,000

653 Roads/Bridges Ogbe IjohWarri south

westOgbe Ijoh new GRA road, Ogbe Ijoh 100,000,000 - 9,072,000 20,000,000

654 Roads / Bridges Owa OyibuConstruction of Owa-Oyibu Internal

roads237,885,610 - 38,400,000 20,000,000

655 Roads/Bridges Ogharefe Ethiope WestConstruction of Ogharefe Internal

Road (4km) Phase II 231,876,750 45,224,530 19,440,000 19,440,000

656 Roads / Bridges Ighagbomi

RoadUghelli North

Construction of 1.5km road with

drains at Hon. Paul Oge Street, off

Guanah sreet Ighagbomi

200,000,000 - 18,144,000 18,144,000

657 Roads / Bridges Effurun UvweiConstruction of Masoje Road

project, off PTI raod 2km 200,000,000 - 18,144,000 18,144,000

658 Roads / Bridges Okioribi Uvwie

Construction of Antarex Road, off

Alegbo Road, off Alegbo Road

Okoiribi, Effurun

250,000,000 - 18,144,000 18,144,000

659 Roads / Bridges Effurun UvwieConstruction of

Ovwodokpokpo/Olomu Streets 981,000,000 158,717,679 17,280,000 17,280,000

660 Roads / Bridges IZOMO UDUConstruction Of Afoke Street Off

Izomo Road120,000,000 - 17,280,000 17,280,000

661 Roads / Bridges Otibo Isoko NorthConstrction of Otibo Ugbolodi road

Otibo 120,000,000 - 17,280,000 17,280,000

662 Roads / Bridges Effurun Uvwie Construction of Sohworvwe strt,

off Ojabugbe Strt Effurun 108,010,700 27,777,753 16,799,985 16,799,985

663 Roads/Bridges Otegbo Ughelli South Construction of Otegbo Township

Rd in Ughelli 108,000,000 - 15,284,506 15,284,506

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 59 of 94

Page 193: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

664 Roads/BridgesCaroline

StreetOkpe

Construction of Caroline street of

East West Road in Okuokoko 150,000,000 15,000,000

665 Roads / Bridges Sapele SapeleConstruction of 1km Road by Gana

Health centre in Gana, Sapele100,000,000 15,000,000

666 Roads / Bridges Aritesoma Warri SouthConstruction of tow (2) side drain

and surfacing of Aritesoma street 100,000,000 15,000,000 15,000,000

667 Roads / Bridges Popo street Warri SouthConstruction of one side drain and

surfacing of Popo street 100,000,000 15,000,000 15,000,000

668 Roads / Bridges Orugboh Lane Warri SouthConstruction of Orugboh Lane off

Olu Palace 100,000,000 15,000,000 15,000,000

669 Roads / Bridges Effurun Uvwie Construction of Imasuen Isoken

Street by Police Barrack 160,000,000 - 14,515,200 14,515,200

670 Roads / Bridges Tuomo BurutuConstruction of Foukunu Bridge

Tuomo (10m)100,000,000 - 14,400,000 14,400,000

671 Roads / Bridges Kwale Ndokwa WestConstruction of Road from Eke to

Winners Chapel to Isumpe, Kwale 150,000,000 22,500,000

672 Roads / Bridges Okuokoko Okpeconstruction of glorious street

okuokoko 100,000,000 - 14,400,000 14,400,000

673 Roads/Bridges Agbor Ika southConstruction of Upper Queen

Street with one Side drainage 100,000,000 - 14,400,000 14,400,000

674 Roads / Bridges Bomadi Bomadi

Construction of New High Court

Road,opp Govt Secretariat in Bomadi

Town

65,274,712 51,567,022 17,831,923 13,707,689

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 60 of 94

Page 194: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

675 Roads / Bridges Effurun Uvwie

Construction of concrete Pavement

in BAAR. Newworld, Safugha street,

off Agbamu Crescent

150,000,000 - 13,608,000 13,608,000

676 Roads / Bridges Bende Estate UvweiReconstruction/Rehabilitation of

Onoyake St 180,000,000 20,378,835 12,325,119 12,325,119

677 Roads / Bridges Ogriagbene BomadiConstruction of rigid pavement

/Drains in Ogriagbene 248,538,950 37,280,843 8,388,190 12,000,000

678 Roads / Bridges Owhrode UduRehabilitation of Owrode-Otor Udu-

Okwagbe Road 249,988,963 37,498,344 25,920,000 12,000,000

679 Roads / Bridges Tamigbe Burutu

Construction of 1.5km Rigid

Pavement/drains internal roads in

Tamigbe

103,236,925 91,253,076 48,035,220 11,983,849

680 Roads / Bridges Koloware PataniConstruction of 1km Rd in Koloware,

Patani 200,000,000 169,901,443 80,278,432 10,000,000

681 Roads / Bridges Arogbo-

OrogunUghelli North

Construction of Emojita Street

Road Arogbo-Orogun (On-going) 150,000,000 22,500,000

682 Roads / Bridges Ovwian UduConstruction/Rehabilitation of 2km

Ovwian Township Roads 185,542,500 120,837,094 59,359,459 9,000,000

683 Roads / Bridges Otokutu Ughelli SouthConstruction of 950m Gbisi street

in Otokutu 86,596,388 16,942,688 8,023,591 8,023,591

684 Roads / Bridges Akugbene Bomadi

Construction of internal road

network at Akugbene town (Lots 1-

12)

2,700,000,000 405,000,000 405,000,000

685 Roads / Bridges EKIUGBOUGHELLI

NORTH

Construction Of Enarhe Avenue Off

Onosode Close Ekiugbo50,000,000 - 7,200,000 7,200,000

686 Roads / Bridges Emevor Isoko North Construction of Itendu Street, in

Emevor 104,988,000 89,239,800 15,748,200 5,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 61 of 94

Page 195: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

687 Roads / Bridges Okpara

WatersideEthiope East Construction Of Okpara Waterside

Internal Road Network

400,000,000 5,000,000

688 Roads/Bridges kokori Ethiope EastConstruction Of Kokori-Okuruokpe-

Okpara Inland Road300,000,000 5,000,000

689 Roads/BridgesOrhuwhorun/

OwhodeUdu

Construction of

Orhuwhorun/Owhode road245,000,000 36,750,000

690 Roads / Bridges Ekogbene

TownBurutu

Construction of 1.5km Rigid

Pavement Road at Ekogbene Town,

Burutu

150,981,750 96,212,561 49,460,953 4,500,000

691 Roads / Bridges Ugbuwangue Warri SouthConstruction of Internal Road

Network - Access rd147,855,025 22,834,578 13,810,353 3,000,000

692 Roads / Bridges Olota Ughelli SouthDesign of 16km Bomadi-Alagbabiri-

Olota Road. 10,000,000 - 2,721,600 2,721,600

693 Roads / Bridges Ukpionvwin/Ey

araUghelli South

Construction of Ukpionvwin - Oghior

- Eyara Road 10,000,000 - 2,721,600 2,721,600

694 Roads/Bridges Ogume UvwieConstruction of Ogume/Kings

Zuokumor Road 150,000,000 177,164,731 2,000,000 2,000,000

695 Roads / Bridges Irri Isoko SouthConstruction of Arch Bishop Apena

street Irri 120,000,000 135,590,725 2,000,000 2,000,000

696 Roads / Bridges Osubi OkpeConstruction of Ekaka Road, Osubi

Okpe LGA (On going) 2014 150,000,000 22,500,000

697 Roads / Bridges Kpakiama BomadiConstruction of Rigid Pavement

Roads in Kpakiama 103,266,850 58,999,230 30,330,324 -

698 Roads / Bridges Esema BomadiConstruction of Esama major farm

road99,763,125 27,003,783 16,331,888 -

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 62 of 94

Page 196: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

699 Roads / Bridges Akugbene BomadiConstruction of Pinawou Road

Akugbene Towa, Road180,000,000 153,000,000 72,292,500 72,292,500

700 Roads/BridgesOdorubu

ImiwherePatani

Construction of 2km Odorubu

Imiwhere Road 195,000,000 179,178,088 84,661,646 -

701 Roads / Bridges Egodor-

Ogbeingbene Burutu

Constr. Of Egodor-Ogbeingbene

Road806,680,991 745,705,477 40,857,155 -

702 Roads / Bridges Tuomo

/TamigbeBurutu

Construction of Bomadi - Tuomo

/Tamigbe Rd (Phase 11) 8,941,574,469 2,971,497,764 8,164,800 -

703 Roads / Bridges Ogulagha BurutuConstruction Of Rigid Pavement

Internal Roads At Ogulagha545,726,800 - 78,584,659 -

704 Roads/Bridges Kpagbodo BurutuConstruction of Kiagbodo-Bikorogha-

Egodo-Agbodobiri Road 40,423,175 29,388,570 15,240,960 -

705 Roads / Bridges Bikorogha Burutu

Completion of Aloba-Bikorogha-

Egobor-Ogbodobiri road(9.508KM

road and 30M Bridge 2NO.)

892,953,201 540,438,029 - -

706 Roads / Bridges Issele Onicha-Uku

Construction of Access Road (from

Issele-Uku/Onicha-Uku/Ugbodu

main road) to Comprehensive

Secondary School, Onicha-Uku

84,724,200 53,232,180 16,767,820 -

707 Roads / Bridges Ovwodokpokpor Ughelli South Ovwodokpokpor - Oviri-Olomu Road 295,895,710 178,571,064 - -

708 Roads / Bridges Ogriagbene BomadiConstruction of Internal road in

Ogriagbene Town, Bomadi LGA-DT948,500,200 551,702,968 300,000,000 -

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 63 of 94

Page 197: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

709 Roads / Bridges Waterside Akugbene

Construction of 2km Rigid Pavement

Road from Waterside to main Palace

Akugbene

200,000,000 - 28,800,000 28,800,000

710 Roads / Bridges Ogbe Ihago Aniocha South

Ogbe Ihago through Ikeh Orji to

Ogbe Ofu Road Ogwashi-Uku HQ

off Aniocha South

200,000,000 - 28,800,000

711 Roads/Bridges Tuomo BurutuConstruction of Tuomo Waterfront

Concrete Road Pavement&drains 200,000,000 - 28,800,000

712 Roads / Bridges Tuomo BurutuConstruction of Ekayama Loyibo

street Internal roads 200,000,000 - 28,800,000

713 Roads / Bridges OdukpaniConstruction of Dawandy school of

excellence roads and erosion control250,000,000 - 36,000,000

714 Roads / Bridges Nde Ikom Ikom

Erosion control and drainage works

at Steady flow-Aranganfam

Knowlwege Village Nde Ikom (Phase

2)

200,000,000 - 28,800,000

715 Roads / Bridges Agoloma Patani Construction of Korobarezi

Internal Roads 248,500,000 - 35,784,000

716 Roads / Bridges Boji-Boji Owa Ika North

Construction of 2.2km road with

600mm excavation and filling and 2

side drains at Umeri/Upper

Ojekpolor Street

300,000,000 76,675,640 43,200,000

717 Roads / Bridges ovwian udu

construction of ejiro reuben close,

opposite peabody hotel dsc

expressway

100,000,000 - 14,400,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 64 of 94

Page 198: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

718 Roads / Bridges Ashama AshamaConstruction of 3km Road from

Ashama-Egbudu-Aka245,000,000 18,559,637 29,472,206

719 Roads / Bridges BMCDA BomadiConstruction of Internal Rd in

Bomadi 247,000,000 14,944,973 27,715,239

720 Roads / Bridges Aladja-IsabaConstruction of Aladja-Isaba-Ogbe

Ijoh-Ode Isekiri Rd Phase 19,000,000,000 - -

721 Roads / Bridges Esama

CommunityBomadi

Construction of Internal Rigid

Pavement in Esama

Community,Bomadi

150,000,000 - 21,600,000

722 Roads / Bridges Ayakoromor Burutu Construction Of Concrete Pavement

At Ayakoromor Town, (Phase 2)200,000,000 - 8,737,500

723 Roads / Bridges Amawha

Layout OlehIsoko South

Construction of

Agabama/Nwange/Dicson Oboba

streets

140,000,000 41,486,819 5,136,696

724 Roads / Bridges Bomadi Bomadi

construction of drainage from

NDDC park road to first bridge

Tuomo road

150,000,000 22,500,000

725 Roads / Bridges Ogriagbene Bomadi

CONSTRUCTION OF MODERN

MARKET/ LINK ROADS AT

OGRIAGBENE, BOMADI

LGA,DELTA STATE PHASE 2

200,000,000 30,000,000

726 Roads / Bridges Ivrogbor Irri Isoko SouthConstruction of Beach road

IvIvrogbor-Irri Isoko200,000,000 30,000,000

727 Roads / Bridges Oleh Isoko SouthConstruction of Okpesia / Ireva and

Hon. Joe Egbe street Oleh150,000,000 22,500,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 65 of 94

Page 199: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

728 Roads / Bridges Kotokoto Lay

outOvwian Udu

Construction of Alfred Mulade

street and Adjoining road Kotokoto

Layout

200,000,000 30,000,000

729 Roads / Bridges Oko Oshimiliconstruction of Oko road (13km)

phase 1350,000,000 52,500,000

730 Roads / Bridges Umutu/

AkokubUkwuani

Construction of Umutu/ Akokub

road Ukwuani (11KM)p350,000,000 52,500,000

731 Roads / Bridges Ogborikoko,

WarriUvwie

Construction of Onoriakpor street,

Ogborikoko, Warri150,000,000 22,500,000

732 Roads / Bridges Ugboroke Uvwie

Construction of 1KM concrete

pavement at Federal Government

site and Service scheme road

Ugboroke along NNPC Housing

complex, In Uvwie

230,000,000 34,500,000

733 Roads / Bridges Akiewe Isoko NorthConstruction of Uthatho road,

Akiewe200,000,000 30,000,000

734 Roads / Bridges Akugbene BomadiConstruction of Rigid Pavement at

Akugbene Phase I 236,966,916 178,629,045 20,255,445

735 Roads / Bridges Kpakiama BomadiConstruction Of Aloumu Ogubo

Primary School Road, Kpakiama Town150,000,000 - 21,600,000

736 Roads / Bridges Ogbein-ama Bomadi

Construction Of1km Internal

Concrete Road At Ogbeinama

Town(Phase 2)

243,000,000 - 34,992,000

737 Roads / Bridges Bomadi BomadiConstruction of Internal Roads in

Bomadi (3km)246,426,500 36,963,975 29,062,556

738 Roads / Bridges Okpokuma Bomadi Const of internal roads 250,000,000 - 36,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 66 of 94

Page 200: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

739 Roads/Bridges Ogodobiri Bomadi Phase 2, Concrete Pavement Rd 150,000,000 - 21,600,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 67 of 94

Page 201: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

740 Roads / Bridges Antarex UvwieConstruction of Antarex road and

Environs off Okoribi road (Phase II) 250,000,000 37,500,000

741 Roads / Bridges Ezeibiri Bomadi2Km Odabar Concrete Pavement

Road at Ezeibiri Town200,000,000 46,485,821 28,800,000

742 Roads/Bridges Effurun UvwieConstruction of Effurun internal

roads500,000,000 - -

743 Roads / Bridges Ezebere Bomadi Construction of Rigid Pavement 200,000,000 127,467,868 68,259,043

744 Roads / Bridges Ojobo Burutu

Construction of Internal Concrete

Pavement 1.5km Road in Ojobo

Community

245,000,000 36,750,000

745 Roads / Bridges Otibio Erawha Isoko NorthConstruction of Otibio Erawha -

Enagbedhi link road236,549,000 172,735,880 81,617,703

746 Roads / Bridges Aghalokpe OkpeConstruction of Aghalokpe -

Gudugudu Waterside Road89,204,000 10,541,314 6,641,028

747 Roads / Bridges Uduophori Patani

Construction of Patani-Angoloma-

Toru Apelebir-Toru-Angiama

(Design)

10,000,000 2,835,000

748 Roads / Bridges Osuni Okpe

construction of ,miller ovedje

court/betherl christian street

Osubi

100,000,000 - -

749 Roads / Bridges Ezeibiri Bomadi 1Km Rigid Pavement Phase 2 200,000,000 - 30,000,000

750 Roads / Bridges Kalafrogbere BomadiConstructuion of Rigid Pavement

Road at Zion Kalafrogbere 120,000,000 16,509,461 9,984,922

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 68 of 94

Page 202: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

751 Roads / Bridges Ovwian uduconstruction of kubuwe street

layout road100,000,000 - -

752 Roads / Bridges Ogulagha Burutu Reclamation works at Ogulagha

community 1,577,663,794 236,649,569 55,432,224

753 Roads / Bridges Ogulagha

OkontuBurutu

Construction of Ogulaha Okontu

Road Network 245,000,000 - 35,280,000

754 Roads / Bridges Ogbabagbene Burutu Internal Roads 200,000,000 - 28,800,000

755 Roads / Bridges Torugbene

TownBurutu

Construction of Bamughan Lane at

Torugbene 235,845,500 31,208,634 18,874,982

756 Roads / Bridges Bubopagbene

Town,Burutu

Construction Of Township Road

Concrete Pavement / Concrete

Landing Jetty At Bubopagbene Town

235,000,000 - 21,319,200

757 Roads / Bridges Odimodi BurutuConstruction Of Concrete Pavement

Odimodi Township Road400,000,000 - 57,600,000

758 Roads / Bridges TORUGBENE BURUTUConstruction Of Rigid Pavement At

Torugbene Phase 2 250,000,000 6,687,525 37,500,000

759 Roads/Bridges Enekorogha BurUTU

CONSTRUCTION OF 1KM

CONCRETE PAVEMENT ROAD AT

EBIAMA COMMUNITY OFF

BYPASS ROAD ENEKOROGHA

230,000,000 - 20,865,600

760 Roads / Bridges Effurun Effurun-WarriConstruction of Dan Etebite Rd in

Effurun 100,000,000 - 21,772,800

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 69 of 94

Page 203: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

761 Roads / Bridges Abraka Ethiope East DELTA ST. UNIVERSITY ABRAKA,

MAINCAMPUS ROADS. 134,156,280 106,857,845 2,183,044

762 Roads / Bridges

Aghalokpe -

Boboeroku -

Jesse

Ethiope

West/East

Design of Aghalokpe - Boboeroku

Road & Bridges Phase 110,000,000 - 2,721,600

763 Roads / Bridges Ejeme Aniogor Aniocha North Construction of 3km Market street 250,000,000 37,500,000 37,500,000

764 Roads / Bridges Umutu UkwuaniConstruction of 1.5km Ozegbe

street 220,000,000 33,000,000 33,000,000

765 Roads / Bridges Okedom Uvovie

Reconstruction. Rehabilitation of

Okedom street and it’s Environs, off

Okoribiroad, Effurun, Uvovie LGA

150,000,000 22,500,000

766 Roads / Bridges Ozoro Isoko NorthConstruction of 2.5km Etereva road

(Lots 1-2) 500,000,000 75,000,000

767 Roads/Bridges Uro Isoko SouthConstruction of 1km Uro township

roads 200,000,000 30,000,000

768 Roads / Bridges Orie Isoko SouthConstruction of 1km Orie township

roads 200,000,000 30,000,000

769 Roads / Bridges Ivrogbor Isoko SouthConstruction of 2km Ivrogbor

township roads (Lots 1-2) 390,000,000 58,500,000

770 Roads/BridgesOkorikpehre

layoutOkpe

Construction of 2km Thompson

Layegbe street road project,

Okorikpehre layout

250,000,000 37,500,000

771 Roads / Bridges Ogodobiri BomadiConstruction of concrete road (rigid

pavement) at Ogodobiri (Phase IV) 234,500,000 35,175,000 35,175,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 70 of 94

Page 204: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

772 Roads / Bridges Elume SapeleConstruction of Amuokpokpor road,

Elume 250,000,000 37,500,000 37,500,000

773 Roads/Bridges Elume Sapele Construction of Ituru road, Elume 200,000,000 30,000,000

774 Roads / Bridges Ekpon Ika EastConstruction of Ndobu

quarters/camp Isaiah road, Ekpon 250,000,000 37,500,000

775 Roads/Bridges Olomoro Oleh Isoko SouthReconstruction of Old Olomoro Oleh

road (Lots 1-2) 490,000,000 73,500,000

776 Roads / Bridges Ozoro Isoko NorthConstruction of 1.4km Shalom city

road with spur150,000,000 - 21,600,000

777 Roads/Bridges Iyede Isoko NorthCollege Road, Iwride to Alagba

Road, Iyede (5km) (Design)10,000,000 - 2,721,600

778 Roads/Bridges Isiokwe Ozoro Isoko NorthConstruction of Etozoha 1km Road in

Isiokwe Ozoro100,000,000 73,012,034 22,470,136

779 Roads / Bridges Emevor Isoko NorthConstruction of 16.7km Roads

(Design)50,000,000 - 13,608,000

780 Roads / Bridges Olomoro/Oleh Isoko South Construction of Dr. Paul Oweh

Strt,off olomoro, old oleh road 141,013,546 - 19,956,688

781 Roads / Bridges Araya-

EwhokpakaIsoko South

construction of 3km Araya-

Ewhokpaka road480,650,345 114,171,107 69,213,650

782 Roads / Bridges Okpe-Isoko Isoko SouthConstruction Of Ovie Palace Road,

Okpe - Isoko, 200,000,000 - 18,144,000

783 Roads / Bridges Okpe-Isoko Isoko North Construction Of Ovie Palace Road

Phase 2200,000,000 - 28,800,000

784 Roads / Bridges Igbide Isoko South Construction of General Omu Road 200,000,000 - 28,800,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 71 of 94

Page 205: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

785 Roads / Bridges Ovwian UduReconstruction of Ekete Inland

road, Ovwian245,000,000 36,750,000

786 Roads / Bridges Emede Isoko South Construction Of 2km Omudu Street

Emede, 200,000,000 - 18,144,000

787 Roads / Bridges Ewhen Isoko SouthConstruction of Ewhen Unenurhie

Bridge, Ewhen150,000,000 - 13,608,000

788 Roads / Bridges Oboriowo

StreetEffurun

Miller Ovedje Court/Bethel

Christian Oboriowo Street, off

Osubi road

200,000,000 - 28,800,000

789 Roads / Bridges Aviara Isoko SouthInternal Township and Access Roads

- 2.5km240,477,600 194,681,667 28,928,186

790 Roads / Bridges Uwherun-

Enhwe-IgbideIsoko South

Construction of Uwherun-Enhwe-

Igbide Road/Design10,000,000 - 2,721,600

791 Roads / Bridges Aviara Isoko SouthConstruction of Aviara Township

Road200,000,000 24,193,399 14,632,167

792 Roads / Bridges Owhelugbo-

AbbiIsoko-North

Rehabilitation and Expansion of

Owhelogbo - Abbi Road248,279,575 37,241,936 71,257,293

793 Roads / Bridges ASE Ndokwa East Edherie-Ase Road 604,374,826 375,718,447 75,110,847

794 Roads/Bridges Utagba-Ogbe Ndokwa EastRehabilitation of Technical Collrge

Road200,000,000 - 18,144,000

795 Roads / Bridges Ndokwa West Ndokwa West Iselegu/Utagba-Uno/Obiaruku Road 5,200,000,000 5,156,395,665 -

796 Roads / Bridges Tanigbe OgharaConstruction of Tanigbe and Oghara

Road176,976,975 12,646,060 23,057,780

797 Roads / Bridges Edo-Otulu Ogwashi-Uku Construction of Edo Otulu rd 200,000,000 - 18,144,000

798 Roads / Bridges Egborode Okpe Egborode Waterside Road with

spur to Egbrode Health Centre 200,000,000 - 28,800,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 72 of 94

Page 206: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

799 Roads/Bridges Jeddo Town Okpe Construction of Internal roads in

Jeddo Town150,000,000 . 21,600,000

800 Roads/Bridges Okukpere Okpe

Construction of Richard Oviorho

Street off Agbarho-Warri Road

Oku-Okukpere near Okuokoko

160,000,000 - 23,040,000

801 Roads / Bridges Orerokpe OkpeRehabilitation of Internal Roads

Orerokpe300,000,000 43,200,000

802 Roads / Bridges Okpokunou Burutuconstruction of concrete pavement

with Bridge and drains200,000,000 - 18,144,000

803 Roads / Bridges Oletukovie Ughelli north Constructuion of Oletukovie Road 239,000,000 92,394,862 14,758,013

804 Roads / Bridges Onicha Uku Onicha Uku

Construction of Access Road to

Onicha Uku Comprehensive

Secondary School

100,000,000 27,693,241 8,199,419

805 Roads / Bridges Akwukwu Oshimili NorthAkwukwu Igbo/Onicha Olona Link

Road in Oshimili LGA 50,000,000 36,125,000 13,875,000

806 Roads / Bridges Akwukwu,(Umu-

Opu to Ogbani)Oshimili North

Construction of Akwukwu to Circular

road180,000,000 - 16,329,600

807 Roads / Bridges Asaba Oshimili NorthInternal Road Network, Federal

Medical Centre, Asaba160,000,000 63,767,669 14,515,200

808 Roads / Bridges Okpanam Oshimili NorthConstruction of Swimming Road off

Asaba/Benin Express Way200,000,000 - 18,144,000 100,000,000

809 Roads/Bridges Okpanam Oshimili NorthConstruction of 3km State Hospital

Road250,000,000 - 22,680,000

810 Roads/Bridges Ase-Asaba Oshimili South Constr. Of Ase-Asaba Ase Bridge 1,000,000,000 500,000,000 -

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 73 of 94

Page 207: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

811 Roads/Bridges Ovwian Uduconstruction of peter ukoh street

by God's grace church ovwian100,000,000 - 14,400,000

812 Roads/Bridges Asaba Oshimili SouthConstruction of Internal Roads at

Asaba Technical College195,764,250 26,895,563 16,266,436

813 Roads/BridgesOkumagba

LayoutOvwie

Construction Of Onofeghara

Street, Okumagba Layout, 104,000,000 - 9,434,880

814 Roads/BridgesWater

ResourcesOvwie

Construction Of Enajekpo Street

/Unuajowhofia Close Linking Arisi

Street Behind Old Airport, Water

Resources Road.

140,000,000 - 12,700,800

815 Roads/Bridges Odorubu PataniHealth centre Road-concrete

pavement with drains180,000,000 - 16,329,600

816 Roads / Bridges Kobowei Road PataniRehabilitation and asphalt overlay of

Kobowei road, Patani LGA137,963,725 41,995,478 25,398,865

817 Roads / Bridges Patani Patani

construction of 1.5km

council/hospital road with

Ashphalt/Drains

220,000,000 - 19,958,400

818 Roads/Bridges Uduophori Patani

concrete pavement road from

Uduophori Town to Waterside with

drains

180,000,000 - 16,329,600

819 Roads / Bridges Patani-

AgolomoPatani Construction of Patani-Agolomo Rd 58,407,773 14,601,943 9,184,505

820 Roads / Bridges Odorobu/Adob

uPatani

Construction of Odorobu/Adobu

Road in Patani, Phase 1 248,457,000 - 29,888,065

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 74 of 94

Page 208: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

821 Roads / Bridges Koloware PataniConstruction of Rigid Pavement in

Patani Road 87,993,351 - 8,467,200

822 Roads / Bridges Patani Patani Construction of Ekise back road 150,000,000 - 13,608,000

823 Roads / Bridges Otokutu Ughelli southConstruction of Idjedo Orhuwhorun

road linking umunade close otokutu100,000,000 - -

824 Roads / Bridges Igun

communityEthiope east

Construction of osuere road (1.5km)

with drains170,000,000 - -

825 Roads / Bridges Bulu Angliama PataniConstruction of Bulu Angiama Road,

patani.200,000,000 - 18,144,000

826 Roads / Bridges Mereje/Ekoko

/EroghorOkpe

Construction of

mereje/ekoko/eroghor road, phase 1

(5km)

500,000,000 - -

827 Roads / Bridges Toru-Apelebiri PataniConstruction Of Concrete At Toru-

Apelebiri Town,235,000,000 - 21,319,200

828 Roads / Bridges Adobu Patani Construction Of Concrete Pavement

At Adobu Town.240,000,000 - 21,772,800

829 Roads / Bridges Toru-Angiama PataniConstruction of 2km Rigd Pavement

Rd in Patani 245,000,000 31,429,824 14,014,395

830 Roads / Bridges Ugbeyiyi Sapele

Construction of charity/ekpotor

road with drains (1.5km) Ebalu

layout

150,000,000 - -

831 Roads / Bridges

Aragba,

Okobia,

Okwetolor,

Okuabude

Okpe

Construction of

Aragba/Okobia/Okwelobar/Okwevis

i/Okuabude road with a spur to

Okwegume (6km)

640,000,000 - -

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 75 of 94

Page 209: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

832 Roads / Bridges Patani PataniAsphalt Overlay and rehabilitation

of Kabowei Road, Patani (2.8km) 137,963,725 - 19,525,068

833 Roads / Bridges Agolomo Patani Patani-Agolomo Uduophoni Road 242,368,500 - 29,155,651

834 Roads / Bridges Okuruware PataniConstruction of Commissioner's

Quarter- Pase 2(3km) 248,000,000 12,097,890 22,498,560

835 Roads / Bridges Patani Town Patani

Construction of Road from

Commissioner Quarters in

Okuruware, Patani town

200,000,000 - 28,304,640

836 Roads / Bridges Marine Road PataniConstruction of Marine Road(Rigid

Pavement) 200,000,000 - 18,144,000

837 Roads / Bridges Odurubu/Adob

uPatani

Constuction of Rigid Pavement at

Odurubu/Adobu, 248,000,000 - 29,833,091

838 Roads / Bridges

Egbeleku,

Umuaghwa,

Oviri-Okpe

Okpe

Construction of EgbelekuUmiaghwa,

Oviri-Okpe Road with a spur to

Amuokpokpor (6km)

640,000,000 - -

839 Roads / Bridges Overah Rd

Gana-SapeleSapele

Construction of Overah Road in

Sapele 200,000,000 - 28,304,640

840 Roads / Bridges Ogaga Road SapeleConstruction of Ogaga Road in

Sapele50,000,000 72,619,188 2,000,000

841 Roads / Bridges Sapele SAPELEConstruction of internal roads in

Sapele249,475,000 139,675,885 46,102,639

842 Roads / Bridges Sapele SAPELEConstruction of I. Ikoyo Road

Sapele (phase 2) 198,995,938 - 28,162,542

843 Roads / Bridges Alaka Udu Costruction of Alaka Road,

Orhuworhu-Udu 100,000,000 8,170,119 9,072,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 76 of 94

Page 210: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

844 Roads / Bridges Orhuwhorun Udu Oko-Aldja(Kotokoto) Layout road

by primary school road-4km 200,000,000 - 18,144,000

845 Roads / Bridges

Igbeku,

Ogborhen

communities

OkpeConstruction of Phase 2 of Igbeku-

Adjekimoni/Ugboren road (4km) 450,000,000 - -

846 Roads / Bridges Izomo Udu Construction of Izomo Road Phase

II 114,000,000 4,598,760 16,133,645

847 Roads / Bridges Mobil Camp Udu

Reconstruction of Mobile Camp

Internal Road/Ekete Inland, Ekete

Community

145,000,000 - 13,154,400

848 Roads / Bridges Kokori Ethiope eastConstruction of kokori internal

roads (2km) phase 2 250,000,000 24,943,966 -

849 Roads / Bridges Orhuwhorun UduConstruction of Rigid Pavement at

Orhuworun 249,056,500 4,139,530 773,673

850 Roads / Bridges Effurun Uvwie

Construction of Ukuade Okpada

waterside road with drainage

(linking okoloba road and effurun

sapele road) (1.5km)

170,000,000 - -

851 Roads / Bridges

Awoabi, off

Ekredjebo

Comm.

Ugheli NorthConstruction of 1km Rd/Drains in

Awoabi 140,000,000 72,728,065 37,388,044

852 Roads / Bridges

Ozobokeme/L.

M

Orusara/Ekete

waterside

Udu

Consrtruction of 1km larry oko-jie

close connected to J.K ozobokeme

and L.M Orusara street , Ekeke

waterside

100,000,000 - -

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 77 of 94

Page 211: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

853 Roads / Bridges Ekakparemre Ugheli South

Construction of

Ekakpare/Otughiavwen/Okwagbe/O

tutuama/Isaba road

1,500,000,000 - 75,600,000

854 Roads / Bridges OTOVWODO UGHELLIUghelli North

Construction Of Otovwodo Ughelli

Oviri Ogor-Okpavuere Olomu

Ophorigala Road

3,200,000,000 2,771,402,251 -

855 Roads / Bridges Ovwian Udu

Construction of old court

/maternity/market road (2.5km) and

NBTC gate to new layout

300,000,000 - -

856 Roads / Bridges Ughelli Ughelli NorthConstruction of old Ogor road,

Ughelli 150,000,000 126,437,500 23,562,500

857 Roads / Bridges Ughelli Ughelli North

Construction of 1.5km Low Cost

Road off Warri-PortHarcourt

Highway, Ughelli

150,000,000 170,160,699 2,000,000

858 Roads / Bridges Ibru Layout

Agbarha-OtorUghelli North Construction of Blessed Avenue. 100,000,000 41,550,716 22,603,025

859 Roads / Bridges Igbide Isoko SouthConstruction/Rehabilitation of Gen.

Paul Ufuoma Omu Road, Igbide100,000,000 - 14,400,000

860 Roads / Bridges Agbarha-Otor Ughelli NorthConstruction of Tutu Street at

Agbarha-Otor in Ughelli North LGA99,122,170 84,253,845 4,913,216

861 Roads / Bridges Agbarho Ughelli-SouthConstruction of Oha-Ikwegu-Agharo

Road 1,439,287,897 - -

862 Roads / Bridges Effurun Uvwie

Construction of drains to deflood

Izobo layout/late chief Ray Inije

road

200,000,000 - -

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 78 of 94

Page 212: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

863 Roads / Bridges Ugboroke Uvwie Construction of Kotoro Strt,

Ugboroke-Effurun 104,000,000 17,204,963 5,184,000

864 Roads / Bridges Refinery road UvwieConstruction Of Uduboh Road, Off

Refinery Road, Effurun, 104,000,000 - 9,434,880

865 Roads / Bridges DDPA Uvwie

Reconstruction /Maintenance Of

Mike Asaboro Street /Freeborn

Street From Sabath Church Ddpa

Estate, Uvwie

145,000,000 - 13,154,400

866 Roads / Bridges Vienna/Polokor Uvwie

Construction of St Michael close off

brighthope streeet/vienna/Ejevwo

road off Polokor road

,Ogborikoko,Uvwie L.G.A

245,000,000 105,115,439 22,226,400

867 Roads / Bridges Ogorode Sapele

Construction of Ojolu layout road

(Off new ogorode road) with a spur

to ireto and ojabube road (3km)

350,000,000 - -

868 Roads / Bridges Lucky London

StreetOkpe Construction of Rigid Pavement Road 250,000,000 - 36,000,000

869 Roads / Bridges Okumagba Warri

Construction of Okumagba

Street/Obahor Link Road Leading to

Upper Erejuwa Road

239,000,000 277,307,857 2,000,000

870 Roads / Bridges koko Warri north Construction rigid pavement/Drains 230,000,000 - 27,667,786

871 Roads / Bridges Warri Warri southConstruction of Obire/Ereku Street

off Cemetry Road250,000,000 - 22,680,000

872 Roads / Bridges Ogbe Str Warri SouthConstruction of Ogbe Str Linking

Agbawu street-1km150,000,000 18,879,785 11,418,494

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 79 of 94

Page 213: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

873 Roads / Bridges Emevon Isoko North

Construction of Ikoko Road Linking

St. Michael Anglican Church and

adjoining St. Emevon

350,000,000 - 50,400,000

874 Roads / Bridges Owhrode-

IwhrideIsoko south Construction of Owhrode-Iwhride 150,000,000 - -

875 Roads / Bridges NIGER CAT UVWIE

Consruction Of Access Road Linking

Oloye Close Byeziegbe Street Niger

Cat Ekpan

230,000,000 - 33,120,000

876 Roads / Bridges Ebrumede UvwieConstruction of Arthur Akpowowo

road, Ebrumede240,000,000 - 34,560,000

877 Roads / Bridges EKIUGBO ghelli NorthConstruction Of Enarhe Avenue Off

Onosode Close Ekiugbo150,000,000 - 21,600,000

878 Roads / Bridges

Ehuigbo-

eruemukohwari

en

Ughelli northConstruction Of Road Linking Oil

Producing Communities300,000,000 - 43,200,000

879 Roads / Bridges Emevor Isoko NorthConstruction Of Otie-Owhe Road To

Emevor (Phase 11) Otie- Owhe200,000,000 - 28,800,000

880 Roads / Bridges Aragba-

Orogun

UGHELLI

NORTH

Construction Of Emojita Street In

Aragba Orogun250,000,000 37,500,000

881 Roads / Bridges Ogboka/ Ezuzu Isoko North

Construction of 1.5km

Ogboka/Ezuzu street road and

drainage

200,000,000 30,000,000

882 Roads / Bridges OgodobiriConstruction Of Concrt Pavement

At Ogodobiri - Oputoru Link Road200,000,000 - 28,800,000

883Roads/Bridges

Total254,978,666,126 43,906,917,717 22,474,122,599 18,066,205,078

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 80 of 94

Page 214: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

884

Governance,

Social Services

& Sports

3 Communities 3 Communities

Sub-Urban / Rural Sports Facilities

And Programs For Youth

Development In The State (3

Senatorial Districts)

100,000,000 25,000,000 38,400,000 45,000,000

885

Governance,

Social Services

& Sports

Ogriagbene BomadiConstruction Of Multi - Purpose

Civic Centre At Ogriagbene Town,200,000,000 - 28,800,000

886

Governance,

Social Services

& Sports

Onicha-Uku AniochaConstruction Of Civic Centre I

Onicha-Uku 99,994,349 84,995,197 5,761,844 14,999,152

887

Governance,

Social Services

& Sports

Aniocha Aniocha Construction Of A Civic Centre 99,994,349 - 76,800,000

888

Governance,

Social Services

& Sports

Agbor

Township

Roads

Ika southProvision Of Tartan Track For

Agbor Township Stadium240,000,000 - 1,000,000

889

Governance,

Social Services

& Sports

Ogo-eze Bomadi Multi Purpose Science Laboratory 12,868,455 5,541,530 2,813,539

890

Governance,

Social Services

& Sports

Ogo-Eze Bomadi Civic Centre 200,000,000 - 76,800,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 81 of 94

Page 215: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

891

Governance,

Social Services

& Sports

Construction of 3 Mini sports park

in each of three Niger Delta states 250,000,000 37,500,000

892

Governance,

Social Services

& Sports

Akugbene

TownBomadi

Construction Of Skills Acquisition

Centre In Akugbene Town153,537,105 76,768,553 13,728,655 45,000,000

893

Governance,

Social Services

& Sports

kokori Ethiope EastConstruction Of Uruokpe Multi-

Purpose Hall240,000,000 5,000,000

894

Governance,

Social Services

& Sports

Ogbeinama BomadiConstruction Of Skills Acquisition

Centre In Ogbeinama179,000,000 - 68,736,000

895

Governance,

Social Services

& Sports

kokori Ethiope EastConstruction of Civic Centre in

kokori Inland250,000,000 5,000,000

896

Governance,

Social Services

& Sports

Akugbene BomadiConstruction Of Civic Centre At

Akugbene Town 239,885,600 40,780,552 13,861,340 80,000,000

897

Governance,

Social Services

& Sports

Bomadi BomadiUpgrade Of Facilities At

Government College Bomadi Phase 1245,859,705 208,980,749 14,161,519 36,878,956

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 82 of 94

Page 216: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

898

Governance,

Social Services

& Sports

Bomadi BomadiUpgrade Of Facilities At

Government College Bomadi Phase Ii 245,859,705 33,198,467 81,661,915 81,661,915

899Governance &

Social ServicesCable Point

Construction and Equipping of

Women and Youths Acquisition

Centre at Cable Point, Delta State

150,000,000 22,500,000

900

Governance,

Social Services

& Sports

Kpakiama

CommunityBomadi Civic Centre 200,000,000 - 76,800,000 76,800,000

901

Governance,

Social Services

& Sports

Burutu Burutu Construction Of 1no. Civic Centre

Plaza At Burutu 33,095,233 28,510,884 1,760,390

902

Governance,

Social Services

& Sports

Issele-Uku Aniocha Renovation of Martins college 100,000,000 15,000,000

903

Governance,

Social Services

& Sports

Odimodi Town Burutu Construction Of Modern Coldroom

In Odimodi Town 40,000,000 - 15,360,000 25,000,000

904

Governance,

Social Services

& Sports

Ojobo BurutuConstruction Of Youth Development

Center At Ojobo Community, 244,948,727 61,237,182 94,060,311 183,711,545

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 83 of 94

Page 217: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

905

Governance,

Social Services

& Sports

Abari Patani

Construction Of Home Economics,

Fine Arts And Ict Laboratory At

Abari

198,765,000 - 28,622,160 30,000,000

906

Governance,

Social Services

& Sports

Abraka Ethiope East

Furnishing And Equipping Of

Econometric Laboratory Of Delta

State University, Campus 3, Abraka

100,000,000 77,196,240 22,803,760 22,803,760

907

Governance,

Social Services

& Sports

Ode ItsekiriWarri South

West

Cnstruction Of Skill Acquisition

Centre In Ode-Itsekiri200,000,000 30,000,000

908

Governance,

Social Services

& Sports

Abraka Ethiope EastRenovation Of Laboratories At

Delta State University246,322,000 103,455,240 2,000,000 60,000,000

909

Governance,

Social Services

& Sports

Ellu Isoko North

Construction And Equipment Of

Multi-Purpose Community Resource

Centre In Delta Southl Senatorial

District In Ellu

200,000,000 - 26,800,000 26,800,000

910

Governance,

Social Services

& Sports

Ozoro Isoko NorthConstruction Of An Audutorium For

Delta State Polytechnic, Ozoro157,406,136 - 60,443,956 60,443,956

911

Governance,

Social Services

& Sports

Ozoro Isoko North Skill Acquisition Centre At Ozoro 180,000,000 - 69,120,000 69,120,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 84 of 94

Page 218: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

912

Governance,

Social Services

& Sports

Oleh Isoko North Skill Acquisition Centre At Oleh 180,000,000 - 69,120,000 69,120,000

913

Governance,

Social Services

& Sports

Oleh Campus Isoko South

Furnishing And Equipping Of The

Nddc-Built Law Library, Delta State

University, Oleh

198,700,500 129,155,325 49,297,722 40,000,000

914

Governance,

Social Services

& Sports

Tuomo Burutu

Construction of Denakeneghan

Debaotubo Civic Centre,

Ekeremobiri Quarters in Tuomo

200,000,000 30,000,000

915

Governance,

Social Services

& Sports

Uzere Isoko South

Modification Of Uncompleted

Hospital To Multi-Purpose

Community Resource Centre

70,000,000 - 26,880,000

916

Governance,

Social Services

& Sports

Erowha Isoko SouthDevelopment Of Skill Acquisition

Centre At Erowha.180,000,000 46,366,153 69,120,000 90,000,000

917

Governance,

Social Services

& Sports

Oko-Odifulu Oshimili South Civic Centre For Displaced Persons 180,000,000 - 69,120,000 69,120,000

918

Governance/So

cial Services &

Sport

AkputRenovation Of Police Station At

Akput Okoyon40,000,000 - 5,760,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 85 of 94

Page 219: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

919

Governance,

Social Services

& Sports

Otu Jeremi Ughelli South

Construction And Equipment Of

Multi-Purpose Community Resource

Centre In Delta Central Senatorial

District In Otu Jeremi

248,818,878 111,968,495 32,077,121 100,000,000

920

Governance,

Social Services

& Sports

Naval

Base,Warr/Sa

pele Roadi

Warri

Renovation Of Residential

Accomodation Of The Co & Eo In

Naval Base. Warri

49,000,000 16,087,202 15,349,847 15,349,847

921

Governance,

Social Services

& Sports

Omadino Warri SouthConstruction Of A Skill Acquisition

Centre In Omadino Community 100,000,000 - 38,400,000 100,000,000

922

Governance,

Social Services

& Sports

Various Various Payment For Retention 500,000,000 - 100,000,000 100,000,000

923

Governance,

Social Services

& Sports

Various Various Special Projects And Consultancy 450,000,000 - 100,000,000 100,000,000

924

Governance,

Social Services

& Sports

Ogbe Olie

cable point in

Asaba

Oshimili SouthConstruction Of Modern Market At

Ogbe Olie Cable Point In Asaba 250,000,000 - 96,000,000 96,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 86 of 94

Page 220: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

925

Governance,

Social Services

& Sports

Various VariousProvision Of Funds For The Payment

Of Interim Payment Certificates2,000,000,000 - 205,023,502 205,023,502

926

Governance,

Social Services

& Sports

Omosuomo Ugheli South

Construction Of Six Unit Of One

Bedroom Flat And And One Unit Of

Two Bedroom Flat For Teachers Of

Omosuomo Primary School

Omosuomo Inland

200,000,000 - 28,800,000 28,800,000

927

Governance,

Social Services

& Sports

Oleh Isoko SouthConstruction Of Madern Market In

Oleh 120,000,000 - 17,280,000 17,280,000

928

Governance,

Social Services

& Sports

Ewheya Isoko South

Construction Of Ewheya Isoko

Multipurpose Centre With Facilities

Oleh Isoko

160,000,000 - 23,040,000 23,040,000

929

Governance,

Social Services

& Sports

Onero Warri North

Construction Of 50 Nos Housing

Units Of Twin Three Bedroom

Bungalows, Onero

500,000,000 75,000,000 75,000,000

930

Governance,

Social Services

& Sports

Okogho

community

Construction Of Civic Center And

Ict Centre At Okogho Community 150,000,000 22,500,000 22,500,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 87 of 94

Page 221: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

931

Governance,

Social Services

& Sports

Sapele SapeleConstruction/Rehabilitation Of

Sapele Police Station 750,000,000 112,500,000 112,500,000

932

Governance,

Social Services

& Sports

Ajagbodudu Warri NorthConstruction Of Community Civic

Centre Ajagbodudu 150,000,000 22,500,000 22,500,000

933

Governance,

Social Services

& Sports

Emevor Isoko NorthConstruction Of Idhigu Street

Linking Old Otor-Owhe Emevor Road 220,000,000 33,000,000 33,000,000

934

Governance,

Social Services

& Sports

Egborode Okpe

Establishment Of Emmergency

Rescue Centre For Accident Victims

To Be Managed By Choplain Care

Centre Of Nigeria At Egborode

Junction Along Warri/Benin Road

Okpe

100,000,000 - 14,400,000 14,400,000

935

Governance,

Social Services

& Sports

Ivrogbor-Isi Isoko NorthSkill Acquisition Centre At Ivrogbor-

Isi 200,000,000 - 28,800,000 28,800,000

936

Governance,

Social Services

& Sports

Kiagbodo BurutuFencing And Interlocking With Gate

Of Hrm Palace , Kiagbodo100,000,000 - 14,400,000 14,400,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 88 of 94

Page 222: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

937

Governance,

Social Services

& Sports

Emevor Isoko NorthRehabilitation/ Construction Of Mix

Secondary School, Emevor250,000,000 - 36,000,000 36,000,000

938

Governance,

Social Services

& Sports Total

12,354,055,742 1,049,241,769 2,154,663,583 2,386,052,634

939 Water Supply Issele Azagba Aniocha North Water Supply Project & Reticulation 45,168,290 6,775,234 17,280,000 20,000,000

940 Water Supply Akugbene Bomadi

Solar-Powered Water Supply &

Distribution Of 500,000 Galons

Scheme

150,000,000 115,119,698 26,986,237 34,880,302

941 Water Supply Akugbene Bomadi Construction And Distribution Of

Solar Water Project At Akugbene 200,000,000 - 76,800,000 60,000,000

942 Water SupplyKalafiogbene

TownBOMADI

Solar Water Scheme Of 150,000

Galons At Kalafiogbene Town44,995,391 38,246,083 19,950,836 6,749,309

943 Water Supply Ogriagbene Bomadi Solar Powered Bore Holes 110,837,000 - 42,561,408 42,561,408

944 Water Supply Bomadi Bomadi Solar Powered Bore Holes 47,825,093 7,173,764 15,610,110 25,610,110

945 Water SupplyEkamentagben

eBomadi Solar Powered Water Project 150,000,000 - 57,600,000 50,000,000

946 Water Supply Okpokonou Bomadi Solar Powered Borehole 50,495,410 42,921,099 2,908,535

947 Water Supply Okpokunu Burutu Solar Powered Scheme 45,767,830 6,865,175 17,280,000 20,000,000

948 Water SupplySokebolou /

YokriBurutu

Solar-Powered Water Supply &

Distribution65,000,000 - 24,960,000 30,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 89 of 94

Page 223: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

949 Water Supply Kiagbodo BurutuSolar Powered Water Project At

Kiagbodo41,874,614 9,928,612 14,235,413 20,000,000

950 Water Supply Enekorogha Burutu

Rehabilitation Of Water

Schemes/Solar Water Supply At

Enekorogha

230,065,250 - 37,418,556 80,000,000

951 Water Supply Odobou Burutu Solar Powered Water 91,047,708 77,172,632 5,328,029 13,875,076

952 Water SupplySelected

Communities

Burutu &

Bomadi

Design &Engineering Drawing For

Surfaces Water Project For

Selected Community

100,000,000 - 38,400,000 35,000,000

953 Water Supply Aja Titor Ethiop WestCustomised Surface Water

Filltration System94,956,455 12,208,601 31,775,176 35,000,000

954 Water Supply Isiokolo Ethiope East

Installation/Distribution Of 35

Galons Solar Powered Water

Scheme At Ekrebo Road

120,000,000 - 46,080,000 40,000,000

955 Water Supply Ibusa Oshimili NorthProvision of water supply scheme

projects in Ibusa 350,000,000 80,000,000

956 Water Supply Erowha Isoko SouthConstruction of Erowha solar water

project 70,000,000 10,500,000

957 Water SupplyOkpara

WatersideEthiope East

Solar Powered Water Project At

Okpara Waterside52,000,000 - 19,968,000 30,000,000

958 Water Supply Eku Ethiope EastWater Scheme (100,000 Gallons) At

Eku89,698,854 47,760,425 14,727,787 41,899,539

959 Water Supply Otefe-Oghara Ethiope WestSolar-Powered Water Supply &

Distribution In Polytechnic45,000,000 27,308,362 6,793,589 15,000,000

960 Water Supply Idumudje UnorIdumudje

UnorSolar Powered Water Projects 89,000,000 76,481,559 11,605,717

961 Water Supply Igbogili Ika South Solar Powerred Water Project 70,000,000 - 26,880,000 25,000,000

962 Water Supply Emevor Isoko Noroth Solar Powered Bore Holes 178,000,000 150,025,000 10,742,400 10,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 90 of 94

Page 224: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

963 Water Supply Ozoro Isoko North

Booster Stations & 10km

Distribution Network For Water

Supply

144,207,665 64,893,449 18,117,922 40,000,000

964 Water Supply Oyede Isoko NorthSolar-Powered Water Supply &

Distribution 44,995,391 38,246,083 2,593,504 6,749,309

965 Water SupplyOghenerurie

IyedeIsoko North Water Project 45,000,000 - 17,280,000 30,000,000

966 Water Supply Ovrode Isoko NorthSolar Powered Water System With

Overhead Tank 45,000,000 - 17,280,000 30,000,000

967 Water Supply Otor-Owhe Isoko NorthRehabilitation Of Water Works In

Otor-Owhe 121,455,550 18,218,333 2,000,000 50,000,000

968 Water Supply Umeh Isoko SouthConstruction of Umeh solar water

project 70,000,000 10,500,000

969 Water SupplyOramudu,Ozor

oIsoko North

Solar Powered Water System In

Oramudu Quarters45,446,087 39,966,018 1,933,049 -

970 Water Supply Ozoro Isoko NorthSolar Powered Borehole In Oranudu

Quarters In Ozoro40,000,000 - 15,360,000 25,000,000

971 Water Supply Otor-Iyede Isoko NorthConstruction Of Iyede Water

Scheme 50,000,000 - 19,200,000 25,000,000

972 Water Supply Oleh Isoko South

Solar-Powered Water Supply &

Distribution In Delta State

University

45,000,000 - 17,280,000 20,000,000

973 Water Supply Enhwe Isoko SouthSolar-Powered Water Supply &

Distribution To Okpolo Clan 45,446,087 23,983,024 6,638,047 21,000,000

974 Water Supply Uzere Isoko South Water Project 45,000,000 - 17,280,000 20,000,000

975 Water Supply Uzere Isoko South Water Project-Phase 2 45,000,000 - 17,280,000 17,280,000

976 Water Supply Oleh Isoko SouthSolar Powered Water System In

Oleh 45,000,000 38,250,000 2,592,000 2,592,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 91 of 94

Page 225: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

977 Water Supply Uzere Isoko SouthSolar Powered Water System In

Uzere 45,000,000 - 17,280,000 17,280,000

978 Water Supply Umeh Isoko South Umeh Water Project 52,000,000 43,830,041 3,137,264 8,169,959

979 Water Supply  Obudu Udu

construction of Solar Powered

Borehole Reticulation, Street Light

and Asphalting of 300Km Internal

road, Obudu, Udu, Delta State ( Lot

1-2)

245,000,000 36,750,000

980 Water Supply Aradhe Isoko-NorthSolar Powered Water Project At

Aradhe 45,446,087 29,169,562 2,593,505 16,000,000

981 Water Supply Otor-Igho Isoko NorthConstruction of Otor-igho solar

water project 70,000,000 10,500,000

982Water Supply

SupplyEmeihu Ugheli North

Water supply Scheme/ Pipeline

Extension at Emeihu Aragba Eboh

and Ogeno, Orogun. (Lot 1-2)

350,000,000 52,500,000

983 Water Supply Olomoro Isoko-SouthSolar Powered Water Project At

Olomoro 45,000,000 18,366,456 10,227,281 20,000,000

984 Water Supply Medu KokoSolar Powered Water Project At

Medu Qtrs, Koko 50,000,000 - 19,200,000 10,000,000

985 Water Supply Umuolu Ndokwa eastSolar Powered Water Project At

Umuolu 45,446,087 38,246,081 2,593,505 7,200,006

986 Water Supply Patani AgolomoConstruction Of Agoloma

Intergrated Water Scheme200,000,000 30,000,000 30,000,000

987 Water Supply OmadinoProvision Of Mega Water Project In

Omadino250,000,000 37,500,000 30,000,000

988 Water Supply Umuojugbeli Ndokwa EastConstruction Of Solar Powered

Deep-Acquifer Water Project 44,995,388 83,286,951 2,000,000 2,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 92 of 94

Page 226: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

989 Water Supply Umututu Nkwani Provision Of Solar Powered Water

Scheme At Umutu Community 150,000,000 - 57,600,000 50,000,000

990 Water Supply Okwighele OkpeSolar-Powered Water Supply To

Okwighele Community47,760,737 6,750,000 17,280,000 41,010,737

991 Water Supply Toru Angiama Patani Solar Powered Water Project 60,470,453 30,401,737 15,901,627 15,000,000

992 Water Supply Patani Town Patani Solar Water Scheme For Patani 52,858,341 7,928,751 17,252,963 4,500,000

993 Water Supply Sapele SapeleProvision Of Solar Potable Water To

Gana Community44,995,391 - 17,280,000 20,000,000

994 Water Supply Tuomo Tuomo Solar Powered Water Project 45,000,000 - 17,280,000 17,280,000

995 Water Supply Egbo-Ide Ugheli South Solar Powered Water 50,000,000 - 19,200,000 19,200,000

996 Water Supply AGBARHO Ughelli NorthSolar Powered Water Project At

Agbarho42,305,333 22,589,565 7,570,855 15,000,000

997 Water Supply Ododegho Ughelli NorthRestoration Of Abandoned Water

Project & Water Distribution44,995,388 31,059,927 14,686,495 13,935,461

998 Water Supply Ekiugbo Ughelli-NorthSolar Powered Water Project At

Ekiugbo45,000,000 - 17,280,000 17,280,000

999 Water Supply Akugbene

Distribution Of Water To Akugbene

Community From The Existing Nddc

Solar Water Scheme

250,000,000 - 36,000,000 36,000,000

1000 Water Supply Illah Ughelli-NorthSolar Powered Water Project At

Illah44,995,391 - 17,280,000 6,000,000

1001 Water Supply Iwhrekpokpo Ughelli-SouthSolar Powered Water Project At

Iwhrekpokpo 44,995,391 24,654,480 7,812,680 10,000,000

1002 Water Supply Usele Warri SouthRehabilitation Of Solar Water

Proejct At Usele 50,000,000 7,500,000 30,000,000

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 93 of 94

Page 227: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

NDDC DELTA STATE 2016 BUDGET

1003 Water Supply ObgborodoWarri South

West

Ogborodo Integrated Water

Project Ogborodo 300,000,000 45,000,000 50,000,000

1004 Water Supply KOKO BEACHWARRI

NORTHSolar Powered Water Project 45,446,087 23,441,340 8,449,823 15,000,000

1005 Water SupplyUgbuwangue

TownWarri South Solar Powered Water Project 54,435,745 38,508,314 14,958,148 10,000,000

1006 Water Supply Inorin Warri South

Solar Powered Water Scheme With

Treatment Units And Layout Points

At Inorin

70,000,000 - 26,880,000 39,013,722

1007 Water Supply Otumara Warri-South Solar Powered Water Project At

Otumara54,435,745 33,882,001 2,592,000 20,553,744

1008 Water Supply Ayama Burutu Solar Water Treatment Plant 150,000,000 - - 45,000,000

1009 Water Supply Oviri Court Okpe

Provision Of Solar Powered Water

Scheme At Oviri Court With

Distribution

50,000,000 - - 30,000,000

1010 Water Supply Uzor-Ubio Ika north east Solar Water Project At Uzor-Ubio 50,000,000 - - 30,000,000

1011 Water Supply Okpare

Okpare Surface Water Project And

Distribution In Okpare-Olomu,

Ughelli South, Delta State

250,000,000 - 36,000,000 41,000,000

Total Water

Supply 6,803,864,239 1,273,658,354 1,249,062,462 1,840,370,682

Total: Delta 293,102,198,193 47,825,556,216 28,136,272,264 25,177,940,957

2016 APPROPRIATION ACT- DELTA NATIONAL ASSEMBLY Page 94 of 94

Page 228: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

1 Ecological Benin-CityIkpoba-

Okha

Erosion control and Management works

in Benin Metropolis (Studies and

Design)

10,000,000 5,000,000

2 EcologicalUgboha/

Amalu

Esan North

/South East

Construction of Drainage System for

Erosion Control from Ugboha to Amalu 100,000,000 15,000,000

3 Ecological Benin-CityIkpoba-

Okha

Construction of Waste

Management/Recycling Plant in

conjuction with Edo State Government

10,000,000 5,000,000

4Ecological

Total 120,000,000 - 10,000,000 15,000,000

5 Education UgbowoOvia North-

East

Renovation and Re-equipping of

Mechanical/Electrical/Civil-

Engineering workshops at the

University of Benin

198,179,095 56,462,757 29,160,000 50,000,000

6 Education Various Various

Reconstruction and renovation of

Primary and Secondary Schools in Edo

State

1,000,000,000 320,000,000

7 Education Benin City Oredo

Construction of ICT Centre at Benin

City in Oredo LGA (Relocated to Edo

College, Benin City)

70,461,465 17,874,465 18,000,000 30,000,000

8 Education Owe Orhionmwon Renovation of Owe Primary School 80,000,000 40,000,000

9 EducationOgbomoide

EkpomaEsan West

Construction of Block of Classrooms at

Abia Primary School, Abia and

Ogbomoide Primary School, Ogbomoide

Ekpoma

50,000,000 7,500,000

NDDC EDO STATE 2016 DRAFT BUDGET

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 1 of 37

Page 229: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

10 Education Owe OrhionmwonRenovation of 4Nr. Blocks of

Classrooms and Fencing. 60,000,000 20,000,000 30,000,000

11 Education EkiadolorOvia North-

East

Construction of ICT/E-Centre at

College of Education Ekiadolor 90,000,000 29,160,000 30,000,000

12 Education Ugbowo EgborConstruction Adolor Secondary School

Road, Ugbowo, Egor L.G.A 150,000,000 22,500,000

13 Education

Benin

Technical

College

EgorRehabilitation of Benin Technical

College, Benin City 250,000,000 37,500,000

14 Education Irrua Esan Central Rehabilitation of Usugbenu, Irrua 150,000,000 22,500,000 35,000,000

15 Education Okunbor EgborConstruction Okunbor /U’se

Secondary School Road, Egor L.G.A 200,000,000 30,000,000

16 Education JattuEtsako west

L.G.A

Construction of 2 blocks of classroom

in Jattu Grammar School, Etsako west

L.G.A

50,000,000 7,500,000

17 Education Eyaen Nogie OredoRenovation of 4 Blocks at Eyaen Nogie

Primary School 120,000,000 18,000,000 20,000,000

18 Education Abe Orhionmwon

Construction and Equiptment of Model

Basic Health Centre at Abe with

fencing, water, Landscaping

150,000,000 20,000,000

19 Education JattuEtsako west

L.G.A

Supply and installation of laboratory

equipment in Jattu Grammar School,

Etsako west L.G.A

150,000,000 22,500,000

20 Education EkiadolorOvia North-

East

Construction of lecture theatre,

Ekiadolor University of Education, Edo

State

250,000,000 37,500,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 2 of 37

Page 230: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

21 Education JattuEtsako west

L.G.A

Construction of perimeter fence in

Jattu Grammar School, Etsako west

L.G.A

70,000,000 10,500,000

22 Education EkiadolorOvia North-

East

Construction of ICT Centre at

Ekiadolor (Relocated to UNIBEN

Falculty of Engneering )

56,859,981 18,000,000

23 Education Ofunama

Ward

Ovia South-

West

Construction of 3 Classroom blocks in

Ofunama 40,000,000 6,000,000

24Total

Education 3,185,500,540 92,337,222 257,820,000 635,500,000

25Energy/Power

SupplyOrhionmwon Orhionmwon

Construction of Inter town connection

(ITC) line linking the 13 villages

electrified by NDDC (2x30MVA Sub-

Station) in Orhionmwon LGA, Edo

State

1,645,053,094 27,353,580 200,000,000 200,000,000

26Energy/Power

SupplyVarious

Ikpoba-

Okha

Construction of 40VA (132/33KV

complete mobile substation for

emergency blackout prevention AC/DC

station unit with HV equipment in Edo

State

500,000,000 75,000,000 75,000,000

27Energy/ Power

SupplyEvabuivbuke

Rural electrification of Evbuivbuke

village in Edo State 100,000,000 15,000,000

28Energy/ Power

SupplyVarious Various

Supply and Installation of

Transformers in Edo State 700,000,000 380,000,000

29Energy/Power

Supply

Obozogbe-

NiroOrhionmwon

Construction of 1x7.5 MVA injection

station at Obozogbe Niro 230,915,343 34,637,301 6,084,321 6,084,322

30Energy/Power

Supply

Okogbo/Avbui

go/AgowieOrhionmwon TDN Electrification 114,586,796 17,188,014 27,000,000 27,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 3 of 37

Page 231: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

31Energy/ Power

SupplyOredo

Supply and Installation of Stand alone

Solar Street Light in Oredo, Edo State 200,000,000 30,000,000

32Energy/Power

SupplyEvbuarhue/Idu Orhionmwon TDN Electrification 60,000,000 9,000,000 14,580,000 14,580,000

33Energy/Power

SupplyOwe Orhionmwon Provision of solar street lights at Owe 80,000,000 40,000,000

34Energy/Power

SupplyOloten. Okuo

Ovia North-

East

High/low tension electrification

Project (Relocated to Oloten and

Okuo)

182,357,203 116,487,446 36,471,441 30,000,000

35Energy/ Power

SupplyIdunmwowina Ovia

Provision of 300 KVA Transformer

Idunmwowina in Ovia North East LGA

Edo state

250,000,000 37,500,000

36Energy/Power

SupplyEnafoghe

Esan North-

East

Provision of 5km Street Light at

Enafoghe - Uromi 225,151,650 67,673,214 32,033,888 30,000,000

37Energy/Power

SupplyUgboha

Esan South

East

Provision of Solar Street Light at

Ugboha 49,895,333 7,484,300 18,225,000 18,225,000

38Energy/ Power

Supply

Orhiomwon/

Uhunmwode

Orhiomwon/

Uhunmwode

Supply and Installation of Solar-

Powered Street Light in

Orhiomwon/Uhunmwode

100,000,000 15,000,000

39Energy/Power

SupplyObozogbe Orhionmwon

Electrification of Obozogbe Nugu

Urhehue 45,128,654 6,769,298 12,960,000 12,960,000

40Energy/Power

Supplyvarious Orhionmwon

Replacement and Re-activation of all

non-functional NDDC electrcity

projects Orhionmwon and adjoining

communities

150,000,000 111,152,074 30,000,000 20,000,000

41Energy/Power

Supply

Ugbogiabo &

Ekonobare

Ovia North-

East

Transformer Substation & Distr.

Newtwork for Ugbogiobo & Ekonobore 91,708,853 62,746,935 - 13,756,328

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 4 of 37

Page 232: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

42Energy/Power

Supply

Ijaja Oloma/

Ogbalishe

Communities

Akoko-EdoElectrification of Ijaja Oloma and

Ogbalishe Communities 100,000,000 15,000,000

43Energy/Power

SupplyAuchi Etsako West

Reticulation of solar powered water

project in Auchi (Lots 1-2) 450,000,000 67,500,000

44 AnegbeteEtsako

Central

Installation of solar street light at

Anegbete 100,000,000 15,000,000

45Energy/Power

SupplyIgbanke Orhionmwon

Construction of proposed Omohua

300kva 11/0415kv relief substation

0.5km off 11kv Overhead extension

and installation of 33/0415kva

transformer

60,000,000 38,440,017 17,496,000 15,000,000

46Energy/Power

SupplyIyakpi Etsako West

Supply of Electricity to Comprehensive

Health Centre Iyakpi 20,000,000 3,000,000 6,750,000 10,000,000

47Energy/Power

Supply

Iduomwina &

IguereOrhionmwon TDN Electrification 95,159,987 81,110,628 30,831,836 10,000,000

48Energy/Power

Supply

Ugo-Oben

IguelabaOrhionmwon Electrification of Ugo-Oben Iguelaba 18,000,000 7,290,000 2,700,000

49Energy/ Power

SupplyOza/ Igbenke Orhionmwon

Solar power street light in Oza and

Igbenke 100,000,000 15,000,000

50Energy/Power

SupplyIkpako

Ovia North-

East

Electrification of Okha-Uloho

(Relocated to Ikpako, Ekenwan,

Ughotun and Gele-gele)

40,456,382 29,272,001 12,150,000 7,500,000

51Energy/Power

SupplyOgwa

Ikpoba-

OkhaElectrification of Ogwa Town 20,497,000 11,986,094 2,907,543 6,000,000

52Energy/Power

SupplyIvbioghomhe Etsako East

Extension of 3km Overhead line and

installation of 300kva 33/0.413kva

transformer

44,561,830 39,140,725 16,402,500 3,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 5 of 37

Page 233: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

53Energy/Power

SupplyEkenwan Road

Ovia North-

East

TDN Electrification (Relocated to

Ugbinne, Oduna, and Egbeta) 52,735,696 49,710,454 3,025,242 2,500,000

54Energy/ Power

SupplyOredo Oredo

Supply of Solar Powered Street Light

in Oredo LGA 100,000,000 15,000,000

55Energy/Power

SupplyIfeku Island

Esan South

East

Provision of Solar Street Light Ifeku

Island 50,000,000 46,420,304 20,250,000 2,500,000

56Energy/Power

SupplyEkiadolor

Ovia North-

EastElectrification of Ekiadolor Town 20,000,000 17,965,085 8,100,000 2,000,000

57Energy/Power

SupplyVarious Various

Rehabilitation of solar street lights

and feasibility study of total capacity

of installed Renewal Energy by the

NDDC

250,000,000 37,500,000

58Energy/Power

Supply

Egor-

Iguoshodin

Nikpemaba

Egor TDN Electrification 146,224,577 21,287,900 30,000,000

59Energy/Power

SupplyOgida Egor

Electrification of Igue-Ikhimwin (TDN

and ITC) 130,000,000 50,000,000

60Energy/Power

SupplyUbiaja

Esan South

EastElectrification of Udo-Egware 31,628,976 4,744,346 8,100,000

61Energy/Power

SupplyUllsoho

Esan South

East

Electrification of Ulloshi Community

through Onogholo (cattle ranch) 250,000,000 37,500,000

62Energy/Power

Supply

Igbinidu

Omoregbe

Street

(Ugbekun

Qtrs)

Ikpoba-

Okha

Supply and installation of 2no

Transformer at Uhunmwagbo junction,

Igbinidu

100,000,000 3,982,000 15,000,000

63Energy/Power

SupplyUgogogin Oredo Eletrification of Ugogogin 45,000,000 6,750,000 18,225,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 6 of 37

Page 234: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

64Energy/Power

SupplyUgbor Oredo

Electrification of Ugbor

Amagbakingbuda 30,000,000 12,150,000

65Energy/Power

Supply

Evukwu

AmagbaOredo

Electrification Project at Evukwu-

amagba Town 208,514,530 96,149,954 41,702,906

66Energy/Power

SupplyEgbola-Iguobo

Ovia North-

EastExtension of Electricity 100,000,000 15,000,000

67Energy/Power

SupplyOdighi

Ovia North-

East

Rural Electrification from Odighi to

Agbakato 250,000,000 37,500,000

68Energy/Power

SupplyEhor Uhunmwode

Electrification of Ehor-Erua-Oke

Communities Electrification 75,000,000 11,250,000

69Energy/Power

SupplyEvbowe Uhunmwode Evbowe Electricity project 69,820,674 18,908,948 20,359,709

70Energy/Power

SupplyEhor-Orhua Uhunmwode

Electrification of Ehor-Irhue-Orhua,

Uhunmwode LGA 50,000,000 30,000,000

71Energy/Power

SupplyUgonoba Uhunmwode

Electrification of Ugonoba, Iguezomo -

Ilobi 50,000,000 30,000,000

72Energy/Power

SupplyAmufi Uhunmwode

Construction of 1x15MVA 33/11KV

Injection Substation (Relocated to

Amufi)

248,952,096 206,776,333 49,790,419 49,790,419

73Energy/Power

SupplyIgarra Akoko Edo Igarra Ososo road Street Lighting 100,000,000 15,000,000

74Energy/Power

SupplyUromi

Esan North-

East

Solar Powered Street light at Akpoka

and Isigie Street in Uromi 75,000,000 11,250,000

75Energy/Power

SupplyUromi

Esan North-

East

Solar Powered Street Light in Uju-Oro

street in Uromi 75,000,000 11,250,000

76Energy/Power

SupplyOnojie

Esan North-

East

Solar Street Light at Onojie of Oheri

Road 250,000,000 29,700,000

77Energy/Power

SupplyOvaro

Esan North-

EastSolar Street Light 220,000,000 33,615,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 7 of 37

Page 235: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

78Energy/Power

SupplyWeppa Etsako East

Solar Street Light in Agenebode road,

Weppa 180,000,000 27,000,000 27,000,000

79Energy/Power

Supply

Ughioke Rd.

Weppa

Agbenebode

Etsako EastProcurement/installation of 2km Solar

Street Light 70,000,000 65,224,584 4,775,416

80Energy/Power

SupplyAgbede-Jagbe Etsako West

Construction of Solar Powered Street

Light at Agbede/Jagbe Community 231,000,000 223,290,300 -

81Energy/Power

Supply

Obanosa-

Isiagbon Str

Ikpoba-

OkhaSolar Street Light 230,000,000 33,000,000

82Energy/Power

Supply

(Ugbekun

Qtrs)

Ikpoba-

Okha

2km Solar Street Light from Igbinidu

Omoregbe Street (Ugbekun Qtrs) 248,000,000 3,982,000 33,480,000

83Energy/Power

SupplyUkhiri

Ikpoba-

Okha

Provision of 3km Solar Street Light in

Enogie Palace Quater-Upper Sokponba

road

60,000,000 17,496,000

84Energy/Power

SupplyAmawu Street

Ikpoba-

Okha

3km Solar Street Light at Amawu

Street, off Upper Sokponba Road

After Oka Market, Oka 3, Ward 8

280,000,000 42,000,000

85Energy/Power

SupplyOkunseri

Ikpoba-

Okha

Solar Street Light at

Okunseri/Ehiorobo/Osarenvida

Quaters, ugbekun community

248,000,000 33,480,000

86Energy/Power

SupplyEweka Street

Ikpoba-

OkhaSolar Street Light 180,000,000 24,300,000

87Energy/Power

Supply

Ugbor/Amagb

a villageOredo

Solar Street Light at Ugbor Amagba

Village Road 250,000,000 37,500,000 37,500,000

88Energy/Power

SupplyBenin-City Oredo

Provision of Solar Powered Street

Light along Plymouth road Ekwnwan

Oba palace road

75,000,000 11,250,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 8 of 37

Page 236: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

89Energy/Power

SupplyOnaghise Oredo Solar Street Light 200,000,000 27,000,000

90Energy/Power

Supply

Ugo

CommunityOrhionmwon Solar Street Light 250,000,000 33,615,000

91Energy/Power

Supply

Sabon Gida

OraOwan East Solar Street Light 248,000,000 -

92

Total

Energy/Power

Supply

11,501,348,673 1,428,633,835 1,409,847,220 1,305,596,069

93 Health Imiegba Town Etsako EastConstruction of Cottage Health Centre

at Imegban Town 180,000,000 70,157,192 29,160,000 29,160,000

94 Health Okhuokhuo-

IsIUhunmwode Construction of cottage hospital 100,000,000 29,160,000 15,000,000

95 Health Saboginda Ora Owan West

Renovation and Solar Powered

Electrification of the General Hospital,

Sabongida-Ora, Sabongida Uhonmon-

Ora road

250,000,000 100,000,000

96 Health Iyakpi Etsako WestRe-Construction of burnt

Comprehensive Health Centre, Iyakpi 50,000,000 - 7,500,000

97 Health Urhonigie OrhionmwonConstruction of Comprehensive NDDC

Model Health Centre Building 100,000,000 84,529,039 29,160,000 12,000,000

98 Health IyekogbaProvision of cottage hospital in

iyekogba community , Edo state 80,000,000 12,000,000

99 Health Ufa Akoko EdoConstruction of Comprehensive Health

Centre at Ufa 100,000,000 29,160,000

100 Health Oredo OredoConstruction of Cottage Hospital in

Oredo 150,000,000 22,500,000

101 Health Usugbenu Esan CentralRehabilitation and modelling of

Usugbenu Health care 150,000,000 22,500,000 30,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 9 of 37

Page 237: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

102 Health Agenebode Etsako EastConstruction of Comprehensive Health

Centre Agendebode 24,750,000 10,195,216 29,160,000

103 Health Okpella Etsako West Cottage House at Okpella 150,000,000 22,500,000

104 Health OrakhuanConstruction of Health Centre with

Modern Equipment in Orakhuan 200,000,000 30,000,000

105 Health Otuo Owan EastSupply of Hospital Equipment to

General Hospital in Otuo 200,000,000 30,000,000

106 Health Imiegba Town Etsako West

Construction of 600meter perimeter

fence, gatehouse, landscapping and

supply of hospital equipment and

furniture to Imiegba Cottage Hospital

100,000,000 15,000,000

107 Health Etegie Orhionmwon Construction of Basic Health Centre 25,000,000 9,112,500

108 Health Obeidu-UromiOvia North-

East

Construction of Comprehensive NDDC

Model Health Centre Building 100,000,000 29,160,000

109 Health OdighiOvia North-

EastConstruction of Health Centre 150,000,000 30,000,000

110 Health Oke New Ora Owan WestConstruction of Comprehensive Health

Centre at Oke New Ora 100,000,000 29,160,000

111 Total Health 2,209,750,000 164,881,448 303,232,500 288,160,000

112Jetty/Shore

ProtectionOjirami Akoko Edo

Dredging and Rehabilitation of Ojirami

Dam 1,500,000,000 150,000,000

113Jetty/Shore

ProtectionBenin-City Egor

Upper Siloko Erosion control Extension

(Relocated to Oghobaghase Street) 150,000,000 20,375,000

114Jetty/Shore

ProtectionVarious Various

Clearing of waterways in Edo State

(Lots 1-20) 1,000,000,000 110,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 10 of 37

Page 238: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

115Jetty/Shore

Protectionillushi

Esan South

EastShoreline protection at Illushi 248,000,000 -

116Jetty/Shore

ProtectionUgbekun

Ikpoba-

Okha

Erediauwa Erosion Control Acquisation

and drains) 149,785,000 22,467,750 30,375,000

117Jetty/Shore

ProtectionErediauwa

Ikpoba-

Okha

Erosion Control at Igbanke (Relocated

to Erediauwa Road) 119,899,786 17,984,968 24,300,000

118Jetty/Shore

ProtectionGapiona Oredo

Erosion Control at Gapiona Street and

environs 150,000,000 22,500,000

119

Total

Jetty/Shore

Protection

3,317,684,786 40,452,718 247,550,000 110,000,000

120 Roads/Bridges Uholor-Ogba OredoConstruction of Uholor-Ogba River

Link Rd 1,827,737,214 482,992,243 100,000,000 300,000,000

121 Roads/Bridges Irrua Esan CentralConstruction of Major General

Esekhaigbe road 3km 250,000,000 30,375,000 38,430,176

122 Roads/Bridges NomayoIkpoba-

OkhaConstruction of Nomayo Road 248,321,500 37,248,225 27,256,593 27,256,593

123 Roads/Bridges ObagieIkpoba-

Okha

Construction og Omi-Iguoshodi, Omi

Obagie, Ogheghe Road, Edo State 500,000,000 45,000,000 45,000,000

124 Roads/Bridges OgbonnaEtsako

Central

Construction of Government Girls

Secondary School road in Ogbonna 230,000,000 37,500,000 37,500,000

125 Roads/Bridges Benin CityOvia South-

West

Construction of Ugbogui-Benin Lagos

Express Way (Phase 1) 450,000,000 38,301,624 40,500,000 40,500,000

126 Roads/ Bridges Etete OredoConstruction of Etete Road GRA Benin

City. (2Km) 250,000,000 200,000,000

127 Roads/ Bridges Enogie Oredo Construction of Enogie Street. (2Km) 250,000,000 200,000,000

128 Roads/ Bridges Saplele Benin CityConstruction of 1KM Abulele Road,

Evboriaria Quarters, Saplele Road 150,000,000 22,500,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 11 of 37

Page 239: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

129 Roads/Bridges Ugo Orhionmwon

Construction of Ogba Road to Adanako-

Ogiarhiakhi to market Road with Spur

to Ugbugo Express of Benin Abraka

Road-Phase 1

400,000,000 54,000,000 54,000,000

130 Roads/Bridges Emabu Owan EastConstruction of Emabu-Ihievbu-

Ihievbe-Ekhueye-Iihievbe 248,000,000 30,132,000 30,132,000

131 Roads/Bridges Ihievbe Owan EastConstr. Of Asphalt Road From Ihievbe

thro Warrake to Agbede 200,000,000 40,500,000 40,500,000

132 Roads/ Bridges Powerline OredoConstruction of Powerline Street,

(Uguomo)(2Km) 250,000,000 200,000,000

133 Roads/ Bridges Idusogie Benin CityIdusogie Eweka Street, Etete Benin

City, 250,000,000 200,000,000

134 Roads/Bridges UromiEsan North-

East

Construction of Federal SC. And Tech.

College Road to Onewa Town, Uromi

(Phase 11)

197,094,739 38,444,963 23,947,011 23,947,011

135 Roads/BridgesIruekpen-

EkpomaEsan West

Reconstruction of Ikhi-Idumogo NTA

Ora road 3km 245,000,000 29,767,500 29,767,500

136 Roads/Bridges Weppa Etsako EastConstruction of Agenebode Road,

Weppa 200,000,000 30,000,000 30,000,000

137 Roads/ Bridges Joe Ohimuan Esan CentralConstruction of Joe Ohimuan road with

drains 200,000,000 50,000,000

138 Roads/ Bridges Okhuuoromi Oredo

Construction of 2km Access road from

Iyekogba road to Okuhuoromi

community, oredo Edo state

200,000,000 30,000,000

139 Roads/Bridges Benin-City Oredoconstruction of 1.2km road Airoghionba

Street, Off Igun Street Benin 250,000,000 112,955,704 33,750,000 33,750,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 12 of 37

Page 240: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

140 Roads/Bridges

Amagba

Community

Road

OredoAkengbuda Youth Road, Amagba

Community (Phase I) 220,000,000 29,700,000 50,000,000

141 Roads/ Bridges Irrua Esan Central Reconstruction of Irrua Market and

Access road, Esan Central 250,000,000 50,000,000

142 Roads/ Bridges Okada OviaCompletion of Okada/ Usen road 5 km

in Ovia North East L.G.A (Phase 1) 250,000,000 37,500,000

143 Roads/Bridges Benin-City Oredo

Construction of Lucky Igbinedion

Street, Roland Obanor and osaro

Street (Phase I)

240,000,000 36,000,000 60,000,000

144 Roads/Bridges Ogunmwenyi OredoConstruction of Ogunmwenyi Street,

Benin City 150,000,000 45,000,000 60,000,000

145 Roads/Bridges Ekenwan Road OredoConstruction of 2km Ero / maho

bakery road, off Ekenwan road 150,000,000 22,500,000 40,000,000

146 Roads/ Bridges Ekpoma Esan WestRehabilitation of Ekpoma Township

Road 150,000,000 22,500,000

147 Roads/ Bridges Okada OviaCompletion of Okada/ Usen road 5 km

in Ovia North East L.G.A (Phase 2) 250,000,000 37,500,000

148 Roads/BridgesOgida

QuartersEgor

Construction of 2.5Km Orobosa Street

and Adjoining Three Lanes, off

Omokaro Road, Ogida Quarters

189,000,000 28,350,000 40,000,000

149 Roads/Bridges UbiajaEsan South

East

Construction of Oyomo Street linking

Uwaka 2km Rd 199,875,000 46,146,682 22,032,000 22,032,000

150 Roads/ BridgesOfumwengbe

communityOredo

Construction of internal road in

Ofumwengbe community, off Ugbor

road

200,000,000 30,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 13 of 37

Page 241: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

151 Roads/Bridges Jattu Etsako East

Construction of NTA road, Jattu,

Uzairue, Etsako West LGAs (To be

Reloated)

142,108,848 32,157,024 19,184,694 19,184,694

152 Roads/Bridges Ebelle-Amahor IguebenConstruction of Ebelle Amahor Road

Phase 1 300,000,000 36,450,000 36,450,000

153 Roads/Bridges Benin-CityIkpoba-

Okha

Construction of Evbuabogun/Evbomoma

Link road, off sapele road, benin city 240,020,000 160,416,424 24,300,000 24,300,000

154 Roads/ Bridges Okhunmwun OviaConstruction of Okhunmwun road Phase

II 147,235,567 12,000,000

155 Roads/Bridges Benin City OredoConstruction of Faith Drive off

Country Home Motel Road, Benin City 201,012,570 121,909,054 40,500,000 40,500,000

156 Roads/Bridges Lawani Oredo

Construction of Lawani Street, Oredo

LGA (Relocated to Etete road with

spurs to Enoge and Adakpor Close)

210,506,505 36,000,000 36,000,000

157 Roads/ Bridges Igarra Akoko Edo

Rehabilitation of Igarra Township

Road, Akoko Edo LGA Edo

North(2.5Km)

150,000,000 150,000,000

158 Roads/ Bridges Ekoshiodin OviaConstruction Ekoshiodin road 2.5 km in

Ovia North East L.G.A 250,000,000 37,500,000

159 Roads/Bridges Ugo Orhionmwon

Construction of

Iduemwongba/Evbogbon Road Road

(1.6km), Ugo, Edo State

240,000,000 32,400,000 60,000,000

160 Roads/Bridges IguosaOvia North-

East

Construction of Odionwere Street,

Iguosa (1.6km) 220,000,000 45,000,000 60,000,000

161 Roads/Bridges Uzebba Owan West

Construction of 2km Ohonomormen

Egheonon Secondary School to Avbioji

old site link road

240,000,000 47,994,598 36,000,000 60,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 14 of 37

Page 242: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

162 Roads/ Bridges Iyekogbe

CommunityOredo

Construction of 2km feeder road in

Iyekogbe Community 150,000,000 22,500,000

163 Roads/Bridges Afuze Owan WestConstruction of Asphalt Road From

Afuze thro Erah to Ekpoma 245,100,000 36,765,000 40,186,125 60,000,000

164 Roads/Bridges Ibilo Akoko EdoConstruction of 2km Ikiron Ile

Junction through Eku Uzeh UBA Ibilo 183,000,000 106,506,975 45,000,000 55,000,000

165 Roads/Bridges Ovie Ibilo Akoko EdoConstruction of Ovie Ibilo Rd Junction

thro Aiyegunle and Uneme-Igarra 249,270,000 37,390,500 32,400,000 50,000,000

166 Roads/ Bridges IdumuguokhaEsan North

/ South

Construction of road from Ogbe

Idumogo and idumuguokha to Odu

river, Ewohimi in North East/South

L.G.A

100,000,000 15,000,000

167 Roads/Bridges2nd Federal

RdEgor

Construction of Etinosa Hotel Street -

2nd Federal Road (2km) 153,969,000 14,094,450 18,707,234 50,000,000

168 Roads/Bridges Opoji Esan Central Construction of Opoji Township Roads 229,880,950 86,557,456 32,400,000 50,000,000

169 Roads/Bridges Ikpe-Jattu Etsako WestConstruction of Alhaji Abbas Road,

Ikpe Jattu 243,187,476 35,561,442 29,547,278 50,000,000

170 Roads/ Bridges OtoikhimiEsan North

/ South

Construction (tarring) of road from

Otoikhimi to Ewoiki Esan North

East/South L.G.A

250,000,000 37,500,000

171 Roads/ BridgesUgboha/

Amalu

Esan North/

East/ South

Construction of drainage system for

erosion control from Ugboha to Amalu,

Esan North/East/South

100,000,000 15,000,000

172 Roads/Bridges Igueben IguebenRehabilitation of igueben Township

roads 150,000,000 7,500,000 35,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 15 of 37

Page 243: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

173 Roads/Bridges Igueben IguebenConstruction of Igueben Girls road,

off Agbor road 200,000,000 30,000,000 40,000,000

174 Roads/Bridges Awo-Street OredoConstruction of Awo Street off First

East Cir. Road B/City 100,000,000 15,000,000 29,160,000 50,000,000

175 Roads/Bridges Uwa Street OredoConstruction of Uwa Street off Sapele

Road 135,080,225 52,365,280 24,618,371 50,000,000

176 Roads/Bridges Ossai OredoConstruction of Ossai-Benson Idahosa

University Road 129,845,100 51,479,411 23,664,269 50,000,000

177 Roads/ Bridges Oza-Igbanke OrhionmwonRehabilitation of Oza-Igbanke Road,

Orhionmwon LGA 100,000,000 15,000,000

178 Roads/ Bridges

Odighi,

Odiguetue

Community

Ovia NorthConstruction of rural roads in Odighi,

Odiguetue Community 980,000,000 147,000,000

179 Roads/Bridges Benin-City OredoRehabilitation /Construction of Iyore

Igbinoba Street Off Country Home 234,000,000 83,941,581 31,590,000 50,000,000

180 Roads/Bridges Iyove Road OredoInternal Road, Country Line, Iyove

Road 237,076,283 28,804,768 50,000,000

181 Roads/BridgesAfashio/

UzairueEtsako West

Construction of Afashio Uzairue Mixed

Secondary School Road, Etsako West 200,000,000 30,000,000

182 Roads/ Bridges Uromi Renovation of Uromi General Hospital 250,000,000 37,500,000

183 Roads/ Bridges Ukepotubu Construction of 2km Ukepotubu road 250,000,001 37,500,000

184 Roads/Bridges Benin-City OredoConstruction of Ogbesasa Street,

Benin City 246,904,235 45,000,000 50,000,000

185 Roads/Bridges Benin-City OredoConstruction of Uwagboe-Osawe

Street, Off Etete 180,000,000 30,000,000 50,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 16 of 37

Page 244: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

186 Roads/Bridges Benin City Oredo Construction of Limit road 220,000,000 32,400,000 50,000,000

187 Roads/ Bridges IdigieEsan North-

EastConstruction of Idigie road 250,000,002 37,500,000

188 Roads/ Bridges Uromi-OnewaConstruction of 2km Uromi - Onewa

road 250,000,003 37,500,000

189 Roads/Bridges Benin-City OredoConstruction of Imuwahen Avenue, off

Gapiona Street, GRA, Benin-City 247,000,000 41,750,000 50,000,000

190 Roads/Bridges Ugo Orhionmwon Idueevwegha/Idueogha/Evbogbon 199,462,754 74,285,081 30,375,000 50,000,000

191 Roads/Bridges EgbohaOvia North-

East

Construction of Linking bridge at

Egboha Ijaw/Yourba Camp 245,000,000 86,238,995 27,000,000 50,000,000

192 Roads/Bridges IguosaOvia North-

EastObadiaru/Obosa/Sawmill/Peace Road 240,000,000 182,519,771 37,964,616 50,000,000

193 Roads/Bridges Sabogida-Orra Owan West

Construction of 2Km Ukhuegigbaira

road Sharp Corner and Oise Lamouth

Road, Sabogida Orra, Owan West

248,000,000 37,200,000

194 Roads/ Bridges IkpobaConstruction of 100 feet road at

Ikopoba-Okha L.G.A 50,000,000 7,500,000

195 Roads/ Bridges Okun-UwagueConstruction of Okun-Uwague road at

Ikopoba-Okha L.G.A 100,000,000 15,000,000

196 Roads/Bridges EkosodinOvia North-

EastBoundary Road to Uniben 192,470,200 113,730,589 30,000,000 50,000,000

197 Roads/BridgesOhe-

Okhuokhuouhunmwode

Construction of Ohe-Okhuokhuo-Isi-

Oghada road 348,925,000 3,902,691 45,000,000 50,000,000

198 Roads/Bridges Evbowe UhunmwodeConstruction of Evbowe internal Roads

in Benin City 221,834,800 35,937,238 50,000,000

199 Roads/Bridges Idigie Esan North-

East

Construction of Idigie & Udo Street in

Uromi 234,000,000 28,431,000 40,000,000

200 Roads/Bridges Ekpoma Esan WestConstruction of Idemebolon road,

ukjemen, Ekpoma 120,773,732 16,200,000 40,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 17 of 37

Page 245: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

201 Roads/ Bridges Ugbor Benin city

Construction of of Nneka

street/Redemption drive/Osaze Ediae

street/jack merry street, with

drainages, off Ugbor road benin city..

200,000,000 30,000,000

202 Roads/ Bridges Amoya Owan

Reconstruction of Amoya road with

spur to Johnson street with drainage

at Otuo, Owan east LGA

200,000,000 30,000,000

203 Roads/Bridges Uhunmwode Uhunmwode

construction of Ohe-Okhuokhuo-

Oghada Road (Phase 2) Uhunmwode

LGA

450,000,000 67,500,000

204 Roads/Bridges Ikpe Uzaire Etsako WestConstruction of Uwafe Road in Ikpe

Uzaire 236,383,001 185,424,986 53,104,239 40,000,000

205 Roads/Bridges Igueben IguebenConstruction of Ewossa Township road

Igueben 100,000,000 38,160,000 40,000,000

206 Roads/BridgesUpper

Sakponba

Ikpoba-

Okha

Construction of Guddy Guddy Road

linking Upp. Sokponba 182,726,950 27,409,043 33,301,987 40,000,000

207 Roads/Bridges EvbuobogunIkpoba-

Okha

Construction of 1km Evbuabogun Road

with Drainage & Culverts 98,711,800 44,069,117 13,326,093 40,000,000

208 Roads/Bridges Ugbor Oredo

Construction of Agbonigiague -Barr

Paul Ohonbamu ogiehor Street with

Spur to Ogiehor Lane

150,000,000 103,092,140 27,337,500 40,000,000

209 Roads/Bridges Auchi Etsako West

Construction of Momodu Omagah

Braimoh Street Off Auchi Rd by Edo

Water Board

246,483,500 36,972,525 29,947,745 35,000,000

210 Roads/Bridges OnewaEsan North-

East

Construction of 1500m Access Road to

Federal Science School Onewa 146,613,600 115,979,168 30,000,000

211 Roads/ Bridges Benin City Oredo Construction of Anu Bonisk Street 246,904,235 20,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 18 of 37

Page 246: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

212 Roads/ Bridges Okhunmwun OviaConstruction of Okhunmwun road Phase

I 180,767,000 15,000,000

213 Roads/Bridges FugarEtsako

CentralConstruction of Arua Circular Road 99,244,300 59,530,711 28,939,638 30,000,000

214 Roads/Bridges Evbuomwan Oredo

Construction of Evbuomwan Street

linking Idusogie - Eweka Street, Etete,

Benin city LGA (Relocated toe Otote

Street, Oredo LGA)

92,672,948 34,407,897 32,400,000 30,000,000

215 Roads/Bridges OlukuOvia North-

EastAmadasun Street Oluku Town 100,000,000 63,981,592 8,841,433 25,000,000

216 Roads/Bridges Utoka Egor Egor/Utoka/Iguosodin Nigbemaba 199,123,050 30,000,000 30,215,176 25,000,000

217 Roads/Bridges UromiEsan North-

East

Construction of st. Peter Street off

Uwalor Road, Uromi 118,000,000 16,200,000 25,000,000

218 Roads/Bridges OkoroUrhonigbe/

Orhiomwong

construction of Okoro/

Okahgbara/Edogua Bye-pass 250,000,000 37,500,000

219 Roads/Bridges Benin City OredoConstruction of Edo Avenue Road

Upper Mission Benin 2km 120,000,000 96,838,188 18,225,000 23,161,812

220 Roads/Bridges Owe OrhionmwonEso/Oheze/Evbueghae Road

(Relocated to Egbokor/Owe Road) 249,000,000 225,537,344 45,380,250 23,462,657

221 Roads/Bridges OjieromonEsan South

East

Construction of Ojieromonn Road to

Roxy Hotel Junction (2km) 222,813,360 209,847,011 40,500,000 12,966,349

222 Roads/Bridges UbiajaEsan South

East

Construction of Road with Drainage of

market Street to Wire Road Junction

Ubiaja (Relocated to Market

Road/Wire Road Ewohimwin

200,000,000 119,741,738 32,400,000 25,000,000

223 Roads/ BridgesUnemen-

Emunekhua

Esan South

East

Construction of Unemen-Emunekhua

road. 245,000,000 36,750,000

224 Roads/Bridges UbiajaEsan South

East

construction of Wire Road Ubiaja in

Easn South East 300,000,000 36,450,000 25,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 19 of 37

Page 247: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

225 Roads/Bridges OghegheIkpoba-

OkhaOgheghe/Obagie Nevbuosa Road 196,733,040 158,830,543 32,164,578 25,000,000

226 Roads/BridgesUrhomigbe

TownOrhionwan

Construction of

Omi/Iguoshodin/Obague/Ogheghe

Road Relocated as Construction of 3Km

in Urhomigbe Town

500,000,000 75,000,000

227 Roads/Bridges Uzebba Owan WestConstruction of Uzebba Okpohumi

Road 150,437,440 127,972,813 33,412,500 22,464,628

228 Roads/Bridges Ugbor Oredo Omoregie Street, Ugbor, Benin City 98,130,560 90,561,957 27,228,248 7,000,000

229 Roads/Bridges Akograms Akoko EdoConstruction of 2km Akograms

junction Osi Ekpesa Road 230,000,000 34,500,000

230 Roads/Bridges Aushan-llekpe Akoko EdoConstruction of Aushan-Ilekpe-Imogba

Road (Phase II) Akoko Edo LGA 224,933,212 27,329,385

231 Roads/Bridges Igarra Akoko EdoRehabilitation of Igarra township Road

in Akoko Edo 230,000,000 37,725,000

232 Roads/Bridges Oghoghosere EgorConstruction of First

Federal/Oghoghosere Road 99,880,500 14,982,075 29,160,000

233 Roads/Bridges Igbinaduwa Egor

Construction of Igbinaduwa Oronmiyan

Road (Relocate to Egwavion Street

Benin City)

100,000,000 29,160,000

234 Roads/Bridges Benin City EgorConstruction of Textile Mill Road

(Relocated to Oghobaghase Road) 185,678,123 27,851,700 33,839,816

235 Roads/Bridges Uselu EgorConstruction of link Road at Egua-

Edaiken Qtrs 200,000,000 30,000,000 30,375,000

236 Roads/Bridges Oni-Obagie EgorConstruction of Oni-Iguoshodin-Obagie

Road 150,000,000 142,500,000

237 Roads/Bridges Useh Egor Construction of Useh By-pass Road 82,724,788 63,906,997

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 20 of 37

Page 248: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

238 Roads/BridgesUpper

ErhunmwenseEgor

Construction of Upper Erhunmwense

Road, off Ehaekpen 150,000,000 22,500,000

239 Roads/Bridges Useh Qtrs Egor Construction of Useh Road 177,823,010 63,906,997 21,605,496

240 Roads/Bridges Benin City Egor Construction of Holy Rosary Road 238,650,923 35,447,574 28,996,087

241 Roads/Bridges Benin-City EgorConstruction of 3.5km Mobile Police

Road, Ogida, Egor LGA 400,000,000 45,000,000

242 Roads/Bridges Benin-City EgorConstruction of 1km Adolor Road with

Drains 240,000,000 40,500,000

243 Roads/Bridges Benin-City EgorConstruction of Ojo Street, off

Uwasota Road, Benin City 249,000,000 42,250,000

244 Roads/Bridges Ekpoma Esan centralRehabilitation of Irrua Township roads

(7km) 150,000,000 7,500,000

245 Roads/Bridges Irrua Esan CentralConstruction of Road From Ohe

Uwesan 200,000,000 27,000,000

246 Roads/Bridges Opoji Esan CentralConstruction of 2km road from Ikinago-

Ujosalen-Iki 250,000,000 32,400,000

247 Roads/BridgesIkilogo/

Ujosani IkiEsan Central

Construction of Ikilogo/Ujosani Iki

Road 1.9km 231,495,246 158,524,171 32,400,000

248 Roads/Bridges Opoji Esan CentralConstruction of 3km road at Irrua

Eguare Okhore Opoji 150,000,000 51,567,872 24,603,000

249 Roads/Bridges Ikekiala Esan Central

Construction of link road between

Usugbenu/Ugbegu road and

irrua/Uromi road 3km

245,000,000 29,767,500 30,000,000

250 Roads/Bridges Agwa-Ibore Esan CentralReconstruction of a Section of Agwa-

Ibore Road 3km 245,000,000 29,767,500 22,500,000

251 Roads/BridgesIkilago/Ujosan

en IkiEsan Central

Construction of Ikilago/Uosanen/Iki

road, Phase II, Esan Central LGA 231,495,246 32,400,000

252 Roads/Bridges UromiEsan North-

EastConstruction of Taxona road Uromi 400,000,000 48,600,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 21 of 37

Page 249: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

253 Roads/Bridges OrakunEsan South

EastConstruction of Orakhuan-Usolo road 200,000,000 30,000,000

254 Roads/Bridges UromiEsan North-

East

Construction and Asphalting of Idumu

ekhuere-Utako-Ujagboi Road 250,000,000 33,750,000

255 Roads/Bridges UnemenEsan South

East

Construction of Unemen-Emunekhua

road 245,000,000 36,750,000

256 Roads/Bridges IdinweEsan South

East

Construction of Idinwe Ewatto Road

with Asphalt 2km 188,744,050 58,311,608 30,375,000

257 Roads/Bridges Ekpoma Esan WestRehabilitation of Ekpoma Township

roads (10km) 150,000,000 7,500,000

258 Roads/Bridges Ekpoma Esan WestConstruction of 2km Emuh / Ukpenu

road, Ekpoma 200,000,000 30,000,000

259 Roads/Bridges Iviukwe Etsako East Construction of Iviukwe Road 235,000,000 29,025,000

260 Roads/Bridges Iviari Etsako East Construction of Iviari Road 245,000,000 1,000,000

261 Roads/Bridges Weppa Etsako East Construction of Aviador road, Weppa 200,000,000 37,500,000

262 Roads/Bridges Uzairue Etsako WestConstruction of 2km of Baba Saliu

Road 200,000,000 30,000,000

263 Roads/Bridges Afasho Etsako WestConstruction of Afaasho Secondary

school road / Iyora road 250,000,000 37,500,000

264 Roads/Bridges Market Square Etsako West

Construction of 2.5km Road fromm

market Square to EDC and back to

Echaedakwi Primary School at Imiegba

248,000,000 33,480,000

265 Roads/Bridges Auchi Etsako West

Construction of Momodu Omagba

Braimoh Road, Off Auchi by

waterborad (Phase II) Etsako West

LGA

231,500,000 31,252,000

266 Roads/Bridges Jattu Etsako WestConstruction of Kings Garden road

Jattu 248,530,625 24,300,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 22 of 37

Page 250: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

267 Roads/BridgesOld Agbor

roadIgueben

Rehabilitation of Igueben Girls road,

off Old Agbor road, Igueben LgA

(Phase II)

245,000,000 38,806,173

268 Roads/Bridges

Amawu Street

Off Upper

Sakponba Road

Ikpoba-

Okha

Construction of 2.5km Rigid Pavement

Internal Road at Amawu Street, Off

Upper Sakponba Road After Oka

Market, Oka 3, Ward 8

280,000,000 42,000,000

269 Roads/Bridges Benin-CityIkpoba-

Okha

Construction of 1.5KM Wire road off

St. Saviour street 250,000,000 37,500,000

270 Roads/Bridges AlohanIkpoba-

OkhaConstruction of Alohan Street 152,334,000 52,134,434 27,762,872

271 Roads/Bridges OmoregieIkpoba-

Okha

Construction of Omoregie Road Of

Upper sokponba Road 140,500,826 21,075,124 30,000,000

272 Roads/Bridges Ugbekun Qtrs)Ikpoba-

Okha

Construction of 2kmIgbinidu

Omoregbe street internal Road

(Ugbekun Qtrs)

249,500,000 37,425,000

273 Roads/BridgesOkunseri-

Ehiorobo

Ikpoba-

Okha

Okunseri-Ehiorobo Road in Ikpoba

Okha LGA 197,168,900 29,575,335 35,934,032

274 Roads/Bridges ObazagbonIkpoba-

Okha

Construction of Obazagbon Abraka

3km Road 198,000,000 36,085,500

275 Roads/BridgesEriaria

Quaters

Ikpoba-

Okha

Construction of 1km Uwuigbe Street

between old/New Sapele Rd in Eriaria

Qtrsin Benin

216,491,000 71,513,136 37,209,375

276 Roads/BridgesUpper

Sakponba

Ikpoba-

Okha

Construction of Guddy Guddy Road

linking Upp. Sokponba (Phase II) 248,000,000 45,198,000

277 Roads/Bridges Benin-CityIkpoba-

Okha

Construction of Lawani Street Off

Upper Mission (Phase II) (Relocated to

Goodnews Street, Benin City)

221,568,123 41,396,869 40,380,790

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 23 of 37

Page 251: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

278 Roads/Bridges Benin-CityIkpoba-

Okha

Construction of Lawani Street Off

Upper Mission (Relocated to

Edokpolor/Irabor Street)

230,918,260 33,235,218 43,080,802

279 Roads/Bridges Benin-CityIkpoba-

Okha

Construction of Umagbae/Igbinovia

Street 159,673,763 84,839,062 36,000,000

280 Roads/BridgesUteh Ekoko

community

Ikpoba-

Okha

Construction of Palace Road 3.5km

phase 1 250,000,000 33,750,000 55,000,000

281 Roads/Bridges Benin-CityIkpoba-

Okha

Construction of Uwa link Road St

Saviour 207,757,000 50,001,478 32,400,000

282 Roads/BridgesOsarenwinda

Road

Ikpoba-

Okha

Construction of 1km Osarenwinda road,

off Dumez road 100,000,000 15,000,000

283 Roads/Bridges OkabereIkpoba-

Okha

Construction of Okabere road, off

Sapele road, Benin City 200,000,000 30,000,000

284 Roads/Bridges Benin-CityIkpoba-

Okha

Construction of Ezegbebe Street, Off

Upper Mission Extension Road,

Opposite Covenant Groups OS School,

Benin City

104,988,000 17,008,056

285 Roads/Bridges Benin-CityIkpoba-

Okha

Construction of Eriaria Road Off

Sapele road 180,767,000 29,284,286

286 Roads/Bridges Benin-CityIkpoba-

Okha

Construction of Osaghae Street and

Ekinado Street with Drains 450,000,000 27,916,796 81,000,000

287 Roads/Bridges VariousIkpoba-

OkhaGrading of Internal Roads 100,000,000 296,160,000

288 Roads/BridgesOkundia Enoma

GapionaOredo

Construction of Okundia, Enoma Street

and Gapiona road Erosion Control 450,000,000 239,301,413 45,000,000

289 Roads/Bridges Oko OredoConstruction of Gauis Idubor Road

(Continuation of Oko Central) 98,362,819 14,754,423 23,902,165

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 24 of 37

Page 252: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

290 Roads/Bridges Benin Oredo

Construction of Ugbiagbe street

linking Itua Street, off St. Saviour

Street, Benin-City

200,000,000 30,000,000

291 Roads/Bridges Benin-City Oredo

construction of Road from Adesuwa

Grammar School Junction Iff Sapele

Ugbor Benson Idahosa University

248,000,000 10,654,000 33,480,000

292 Roads/Bridges Benin City Oredo

Construction of Central Hospital Benin

City internal Road (Relocated to Isere

Str. Off Godwin Abbe Road Benin City

180,000,000 40,000,000

293 Roads/Bridges Iyekogba OredoConstruction of Evbuo-Ekhae/Evbuo-

Vbioke Road 247,986,500 90,859,209 37,665,000

294 Roads/Bridges Benin-City Oredo

Construction of Lawani Street

Extension to New Benin Market

(Relocated to Boundary Road Benin

City)

248,537,543 188,211,862 45,295,967

295 Roads/Bridges Ugbor OredoEmergence Repairs / Rehabilitation of

Ugbor Road 248,677,589 29,700,000

296 Roads/Bridges Benin-City Oredo

Construction of 3km Township Road

and Drain at Edegbe Road and Drains

GRA Benin

450,000,000 48,600,000

297 Roads/Bridges Eguaholor OredoConstruction of Eguavon Street, Off

Gapiona Street 100,000,000 12,150,000

298 Roads/Bridges Benin Oredo

Construction of Owina Street and

Efomo lane Off 1st East Cir. Road,

Benin

250,000,000 -

299 Roads/Bridges

Ogiza-

Iguogogin

Road

OredoConstruction of Culverts at Ogiza-

Iguogogin Road 30,000,000 4,500,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 25 of 37

Page 253: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

300 Roads/Bridges Iwehen Street Oredo Rehabilitation of Iwehen Street 100,000,000 15,000,000

301 Roads/BridgesEhigiamusoe

RoadOredo

Cnstruction of Ehigiamudoe Road,

GRA,Benin-City 100,000,000 13,513,500 15,000,000

302 Roads/Bridges Benin-City OredoRehabilitation/Reconstruction of

country Home Motel Road 238,000,000 84,123,612 56,700,000

303 Roads/Bridges Benin-City OredoConstruction of 2km Osaigbovo/Ebo

Road, Ugbor Village 250,000,000 34,500,000

304 Roads/Bridges Benin-City OredoConstruction of Chief Mike Ozekhome

Street, off Amagba road 250,000,000 37,500,000

305 Roads/Bridges Benin City OredoConstruction of Okorotun Road

(Relocated to Omoruyi Street) 150,000,000 24,603,750

306 Roads/BridgesEdegbe

AvenueOredo

Construction of Edegbe Avenue, off

Giwa Amu 99,633,150 31,405,900 12,105,428

307 Roads/Bridges Adumagbae Oredo

Construction of Adumagbae Road

(Relocated to SSS Hqts internal roads

and Gaius Idubor Street)

93,963,000 51,903,902 11,416,505

308 Roads/Bridges Iyi-Eweka Oredo Construction of Iyi-Eweka Road 245,000,000 23,066,686 29,767,500

309 Roads/Bridges Benin City OredoConstruction of Odaro Street, Off

Country Home Road 236,317,161 70,623,821 24,300,000

310 Roads/Bridges Benin-City Oredo

Construction of Godwin Erebor-Ogadie

Street Off Country Home Motel Road,

Benin City (1km)

150,000,000 45,000,000

311 Roads/Bridges Idele Avenue OredoConstruction Idele Avenue and Annex

Road (1km) 120,000,000 27,000,000

312 Roads/Bridges Benin-City OredoConstruction of Osaremen/Eriametoe

Road (1km) 120,000,000 27,000,000

313 Roads/Bridges Benin-City OredoRemedial Works on Ihama Road Oredo,

Edo State 42,196,770 17,089,692

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 26 of 37

Page 254: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

314 Roads/Bridges Etete Oredo

Remedial Works on Vegetable Market

Road, Benin City Oredo LGA and Upper

Uwa Street, Ikpoba Okha LGA, Edo

State (Relocated to Osawe Street,

Etete)

97,000,000 39,285,000

315 Roads/Bridges Umoghun OrhionmwonConstruction of Umoghun

Nokhua/Orogho road in Orhionmwon 250,000,000 37,500,000

316 Roads/BridgesAbraka-

OkogboOrhionmwon

Construction of Rigid Pavement 1km

Road in Abraka Okogbo Road 220,000,000 93,091,397 495,000

317 Roads/Bridges Ugo OrhionmwonConstruction of Okaro Okaligban-

Edogun Bypass 200,000,000 30,000,000

318 Roads/BridgesBenin &

EnvironsOrhionmwon

Remedial Works on Ojo Street, Benin

City, Oredo L.G.A & Ugo-Oben road in

Orhionmwon L.G.A

75,663,710 20,413,920 20,643,803

319 Roads/Bridges OkokhuoOvia North-

East

Construction of 1km Road on Okokhuo

road 240,000,000 32,400,000

320 Roads/Bridges Benin Ovia North-

East

Reconstruction of Erediauwa Road,

Ekenwan, Complete with Drianage in

Benin

705,000,000 61,999,995

321 Roads/Bridges Benin-CityOvia North-

East

Construction of Edo Street/Okunghae

Street (1.5km) 200,000,000 45,000,000

322 Roads/Bridges OkhunwunOvia North-

EastCompletion of Okhunwun Road 980,000,000 124,500,000 50,000,000

323 Roads/Bridges Benin CityOvia North-

East

Construction of internal road James

Watt N. Okaeben street, off

Akpakpava road

200,000,000 30,000,000

324 Roads/Bridges Benin CityOvia North-

East

Construction of internal road Eanalou

street, off Country Home road, Ugbor

Quarters

200,000,000 30,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 27 of 37

Page 255: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

325 Roads/Bridges New Benin

Construction of internal road Oye

Utbinoba street, off Eweka Upper

Lawani

200,000,000 30,000,000

326 Roads/Bridges OvbiogieOvia North-

East

Construction of Hospital road in

Ovbiogie Community 100,000,000 25,000,000

327 Roads/BridgesOhummora-

Ora Owan West

Construction of 2km Odu street in

Ohummora-Ora 200,000,000 30,000,000

328 Roads/Bridges Uzebba Owan WestConstruction of 2km Okhaide

Giwa/lucky/Faraway/Monite Link Road 200,000,000 24,300,000

329 Roads/Bridges Uzebba Owan WestConstruction of 2km

Okunagbe/ekiaoma link Road 200,000,000 24,300,000

330 Roads/Bridges Uzebba Owan West

Construction of 2Km Internal Road

from George-Jehova Witness Hall,

Avbiosi and its adjoinng links at

Uzebba

230,000,000 22,500,000

331 Roads/Bridges Ekhua Uhunmwode Ekhua/Evbuosa/Egba 148,277,905 125,644,604 22,882,500

332 Roads/Bridges Ugonoba Uhunmwode Ugonoba/Obadan/Adesogban 149,950,200 49,620,212 27,337,500

333 Roads/Bridges Benin-City UhunmwodeConstruction of secondary School Road

Uzamere Farm Road/Uzamere Road 200,000,000 94,998,600 40,486,266

334 Roads/Bridges Benin-City UhunmwodeConstruction of secondary School Road

Uzamere (Phase II) in Uhunmwode LGA 200,000,000 169,051,935 40,000,000

335 Roads/BridgesAkhionmwan

RiverUhunmwode

Construction of Bridge Across

Akhianmwan River 250,000,000 33,750,000

336 Roads/Bridges Benin-City Uhunmwode Construction of Eresoyen Street 80,000,000 12,000,000

337Total

Roads/Bridges 48,439,125,427 6,052,620,976 6,057,173,822 5,453,755,421

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 28 of 37

Page 256: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

338

Governance

Social Services

& Sports

Auchi Etsako WestConstruction and Furnishing of Edo

North Traditional Council Hall 195,000,000 29,250,000 50,000,000

339

Governance

Social Services

& Sports

Benin City Ikpoba-

Okha

Construction of Youth House complete

furnishing and fencing in Ikpoba Okha 130,000,000 40,000,000 48,000,000

340

Governance

Social Services

& Sports

Ugo Orhionmwon Construction of Police Station at Ugo 149,850,800 80,445,804 30,375,000 50,000,000

341

Governance

Social Services

& Sports

Iyekogbe

CommunityOredo

Development of Skill Acquisition

Centre in Iyekogbe Community 150,000,000 22,500,000

342

Governance

Social Services

& Sports

UsenOvia South-

West

Construction of Community Civic

Centre/Town Hall 149,850,800 80,657,987 30,375,000 50,000,000

343

Governance

Social Services

& Sports

Uzebba Owan WestConstruction of Ultra Modern Civic

Centre in Uzebba, Owan West LGA 248,000,000 37,200,000

344Governance &

Social Services

Ogba-Neki

Village

Provision of Town Hall in Ogba-Neki

Village 100,000,000 15,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 29 of 37

Page 257: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

345

Governance

Social Services

& Sports

Ekhae OredoConstruction of Equiptment of ICT

Centre 70,000,000 15,850,615 22,680,000 35,000,000

346

Governance

Social Services

& Sports

Igarra Akoko Edo Construction of Civil Centre at Igarra 119,300,845 71,219,343 30,316,001 30,000,000

347

Governance

Social Services

& Sports

Edo Central Edo CentralWomen and Youth Empowerment in Edo

Central Senatorial District 150,000,000 22,500,000

348

Governance

Social Services

& Sports

UgbekunIkpoba-

Okha

Rehabilitation of Warfare Home at

Ugbekun 99,780,900 52,305,669 32,400,000 30,000,000

349

Governance

Social Services

& Sports

Benin City Ikpoba-

Okha

Construction and Equiptment of ICT

Centre 70,416,485 20,250,000 20,000,000

350

Governance

Social Services

& Sports

Ibbiughuru Owan WestConstruction of Civil Centre in

Ibiughuru 99,864,500 65,656,253 22,500,000 30,000,000

351

Governance

Social Services

& Sports

Benin-CityIkpoba-

Okha

Construction of Public Tolet at Ramat

Park with Water Borehole (Relocated

to Aduwawa Primary School)

49,750,800 26,313,447 20,250,000 23,437,353

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 30 of 37

Page 258: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

352

Governance,

Social Services

& Sports

Iruekpen Esan WestConstruction of Youth Ultra-Modern

Town Hall at Iruekpen 80,000,000 12,000,000

353

Governance

Social Services

& Sports

Okpuje Owan WestConstruction of Community Civic

Centre/Town Hall 150,000,000 132,713,236 30,375,000 10,000,000

354

Governance

Social Services

& Sports

Ibillo Akoko EdoConstruction of Multi-Purpose Town

Hall 161,500,000 27,000,000

355

Governance

Social Services

& Sports

Auchi Akoko EdoConstruction of Multi-Purpose Town

Hall ai Aucha 161,500,000 27,000,000

356

Governance

Social Services

& Sports

Ogida EgorRenovation of Police Training School,

Ogida 250,000,000 37,500,000

357

Governance

Social Services

& Sports

Ogida EgorRenovation of Police Secondary School,

Ogida 250,000,000 37,500,000

358

Governance

Social Services

& Sports

OghegheIkpoba-

Okha

Construction of Police Station at

Ogheghe Community 200,000,000 30,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 31 of 37

Page 259: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

359

Governance

Social Services

& Sports

Oredo Oredo Clearing of Township road by Youths 100,000,000 32,400,000

360

Governance

Social Services

& Sports

Benin City Oredo Rehabilitation of Mopol Barracks,

Benin City. 100,000,000 20,000,000

361

Governance

Social Services

& Sports

Benin-City OredoConstruction of Police Station at Oko

Central, Ekhoguere Community 150,000,000 22,500,000

362

Governance

Social Services

& Sports

Adeyanba Orhionmwon Construction of Civil Centre at

Adeyanba 100,000,000 20,000,000

363

Governance

Social Services

& Sports

Umoghun-

Nokhua Orhionmwon

Construction of Civil Centre at

Umoghun-Nokhua 100,000,000 30,000,000

364

Governance

Social Services

& Sports

3 Senitorial

DistrictsOrhionmwon

Sub-Urban/Rural Sports Facilities and

Programs for Youth Development in the

State (3 Senitoral Districts)

100,000,000 32,400,000

365

Governance

Social Services

& Sports

4 Senitorial

DistrictsOrhionmwon

Establishment of a Community

Development Foundation (CDF) in each

of the Senatorial Districts

75,000,000 24,300,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 32 of 37

Page 260: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

366

Governance

Social Services

& Sports

Oil Producing

AreasOrhionmwon Organising Sport Competition 60,000,000 19,440,000

367

Governance

Social Services

& Sports

OkadaOvia North-

East

Construction of Skill Acquisation

Centre 150,000,000 22,500,000

368

Governance

Social Services

& Sports

Uzeba Owan WestConstruction of civil and youth centre

at uzeba 150,000,000 22,500,000

369

Governance

Social Services

& Sports

Oshofo

Oruere LulehaOwan West Construction of civic centre 150,000,000 22,500,000

370Ecological

Total 4,269,815,130 525,162,353 736,311,001 485,637,353

371 Water Supply3 Senetorial

District

Ikpoba-

Okha

Rehabilitation and Reactivation and

upgrading of 3 nos existing NDDC

Borehole in each existing Borehole in

each Senatorial Districts

240,000,000 58,898,178 36,000,000 70,000,000

372 Water Supply Aideyanba OrhionmwonSolar Powered Water at Aideuanba,

Orhionmwon LGA 150,000,000 36,000,000 40,000,000

373 Water Supply Evboesi Orhionmwon Solar Powered Water 54,520,000 19,962,000 19,962,000

374 Water Supply Iyanmho Etsako West

Solar Powered Borehole with

reticulation to Iyamho and Adjoining

Village

70,000,000 19,962,000 35,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 33 of 37

Page 261: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

375 Water Supply IviukweEtsako

CentralSolar Powered Borehole 53,059,100 7,958,865 15,472,034 30,000,000

376 Water Supply Ugbalo Esan CentralRehabilitation of Ugbalo water scheme

and reticulation works 500,000,000 75,000,000

377 Water Supply Evbokabua Orhionmwon Solar Powered Borehole at Evbokabua 49,095,424 7,364,314 17,895,282 30,000,000

378 Water SupplyIguodia/

Iguoda Iken

Ovia South-

WestSolar Powered Borehole 47,842,146 14,668,418 14,534,482 30,000,000

379 Water Supply Igieduma Egor Solar Powered Borehole 49,095,433 19,134,846 17,895,285 20,000,000

380 Water Supply OhorduaEsan South

EastSolar Powered Borehole 44,750,000 23,699,752 13,668,750 20,000,000

381 Water Supply OkhaIkpoba-

Okha

Solar Powered Borehole at Okha (along

Express Way) 47,732,472 7,159,871 8,398,486 20,000,000

382 Water Supply Owe Orhionmwon Solar Powered Borehole 45,000,000 16,754,468 16,402,500 20,000,000

383 Water SupplyObagie (Near

Abudu)Orhionmwon Solar Powered Borehole 49,095,433 13,321,805 17,895,285 20,000,000

384 Water Supply Idueogba-Ugo Orhionmwon Solar Powered Borehole 47,395,798 12,996,354 17,275,768 20,000,000

385 Water Supply Obe Orhionmwon Solar Powered Borehole at Obe 47,732,472 7,159,871 17,398,486 20,000,000

386 Water Supply FugarEtsako

Central

Solar Water in Fugar Etsako Central

LGA 200,000,000 30,000,000

387 Water Supply Owe OrhionmwonSolar Powered Borehole at Owe

(Relocated to Evbobemwen) 49,095,424 18,956,493 16,765,551 20,000,000

388 Water Supply Okada OviaProvision of solar powered borehole at

Okada in Ovia North East L.G.A 100,000,000 15,000,000

389 Water Supply ObayantoOvia North-

EastSolar Powered Borehole 49,095,433 22,198,167 17,895,285 20,000,000

390 Water Supply IgueroOvia North-

East

Solar Powered Borehole (Relocated to

Iguero) 49,095,433 12,608,562 18,795,285 20,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 34 of 37

Page 262: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

391 Water Supply IguosaOvia North-

EastSolar Powered Borehole at Iguosa 50,000,000 15,525,000 20,000,000

392 Water Supply EkiadolorOvia North-

East

Solar Powered Borehole at COE

Ekiadolor 49,095,433 7,364,315 15,525,000 20,000,000

393 Water Supply UgbineOvia North-

EastSolar Powered Borehole at Ugbine 50,000,000 28,054,102 11,902,500 20,000,000

394 Water Supply Iduonwina UhunmwodeSolar Powered Borehole at Uselu

(Relocated to Iduonwina) 49,095,433 25,654,474 18,225,000 20,000,000

395 Water Supply Avbiugo Orhionmwon Bore hole Water Project 30,000,000 4,500,000 10,000,000

396 Water Supply Evbuoehighae Orhionmwon Water Project 30,000,000 4,500,000 10,000,000

397 Water Supply Urhehue Orhionmwon Water Project 30,000,000 4,500,000 10,000,000

398 Water Supply Egbokor Orhionmwon Water Project 30,000,000 4,500,000 10,000,000

399 Water Supply

Okaro

Quarters,

Urhonigbe

Orhionmwon Water Project 30,000,000 4,500,000 10,000,000

400 Water Supply Idulaka Orhionmwon Water Project 30,000,000 4,500,000 10,000,000

401 Water Supply Egbede Orhionmwon Water Project 30,000,000 4,500,000 10,000,000

402 Water Supply Iguehenzae OrhionmwonSolar Powered Borehole at

Iguehaanzae 47,732,472 31,848,704 17,398,486 15,000,000

403 Water Supply

3 Nos Oil

Producing

LGAs

Orhionmwon

Rehabilitation and Reactivation and

upgrading of 2 nos existing NDDC

Borehole in each existing Borehole in

each LGA in the Senatorial Districts

239,900,750 209,707,171 29,700,000 15,000,000

404 Water SupplyIguoshodin

Nebudin

Ovia North-

EastWater Project 30,000,000 8,732,644 4,500,000 10,000,000

405 Water SupplyIguosula,

Utoka

Ovia North-

EastWater Project 30,000,000 4,500,000 10,000,000

406 Water Supply IguoghoOvia North-

EastWater Project 30,000,000 4,500,000 10,000,000

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 35 of 37

Page 263: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

407 Water SupplyIdunowina/igu

ere

Ovia South-

WestSolar Powered Borehole 48,955,906 18,405,317 14,870,356 15,000,000

408 Water Supply Eme-Ora Owan WestConstruction of Solar Powered

Borehole at Eme-Ora 24,980,500 3,747,075 8,201,250 15,000,000

409 Water Supply Oza Nisi Uhunmwode Solar Powered Borehole 49,095,424 14,956,939 17,895,282 15,000,000

410 Water Supply Ikpebo Uhunmwode Solar Powered Borehole 49,095,424 35,181,478 14,912,735 9,064,161

411 Water Supply IdogboIkpoba-

OkhaProvision of Solar Powered Borehole 45,000,000 40,757,990 14,762,250 4,000,000

412 Water Supply Okhoro Egor

Construction of Water Scheme at

Okhoro Area, Hotel Philomena and

Environs (Relocated to Igueikpe)

41,354,730 28,042,712 15,073,799 13,312,018

413 Water SupplyIguoshodin

NikpemabaEgor

Solar Powered Borehole (Moved to

Iguoshodin-Nikpemaba) 49,095,433 18,094,790 15,325,358

414 Water Supply

Emovon

Street, Upper

Mission

Egor Water Project 30,000,000 4,500,000

415 Water Supply Ughogua Egor Solar Powered Borehole 45,000,000 64,128,769 36,000,000

416 Water Supply Usegbenu Esan CentralConstruction of Water Scheme at

Ikekiala-Usugbenu 42,306,333 29,937,141 12,850,610

417 Water Supply Auchi Etsako WestContract for reactivation of Auchi

water scheme 61,618,497 42,281,410

418 Water Supply OgwaIkpoba-

OkhaSolar Powered Borehole 49,095,424 7,364,314 17,895,281

419 Water Supply Ozolua Street Oredo Water Project 30,000,000 4,500,000

420 Water Supply Erie Street Oredo Water Project 30,000,000 4,500,000

421 Water Supply Egbire Oredo Water Project 30,000,000 4,500,000

422 Water SupplyGuobadia/

IgbinobaOredo

Solar Powered Borehole (Relocated to

Uhi and Ugiehudu) 100,000,000 19,192,500

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 36 of 37

Page 264: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/NPROJECT

TYPELOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC EDO STATE 2016 DRAFT BUDGET

423 Water Supply Uzebba Owan West

Construction of Solar Powered Water

Project at Uzebba (Relocated to Oke-

Old and Eruwe in Owan West LGA)

96,539,120 40,493,816 36,000,000

424 Water Supply Iviughuru Owan West Solar Powered Borehole at Iviughuru 44,750,000 16,536,116 19,192,500

425 Water Supply Okpujie Owan West Solar Powered Borehole at Opujie 100,000,000 19,192,500

426 Water Supply Uzeba Owan West

Reticulation of water to 16 villages

from an NDDC water Project at

Uzebba

145,000,000 82,738,779 26,426,250

427 Water Supply Orhua Uhunmwode Solar Powered Borehole 49,095,433 16,467,346 17,895,285

428 Water Supply Obagie Uhunmwode Solar Powered Borehole 47,906,078 7,185,912 16,402,500

429 Water Supply Ugonoba Uhunmwode Solar Powered Borehole 50,000,000 17,731,677 13,702,500

430 Water Supply Ogba OredoConstruction of Water Supply for

Ogba 110,173,840 20,229,141 17,758,646

431Ecological

Total 4,097,490,793 1,058,522,096 847,042,067 856,338,179

Grand Total 77,030,715,350 9,362,610,647 9,863,976,609 9,112,487,022

2016 APPROPRIATION ACT- EDO NATIONAL ASSEMBLY Page 37 of 37

Page 265: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

1 Education Mmahu Ohaji/Egbema

Construction of Admin Block/Library,

Hostel block and 3Nos staff qurters

at NDDC Model Secondary School

245,000,000 - 25,000,000 25,000,000

2 Education Umudike II Ohaji/Egbema

Construction of Admin Block/library,

2nos hostel block and 3nos staff

quarters at NDDC Model Secondary

school

249,000,000 25,892,008 25,000,000 25,000,000

3 Education Imo West

Construction of Imo West Centre for

Medical Education, Research and

Publications College of Medicine,

University of Nigeria

240,000,000 - 36,000,000 26,000,000

4 Education Amuzu Aboh MbaiseRenovation of Centrla School,

Amator, Amuzu 50,000,000 7,500,000

5 Education Obiangwu Ngor-OkpalaRehabilitation of imerienwe Girls

Secondary School 70,000,000 10,500,000

6 Education Owerri Owerri

Construction of 6 Classroom blocks

at Federal Government Girl's

College, Owerri

30,000,000 - 25,000,000 4,500,000

7 Education Owerri OwerriPerimeter Fencing of Federal

University Of Technology, Owerri 98,000,000 - 14,820,000 -

8 Education Ndiuche Ideato North

Construction of two classroom block

and fencing of Community primary

school1 Ndiuche, Arondizugu

120,000,000 18,000,000 -

NDDC IMO STATE 2016 DRAFT BUDGET

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 1 of 42

Page 266: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

9 Education Mbutu Aboh Mbaise

Rehabilitation/equipping of three

block of 4Nos classrooms, Science

Laborratory with perimeter fencing

and solar street light at Mbutu

secondary school, Mbutu, Aboh

150,000,000 22,500,000 10,000,000

10 Education Mbutu Aboh MbaiseRehabilitation of Mbutu Secondary

School Hall 45,000,000 - 25,000,000 2,000,000

11 Education Total 1,297,000,000 25,892,008 191,320,000 110,500,000

12Energy/Power

SupplyIkem Ngor-Okpala

Const of injection substation and

assoiciated transmission lines 1,081,218,232 - 150,000,000 70,000,000

13Energy/Power

SupplyUmudike Ohaji/Egbema

Solar Street Light at Umudike

Egbema 2km 240,000,000 - - 36,000,000

14Energy/Power

SupplyObiakpu Ohaji/Egbema Solar Street Light at Obiakpu 200,000,000 - - 30,000,000

15Energy/Power

Supply K-Beach Oguta

Solar street light at Oguta, Agwa,

Ndioshimiri, K-Beach 200,000,000 - 30,000,000 30,000,000

16Energy/Power

Supply

Egbema/Oha

jiOhaji/Egbema

Solar Street Light in Ohaji/Egbema

communities 200,000,000 - 30,000,000 30,000,000

17Energy/Power

SupplyObokofia Ohaji/Egbema

Solar Street Light at Obokofia

(1.5km) 150,000,000 - - 22,500,000

18Energy/ Power

SupplyAhiara Ahiazu Mbaise

Provision of solar street light at

Bishop's gate - Umuwaoma road 50,000,000 7,500,000

19Energy/Power

SupplyIzombe Oguta Solar street Light 70,000,000 - 10,500,000 10,500,000

20Energy/Power

SupplyOpuoma Ohaji/Egbema Solar Street Light at Opuma 105,000,000 - - 15,750,000

21Energy/Power

Supply

Umuekwune

RoadNgor Okpala Rural Electrification 150,000,000 46,643,013 40,000,000 20,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 2 of 42

Page 267: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

22Energy/Power

Supply

Ucholu

EziamaNgor Okpala Rural Electrification 50,000,000 7,500,000 20,000,000 15,000,000

23Energy/Power

Supply

Enyiogugu -

Mbutu -

Uvuru

Aboh MbaiseSolar street lights at Enyiogugu -

Mbutu - Uvuru road 100,000,000 15,000,000 15,000,000

24Energy/ Power

SupplyUmudihe Orlu

Extension of rural electrification

projects in Ndiowerre village,

Umudiatu village all in Orlu LGA

50,000,000 7,500,000

25Energy/Power

Supply

Umunakanu-

UmuezealaEhime Mbano

Provision of Solar Street light at

Umunakanu-Umuezeala 100,000,000 - 15,000,000 15,000,000

26Energy/Power

Supply

Umuokpara/

Umuaka roadOkigwe Solar street Light 100,000,000 - 15,000,000 15,000,000

27Energy/Power

Supply

Umuoshi/Um

uama di

Nguru

Aboh Mbaise Solar light 100,000,000 - 15,000,000 15,000,000

28Energy/Power

Supply

Umuobom/U

mucheke,

Ndianichie

Ideator

South/Ideato

r North

Procurement and Installation of

500KVA Transformer 100,000,000 - 15,000,000 15,000,000

29Energy/ Power

Supply

Abacheke

Egbema

Solar Street Light at main market

Afia Ezhi-Cherubim church- Ipo

layout Abacheke Egbema

130,000,000 19,500,000

30Energy/Power

Supply

Umuokwu

ExtentionOguta

Extention of Electricity to Umuokwu

New Layout/ College Road Izombe. 100,000,000 - - 15,000,000

31Energy/Power

Supply

Pocket

Layout

Amokohi

Owerri North

Provision of High Tension and Low

Tension Lines with Sub Station

(1.2km)

45,000,000 - - 6,750,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 3 of 42

Page 268: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

32Energy/Power

SupplyNkwerre

Solar street light at Nkwerre-Isu-

Njaba-Nwangele 72,000,000 - 10,800,000 10,800,000

33Energy/Power

SupplyIsiala Mbano Isiala Mbano

Solar Powered Street Light in Isiala

Mbano 70,000,000 - 10,500,000 10,500,000

34Energy/ Power

SupplyAmuzari

Construction and installation of Solar

powered street light 70,000,000 10,500,000

35Energy/Power

SupplyUmudike Ideato North

Solar street light from Umudike-Orie

Umuobom-Amaikpa/Umudike to 200,000,000 - 30,000,000 10,500,000

36Energy/Power

Supply

Ihitte

UbomaIhitte Uboma

Solar Powered Street Light in Ihite

Uboma 70,000,000 - 10,500,000 10,500,000

37Energy/Power

Supply

Umuhu-

AmanachiOrsu Solar street Light 71,678,900 60,498,311 11,180,589 8,000,000

38Energy/Power

SupplyVarious

Ohaji /

Egbema

Review / Reactivation of all Non-

functional NDDC Electricity Projects

in Ohaji / Egbema, Izombe and Oguta

Constituencies(design)

50,000,000 7,500,000 7,500,000 7,500,000

39Energy/Power

Supply

Oguta

CommunityOguta

Solar Street from Ogbuide Rd to

Arthur Nzeribe Road 50,000,000 7,500,000 27,500,000 7,500,000

40Energy/Power

SupplyIfe Ezeinihitte Solar Street light 50,000,000 7,500,000 25,000,000 7,500,000

41Energy/Power

SupplyEgwe Oguta Solar Street Light 50,000,000 7,500,000 7,500,000 7,500,000

42Energy/ Power

SupplyMgbirichi Ohaji

Solar powered Street light at

Mgbirichi, ohaji. 40,000,000 6,000,000

43

Energy/ Power

Supply/ Power

Supply

Amaimo IkeduruSolar Street Light in Amaimo

Community and Ikeduru, Imo State 100,000,000 75,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 4 of 42

Page 269: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

44Energy/Power

Supply

Amuzi &

OdenkumeObowo Solar Street Light 50,000,000 7,500,000 7,500,000 7,500,000

45Energy/Power

Supply

Amazu

AkataOru East Solar Street Light in Amazu Akatta 124,164,943 18,624,741 45,000,000 7,000,000

46Energy/Power

SupplyOrlu Orlu Solar Street Light in Orlu Township 127,722,500 19,158,375 29,158,375 5,000,000

47Energy/Power

SupplyNduche Okigwe Rural Electrification 214,356,780 32,153,517 40,000,000 5,000,000

48Energy/Power

SupplyOguta Oguta Solar street Light 72,449,885 10,867,483 30,867,000 5,000,000

49Energy/ Power

SupplyAssa Ohaji

Solar powered Street Light at Assa ,

Obile and Awarra, ohaji. 100,000,000 15,000,000

50Energy/Power

SupplyUmuekezie Oru Solar powered street light 75,000,000 - 11,250,000 -

51Energy/Power

SupplyNduche Okigwe

Solar powered street light at

Nduche, Aro-Onuimo, Okigwe75,000,000 - 11,250,000 -

52Energy/Power

SupplyAgunaeze Obowo

Construction of solar street light at

Agunaeze-Umulogho Road240,000,000 - 36,000,000 -

53Energy/Power

SupplyEzinihitte Mbaise

Construction of Akpodim Mkt-Otulu-

Eziala-Amumara-Itu Road248,000,000 - 37,200,000 -

54Energy/Power

Supply

Umunwachuk

wuikeIhitte-Uboma

Solar powered street light at

Umuwachukwuike, Umuonyenche

Umunohu Road

240,000,000 - 36,000,000 -

55Energy/Power

Supply

Ndiogunonye

oma

Arondizogu

Okigwe Construction of solar street light 96,000,000 - 14,400,000 -

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 5 of 42

Page 270: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

56Energy/Power

Supply

Aboh

Mbaise/Ngo

r Okpalla

Aboh

Mbaise/Ngor

Okpalla

Supply and installation of 30Nos

500KVA transformers to Aboh

Mbaise/Ngor Okpalla Federal

Constituency

150,000,000 - 22,500,000 -

57Energy/Power

Supply

Aboh

Mbaise/Ngo

r Okpalla

Aboh

Mbaise/Ngor

Okpalla

Provision of solar street lightin Aboh

Mbaise/Ngor Okpalla 300,000,000 - 45,000,000 -

58Energy/Power

SupplyFuto Owerri Solar street Light 249,000,000 - 40,000,000 -

59Energy/Power

SupplyOwerri

Owerri

Municipal

Instalation of 2 Transofrmers at

Works Layout 10,000,000 - - -

60Energy/Power

SupplyEzinachi Okigwe Rural Electrification 189,000,000 - 30,000,000 -

61Energy/Power

SupplyNdianichie Ideato North

Provision of Solar Street light at

Indianichie 100,000,000 - 15,000,000 -

62Energy/Power

SupplyIhiagwa Owerri West

Provision of Solar Street Light at

Nkaramache road, Ihiagwa 150,000,000 22,500,000 22,500,000

63Energy/Power

Supply

Umuduruogb

a OkwudorNjaba

Supply and Installation of 300kva

Transformer 80,000,000 - 12,000,000 -

64Energy/Power

SupplyUmuodu Ehime

Solar street light at Umuodu-

Umunanom-Umuarugwu-Umualuwaka 200,000,000 - 30,000,000 -

65Total Energy/

Power Supply7,305,591,240 232,945,440 1,011,605,964 649,800,000

66 Canalization Awucha Road OgutaRemedial and Erosion Control works

on Awucha Road and Egwe 100,000,000 - 15,000,000 15,000,000

67 Canalization Obiangwu Ngor-OkpalaErosion control works at Ekeisu-Afor

Enyiogugu road 130,000,000 19,500,000

68 Canalization Imerienwe Ngor-OkpalaErosion control worksat Egbelu Nguru-

Umuoye Imerienwe road 200,000,000 30,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 6 of 42

Page 271: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

69Canalization

Total100,000,000 - 15,000,000 64,500,000

70 Health Various VARIOUSSpecial Medical Referrals and Check-

up for the State200,000,000 30,000,000

71 Health Ikeduru IkeduruConstruction and Equipment of 50

Bed Hospital 500,000,000 - 80,000,000 20,000,000

72 Health Otiti Omuma Oru EastConstructuion of Comprehensive

Health Care Centre in Otiti Omuma 245,000,000 - 30,000,000 20,000,000

73 Health Umudim Orsu

Construction of Comprehensive

Health Centre at Umudim Imenyi,

Orsu

120,000,000 - - 18,000,000

74 Health Ndioyemaobi Oguta Ndioyemaobi Health Centre 50,000,000 - - 7,500,000

75 Health Umuezeala Oru EastConstruction of Umuezeala Health

Centre, Omuma 120,000,000 - 18,000,000 18,000,000

76 Health Ezi-Osu Ezi-Osu Repair/Renovation of Health center 22,692,442 1,049,458 - 3,403,866

77 Health various VariousFencing, water and powersupply for

21 No. BHC 200,000,000 - 30,000,000 15,000,000

78 Health Mgbele Oguta

Mgbele Health Centre with

Perimetre Fencing, Landscaping and

Generator

80,000,000 - - 12,000,000

79 Health Eze Oke NsuEHIME

MBANO

Construction of Basic Health Centre

with Fencing at Umuduruehie,

Ezeoke Nsu

50,000,000 - - 7,500,000

80 Health Mmahu Ohaji/EgbemaConstr, Of 1No Comprehensive

Health Centre at Mmahu 90,521,466 13,578,220 11,767,791 11,767,791

81 Health Ogwuama AhiazuConstruction of 1No Comprehensive

Health Centre at Ogwuama 70,000,000 - 10,500,000 10,500,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 7 of 42

Page 272: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

82 Health AssaOhaji /

Egbema

Construction of comprehensive

Health Centre Complex comprising of

Main Block, Doctors' Qtrs, Nurses

Qtrs, and Matrons' Qtrs; Power &

Water Supply & External works

100,000,000 - 15,000,000 10,000,000

83 Health Okporo OrluConstruction of Hostel Block at St.

Demian Nursing Institute Okporo 40,000,000 - - 6,000,000

84 HealthAma Ukwu

OboloIsiala Mbano

Constr, Of 1No Model Basic Health

Centreb at Amaukwu Obolo14,815,707 2,222,356 7,593,050 7,593,050

85 Health Umuezeaga Ideato North

CONSTRUCTION OF 1 NO.

COMPREHENSIVE HEALTH CENTRE

AT Umuezeaga ideato North

14,815,707 2,222,356 7,542,749 7,542,749

86 HealthUmuna

Isiaku

IDEATO

SOUTH

CONSTRUCTION OF 1 NO. BASIC

HEALTH CENTRE AT Umuna Isiaku,

ideato south

13,065,707 1,959,856 2,286,499 2,286,499

87 Health Total 1,930,911,028 21,032,246 212,690,088 207,093,954

88Jetty/Shore

ProtectionOpuoma

OHAJI /

EGBEMA /

OGUTA

Reclammation & Shore Protection of

Opuoma/Eziorsu 4,878,921,078 1,540,153,277 2,000,000 200,000,000

89

Total

Jetty/Shore

Protection

4,878,921,078 1,540,153,277 2,000,000 200,000,000

90 Roads/BridgesUkwugba

UmuapuOhaji/Egbema

Construction of 19.2km Ukwugba -

Umuapu Road Obokofia Section,

Beginning from Umuapu

2,300,000,000 - - 345,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 8 of 42

Page 273: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

91 Roads/BridgesUKWUGBA-

UMUAPU

Ohaji /

Egbema

Construction of Ukwugba Junction-

Egbema – Etekwuru- Umuapu (43.1km) 2,549,620,908 924,557,404 80,000,000 80,000,000

92 Roads/BridgesUmuawchi-

UmunakanuEhime Mbano

Construction of Umuawuchi Umueze 1

- Umuele Umunakanu Road/Bridge

(30m Bridge + 5 Km road)

2,036,136,650 323,787,805 111,500,000 111,500,000

93 Roads/Bridges OBIAKPU Ohaji/EgbemaConstruction of Obiakpu Internal

Road/Drainages(21.56km) 2,071,896,732 550,385,718 65,000,000 65,000,000

94 Roads/Bridges Assa Ohaji/EgbemaConstruction of Assa - Obile Internal

roads (phase II) - 14km 1,008,086,002 151,212,900 70,000,000 70,000,000

95 Roads/Bridges Umuapu Ohaji/Egbema

Emergency Repairs on Umuapu,

Owerri - Port-Harcourt By Pass 2.1km

( Phase I)

152,012,763 - - 22,801,914

96 Roads/Bridges Umuapu Ohaji/Egbema

Emergency Repairs on Umuapu,

Owerri - Port-Harcourt By Pass

Phase II (Drians)

120,000,000 - - 18,000,000

97 Roads/BridgesEziama

IzombeOguta

Construction of Izombe Serminary

School Road 300,000,000 - - 45,000,000

98 Road/ Bridges Obeakpu Ohaji/EgbemaConstruction of Obeakpu internal

Road 300,000,000 - - 45,000,000

99 Roads/Bridges Umuokanne Ohaji/EgbemaConstruction of Umuezuta -

Umuokanne Road (Phase 1) 2km 300,000,000 - - 45,000,000

100 Roads/Bridges Mgbirichi Ohaji/EgbemaConstruction of Umuokanne -

Mgbirichi Road (3km) 300,000,000 - - 45,000,000

101 Roads/Bridges IkeduruIkeduru/

Mbaitoli

Construction of Eke Atta - Amawo -

Eke Oha Ogwa Link Road

Ikeduru/Mbaitoli

300,000,000 - - 45,000,000

102 Roads/Bridges Umudike IIOhaji /

Egbema

Construction of Umudike II Internal

Roads/ Drainage 1,403,027,438 220,682,506 72,500,000 72,500,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 9 of 42

Page 274: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

103 Road/ Bridges Nekede Owerri NorthConstruction of 2km Road with

Drians at Federal Poly Nekede 240,000,000 - - 36,000,000

104 Road/ Bridges FUTO FUTO

Rehabilitation of FUTO Internal

Road leading to NDDC Hostel (2.5KM)

with Drains.

215,000,000 - - 32,250,000

105 Road/ Bridges Nguru Ngor OkpallaConstruction of Umuaga-Umukabia

Road 2km Phase 1 248,000,000 37,200,000

106 Road/ Bridges Umuguma Owerri WestConstruction of Paradise/ Uwakwe

Road, Umuguma, Owerri West 210,000,000 - - 31,500,000

107 Road/ Bridges Umuezeala Mbano

Construction of internal road

network in Umuezeala Ogwara, Ehime

Mbano

245,000,000 - 36,750,000 51,250,000

108 Road/ Bridges Obiti Ohaji/Egbema Construction of Obiti Internal Road 157,314,470 - 64,536,312 50,536,718

109 Road/ Bridges Mmahu Ohaji/Egbema

Construction of Ekenta-Omanpe

Uduekwa Ring Road and Mmahu

Township road/Drainage & Flood

Control at Omange and Udakputa

with a spur at Urashi Road.

1,571,025,630 509,774,895 50,000,000 50,000,000

110 Road/ Bridges UmuloghoIHITTE/UBO

MA/OBOWO

Constr. Of Umulogho Okwohia

Isinweke 850,000,000 232,811,716 50,000,000 50,000,000

111 Roads/ Bridges

Mbaitioli/

Ikedduru-

Ahiazu

Ikeduru Construction of Ugwuoji-Atta road 250,000,000 50,000,000

112 Roads/ Bridges Ekeututu Orsu

Two kilometer road from Ekeututu

International Market road,

Orsuiteukwa to Ohiara river bridge

Ihitenansa community in orsu LGA

250,000,000 37,500,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 10 of 42

Page 275: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

113 Road/ Bridges Izombe Oguta Izombe Internal Roads Extension 425,851,793 106,462,948 50,000,000 50,000,000

114 Road/ BridgesUkagba -

OkporoOrlu

CONSTRUCTION OF NZE T.N

UKAGBA/UMUOKPARA ROAD,

AKWAKUMA OKPORO IN ORLU LGA

235,000,000 75,412,763 50,000,000 50,000,000

115 Road/ Bridges OgutaOhaji/Egbema

/ OgutaIzombe - Agwa - Obokofia Road 1,612,345,401 756,828,594 50,000,000 50,000,000

116 Road/ Bridges Iheagwa Owerri WestConstruction of Iheagwa Internal

Road (Phase I) 245,000,000 - 45,500,000 45,500,000

117 Road/ Bridges Iheagwa Owerri WestConstruction of Iheagwa Internal

Road (Phase 2) 245,000,000 - 45,500,000 45,500,000

118 Road/ BridgesNdiuloukwu-

AwaOguta

Construction of Ndiuloukwu – Awa

Road. 245,731,025 - 36,859,654 36,859,654

119 Roads/Bridges OpuomaOhaji/

Egbema

Construction of St Mary Catholic

Palace Road Opuoma 2KM with

Drains.

150,000,000 - - 22,500,000

120 Roads/ BridgesUmuhu -

Mbutu Aboh Mbaise Construction of Umuhu - Mbutu road 200,000,000 30,000,000

121 Roads/ BridgesInyishi-

AmamaoIkeduru

Construction of Inyishi-Amamao

road, Oru Afor 250,000,000 50,000,000

122 Roads/Bridges Ohaji Ohaji/EgbemaConstruction of Umuokanne Ilile -

Umuapu Road ( Phase 1) 3km 450,000,000 - - 50,000,000

123 Roads/Bridges Obosima Ohaji/EgbemaConstruction of Umuago - Obosima

FECOLAT Road (1.5km) 200,000,000 - - 30,000,000

124 Roads/Bridges Umuojukwu Owerri West

Construction of Sir Ajunwa Daniel

Avenue Umunwayi, Umojukwu Layout,

Owerri West LGA, Imo State

200,000,000 - - 30,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 11 of 42

Page 276: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

125 Roads/BridgesImo

PolythecnicUmuagwo

Rehabilitation of Imo State

Polythecnic Internal Road (6km) 480,000,000 - 72,000,000 40,500,000

126 Roads/Bridges Ngwoma Owerri North

Costruction of Ngwoma Obube

through seat of Wisdom Seminary

Road Ulakwo Obube

250,000,000 37,500,000

127 Roads/Bridges Umuhu Oru EastConstruction of Umuru-Omuma Afor

Akatta Road (2km) 255,000,000 - 38,250,000 38,250,000

128 Roads/Bridges Market Road OrsuResurfacing with Drainage of 1km

Ogum St. Mary's Catholic Church 100,000,000 - 37,500,000 37,500,000

129 Roads/Bridges Akata Road OrluConstruction of Akata Road, Sabbath

Nkwo Umutane Obor Akata Road 222,808,740 76,403,687 37,500,000 37,500,000

130 Roads/Bridges Umuguma Owerri West

Construction of Road 6 Extension

Area XA Imo Housing Estate

Umuguma, New Owerri (1.2km)

150,000,000 - - 22,500,000

131 Roads/Bridges Umuabor IsuConstruction of Umuabor - Nkuahu

Road 249,000,000 158,466,696 37,350,000 37,350,000

132 Roads/Bridges Isiala Mbano Isiala MbanoConstruction of Ekezeala-Abeke road-

2km 248,000,000 - 37,200,000 37,200,000

133 Roads/ BridgesEhime

Mbano

Internal road entwork for Ehime

Mbano Phase II (Lots 1-4) 330,000,000 49,500,000

134 Roads/Bridges Irette Owerri WestConstruction of BOC -Ifeobu/Nkem

Dem road, Umuelele 245,000,000 36,750,000 36,750,000

135 Roads/Bridges Uzobi Ideato NorthConstruction of Uzobi-Obodoukwu-

Ihitteowerri. 245,000,000 20,840,596 36,750,000 36,750,000

136 Roads/Bridges

Ihiagwa

(Umuokwo) -

Eziobodo

Owerri WestConstruction of Ihiagwa (Umuokwo) -

Eziobodo road 245,000,000 36,750,000 36,750,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 12 of 42

Page 277: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

137 Roads/Bridges

Umuakuchuk

wu-Uriaba

Umuezeala

Ofor Rd

Nwangele

Construction of Umuakuchukwu-

Uriaba Umuezeala Ofor Rd and

Drains

240,000,000 - 36,000,000 36,000,000

138 Roads/Bridges Oriaku Ehime MbanoConstruction of Oriagu Nsu Market-

Umunomo Ibeakor Nzerem 2km Road 240,000,000 - 36,000,000 36,000,000

139 Roads/Bridges Umunohu Ehime

Construction of Umudim (Umunohu) -

Umuoparakuru (Umuakagwu -

Orieagu) Road (3km)

240,000,000 - 36,000,000 36,000,000

140 Roads/Bridges AmanatoIDEATO

SOUTH

Construction of St. Joseph Road-

Ogboza Market square 248,324,000 - 35,250,000 35,255,000

141 Roads/ BridgesUzii-Umuaju-

Eke Eziama

Construction of Afore Uzii-Umuaju-

Eke Eziama Road 200,000,000 30,000,000

142 Roads/Bridges Izombe Oguta IIConstruction of Izombe-Agwa Road

in Oguta 235,000,000 60,850,930 35,250,000 35,250,000

143 Roads/BridgesUkwuegbu-

Ishie OwerriNkwerre

Construction of 1 km Ukwuegbu-Ishie

Owerri-Umuwala road 140,000,000 32,290,291 35,000,000 35,000,000

144 Roads/Bridges Amaji MbanoConstruction of road at Amaji-

Umugolo-Umudougwo 248,000,000 - 37,200,000 35,000,000

145 Roads/Bridges Orie Akabo Mbaitoli

Construction of Road from Orie

Akabo in Ikeduru Amankuta Mbieri -

Nwaorieubi

220,000,000 79,085,399 33,000,000 33,000,000

146 Roads/BridgesIzombe

MgbeleOguta

Construction of Amawell-Awa-

Ogbafor-Mgbele Road204,339,590 30,650,939 30,650,939 30,650,939

147 Roads/Bridges Abacheke Ohaji/EgbemaConst of Abacheke Ring

Road/Drainage Project 200,595,387 96,005,732 30,089,308 30,089,308

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 13 of 42

Page 278: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

148 Roads/Bridges Owerri Owerri

Construction of Alvan Ikoku Federal

University of EducationOwerri

Internal Roads (3KM)

200,000,000 - 30,000,000 30,000,000

149 Roads/Bridges Obinze Ohaji/EgbemaConstruction of Obinze -Umuokanne

road 200,000,000 30,000,000 30,000,000

150 Roads/BridgesUmuoso-

UmuagwuOhaji/Egbema

Constrution of 2km Umuoso Umuagwu

road 200,000,000 - 30,000,000 30,000,000

151 Roads/Bridges Enyeogugu Aboh MbaiseConstruction of Enyeogugu-Ulakwo

Road (Phase II) 200,000,000 44,790,569 30,000,000 30,000,000

152 Roads/Bridges Orsu Obodo OgutaConstruction of Orsu Obodo Internal

Road (2.5KM). 215,000,000 - - 30,000,000

153 Roads/BridgesUmudim-Oka

Ugiri RoadIkeduru

Construction of Umudim-Oka Ugiri

Road 200,000,000 - 30,000,000 30,000,000

154 Roads/Bridges

Imo Housing

Estate

Umuguma

Owerri West

Construction of Prof Ahamefule Ave

off Pocket Layout , Road 2 and

Drains, Imo Housing Estate Umuguma

(1km)

120,000,000 - - 18,000,000

155 Roads/ Bridges Ntu Ngor-Okpala

Construction of Uzo Egbelu Uvuru-

Umuodagu Ntu Eziama road to convey

agricultural produce from the farms

200,000,000 30,000,000

156 Road/ BridgesAbaezi -

AbachekeOhaji/Egbema

Construction of Abaezi - Abacheke

Link Road (2km) 300,000,000 - - 30,000,000

157 Roads/ BridgesNkwo Imo

MarketIkeduru

Construction of St. John- Nkwo Imo

Market Obodo Amaimo with one side

drain (2Km)

250,000,000 50,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 14 of 42

Page 279: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

158 Roads/ Bridges AhiaraConstruction of 3 km road

Aku/Umuduru/Obodo road Ahiara 250,000,000 37,500,000

159 Roads/BridgesWorks

Layout

Owerri

Municipal

Construction of Odunnna Cresent

Works Layout, Oweii 213,498,840 - - 30,000,000

160 Roads/Bridges Opuoma Ohaji/EgbemaConstruction of Ndiowerre - Ohum

Road, Opuoma 222,808,740 - - 30,000,000

161 Roads/BridgesIzombe/Abo

shioguta Constr. of Izombe college Road 195,495,773 29,324,366 29,324,366 29,324,366

162 Roads/ Bridges

Amaukwu

Orodo/

Ogwa

MbaitoliConstruction of Amaukwu Orodo to

Ogwa road (2Km) 250,000,000 37,500,000

163 Roads/Bridges Obokofia Ohaji/EgbemaConstruction of Obokofia internal

roads and drains phase I195,000,050 - 29,250,008 29,250,008

164 Roads/BridgesUgwumabiri

OrielaObowo

Constr.of 1.5km Ugwumabiri Oriela-

Afougiri Road 190,129,723 163,094,047 27,035,677 27,035,677

165 Roads/BridgesAssumpta

Avenue

Owerri

Municipal

Construction of Assumpta Avenue

Road. 180,000,000 - 27,000,000 27,000,000

166 Roads/BridgesOmadi

EgbuomaOguta Omadi Ebuoma-Ohakpu Road (2.5KM). 180,000,000 - 27,000,000 27,000,000

167 Roads/Bridges Umudike ll Ohaji/EgbemaConstruction of Umudike ll Internal

roads126,213,400 18,932,010 25,242,680 24,765,163

168 Roads/Bridges Ekwuruabor Oguta Construction Ekwuruabor Rd 150,000,000 - 35,000,000 22,500,000

169 Roads/Bridges Umuama OgutaConstruction of Umuama-NDDC

Infotek road with Spur. 150,000,000 - 35,000,000 22,500,000

170 Roads/ Bridges Ibeku Aboh MbaiseConstruction of Ibeku-Amaohuru

road 100,000,000 15,000,000

171 Roads/Bridges ChokonezeEzinihitte/Ab

oh Mbaise

Construction of Chokoneze-Mbutu

Road (Phase I) 195,000,000 29,318,289 35,000,000 10,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 15 of 42

Page 280: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

172 Roads/BridgesEziala

EnyioguguAboh Mbaise

Construction of Austin Cosmos Road

(1KM). 100,000,000 - 15,000,000 25,000,000

173 Roads/Bridges Umunomu Ehime MbanoConstruction of Umuokiri Akmocha

Umuchoke Umunumuo Road 180,000,000 - - 25,000,000

174 Roads/Bridges Ezeoke-Nsu Ehime Mbano

Construction of St Paul’s

Cathedral/Bishop’s Court Road with

Drains (1KM).

100,000,000 - - 15,000,000

175 Roads/Bridges Ukwugba Ohaji/Egbema

Construction of Ukwugba Road Phase

1 ( Emergency Repair /Reconstruction

from Mgbede Junction Road, Shell

Location Ukwugba, Imo State

203,500,050 - - 25,000,000

176 Roads/ Bridges

Umueze-

Umuekpene/

Umuakam-

Owutu

Construction of Umueze-

Umuekpene/Umuakam-Owutu road

(Ogwumabiri Market)

200,000,000 30,000,000

177 Roads/BridgesEzioha

AmaifekeOrlu

Construction of Internal Roads of St

Joseph Catholic Church Linking to

Idiga Okoroji Street and Ama John

and Catholic Church Through Ama

Felix to Ama-louis Street (1.5KM)

with Drains.

165,000,000 - 24,750,000 24,750,000

178 Roads/Bridges Nduche OkigweConst. of Nduche - Okigwe/Owerri

express link road248,467,234 37,270,085 20,000,000 20,000,000

179 Roads/BridgesUkwube/

UmuyimNkwerre

Construction of Ukwube/Umuyim

Road (3 km)240,000,000 70,105,813 20,000,000 20,000,000

180 Roads/Bridges

Eziala-

Obokwu-

Orie-Uvuru

Aboh MbaiseConstruction of 4km road from Eziala-

Obokwu-Orie Uvuru 250,000,000 - 20,000,000 20,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 16 of 42

Page 281: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

181 Roads/Bridges Umuduru MbaitoluConstruction of Umuduru-Ijimadu

road 153,000,000 121,914,248 - 20,000,000

182 Roads/BridgesUmuznwere

Umuagwu

Ohaji/

Egbema

Construction of Umuznwere Umuagwu

Road. 184,522,612 - - 20,000,000

183 Roads/BridgesEkugba -

MgbaraOhaji/Egbema

Design of Ekugba - Mgbara - Umuorji

- Offoralla Linkage and Internal

Roads and Bridges/Drains Linking

from Mgbara to Obiakpu

75,000,000 - - 11,250,000

184 Roads/BridgesAmaudechuk

wuOrsu

Construction of Amaudechukwu-

Amachikere Amaegbu Road in Orsu. 235,000,000 48,229,135 35,250,000 15,250,000

185 Roads/Bridges

Eke Atta-

Ngugo-

Uzoagba

IkeduruRehabilitation of Eke Atta-Ngugo-

Uzoagba-Ebikoro-Emekuku Road 250,000,000 - 37,500,000 15,000,000

186 Roads/BridgesNkuebe/Nkw

ube

Construction of Internal Road from

Nkwuebe-Nkwube234,738,000 - 30,000,000 15,000,000

187 Roads/Bridges Nguru Ngor OkpalaConstruction of Umuaga-Umukabia

road-2km, Phase 1248,000,000 - 37,200,000 15,000,000

188 Roads/BridgesIhitte

UbomaIhitte Uboma

Construction of Ukwuachi Nnachievu-

Nkwo-Ihitte-Amakekeocha 2km Road248,000,000 - 37,200,000 15,000,000

189 Roads/Bridges Umutanze Orlu Construction of Umutanze Ring Road 240,000,000 - 36,000,000 15,000,000

190 Roads/Bridges Umuchioke NwangeleConstruction of Umuchioke -

Umutakwu road 247,000,000 - 37,050,000 15,000,000

191 Roads/BridgesObitti-

Umuoke

Ohaji/Egbema

/Oguta

Construction of Obitti-Umuoke road

Ohaji/Egbema/Oguta in LGA 235,468,900 - 35,320,335 15,000,000

192 Roads/Bridges Okpala Ngor OkpalaConstruction of Okpla-Obokwe-Alulu

Road Phase I 250,000,000 146,915,586 54,400,000 15,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 17 of 42

Page 282: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

193 Roads/BridgesAmadia

NwokesimaObowo

Construction of Ama Alia -

Umuekwele - Umuosochie -

Nwokeisima (Umulogho) Road

249,500,000 37,425,000 37,425,000 15,000,000

194 Roads/BridgesObosa-

OhubaOhaji/Egbema Construction of Obosa-Ohuba 239,002,335 35,850,350 20,000,000 15,000,000

195 Roads/BridgesNkwoala-

Akpim-OgbeAhiazu

Construction of Nkwoala - Amauka -

Umuasiegbu - Umumbagu Ekeala -

Akpim - UmuokeAWA - Ogbe

249,500,000 37,425,000 37,425,000 15,000,000

196 Roads/BridgesUmuariam/

Achara/Obowo

Construction of Umuariam - Achara -

Avutu Road 249,500,000 37,425,000 37,425,000 15,000,000

197 Roads/ Bridges

Okorobi-

Afor Ububu

Umuju

Umuezedike

Construction of Okorobi-Afor Ububu

Umuju Umuezedike road 1.5km 150,000,000 22,500,000

198 Roads/Bridges Nkwo-Ezize Orlu

Construction of Nkwo-Ezize-Orie

Okporo - Ezeugo - Owerri Road (Orlu

LGA)

195,455,260 119,473,628 30,000,000 15,000,000

199 Roads/Bridges Umulogho ObowuConstruction of Umulogho rural road

Obowu LGA, Imo State. 200,000,000 30,000,000 15,000,000

200 Roads/Bridges Afor Ogbe Abor Mbaise

Construction of Afor Ogbe –

Ezeagbogu – Nkwo Mbaise Junction in

Abor Mbaise LGA.

200,000,000 30,000,000 15,000,000

201 Roads/BridgesUmudurueke

NciawaOguta

Construction of Umudurueke Ndiawa

– Ndionwanibe road Izombe Oguta

LGA.

220,000,000 - 33,000,000 15,000,000

202 Roads/BridgesUbahu

AmaigboNwangele

Construction of Theo and theo road

Ubahu Amaigbo Nwangele LGA Imo

State.

180,000,000 27,000,000 15,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 18 of 42

Page 283: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

203 Roads/Bridges Eke Oha Mbaitolu

Ikeduru

Construction of Eke Oha Ogwa Orodo

road and erosion control with drains

(2km) in Mbaitoli LGA

200,000,000 30,000,000 15,000,000

204 Roads/Bridges

Ndioko

Amakpu

Amaudo

OgutaConstruction of Ndioko Amakpu

Amaudo Link Road (3KM) Oguta 220,000,000 33,000,000 15,000,000

205 Roads/BridgesUmuokpoko

UzoaforIsu

Construction of Umuokpoko-Uzoafor

Road (1.2KM) 200,000,000 30,000,000 15,000,000

206 Roads/Bridges Obeabor OgutaConstruction of FMC Umuakpa -

Ubogugu Link road (2KM) Izombe 200,000,000 30,000,000 15,000,000

207 Roads/Bridges OgbokoIDEATO

SOUTH

Construction of Rochas Okorocha

Road /Drain 150,000,000 22,500,000 22,500,000 15,000,000

208 Roads/Bridges School road Owerri

Construction of school road off

works layout, now relocated to Naze

Idustrial Cluster

175,325,128 26,298,769 26,298,769 15,000,000

209 Roads/Bridges Obua Jukwu OgutaConstruction of Obua Jukwu Road

Oguta,. 222,808,740 40,583,029 33,421,311 15,000,000

210 Roads/Bridges Umuokwu OgutaConstruction of Umuokwu - Umuorji

link road, Aborshi 226,111,500 33,916,725 33,916,725 15,000,000

211 Roads/BridgesOfepe

UmuezeOkigwe Construction of Ope-Umueze-Umuike 170,081,100 109,082,803 25,512,165 15,000,000

212 Roads/Bridges

Akabo-

Mbieri-

Nwaorieubi

Road

Mbaitolu

Ikeduru

Construction of Orie Akabo-Mbieri-

Nwaorieubi Road in Mbaitolu Phase 2 500,000,000 79,085,399 50,000,000 15,000,000

213 Roads/Bridges Ngor Okpala Ngor OkpalaConstruction of Umuowa-Nguru Road

2km Road 190,000,000 64,611,637 20,000,000 15,000,000

214 Roads/BridgesOkwu Akpulu-

UmuisimIdeato North

Construction of Okwu Akpulu-

Umuisim Road 248,000,000 114,219,866 37,200,000 15,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 19 of 42

Page 284: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

215 Roads/Bridges Mgbele OgutaConstruction of Mgbele Izombe Road

(Phase I) 270,000,000 - 40,500,000 15,000,000

216 Roads/ Bridges Nkwo Idmili Orsu

Construction of 4.7km Ama Mbamala-

Edenta-Awo Police station L.G Hqtrs

road – Nkwo Idmili, Phase I

250,000,000 37,500,000

217 Roads/BridgesUmuokazi-

AmuziAhiazu Mbaise

Construction of Umuokazi-Amuzi Link

Road. 180,000,000 - 27,000,000 15,000,000

218 Roads/Bridges

Umuoma-

Afara-

Odumara

MbaitoliConstruction of Umuoma-Afara-

Odumara Road. 180,000,000 - 27,000,000 15,000,000

219 Roads/Bridges Amakohia Owerri NorthConstruction of Nze Ezeugo/Uga

Street Amakohia Owerri. 300,000,000 - 45,000,000 15,000,000

220 Roads/Bridges Omuma Oru EastConstruction of Umuma Mission Road

(2KM). 180,000,000 - 27,000,000 15,000,000

221 Roads/Bridges

Umuokwuaba

Owerre-

Ebeiri

OrluConstruction of Umuokwuaba Owerre-

Ebeiri Road. 180,000,000 - 27,000,000 15,000,000

222 Roads/BridgesAmuacha-

UmuorieOrlu

Construction of Eke Eziachi-Amuacha-

Umuorie Road (2KM). 180,000,000 - 27,000,000 15,000,000

223 Roads/BridgesOmera/Umu

kaOkigwe

Construction of 1km Okpara Road

Junction to Omera/Umuka Road 100,000,000 15,000,000 15,000,000

224 Roads/Bridges Ejemekwuru Oguta Umuagwu-Umuebee Ejemekwuru Road 80,000,000 64,652,465 - 15,000,000

225 Roads/Bridges Izombe OgutaConstruction of Umuama-NDDC

Infotek road with in Izombe 163,424,788 - - 15,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 20 of 42

Page 285: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

226 Roads/Bridges ObowuConstruction of 2KM Road from

Umuagu Obowu to Ehume 220,000,000 33,000,000

227 Roads/Bridges Umuaro 2Isiala Mbiano

LGA

Construction of 2Km Umuaro 2, Isiala

Mbano Road with Drains, Isiala

Mbiano LGA

240,000,000 36,000,000

228 Roads/ Bridges Nkwo Idmili Orsu

Construction of 4.7km Ama Mbamala-

Edenta-Awo Police station L.G Hqtrs

road – Nkwo Idmili, Phase II

250,000,000 37,500,000

229 Roads/Bridges

Eucharistic

Congress

Avenue

Owerri

Municipal

Construction of Eucharistic Congress

Avenue Road (1KM). 90,000,000 - 13,500,000 13,500,000

230 Roads/Bridges Ugirinna-Oka Isiala MbanoConstruction of Ugirinna Oka-Isiala

Mbano Road. (2kM) with Drains 215,000,000 38,787,813 32,250,000 12,250,000

231 Roads/Bridges Umuduru Orlu Construction of Anunihu Road 240,000,000 12,098,450 36,000,000 12,000,000

232 Roads/Bridges Amafa Ngor Okpala Construction of Amafor Umikoro 184,619,275 - 27,692,891 12,000,000

233 Roads/BridgesAba

JunctionNwangele

\construction of CKC Aba Junction to

St. Pails Isu Juction and Drains,

Nwangele LGA

240,000,000 - 36,000,000 10,000,000

234 Roads/Bridges Afor Uzi Ahiazu

Construction of Afor Uzi Market

square Umuohuo Mpam-Umuzu Eziama-

Ekeziama market square

120,000,000 - 18,000,000 10,000,000

235 Roads/Bridges Ndiuku IdeatoConatruction of Ndiuku - NIPROC

road, Arondizuogu, 245,000,000 - 36,750,000 10,000,000

236 Roads/Bridges Egbulu IkeduruConstruction of Egbulu Amaimo

internal link road 240,000,000 - 36,000,000 10,000,000

237 Roads/Bridges Umuokuzu Ohaji/EgbemaConstruction of Umuokuzu Village

road in Umuokanne Ohaji/Egbema 240,000,000 - 36,000,000 10,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 21 of 42

Page 286: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

238 Roads/ Bridges Orsu Orsu

Construction of 6.2km Orsumoghu-

Ihiteukwa-Ubahaezedeke-Isieke-

Afor Awo Amadim-Ubuku, Phase I

250,000,000 37,500,000

239 Roads/Bridges Ahia Obowo

Construction of Ahia Nwevule-Ama

Joseph- Uhunaokwu-Akim Junction

road(3km)

240,000,000 - 36,000,000 10,000,000

240 Roads/Bridges OrluConstruction of Ihiteowerri Umuagu

Junction Road to Amanato-Utali Road 200,000,000 30,000,000

241 Roads/BridgesOduzu-

OgbotoekeIhitte Uboma

Construction of Oduzu-Ogbotoeke-

Nkwoihitte- Umuoyo road with 5

culvets at Amakohia.

400,000,000 - 60,000,000 10,000,000

242 Roads/Bridges Ihiagwa Owerri WestConstruction of road at Nkaramache

road, Ihiagwa 245,000,000 36,750,000 36,750,000

243 Roads/Bridges Ogbuide OgutaResurfacing and Const of Ogbuide

Road/Drainage 195,000,050 - 29,250,008 10,000,000

244 Roads/Bridges Mbutu Aboh MbaiseConstruction of Chokoneze-Mbutu

Road Logara (Phase III) 150,000,000 - 22,500,000 10,000,000

245 Road/ Bridges Okpala Ngor OkpalaConstruction of Okpla-Obokwe-Alulu

Road Phase 2 250,000,000 - 40,000,000 10,000,000

246 Roads/Bridges ObeakpuOhaji /

Egbema

Construction of Obeakpu-

Odekpurunwa Link Road (Phases I &

II)

265,000,000 44,513,822 13,250,000 10,000,000

247 Roads/ BridgesUgidike-

AforIkeduru

Construction of Ugidike-Afor-Ogbe

raod (Bridge) 250,000,000 50,000,000

248 Roads/Bridges Umuopara Isiala MbanoConstruction of Umuopara - Ugiri link

road Road 185,642,000 86,180,532 27,846,300 10,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 22 of 42

Page 287: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

249 Roads/Bridges MbaiseMbaise/Obow

o

Construction of Mbara Uhuala-

Udo/Dikenta Obowo road Uhuola-Udo

Mbaise/Obowo

250,000,000 - 37,500,000 10,000,000

250 Roads/BridgesUmmuokwara

dimisu

Construction of Nworie - Mkp to

Mission road with a Sub face to

Community Hall Umokwaradim-

Nnerim - Ndugba

220,000,000 33,000,000 10,000,000

251 Roads/ Bridges

Eluama/

Ndiowerre/

Ama Ezie

Orlu

Construction of roads with drainage

Eluama/Ndiowerre/Ama Ezie road,

and Practicing school 2 road.

150,000,000 22,500,000

252 Roads/Bridges Ihite Akatta Orlu Construction of Ichi Amaka road 200,000,000 10,331,250 30,000,000 10,000,000

253 Roads/BridgesObiti/Umudo

/ OgburuOhali/Egbema

Construction of Obiti - Umudo -

Ogburu link road200,000,000 46,694,348 30,710,658 10,000,000

254 Roads/Bridges Eziorsu OgutaConstruction of Ezi Orsu Internal

Roads/Drains/flood control (design)20,000,000 - 10,000,000 10,000,000

255 Roads/Bridges Mmahu Ohaji/EgbemaConstruction of 2KM Internal

Road/Drainage at Mmahu 248,000,000 37,200,000

256 Roads/Bridges

Amafor-

Umuikoro

Opehi Etche

Road

Owerri West Amafor- Umuikoro Opehi Etche Road 185,619,275 27,842,891 27,842,891 10,000,000

257 Roads/Bridges Oguta OgutaConstruction of Agba I.B. Eneke

road 103,257,000 28,916,088 15,488,550 10,000,000

258 Roads/Bridges

Umuhu

Okabia-

Ihitenansa

OrsuConstruction of 1km Umuhu Okabia-

Ihintenasa road 100,000,000 12,367,219 15,000,000 10,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 23 of 42

Page 288: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

259 Roads/BridgesOnitsha/Bish

op NwaedoOguta

Construction of Onitsha/Bishop

Nwaedo Road 79,273,700 10,746,000 15,000,000 10,000,000

260 Roads/Bridges Orie Alike ObowoConstr. Of Orie Alike- Ummuekwele,

Umuosochi 247,000,000 70,536,974 37,050,000 10,000,000

261 Roads/Bridges Okwelle OnuimoConstruction of Okwelle-Umucheke

Eziama Road Phase II 100,000,000 43,092,950 15,000,000 10,000,000

262 Roads/BridgesEgwe

CommunityOguta

Construction of 2 km Ibiam road with

drains248,000,000 - 37,200,000 10,000,000

263 Road/ Bridges Emuonyezum OrluConstruction of Emuonyezum Road

Oleme, Amaifeke98,606,000 - 19,721,200 10,000,000

264 Road/ BridgesAgbor Ikor

Umuezhi

Construction of Agbor Ikor Umuezhi

Road99,702,000 - 19,940,400 10,000,000

265 Roads/Bridges Amawillie Nwangele

Construction of 2km road at Amukwe-

Dimau Amato-Amawillie road in

Ogwuaga

245,000,000 - 36,750,000 10,000,000

266 Roads/BridgesAgbo

OjirinmabeOguta

Construction of 2km Agbo

Ojirinmabe road 240,000,000 36,000,000 10,000,000

267 Roads/ Bridges Ohiara River Orsu

Construction of road from Hon.

Justice Orji road to St. Mary's

Church with one bridge over the

Ohiara River

300,000,000 45,000,000

268 Roads/Bridges

Afor Ugba -

Umuekwunne

- Orishieze

Ngor OkpalaConstruction of 2km Afor Ugba -

Umuekwunne - Orishieze road 245,000,000 36,750,000 10,000,000

269 Roads/Bridges

Imo Airport -

Amaigbo

Nguru

Ngor OkpalaConstruction of Imo Airport -

Amaigbo Nguru road 245,000,000 36,750,000 10,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 24 of 42

Page 289: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

270 Road/ Bridges OwerriOwerri

Municipal

Construction of 1km Nkwerre street -

Hon. Samdaddy Anyanwu street with

one side drain, Owerri

200,000,000 30,000,000 10,000,000

271 Roads/ BridgesObollo-

UmuchimMbano

Construction of 7.5Km Obollo-

Umuchim Ogogwe road with 2 small

Bridges at Isiala Nbamo and Ehime

Mbano LGAs. (Lot 1-12)

2,000,000,000 320,000,000

272 Road/Bridges Umuokwu OgutaConstruction of Umuokwu new layout

Roads (2.8KM). 270,000,000 - 40,000,000 10,000,000

273 Road/Bridges Osina Ideato North Osina Internal Road (Phase II) 1.2kM 120,000,000 78,618,319 - 10,000,000

274 Road/Bridges AkpodimEzinihite

Mbaise

Construction of Akpodim Owutu - Ife

road (spur) - concrete road 60,000,000 9,000,000 9,000,000 9,000,000

275 Road/Bridges Amorka OrsuConstruction of Amorka-Ibiasoegbe,

Bulu Orsu Road 190,000,000 28,500,000 28,500,000 8,500,000

276 Roads/Bridges Mmahu Ohaji/EgbemaConstr. Of Umuaforkita - Ogbe -

Nwakpantakpa rod 205,000,000 8,327,581 10,250,000 8,000,000

277 Roads / Bridges Eke-Avutu ObowoConstruction of Eke Avutu Market-

Alupa road with drainage 200,000,000 - 30,000,000 7,500,000

278 Roads / Bridges Iheagwa Owerri WestConstruction of Ihegwa road in Dindi

autonomous Community, Owerri 200,000,000 - 30,000,000 7,500,000

279 Roads / Bridges Amainyara/U

muezealaOru East

Construction of

Amainyara/Umuezeala Road240,000,000 - 36,000,000 5,000,000

280 Roads / Bridges Osina Ideato North Internal roads Phase 1 245,768,000 36,865,200 50,000,000 5,000,000

281 Road/ BridgesEke-Na-

Ututu EkeEzenihitte

Construction of 1km Eke-Na-Ututu

Eke-Ezeagbogu180,000,000 - 27,000,000 5,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 25 of 42

Page 290: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

282 Road/ Bridges Umuwaoma Ahiazu MbaiseConstruction of Umuwaoma-Bishop's

gate Nnarambia Ahiara 800mtrs road100,000,000 - 15,000,000 5,000,000

283 Road/ Bridges Ihioma OrluConstruction of Levis Filling station

to John Woseu Road 245,000,000 - 36,750,000 5,000,000

284 Road/ Bridges Izombe-Awa OgutaConstruction of Izombe (Ogbafor)

Awa Road.(4.5kms) with Drains 450,000,000 175,516,486 67,500,000 5,000,000

285 Road/ Bridges Omuma NjabaConstruction of Omumma- Nkume

Road 230,000,000 67,562,856 34,500,000 4,500,000

286 Road/ Bridges Okrika-Ama Ahiazu Const of Uzo Umu Asiegbu - Okulo

road (5km) 500,000,000 - 50,000,000 -

287 Road/ Bridges Ezinachi Okigwe internal roads 247,467,234 37,120,085 12,373,362 -

288 Road/ BridgesUmuofor

EgbuOwerri North

Construction of Christiana Hospital

road to Paschal Dozie Country Home 200,000,000 30,000,000 -

289 Road/ BridgesUmuofor

EgbuOwerri North

Construction of Uzo Otamiri river

road 200,000,000 30,000,000 -

290 Road/ BridgesOguta/Egbuo

ma-Uli oguta

Constr. Of Oguta/Egbuoma to

Osemoto /Uli Road/Bridge (6.5km)

(design)

20,000,000 - 12,000,000 -

291 Road/ BridgesUkwu/Umuez

egwoEhime Mbano

Construction of 1km Ukwu Ugiri

Umunakanu Umuo Para Umuezegwo 100,000,000 - 30,000,000 -

292 Road/ Bridges Uhu-Orji Owerri North Construction of 1km Road in Uhu-Orji 100,000,000 - 15,000,000 -

293 Road/ BridgesNkwo-Egbu-

UmuezealaOguta

Construction of 2km Nkwo-Egbu-

Umuezeala Road with Drianage in

Egbuoma Community

250,000,000 - 37,500,000 -

294 Road/ BridgesOmera/Umu

kaOkigwe

Construction of 1km Opara Road

Junction to Omera/Umuka 100,000,000 - 37,500,000 -

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 26 of 42

Page 291: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

295 Road/ BridgesOrieikpa

UmuezeAhiazu

Construction of 1km Orieikpa Umueze-

Lati Road 100,000,000 - 35,000,000 -

296 Road/ BridgesOrieikpa

UmuezeAhiazu

Construction of 1km Orieikpa Umueze-

Lati Road Phase 2 (350) 100,000,000 - 35,000,000 -

297 Road/ BridgesUmucia-

EzeaniOrlu

Construction of Umucia-Umudioka-

Ezeani 1km RD 245,000,000 - 35,000,000 -

298 Road/ Bridges

Sir John

Nwosu's

House

Orlu

Construction of 1 km Rd at Levis Gas

station- Sir John Nwosu's House-Old

Ihioma Hall.

100,000,000 - 35,000,000 -

299 Road/ Bridges ChokonezeEzenihitte/Ab

oh Mbaise

Construction of Chokoneze-Lorji-

Amuzu-Nriukwu Road 2km (Phase II) 100,000,000 - 20,000,000 10,000,000

300 Road/ Bridges Mbutu-Uvuru Aboh Mbaise

Rehabilitation/upgrading works of

dilapidated Enyiogugu-Mbutu-Uvuru

road

480,000,000 - 20,000,000 10,000,000

301 Road/ Bridges Umuadara ObowoConstruction of 2km Umuadra

Internal Road 239,442,038 - - -

302 Road/ BridgesNjaba

UmezelaOru

Construction of Njaba Umuezeala

Ubogwu Umuokwe junction at Awo-

Omama

430,000,000 - 30,000,000 -

303 Road/ Bridges Umuneke NjabaConstruction of Umuneke - Amuri

Road 245,000,000 - 36,750,000 -

304 Road/ Bridges Amiyi NjabaConstruction of Amiyi Mission Road,

Amiyi 240,000,000 - 36,000,000 -

305 Road/ BridgesMission/Agu

nze RoadOwerri Construction of Mission/Agunze road 157,426,500 - 23,613,975 -

306 Road/ Bridges Umunakara NwangeleConstruction of Umunakara Road, Isu

Nwangele 240,000,000 - 36,000,000 -

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 27 of 42

Page 292: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

307 Road/ Bridges Afor Amazu OrsuConstruction of Afor Amazu

Amaegbu Road 234,000,000 - 35,100,000 -

308 Road/ Bridges Nkwo Eleh Oru EastConstruction of Nkwo Eleh -Ekeabia

Omuma Road 248,000,000 - 37,200,000 -

309 Road/ Bridges Umuduru OnuimoConstruction of Umuduru-Egbeaguru

Road 234,708,650 36,556,298 33,206,298 -

310 Road/ Bridges Mgbidi Oru West

Construction of Umudinma-Umuopara

Road by Primary School Eziali Mbidi

(1km)

200,000,000 - 30,000,000 -

311 Roads/Bridges Ahia

Construction of hi Nwevwwe-Amajor-

Akpin Junction-Girl College Road

(2KM)

200,000,000 - 30,000,000 -

312 Road/ Bridges Otulu Oru WestConstruction of Otulu-Amiri-Atta

Road 190,000,000 28,500,000 28,500,000 -

313 Road/ Bridges Amaigbo IsuConstruction of Amaigbo-Amandugba

Road 230,000,000 - 34,500,000 -

314 Road/ Bridges Awo Oru EastConstruction of Awo-Ommama-Amiri

Omuma Road 230,000,000 - 34,500,000 -

315 Road/ Bridges Ogbafor OgutaConstruction of Ogbafor Mgbala

Agwa Road, Oguta (2km) 257,000,000 - 38,550,000 -

316 Road/ Bridges Aghoyibo Ohaji/EgbemaConstruction of Aghoyibo Estate-Ipo

Ezhi Ose Road 250,000,000 - 37,500,000 -

317 Road/ Bridges Umuofor Owerri North

Construction of Umuofor,

Umuaguegbe-Umunku Internal Road

and Drainages (2km)

200,000,000 - 30,000,000 -

318 Road/ Bridges Umumeje Owerri WestConstruction of 2km Road at

Umumeje Obinze, Owerri West 240,000,000 - 36,000,000 -

319 Road/ BridgesOwerri

NorthImo East

Construction of Egbu-Emii-Airport

Road, Owerri North, Imo State 200,000,000 - 30,000,000 -

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 28 of 42

Page 293: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

320 Road/ Bridges OparanadinAhiazu/Imo

East

Construction of Oparanadim-

Umumbiri-Nkwoa Road 177,000,000 - 26,550,000 -

321 Road/ Bridges Nwaeku Orlu Construction of Nwaeku Road 170,000,000 - 25,500,000 -

322 Road/ Bridges Ugirinna-Oka Isiala MbanoConstruction of Ugirinna Oka Isiala

Road 235,000,000 - 35,250,000 -

323 Road/ Bridges Umuokpara OkigweConstruction of 1.5km road leading

Mathew Omegara road 230,000,000 34,500,000 -

324 Road/ BridgesC.K.C. St

Paul's IsuNwangele

Construction of 2km road at C.K.C. St

Paul's Isu Junction 245,000,000 - 36,750,000 -

325 Road/ Bridges

Umuobu-

Uriaba-

Uteke

NwangeleConstruction of Umuobu-Uriaba-

Uteke road and drains in Abba 245,000,000 - 36,750,000 -

326 Road/ Bridges Umulogho Obowo

Construction of 2km road at

Umualibara-Umuokpa-Okwohia

Umulogho

275,000,000 - - -

327 Road/ BridgesAmakofia

AbiaziemOguta

Construction of Amakofia Abiaziem

Road.(4.5Kms) with Drains 450,000,000 - 67,500,000 -

328 Road/ Bridges Umuorobara Aboh MbaiseConstruction of Umuorobara-Akpotu

Road.(2kms) 180,000,000 - 27,000,000 -

329 Road/ Bridges

Ndionwanibe-

Ndiawa-

Umuokwu

OgutaConstruction of Ndionwanibe-Ndiawa-

Umuokwu Link Road (2.5KM). 231,413,230 - 34,711,985 -

330 Road/ BridgesEgbu-Emii-

AirportOwerri-West

Construction of Egbu-Emii-Airport

Road (3kms) 250,000,000 - 37,500,000 -

331 Road/ Bridges Agwa OgutaConstruction of Ogbafor-Obakuma-

Oboama Road (2.5KM). 215,000,000 - 32,250,000 -

332 Road/ Bridges Eziorsu Oguta Eziorsu Internal Road (2.5KM). 215,000,000 - 32,250,000 -

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 29 of 42

Page 294: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

333 Road/ Bridges AfiaOhaji/

Egbema

Afia Okishikpa-Onwuruazhi Ogbedeyi

Olumba Olumba- Prem Church Road. 180,000,000 - 27,000,000 -

334 Road/ BridgesUmueze-

Abacheke

Ohaji/

Egbema

Umueze-Abacheke Michael Aligbo

Road. 135,000,000 - 20,250,000 -

335 Road/ Bridges Umuchukwu Isiala Mbano

Umuchukwu-Umuanunu-

Umuezealaegbe Road (Unity Road) in

Umuluwe Ajirija Isiala Mbano.

215,000,000 - 32,250,000 -

336 Road/ BridgesMopol 18,

IreteOwerri-West

Construction of 2KM Road in Mopol

18, Irete, Imo State. 200,000,000 - 30,000,000 -

337 Road/ Bridges

Obudi-

Umuofeke-

Umukpo

OgutaConstruction of Obudi-Ogbafor-

Umuofeke-Umukpo-Church Road. 180,000,000 - 27,000,000 -

338 Road/ Bridges

Imo Police

Command

Headquarter

s, Owerri

Owerri

Municipal

Rehabilitation of 2.5KM Internal

Roads at Imo Police Command

Headquarters, Owerri, Imo State.

200,000,000 - 30,000,000 -

339 Road/ BridgesUmuokwu-

UmuorjiOguta

Construction of Umuokwu-Umuorji

Addax Road. 215,000,000 - 32,250,000 -

340 Road/ Bridges Orsu OgutaConstruction of Orsu Addax Junction

Link Road. 215,000,000 - 32,250,000 -

341 Road/ BridgesUmukabia

AmaigboNwangele

Construction of Chief Athan

Iwuchukwu Road, Umukabia

Amaigbo(2KM)

180,000,000 - 27,000,000 -

342 Road/ BridgesUmuezike

EgbuomaOguta

Umuezike Egbuoma-Ohakpu Road

(2KM). 180,000,000 - 27,000,000 -

343 Road/ Bridges Umudike 1Ohaji/

Egbema

Construction of Umudike Internal

Roads with Drains (2.5KM). 215,000,000 - - -

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 30 of 42

Page 295: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

344 Road/ Bridges AIFCEOwerri

Municipal

Construction of Alvan 2.5KM Internal

Road at Alvan Extension. 215,000,000 - - -

345 Road/ BridgesAfor

UmuezeEhime Mbano

Construction of Internal Roads at

Afor Umueze 248,000,000 - 37,200,000 -

346 Road/ Bridges UmuogbuAbba

Nwangele

Construction of Umuogbu-Amato-

Uriaba-Dimagu Road 246,000,000 - 36,900,000 -

347 Road/ BridgesUmuakuchuk

wuNwangele

Construction of Umuakuchukwu-

Okwaraeke-Isu Road 246,000,000 - 36,900,000 -

348 Road/ Bridges Amaigbo NwangeleConstruction of 2km road Umuduruji-

Umuezealanwoke Road 246,000,000 - 36,900,000 -

349 Road/ Bridges Umuarugwu Ehime MbanoConstruction of Umuarugwu Internal

Roads 248,000,000 - 37,200,000 -

350 Road/ Bridges Agwa OgutaConstruction of 2KM Ogborie Market

Umuofeke to Adapalm Ohaji Road. 231,992,500 - - -

351 Roads/Bridges MmahuOhaji/

Egbema

Construction of Iyi aba Ose Mmahu

Road. 200,000,000 - - -

352 Road/ Bridges

Umuokpara

Ozuh Orie

Amiri

Oru-East Umuokpara Ozuh Orie Amiri Road 200,000,000 - - -

353 Road/ Bridges Omuma Oru-East Omuma Internal Road with Drainage 300,000,000 - - -

354 Road/ Bridges Eleh -Aji Oru-East Construction of Eleh-Aji Road 150,000,000 - - -

355 Road/ Bridges Omuma Oru-East Omuma Atta Nkume Road (Phase II) 240,000,000 - - -

356 Road/ BridgesUmuchoke

AmaigboNwangele

Umuchoke Amaigbo Rehabiliitation

Centre Road 200,000,000 - - -

357 Road/ Bridges Agwa OgutaConstruction of Umuekpu-Umuomi

Road 200,000,000 - - -

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 31 of 42

Page 296: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

358 Road/ Bridges Nwangele NwangeleConstruction of Umuduuodu-Ekiti

Afor Abba road,2km 248,000,000 - 37,200,000 -

359 Road/ BridgesEhime

MbanoEhime Mbano

Construction of Amaji-Umugolo-

Umudogwu road 249,000,000 - 37,350,000 -

360 Road/ Bridges Oru West Oru WestConstruction of Umuorji Girls-Utulu

Rd 240,000,000 - 36,000,000 -

361 Road/ BridgesOwerri

Municipal

Owerri

Municipal

Construction of 1km access road to

Assumpta Owerri 124,000,000 - 18,600,000 -

362 Road/ Bridges Abba NwangeleConstruction of Amaukwe-Umudimagu-

Umuogbu Road 180,000,000 - - -

363 Road/ Bridges Izombe OgutaConstruction of Ndioko Ugbele

Amakpu link road 2km 200,000,000 - - -

364 Road/ Bridges Amaraku Isiala MbanoOkwelle-Umumpele-Agbaja Road with

Drains 120,000,000 - - -

365 Road/ Bridges Egbu Owerri North

Construction of (2km) Eze Egbukole

Palace road - Chimdi Amadi Close

Egbu

245,000,000 - 36,750,000 -

366 Road/ Bridges AmakohiaOwerri

Municipal

Construction of (2.3km) Okey Uzoho

Streeet road Amakohia Layout,

Owerri

245,000,000 - 36,750,000 -

367 Road/ Bridges Mbutu Aboh MbaiseConstruction of Chokoneze-Mbutu

Road Logara (Phase II) 2.3km Road 249,000,000 - 35,000,000

368 Road/ Bridges Orie Uvuru

Abor

Mbaise/Ngor

Okpala

Construction of Orie Uvuru-Egbelu

Uvuru-Ohekelem 150,000,000 - 20,000,000

369 Road/ Bridges Ngor Okpala Ngor OkpalaRahabilitation of Imo Airport-

Nneorie-Aba Road 150,000,000 - 22,500,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 32 of 42

Page 297: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

370 Road/ Bridges Logara Ngor OkpalaConst. of Imo Airport Junction -

Logara Road Phase 1 245,000,000 - 36,750,000

371 Road/ Bridges Egwe OgutaConstruction of Zenith Road Egwe,

Oguta LGA 100,000,000 - -

372 Road/ Bridges

Okonya/Just

ice Asieme,

Oguta

OgutaConstruction of Okonya/Justice

Asieme Road. 225,932,114 - 33,889,817

373 Road/ BridgesIhie-Urashi

MmahuOhaji/Egbema

Construction of Ihie-Urashi Road,

Mmahu Road (2KM). 180,000,000 - 27,000,000

374 Road/ Bridges Oforola Owerri West

Construction of Federal College of

Lands and Agricultural Technology

(FECOLAT) Road (2.5KM).

215,000,000 - 32,250,000

375Total Roads/

Bridges76,335,538,266 6,877,630,498 7,152,221,582 5,500,518,746

376

Governance,

Social Services

& Sports

Various Various Evacuation of Small ticket Projects 622,657,043 95,541,007

377

Governance,

Social Services

& Sports

Orieagu Ehime MbanoConstruction of multi-purpose Civic

Centre at Orieagu Ehime Mbano 174,986,347 - 25,500,000 26,247,952

378

Governance,

Social Services

& Sports

Umudike Ohaji/Egbema

Construction of Multi Purpose Civic

Centre Complete with Fencing, Water

and Furnishing with Recreational

Facilities

180,000,000 - - 27,000,000

379Governance &

Social ServicesAboh Mbaise Ngor Okpala

Renovation of rural markets in Aboh

Mbaise/Ngor Okpala LGA 100,000,000 15,000,000

380

Governance,

Social Services

& Sports

Oguta OGUTAConstr. & Equipping Of Court

Complex at Oguta61,206,448 12,801,612 39,223,869 39,223,869

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 33 of 42

Page 298: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

381

Governance,

Social Services

& Sports

Imo

PolythecnicUmuagwo

Fencing of the Premises of Imo

Polythecnic Umuagwo 250,000,000 - 37,500,000 37,500,000

382Governance &

Social Services

Enterpreneur training for Niger

Delta Youths (Lots 1-9) for each

State

450,000,000 67,500,000

383

Governance,

Social Services

& Sports

Opuoma

(Ikeduru)

Ohaji/Egbema

(Ikeduru)

Construction of Civic Centre (

Relocated to Opuoma Egbema 150,000,000 - 20,000,000 22,500,000

384

Governance,

Social Services

& Sports

Abacheke Ohaji/EgbemaConstruction of multi-purpose Civic

Centre 149,800,450 - 50,000,000 22,470,068

385

Governance,

Social Services

& Sports

Oguta/Izom

be/

EtekwuruII/

Umudike II

Oguta &

Ohaji/Egbema

Constr. Of 3Nos Youth Development

centres in Oguta, Izombe, &

Etekwuru II/Umudike II

185,000,000 27,750,000 27,750,000 27,750,000

386

Governance,

Social Services

& Sports

Umueze 1

(Okwelle)

Ehime Mbano

(Onuimo)

Construction of multi-purpose Civic

Centre at Okwelle Onuimo. Relocated

Umueze 1

170,000,000 - 25,500,000 25,500,000

387Governance &

Social Services

Skills acquisition training for Niger

Delta Youths (Lots 1-9) for each

state

450,000,000 67,500,000

388

Governance,

Social Services

& Sports

PMSS Oguta

Rehabilitation of Two School Blocks

and One Staff Building at PMSS

Oguta

90,000,000 - - 13,500,000

389

Governance,

Social Services

& Sports

Abba NwangeleConstruction of Skill Aquisition

Centre at Aba LGA 100,000,000 - 20,000,000 20,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 34 of 42

Page 299: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

390

Governance,

Social Services

& Sports

Mmahu Ohaji/Egbema

Furnishing and Equiping/Landscaping

of Mmahu Comprehensive Health

Centre.

50,000,000 - - 7,500,000

391

Governance,

Social Services

& Sports

Izombe Oguta Construction of High Court Complex 75,000,000 - - 11,250,000

392

Governance,

Social Services

& Sports

Mbutu Aboh MbaiseNkwo Mbutu Cooperative Market

Development 200,000,000 30,000,000

393

Governance,

Social Services

& Sports

Mmahu Ohaji/EgbemaConstruction of Multi-Purpose Hall/

Civic Centre at Mmahu 156,896,212 66,401,788 23,534,432 15,000,000

394

Governance,

Social Services

& Sports

Nguru Ngor-OkpalaConstruction of farm cottage

industry in Nguru 85,000,000 12,750,000

395

Governance,

Social Services

& Sports

Ehume Town ObowoConstruction of Skill Aquisition

Centre at Ehume Town 100,000,000 26,095,108 35,000,000 15,000,000

396

Governance,

Social Services

& Sports

SS Quarters

Owerri

Owerri

MunicipalRehabilitation of SS Quarters 40,000,000 - - 6,000,000

397

Governance,

Social Services

& Sports

Oguta OgutaConstruction of Multi-Purpose Civic

Centre at Oguta 61,492,167 9,223,825 9,223,825 9,223,825

398

Governance,

Social Services

& Sports

Izombe Oguta

construction and furnishing of High

Court (judiciary building and judiciary

staff quarters)

244,005,000 30,000,000

399

Governance,

Social Services

& Sports

Oguta OgutaConstruction of Marine Police Station

at Oguta 200,000,000 - 15,000,000 -

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 35 of 42

Page 300: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

400

Governance,

Social Services

& Sports

Orlu/Owerri

/Okigwe

Senatorial

Zones

Orlu/Owerri/

Okigwe

Senatorial

Zones

Establishment of a Community

Development Foundation (CDF) in

each of the Senatorial Districts

200,000,000 - 15,000,000 -

401

Governance,

Social Services

& Sports

Ogboto-

UkwuObowo

Construction of modern skill

Acquisition centre at Ogboto-

Ukwu,Amuzi

240,000,000 - 36,000,000 -

402

Governance,

Social Services

& Sports

Owerri

MunicipalImo East

Equipment and furnishing of 2nos

Skill Acquisition centres (Owerri

Municipal and Umuokrika in Imo East

Senetorial District

300,000,000 - 60,000,000 -

403

Governance,

Social Services

& Sports

Omuma Oru EastConstruction of Omuma Civic Centre

& Skills Acquisition Centre 180,000,000 - 27,000,000 -

404

Governance,

Social Services

& Sports

Umuokirika AhiazuConstruction of Umuokirika Civic

Centre & Skills Acquisition Centre 150,000,000 - 22,500,000 -

405

Governance,

Social Services

& Sports

OwerriOwerri

Municipal

Construction of multi purpose Civic

Centre 150,000,000 - 15,000,000 -

406

Governance,

Social Services

& Sports

OpkpofeEzinihitte

Mbaise

Construction and upgrading of

Okpofe Civi Centre 80,000,000 - 15,000,000 10,000,000

407

Governance,

Social Services

& Sports

Umualumoke OkigweConstruction of Skill Acquisition

Centre at Umualumoke - Okigwe 150,000,000 22,500,000 -

408

Governance,

Social Services

& Sports

Umuofor

EgbuOwerri North

Construction of Multi purpose Civic

centre 150,000,000 22,500,000 -

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 36 of 42

Page 301: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

409

Governance,

Social Services

& Sports

Various

Technical

Institutions

in the State

Various

Technical

Institutions in

the State

Supply of critical machine tools to

Fed. Polt Nekede-Owerri, Imo State

Poly Umuagwo, Ahiara Technical

College Ahiazu, Okporo Technical

College Orlu

46,851,000 - - -

410

Governance,

Social Services

& Sports

ObiziEzinihite

Mbaise

Supply of ICT Ed/Mat/Sch Upgrade

at Obizi High School 200,000,000 30,000,000 20,000,000

411

Governance,

Social Services

& Sports

Emekuku Owerri

Supply of ICT Ed/Mat/Sch Upgrade

at Comprehensive Secondary School,

Emekuku

200,000,000 30,000,000 20,000,000

412

Governance,

Social Services

& Sports

Omuma Oru EastFencing of Omuma Technical

Secondary Secondary School 150,000,000 - 25,500,000 -

413

Governance,

Social Services

& Sports

Owerri WestOwerri West/

Imo East

Construction of Civic Centre in

Owerri West, Imo East 150,000,000 - 70,000,000 -

414

Governance,

Social Services

& Sports

EzeinihitteEzinihitte/Im

o East

Construction of Civic Centre at

Ezinihitte 150,000,000 - 17,500,000 -

415

Governance,

Social Services

& Sports

Agwa OgutaPerimeter Fencing of Agwa

Secondary School. 70,000,000 - - -

416

Governance,

Social Services

& Sports

Izombe OgutaIzombe Divisional Police

Headquarters Complex. 200,000,000 - - -

417

Governance,

Social Services

& Sports

Agwa OgutaConstruction of Agwa Police Station

Complex. 100,000,000 - - -

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 37 of 42

Page 302: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

418

Governance,

Social Services

& Sports

Izombe Oguta

Rehabilitation and Equipment of

Izombe Maternity Hospital with

Perimeter Fence.

150,000,000 - - -

419

Governance,

Social Services

& Sports

Izombe Oguta

Construction of 2 NOs Staff

Quarters at Izombe Maternity

Hospital.

80,000,000 - - -

420

Governance,

Social Services

& Sports

Egbu Owerri North

Design of Erosion Control in the Ring

Road Covering Afor Egbu Market to

Ofeuzo Village to Comprehensive

Secondary School, Road Safety and

Umuayalu Village

20,000,000 - - -

421 Small ticket

ProjectsUkulo Imo North Construction of Ukulo Town Hall 240,000,000 - 36,000,000 -

422

Total

Governance,

Social Services

& Sports

7,702,894,666 142,272,333 772,732,126 693,956,720

423 Water Supply Ozuh Omuma Oru EastConstruction of Sola Powered Water

at Ozuh Omuma, Oru East 54,500,000 - - 8,175,000

424 Water Supply Umunachi ObowoSolar Powered Borehole at Umunachi-

Mbara Umuokere village square 70,000,000 - 19,550,000 19,550,000

425 water SupplyNzerem/

IkpemEhime Mbano

Solar Powered Borehole at

Nzerem/Ikpem 70,000,000 - 17,500,000 17,500,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 38 of 42

Page 303: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

426 water Supply Oguta OgutaSolar powered Water Project in

Oguta Town. 100,000,000 15,000,000 15,000,000

427 Water Supply Obogwe Obogwe Water Scheme 15,000,000 - - 2,250,000

428 Water Supply Umuduruehie Ehime Mbano

Construction of Solar Powered Water

and reticulation at Umuduruehie in

Ezeoke Nsu

50,000,000 - - 7,500,000

429 Water Supply Amanato Orlu Solar Powered Water Scheme 71,678,900 10,751,835 17,419,725 11,000,000

430 water Supply UbomaIhitte -

Uboma

Uboma -Imo River Surface Dam ,

Ihitte -Uboma 100,000,000 44,709,960 25,000,000 10,000,000

431 water Supply Egwe/Oguta Oguta Solar Powered Water Project 100,000,000 - 25,000,000 10,000,000

432 water Supply Obokofia Ohaji/

Egbema

Solar powered Water Projectin

Obokofia 30,000,000 4,500,000 10,000,000

433 Water Supply Ohaba OhajiSolar powered water project at

Ohoba, ohaji. 50,000,000 7,500,000

434 water SupplyUbahaeze,

Awo OmamaOrlu Solar Powered Project 49,151,341 7,372,701 24,523,133 7,500,000

435 water Supply Abiaziem Oguta Solar Powered Project 49,151,341 7,372,701 24,523,133 7,500,000

436 water Supply Umuzike Orlu Solar Powered Project 56,400,150 8,460,023 14,100,038 7,500,000

437 water Supply Abajah Nwangele Solar Powered Water Project 48,500,000 7,275,000 12,125,000 7,500,000

438 water SupplyAbosi

IzombeOguta Solar Powered Water Project 49,500,000 - 12,375,000 7,500,000

439 Water Supply AssaOhaji /

EgbemaSolar Powered Water Project 52,672,437 7,900,866 13,168,109 7,500,000

440 Water Supply Osina Ideato North Solar Powered Water Project 52,672,437 7,900,866 13,168,109 7,500,000

441 Water Supply Umunakanu Ehime mbano Solar Powered Water Project 52,672,437 7,900,866 13,168,109 7,500,000

442 Water Supply

Ubahangwo

Etiti, Orsu

Ihiteukwa

Orsu

Bore-Hole Water Project at

Ubahangwo Etiti, Orsu Ihiteukwa

with 40KVA Gen Set

45,000,000 - - 6,750,000

443 Water Supply Oniumo Solar Powered Borehole 40,000,000 - 6,000,000 6,000,000

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 39 of 42

Page 304: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

444 Water Supply Nguru Ngor Okpala Solar Water Project 35,000,000 - 8,750,000 5,250,000

445 Water Supply UMUOKANNEOHAJI /

EGBEMA Solar Water Project 45,000,000 6,750,000 9,316,125 5,000,000

446 Water Supply Aboh MbaiseCompletion of Mini Water Project at

Ndigbo Uvuru, Aboh Mbaise LGA80,000,000 12,000,000

447 Water Supply Nkwesi Oguta Solar Water Project 45,000,000 27,825,089 15,112,825 5,000,000

448 Water Supply Awo Idemili Orsu Solar Powered Project 42,305,333 6,345,800 24,523,133 5,000,000

449 Water Supply Orsu OgutaSolar powered water project at Orsu

obodo, oguta 50,000,000 7,500,000

450 Water Supply Amawon Owerri Solar Powered Project 42,305,333 13,021,702 24,523,133 5,000,000

451 Water Supply Umuchima Ideator South Solar Powered Water Project 45,000,000 19,975,548 11,250,000 5,000,000

452 Water Supply Akokwa Ideator North Solar Powered Water Project 65,018,500 9,752,775 16,254,625 5,000,000

453 Water Supply Umualikwojo Ikeduru

Solar Powered Borehole and

Reticulation in

Umualikwojo/Umumgbeke Ugiri-Ike

45,000,000 - 11,250,000 5,000,000

454 Water Supply Various Various

Rehabilitation/upgrading of 5Nos

OMPADEC Water Projects at

Ukwuga, Ekugba 11, EtekwuruII &

Umudike II and Eziorsu

180,000,000 25,616,240 45,000,000 -

455 Water Uwaoma AhiazuConstruction of 10,000Litres

Motorized Borehole in Uwaoma 60,000,000 - 15,000,000 -

456 Water Muhu Aboh Mbaise Solar Water Project 30,000,000 - 7,500,000 -

457 Water Supply Ananara Isiala Mbano Water Reticulation Works in Anauara 100,000,000 - 25,000,000 -

458 Water Supply Iheagwa Owerri WestIheagwa Solar Powered Water

Projects 100,000,000 - 24,979,699 -

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 40 of 42

Page 305: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

459 Water Supply Ogboetere OgutaSolar Powered Water Project at

Ogboetere. 45,000,000 6,750,000 -

460 Water SupplyObeama

Mbano AgwaOguta

Solar powered Water Project at

Obeama Mbano Agwa. 45,000,000 6,750,000 -

461 Water SupplyOrsu -

AmakofiaOguta

Solar powered Water Project at

Orsu-Amakofia. 45,000,000 6,750,000 -

462 Water Supply Orlu Town OrluSolar powered Water Project at

Orlu Main Town. 45,000,000 6,750,000 -

463 Water SupplyUmuele-

UmunumoEhime Mbano

Bore-Hole Water Project at Umuele-

Umuofeke Oweri Ibeafor Umunumo

With 40KVA Gen Set

- - -

464 Water Supply Obokofia Ohaji/

Egbema

Rehabilitation of Obokofia Water

Project with 40KVA Generator. 30,000,000 - - -

465 Water Supply OforolaOhaji/

Egbema

Federal College of Lands and

Agricultural Technology (FECOLAT)

Water Project with 40KVA

Generator.

45,000,000 - - -

466 Water Supply ChokonezeEzinihitte

Mbaise

Chokoneze, Ezinihitte Mbaise Water

Project with 40kVA Generator. 45,000,000 - - -

467 Water Supply Oguta Oguta

Bore-Hole Water Project with 3.5KM

Reticulation in Oguta Town with

40kVA Generator.

100,000,000 - - -

468 Water SupplyAmurie

OmanzeIsu

Amurie Omanze Water Project with

40kVA Generator. 45,000,000 - - -

469 Water Supply Ogboetere OgutaBore-Hole Water Project at

Ogboetere with 40kVA Generator 45,000,000 - - -

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 41 of 42

Page 306: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT TYPE LOCATION LGA DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN

2015

AMOUNT

APPROVED IN

2016

NDDC IMO STATE 2016 DRAFT BUDGET

470 Water SupplyObeama

Mbano AgwaOguta

Bore Hole Water Project at Obeama

Mbano Agwa 45,000,000 - - -

471 Water SupplyOrsu -

AmakofiaOguta

Bore-Hole Water Project at Orsu-

Amakofia with 40kVA Generator 45,000,000 - - -

472 Water Supply Orlu Town OrluBore-Hole Water Project at Orlu

Main Town with 40kVA Generator 45,000,000 - - -

473 Water SupplyArondi-

izuoguIdeato North

Arondi-Izuogu Bore-Hole with 40kVA

Generator. 50,000,000 - - -

474 Water Supply Umuorobara Aboh Mbaise Umuorobara Bore-Hole with 40kVA

Generator 45,000,000 - - -

475 Water SupplyUmuoparadu

ruIsiala Mbano

Construction of solar Borehole with

overhead tank at Umuoparaduru

muehie Ogbor Ugiri

96,000,000 - 15,000,000 -

476 Water Supply Imerienwe Ngor/ Ophala

Solar powered water project with

reticulation at Imerienwe in

Ngor/Ohpala LGA, Imo State.

160,000,000 - - -

477 Water SupplyAfor

UmuezeEhime Mbano

Water project at Afor Umueze

Market Square Ehime Mbano 150,000,000 - 22,500,000 -

Umuanoro

UbahangwoOrsu

Solar Water Project at Umuanoro

Ubahangwo - Etiti Autonomous

Community

478 Water Supply Umumpele Isiala MbanoWater project at Umumpele Village

Hall, Amuazare, Isiala 150,000,000 - 22,500,000 -

Total water

Supply3,447,528,209 218,931,970 582,579,895 250,975,000

GRAND TOTAL 103,328,384,488 9,058,857,772 10,131,469,654 7,677,344,420

2016 APPROPRIATION ACT- IMO NATIONAL ASSEMBLY Page 42 of 42

Page 307: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT

TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

1Agric &

Fisheries Various

Artisana fishing input and gears

for cooperative society in Ondo

State.

900,000,000 20,000,000 20,000,000

2 TOTAL AGRIC 900,000,000 - 20,000,000 20,000,000

3Canalization /

Reclamation All Rivers Ilaje

Clearing Of Waterways In Ilaje

Lga 800,000,000 46,000,000 40,000,000

4Canalization /

Reclamation All Rivers Ese-Odo

Clearing Of Waterways In Ese -

Odo Lga 300,000,000 29,000,000 30,000,000

5Canalization /

Reclamation Ijuoshun Okitipupa

Construction of Jetties at

Ijuoshun,Iyansan and Akotogbo for

theuse of naval outpost men and

Marine Police men

120,000,000 18,000,000 18,000,000

6Canalization /

Reclamation

Obe-Enikanselu

And Environs Ilaje

Sandfilling And Reclamation Works

Phase 1 4,865,092,155 296,000,000 150,000,000

7Canalization /

Reclamation

Fiyebrasintei/

Majabi

Dredging of Fiyebrasintei to

Majabi 600,000,000 90,000,000 90,000,000

8Canalization /

Reclamation Yonrin-Ogheye Ilaje

Design and canalization of Yonrin-

Ogheye creek (Lots 1-3) 2,460,000,000 200,000,000

9Canalization /

Reclamation Atijere Ilaje

Canalisation Of Atijere To Eremi -

Alape In Ilaje (Design) 50,000,000 13,000,000 7,500,000

10Canalization /

Reclamation Ode Etikan Ilaje

Reclamation Of Idiepe, Ode Etikan

And Ogo Olowoyo Communities

(Phase 1)

3,676,530,000 158,000,000 150,000,000

NDDC ONDO STATE 2016 BUDGET

2016 APPROPRIATION ACT- ONDO NATIONAL ASSEMBLY Page 1 of 34

Page 308: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT

TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

NDDC ONDO STATE 2016 BUDGET

11Canalization /

Reclamation Yonrin-Ogheye Ilaje

Design and canalization of Yonrin-

Ogheye creek (lot 1, 2, 3) 2,460,000,000 369,000,000 -

12 Canalization /

Reclamation Siloko Odigbo

Canalisation of Siloko - Igunuwei -

Taribor Creek. 930,000,000 180,000,000

13 Canalization /

Reclamation Odigbo

Canalisation of Siloko-Taribor

Creek 1,200,000,000 180,000,000 150,000,000

14 Canalization /

Reclamation Siloko Odigbo

Canalisation of Siloko-Taribor

Creek (PHASE II) 600,000,000 90,000,000 90,000,000

15

Canalization /

Reclamation

Total

18,061,622,155 - 1,469,000,000 925,500,000

16 Education Aiyetoro Ilaje

Construction And Equipment Of

Modern Library At Happy City

College

45,000,000 6,750,000 13,500,000 6,750,000

17 Education Ilepete Ilaje Construction And Equiping Of

Science Laboratories 80,000,000 12,000,000 7,500,000

18 Education Ajowa Akoko N/WConstruction And Equipment Of

Science Laboratories 60,000,000 9,000,000 7,500,000

19 Education Akure Akure SouthConstruction And Equipment Of

Science Laboratories 60,000,000 9,000,000 7,500,000

20 Education Ondo Ondo/WConstruction And Equipment Of

Science Laboratories 60,000,000 9,000,000 7,500,000

21 Education Okitipupa Okitipupa

Provision of 1500 desktop

Computers for supply to Secondary

Schools in Ondo State

240,000,000 240,000,000

22 Education Owo OwoConstruction And Equipment Of

Science Laboratories 60,000,000 9,000,000 9,000,000

2016 APPROPRIATION ACT- ONDO NATIONAL ASSEMBLY Page 2 of 34

Page 309: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT

TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

NDDC ONDO STATE 2016 BUDGET

23 Education Akure Akure South

Construction Of 400 Seater

Lecture Auditorim At Engineering

Faculty Federal University Of

Technology, Akure

250,000,000 37,500,000 22,500,000

24 Education Oka Akoko Akoko S/W

Construction And Equipment Of

Science Laboratories at Ogoso

Grammer School, Oka

60,000,000 9,000,000

25 Education Okeigbo Ile-

Oluji/Okeigbo

Construction And Equipment Of

Science Laboratories 60,000,000 9,000,000 9,000,000

26 Education Various Various

Reconstruction and renovation of

Primary and Secondary Schools in

Ondo State

300,000,000 45,000,000

27 Education Irele IreleConstruction And Equipment Of

Science Laboratories 60,000,000 9,000,000 9,000,000

28 Education Ugbo-Nla Ilaje Construction And Equipment Of

Science Laboratories 60,000,000 9,000,000 9,000,000

29 Education Bolorunduro Ondo EastConstruction And Equipment Of

Science Laboratories 60,000,000 9,000,000 9,000,000

30 Education Igbara-Oke IfedoreConstruction And Equipment Of

Science Laboratories 60,000,000 9,000,000 9,000,000

31 Education Igbokoda Ilaje Construction Of Mega Caring Heat

Primary School Blocks 250,000,000 37,500,000 9,000,000

32 Education Zion Pepe Ilaje Construction And Equipment Of

Science Laboratories 60,000,000 9,000,000 9,000,000

33 Education Molutehin IlajeConstruction And Equiping Of

Science Laboratory 120,000,000 18,000,000 9,000,000

2016 APPROPRIATION ACT- ONDO NATIONAL ASSEMBLY Page 3 of 34

Page 310: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT

TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

NDDC ONDO STATE 2016 BUDGET

34 Education Idiogba IlajeConstruction And Equiping Of

Science Laboratory 100,000,000 15,000,000 9,000,000

35 Education Igbokoda IlajeConstruction And Equiping Of

Science Laboratory 100,000,000 15,000,000 9,000,000

36 Education Mahin IlajeConstruction And Equiping Of

Science Laboratory 100,000,000 15,000,000 9,000,000

37 Education Igbobini Ese-OdoConstruction Of 6 Class Room

Block 15,000,000 2,250,000 2,250,000

38 Education Apomu Akure SouthConstruction Of 3 Class Room

Block 8,000,000 1,200,000 1,200,000

39 Education Ayetoro Ilaje Construction Of Carpentary

Workshop 40,000,000 5,000,000 2,250,000

40 Education Igbokoda Gram.

School Ilaje

Construction Of 6 Class Room

Block 15,000,000 2,250,000 1,500,000

41 Education Mogohen Ilaje Construction Of 12 Class Room

Block Composite Struction 50,000,000 5,000,000 5,000,000

42 Education Erunna Ilaje Construction Of 6 Class Room

Block 19,179,324 2,876,899 2,876,899

43 Education Odun Ogun Ilaje Construction Of 6 Class Room

Block Composite Struction 19,179,324 2,876,899 2,876,899

44 Education Ilepete Ilaje Construction Of 12 Class Room

Block Office Block 41,145,510 6,171,827 5,000,000

45 EducationConstruction of Hostel in the new

medical science University 240,000,000 36,000,000

46 Education Ikorigho Ilaje Staff Quarters /Office Projects 41,145,510 5,000,000 2,000,000

47 Education Igbekebo Ese-OdoConstruction And Equiping Of

Science Laboratories 61,344,000 8,000,000 5,000,000

2016 APPROPRIATION ACT- ONDO NATIONAL ASSEMBLY Page 4 of 34

Page 311: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT

TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

NDDC ONDO STATE 2016 BUDGET

48 Education Oba Ile Akure/NConstruction And Equiping Of

Science Laboratories 61,344,000 5,000,000 9,201,600

49 Education Biagbini Ese-OdoConstruction Of 6 Wooden Class

Room Block 12,897,280 1,934,592 -

50 Education Ajapa Ese-OdoConstruction Of Wooden Class

Room Block 12,897,280 1,934,592 1,500,000

51 Education Idanre IdanreConstruction And Equiping Of

Science Laboratory 55,000,000 6,000,000 8,250,000

52 Education Isua AkokoAkoko South-

East

Construction of Classroom blocks

at isua Akoko Primary School 150,000,000 22,500,000 22,500,000

53 Education Ikun Akoko Akoko S/E

Construction of Classroom blocks

at Holy Trinity Primary school Inun

Akoko

150,000,000 22,500,000 22,500,000

54 Education Iye Akoko Akoko N/W

Construction of Classroom blocks

at Aye Iwara Secondary School,

Iye Akoko

150,000,000 22,500,000 15,000,000

55 Education Ifon Ose

Construction and Equiping of

Science Laboratory Block at Eka

Marun Grammer School, Ifon

100,000,000 15,000,000

56Education

Total 3,487,132,228 6,750,000 616,494,808 381,155,397

57Energy/ Power

Supply Ajagba - Kiribo Ese-Odo Solar Street Lightening In Kiribo 200,552,880 30,082,932 60,165,864 -

58Energy/ Power

Supply

Ebijaw/Obajare

/Asejere Odigbo

Ebijaw/Obajare /Asejere Rural

Electrification 49,999,498 5,999,924 14,999,812 -

59Energy/ Power

Supply

Esure - Ako Ni

Ido - AniOse Rural Electrification 39,940,004 5,999,100 11,982,001 -

2016 APPROPRIATION ACT- ONDO NATIONAL ASSEMBLY Page 5 of 34

Page 312: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N PROJECT

TYPE LOCATION L.G.A PROJECT DESCRIPTION BUDGETED COST COMMITMENT

AMOUNT

APPROVED IN 2015

AMOUNT

APPROVED IN

2016

NDDC ONDO STATE 2016 BUDGET

60Energy/ Power

Supply Ebijaw Odigbo Electrification Of Ebijaw 49,999,370 7,499,906 14,999,812 5,500,999

61Energy/ Power

Supply Surelere Akoko N/W Electrification Project 39,998,074 5,999,711 11,999,422 -

62Energy/ Power

Supply Imoru Ose Electrification Project 64,445,822 9,666,873 19,333,747 -

63Energy/ Power

Supply Iwonja Idanre Electrification Of Iwonja - Idanre 39,995,403 5,999,310 11,998,621 5,000,000

64Energy/ Power

Supply

Segbemi,

Gbeleju Odo,

Oke

Ese-Odo Electrification Project 24,994,561 3,749,184 7,498,368 5,000,000

65Energy/ Power

Supply Surelere Akoko N/W Rural Electrification 56,806,232 8,520,935 17,041,870 -

66Energy/ Power

Supply Ugbo-Oghoye Ilaje

Extension Of National Grid From

Ugbo - Oghoye (Design) 50,000,000 7,500,000 7,500,000

67Energy/ Power

Supply Molutehin Ilaje Solar Street Light 80,000,000 12,000,000 12,000,000

68Energy/ Power

SupplyIgbokoda Ilaje

Reconstruction/ Renovation of

Igbokoda General Hospital 100,000,000 15,000,000

69 Energy/Power

Supply Odun Oriretan Ilaje

Solar Electrification at Odun

Oriretan, Ilaje100,000,000 15,000,000 15,000,000

70 Energy/Power

Supply Ore

Construction of Solar Street Light

at Beaular Street new site, ore 250,000,000 37,500,000 15,000,000

71 Energy /Power

Supply Ayejuni Okitikpupa

Solar street Light at Ayejuni

street off erinje road 200,000,000 30,000,000 30,000,000

72 Energy /Power

Supply Oke - Oka Akoko S/W

Solar streetlight at Oke -Oka

community, Akoko 250,000,000 37,500,000

2016 APPROPRIATION ACT- ONDO NATIONAL ASSEMBLY Page 6 of 34

Page 313: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

=N= =N= =N= =N=

1Canalization/

ReclamationObiofu Onelga

Reclamation Of Shore Protection

Of Obiofu, Rivers State 5,215,902,758 2,420,663 346,717,689

2Canalization/

Reclamation

Abonnema/

KrakramaAkuku Toru

Award Of Contract For The

Abonnema/Krakrama Reclamation

Project

2,286,742,500 129,457,440 300,000,000

3Canalization/

ReclamationUtuechi Onelga

Sandfilling And Shore Protection

At Utuechi Town 1,200,186,120 172,500,000 82,310,000 82,310,000

4Canalization/

ReclamationOmoku Onelga

Contract For The Canalization

Project 2,030,831,901 607,064,144 81,705,707 81,705,707

5Canalization/

ReclamationOpuoma Dredging of Opuoma 200,000,000 30,000,000

6Canalization/

Reclamation

Koroma-

NtoriawanTai

Canalization/Reclamation At

Koroma-Ntoriawan 300,000,000 29,779,750 0.00

7Canalization/

ReclamationEgbekwu Onelga

Clearing And Channalisation Of

Eviam Creek Egbekwu 800,000,000 0.00

8Canalization/

ReclamationOgbogbo Okrika

Dredging Of Ibaka/Ogbogbo

Water Front 5,500,000,000 501,250,000 0.00

9Canalization/

ReclamationMgbosimini Obio/Akpor

Canalisation Of Chinda Creek

Linking Agip Extension/Mgbozimini 750,000,000 0.00

10Canalization/

ReclamationIkpukulubie Phalga

Dredging Of Ikpukulubie At

Borikiri In Port Harcourt 5,000,000,000 3,825,000 0.00

11Canalization/

ReclamationUtuechi Onelga Utuechi Sandfilling 750,000,000 0.00

12Canalization/

Reclamation

Emesu

CommunityAbua Odual

Flood Control Embarkment In

Emesu Community Lots 1-2 400,000,000 25,500,000 0.00

NDDC RIVERS STATE 2016 BUDGET

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 1 of 119

Page 314: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

13Canalization/

Reclamation

Amadi Ama,

Fimie,

Ozuboko

PhalgaDredging Of Amadi Ama, Fimie,

Ozuboko In Port Harcourt 3,000,000,000 3,187,500 0.00

14Canalization/

ReclamationBolo Ogu Bolo Dredging Of Yakokiri In Bolo 3,000,000,000 2,550,000 0.00

15Canalization/

ReclamationChuku Ama

Dredging Of Orubu, Opposite

Amawari Polo To Chuku Ama In

Ogu

3,500,000,000 4,462,500 0.00

16Canalization/

Reclamation

Buguma New

TownAsari Toru Sandfilling Of Buguma New Town 1,000,000,000 127,500,000 0.00

17Canalization/

ReclamationOguchuku

Dredging Of Oguchuku To Back Of

Ogu/Bolo Council 3,000,000,000 3,825,000 0.00

18Canalization/

ReclamationOgo/Bolo Ogo/Bolo Dredging Of Ikpokiri 4,000,000,000 5,100,000 0.00

19Canalization/

Reclamation

Adada-

Emelego-

Okolomade

Rivers

Abua OdualCanalisation Of Adada-Emelego-

Okolomade River 2,000,000,000 400,000,000 0.00

20Canalization/

ReclamationBodo City Gokana

Canalization/Reclamation Of Bodo

City 200,000,000 3,678,230 19,635,000 0.00

21Canalization/

ReclamationOgu/Bolo Ogu/Bolo

Dredging/Reclamation &

Sandfilling- Phase 1 245,000,000 31,237,500 0.00

22Canalization/

ReclamationOgu/Bolo Ogu/Bolo

Dredging/Reclamation &

Sandfilling- Phase 2 245,000,000 31,237,500 0.00

23Canalization/

ReclamationOkrika Okrika

Dredging/Reclamation &

Sandfilling- Phase 1 945,000,000 120,487,500 0.00

24Canalization/

ReclamationOkrika Okrika

Dredging/Reclamation &

Sandfilling- Phase 2 945,000,000 120,487,500 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 2 of 119

Page 315: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

25Canalization/

ReclamationOkrika Okrika

Dredging/Reclamation &

Sandfilling- Phase 3 945,000,000 120,487,500 0.00

26Canalization/

ReclamationOgs

Dredging Of Ogs Front Facing The

Island 3,000,000,000 382,500,000 0.00

27

Canalization /

Reclamation

Total

50,458,663,279 915,120,477 2,097,067,957 840,733,396

28 Education Yae KhanaRenovation Of Yae Community

Primary School, Khana 80,000,000

29 Education Rumuoparaeli Obio/Akpor

Construction And Equiping Of

Niger Delta Regional Technical

College/Craft Development

Schools Rumuoparaeli, Obio Akpor

L.G.A.-Rivers State.

997,645,635 67,919,531 70,000,000

30 Education All Lgas In Rv All Lgas In Rv

Setting Up Of Libraries In

Sellected Community Secondary

Schools (5 Per Senetorial District)

300,000,000 35,343,000 45,000,000

31 Education Omoku Onelga

Construction Of Mini Student

Hostel (Lot 4) For Federal College

Of Education (Tech), Omoku In

Onelga, Lga Rivers State

248,750,000 99,590,000 37,312,500

32 Education Omoku Onelga

Construction Of Mini Student

Hostel (Lot 5) For Federal College

Of Education (Tech), Omoku In

Onelga, Lga Rivers State

248,750,000 37,346,250 37,312,500

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 3 of 119

Page 316: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

33 Education Omoku Onelga

Construction Of Mini Student

Hostel (Lot 3) For Federal College

Of Education (Tech), Omoku In

Onelga, Lga Rivers State

248,750,000 37,346,250 37,312,500

34 Education Wakirike OkrikaSupply of Education Materials to

Primary Schools in Wakirike 150,000,000 22,500,000

35 Education Okoboh Abua/OdualConstruction of Obranny Internal

Road 200,000,000 30,000,000

36 Education Akinima Ahoada West

L.G.A

Construction Of 2nos. Classroom

Blocks At Akinima In Ahoada West

L.G.A, Rivers State.

43,170,005 6,475,501

37 Education Abalama Asari Toru

Construction Of 2n0s Classroom

Block And Teachers Quarters At

Abalama, Asari Toru

249,312,081 119,783,823 43,675,000 0.00

38 EducationPrimary/Seco

ndary School

Primary/Seco

ndary School

Supply Of Educational Materials

To Primary And Secondary Schools

In Rivers State

1,000,000,000 1,000,000 0.00

39 Education Various SchoolsSuppy Of Water Purifiers To

Schools In The Region 100,000,000 12,750,000 0.00

40 Education Egweida-Ke TaiConstruction Of Community

Library 120,000,000 0.00

41 Education Ukwa EtcheConstruction Of Ict Centre At

Ngo 100,000,000 0.00

42 Education Asarama AndoniConstruction Of Ict Centre At

Asarama 100,000,000 0.00

43 Education Total 4,186,377,720 361,985,854 92,768,000 285,913,001

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 4 of 119

Page 317: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

44Energy/Power

SupplyAgbonchia Eleme Solar Street Light 250,000,000 37,500,000 28,875,000

45Energy/Power

Supply

Botem/Gbene

y ETai Solar Powered Street Light 250,000,000 37,500,000 28,875,000

46Energy/Power

Supply

Rumukurushi(

Ga Rden,

Atali)

Port Harcourt Solar Street Light 240,000,000 36,000,000 27,720,000

47Energy/Power

SupplyOpobo Opobo

Solar Street Light At Minimah,

Isaipolo And Ilomo237,000,000 35,550,000 27,373,500

48Energy/Power

SupplyOkolomade Abua Odual Solar Street Light 235,000,000 35,250,000 27,142,500

49Energy/Power

SupplyEpellama

Andoni/

Opobo/

Nkoro

Solar Street Light At Epellama 237,000,000 123,300,000

50Energy/Power

SupplyKalio-Ama Okrika 

Installation of Solar Power Street

Light in Kalio-Ama Okrika 100,000,000 15,000,000

51Energy/Power

SupplyOmku Onelga

Upgrading And Rehabilitation Of

Township Distribution Network

(Construction Of 1x15mva, 33/11kv

Injection Substation) At Omoku,

Onelga, Rivers State

230,000,000 34,500,000 27,096,300 27,096,300

52Energy/Power

Supply

Okehi –

NdashiEtche

Award Of Contract For The

Electrification Of Okehi – Ndashi 523,413,295 393,329,710 65,000,000

53Energy/Power

SupplyRumuchakara Obio/Akpor

Provision Of Solar Powered Street

Light At Rumuchakara, Choba In

Obio-Akpor Lga, River State

121,527,285 18,229,093

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 5 of 119

Page 318: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

54Energy/Power

SupplyRukporodu Obio/Akpor

Construction Of Solar Powered

Street Light At Rukporodu (Phase

Ii), Obio/Akpor, Rivers State

179,500,000 88,934,218 26,925,000

55Energy/Power

SupplyOmoku

Ogba/Egbema

/Nd Oni

Construction Of Ixl5mv 33/1 Lkv

Injection Substation238,568,000 35,785,200 24,982,841 24,982,841

56Energy/Power

SupplyObrikom Onelga

Extension Of Township

Distribution Network To New

Layout Lot 11 Ob/Ob Gas Plant

Road Extension And Environs

(1x15mva Injection Substation),

Obrikom, Onelga,

240,000,000 120,000,000 23,562,000 23,562,000

57Energy/Power

SupplyBorikiri Khana

Construction Of 1 Xl 5mv 33/11 Kv

Injection Substation224,235,000 33,635,250

58Energy/Power

Supply

Port Harcourt

IiPhalga

Construction Of 1 Xl 5mv 33/11 Kv

Injection Substation240,200,000 36,030,000

59Energy/Power

SupplyVarious

Ogba/Egbema

/Ndoni

Extension Of Town Distribution

Network To New Layout Lot 1

(Erema Street Extension And

Environs)

248,900,000 37,335,000 24,435,758 24,435,758

60Energy/Power

SupplyZaakpon Khana Electrification of Zaakpon 249,685,511.54 156,789,600 37,452,827

61Energy/Power

Supply

Ochigbu/Ikat

a

Electrification Of

Ochigbu/Ikata,Rivers State. 155,000,000 23,250,000 18,260,550 18,260,550

62Energy/Power

Supply

 Etche/Omum

a

 Etche/Omum

a

Electrification of Umuodiri-

Ummofeke Community in

Etche/Omuma

250,000,000 37,500,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 6 of 119

Page 319: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

63Energy/Power

SupplyElele Ikwerre

Installation Of 1 No.

300kva/0.415kv Transformer For

Omoikpiriku Community,Elele In

Ikwerre Lga Now Relocated To

Akabuka In Rivers State

70,135,584 4,553,861 10,520,338

64Energy/Power

Supply

Bukuma /

TombiaDegema

Electrification Of Bukuma /

Tombia Communities In Degema

Lga, Rivers State

100,000,000 30,629,942 23,562,000 23,562,000

65Energy/Power

SupplyAbalama Asari Toru

Construction Of 2 X 2.5 Mva

Injection Substation190,737,500 28,610,625

66Energy/ Power

Supply

Igwuruta/

Edoha-Emohua

Extension of HT/LT Electricity

with Transformers at Igwuruta

and Edoha-Emohua

150,000,000 22,500,000

67Energy/Power

Supply

Ekeen And

Kapor Khana

Electrification Of Ekeen And

Kapor Communities 114,201,096 50,352,375 17,130,164

68Energy/Power

Supply

Ndoni/Agwe/

Odugiri

Ogba/Egbema

/Ndoni

Award Of Contract For The Ndoni

– Agwe – Odugiri Electrification

Project

99,100,000 53,735,548 30,000,000

69Energy/Power

Supply

Port-Harcourl

1Phalga

Construction Of Lxl5mv 33/1 Lkv

Injection Substation249,500,000 30,000,000

70Energy/Power

SupplyOkrika Okrika

Solar Powered Street Light In

Okrika Island, Okrika L.G.A.,

Rivers State

59,785,000 8,967,750 14,137,200 14,137,200

71Energy/Power

SupplyBakana Degema

Wind Turbine Electrification Of

Ekweboko Waterside In Bakana 150,000,000 8,641,928 30,000,000

72Energy/Power

SupplyObonoma Onelga

Solar Powered Street Light Phase

11237,000,000 29,198,400

73Energy/Power

Supply

Korokoro/Gek

enSolar Street Light 250,000,000 37,500,000 28,875,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 7 of 119

Page 320: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

74Energy/ Power

SupplyBuguma/ Ido Asari-Toru

Solar Electrification of Emohua-

Kalabari Road, Abonnema to

Obonoma, Buguma to Ido

200,000,000 30,000,000

75Energy/Power

SupplyEbubu Eleme Solar Street Light 250,000,000 37,500,000 28,875,000

76Energy/Power

SupplyBuguma Asalga

Solar Street Light At

Buguma/Asalga Communities 990,000,000 148,500,000 28,875,000

77Energy/Power

SupplyElekehia Port Harcourt Solar Street Light At Ibe Street 250,000,000 37,500,000 28,875,000

78Energy/Power

SupplyRumukalagbor Port Harcourt Solar Street Light 250,000,000 37,500,000 28,875,000

79Energy/Power

SupplyBorokiri Port Harcourt

Installation of 50 No. 50KVA,

HVDS Transformers complete with

Aerial Bundled Conductors in

Borokiri.

250,000,000 37,500,000

80Energy/Power

SupplyOkrika Okrika Solar Street Light 248,000,000 37,500,000 28,875,000

81Energy/Power

SupplyKpoghor Tai Solar Street Light 250,000,000 37,500,000 28,875,000

82Energy/ Power

SupplyBonny Bonny

Construction of fully Equipped

Electronic Learning Centre in

Bonny and Solar Light in Amariari,

Ajala, Light House Sidekiri

150,000,000 22,500,000

83Energy/Power

SupplyErema Onelga Solar Powered Street Light 232,772,575 28,677,581

84Energy/Power

SupplyOmuoduweze Obio Akpor

Solar Street Light At

Omuoduweza-Omuokiri Phase 1 248,000,000 37,200,000 28,644,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 8 of 119

Page 321: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

85Energy/Power

Supply

Sf. Johns Jnx

Elioparanwon

Jnx-Agu

Street

Oblo-AkporSolar Powered Street Light At

Rumuluemenl/Elioparanwo231,169,550 28,480,089

86Energy/Power

SupplyArukwo Abua/Odua Solar Street Light 240,000,000 36,000,000 27,775,589

87Energy/Power

SupplyPort Harcourt Port Harcourt

Solar Street Light On Chinda

Road, Off Ada George (2km) 240,000,000 36,000,000 27,720,000

88Energy/Power

Supply

Egwi-Odufor -

UmuoyeEtche

Award Of Contract For The

Electrification Of Egwi-Odufor -

Umuoye

202,805,352 175,452,798 27,352,554

89Energy/Power

SupplyRumuoke Obio Akpor

Rural Electrification Of Rumuoke

New Layout/Mgbuakara And

Environs, Rumueprikon, Obio Akpor

L.G.A., Rivers State

246,731,812 194,517,344 25,500,000 26,714,468

90Energy/ Power

Supply

Oroabali/

OroworukwoPH

Solar Street Light at Orogbum,

Oroabali and Oroworukwo 150,000,000 22,500,000

91Energy/Power

SupplyRumuosi Obio Akpor

Solar Light At Yizhak

International School Road To Link

New Airport Road Ohia Mini Nta

Road

225,000,000 33,750,000 25,987,500

92Energy/Power

SupplyBaa-Lueku Khana Electrification Project 198,340,365 24,435,533

93Energy/Power

SupplyRoad 11 Rumueme

Solar Street Light At Rumueme

Layout, Rumuokwuta 200,000,000 30,000,000 23,100,000

94Energy/Power

SupplyAbalama Asari Toru Solar Powered Street Light 187,416,938 23,089,767

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 9 of 119

Page 322: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

95Energy/Power

SupplyUmudi, Igbodo Etche

Electrification Of Umudi, Igbodo,

Etche 51,448,243 18,458,795 5,733,974 20,000,000

96Energy/Power

SupplyObotebe Burutu Solar Powered Street Light 70,000,000 25,200,000 19,404,000

97Energy/Power

Supply

Rumuokalagbo

rPhalg Solar Powered Street Light 122,772,275 15,125,544

98Energy/Power

SupplyNkpono

Construction Of 2x2mv Injection

(Substation At Npono.

Communfty.Rumuolumlni

111,636,600 13,753,629

99Energy/Power

Supply

Ikem

CommunitiesEtche

Electrification Of Ikem

Communities 84,457,201 71,768,621 12,688,580

100Energy/Power

SupplyObuama Degema Solar Powered Street Light 74,593,463 64,067,031 12,000,000

101Energy/Power

SupplyOzuoba Obio-Akpor

Electrification Of Chi - Ji - Nu -

Ehe - Ehie Community, Ozuoba In

Obio Akpor Lga

63,025,092 53,571,328 9,453,764

102Energy/Power

SupplyVarious Various

Rehabilitation of solar street

lights and feasibility study of total

capacity of installed Renewal

Energy by the NDDC

250,000,000 37,500,000

103Energy/Power

SupplyOzuzu Etche Solar Powered Street Light 44,541,920 5,487,565

104Energy/Power

SupplyBeten Khana Solar Street Light 240,000,000 24,052,875 0.00

105Energy/Power

Supply

Nkpolu-

RukporoduObio/Akpor Solar Street Light 109,072,720 16,360,908 27,312,257 0.00

106Energy/Power

SupplyDegema Abonema

Solar Street Light At Degema

Abonema Road 220,000,000 1,000,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 10 of 119

Page 323: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

107Energy/Power

SupplyTema Emouha

Solar Street Light At Tema

Degema Road 230,000,000 1,000,000 0.00

108Energy/Power

Supply

Ogbakiri

Junction

Construction Of Solar Street

Light At Tema Junction To

Ogbakiri Junction, Rivers State

231,169,550 29,325,000 0.00

109Energy/Power

SupplyUpata-Abua

Ahoada

East/Obua

Odua

Electrifications Of Communities In

Ahoada East (Apata) To Abua

Odua (Phase Ii-Extension Of Low

Tension (Lt) Distribution In Abua)

(Design)

20,000,000 5,890,500 0.00

110Energy/Power

SupplyRoad 13 Obio/Akpor

Solar Street Light At Road 13,

Ohia Odane, Rumuokkuta,

Obio/Akpor, Phase I

185,000,000 18,211,463 0.00

111Energy/Power

SupplyKhana Khana Eeken And Kapnor 515,909,564 118,814,324 47,886,894 0.00

112Energy/Power

SupplyPort Harcourt Port Harcourt

Solar Street Light For 4.2km

Access Road In Nigeria Army

Barrack

250,000,000 20,458,876 28,875,000 0.00

113Energy/Power

SupplyUmuagbai Oyigbo Solar Street Light 250,000,000 24,543,750 0.00

114Energy/Power

SupplyOpobo Town Opobo Nkoro

Electrification Project At Opobo

Nkoro 100,000,000 15,000,000 0.00

115Energy/Power

SupplyPort Harcourt Port Harcourt

Installation Of Solar Powered

Street Light At Ambassador Iyala

Layout

245,000,000 31,237,500 0.00

116Energy/Power

SupplyPort Harcourt Port Harcourt

Solar Powered Street Light At

Chief Frank Nweke Layout Nta

Ozuoba

232,000,000 29,580,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 11 of 119

Page 324: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

117Energy/Power

SupplyPort Harcourt Obio Akpor

Solar Powered Street Light At

Rumuomasi-Rumuekim-Alu Road 230,000,000 29,325,000 0.00

118Energy/Power

SupplyRebisi Garden Obio Akpor

Construction Of Solar Powered

Street Light At Rebisi Garden,

Area Behind Mopol 19

170,000,000 85,940,593 21,675,000 0.00

119Energy/Power

Supply Tem Khana

Electrification Of Tem Community

Khana 198,340,365 25,288,397 0.00

120Energy/Power

SupplyObio Akpor

Solar Powered Street Light At

Eneka Community 220,000,000 28,050,000 0.00

121Energy/Power

SupplyOkolomade Abua/Odual

Solar Powered Street Light At

Okolomade 235,000,000 29,962,500 0.00

122Energy/Power

Supply

Politechnic

RoadBori/Khana

Solar Powered Street Light Along

Polytechnic Road 90,000,000 11,475,000 0.00

123Energy/Power

SupplyOkrika Okrika Electrification Of Okrika 2,000,000,000 255,000,000 0.00

124Energy/Power

SupplyObona Egbema Ndoni

Electrification Project Of Obona

Electrificatio 233,000,000 29,707,500 0.00

125Energy/Power

SupplyOgubolou Ogubolou Electrification Of Ogubolou 700,000,000 89,250,000 0.00

126Energy/Power

Supply

Omuordu-

OmuekeKelga

Provision Of Solar Powered Street

Light At Omuordu-Ubima Ogbodo,

Nkarahia And Omueke

Communities, Kelga, Rivers State

249,620,000 0.00

127Energy/Power

SupplyOmuwhenchi Ikwerre

Rural Electrification At

Omuwhenchi New Layout, Solar

Street Lights And Supply Of

Transformer

240,000,000 27,720,000 0.00

128Energy/Power

Supply

Kpite/Korona/

H OroTai Solar Street Light 250,000,000 179,511,297 24,543,750 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 12 of 119

Page 325: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

129Energy/Power

SupplyBorokiri Port Harcourt

Provison Of Solar Powered Street

Light, Borokiri Phase Iv170,000,000 25,500,000 0.00

130Energy/Power

Supply

Borokiri

Sandfilled

Area

Port Harcourt

Installation Of Solar Powered

Street Lights Beside Makalabsh

School Road Phase Iv, Borokiri

Sandfilled Area

150,000,000 22,500,000 0.00

131Energy/Power

Supply

Elieta-Egbeda

OsiakpuOnelga

Elecrification Project At Elieta-

Egbada-Osiakpu Communities120,000,000 18,000,000 14,137,200 0.00

132Energy/Power

SupplyVarious Abua Odual

Otapha And Arukwo Clan In Abua

Odua Lga (Agada 1-2, Digirigi Etc248,453,300 52,185,991 7,317,571 0.00

133Energy/Power

SupplyAkabuka Onelga

Construction Of Solar Street

Light231,169,550 22,695,071 0.00

134Energy/Power

SupplyObonoma Akuku-Toru

Provision Of Solar Powered Street

I Light220,675,800 33,101,370 21,664,847 0.00

135Energy/Power

SupplyOkrika Okrika

Ogan Ama/Dumo Ama's

Electrification57,743,972 8,661,596 11,338,029 0.00

136Energy/Power

SupplyElelenwo Obio/Akpor

Solar Powered Street Light At

Okworo Street206,381,535 30,957,230 40,627,291 0.00

137Energy/Power

SupplyOld Gra Phalga

Light At Atako/Herbert Maculey

J Nzirim Street Old Gra Port

Harcourt

237,500,000 69,995,727 31,633,125 0.00

138Energy/Power

SupplyElelenwo Oblo-Akpor Solar Powered Street Light 122,772,275.00 96,424,638 12,856,713 0.00

139Energy/Power

SupplyObor Onelga Solar Powered Street Light 159,772,260.00 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 13 of 119

Page 326: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

140Energy/Power

SupplyVarious Asalga

Provision Of Lt/Ht Dt Minama,

Sangana.Omekweama.Krakrama,

Angulama& Abalama

249,500,001 0.00

141Energy/Power

Supply

Ada-Ariobu

Off Abuloma

Road By FGGC

Phalga Solar Powered Street Light 218,758,750 205,223,573 0.00

142Energy/Power

SupplyKeen & Kakpor Khana

Electrification Of Keen & Kpoor

Communities114,201,096 0.00

143Energy/Power

SupplyOgbunabali Port Harcourt

Electricity Extension In

Ogbunabali Community, Ph96,342,469 14,451,370 27,720,000 0.00

144Energy/Power

SupplyRoad 11 Rumueme

Solar Street Light At Rumueme

Layout, Rumuokwuta200,000,000 25,500,000 0.00

145Energy/Power

SupplyRumukalagbor Port Harcourt Solar Street Light 250,000,000 31,875,000 0.00

146Energy/Power

SupplyObotebe Burutu Solar Street Light 70,000,000 0.00

147Energy/Power

SupplyOmuoduweze Obio/Akpor

Solar Street Light At

Omuoduweza-Omuokiri Phase 1248,000,000 0.00

148Energy/Power

SupplyElelenwo Obio/Akpor

Construction Of Solar Street

Light At Ihunwo Aharie Street

And Station Road Rumuodunwere,

Elelenwo

200,000,000 30,000,000 0.00

149Energy/Power

SupplyRumuosi Obio/Akpor

Solar Light At Yizhak

International School Road To Link

New Airport Road Ohia Mini Nta

Road

225,000,000 28,687,500 0.00

150Energy/Power

SupplyOkrika Okrika Solar Street Light 248,000,000 31,875,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 14 of 119

Page 327: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

151Energy/Power

Supply

Port Harcourt

IPhalga

Construction Of 1 Xl 5mv 33/11 Kv

Injection Substation249,500,000 0.00

152Energy/Power

Supply

Rumuokalagbo

rPhalg Solar Power Street Light 122,772,275 0.00

153Energy/Power

SupplyAbalama Asari Toru Solar Powered Street Light 187,416,938 0.00

154Energy/Power

SupplyNkpono

Construction Of 2x2mv Injection

Substation At Npono, Community,

Rumuoumini

111,636,600 0.00

155Energy/Power

SupplyAmaekwunne Etche

Construction Of Solar Powered

Street Light At Amaekwunne In

Okehi Ii

230,000,000 29,325,000 0.00

156Energy/Power

SupplyUmuomara Etche

Construction Of Solar Powered

Street Light At

Umuomara/Umukpaku Ukehi Ii

248,000,000 31,620,000 0.00

157Energy/Power

SupplyIsaka Town Okrika

Electrification Of Isaka

Communities1,000,000,000 127,500,000 0.00

158 Total 25,988,364,138 2,574,728,542 2,371,005,354 1,639,069,507

159 Health Various VARIOUSSpecial Medical Referrals and

Check-up for the State300,000,000 45,000,000

160 Health Sakpenwa TaiSpecialist Hospital/Equipment And

Expanded Scope600,000,000 124,812,294 48,913,264 48,913,264

161 Health Kpite ElemeConstruction Of Proposed

Jspecialist Hospital245,500,000 36,825,000

162 Health Tombia DegemaBuilding Of Hospital In Tombia

Rivers State150,000,000 22,500,000 17,671,500 17,671,500

163 Health Alesa ElemeConstruction Of Hospital At Alesa.

Eleme249,500,000 61,920,770 50,450,000 50,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 15 of 119

Page 328: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

164 Health Tua Tua KhanaConstruction Of Tua Tua Cottage

Hospital, Khana249,500,000 36,750,000 50,000,000

165 Health Akpajo ElemeConstruction Of Hospital At

Akpajo Eleme Lga, Rivers State249,500,000 37,425,000

166 Health Bonny Bonny

Upgrading and renovation of Bonny

Primary Health Care Centre in

Bonny LGA of Rivers State

205,000,000 30,750,000

167 Health Onne ElemeBuilding Of Cottage Hospital In

Onne249,500,000 36,750,000 28,863,450 50,000,000

168 Health Oylgbo OylgboBuilding Of Cottage Hospital In

Oyigbo249,500,000 18,750,000 24,494,663 50,000,000

169 Health Alesa Eleme Construction Of Hospital At Alesa 249,500,000 37,425,000 -

170 Health Kpite ElemeConstruction Of Proposed

Specialist Hospital 245,500,000 36,825,000

171 HealthAll Lgas In

Rivers StateRivers State

Procurement Of Hospital

Equipments For Primary Health

Care Centres In The 23 Lgas

600,000,000 52,874,158 100,580,900 0.00

172 Health Okolomade Abua OdualSuppy Of Medical Equipment At

Okolomade Health Centre200,000,000 25,500,000 0.00

173 Health Ogbogolo Ahoadd West

Construction Of Comprehensive

Health Centre At Ogbogolo

Community In Ahoada West L.G.A

45,722,148 4,488,773 0.00

174 Health Eteo ElemeBuilding Of Cottage Hospital In

Eteo245,000,000 33,957,000 0.00

175 Health Asarama AndoniConstruction Of Cottage Hospital

At Asarama250,000,000 37,500,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 16 of 119

Page 329: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

176 Health Okolomade Abua OdualRefurbishing And Furnishing Of

Health Centre In Okolomade238,000,000 30,345,000 0.00

177 Health Bodo GokanaComplete Renovation Of Bodo

General Hospital (Phase 1)150,000,000 17,671,500 0.00

178 Health Akwu EtcheConstruction Of Comprehensive

Health Centre41,412,210 0.00

179 Health Unyengala AndoniRehabilitation Of Unyengala

Cottage Hospital 100,000,000 0.00

180 Health Total 5,113,134,358 391,782,222 420,436,049 453,409,764

181Jetty/Shore

Protection

Abonnema/Kr

a

Krama/Degem

a

Asalga/Delga

/ AkulgaShore Protection 2,080,332,500 129,457,440 381,212,331 500,000,000

182Jetty/Shore

ProtectionBuguma Asalga Buguma Shore Protection 2,860,215,966 992,612,247 200,789,550 200,789,550

183Jetty/Shore

ProtectionOgu Town Ogu-Bolo

Sandfilling And Shore Protection

Of Ogu Town8,133,835,917 5,501,898,370 200,000,000

184Jetty/Shore

ProtectionOkujagu Ama Okrika Shore Protection At Okujagu-Ama 2,690,636,366 1,702,166,828 85,083,495 100,000,000

185Jetty/Shore

ProtectionKrakrama Asari Toru

Compl. Of Reinforcement Concrete

Retaining Wall Embarkment And

Jetty At Krakrama.

253,910,044 55,589,862 38,086,507

186Jetty/Shore

ProtectionOpobo Opobo/Nkoro

Installation Of Cathodic

Protection System On The Opobo

Steel Sheet Pile Embankment

248,500,200 52,367,846 37,175,030 37,175,030

187Jetty/Shore

ProtectionIroniga Andoni

Jetty At Ironiga/ Igoma

Epere/Nkem169,780,000 25,467,000 20,027,700 20,027,700

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 17 of 119

Page 330: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

188Jetty/Shore

ProtectionIsaka Town Okrika

Construction Of 2 Nos Concrete

Landing Jetty182,364,760 27,354,714 23,562,000 23,562,000

189Jetty/Shore

ProtectionBukuma-Agum Asari -Toru Community Jetty 79,625,183 11,943,778 18,761,286 18,761,286

190Jetty/Shore

ProtectionOgbema Abua/Odual

Construction Of Concrete Landing

Jetty91,497,768 13,724,665

191Jetty/Shore

ProtectionOgbema Abua/Odual

Construction Of Concrete Landing

Jetty91,497,768 13,724,665

192Jetty/Shore

ProtectionKula Akuku-Toru

Construction Of Concrete Landing

Jetty85,224,570 12,783,686

193Jetty/Shore

ProtectionIloma Andoni Construction of Iloma landing jetty 150,000,000 22,500,000

194Jetty/Shore

ProtectionQueens Town

Andoni/

Opobo/

Nkoro

Queens Town foreshore protection 5,500,000,000 825,000,000

195Jetty/Shore

ProtectionKula Akukutoru

Construction Of Concrete Landing

Jetty85,224,570 12,783,686

196Jetty/Shore

Protection

Navy Ship

PathfinderPort Harcourt

Construction Of Jetty At The

Nigerian Navy Hydrographic

School, Borokiri At The Nigerian

Navy Ship Pathfinder, (Lot 2b),

Port Harcourt, Rivers State.

235,456,129 0.00

197Jetty/Shore

ProtectionKalaibiama Bonny

Shore Protection & Jetty

Construction Of Ngo-Lkuru Town286,884,182 71,721,045 65,450,000 0.00

198Jetty/Shore

ProtectionNgo-Lkuru Andoni

Canalization Project, Andoni Lga

Rivers State960,000,000 480,000,000 85,000,000 0.00

199Jetty/Shore

ProtectionKula Akuku-Toru Sandfilling/Shore Protection 10,012,000,000 597,926,306 66,383,495 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 18 of 119

Page 331: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

200Jetty/Shore

ProtectionAdada Abua/Odual Construction Of Landing Jetty 148,000,000 25,000,000 0.00

201Jetty/Shore

Protection

Kalio

Ama/George

Ama

OkrikaConstruction Of Kalio Ama Jetty

And George Ama Jetty180,000,000 27,000,000 27,000,000

202Jetty/Shore

ProtectionEmelego Abua/Odual Construction Of Landing Jetty 148,000,000 25,000,000 0.00

203Jetty/Shore

ProtectionOkolomade Abua/Odual Construction Of Landing Jetty 148,000,000 25,000,000 0.00

204Jetty/Shore

ProtectionGio Tai Shore Protection 980,000,000 124,950,000 0.00

205Jetty/Shore

ProtectionOpobo Opobo

Foreshorewall Protection In Opobo

Community2,818,902,570 422,835,385 0.00

206Jetty/Shore

ProtectionOgoloma Okrika

Ogoloma Shore Protection And

Drains 4,808,822,700 129,437,440 66,383,495 0.00

207Jetty/Shore

ProtectionIroniga Andoni

Ironija-Lwoma Nkoro/Lloma

Jetties250,000,000 70,000,000 32,725,000 0.00

208Jetty/Shore

ProtectionKe Community Degema

Construction Of Fore

Shoewall/Anding Jetty At Ke

Community In Degema Lga, River

State

200,000,000 30,000,000 0.00

209Jetty/Shore

ProtectionEkerekana Okrika

Sandfilling And Shore Protection

At Ekerekana Okrika In Rivers

State

11,151,432,936 250,000,000 0.00

210Jetty/Shore

ProtectionAkinima Ahoada East Shore Protection At Akinima 200,000,000 23,562,000 23,562,000

211Jetty/Shore

Protection

Abonnema

WharfPort Harcourt

Reconstruction Of Abandoned

Jetty245,525,700 36,828,855 28,925,383 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 19 of 119

Page 332: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

212Jetty/Shore

Protection

Minimah-

KalamaOpobo

Sand Filling Of Minimah Kalama

Community (Lots 1-9)6,500,000,000 975,000,000 0.00

213Jetty/Shore

Protection

Fimie - Ama

CommunityPort Harcourt

Shore Protection, Sheet

Pilling/Sand Filling/Jetty At Fimie-

Ama Community Ogoloma

2,000,000,000 300,000,000 0.00

214Jetty/Shore

ProtectionAbalama Asari -Toru Sandfilling/Reclamation Phase 2 960,655,000 500,000,000 0.00

215Jetty/Shore

ProtectionBodo Gokam

Jetty Renovation And Expansion

At Bodo210,000,000 31,500,000 0.00

216Jetty/Shore

ProtectionAlesa Eleme

Construction Site Preparation&

Reclamation With Sharp Sand At

The Hospital Site, Size 220mx

150m X 1 M

219,608,100 97,061,640 58,383,495 0.00

217Jetty/Shore

ProtectionOgbo Ahoada East

Reconst Of Concrete Landing

Jetty120,000,000 18,000,000 16,632,000 0.00

218Jetty/Shore

ProtectionAbissa Akuku-Toru Concrete Landing Jetty 81,832,941 12,274,941 10,711,932 0.00

219Jetty/Shore

ProtectionIkuru

Reclamation/Shore Protection In

Ikuru Town (Lots 1-2)1,500,000,000 225,000,000 0.00

220Jetty/Shore

ProtectionAzhiegule

Okrka/Ahoad

a West

Sandfilling Of Azhiegule Water

Front250,000,000 28,875,000 0.00

221Jetty/Shore

Protection

Abalama

(Behind Css)Asalga Sandfilling/Reclamation Phase 1 988,119,500 77,008,632 0.00

222Jetty/Shore

ProtectionWaja/Nkpogu Phalga Shore Protection At Waja/Nkpogu 700,000,000 7,522,500 0.00

223Jetty/Shore

ProtectionOgbema Abua/Odual

Construction Of Concrete Landing

Jetty91,497,768 0.00

224Jetty/Shore

ProtectionKula Akukutoru

Construction Of Concrete Landing

Jetty85,224,570 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 20 of 119

Page 333: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

225Jetty/Shore

ProtectionBara-Kono Ogoni

Bara-Kono Sandfilling And Shore

Protection955,000,000 121,762,500 0.00

226

Jetty/Shore

Protection

Total

70,137,607,706 10,012,108,313 4,417,222,207 2,089,480,774

227 Roads/Bridges Kaa/AtabaKhana &

Andoni

Construction Of Kaa - Ataba Road

& Bridge10,096,134,956 2,100,568,729 380,000,000 280,000,000

228 Roads/Bridges EremaOgba/Egbema

/Nd OniConst Of Erema Ring Road 3,409,156,163 340,000,000 63,893,906 63,893,906

229 Roads/Bridges OrashiOgba/Egbema

/Nd OniTrans - Orashi Highway 4,308,601,811 1,649,518,255 146,500,000 146,500,000

230 Roads/Bridges Rumuoghalu Obio-Akpor

Construction Of New Rumuoghalu

Layout Road Umuodoro off pipe

line Rumuagholu

350,000,000 52,500,000

231 Roads/Bridges Oyigbo Oyigbo

Construction Of Asihar Eletou

Road From Old To New Phc/Aba

Road

250,000,000 37,500,000

232 Roads/Bridges NdonlOgba/Egbema

/Nd Onl

Expansion Of Ndoni- Ukwuishikere

Road &. Const Of Bridge Dcross

Imonite Creek

1,467,637,995 1,069,185,502 159,498,458 140,000,000

233 Roads/Bridges Omudloga EmohuaConstruction Of Ubimini - Obiosimi

Road & Bridge (4.77km)2,784,235,514 1,330,235,885 110,900,000 110,900,000

234 Roads/BridgesEmohua And

OthersTai Electrification Of Six Communities 338,541,368 50,781,205

235 Roads/Bridges Omoku OnelgaIntegrated Central Drainage

System & Internal Road Networks1,293,733,447 103,950,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 21 of 119

Page 334: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

236 Roads/BridgesEleme Ring

Road Igbo-Eleme

Road Construction Road

Construction At Oil Mill/Eleme

Junction-Lgbo Etche-Umuechem-

Ozuzu

1,200,261,835 990,895,997 82,000,000 82,000,000

237 Roads/BridgesKira Dere

MoghoGokana

Construction Of Kira Dere Mogho

Road & Bridge On Gokana Lga-

Rivers State

2,474,519,928 2,103,341,939 100,000,000

238 Roads/BridgesUmuaturu-

NdashiEtche

Construction Of Umuaturu-

Umukeke-Umuechem-Ndashi215,143,500 80,161,990 44,861,593 44,861,593

239 Roads/ Bridges Iguruta Ikwerre

Construction of Igwuruta Palm

Field Estate Link road, Off

Checkpoint Phase I

245,000,000 50,000,000

240 Roads/Bridges Adada Abua/Odual Adada Internal Road 237,987,160 103,202,851 23,364,389 23,364,389

241 Roads/Bridges Rumuatanwhor Obl-Akpo

Construction Of

Rumutanwhor/Minta Rumuigbo

Road Ozuoba.

240,000,000 50,812,500 50,812,500

242 Roads/Bridges Ohia-Minita Obio/Akpor

Construction Of Ohia-Minita

Interanl Road And Darin Off East

West Road, Obio/Akpor

350,000,000 52,500,000

243 Roads/BridgesOkehi-Eberi-

Omuma

Eche &

Omuma Lgas

Contract For The Okehi-Eberi-

Omuma Road. Etche & Omuma

Lgas(12km And 120m Bridge),

Rivers State.

1,507,005,490 1,353,323,988 100,000,000 77,000,000

244 Roads/Bridges Alesa Eleme ElemeConstruction Of Hospital At Alesa

Eleme249,500,000 37,425,000

245 Roads/Bridges

Mini Orlu

Road Off Ada-

George

Obio-AkporConstruction Of Mini Orlu Road

Off Ada-George Road249,098,713 37,364,807

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 22 of 119

Page 335: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

246 Roads/Bridges Rukpokwu Obio-Akpor

Construction Of Ohia-

Igba.Rumuapu Internal

Road.Rukpokwu Town,

247,042,870 37,056,431

247 Roads/Bridges Mgbuigwe Ikwerre Mgbuigwe Road (1.7km) 247,000,000 49,749,410 34,234,200 34,234,200

248 Roads/Bridges Emohua EmohuaConstruction Of Emohua Internal

Road Phase 1249,000,000 62,261,038 29,334,690 29,334,690

249 Roads/Bridges Rundele EmohuaConstruction Of Ukeli Road

Rundele Community Emoha229,991,750 57,497,938 29,323,948 29,323,948

250 Roads/Bridges Woji Obio/Akpor

Calvary Street Off Eze

Gbakagbaka Road, Woji, Port

Harcourt.

150,000,000 22,500,000

251 Roads/Bridges Atali Obio/AkporApamini Onwor Road, Atali Town,

Obio/Akpor Lga, Rivers 150,000,000 22,500,000

252 Roads/Bridges Rumuagholu Port Harcourt

Wosu Street Off Rumuagholu

Road, Rumuokoro, Port Harcourt, 1

Km

150,000,000 22,500,000

253 Roads/Bridges Trans-Amadi Port Harcourt

Gudi Street Off Panama Off Odili

Road, Trans-Amadi, Port Harcourt,

Ikm

150,000,000 22,500,000

254 Roads/Bridges Eneka Obio/Akpor

Chinyere Maternity Road,

Rumucholu, Eneka, Rivers State,

Ikm

150,000,000 22,500,000

255 Roads/BridgesOhia Egberu Road, Ikm Off Km 17

Aba Road 150,000,000 22,500,000

256 Roads/Bridges Okogba Ahoada west

Ishieze Road, Okogba, Ahoada

West Local Government Area

(Ikm) Phase One.

150,000,000 22,500,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 23 of 119

Page 336: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

257 Roads/Bridges Mgbuoba Obio/Akpor

Road 12 First Avenue Okania Off

Shell Location Road, Mgbuoba, Port

Harcourt (1km)

150,000,000 22,500,000

258 Roads/Bridges Bodo Gokona

Bodo Hospital Mortuary Road To

Barikor Road, Bodo Gokana Local

Government Area

150,000,000 22,500,000

259 Roads/Bridges Aluu Obio/AkporEgbu Crescent Omuigwe, Aluu,

Rivers State 150,000,000 22,500,000

260 Roads/Bridges Elibrada Emohua LgaProvision Of Solar Powered Street

Light At Elibrada,232,876,160 71,725,857

261 Roads/Bridges Tende Ogu Bolo Tende/Ada Interndl Road (2km) 247,922,000 37,188,300 29,252,223 29,252,223

262 Roads/BridgesG.R.A., Phase

3Port Harcourt

Onyebelem/Ebebi Road, G.R.A.,

Phase 3 (2km) (Ring Pavement)249,300,000 57,121,618 29,370,033 29,370,033

263 Roads/ Bridges Iguruta Ikwerre

Construction of Igwuruta Palm

Field Estate Link road, Off

Checkpoint Phase II

245,000,000 50,000,000

264 Roads/BridgesOmuoko/

OmuayiaOmuma

Construction Of Omuoko/Omuayia

Road, Omuma Lga 249,450,245 37,417,537

265 Roads/Bridges Ellgboko Obio AkporConst, Of Eligboko-Eliozu Road

Off Borrow Pit99,913,000 14,986,950 70,000,000

266 Roads/Bridges Gwara-Lala KhanaConstruction Of Internal Road In

Gwaralala244,390,000 36,658,500

267 Roads/Bridges Akabuka OnelgaConstruction Of School Road

Akabuka245,528,000 36,829,200 24,104,711 24,104,711

268 Roads/Bridges Rukpoku Obio / AkporConstruction Of Igba Road

Network Off Rukpoku-Eneka Road239,923,550 35,988,533 50,983,754 50,983,754

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 24 of 119

Page 337: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

269 Roads/Bridges Egeonu Obio / Akpor Construction Of Egeonu Link Road 235,520,000 112,153,613 23,122,176 23,122,176

270 Roads/Bridges Eligbaboko Asaru-ToruConstruction Of Road With

Interlocking Paving Stone164,197,627 24,629,644 22,753,119 22,753,119

271 Roads/Bridges Ataba Andoni

Construction Of 2.139km Multiple

Rural Internal Road Network

Within Ward 11 Area

249,990,350 99,996,140 40,000,000

272 Roads/Bridges Alesa Eleme Eleme

Site Preperation And Reclamation

With Sharp Sand At The Hospital

Site At Alesa Eleme, Size 299m X

150m X 1 Meter

219,608,100 32,941,215

273 Roads/Bridges Oyigbo OyigboConstruction Of Internal Road

(Phase 1)249,500,000 125,820,300 48,989,325 57,000,000

274 Roads/Bridges Rumuepirikom Obio/Akpor Noble Drive Rood, Rumuepirikom ( 248,000,000 37,200,000 29,216,880 55,000,000

275 Roads/Bridges Rumuche Emuoha Emuoha Hospital - Rumuche Road 247,131,675 37,069,751 29,428,938 55,000,000

276 Roads/Bridges Ubimini Emuoha Ubimini - Award Road (1.8km) 248,300,000 37,245,000 29,252,223 55,000,000

277 Roads/Bridges Umunkaru OnelgaConstruction Of Umunkaru And

Samade Street, Omoku249,000,000 37,350,000 24,445,575 55,000,000

278 Roads/Bridges Iriebe PhalgaConstruction Of Iriebe Industrial

Layout Road240,020,000 14,967,072 55,000,000

279 Roads/Bridges AmahOgba/Egbema

/Ndoni

Construction Of New Layout Road

Network In Amah In

Ogba/Egbema/Ndoni Lga, Rivers

State

239,000,000 107,550,000 35,850,000

280 Roads/Bridges Okehi Etche

Construction Of Okehi Internal

Roads, Phase Ii, Etche, Rivers

State.

247,438,800 37,115,820 37,115,820

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 25 of 119

Page 338: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

281 Roads/Bridges Rumuene Obio-AkporConstruction Of Easy Avenue Road

24 Extension/Lucky Stree &248,039,750 89,850,265 65,000,000

282 Roads/ Bridges Amaikpu AndoniConstruction of unity road to

Amaaikpu Community Andoni LGA. 200,000,000 30,000,000

283 Roads/Bridges Mini Orlu Obio-AkporConstruction Of Mini Orlu Road,

Off Ada George Road249,098,713 112,094,421 64,000,000

284 Roads/Bridges Ebubu ElemeConstruction Of Ebebu Internal

Road, Eleme 249,500,000 249,500,000 -

285 Roads/Bridges OboburuOgba/Egbema

/ NdoniInternal Roads 239,747,717 35,962,158 61,135,668 50,000,000

286 Roads/BridgesBuan Internal

RoadsKhana

Construction Of Internal Road At

Buan 5km .244,079,472 111,803,165 23,962,502 60,000,000

287 Roads/Bridges Kalaoko Obio/AkporConst Of Of Road At Kalaoko Town

Exit/Entry248,135,250 101,485,285 29,232,814 50,000,000

288 Roads/BridgesTombla |

ExtensionPort Harcourt

Ohiamini Street, By Royal House

Of Grace, Off Tombia Extension

G.R.A., Port Harcourt (1.3km)

170,521,690 77,947,097 6,545,000 30,000,000

289 Roads/Bridges Rumuolumeni Obio/AkporConstruction Of Rumuakata-Elu

Internal Road, Rumuolumeni 234,000,000 66,455,672 60,000,000

290 Roads/Bridges Rumuolumeni Obio/Akpor

Street/Owhochukwu Lane, Aker-

Base Rumuolumeni In Obio/Akpor

Lga, Rivers State.

216,224,577 34,990,445 25,473,417 60,000,000

291 Roads/Bridges

Kings Gboms

Road By

Abacha

Obi/AkporConstruction Of Kings Gboms Road

By Abacha237,471,150 20,027,700 35,620,673

292 Roads/Bridges Ogbunabali Port HarcourtConstruction Of Ogbunabali

Internal Roads 178,669,218 107,655,300 50,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 26 of 119

Page 339: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

293 Roads/Bridges Umuofeke OmumaConstruction Of Umuefeke-

Umueze232,600,200 116,300,100 21,729,767 60,000,000

294 Roads/BridgesOtutu Street

Off EliapaminiObio-Akpor

Construction Of Otutu Street Off

Eliapamini Johnson Road Off321,327,976 48,199,196

295 Roads/ BridgesConstruction of Sime/Bara-

Ale/Ogu Road 150,000,000 22,500,000

296 Roads/Bridges Lubara KhanaProvision Of Solar Powered Water

Project At Lubara178,897,545 26,834,632

297 Roads/Bridges Duburo Khana Lg As

Construction Of East/West-

Duburo Road (5.103km), Khana

Lgas, Rivers State

231,723,896 126,013,013 32,375,250 55,000,000

298 Roads/Bridges Obonoma Akuku-Toru Obonoma Internal Roads 200,000,000 23,439,113 51,000,000 55,000,000

299 Roads/Bridges Buguma Asari-ToruConstruction of Buguma Ring Road

Phase I750,000,000 112,500,000

300 Roads/Bridges Port Harcourt Port HarcourtConstruction of Old Apani Road

(3.6KM)250,000,000 37,500,000

301 Roads/BridgesArukwo-

EmelesueAbua/Odual

Construction Of Arukwo-Emelesue

Road246,550,000 23,562,000 55,000,000

302 Road/Bridges Olom Ama Opobo/NkoroConstruction of Olom Ama Nkoro

road200,000,000 30,000,000

303 Road/Bridges Oduoha EmuohaConstruction of Oduoha-Ogbakiri

link road250,000,000 37,500,000

304 Road/Bridges Opobo Opobo/NkoroConstruction of Opobo-Kalama

bridge2,000,000,000 300,000,000

305 Road/Bridges Dema Andoni Construction of landing jetty 100,000,000 15,000,000

306 Roads/Bridges Tema Ifoko Asari ToruConstruction Of Tema Ifoko Rigid

Pavement Road Phase 2250,000,000 37,500,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 27 of 119

Page 340: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

307 Roads/Bridges Abam OkrikaConstruction of Abam-George-kalio

link roadd250,000,000 107,500,000

308 Roads/Bridges Abam OkrikaConstruction of Abam-Okrika link

road250,000,000 97,500,000

309 Roads/Bridges Rumuolumeni Obio AkporConstruction of flag avenue off

Aker road200,000,000 30,000,000

310 Roads/Bridges Iriebe Oyigbo Construction of Peacock Estate 204,969,000 30,745,350

311 Roads/Bridges Egbelu Obio AkporConstrucion of Hawkins street

Egbelu Ozodo205,000,000 30,750,000

312 Roads/BridgesConstruction of Apanbeleku new

layout205,000,001 30,750,000

313 Roads/Bridges Orepo Port Harcourt Constr of Ibe Kamalu road 205,000,002 30,750,000

314 Roads/Bridges Ede ONELGA Construction of Okwagi road 200,000,001 30,000,000

315 Roads/Bridges Ogbogoro Obio AkporConstruction of 2.5km Egbelu

Mgbaraja community in Ogbogoro250,000,000 37,500,000

316 Roads/Bridges Abuloma Port HarcourtConstruction of Jemaima street,

off Peter Odili road 150,000,000 22,500,000

317 Roads/Bridges Abbiama Asari ToruConstruction of Buguma-Abbiama

bridge249,500,000 37,425,000

318 Roads/Bridges Iwokiri OpoboConstruction of 1km road from

Opobo 11 to Iwokiri120,000,000 78,000,000

319 Roads/Bridges ATC OkrikaConstruction of ATC to Market

Okrika248,000,000 37,200,000

320 Roads/Bridges Odldo ElemeConstruction Of Internal Road

Odido248,500,000 136,669,734 24,396,488 55,000,000

321 Roads/BridgesRumukwurushi

RdEtche

Construction Of Chokocho/Lgbo/

Rumukwurushi249,000,000 78,813,225 24,445,575 55,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 28 of 119

Page 341: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

322 Roads/Bridges Degema DegemaConstruction Of Degema Internal

Roads200,000,000 40,712,501 46,200,000 55,000,000

323 Roads/Bridges Elele EmohuaConstruction Elele-Alimi Internal

Road200,000,000 30,000,000 30,000,000 55,000,000

324 Roads/Bridges Aker Base Obio/Akpor

Construction Of Owochukwu

Street, Aker Base (Phase Ii) Eagle

Cement Road,

178,550,000 26,782,500 26,782,500

325 Roads/Bridges Rumuigbo Obio/Akpor

Construction Of

Ordu/Chiworlu/Lhunwho Micah

Ihunwho Laneobio Akpor Lga

222,808,740 85,175,450 26,249,098 55,000,000

326 Roads/Bridges Obio Obio/AkporConstruction Of Worlu - Eguma

Street In Obio Akpor249,095,000 136,225,819 37,364,250

327 Roads/Bridges Lewe Gokana Construction Of Internal Roads 231,611,073 34,741,661 22,738,417 55,000,000

328 Roads/ Bridges Otunria AndoniConstruction of Rigid Pavement

and Drain at Otunria 150,000,000 22,500,000

329 Roads/Bridges Rumuwoji PortharcourtConstruction Of Road And

Drainage At Rumuwoji200,000,000 60,000,000 23,562,000 55,000,000

330 Roads/Bridges Peace Drive Obio Akpor Construction Of Peace Drive 214,742,000 103,517,310 25,298,755 55,000,000

331 Roads/Bridges Iriebe OylgboConst, Of Iriebe Indusrtial Layout

Road Phase 11240,204,800 144,731,400 28,298,527 55,000,000

332 Roads/Bridges Ohia Obi-AkpoConst, Of Living Stone /Ohia

Mgakiri Road169,000,000 19,909,890 55,000,000

333 Roads/Bridges Ubima IkwerreConstruction Of Omungu Road

(Ubima), Ikwerre Lga, Rivers State 249,000,000 133,539,188 37,350,000

334 Roads/Bridges Rukpoku Obio-AkporConstruction Of Internal Road At

Rukpoku-Rumuapa & Eneka222,377,830 33,356,675

335 Roads/Bridges Omodu Obio-AkporConstruction Of Omodu Street

Off Nta Road, Mgbuoba244,745,000 98,706,660 25,629,696 55,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 29 of 119

Page 342: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

336 Roads/Bridges Oyigbo OyigboConstruction Of Calabar Quarters

Road Off Afa Road Phase 1158,003,750 47,401,125 23,700,563

337 Roads/Bridges Rumuokwuta Obio/Akpor

Construction Of Road 7 Rumuokani

Rumuokwuta (Through Ngbuoba

New Road) Obio Akpor

174,757,250 75,901,880 26,213,588

338 Roads/Bridges EdeohaConstruction Of Edeoha Comunity

Roads With Drainage (5km)200,000,000 25,500,000 55,000,000

339 Roads/Bridges Ohia-Lgbo Obio-AkporConstruction Of Ohia-Lgba,

Rumuapu Internal Road, Rukpoku247,042,870 37,056,431

340 Roads/Bridges OmokuOgba/Egbema

/Ndoni

Rehabilitation Ofpalace

Road,Church,Cementry Road,High

Court,Omoku,Onelga

227,489,010 34,123,352

341 Roads/ Bridges

Ogbologbolo/

Obodhi/

Ozochi

Ahoada West

Construction of 10km

Ogbologbolo/Obodhi/Ozochi Road

with Bridge, Phase I

250,000,000 37,500,000

342 Roads/Bridges Ozuoba Obio/Akpor

Construction Of Rccg (Christ The

Lord), Ozuoba/Nta Link Road At

Obio/Akpor In Rivers State

238,000,000 26,850,000 35,700,000

343 Roads/Bridges Ogbogu/ObiteOgba/Egbema

/Ndoni

Construction Of Ogbogu - Obite

Link Road, Onelga 228,600,650 34,290,098

344 Roads/Bridges Egbelu Minita Obio-Akpor

Construction Of Internal Road In

Egbelu Minita New Layout

Opposite Jephtah Secondary

School, East West Road, Ozuoba

240,000,000 36,000,000

345 Roads/Bridges Ogu/Nonwa Ogu Bolo Ogu/Nonwa Road (2.1km) 249,850,000 123,574,325 64,973,000 37,477,500

346 Roads/Bridges Rumueme Obio/Akpor

Construction Of Road Ii Link Road,

Federal Housing Estate, Rumueme

In Obio/Akpor L.G.A.

240,745,000 162,159,025 28,362,168 50,223,807

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 30 of 119

Page 343: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

347 Roads/Bridges Okwuzi Ogba/Egbema

/NdoniRoad In Okwuzi Inonelga 226,289,250 33,943,388

348 Roads/Bridges Okujagu Port Harcourt Construction Of Okujiagu Internal

Road, Behind Zoo, Phalga 194,064,313 108,676,015 29,109,647

349 Roads/Bridges Akpajo/Eleme Eleme Internal Road Akpajo 227,057,277 34,058,591 57,899,606 50,000,000

350 Roads/Bridges Ogbakiri Emuoha Ogbakiri Interhnal Roads 247,330,755 107,931,189 63,069,343 50,000,000

351 Roads/Bridges Umukomdnu Omuma Umukamanu-Umudike Road -Phase 1 248,111,320 74,793,944 24,358,329 50,000,000

352 Roads/ Bridges Udebu Ihuaba Ahoada EastUdebu /Ihuaba road in Ahoada

East L.G.A (5 Kilometers) 250,000,000 37,500,000

353 Roads/Bridges Ogbudigha EmohuaConstruction Of Internal Roads

Ogbudigha, Emohua150,000,000 64,053,375 17,671,500 50,000,000

354 Roads/Bridges Igwuruta IkwereConstruction Of Igwuruta Internal

Roads And Drainages220,048,500 88,172,714 25,923,914 50,000,000

355 Roads/Bridges Kalaoko Khana

Construction Of Kalaoko Town -

Entry/Exit Road Khana Lga. East-

West Road Extension 5km

250,000,000 37,500,000 24,543,750 50,000,000

356 Roads/Bridges Oyigbo Oyigbo

Construction Of Afam Nta-

Umuagbai And Afam-Nta Mgboji

Ideçirinl

249,500,000 132,269,770 24,494,663 50,000,000

357 Roads/Bridges

Egberu -

Nonwa Bunu-

Tai

Oyigbo / TaiConstruction Of Egberu-Nonwa-

Bunu-Tai Road200,000,000 97,312,826 23,562,000 50,000,000

358 Roads/Bridges Bolo Ogu Bolo Construction Of Access Road 219,010,715 93,187,663 21,501,377 50,000,000

359 Roads/Bridges Phalga PhalgaConst Of Dayspring Lane, Off

Total Gospel Road Ejuan, Abuloma 101,191,175 27,136,250 15,178,676

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 31 of 119

Page 344: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

360 Roads/Bridges Oylgbo OyigboRehabilitation Of Unity Road/Close

At Oyigbo198,777,836 29,816,675 19,515,014 50,000,000

361 Roads/Bridges Emelesue Abua Odual Construction Of Internal Roads 232,000,000 164,189,490 34,800,000

362 Roads/ Bridges Borokiri PHSolar powered water project in

Borokiri 245,000,000 36,750,000

363 Roads/Bridges Aluu Obio/AkporConst Of Aluu Internal Road

Obio/Akpor 191,150,000 95,575,000 28,672,500

364 Roads/Bridges Ekerekana Okriko Ekerekana-Okochiri Rood (2km) 249,000,000 49,720,200 29,334,690 50,000,000

365 Roads/Bridges Obio Akpor

Construction of Rumuodunwere

Internal Roads & Drians and

Onwucheka Close by Radio Rivers,

Rumuodani, Elelenwo.

249,000,000 37,350,000

366 Roads/Bridges Akalama Akuku ToruConstruction of Akalama-Piri 1Km

Road100,000,000 15,000,000

367 Roads/Bridges Eneka Road Port HarcourtIriebe-Eneka Road (2.1 Km) (Rigid

Pavement)249,900,000 37,485,000 29,440,719 50,000,000

368 Roads/Bridges

Chdrles

Okonji

Oporoma/Tem

a

Port Horcourt

Construction Of Chorles Okonji

Adjoining Roads (Rigid Pavement)

(2.1km)

249,950,000 37,492,500 29,446,610 50,000,000

369 Roads/Bridges Tema Ifoko Asari -ToruConstruction Of Tema Ifoko Rigid

Pavement Road Phase 1180,000,000 53,040,000 50,000,000

370 Roads/Bridges Umubo-Abuchi Obio/AkporConstruction Of Flexible Pavement

In Umubo-Abuchi Street179,363,600 52,408,663 21,087,990 50,000,000

371 Roads/Bridges Omoku OnelgaConstruction Of King Jaja / Onyije

Streets, Off-Kriegani Rd, Omoku249,950,000 74,985,000 31,868,625 50,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 32 of 119

Page 345: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

372 Roads/Bridges Poth Harcort Obio AkporConstruction Of Chinwo Crescent,

Off Okporo, Porth Harcort116,932,794 24,848,219 47,222,885

373 Roads/Bridges Choba Obio AkporConstruction Of Mkpokwodu And

Adjoining Roads In Choba226,567,895 99,863,504 65,450,000 33,985,184

374 Roads/Bridges Rumuodamaya Obio / AkporConstruction Of Rumodomanya-

Agric Farm Road Phc 105,765,000 15,864,750 15,864,750

375 Roads/Bridges Abalama Asari -ToruRehab. Of Buguma-Ldo-Abalama

Degema Road1,041,739,799 671,502,490 181,369,707 50,000,000

376 Roads/Bridges Ellarugburu Obio / Akpor Construction Of Eliarugburu Road 174,834,000 63,155,529 26,559,078 50,000,000

377 Roads/Bridges Alakahia Obio/AkporConstruction Of Alakahia-Alogu

Road175,816,540 26,372,481 39,272,217 50,000,000

378 Roads/ BridgesUmuodiri-

UmurokeOmuma

Construction of 3km Umuodiri-

Umuroke Internal Roads, Phase I 245,000,000 36,750,000

379 Roads/Bridges Erema OnelgaConstruction Of Erema Internal

Road235,362,600 35,304,390 23,106,723 50,000,000

380 Roads/Bridges Obio/Akpor Obio/AkporThe Construction Of Spring Valley

Road, Off Nta Road, Obio/Akpor 174,757,250 43,689,313 26,213,588

381 Roads/Bridges Odlgbo Ahoada EastConstruction Of Odigbo-Odike

Road194,216,000 64,401,569 41,270,900 50,000,000

382 Roads/Bridges Kings Avenue PhalgaConstruction Of Kings Avenue Off

Tombia Extension Gra, Ph170,521,690 64,008,370 25,578,254

383 Roads/Bridges

Minikwu/Omu

ari

A/Omunwei

Link Road

(1km),

Ikwere

Construction Of

Minikwu/Omuaria/Omunwei Link

Road (1km), Igwuruta

100,000,000 15,000,000 26,180,000 50,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 33 of 119

Page 346: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

384 Roads/Bridges Rumuodara Obio Akpor

Construction of Peace Estate

internal road at 33 Nvuike road RD

road,

250,000,000 37,500,000

385 Roads/Bridges Ikata Ahoada EastConstruction Of Ikata Internal

Road And Drains, Ahoada East Lga 250,000,000 37,500,000

386 Roads/Bridges Elelenwo Obio-AkporReconstruction of Odani Road,

Rumuodani Elelenwo, Obio-Akpor200,000,000 30,000,000

387 Roads/Bridges Bodo City  Gokana Construction of Bodo City 2Km

Internal Road249,000,000 37,350,000

388 Roads/Bridges Bori KhanaConstruction Of Bori Internal

Road167,404,125 50,000,000

389 Roads/BridgesMgbuosimini

Eme AvenueObio Akpor

Construction Of Internal Road

Mgbuosimini Eme Avenue 230,000,000 34,500,000 29,325,000 50,000,000

390 Roads/Bridges Gbei RumugboConstruction Of Gbei Roral Ave.

And Adjourning Street, Rumuigbo168,542,112 25,281,317 19,855,946 48,000,000

391 Roads/Bridges Egbekwu/

Obor/ Obie Onelga

Construction of Nwa-Oriema

(Attah) Road and drainages at

Egbekwu/Obor/Obie

450,000,000 67,500,000

392 Roads/BridgesRumuoro/Ogb

a Kirl/EmohuoEmohua

Construction Of Rumuoro-Ogbakiri-

Tombia-Emohua Link Road150,000,000 67,110,711 38,250,000 45,000,000

393 Roads/Bridges Olom - Nkoro Opobo/NkoroConstruction Of A 2km Road From

Olom Nkoro To Nkoro Town195,583,290 77,927,171 19,201,390 45,000,000

394 Roads/Bridges Aker Base Obio/Akpor

Construction Of Erema/Okuta

Street Off Aker Road In Obio-

Akpor Lga

104,988,000 15,748,200 15,748,200

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 34 of 119

Page 347: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

395 Roads/Bridges Rukpoku Obio/AkporMgbuchi New Road Spur To

Wanyawu Street.200,000,000 130,409,587 23,562,000 45,000,000

396 Roads/Bridges K-Dere KhanaConstruction Of K-Dere Internal

Roads150,000,000 54,777,037 20,790,000 45,000,000

397 Roads/Bridges Obor

Ogba/

Egbema/

Ndoni

Construction Of Obor Internal

Roads248,000,000 151,233,960 29,216,880 45,000,000

398 Roads/Bridges Agip Estate Obio/Akpor

Construction Of Road 11, Federal

Housing Estate Road, Agip Estate,

Port Harcourt, Obio-Akpor Lga,

Rivers State

110,449,250 15,000,000 16,567,388

399 Roads/Bridges Atali Town Obio AkpurConstruction Of Internal Roads At

Rumukamalu170,000,000 87,605,873 25,298,755 45,000,000

400 Roads/Bridges Kwuruola Obio-AkporConst, Of Kwuruola Road Off

Stadium Road104,988,000 15,748,200 12,370,050 45,000,000

401 Roads/Bridges Rumuoke /

Rumuepirikom Obio/Akpor

Construction of 1km Rigid

Pavement at Anglican Avenue of

Rumuoke Road, Rumuepirikom

235,000,000 35,250,000

402 Roads/Bridges Omoku Onelga

Construction Of Road And

Drainage At Wilson Ake Road

(Phase 1) Omoku Town

120,000,000 33,610,923 14,137,200 45,000,000

403 Roads/Bridges ObuamaConstruction Of Obuama Internal

Road99,633,450 14,945,018 19,563,028 45,000,000

404 Roads/Bridges Okochiri OkrikaConstruction Of Okochiri-Okoro-

Ama Link Road99,633,150 30,494,359 9,781,485 45,000,000

405 Roads/Bridges Ada-Ariobu Port Harcourt

Construction Of Ada-Ariobu

Internal Road Netwrok Off

Abuloma Road By Fggc

180,000,000 27,000,000 23,562,000 45,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 35 of 119

Page 348: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

406 Roads/BridgesChief Onuoha

.Odu AvenuePhalga

Construction Of Chief Onuoha Odu

Avenue .Eliokani New Layou238,554,200 45,000,000

407 Roads/Bridges Woji PhalgaConstruction Of Chief Mgba

Street With Spur To Regal Avenue189,562,048 28,434,307 45,000,000

408 Roads/Bridges Eliozu Obio-AkporConstruction Of Eliozu Internal

Roads165,000,000 74,250,000 45,000,000

409 Roads/Bridges Rumukurusi Obio/Akpor

Pedestrian Concrete Bridge For

Rumuorianwo/Wogolo New Layout,

Off East-West Road, Rumukurusi,

Port Harcourt

121,351,205 60,675,603 18,202,681

410 Roads/Bridges

Okemini

Street/Ogbon

da

Obio-AkporConstruction Of Okemini

Street/Ogbonda Street/Sylvanua103,439,930 15,515,981 45,000,000

411 Roads/Bridges PH PHConstruction of Chief Daniel Amadi

street, off Stadium road, PH 200,000,000 30,000,000

412 Roads/Bridges Allen Avenue

Construction Of Allen Avenue

With Spui To Temple Amadi

Avenue

121,815,210 58,864,657 45,000,000

413 Roads/Bridges Rumuokparali Obio-Akpor

Construction Of 1.5km Of Road 1

Extension And Road 2 Extension

At Rumuokparali New Layout

300,000,000 45,000,000

414 Roads/Bridges Iriebe Etc HeConstruction Of Iriebe Community

School Road & Palace Street198,766,000 127,489,638 26,018,469 40,100,000

415 Roads/Bridges Borokiri Port HarcourtConst Of New Road Borokiri Port

Harcourt 99,633,150 14,944,972 14,944,973

416 Roads/Bridges Okrika Okrika Ilamooku Rd Okrika Lga 102,000,000 15,300,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 36 of 119

Page 349: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

417 Roads/Bridges Obio/Akpor Obio/Akpor

Extension Of Agu Street By Jabez

Bus Stop Off

Ogbogoro/Rumuolumeni Road

(Rigid Pavement), Obio Akpor Lga,

Rivers State

89,953,750 13,493,063

418 Roads/Bridges Ozuba Obio/Akpor

Construction Of Rivers

Street/Royal Avenue

Road/Drainage Behind Nta Station

220,000,000 40,000,000

419 Roads/Bridges Alesa Eleme Construction Of Alesa Eleme Road 249,500,000 37,425,000 10,780,000 37,425,000

420 Roads/BridgesDauwari

StreetOblò Akpor

Construction Of Chief Dauwari

Street (Internal Roads) Off Ada99,000,000 14,850,000

421 Roads/BridgesSalvation

AvenueObio Akpor

Salvation Avenue Isaac Ehio Lane

By Bakery Junction Off Ada105,000,000 13,387,500 40,000,000

422 Roads/Bridges Yeghe Gokhana

Construction Of Asphalting And

Side Drains Of Barako -Yeghe

Road

100,000,000 14,956,451 23,562,000 40,000,000

423 Roads/Bridges Abonnema AkulgaConstruction Of Abonnema New

Site Internal Road210,000,000 29,918,745 24,740,100 40,000,000

424 Roads/BridgesEgbekwu

/Obrikom

Ogba/

Egbema/

Ndoni

Construction Of Obie Internol

Roads248,000,000 172,054,493 29,216,880 40,000,000

425 Roads/Bridges Elelenwo Obio/Akpor

Construction Of Aluworks Road

With Spur At Minigwugwu,

Elelenwo

131,231,450 59,054,153 19,684,718

426 Roads/Bridges Umuebule Port Harcourt Const Of Pilgrim Hospital Road 162,345,128 99,156,060 19,125,880 40,000,000

427 Roads/Bridges Ozikohua Etche Ozikohua/Uzuzu Road (2km) 249,000,000 29,334,690 40,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 37 of 119

Page 350: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

428 Roads/Bridges Woluchem Phalga

Aso Rock Estate Ahiamakara Off

Trans-Amadi Indu. Lay-Out

Construction Of Rumuokeke

88,000,000 12,498,255 20,734,560 40,000,000

429 Roads/Bridges Obio/Akpor Obio/Akpor

Const Of Internal Rd Of

Worlueguma, Wachukwu Roads In

Loboloji Layout

99,633,150 35,761,758 14,944,973

430 Roads/Bridges Ogbudigha EmuohaConstruction Of Internal Roads At

Ogbudiagha (Phase 2)96,409,000 14,461,350 9,464,954 40,000,000

431 Roads/Bridges Rumuokwurish Obio/AkporConstruction Of Owen Street, Off

Rumukwurish107,835,200 34,871,603 10,586,721 40,000,000

432 Roads/Bridges Dumo-Ama OkrikaConstruction Of Dumo-Ama And

George-Ama228,224,080 108,953,978 29,874,532 40,000,000

433 Roads/BridgesChiji Nu Ehie

EhleObio-Akpor

Construction Of Chiji Nu Ehie Ehie

Community Road, Ozuoba187,770,500 28,165,575 19,663,327 40,000,000

434 Roads/Bridges Minichlwandd IkwerreConstruction Of Unity Layout

/Minichiwandd Road, Adanta217,656,088 108,828,044 22,792,945 40,000,000

435 Roads/Bridges Okrika Okrika

Construction Of Waterside To

St.Peters Road Okirika In Okirika

L.G.A.

135,264,950 20,289,743

436 Roads/Bridges Mogho GokanaConstruction Of Mogho Internal

Road (12 Km)153,013,880 45,173,846 40,000,000

437 Roads/Bridges Rumuodomaya Obio-AkporConstruction Of Egbelu /Eliozu (

Benviatto School), Rumuodomaya216,779,200 85,232,187 40,000,000

438 Roads/Bridges

Chief

Ikegwuru Kala

Stret

Obio-AkporRehabitation Of Chief

Lkegwuru(Kala Street)102,540,000 38,914,213 10,737,989 40,000,000

439 Roads/Bridges Erema Onelga Construction Of Ude Road, Erema 101,676,750 16,096,103 40,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 38 of 119

Page 351: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

440 Roads/Bridges Ohio Oroigwe Obio-AkporConstruction Of 1 Km Road At

Ohia Oroigwe93,963,000 14,094,450 40,000,000

441 Roads/Bridges Ndashi Street PhalgaConstruction Of 1 Km Road At

Ndashi Street Off Olu Obansajo102,335,450 30,700,635 40,000,000

442 Roads/Bridges

Off Ada

George,Port

Harcourt

Obio/Akpor

Reconstruction Of Drainageat Mini-

Orlu Road, Off Ada George, Port

Harcourt

142,000,000 49,700,000 40,000,000

443 Roads/Bridges

Kono

Community

Road

KhanaConstruction Of Kono Community

Road (1km)100,000,000 37,724,542 40,000,000

444 Roads/Bridges Borokiri Port HarcourtConstruction Of Estate/Golden

Street, Borokiri Layout. 129,782,195 37,342,500 19,467,329

445 Roads/Bridges Apagodo Obio-AkporConstruction Of Apagodo Street,

Off Ada George Road211,116,232 31,667,435 40,000,000

446 Roads/Bridges Rumuigbo Obio/AkporConstruiction Of Chiziezebrabra

Road Rumuigbo, Port Harcourt 123,268,706 53,340,060 18,490,306

447 Roads/Bridges Obio/Akpor Obio/Akpor

Construction Of Elder J. W.

Ejekwu Close In Obio-Akpor Lga,

Rivers State

117,278,307 17,591,746 17,591,746

448 Roads/Bridges Eleme Eleme Const Of Nsisiokem Rd 97,047,545 47,628,199 14,557,132

449 Roads/Bridges Abuloma PhalgaConstruction Of Gas Junction Link

Road Off Abuloma152,436,211 76,580,031 37,593,510 38,262,671

450 Roads/Bridges Elenwa Port HarcourtConstruction Of 1000m Elenwa

Internal Roads, Grace Avenue 100,532,250 55,292,738 15,079,838

451 Roads/BridgesOkaki Market

RdAhoada West

Construction Of Okaki Market

Road120,000,000 69,096,006 14,137,200 36,766,794

452 Roads/Bridges Chiolu Obio/AkporConstruction Of Chiolu Street

Obio/Akpor (Eddybo)102,106,160 34,848,019 21,697,559 35,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 39 of 119

Page 352: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

453 Roads/Bridges Rumuomasi Obio/Akpor

Construction Of Market Lane, Off

Uyo Sfrt, Adjoining Market Rd

Rumuomasi

109,988,000 28,046,940 35,000,000

454 Roads/ BridgesUmuodiri-

UmurokeOmuma

Construction of 3km Umuodiri-

Umuroke Internal Roads, Phase II 245,000,000 36,750,000

455 Roads/BridgesUzeogbelu/O

mu DiogaIkwerre

Tarring Of Uzeogbelu/Omudlogd

In Ikwerre-Ph92,248,817 12,000,000 35,000,000

456 Roads/Bridges Ph Port Harcourt Construction Of Civic Close Gra 87,785,250 47,502,820 35,000,000

457 Roads/BridgesOgbakiri-

DegemaEmohua

Rehabilitation Works On Ogbakiril-

Degema Road212,177,482 31,826,622 20,830,524 35,000,000

458 Roads/Bridges Eliozu Obio / AkporConstruction Of New Heaven

Aveneu Road Eliozu60,988,494 15,247,124 12,960,055 35,000,000

459 Roads/Bridges Atali Obio / Akpor Construction Of Chief Eric Aso 149,372,023 77,362,980 31,200,183 35,000,000

460 Roads/Bridges Ekpene Ahoadd EastConstruction Of Ekpene-Nwakuya

Road97,699,350 39,022,931 20,671,109 35,000,000

461 Roads/Bridges Adc Road Port HarcourtConst Of Bright Ihunwo Street,

Off Adc Road 99,633,150 14,944,973

462 Roads/Bridges Rumuokwuta Obio-Akpor

Construction Of Ichenwo Total

Child (Oro-Ekpo) Street Off

Iwofe Road

199,241,350 29,886,201 35,000,000

463 Roads/Bridges Umuihu OnelgaConstruction Of Umuihu Street,

Akabuka93,003,750 13,950,563 35,000,000

464 Roads/Bridges

Owhor

Chukwu

Street

Obio-AkporConstruction Of Owhor Chukwu

Street, Rumuolumini95,207,280 40,464,236 9,970,106 35,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 40 of 119

Page 353: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

465 Roads/Bridges Iwofe Obio/Akpor

Const Of Mem Road, 6th Avenue &

Ext. Button Close, Iminabo Close &

Amaechi St. Off Iwofe Road

99,633,150 35,589,445 14,944,973

466 Roads/Bridges

Chief Ochoma

Road. Off

Eagle Cement

Road

Phalga

Constructor! Of Assemblies Of

God Church Road/Chief Ochoma

Road, Off Eagle

78,432,198 23,829,182 35,000,000

467 Roads/Bridges

Ogologo

Road,Off East

West Road

(1km)

Obio/Akpor

Construction Of Chief Alex

Wele/Isi-Apa Ogologo Road, Off

East-West Road (Ikm), Nkpou-

Rumuigbo

100,000,000 49,507,594 15,000,000

468 Roads/Bridges Akpajo ElemeConstruction Of Calvary Drive,

Akpajo, Eleme Lga, Rivers State. 115,863,000 86,897,250 28,965,750

469 Roads/Bridges Ogbonda Port HarcourtConst Of Circular Road/Goodluck

Mark Ogbonda Road 99,633,150 48,820,244 14,944,973

470 Roads/Bridges Mile 4 Obio/Akpor

Emergency Re-Construction Of

Worgumati/Chinda Nu Ordu/Chief

James Ogite Street, Mile 4

100,000,000 15,000,000 15,000,000

471 Roads/ Bridges Dikibo Obio Akpor Construction of Dikibo road 240,020,000 20,000,000

472 Roads/Bridges Nyokuru Khana

The Construction Of Nyokuru

International Road At Khana L.G.A

In Rivers State.

100,000,000 15,000,000 15,000,000

473 Roads/Bridges Aba Road Obio/Akpor

Emergency Repairs Of Aba Road

From Eleme Junction (Crushec

Rock Industries To Aba)

121,866,300 18,279,945

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 41 of 119

Page 354: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

474 Roads/Bridges

Old Abua

Road, Phase Li

(Starting

From Edeoha

Market,

Through Mile

5, Linking

Ahoada East

Construction Of Old Abua Road,

Phase Li (Starting From Edeoha

Market, Through Mile 5, Linking

Gufanti And Upto The New Abua

Road (1km)

100,000,000 30,800,000

475 Roads/BridgesRccg (Regional

Camp)Port Harcourt

Emergency Re-Construction Of

Rccg (Regional Camp) Road Lots 2,

Linking Phc/Owerri Road Ada

George/ Airport Road

100,000,000 30,800,000

476 Roads/Bridges

Professor

Eneyo Close

Linking

Ohakwe Road

And Otobo

Street ,11km).

Port Harcourt

Construction Of Professor Eneyo

Close Linking Ohakwe Road And

Otobo Street (1 Km), Rumigbo

100,000,000 30,800,000

477 Roads/BridgesRccg (Regional

Camp)Port Harcourt

Emergency Re-Construction Of

Rccg (Regional Camp) Road Lots 1 3100,000,000 30,000,000

478 Roads/Bridges

Umuajie

Roads In

Obrikom

ObrikomEmergency Rehabilitation Of

Umuajie Roads In Obrikom100,000,000 30,000,000

479 Roads/Bridges Ogbunabali Port Harcourt

Emergency Rehabilitation Of

Aguma/Akjacent Street Linking

Easter By-Pass, Ogbunabali

100,000,000 30,000,000

480 Roads/Bridges Bangha Khana Construction Of Bangha Road 248,400,500 30,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 42 of 119

Page 355: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

481 Roads/Bridges Rumuene Obio-AkporConstruction Of Easy Avenue Road

24 Extension/Lucky Stree &248,039,750 30,000,000

482 Roads/Bridges Ohia-Lgbo Obio-AkporConstruction Of Ohia-Lgba,

Rumuapu Internal Road, Rukpoku247,042,870 30,000,000

483 Roads/Bridges Oka Nkpala Eleme Construction Of Oka Nkpala Road 246,111,600 30,000,000

484 Roads/Bridges Kaani KhanaConstruction Of Kaani Community

Road245,532,000 30,000,000

485 Roads/Bridges Ozuboko Port HarcourtOzuboko Internol Ring Road With

Drains100,200,000 40,080,000 19,396,994 30,000,000

486 Roads/Bridges Rumuolumeni Obio/Akpor

Const. Of Chiwata/Ohiamini Road

Road, Rumuolumeni Obio/Akpor

Lga,

249,000,000 30,000,000

487 Roads/ Bridges Kuruola PH Construction of Kuruola road 104,988,000 15,748,200

488 Roads/Bridges Okeh/Ordu Obio/AkporConstruction Of Okeh/Ordu

Layout Eliowhani Port Harcourt245,000,000 160,010,869 28,863,450 30,000,000

489 Roads/Bridges Umuebulu EtcheConstruction Of Chief Nnandi

Street, Unubulu, Etche Lga96,075,000 61,509,131 30,000,000

490 Roads/Bridges

Williams

Ihunwo/Benne

t

PhalgaConstruction Of Willaims

Ihunwo/Benneth Eke Layout In69,943,485 30,000,000

491 Roads/Bridges Emuoha EmuohaConstruction Of Akpabu Bypass

Road, Emohua247,578,256 233,134,409 30,000,000

492 Roads/Bridges Rumuakpu Obio-AkporConstruction Of Ogbodo Road,

Rumuakpu,Rukpoku153,960,750 92,376,450 30,000,000

493 Roads/Bridges Degeme DegemaReconstruction Of Catering Rest

House Access Road In Degeme 96,463,400 14,469,500 30,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 43 of 119

Page 356: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

494 Roads/BridgesChukwu

AgholuObio-Akpor

Construction Of Chukwu Agholu

Street, Rumuoghalu90,756,855 49,916,270 30,000,000

495 Roads/Bridges Egbelu-OzodoConstruction Of 6th Avenue

Internal Roads, Egbelu-195,150,000 159,489,668 30,000,000

496 Roads/Bridges Rumudara Obio-AkporConstruction Of 1 Km Road At

Egbelu Road & Environs Okporo93,963,000 40,164,656 30,000,000

497 Roads/Bridges Oyigbo OyigboConstruction Of Iwu Street With

Spur Into School Road In Oyigbo94,231,200 21,059,695 9,867,897 30,000,000

498 Roads/Bridges Obio/Akpor Obio/Akpor

Const Of Kukpakwadima Street

Off Eligbolo Road, Obio/Akpor

Lga,

99,633,150 33,875,271 14,944,973

499 Roads/Bridges

Open Door

Road Linking

Ada George

Port Harcourt

Remedial Works On Open Door

Road, Linking Ada George Road,

Port Harcourt

110,000,000 35,270,167 28,798,000 30,000,000

500 Roads/BridgesLane 5 Egbelu

New LayoutObio/Akpor

Construction Of 4th Avenue Lane,

5 Egbelu New Layout (1km)100,000,000 15,000,000

501 Roads/Bridges

Machi Street

(1km), Ede

Town

Ogba/Egbema

/Ndoni

Construction Of Machi Street

(1km),Ede Town100,000,000 15,000,000 26,180,000 30,000,000

502 Roads/Bridges

Grace

Street,Off

Farm Road

(1km)

Mgbuoba

Construction Of Grace Street,Off

Farm Road (1km), Mgbuoba,Linking

Road 8 On New Road

100,000,000 30,414,415 26,180,000 30,000,000

503 Roads/Bridges

Immanuela

Drive,Off

Danguma Road

Port Harcourt

Construction Of Immanuela Drive,

Off Danguma Road (1km),Off Odili

Road

100,000,000 15,000,000 26,180,000 30,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 44 of 119

Page 357: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

504 Roads/BridgesEze-Ohali /

Police RoadOmoku

Emergency Rehabilitation Of Eze-

Ohali / Police Road100,000,000 57,889,414 30,000,000

505 Roads/ Bridges Ohiamini PH Construction Ohiamini road 104,988,000 15,748,200

506 Roads/BridgesRumuosi/Ozuo

baObio/Akpor

Remedial Works On Rumuosi-

Ozuoba Road, Industry Road And

Harbour Road, Obio Akpor Lga,

Rivers State

148,379,325 111,284,494 22,256,899

507 Roads/Bridges Ovunwo Lane Obio/Akpor

Construction Of Ovunwo Lane

With Spur At Road In Clitter

Layout To Link East West Road

99,297,675 14,894,651 14,894,651

508 Roads/Bridges Amaji EtcheConstruction Of Internal Roads At

Amaji Roads At Amaji, Etche L.G.A 179,000,000 26,850,000

509 Roads/Bridges Elioparanwo Obio-AkporConstruction Of Elioparanwo

Road/Drains( Ada George243,312,201 29,976,063

510 Roads/Bridges Rumuolumeni Obio-AkporConstruction Of Acess Road To

Sanitation Authority Final Dump236,600,200 29,149,145

511 Roads/Bridges Wali Woko Obio-AkporConstruction Of Wali Woko Road

With Spur At Ihia Rumuoke231,169,550 28,480,089

512 Roads/Bridges Obio/Akpor Obio/Akpor

Construction Of Kpakani Oad/Obi

Wali Link Road, Rumuigbo, Obio

Akpo Lga Port Harcourt

58,906,932 31,996,843 8,836,040

513 Roads/Bridges Port Harcourt Port Harcourt

Construction Of Wechie – Okokwu

Road Port Harcourt. 1.1km And

Drians

53,334,120 26,667,060 8,000,118

514 Roads/Bridges Okporomlni OnelgaConstruction Of Okporomini-

Omokiri-Ehulor-Hope Avenue139,157,870 76,879,367 36,655,722 25,622,780

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 45 of 119

Page 358: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

515 Roads/Bridges Rumueme Phalga

Rehabitation/Construction Of 1st

Avenue Federal Housing Estate

Rumueme With Spur To Nddc Side

Gate Linking Tombia Street,Phc

205,000,000 25,256,000

516 Roads/Bridges Gwara-Laalaa KhanaConstruction Of Gwaraa-Laalaa,

Phase 11205,000,000 25,256,000

517 Roads/Bridges Bori Khana Const Of Old Bori Road, 99,633,150 74,468,705 14,944,973

518 Roads/Bridges Ekerenam Obio/Akpo

Construction Of Chief Justus

Ojika Avenue With Spur At

Ekerenam Elloparanwon

122,896,400 85,746,109.13 12,065,354 25,084,937

519 Roads/Bridges Abonnenna Akuku-Toru Resurfacing Of Road In Abonnema 50,704,885 7,605,733 11,947,085 25,000,000

520 Roads/BridgesIgwuruta/Rum

uokwurushiObio/Akpor

Wosu Street Off

Igwuruta/Rumuokwurushi

Rumuchiolu, Obio Akpor

200,000,000 168,891,296 25,000,000

521 Roads/Bridges Abuloma Port Harcourt

Construction Of Road From Olari

Ghiali Drive- Deineyi Close,

Abuloma,Off Peter Odili Road

98,520,450 63,829,314 14,778,068

522 Roads/Bridges Rumuokani Obio-AkporConstruction Of Rumuokani Street

Off Choba Road.Rumuokwuta195,087,500 24,034,780

523 Roads/ Bridges PH Obio AkporConstruction Tower of Love

(Adamac) road 104,988,000 15,748,200

524 Roads/Bridges Odagwa EtcheConstruction Of Odagwa Internal

Roads,Phase Ii194,942,710 24,016,942

525 Roads/Bridges Aleto ElemeConstruction Of Adoo New Town

Internal Road, Aleto, Eleme192,701,233 23,740,792

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 46 of 119

Page 359: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

526 Roads/Bridges Umuagwu OmumaConstruction Of Umuogwu Road &

Drains Phase 194,838,389 71,128,791 23,709,597

527 Roads/Bridges Abuloma Port Harcourt Panama -Hanson Road With Spurs 88,774,350 65,249,682 23,524,668

528 Roads/Bridges Abuloma Port Harcourt

Re-Construction Of Faith Mission

Avenue Road, Inu Community,

Trans Amadi Industrial Layout

Area, Abuloma Port Harcourt

58,160,465 31,510,190 8,724,070

529 Roads/Bridges Nwachukwu Obio/Akpor

Re-Construction And Rehabilitation

Of Nwachukwu Street, Mile Ii

Diobu,Port Harcourt

43,009,470 19,714,761 6,451,421

530 Roads/BridgesHerbert

MacouleyPhalga

Resurfacing Of Herbert

Macauley/Atako/Nzlmiro Street,170,731,550 21,034,127

531 Roads/ Bridges Ebukuma -

OtuibotoronAndoni

Construction of Ebukuma -

Otuibotoron road200,000,000 30,000,000

532 Roads/Bridges Bori Camp Obio-AkporConstruction Of Bori Camp

Internal Road, Phase Iii166,399,360 20,500,401

533 Roads/Bridges Rumuola Obio-AkporConstruction Of Mfm Internal

Road And Street Lightting In163,358,233 20,125,734

534 Roads/Bridges Rumuokoro Obio/Akpor

Construction Of Foundation Faith

Church Road By Rumuokoro Police

Station Obio Akpor.

222,808,740 174,562,593 26,249,098 20,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 47 of 119

Page 360: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

535 Roads/Bridges Port Harcourt Port Harcourt

Construction Of Interlocking

Pavement On Chief Segun Akinyomi

Close Off Vero Avenue/Peter Odili

Road, Port Harcourt Lga, Rivers

State

55,659,550 8,348,933

536 Roads/Bridges Port Harcourt Port Harcourt

Construction Of Link Road

Through A.P. Ambrose Ogbonna

Avenue (Off Stadium Road) To

Mini Igbogo Street With Spur In

Port Harcourt

78,447,600 59,379,602 11,767,140

537 Roads/Bridges Port-Harcourt Obio-AkporConstruction Of Emmanuel O.

Amadi Road154,381,815 19,019,840

538 Roads/Bridges Paulina Edet EtcheConstruction Of Paulina Edt Street

Umuebulu153,960,750 18,967,964

539 Roads/BridgesIwoma Green

BonnyOnelga

Const/Rehab Od Existing Rural

Water Scheme At Iwoma Green

Bonny

60,745,373 18,709,575

540 Roads/Bridges Ogoranya Ewo OnelgaConstruction Of Ogaranya Ewo

Road, Omoku151,587,470 18,675,576

541 Roads/BridgesChiorlu

Close/EvuorluObio-Akpor

Construction Of Chiorlu

Close/Evuorlu Close 8, Off Nta146,670,000 18,069,744

542 Roads/Bridges Allen AvenueConstruction Of Allen Avenue Off

Oroigwe Road With Spur139,545,415 17,191,995

543 Roads/Bridges Lupatabo Ahoada EastConstruction Of Upatabo-Ula-

Ikata Link Road, Phase Ii137,294,475 16,914,679

544 Roads/Bridges Apamini Obio-AkporConstruction Of Apamini

Road.Mgbukara132,154,400 16,281,422

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 48 of 119

Page 361: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

545 Roads/Bridges Nkakini Strt PhalgaConstruction Of Nkanini Street

Off Uyo Street, Rumuomasi130,667,000 16,098,174

546 Roads/Bridges Aker/Nkpoi Obio-AkporConstruction Of Aker/Nkpor

Internal Road, Rumuolumeni128,000,000 15,769,600

547 Roads/Bridges Rumuibekwe Obio-AkporConstruction Of 5th Avenue,

Rumuibekwe125,250,000 15,430,800

548 Roads/Bridges

Gideon

Avenue Off

Peter Odill

Phalga 122,827,446 15,258,057

549 Roads/BridgesSangama

IfokoAsalga

Construction Of Sangama Ifoko

Internal Road122,204,577 15,055,604

550 Roads/Bridges Rumuolumeni Obio-AkporConstruction Of Borrow Pit Street

Off Iwofe Road, Rumuolumeni121,364,000 14,952,045

551 Roads/Bridges

Bible

Missionary

Road

Obio-AkporConstruction Of Bible Missionary

Road.Umuepirikom120,000,000 14,784,000

552 Roads/Bridges Borikiri Port Harcourt

Rehabilitation Of Crossroads:

Baptist High Sch Main Gate To

Churchill Rd To Kingjaja Str. To

125,785,587 18,867,838 18,867,838 14,528,235

553 Roads/BridgesOgele New

LayoutObio-Akpor

Construction Of Ogele New Layout

Off Eliohani Road Oroigwe115,662,238 14,249,588

554 Roads/Bridges Apa-Ogwu Obio-AkporConstruction Of Apa-Ogwu,

Rumudara109,988,000 13,550,522

555 Roads/Bridges Abuloma Port Harcourt

Award Of Contract For Remedial

Works On Roads Leading To Nddc

Estate, Off Abuloma Road, Port

Harcourt, Rivers State

80,000,000 66,546,535 12,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 49 of 119

Page 362: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

556 Roads/Bridges Elioparanwo Obio/Akpor

C Onstruction Of Internal

Roads/Drains At Apa-

Ngbabueke/Rumuigwe Unit

Road/Favour Close, Elioparanwo

Town, Obio/Akpor

84,137,050 70,800,917 12,620,558

557 Roads/Bridges Odagwa Etche LgaConstruction Of 2nos. 6 Classroom

Block At Odagwa43,170,004 13,296,361

558 Roads/Bridges Eke StreetConstruction Of John/Joseph Eke

Street192,200,250 153,760,200 25,159,013 13,281,037

559 Roads/Bridges Nkpor Obio-AkporConstruction Of Giwa

Street/Okacha Road, Nkpor106,590,500 13,131,950

560 Roads/Bridges

Trans-Amadi

Indusrial

Layout

PhalgaConstruction Of Ebenezer Close

Off Righteous Minitry Avenue Off105,040,500 12,940,990

561 Roads/BridgesMathlas

Nyenye KumoObio-Akpor

Construction Of Mathias Nyenye

Kumo Road Of Aker Road104,988,000 12,934,522

562 Roads/Bridges Rumuodomaya Obio-Akpor Construction Of Transformer Road 104,988,000 12,934,522

563 Roads/Bridges

Nwabikeze

Street, Off

Krigene Road

Ogba/Egbema

/Ndoni

Construction Of Nwabikeze

Street, Off Krigene Road

(1km.Omoku,Ogba/Egbema/Ndoni

100,000,000 87,167,655 12,832,345

564 Roads/Bridges Odum/Ewha Port HarcourtTdrring Of Odum/Ewha Street In

Elekehia-Ph85,450,131 72,632,612 12,817,520

565 Roads/Bridges Umuebule EtcheConst, Of Umuebule Internal Road

Phase 1118,266,328 105,605,345 12,660,983

566 Roads/BridgesOwudo Road,

AbulomaPhalga

Construction Of Owudo Road,

Abuloma102,548,110 12,633,927

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 50 of 119

Page 363: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

567 Roads/Bridges

Wanwuna

Road Olf

Ohakwe

Obio-AkporCosntruction Of Wanwuna Road

Off Ohakwe Street. Obi Wali Link101,451,316 12,498,802

568 Roads/Bridges Dike/Edom PhalgaConstruction Of Dike/Ebom

Street, Oginigba98,824,740 12,175,208

569 Roads/BridgesChief Ume

StreetObio-Akpor

Construction Of Chief Ume

Street.Off Ada George Road98,730,030 12,163,540

570 Roads/Bridges Nyobe-Bangha KhanaConstruction Of Nyobe Bangha

Road98,556,075 12,142,108

571 Roads/Bridges Onne ElemeConstruction Of Internal Road

Phdse 1 Rsust Onne98,500,000 12,135,200

572 Roads/Bridges 1 Eli Okporo Obio-AkporConstruction Of Eli Okporo Link

Road With Spur At Rukpokwu98,358,042 12,117,711

573 Roads/Bridges Port-HarcourtResurfacing Of Maxchef Street

Off Iwofe Road98,000,000 12,073,600

574 Roads/Bridges Port-Harcourt Phalga

Construction Of Engr, Adola

Street Idamiete Drive/Lucky

Avenue Off

97,793,850 12,048,202

575 Roads/BridgesOnumini

OkporoObio-Akpor

Construction Of Onumini Okporo

Street With Spur At Acho Amadi

Close, Rumuodomaya

97,500,000 12,012,000

576 Roads/BridgesNkemka/Adjoi

ni

Construction Of

Nkemka/Adjoining Streets97,187,370 11,973,484

577 Roads/Bridges

Iwowari

Avenue/Earop

la

PhalgaConstruction Of Iwowari

Avenue/Earoplane Drive To Black96,081,405 19,133,596 11,837,229

578 Roads/Bridges Onne ElemeConstruction Of Internal Road

Phase Ii Rsust Onne Campus95,850,000 11,808,720

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 51 of 119

Page 364: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

579 Roads/BridgesEckankar

Street

Construction Of 1 Km Road At

Eckankar Street, Omoku95,110,313 11,717,591

580 Roads/Bridges

Eliminigwe

Housing

Estate

Obio-AkporConstruction Of Eliminigwe

Housing Estate.Phase Iii Elelenwo93,544,238 11,524,650

581 Roads/Bridges Oroekpo Obio-AkporConstruction Of 1 Km Road At

Oroekpo Road .Rumuepirikom75,000,000 63,604,032 11,395,968

582 Roads/Bridges

Ogbogoro

Egbelu Rd Off

Mgbosimini

Obio/AkporConstruction Of Road Ogbogoro

Egbelu Rd Off Mgbosimini96,555,900 85,168,880 11,387,020

583 Roads/BridgesChiziebrabra

RoadObio-Akpor

Construction Of Chiziebrabra

Road.Rumuigbo85,450,131 10,527,456

584 Roads/BridgesOriianwokpaka

NiObio-Akpor

Construction Of Concrete Road &

Drains At Oriianwokpakani Layout,85,057,875 10,479,130

585 Roads/Bridges Eliogbolo Obio-AkporConstruction Of Eliogbolo Link

Road By New Airport Road, Eliozu84,581,073 10,420,388

586 Roads/BridgesRugalaga,

Borrow PitObio-Akpor

Construction Of Rugalaga Borrow

Pit Road, Rumumoi84,404,335 10,398,614

587 Roads/Bridges Port-HarcourtConstruction Of Concrete Road &

Drains At Ekimigbo Off Ogologo76,891,684 9,473,055

588 Roads/BridgesMfm Orlumeni

RoadObio-Akpor

Construction Of Mfm Orlumeni

Road 3, Overlaying Nddc Road,

Rumuolumeni Phase

75,000,000 9,240,000

589 Roads/Bridges Abalama Asari Toru

Rehabilitation Of Existing Rural

Community Water Schemes,

Abalama,

29,950,855 9,224,863

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 52 of 119

Page 365: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

590 Roads/Bridges Port-Harcourt Obio-AkporConstruction Of Elder Adori

Street73,254,616 9,024,969

591 Roads/BridgesWechie-Port

HarcourtPort Harcourt

Maintenance Of Selected Roads In

P.H. Metropolis53,334,120 18,860,727 11,655,993 8,000,118

592 Roads/Bridges Okwalle KhanaConstruction & Repdirs Of Okwalle

Junction Luege Road66,970,190 8,250,727

593 Roads/Bridges

Ogbunabali

Internal

Roads

Port HarcourtInternal Road Construction In

Ogbunabali Phase 1178,668,218 107,655,300 10,629,219 8,184,499

594 Roads/Bridges Erema OnelgaConstruction Of Drains At

Okpulahia In Erema58,500,000 27,192,788 7,207,200

595 Roads/Bridges

Elder Lazarus

Avenue &

Elder

PhalgaConstruction Of Elder Lazarus

Avenue & Elder Emenike Gbekee56,624,895 6,976,187

596 Roads/BridgesChief Ntagbu

StreetPhalga

Construction Of Chief Ntagbu

Street, Elekahia.Rebisi55,355,559 6,819,805

597 Roads/Bridges Piribiri OkrikaFlood/Erosion Control Work at

Piribiri Community50,000,000 7,500,000

598 Roads/Bridges Zaami  Bori

Construction of Zaami

Street/Kor/Aa Kaani Bori Link

Road, Bori Urban 2Km with

concrete Bridge

245,000,000 36,750,000

599 Roads/Bridges UsokunConstruction Of Usokun Internal

Road40,474,949 4,986,514

600 Roads/BridgesChief Gbekee

RoadObio-Akpor

Recontrution Of Chief Gbekee

Road35,788,812 4,409,182

601 Roads/Bridges Road, Boroklri Port HarcourtEngr. Adoki Street/Damiete Drive

Off Peter Odili Road97,793,850 75,217,117 5,118,939 3,941,583

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 53 of 119

Page 366: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

602 Roads/Bridges OwuPhalga &

ObalgaConstr. Of Owu Road 96,800,000 91,893,632 4,000,000 3,080,000

603 Roads/Bridges

Elele-

Rumuekpe-

Ogbele

EmohuaCompletion Of Elele-Alimini-

Rumuekpe-Ogbele Road780,861,575 823,587,875 2,966,379 2,284,112

604 Roads/Bridges Rumuepirikom Obio/AkporRumuepirikom Internal Roads

(Phase I & Ii)988,119,500 77,008,632 8,000,000 0.00

605 Roads/BridgesF.C.E(T)

Omoku

Ogba/Egbema

/ Ndoni

Construction Of Internal Roads At

Permanent Site247,500,000 64,150,000 0.00

606 Roads/BridgesOff Add

George RoadOblo-Akpor

Construction Of Mini Orlu Road,

Off Ada George Road249,098,713 37,425,000 59,693,562 0.00

607 Roads/Bridges

Otari-Ogbelle-

Oshigboko

18.11-Okoma-

Okporowo

Abua/Odual &

Ahoada East

Lgas

Abua-Ogbelle-Oshigboko-Okoma 1

& 11 -Okporowo Road/Bridge [

18.453km Road And 31,5m

Bridge),Abua/Odudl &. Ahoada

East Lgas, Rivers State

819,437,042 345,310,270 118,956,446 0.00

608 Roads/Bridges Ahoada AhoadaConstruction Of Ahoada Internal

Road, Rivers State249,850,100 0.00

609 Roads/Bridges Abua/Odual Abua/OdualEmergency Road Repairs In

Abua/Odual900,000,000 250,000,000 0.00

610 Roads/Bridges Obio/Akpor Obio/AkporEmergency Road Repairs In

Obio/Akpor1,000,000,000 127,500,000 0.00

611 Roads/Bridges Ogu Town Ogu-Bolo

Construction Of Dasa Ama-Chukwu

Ama Bridge In Ogu Town, Ogu Bolo

Lga, Rivers State (Lots 1-2)

1,500,000,000 42,500,000 0.00

612 Roads/Bridges

Odhaje-

Ahoada Old

Brlgde

Ahoada EastConstruction Of Adhaje-Ahoada

Old Bridge844,999,980 408,893,546 155,899,995 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 54 of 119

Page 367: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

613 Roads/Bridges AbulomaDesign And Construction Of Bridge

From Abloma-Kalio-Ama5,000,000,000 637,500,000 0.00

614 Roads/Bridges Abonemo Akuku ToruRehabilitation Of Abonema-

Aboloma234,000,000 28,900,000 0.00

615 Roads/Bridges Abua CentralConstruction Of Internal Roads In

Abua Central950,000,000 400,000,000 0.00

616 Roads/BridgesOgu Sand

Field

Construction Of Ogu Sand Field

Internal Road With Drainage And

Electrification

800,000,000 2,550,000 0.00

617 Roads/Bridges Omuwhenchl Ikwerre

Construction Of 2.5km Rigid

Pavement Road From Omuwhench-

Omuoduweze-

249,000,000 37,350,000 0.00

618 Roads/Bridges Minikoko Ph 1.7km Road And Drainage 230,000,000 29,325,000 0.00

619 Roads/Bridges Omuma OmumaEgbely-Ogwe 4km Road Rigid

Pavement And Concrete Rd250,000,000 31,875,000 0.00

620 Roads/Bridges Road 18 : Phalga Ot Rood 18, Ohio-Oda Rumuokwuta 248,500,000 31,683,750 0.00

621 Roads/Bridges Opobo Opobo/Nkoro Minlmah Internal Road Network 250,000,000 37,500,000 0.00

622 Roads/Bridges Nsl Akukuri Nslakukurl Ring Road 200,000,000 25,500,000 0.00

623 Roads/Bridges Ogbakiri EmohuaReconstruction Of Ogbakiri

Junction Road998,000,000 127,245,000 0.00

624 Roads/Bridges Ihubogo-Akoh Ahoada East

Construction Of Ihubogo -Odieke-

Odlmerenyi-Akoh Road Phdse 1 &

11

1,407,693,327 850,255,876 84,638,992 0.00

625 Roads/Bridges Bakand Port Harcourt1.6km Rigid Pavement Road With

Drainage236,000,000 30,400,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 55 of 119

Page 368: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

626 Roads/Bridges

Ellgbo

Waterside-

Eremd-

Obukegi-

Akabuka

Ahoada East

& Onelga

Road Construction (Ellogbo -

Akabuka) 10km806,064,000 275,241,561 135,546,320 0.00

627 Roads/Bridges Oba Ama OkrikaConstruction Of Igbiri-Abam-

Abibo-Oba Link Road And Bridges2,985,708,705 1,253,997,656 17,000,000 0.00

628 Roads/BridgesAkabuka-

Ubarama

Ahoada East

& West

Construction Of Akabuka-Ubarama-

Oboburu-Ldu-Orashi River-Taylor

Creek Road & Bridge

1,970,968,209 1,251,270,877 230,000,000 0.00

629 Roads/BridgesInyongorong/

AgbangngoAndoni

Construction Of Rigid Pavement

And Drains At Inyongorong-

Agbangngo

250,000,000 37,500,000 37,500,000

630 Roads/BridgesOkrika

MainandOkrika

Construction Of

Obianime/Fiberesima/ Orupabo

Internal Road (Lots 1-2)

490,000,000 73,500,000 73,500,000

631 Roads/BridgesBorokiri Phase

IvPort Harcourt

Construction Of Internal Road

Beside Makalabh School, Off

Wilson Bakery Road, Borokiri

Phase Iv

245,000,000 36,750,000 36,750,000

632 Roads/Bridges Abonnema Akuku ToruConstruction Of Nyemoni Anglican

Grammer School Internal Road245,000,000 36,750,000 36,750,000

633 Roads/Bridges Rumueme Obio/Akpor

Construction Of 1km Road Project

Chief Ehule Street Off Ada-

George Rumueme, Obio/Akpor

120,000,000 18,000,000 18,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 56 of 119

Page 369: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

634 Roads/Bridges Rumughow Obio/AkporConstruction Of Okemini Street,

1km Road Project, Rumughow100,000,000 15,000,000 0.00

635 Roads/Bridges Rumueme Obio/Akpor

Construction And Rehabilitation

Of 1.6km 3rd Avenue Extension

And 4th Avenue Road, Federal

Housing Estate, Rumueme

240,000,000 36,000,000

636 Roads/Bridges Rumueme Obio/AkporConst Of Mgbosimini Internal

Road, Rumueme184,112,200 0.00

637 Roads/Bridges Rumueme Obio/Akpor

Construction And Rehabilitation

Of 1.6km 3rd Avenue Extension

And 4th Avenue Extension Road,

Federal Housing Estate, Rumueme

235,000,000 35,250,000 35,250,000

638 Roads/Bridges Obonoma AkukutoruConstruction And Rehabilitation

Of 1.6km Obonoma Road240,000,000 36,000,000 76,000,000

639 Roads/BridgesOkogbe-

Ogbogolo

Ahoada East

& West

Const. Of Okogbe-Ogbogolo-

Ochiba Road1,091,984,025 784,904,876 105,636,770 0.00

640 Roads/Bridges

Borokiri

Sandfilled

Area

Port Harcourt

Construction Of Internal Roads

Phase Iii & Iv, Sandfilled Area,

Borokiri

245,000,000 36,750,000 0.00

641 Roads/Bridges Angulama Asari -Toru

Completion Of Angulama Concrete

Jetty Waiting Shed And Access

Rodd

32,321,131 27,901,414 0.00

642 Roads/Bridges Uumuodlri OmumaConstruction Of Umueze-Umuodiri

! 2km Road150,000,000 7,417,305 38,250,000 0.00

643 Roads/Bridges Kono-Bua Khana Internal Roads And Drains 890,000,000 10,897,000 113,475,000 0.00

644 Roads/BridgesBori/Kwawa/B

ouaInternal Roads Rehabilitation 900,000,000 114,750,000 0.00

645 Roads/Bridges Emere ElemeConstruction Of Emere Road,

Eleme, Eleme Lga, Rivers State 238,750,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 57 of 119

Page 370: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

646 Roads/Bridges

Nchla

Internal

Roads

Eleme

Road Construction Of Expanded

Scope Of Nchia-Ebubu Internal

Roads 16km & Drains

1,100,000,000 745,253,855 127,000,000 0.00

647 Roads/Bridges Ekpeagha Onelga Construction Of Interna] Roads 233,558,411 35,033,762 0.00

648 Roads/BridgesUmuechem -

Ozuzu RoadEtche

Mill/Eleme Junction-Lgbo Etche-

Umuechem-Ozuzu1,400,000,000 280,000,000 118,000,000 0.00

649 Roads/BridgesBomu-Giokoo-

NweolGokana Road Construction 5.85km 226,000,000 56,500,000 57,630,000 0.00

650 Roads/BridgesNdoni - Ase

Azaga

Ogba/Egbema

/ Ndoni

Ndoni -Asa-Azaga Road /

Bridges/Drainages (20km)5,887,705,438 1,761,414,014 239,454,962 0.00

651 Roads/Bridges Ido Town Asari -Toru Rigid Pavement Internal Roads 200,000,000 25,500,000 0.00

652 Roads/Bridges Abalama Asari Toru

Construction Of Abalama Internal

Roads (Rigid Pavement And Drains)

Asari Toru Lga

215,000,000 45,687,500 0.00

653 Roads/Bridges Portharcourt Portharcourt

Construction Of Prof. Okujagu

Road With Spurs Off Peter Odili

Road

150,000,000 22,500,000 22,500,000

654 Roads/Bridges Ihuechi Town IkwerreConstruction Of 2km New Lay Out

Rigd Pavement Road245,000,000 3,987,763 24,052,875 0.00

655 Roads/Bridges Omoku-OrashiOgba/Egbema

/ Ndoni

Construction Of Omoku-Okpasimini

Orashi Road/Bridge1,354,231,000 492,750,000 80,900,000 0.00

656 Roads/Bridges Trans-Amadi Phalga

Construction Of Eini Close Off

Total Gospel Rd Linking Peter Odili

Road

85,000,000 12,750,000 0.00

657 Roads/BridgesEgberu-

OkolomaOyigbo Construction Of Road 530,738,765 435,198,451 7,643,959 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 58 of 119

Page 371: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

658 Roads/Bridges

Umuroke-

Umuelechi-

Umuokpurukpu

Omuma

Construction Of Umuroke-

Umuelechi-Umuokpurukpu

Construction Of Rigid Pavement At

150,000,000 19,125,000 0.00

659 Roads/Bridges Road 13 Obio Akpor Road 13. Ohia Odane, Rumuokwuta 246,500,000 24,200,138 0.00

660 Roads/Bridges

Chinda Link

Road Road,

Rumuepirikom

Obio/Akpor

Construction Of Bible

Missionary/Chinda Link Road

Road.Rumuepirikom

249,711,000 31,838,153 0.00

661 Roads/Bridges

Wobasi Str

At

Orazi/Ebara

Rd Chinda

Phalga &

ObalgaRoad Construction 69,657,601 61,153,488 0.00

662 Roads/Bridges

Presidential

Housing

Estate Link

Rd.

Port Harcourt Road & Drainage 94,813,278 70,305,060 6,010,756 0.00

663 Roads/Bridges Okabie Obio/AkporConstruction Of Okabie Street

Off Chinda Street228,600,650 208,667,267 41,148,117 0.00

664 Roads/BridgesAwga(Kolo)

Street

Phalga &

ObalgaConstr. Awga(Kolo) Street 23,138,984 5,784,746 17,354,238 0.00

665 Roads/Bridges Ogele Street Obio/AkporRoad Construction At Ogele

Street Behind Shell Ra33,024,337 8,256,084 15,524,689 0.00

666 Roads/Bridges Diobu Port HarcourtRoad Construction At Owo Street

Ekwulobia (Behind Ust Gate)89,401,208 85,342,128 3,000,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 59 of 119

Page 372: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

667 Roads/Bridges

Sakpenwa-

Botem-Kpite

(Tai Internal

Rds

Tai Tai Internal Roads 1,871,556,225 841,650,139 92,710,322 0.00

668 Roads/Bridges

Elele-Alimini-

Akpabu Itul-

Itul 1-Erema

OnelgaElele-Alimini-Akpabu Itul-Ltul 1-

Erema Road3,001,342,682 1,388,425,627 88,196,633 0.00

669 Roads/Bridges

Mbiama -

Okparaki -

Odawa (Phase

11)

Ahoada West

Construction Ofmbiama-Okarki -

Okparaki Udoda Road (10.7 Km)

Phase II

3,397,016,165 1,131,442,057 100,434,206 0.00

670 Roads/Bridges Ogbogoro Obio/AkporConstruction Of Ogbogoro-

Rumuolomoni -12km Rd408,799,670 382,883,974 17,000,000 0.00

671 Roads/Bridges Rumuolumeni Obio/AkporConstruction Of Rumuolumeni

Internal Roads402,300,250 384,325,145 17,000,000 0.00

672 Roads/Bridges Elimgbu Obio/Akpor

Construction Of Elimgbu-

Rumuehdrd-Rumunduru-Eliozu Rd

With Spur To Eneko

871,097,884 495,641,505 51,902,386 0.00

673 Roads/BridgesObagi

Community

Ogbo/Egbema

/ Ndoni

Construction Of Obagi Internal

Rds(12.9km).1,391,901,533 305,898,564 72,144,924 0.00

674 Roads/Bridges Old Bakana DegemaConstruction Of Road/Bridge (Old'

Bakana - Bakana)277,036,431 41,555,465 32,637,662 0.00

675 Roads/Bridges JoinkramaAhooda

West/EastJoinkrama Road/Bridge 2,610,959,518 468,632,551 70,908,193 0.00

676 Roads/Bridges Rumuodamaya Obio/AkporOmachi Roads And Drains, Ohla

Iru Estate, Rumuodamaya108,737,750 26,623,341 31,128,126 0.00

677 Roads/Bridges Elelenwo Obio/AkporConstruction Of Chindd Crescent

Elelenwo Interndl Roods170,000,000 175,361,468 30,600,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 60 of 119

Page 373: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

678 Roads/Bridges Kula Akuku-ToruConstruction Of Kula Internal

Road2,511,056,686 482,211,337 88,261,495 0.00

679 Roads/Bridges Okrika Okrika Igblri -Abam- Ablbo Oba Link Road 2,985,708,705 447,856,306 275,000,000 0.00

680 Roads/Bridges Boue Bori Construction Of Borl To Boue Road 99,147,940 14,872,191 25,282,725 0.00

681 Roads/Bridges PhPh/Obio

Akpor

Dualisation Of Airport Road To

Iwofe (5.8km)2,880,288,400 261,079,876 448,290,000 0.00

682 Roads/Bridges Abua Abua/Odual

Abua-Okoboh-Aminigboko-

Owerewere-Ochigba-Okogbe

(Design)

50,000,000 14,726,250 0.00

683 Roads/BridgesOgonokom/De

gema

Ogonokom/De

gema

Construction Of

Ogonokom/Degema Road And

Bridges

3,769,639,997 1,319,373,999 0.00

684 Roads/Bridges Lolo-Ama PhalgaConstruction Of 1km Road At Lolo-

Ama Community In Port-Harcourt400,000,000 0.00

685 Roads/Bridges Okwuzi-UgadaOgba/Egbeme

/Ndo NiOkwuzi Ugada Road /Bridge 3,914,142,602 782,828,520 107,121,390 0.00

686 Roads/BridgesRumuekpe-

Ogbele-Abua

Rumuekpe-

Ogbele-Abua

Construction Of Rumuekpe-Ogbele-

Abua Road3,805,221,590 1,027,409,829 0.00

687 Roads/Bridges Okoboh Abua/OdualInterlocking Of Internal 1 Km

Roads In Okoboh127,534,310 19,130,147 33,750,000 19,130,147

688 Roads/Bridges

Odllugbojl/O

mb

Or/Olukuma

Ahoada WestConstruction Of Odiolugboji -

Ombor-Olukuma - Rd & Bridge Rd200,000,000 125,031,275 52,360,000 0.00

689 Roads/Bridges Obelle / EleleEmuoha/Lkwe

rre

Construction Of Obelle - Elele

Road (8.3km) (Design)20,000,000 5,890,500 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 61 of 119

Page 374: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

690 Roads/BridgesKhana /

Oyigbo

Khana /

Oyigbo

Construction Of East/West -

Nyokuru - Lueke - Lorre - Luebe

Road, Spur To Obette

2,519,079,037 375,173,920 93,500,000 0.00

691 Roads/Bridges Woji Town Obio/AkporConstruction Of 5km Road In Eke

Layout. Woji Town (Design) 10,000,000 2,945,250 0.00

692 Roads/Bridges Mgbuoslmini Obio/AkporConstruction Of Mgbuosimini New

Layout Internal Rd/Drains184,112,200 171,090,998 2,000,000 0.00

693 Roads/Bridges Rumuola Obio/AkporConstruction Of Road In Rumoula

Obio/Akpor L.G50,000,000 26,661,712 22,500,000 0.00

694 Roads/Bridges Mgbundukwu Rumuibekwe Mgbundukwu-Rumuibekwe Road 94,737,552 52,717,164 18,601,718 0.00

695 Roads/Bridges Wechele Obio/AkporWechele Street, Rumunduru

Oroigwe99,633,150 29,691,975 19,562,969 0.00

696 Roads/Bridges Okorki Ahoada WestConstruction Of New Layout Road

At Okarki In Ahoada West Lga103,219,930 44,084,154 51,610,919 0.00

697 Roads/Bridges AtugboElekahia

Rebisi

Construction Ofrood In Atugbo

Street In Elekahia Rebisi In Port91,489,949 49,019,849 26,389,824 0.00

698 Roads/BridgesElekehia

RebisiPhalga

1 Km Road From Elekehia Ring Road

To Elekehia Rebisi180,000,000 22,950,000 0.00

699 Roads/BridgesSaint Aquinas

Rd Ikwere Tarring Of Saint Aquinos Road 111,452,825 28,334,942 13,130,257 0.00

700 Roads/Bridges Ama John AndoniConstruction Of Ama John-Ebon

Ekpuru Community230,000,000 66,200,000 0.00

701 Roads/Bridges Eberi Omuma Eberi-Obiohia-Umuogwu Road 249,986,509 37,497,976 37,497,976 0.00

702 Roads/BridgesEberi-

UmuokpukpuOmuma

Construction Of Eberi-

Umuokpukpu Rood223,008,500 162,411,068 21,893,858 0.00

703 Roads/Bridges Aker Base Obio/AkporAdamac Road Linking

Akerbase/Trans Kalabari Road.104,988,000 74,193,378 10,307,197 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 62 of 119

Page 375: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

704 Roads/Bridges Sama- Asari -ToruSama Road Linking

Degema/Abonnema Rd.97,550,045 71,927,851 22,984,742 0.00

705 Roads/Bridges Nkakini Sfrt Port HarcourtConstruction Of Nkakini Street,

Off Ada George Rd, Ph200,000,000 12,207,740 20,753,158 0.00

706 Roads/Bridges Ahoada West Ahoada WestConstruction Of Mbiama Junction

On East-West Road Igbogene3,551,756,811 1,243,114,884 0.00

707 Roads/BridgesOkporo

MgbuchiObio/Akpor

Construction Of Okporo Mgbuchi

Rukpokwu Town Road199,982,166 116,811,791 9,550,286 0.00

708 Roads/Bridges Omoku OnelgaConstruction Of Omoku Internal

Road Phase 197,900,000 67,464,891 5,404,890 0.00

709 Roads/Bridges Abuloma Port HarcourtRehabilitation And /Construction

Of Bakers Access Road129,463,048 19,419,457 23,400,000 0.00

710 Roads/Bridges Wike Oblo/Akpor Wike Internal Roads Obio Akpor 215,000,000 79,586,525 14,911,274 0.00

711 Roads/Bridges

Ohiamini

Apu/Rkpoku

Link Rd

Obio/AkporConstruction Of Ohiamini Apu/

Rukpoku Link And Drainage177,737,022 58,421,918 14,720,470 0.00

712 Roads/BridgesOromerezimg

buPort Harcourt 200,000,000 23,562,000 0.00

713 Roads/Bridges Rumuji Emohua

Construction Of Rumuji-

Rumuodogo- Rumuewhor 1 & Ii

Road

200,000,000 23,562,000 0.00

714 Roads/Bridges Udoda AhoadaConstruction Of Mbiama-Okarki

Okparaki Udoda Road Phase 16,428,212,631 5,831,969,607 106,500,111 0.00

715 Roads/BridgesUmueze-

UmuofekeOmuma Umuofeke Road 2km 232,600,000 139,747,582 23,831,443 0.00

716 Roads/BridgesOmuanwa

RoadIkwere Omuizua -Ubordu Road 214,932,821 56,836,515 21,101,029 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 63 of 119

Page 376: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

717 Roads/Bridges Umuechem EtcheConstruction Of Umuechem

Internal Roads192,757,500 28,913,625 22,708,761 0.00

718 Roads/BridgesUbimini -

Awara LinkIkwere

Construction Of Ubimini - Awara

Link Road, 5.4km (Design)10,000,000 42,737,053 2,000,000 0.00

719 Roads/Bridges Rumuepirikom Oblo/Akpor

Const Of Of Road At Rumuchiorlu

Linking Rumuolumeni Off Ada

George

183,412,790 151,325,357 32,087,433 0.00

720 Roads/Bridges Rumuodomaya Obio/Akpor

Const Of Of Road At Mbuchi New

Road With Spur To Wanyanwu

Drool........

174,874,700 79,841,210 20,601,988 0.00

721 Roads/Bridges Asokoyet Andoni

Construction Of Asokoyet Ikuku

Asukama Road And Bridge, Andoni

Lga, Rivers State

3,606,805,510 390,000,000 120,000,000 0.00

722 Roads/Bridges Elelenwo Obio/AkporConst Of Of Road At Miniyunugu

Off Boskel Road Elelenwo111,239,250 131,290,203 2,000,000 0.00

723 Roads/Bridges Okrika OkrikaPeter - Ama Internal Community

Rd With Drainage, Okrika149,972,750 22,495,913 14,723,575 0.00

724 Roads/Bridges Aker Base Obio/AkporAker Base - Eagle Cement-

Owochukwu St. Road 4km150,000,000 22,500,000 14,726,250 0.00

725 Roads/Bridges Umuajuloke OmumaUmuakali, Umuolilo Umuerim Road^

2km194,185,200 144,145,760 19,064,132 0.00

726 Roads/Bridges Umuajuloke Omuma Umuakali, Umuolilo Umuerim Road 208,527,850 71,773,883 53,064,132 0.00

727 Roads/Bridges Rumueme Obio/Akpor

Road 1 Western Extension Fed.

Housing Estate With Spur To Ada

George Rd Rumueme

100,000,000 85,118,291 14,881,709 0.00

728 Roads/BridgesRumuibekwe

EstatePort Harcourt

Construction Of Ohakwe Avenue

Rumuibekwe Estate Extension130,821,950 19,623,293 15,109,935 0.00

729 Roads/Bridges Rumuodara Obia Akpor

Construction Of Drainage Of

Nnanta Weli Close Off Okporo

Road, Rumuodara,

150,000,000 14,726,250 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 64 of 119

Page 377: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

730 Roads/Bridges Poth Harcort Obio AkporConstruction Of Calabar Quatrs

Road Obigbo200,000,000 19,635,000 0.00

731 Roads/Bridges Abuloma Poth HarcortConstruction Of Kirlkiridien Road

In Abuloma (2km) With Drains200,000,000 19,635,000 0.00

732 Roads/Bridges Ozuoba Obio/AkporRehab/Recont Of Eze Oloria

Street, Ohio Alimini242,000,000 28,510,020 0.00

733 Roads/Bridges Ke Degema Ke Internal Road 200,000,000 27,720,000 0.00

734 Roads/Bridges Eliozu Obio/AkporEliozu Bridge Bye Pass

Road/Drainage135,000,000 64,460,402 0.00

735 Roads/Bridges Ochigba Ahoada EastConstruction Of Ochigba-Nkata

Road (6km) (Design)10,000,000 2,945,250 0.00

736 Roads/Bridges ObobruOgba/Egbema

/ Ndoni

Construction Of Obobru-Ldu Road

|4km) (Design)10,000,000 2,945,250 0.00

737 Roads/Bridges Alode ElemeConstruction Of Alode Internal

Road, Eleme (Design)10,000,000 2,945,250 0.00

738 Roads/Bridges Ozuoboko Port Harcourt Construction Of Ozuoboko Road 100,000,000 23,562,000 0.00

739 Roads/Bridges Ejekwu Wike Obio/AkporEjekwu Wike Close Off Ada

George Road Obio Akpor Lga.222,808,740 112,506,954 26,249,098 0.00

740 Roads/Bridges Rumuoddnidya Obio/Akpor

Construction Of Deeper Life

Church Road /Omachi Lanes In

Rumuoddmaya Obio Akpor.

168,590,100 95,577,290 14,726,250 0.00

741 Roads/Bridges Phalga Phalga

Rehabilitdtion Of Total Gospel

Road Off Odill Rood Phase 2

Phalga.

125,000,000 24,876,540 21,250,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 65 of 119

Page 378: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

742 Roads/Bridges Abuloma Phalga

Construction Of Tende Avenue

Off Senator Sekibo Road Abuloma

Phalga.

152,500,450 22,875,068 25,925,077 0.00

743 Roads/Bridges Abuloma PhalgaConstruction Of Ewerim Close Off

Total Road Abuloma Phalga.152,500,450 22,875,068 17,966,078 0.00

744 Roads/Bridges Upth-Nta Obio/AkporConstruction Of Upth-Nta Via

Alakahia Road188,281,500 14,471,700,206 22,181,444 0.00

745 Roads/BridgesOdhiaje- Old

AhoadaAhoada West

Construction Of Odhiaje - Old

Ahoada Entrance Road & Bridges

Reconstruction (7km + Drains)

844,999,980 257,726,241 0.00

746 Roads/BridgesIkwerre, Mile

4Port Harcourt

Connstruction Of Chief James

Ikegwuru Street (Kala Street) Off

Kala Bus Stop Ikwerre Road Mile

4, With Drains

200,000,000 20,000,000 0.00

747 Roads/Bridges Alode ElemeRehabilitation/Reconstruction Of

Bishop Kattey/Alode Access Roads224,324,670 33,648,701 22,023,074 0.00

748 Roads/Bridges Baen KhanaRehabilitation/Reconstruction Of

Baen Link Road211,334,577 31,700,187 20,747,772 0.00

749 Roads/Bridges Oyigbo OyigboRehabilitation Of Oyigbo - Old Aba

Road/Location Road247,536,211 37,130,432 29,162,241 0.00

750 Roads/Bridges Obrikom

Ogba/

Egbema/

Ndoni

Rehabilitation Of Community Roads 245,000,000 57,703,761 28,863,450 0.00

751 Roads/BridgesEgbekwu

/Obrikom

Ogba/

Egbema/

Ndoni

Resurfacing Of Umuriem

Community Roads245,000,000 56,093,573 28,863,450 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 66 of 119

Page 379: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

752 Roads/BridgesEgbekwu

/Obrikom

Ogba/

Egbema/

Ndoni

Resurfacing Of Umuenyike

Community Roads245,000,000 83,850,197 28,863,450 0.00

753 Roads/BridgesEgbekwu

/Obrikom

Ogba/

Egbema/

Ndoni

Resurfacing Of Ihiukwu Community

Roads245,000,000 51,394,993 28,863,450 0.00

754 Roads/Bridges Aluu Ikwerre

Construction Of 2km Doctor Jesus

City Crescent, Off Tam David

West Road, Aluu

250,000,000 25,000,000 0.00

755 Roads/Bridges Ikwerre Ikwerre Unuchetu/Lmogu Link Road Phase 1 200,000,000 19,635,000 0.00

756 Roads/Bridges Ido Asari -Toru Rigid Pavement Internal Rd 200,000,000 19,635,000 0.00

757 Roads/BridgesOpobo New

LayoutOpobo/Nkoro

Construction Of Opobo New

Layout Road Network250,000,000 24,543,750 0.00

758 Roads/Bridges Elelenwo Obio/AkporConstruction Of C.R.A Rood In

Odikirike250,000,000 24,543,750 0.00

759 Roads/Bridges Isiokpo IkwereStudy And Design Of Isiokpo

Internal Roads40,000,000 11,781,000 0.00

760 Roads/Bridges Igwuruta IkwereConstruction Of Igwuruto Internal

Roads (Phase 1)550,000,000 109,970,145 26,180,000 100,000,000

761 Roads/Bridges Igwuruta IkwereConst Of Alimini-Lgwuruta Ali

Road249,128,450 99,340,417 0.00

762 Roads/BridgesElekehia

RabisiObio-Akpor

Construction/Rehabilitation Of

Chukwu Street, Behind Police

Station

245,000,000 1,000,000 0.00

763 Roads/BridgesEmmanuel

StreetObio-Akpor

Construction Of Emmanuel Street

Off Nta/Apara Link Road229,000,000 29,197,500 0.00

764 Roads/Bridges Rumukwurushi Obio/AkporConst Of Rumunwokerebo Street

Off Igwuruta/Lgbo Etche Road160,000,000 18,849,600 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 67 of 119

Page 380: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

765 Roads/Bridges Isiokpo Ikwere Azumini/Nkarahia/Alimini Road 246,124,567 36,918,685 39,270,000 0.00

766 Roads/Bridges Igwuruta IkwereConst Of Omusele/Omunwei-

Igwurutd Road235,342,120 101,954,827 0.00

767 Roads/Bridges Okrika OkrikaConst Ot Atc Waterside To St.

Peters Road135,342,120 20,301,318 15,944,655 0.00

768 Roads/Bridges Elele Alimini Ikwerre Omuse/Omuagara Road 125,342,444 18,801,367 14,766,593 0.00

769 Roads/Bridges Ekporo/Ogu Obio/Akpor Ekporo Ogu Link Road (Lots 1 8> 2) 497,654,323 74,648,148 58,905,000 0.00

770 Roads/Bridges Okechi Etche Okechi/Agbdlu Rodd (1.9km) 247,000,000 34,234,200 0.00

771 Roads/Bridges Umuoko Omuma Umuoko/Umuayia Rodd (2km) 249,500,000 45,815,000 0.00

772 Roads/Bridges Emohua EmohuaConstruction Of Emohuo Internal

Road Phase 1249,000,000 80,845,066 56,450,000 0.00

773 Roads/Bridges Mgbuoba Port Harcourt

Construction Of Road 11, First

Avenue Okanta Off Shell Location

Road, Mgbuoba

245,000,000 36,750,000 0.00

774 Roads/Bridges Omungwu Ikwerre Omungwu Road (1.9km) 249,000,000 87,028,313 29,334,690 0.00

775 Roads/Bridges Isiokpo Ikwerre Dayfree Road (1.8km) 248,000,000 94,687,500 0.00

776 Roads/Bridges Abuloma Port HarcourtSt. Matthew Lane Off Christ

Avenue, Abuloma (1.9km)246,128,456 78,348,490 29,240,442 0.00

777 Roads/Bridges

/Sdma/Lfoko

/Llel

Ena/Okpo/Ab

al Ama

Asari-Toru Construction Of Road 240,000,000 23,562,000 0.00

778 Roads/Bridges Alakahia Obio/AkporConstruction Of Chakara/Alakahia

Road248,520,000 224,740,170 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 68 of 119

Page 381: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

779 Roads/Bridges Rumuigbo Obio/Akpor

Construction Of West End Avenue

Off Rumuobasiolu Street.

Psychiatric Hospital Road,

Rumuigbo Construction Of

Woluchem Layout

235,520,000 216,463,637 0.00

780 Roads/Bridges Nkpolu Obio/AkporInternal/Wali Layout Linking

East/West Road240,020,000 173,495,440 28,276,756 0.00

781 Roads/Bridges Omagwa IkwerreOmagwa Internal Roads, Ikwerre

Lga, Rivers State 241,738,900 0.00

782 Roads/Bridges Wali Close Obio/AkporConstruction Of Wali Close In

Obio/Akpor L.G.A.. Rivers State 242,468,123 41,219,581 0.00

783 Roads/Bridges Eteo/Ogu Eleme Construction Of 1km Road 200,000,000 156,310,766 36,652,000 0.00

784 Roads/BridgesUmudu-

UmugwuOmuma

Construction Of Umudu-Umugwu

Road150,000,000 100,292,663 29,452,500 0.00

785 Roads/BridgesOgu/Nonwa

RoadOgu/Tai

Construction Of Ogu/Nonwa Road

Phase 2249,000,000 150,609,348 29,334,690 0.00

786 Roads/Bridges Arukwo AbuaConstruction Of Arukwo Internal

Roads Phase 1170,000,000 56,829,248 0.00

787 Roads/Bridges Woji Obio-AkporConstruction Of Road 1 At Federal

Housing Estate, Woji120,000,000 1,000,000 0.00

788 Roads/Bridges Umuoma EtcheConstruction Of Umuoma Farm

Road In Chokota-Lgbo120,000,000 1,000,000 0.00

789 Roads/BridgesTorrgbo/Men

eb OnGokana

Construction Of Kpegenadaa

Torgbo-Menebor Road With

Drainage

200,000,000 19,635,000 0.00

790 Roads/Bridges Rumuokuta Obio-Akpor

Construction Of Rigid Pavement At

Road 13, Ohio Oda, Rumuokwuta

Phase 2

246,300,000 24,151,050 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 69 of 119

Page 382: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

791 Roads/Bridges Rumuokuta Obio-Akpor

Construction Of Rigid Pavement At

Road 8, Ohia Odane, Rumuokwuta

Phase 1

225,500,000 22,138,463 0.00

792 Roads/Bridges Erim Omuma Erim Road In Omuma Lga 200,000,000 25,500,000 0.00

793 Roads/Bridges Uzomiri Omuma Uzomiri Umuakali 2km Road 150,000,000 19,125,000 0.00

794 Roads/Bridges Njuru PhNjuru Akpakpan Okerewa Pipeline

Road-3km250,000,000 31,875,000 0.00

795 Roads/BridgesUmuanyagu

OdagwaEtche

Construction Of Roads In

Umudnyagu Odagwa180,000,000 21,205,800 0.00

796 Roads/Bridges Port Harcourt Port Harcourt Construction Of Wami Street Rd 100,000,000 23,562,000 0.00

797 Roads/Bridges Kagwara Gure Construclion Of Kagwara 2.5km Rd 245,000,000 28,863,450 0.00

798 Roads/Bridges Port Harcourt Port HarcourtConstruction Of Amdngo Polo

Road, Off Reclamation Road150,000,000 14,726,250 0.00

799 Roads/Bridges Ogbunabali Port HarcourtConst, Of Ogbunaboli Internal

Road Phase Ii100,000,000 24,550,695 17,017,000 0.00

800 Roads/BridgesIgwuruta

TownIkwerre

Construction Of Road At Chikwe's

Layout Omuoluta Igwurutali Village

2km

200,000,000 152,929,770 23,562,000 0.00

801 Roads/Bridges Nkpogu Port-HarcourtConstruction Of Nda Bros Street

In Nkpogu150,000,000 54,990,572 17,671,500 0.00

802 Roads/Bridges Enel-Guake Obîo Akpor

Emergency Repair Of Failed

Portions From Enela - Guake Road

3.7km

232,693,504 34,904,026 27,096,300 0.00

803 Roads/Bridges Obio Obio/AkpoConst, Of Dr. Laz Eke Road Obio/

Akpor Lga184,020,496 74,032,170 13,090,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 70 of 119

Page 383: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

804 Roads/BridgesTormaka

/OnukiriOgu Bolo

Construction Of Tornaka- Onukiri

Link Bridge Linking Nddc

Sdndfilling Areds In Ogo Bolo

3,644,860,756 43,999,168 364,719,746 0.00

805 Roads/Bridges Worlu Obia/AkporConstruction Of Worlu-Wachukwu

Road Rukpokwu150,000,000 19,125,000 0.00

806 Roads/BridgesRumubekwe

EstateObia/Akpor

Construction Of Disney Road With

Spure To Amaewhule Street,

Rumubekwe Estate Extension

200,000,000 42,500,000 0.00

807 Roads/Bridges Olukwu Obia/AkporConstruction Of Olukwu-Rumuowha

Road, Eneka200,000,000 42,500,000 0.00

808 Roads/Bridges Aye Pepple Portharcourt

Construction Of Aye Pepple Close,

Prof Adolphus Toby Avenue,

Boroklri Sand Filled

150,000,000 19,125,000 0.00

809 Roads/Bridges Portharcourt Obia/AkporConstruction Of Rumuokpara Link

Road Rukpoku250,000,000 31,875,000 0.00

810 Roads/Bridges Omalem-Otari Abua/Odual

Construction Of Omalem-Otari

Link Road With Side Drainage In

Abua/Odual

200,000,000 42,500,000 0.00

811 Roads/Bridges Poth Harcort Obio Akpor

Construction Of Chief Daowari

Street / Internal Rood, Off Add

George Rd

200,000,000 42,500,000 0.00

812 Roads/Bridges Nwagbogwe OnelgaConstruction Of Nwagbogwe

Street And Environs500,000,000 63,750,000 0.00

813 Roads/Bridges Abua OdualConstruction Of Okolomade New

Layout Intemal Roads Abua496,000,000 180,000,000 0.00

814 Roads/Bridges Abua Odual Emelego Internal Roads Abua 496,000,000 180,000,000 0.00

815 Roads/Bridges Woji Obia-Akpor Construction Of Abec Road, Woji 230,000,000 29,325,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 71 of 119

Page 384: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

816 Roads/Bridges Abuloma PothharcourtConstruction Of Akpos Marine

Jetty Road Abuloma240,000,000 30,600,000 0.00

817 Roads/Bridges Rumuodamaya Obio/Akpor

Construction Of Tasie Avenue,

Road 7, With Spur, Akwaka Phase

3

190,000,000 24,225,000 0.00

818 Roads/Bridges Rumuodara Obio Akpor

Construction Of Mini Rumuodara

Link Road Off East-West Road,

Rumuodara, Obidkpor

200,000,000 42,500,000 0.00

819 Roads/Bridges Owhule Obio Akpor

Construction Of Owhule Internal

Road.Eneka Town, Off Igwuruta-

Ereka Road

200,000,000 42,500,000 0.00

820 Roads/Bridges Poth Harcort Obio Akpor

Construction Of St Rumurosi

Street, Off Phychiatric Hospital

Road, Port Harcourt

50,000,000 4,908,750 0.00

821 Roads/Bridges Poth Harcort Obio Akpor

Construction Of Ellmgbu-Emma-

Utchay Road By Court Estate

Elimgbu Porth Harcourt

200,000,000 42,500,000 30,000,000

822 Roads/Bridges Poth Harcort Obio Akpor

Reconstruction Of Section Of

Nvuigwe Road And Holy Family

Catholic Church Bypass Road

200,000,000 42,500,000 30,000,000

823 Roads/Bridges Poth Harcort Obio AkporConstruction Of New Woji

Layoutroad Phase 1 And 2 200,000,000 42,500,000 30,000,000

824 Roads/Bridges Poth Harcort Obio AkporConstruction Of Rumunduru Arm

Road Oroigmu Port Harcourt 200,000,000 42,500,000 30,000,000

825 Roads/Bridges Poth Harcort Obio AkporConstruction Of Rumu-Ewara Road

Off Eneka Road Porth Harcourt 200,000,000 42,500,000 30,000,000

826 Roads/Bridges Poth Harcort Obio AkporConstruction Of Marina Close Woji

P.H 200,000,000 42,500,000 30,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 72 of 119

Page 385: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

827 Roads/Bridges Poth Harcort Obio Akpor

Construction Of Dave Ejeddwe

Avenue, Off Okogbule Wonodi

Road

200,000,000 42,500,000 30,000,000

828 Roads/Bridges Umu-Lhu OnelgaConstruction Of Umu-Lhu/Akabuka

Ring Road 200,000,000 42,500,000 0.00

829 Roads/Bridges Enito Abua WestConstruction Of Enito Ring Road

And Drainages 200,000,000 42,500,000 0.00

830 Roads/Bridges Akabuka OnelgaConstruction Of Akabuka-

Obbiyebe Link Roadand 200,000,000 42,500,000 0.00

831 Roads/Bridges BoriConstruction Of School To Land

Betem Road, Bori (2km)245,000,000 31,237,500 0.00

832 Roads/Bridges Erema AhoadaConstruction Of Erema Internal

Road230,000,000 29,325,000 0.00

833 Roads/Bridges Bonny IslandRehabilitation Of Abamabrie

Court, Park Community Road.798,093,200 101,756,883 0.00

834 Roads/Bridges Poth Harcort Obio AkporConstruction Of Road 5, Okporo

Estate Elikpokwuodu, Rukpoku P.H150,000,000 19,125,000 0.00

835 Roads/Bridges Eliozu Obio/AkporConstruction Of Jessica Street

Eliozu223,004,100 133,169,519 21,893,428 0.00

836 Roads/Bridges Anakpo Ahoada WeslConst- Of Anakpo/Ukpatabo

Internal Roads249,500,000 129,082,913 0.00

837 Roads/Bridges Buguma Asari-Toru

Construction Of Drains/Pavement

On Buguma Internal Roads From

Motor Park

161,000,000 36,657,252 18,967,410 0.00

838 Roads/Bridges Egberu. Oyigbo 1.5km Egberu Koroma Road, Oyigbo 250,000,000 24,543,750 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 73 of 119

Page 386: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

839 Roads/Bridges Rumuomasi Port Harcourt

Award Of Contract For Remedial

Works On Presbyterian Close, Off

Stadium Road, Rumuomasi, Port

Harcourt, Rivers State

149,500,000 139,024,069 0.00

840 Roads/Bridges Okwuola Oblo-AkporConstrucfulon Of Okwuolo Roads

Off Stadium Road Port Harcourt200,792,570 66,186,446 0.00

841 Roads/Bridges Eliozu Oblo-Akpor

Construction Of Amaewale

Crecent.Half Km With Drainage On

Both Sides, Off Ake Road Beside

Oando Filling Station At The Foot

Of The Bridge

60,000,000 7,650,000 0.00

842 Roads/Bridges Nkpolu Obio / AkporConstruction Of Chief Wilison

Street, Nkpolu Rumuigbo163,072,306 53,006,738 6,545,000 0.00

843 Roads/Bridges Okpeden Abua/OdudlDesign Of Okpeden Road/1 No.

Bridge2,500,000,000 32,725,000 0.00

844 Roads/Bridges Okolomade Abua/OdualConstruction Of New Layout

Internal Roads248,000,000 24,347,400 0.00

845 Roads/Bridges Emelego Abua/OdudlConstruction Of Emelego Internol

Roads248,000,000 24,347,400 0.00

846 Roads/Bridges Llelema Asari -Toru

Construction Of Rigid Pavement

Road And Drains At Llelema Okpo,

Ifoko And Abalama Communities

965,720,000 94,809,561 0.00

847 Roads/Bridges Rumuovuehi Port-HarcourtReconstruction Of Rumuovuehi-

Rumuoke Road200,000,000 425,000 0.00

848 Roads/Bridges Igwuruta IkwerreConstruction Of Assembly Hall

Road154,491,400 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 74 of 119

Page 387: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

849 Roads/Bridges Rukpoku Obio-Akpor

2km Road With Drainage By

Mbuchi Town Hall To Shell Pipeline

In Rukpokwu Town Construction

And Drainage Of

250,000,000 24,543,750 0.00

850 Roads/Bridges Ndai Street Oblo-AkporMini Ndai Street Opposite College

Of Education Fence- Rumulumeni250,000,000 24,543,750 0.00

851 Roads/Bridges Aluu IkwerreOmuwhuechi New Layout Internal

2km Road Network Phase 1230,000,000 22,580,250 0.00

852 Roads/Bridges Omuchlolu Ikwerre1.5km Internal Road With Drains

At Omuchiolu-Omuokiri Road230,000,000 22,580,250 0.00

853 Roads/Bridges Oyigbo OyigboConstruction Of Internal Road

(Phase 2)201,500,000 30,225,000 65,450,000 0.00

854 Roads/Bridges Omoku OnelgaIntegrated Central Drainage

System & Internal Road Networks1,293,733,447 0.00

855 Roads/BridgesRumuodnwere

ElelenwoOblo/Akpor

Okworo River Acess Erosion

Control And Access Rd

Construction

245,125,258 210,841,208 7,222,948 0.00

856 Roads/Bridges Okato George OkrikaConst. Of Okata George-Ama

Internal Road Okrika.205,000,000 124,353,537 50,669,000 0.00

857 Roads/Bridges Trans-Amadl OkrikaConstruction Of Jessy & Jane

Road.Off Peter Odili Road Trans A249,500,000 37,425,000 62,319,100 0.00

858 Roads/Bridges Mgbuoba Oblo/AkporConstruction Of Hardy Avenue

Road99,868,368 31,133,973 41,926,363 0.00

859 Roads/Bridges Bianu Khana Construction Of Bianu Road 249,186,000 127,909,119 51,468,241 0.00

860 Roads/Bridges Oke Ogoloma Obio / Akpor Construction Of Oke Ogoloma 91,505,400 13,725,810 41,549,041 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 75 of 119

Page 388: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

861 Roads/Bridges Oglnigba Obio / AkporConstruction Of Oginigba Internal

Road128,850,300 19,327,545 0.00

862 Roads/Bridges Ada George Obio / AkporConstruction Of Chief Mba Road,

Off Ada George Road75,833,520 11,375,028 38,420,174 0.00

863 Roads/Bridges Okenta ElemeConstruction Of Okenta Eleme

Road 193,653,600 38,660,446 49,107,865 0.00

864 Roads/Bridges Rumuodamaya Obio / AkporConstruction Of Owhuonuobuchi

Phase 111 Rumuodumaya Road91,184,325 13,677,649 16,143,710 0.00

865 Roads/Bridges Rumuodara Obio / AkporConstruction Of Holiness Street

Rumuoddra145,076,568 31,930,546 29,425,675 0.00

866 Roads/Bridges Eta Eleme Construction Of Eta Road 89,633,775 13,445,066 5,370,008 0.00

867 Roads/Bridges Obuoba Obio / AkporConstruction Of Obuoba Infernal

Ror-Ih188,050,120 48,586,206 0.00

868 Roads/Bridges Woji Obio / AkporConstruction Of Road 26 In Woji

Housing Estate94,945,665 38,973,013 22,213,012 0.00

869 Roads/Bridges Nkpolu Obio / AkporConstruction Of Chief Wilison

Street, Nkpolu Rumuigbo163,072,306 24,460,846 39,529,779 0.00

870 Roads/Bridges Fuchee Degema Internal Road At Fuchee 99,633,150 14,944,973 13,529,594 0.00

871 Roads/Bridges Orasi-Azungu Obio / Akpor

Construction Of Orosi-Azungugu

New Layout Opposite Abundant

Life Church Psychiatric Road

104,988,000 15,748,200 0.00

872 Roads/Bridges Mgbusilari Obio / Akpor

Mgbusilary Coommunity Road 1 And

11 Off Circular Road By New Rodd,

Off East West Road.

99,633,150 14,944,973 0.00

873 Roads/Bridges Luere-Luegbo KhanaConstruction Of Luere-Luegbo

Been Link Road 249,942,000 137,507,234 50,539,489 0.00

874 Roads/Bridges Odagwu EtcheConstruction Of Odagwu Internal

Road140,000,000 21,000,000 18,456,046 0.00

875 Roads/Bridges Ogale Eleme Construction Of Ogale Road 192,813,600 38,479,280 30,697,654 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 76 of 119

Page 389: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

876 Roads/Bridges Okoroma OnelgaConstruction Of Okoroma-Lfeanyi

Link Road80,664,675 12,099,701 4,963,995 0.00

877 Roads/Bridges Obiyebe OnelgaConstruction Of 1km At Aliebo-

Isaac Agilebu Jp House150,653,937 22,598,091 43,360,840 0.00

878 Roads/Bridges Ovu Close Oblò / AkporConstruction Of Ovu Close And

Environs.Off Nta-Choba Road153,909,950 23,086,493 0.00

879 Roads/Bridges Gore Khana Construction Of Gore Road 248,083,500 37,212,525 24,355,598 0.00

880 Roads/Bridges

Evo

Crescent/Tom

bia Street

Ph

Construction Of Sub-Surface

Drainage And Road Resurfacing

Works

350,000,000 5,879,000 44,625,000 0.00

881 Roads/Bridges Iguruta Ikwerre Assembly Hall Road 104,988,000 15,748,200 22,309,950 0.00

882 Roads/BridgesDegema/Krakr

amaAsari -Toru

Construction Of Degema-Krakrama

Jetty Acess Road98,000,000 12,495,000 0.00

883 Roads/Bridges Emohua EmohuaConstruction Of Internal Road

Atemohua200,597,000 134,437,788 19,693,610 0.00

884 Roads/Bridges Rumuigbo Obio/Akpor

Construction Of Eli Okahia Olua

Internal Roads (East-West Road)

At Rumuigbo)

249,500,000 31,811,250 0.00

885 Roads/Bridges

Pargoleens

Street,

Elikpokwodu,

Rukpokwu

Town

Obio/Akpor

Construction Of Pargoleens

Street, Elikpokpwodu, Rukpokwo

Town At Obi Akpor

249,500,000 31,811,250 0.00

886 Roads/BridgesJulius Ocoy

StreetObio/Akpor

Construction Of Julius Ocoy

Street, Off Obi Wali Road

(Immediately After Erkankia From

Everyday Supermarket End- 1km

Road

150,000,000 19,125,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 77 of 119

Page 390: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

887 Roads/Bridges Abalama Asari -Toru

Construction Of Fence And

Landscaping At Nddc Secondary

School At Abalama

165,000,000 21,037,500 0.00

888 Roads/Bridges Aiuu Obio / Akpor

Emergency Repair/Construction Of

Aluu/Omoke Road, Port Harcourt,

Rivers State.

198,310,634 155,957,344 22,753,119 0.00

889 Roads/Bridges Iwofe Port Hacourt

Construction Of Chief Alalibo

Street By Assemblies Of God

Church, Eagle Cement Road

249,856,511 229,428,749 20,427,762 0.00

890 Roads/Bridges Rumuibekwe Obio/AkporConstruction Of Inlernal Road In

Rumuibekwe211,467,000 31,720,050 27,681,030 0.00

891 Roads/Bridges Wop PhalgaConstruction Of Clement Eke

Street Road48,236,804 7,235,521 22,099,692 0.00

892 Roads/Bridges Pur Khana Construction Of Pur Road 98,063,700 14,709,555 15,101,810 0.00

893 Roads/Bridges RurmuolumenlConstruction Of Peace Avenue

Linking Rumuolumeni - Ogbogoro75,454,538 11,318,181 987,699 0.00

894 Roads/Bridges Ogugu Obio-AkporConstruction Of Ogugu Street And

Linking Roads, Aka Road214,440,300 32,167,395 22,456,188 0.00

895 Roads/Bridges Gberesa Gokana Gberesa Internal Road 249,500,000 0.00

896 Roads/Bridges Luawi Khana Construction Of Luawi 1 Raod 193,212,500 0.00

897 Roads/BridgesOchoma

AvenueOyigbo

Construction Of Ochoma Avenue /

Happy Life Street194,235,000 111,758,050 41,274,938 0.00

898 Roads/Bridges Okobo Abua OdualConstruction Of Rigid Pavement

Road At Okobo194,235,655 56,813,929 41,274,938 29,135,348

899 Roads/Bridges Port Harcourt PhalgaConstruction Od Adama Road &

Drains, Iwofe109,478,000 0.00

900 Roads/Bridges Ozoboko PhalgaRehabilitation Of Ozoboko

Inyternal Road Off Abuloma179,846,911 0.00

901 Roads/Bridges Degema DegemaConstruction Of Degema Internal

Roads (Rigid Pavement) Phase Ii248,950,400 231,478,047 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 78 of 119

Page 391: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

902 Roads/BridgesChiezebarabar

aObio-Akpor

Construction Of Chiezebarabara

Road, Phase Ii229,151,010 0.00

903 Roads/Bridges Ozuoba Obio/AkporConstruction Of Aranta Layout

Road, Ozuoba. Obio/Akpor339,596,157 0.00

904 Roads/Bridges Oroigwe Obio/Akpor

Construction Of 2km Farm Road-

Runduru-Oroigwe Road With

Drains

235,896,771 0.00

905 Roads/Bridges Woji PhalgaConstruction Of Liberty Drive Off

Alcon Road.Woji Town153,960,750 17,822,998 16,122,770 0.00

906 Roads/Bridges Emuoha EmuohaConstruction Od Emuoha Internal

Road200,597,000 41,981,258 21,006,518 0.00

907 Roads/Bridges Port-Harcourt Obio-Akpor

Construction Of Tere-Ama New

Layout Internal Roads With Spur

At

70,671,741 0.00

908 Roads/Bridges Unity Road PhalgaConstruction Of Unity Road With

Spur At Iwowari Avenue143,441,235 7,133,385.00 15,021,166 0.00

909 Roads/Bridges Rumudara Obio-AkporConstruction Of Chief Tony Estate

Off Origwe Road, Rumuddra100,417,800 6,132,210.00 10,515,752 0.00

910 Roads/Bridges Ebebu ElemeConstruction Of Ebebu Internal

Road249,500,000 0.00

911 Roads/Bridges RumuwhorConstruction Of Rumuwhor Ring

Rood148,597,920 7,098,131 15,561,174 0.00

912 Roads/Bridges Lubara KhanaConstruction Of Lubara Internal

Road249,302,490 176,816,938 26,106,957 0.00

913 Roads/BridgesElioparanwo &

IwofeObio-Akpor

Maintainance & Repairs Of

Elioparanwo & Iwofe146,325,300 0.00

914 Roads/Bridges

Apa-

Ngbobueke/R

u

Obio-AkporConstruction Of Internal Road &

Drains At Apa-84,137,050 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 79 of 119

Page 392: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

915 Roads/Bridges Obere ElemeConstruction Of 1 Km Road At

Obere Road .Eleme89,633,775 4,231,369 19,047,177 0.00

916 Roads/BridgesChief Mezie

LaneObio-Akpor

Construction Of Chief Mezie Lane

Farm Road, Majesrt Avenue,133,550,000 75,793,389 13,985,356 0.00

917 Roads/Bridges Rumuola Ph Construction Of 1km Road At Shell

Location Road By People's Club150,000,000 19,125,000 0.00

918 Roads/BridgesCherubim

RoadObio-Akpor

Construction Cherubim Road With

Spur At Rukpokwu97,577,970 0.00

919 Roads/Bridges Allu Obio-Akpor Construction To Allu Internal Road 191,150,000 0.00

920 Roads/BridgesEmesu

WatersideAhoada West

Construction Of Emesu Waterside

Ogbogolo Internal Road203,111,000 0.00

921 Roads/BridgesBoskel

LocationObio-Akpor

Construction Of Boskel Location

Road(Near Intels Camp)212,000,500 59,424,839.00 0.00

922 Roads/Bridges Ikuru Town Andoni

Construction Of School-Church

Road At Ikuru Town, Rigid

Pavement

239,967,598 0.00

923 Roads/Bridges Egbelebie Okrika

Construction Of St. Andrews

Anglican Church Road, Egbelebie,

Okrika

250,000,000 0.00

924 Roads/Bridges Omerelu Ahoada

Construction Of Opi Square

Junction To Omuichi Village Road,

Omerelu

178,000,000 0.00

925 Roads/Bridges Odagwa EtcheConstruction Of Odagwa Internal

Roads,Phase 1140,000,000 49,157,905 14,660,800 0.00

926 Roads/Bridges Ozuoba Obio-AkporConstruction Of Ozuoba Internal

Road188,050,120 80,176,438 19,692,609 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 80 of 119

Page 393: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

927 Roads/Bridges

Ohia Igba

Rumuapu

Rukpokwu

Obio/Akpor

Construction Of 114 Road, Street

Light, Close. Ohia Igba Rumuapu

Rukpokwu

230,000,000 0.00

928 Roads/Bridges Emilaghan Abua OdualConstruction Of Emilaghan

Internal Roads242,000,000 0.00

929 Roads/BridgesRumuechi-

Emohua -

Rehabilation Of Rumuechi-Emohua -

Kalabari Express Link69,970,190 54,703,253 7,327,278 0.00

930 Roads/Bridges Elelenwo Obio-AkporConstruction Of Elelenwo Internal

Roads/Drains151,634,894 87,256,965 15,879,206 0.00

931 Roads/BridgesWichele

StreetObio-Akpor

Construction Of Wichele

Street.Rumudure Oroigwe55,989,119 66,622,849 2,000,000 0.00

932 Roads/Bridges Eli-Jiji Akwor Obio-AkporConstruction Of 1 Km Road At Eli-

Jiji Akwor Layout Mgbuoshimini,99,500,000 53,174,830 10,419,640 0.00

933 Roads/BridgesNwawuna

Street OffObio-Akpor

Construction Of 1 Km Road At

Nwawuna Street Off Ohakwe93,963,000 57,821,791 9,839,805 0.00

934 Roads/Bridges Mini Avenue Obio-AkporConstruction Of Internal Road At

Mini Avenue To His Royal Majesty87,885,000 5,939,353 0.00

935 Roads/BridgesOvunda/Eligbo

loObio-Akpor

Construction Of Ovunda/Eligbolo

Link Road98,211,968 0.00

936 Roads/Bridges

Agbonchia/Oy

i Gbo Road,

Eleme And

Elele

Eleme

Remedial Works On

Agbonchia/Oyigbo Road, Eleme

And Elele Town To Elele Alimini

152,050,282 33,670,313 0.00

937 Roads/Bridges Uniport-Aluu Obio-AkporRemedial Works On Uniport - Aluu

Road150,105,180 7,101,806 39,297,536 0.00

938 Roads/Bridges

Eliminigwe

Housing

Estate

Obio-AkporConstruction Of Eliminigwe

Housing Estate.Phase Iii Elelenwo93,544,238 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 81 of 119

Page 394: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

939 Roads/Bridges

Mini-Orlu

Road Off Ada-

George With

Spur To

Breakthrough

Close/Elder

Adiela Close

Obio-Akpor

Remedial Works On Mini-Orlu

Road Off Ada-George With Spur

To Breakthrough Close/Elder

Adiela Close

165,987,136 75,303,171 43,455,432 0.00

940 Roads/Bridges Agip Estate PhConstruction Of Road 24

Extension A, Agip Estate, P.H150,000,000 22,500,000 0.00

941 Roads/Bridges Ahoada West Obio/Akpor

Construction Of Enito Interna

Roads Phase Ii, Ahoada West Lga,

Rivers State

200,000,000 30,000,000 0.00

942 Roads/Bridges Atali Obio/AkporConsruction Of Azumini Road

(2km) Atali230,000,000 34,500,000 0.00

943 Roads/Bridges Umuochahi EtcheConstruction Of Internal Road At

Umuochanhi200,000,000 30,000,000 0.00

944 Roads/Bridges Elelenwo Obio/Akpor

Construction Of West Bank Road

Off Apamoto Odani Linking

Elimwinggwe Phase 3 Estate,

Elelenwo

200,000,000 30,000,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 82 of 119

Page 395: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

945 Roads/BridgesRumuokwurush

iObio/Akpor

Construction Of Webilor/Saughter

Road Rumuokwurushi Behind Mtn

Office Off Elelenwo Road

150,000,000 22,500,000 0.00

946 Roads/Bridges Ohia Agbada Obio/AkporConstruction Of Ohia Agbada

Eshralu Street240,000,000 36,000,000 0.00

947 Roads/Bridges Ekpegong Andoni

Construction Of

Ekpengong/Ataijong Road Of

Asalakiri In Andoni

200,000,000 30,000,000 0.00

948 Roads/Bridges Ke Town Degema

Construction Of 1.7km Internal

Road At New Site Ke Town /

Amachire Polo Street/Ferupaka-

Ama In Degema Lga Rivers

280,000,000

200,000,000 30,000,000 0.00

949 Roads/Bridges Port Harcourt Port Harcourt

Construction Of 2km Ngara-Ngo

Street, Off 147 Nta Road, Port

Harcourt

200,000,000 30,000,000 0.00

950 Roads/Bridges Port Harcourt Port Harcourt

Construction Of Chief Elijah Wobo

Street Off Ada George Road Port

Harcourt, Port Harcourt Lga,

Rivers State

200,000,000 30,000,000 0.00

951 Roads/Bridges Port Harcourt Port HarcourtConstruction Of Praise Avenue Off

Zion Street, Rumudomaya250,000,000 37,500,000 0.00

952 Roads/BridgesMgbuoba Port

HarcourtPort Harcourt

Construction Of Road 11 & 12 First

Avenue Okania Off Shell Location

Rd

245,000,000 36,750,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 83 of 119

Page 396: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

953 Roads/Bridges Location Road Obio/Akpor

Construction Of 1.5km Street At

Road One Avenue One & Two And

Road Two Avenue 1 & 2 Location

Road Off Ada George Road

200,000,000 30,000,000 0.00

954 Roads/Bridges Port Harcourt Obio/Akpor

Construction Of New Layout Road

24 Extension 'A' Agip Road Estate

Phc

200,000,000 30,000,000 0.00

955 Roads/Bridges Iriebe Obio/AkporConstruction Of King Vilage Road,

Iriebe200,000,000 30,000,000 0.00

956 Roads/Bridges

Eleme

Junction-

Refinery

Junction

Obio-Akpor

Remedial Works On Eleme

Junction - Refinery Junction In

Obio/Akpor

150,159,150 8,105,561 39,311,665 0.00

957 Roads/Bridges

Omoku-

Okwuzi Road,

Etche And

Eteo-Ogu

Road, Eleme

Remedial Works On Omoku-Okwuzi

Road, Etche And Eteo-Ogu Road152,417,061 34,957,789 39,902,787 0.00

958 Roads/Bridges

Woji,

Obio/Akpor

Lga And

Nwiakara-

Taabaa-

Okwale

Obio-AkporRemedial Works On Old Aba Road

To Ykc0.00

959 Roads/Bridges Bonny BonnyConstruction Of Bonny Ring

Road/Bridges18,287,243,958 2,943,086,593 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 84 of 119

Page 397: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

960 Roads/Bridges

Bie -Ama

Junction Ring

Road (King

Ogan Rood)

Through ..Fuel

Borikiri

Construction Of Bie - Ama

Junction Ring Road (King Ogan

Road) Through Fuel Junction Off

New Road, Borikiri Sandfilled Area

100,000,000 42,914,224 0.00

961 Roads/Bridges Amiakpu AndoniConstruction Of Unity Road -

Amaikpu Road845,867,956 0.00

962 Roads/BridgesOld Abua

RoadAhoada East

Construction Of Old Abua Road,

Phase 1 (Starting From Filling

Station Through Sda Church

Edeoha, Upto Late Chief Okpo's

Residence Okm)

100,000,000 15,000,000 26,180,000 0.00

963 Roads/Bridges

East West-

Ihuike -

Okpogaudhodu

Ahoada

Construction Of East West -

Ihuike -Okpogaudhodu Community

Road (1km)

100,000,000 15,000,000 26,180,000 0.00

964 Roads/Bridges

Ikata

Junction -

Igbokor-

Onwunyoechi -

Ahoada East

Construction Of Ikata Junction -

Igbokor -- Onwunyoechi - Ihuowo

Community Road (1km)

100,000,000 15,000,000 0.00

965 Roads/Bridges

Eze Ahoada

Palace - King

Pin School

Link

Ahoada East

Construction Of Eze Ahoada

Palace - King Pin School Link Road

(1km)

100,000,000 55,242,950 26,180,000 0.00

966 Roads/Bridges Rumuepirikom Obio/AkporConstruction Of Oro-Ekpo Road -

Rumuepirikom100,000,000 9,011,116 26,180,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 85 of 119

Page 398: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

967 Roads/BridgesErema Street,

Omoku

Ogba/Egeme/

Ndoni

Completion Of Remedial

Works/Reconstruction Of Drains

On Erema Street, Omoku

136,248,479 115,350,900 0.00

968 Roads/BridgesOkehi -

NdashiEtche Electrification Of Okehi - Ndashi 523,413,295 393,329,710 0.00

969 Roads/Bridges Ataba Andoni

Construction Of 2.139km Multiple

Rural Internal Road Network

Within Ward 10 Area In Ataba

249,990,350 199,992,280 0.00

970 Roads/Bridges Rumuodamaya Obio AkporConstruction Of Adp Agric Road,

Rumuodamaya Obio Akpor98,835,000 24,284,371 0.00

971 Roads/Bridges Ngo AndoniConstructionof Ngo Internal Roads

And Drains-Rigid Pavement 2,032,046,202 0.00

972 Roads/Bridges Amaikpu AndoniConstruction Of Unity Road

–Amaikpu Road 845,867,956 0.00

973 Roads/Bridges Iwoma OnelgaConstruction Of Asaramaija-

Iwokit Road 619,293,530 0.00

974 Roads/BridgesOgoloma-

UkayaAndoni

Construction Of Ogoloma-Ukaya

Road And Drains- Rigid Pavement 532,565,805 0.00

975 Roads/Bridges Odili Road Phalga

Construction Of Salvation

Street/Total Gospel Street Off

Odili Road

178,000,000 0.00

976 Roads/Bridges Ogale ElemeConstruction Of Ogale Internal

Roads And Drains 150,000,000 0.00

977 Roads/Bridges Aleto ElemeConstruction Of Aleto Clan

Internal Roads And Drains. 150,000,000 0.00

978 Roads/Bridges Tekuru GokanaConstruction Of Tekuru 32-Bodo-

Kozo 3.2km Road 340,000,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 86 of 119

Page 399: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

979 Roads/Bridges 0zuoba Obio/AkporConstruction Of Alimini Road,

Ozuoba. Obio/Akpor 309,588,694 0.00

980 Roads/Bridges Borokiri Phalga

Constuction Of Access Road And

Drains At Oil Of Joy Church Road

And Environs, Borokiri.

200,000,000 0.00

981 Roads/Bridges Isiodu Road EmouhaConstruction Of Isiodu Road And

Drains, Emouha 250,000,000 0.00

982 Roads/Bridges Mgbuoba Obio/AkporConstruction Of Down Odanwere

Road, Mgbuoba, P.H 245,000,000 0.00

983 Roads/Bridges Rumukrushi Obio/AkporEmergency Maintainance Of Rd

Road –Rumukrushi Road And Drains 310,000,000 0.00

984 Roads/Bridges Rumukania Obio/Akpor

Constrution Of Road 10, First

Avenue, Rumukania New Layout

Road And Drain

180,000,000 0.00

985 Roads/Bridges Uniport Obio/Akpor

Rehabilitation/Reconstruction Of

Access Road And Internal Roads

At The University Of Port-

Harcourt

902,000,000 0.00

986 Roads/Bridges Elele Alimini EmohuaConstruction Of Water Works

Road, Elele Alimini, Emohua 150,000,000 0.00

987 Roads/BridgesPhalga/Etche/

Oyigbo

Phalga/Etche

/ Oyigbo

Reconstruction Of Port

Harcourt/Igbo-Etche/Oyigbo Road 2,000,000,000 0.00

988 Roads/Bridges Gbobozor GokanaConstruction Of Gbogozor Road

Budo 120,000,000 0.00

989 Roads/Bridges Chokota Etche

Rivers State Government Housing

Estate Linking Chokota In Etche

Lga (2km)

350,000,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 87 of 119

Page 400: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

990 Roads/Bridges Rumueme Obio/Akpor

Re-Construction Of Road 24 And

Road 2, Federal Housing Estate,

Rumueme, Port Harcourt (2km)

300,000,000 0.00

991 Roads/Bridges Woji Obio/Akpor

Re-Construction Of Road 12

Connecting Road 29 To Road 21

Federal Housing Estate. (2km)

300,000,000 0.00

992 Roads/Bridges Umu-Ebereke Oyigbo

Construction Of Umu-Ebereke

Road, Off Umusoya Road, High

Tension, Oyigbo, Rivers State

(1.5km)

250,000,000 0.00

993 Roads/BridgesChukwuma

AvenueRumudomaya

Construction Of 1.0km Road And

Drainage At Chukwuma Avenue,

Rumuodomaya, Obio/Akpor Lga,

Rivers State.

200,000,000 0.00

994 Roads/Bridges Agbonchia ElemeConstruction Of City Of Favour

Road, Agbonchia, Eleme 200,000,000 0.00

995 Roads/Bridges Abonnema AkulgaConstruction Of Glady Road,

Abonnema, Akuku Toru200,000,000 0.00

996 Roads/Bridges Abuloma Phalga

Construction Of Fayeofori Close

With Drains (Rigid Pavement),

Abuloma, Ph

50,000,000 0.00

997 Roads/Bridges Omoku OnelgaIntegrated Central Drainage

System & Internal Road Networks1,293,733,447 0.00

998 Roads/Bridges Ogoranya Ewo OnelgaConstruction Of Ogaranya Ewo

Road, Omoku151,587,470 0.00

999 Roads/Bridges Rumuokani Obio-AkporConstruction Of Rumuokani Street

Off Choba Road.Rumuokwuta195,087,500 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 88 of 119

Page 401: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1000 Roads/BridgesHerbert

MacouleyPhalga

Resurfacing Of Herbert

Macauley/Atako/Nzlmiro Street,170,731,550 0.00

1001 Roads/Bridges Upatabo Ahoada EastConstruction Of Upatabo-Ula-

Ikata Link Road, Phase Ii137,294,475 0.00

1002 Roads/BridgesChief Ntagbu

StreetPhalga

Construction Of Chief Ntagbu

Street, Elekahia.Rebisi55,355,559 0.00

1003 Roads/BridgesOgele New

LayoutObio-Akpor

Construction Of Ogele New Layout

Off Eliohani Road Oroigwe115,662,238 0.00

1004 Roads/Bridges Oka Nkpala Eleme Construction Of Oka Nkpala Road 246,111,600 0.00

1005 Roads/Bridges Rumuolumeni Obio-AkporConstruction Of Borrow Pit Street

Off Iwofe Road, Rumuolumeni121,364,000 0.00

1006 Roads/Bridges Beera Road Khana

Construction Of 4km Beera Road

And Drains With 2 Culverts, Khana

Lga.

645,000,000 0.00

1007 Roads/Bridges Kaa Khana/AndoniConstruction Of Kaa-Ajakajak-

Ibotirem Road And Bridges. 2,000,000,000 0.00

1008 Roads/Bridges Akpajo ElemeConstruction Of Farm Road And

Drains, Akpajo 189,569,349 0.00

1009 Roads/BridgesChiorlu

Close/EvuorluObio-Akpor

Construction Of Chiorlu

Close/Evuorlu Close 8, Off Nta146,670,000 0.00

1010 Roads/Bridges Gra Obio/AkporConstruction Of Road With

Interlocking Paving Stone/Drains127,149,015 0.00

1011 Roads/Bridges Rumuigbo Obio/ApkorConstruction Of Amadi Chukwu

Close Off Gbei Road102,660,875 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 89 of 119

Page 402: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1012 Roads/Bridges Ula-Ehuda Ahoada EastRehabilitation Of Ula-Ehuda Road

Linking Odiereke Ubie 195,553,018 85,916,466 0.00

1013 Roads/Bridges Rumuagholu Obio/AkporRehabilitation/Constuction Of

Workw-Ota Avenue Off 121,865,500 0.00

1014 Roads/Bridges Saa-Guil KhanaConstruction Of Saa-Guil In

Nyokana District 221,101,650 0.00

1015 Roads/Bridges Pkean KhanaConstruction Of Vincent Peter

Road, Kpean 242,634,511 0.00

1016 Roads/Bridges Ogbogoro Obio/AkporConstruction Of Runuadi

Rumunwokoke Road, Ogbogoro 249,500,000 0.00

1017 Roads/BridgesOhiakporokot

orObio/Akpor

Construction Of Ohiakporokotom

New Layout, Rumuodumaya 239,500,564 0.00

1018 Roads/BridgesHigh Court

RoadObio/Akpor

Constructionof High Court Road,

Southern Pride Hotel Opposite 214,210,463 0.00

1019 Roads/Bridges Oyigbo OyigboConstruction Of Internal Road

(Phase Ii) 229,151,010 0.00

1020 Roads/BridgesMathlas

Nyenye KumoObio-Akpor

Construction Of Mathias Nyenye

Kumo Road Of Aker Road104,988,000 0.00

1021 Roads/Bridges Paulina Edet EtcheConstruction Of Paulina Edt Street

Umuebulu153,960,750 0.00

1022 Roads/Bridges Rumueme Phalga

Rehabitation/Construction Of 1st

Avenue Federal Housing Estate

Rumueme With Spur To Nddc Side

Gate Linking Tombia Street,Phc

205,000,000 0.00

1023 Roads/Bridges Wali Woko Obio-AkporConstruction Of Wali Woko Road

With Spur At Ihia Rumuoke231,169,550 0.00

1024 Roads/Bridges Rumuodomaya Obio-Akpor Construction Of Transformer Road 104,988,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 90 of 119

Page 403: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1025 Roads/Bridges Nkakini Strt PhalgaConstruction Of Nkanini Street

Off Uyo Street, Rumuomasi130,667,000 0.00

1026 Roads/Bridges Rumuola Obio-AkporConstruction Of Mfm Internal

Road And Street Lightting In163,358,233 0.00

1027 Roads/Bridges Apa-Ogwu Obio-AkporConstruction Of Apa-Ogwu,

Rumudara109,988,000 0.00

1028 Roads/Bridges Nkpor Obio-AkporConstruction Of Giwa

Street/Okacha Road, Nkpor106,590,500 0.00

1029 Roads/Bridges Rumuolumeni Obio-AkporConstruction Of Acess Road To

Sanitation Authority Final Dump236,600,200 0.00

1030 Roads/Bridges

Iwowari

Avenue/Earop

la

PhalgaConstruction Of Iwowari

Avenue/Earoplane Drive To Black96,081,405 23,405,326 0.00

1031 Roads/Bridges Onne ElemeConstruction Of Internal Road

Phdse 1 Rsust Onne98,500,000 0.00

1032 Roads/Bridges Port-Harcourt Phalga

Construction Of Engr, Adola

Street Idamiete Drive/Lucky

Avenue Off

97,793,850 0.00

1033 Roads/Bridges Erema OnelgaConstruction Of Drains At

Okpulahia In Erema58,500,000 29,802,438 0.00

1034 Roads/BridgesChief Gbekee

RoadObio-Akpor

Recontrution Of Chief Gbekee

Road35,788,812 0.00

1035 Roads/Bridges Okwalle KhanaConstruction & Repdirs Of Okwalle

Junction Luege Road66,970,190 0.00

1036 Roads/Bridges Apamini Obio-AkporConstruction Of Apamini

Road.Mgbukara132,154,400 0.00

1037 Roads/Bridges Elioparanwo Obio-AkporConstruction Of Elioparanwo

Road/Drains( Ada George243,312,201 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 91 of 119

Page 404: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1038 Roads/Bridges Gwara-Laalaa KhanaConstruction Of Gwaraa-Laalaa,

Phase Ii205,000,000 0.00

1039 Roads/Bridges UsokunConstruction Of Usokun Internal

Road40,474,949 0.00

1040 Roads/Bridges Onne ElemeConstruction Of Internal Road

Phase Ii Rsust Onne Campus95,850,000 4,259,097 0.00

1041 Roads/Bridges Eliogbolo Obio-AkporConstruction Of Eliogbolo Link

Road By New Airport Road, Eliozu84,581,073 0.00

1042 Roads/Bridges Nyobe-Bangha KhanaConstruction Of Nyobe Bangha

Road98,556,075 0.00

1043 Roads/Bridges Allen AvenueConstruction Of Allen Avenue Off

Oroigwe Road With Spur139,545,415 0.00

1044 Roads/BridgesChief Ume

StreetObio-Akpor

Construction Of Chief Ume

Street.Off Ada George Road98,730,030 4,298,563 0.00

1045 Roads/Bridges Port-HarcourtConstruction Of Concrete Road &

Drains At Ekimigbo Off Ogologo76,891,684 0.00

1046 Roads/Bridges Bori Camp Obio-AkporConstruction Of Bori Camp

Internal Road, Phase Iii166,399,360 0.00

1047 Roads/Bridges Odagwa EtcheConstruction Of Odagwa Internal

Roads,Phase Ii194,942,710 8,673,429 0.00

1048 Roads/Bridges Port-Harcourt Obio-AkporConstruction Of Elder Adori

Street73,254,616 0.00

1049 Roads/BridgesEckankar

Street

Construction Of 1 Km Road At

Eckankar Street, Omoku95,110,313 0.00

1050 Roads/Bridges Dike/Edom PhalgaConstruction Of Dike/Ebom

Street, Oginigba98,824,740 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 92 of 119

Page 405: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1051 Roads/Bridges

Wanwuna

Road Olf

Ohakwe

Obio-AkporCosntruction Of Wanwuna Road

Off Ohakwe Street. Obi Wali Link101,451,316 6,241,239 0.00

1052 Roads/Bridges 1 Eli Okporo Obio-AkporConstruction Of Eli Okporo Link

Road With Spur At Rukpokwu98,358,042 4,987,493 0.00

1053 Roads/BridgesRugalaga,

Borrow PitObio-Akpor

Construction Of Rugalaga Borrow

Pit Road, Rumumoi84,404,335 0.00

1054 Roads/BridgesNkemka/Adjoi

ni

Construction Of

Nkemka/Adjoining Streets97,187,370 0.00

1055 Roads/Bridges

Elder Lazarus

Avenue &

Elder

PhalgaConstruction Of Elder Lazarus

Avenue & Elder Emenike Gbekee56,624,895 0.00

1056 Roads/Bridges

Gideon

Avenue Off

Peter Odill

PhalgaConstruction Of Gideon Avenue

Off Peter Odili Road, Aboloma122,827,446 0.00

1057 Roads/Bridges Aker/Nkpoi Obio-AkporConstruction Of Aker/Nkpor

Internal Road, Rumuolumeni128,000,000 0.00

1058 Roads/Bridges Rumuibekwe Obio-AkporConstruction Of 5th

Avenue,Rumuibekwe125,250,000 0.00

1059 Roads/BridgesOnumini

OkporoObio-Akpor

Construction Of Onumini Okporo

Street With Spur At Acho Amadi

Close, Rumuodomaya

97,500,000 0.00

1060 Roads/Bridges Port-HarcourtResurfacing Of Maxchef Street

Off Iwofe Road98,000,000 0.00

1061 Roads/BridgesOriianwokpaka

NiObio-Akpor

Construction Of Concrete Road &

Drains At Oriianwokpakani Layout,85,057,875 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 93 of 119

Page 406: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1062 Roads/BridgesMfm Orlumeni

RoadObio-Akpor

Construction Of Mfm Orlumeni

Road 3, Overlaying Nddc Road,

Rumuolumeni Phase

75,000,000 0.00

1063 Roads/BridgesSangama

IfokoAsalga

Construction Of Sangama Ifoko

Internal Road122,204,577 0.00

1064 Roads/Bridges

Eliminigwe

Housing

Estate

Obio-AkporConstruction Of Eliminigwe

Housing Estate.Phase Iii Elelenwo93,544,238 0.00

1065 Roads/Bridges

Mgbede

Junction To

Aggah Road

Ogba/Egbema

/Ndoni

Remedial Works On Mgbede

Junction To Aggah Road In

Ogba/Egbema/Ndoni

101,938,643 0.00

1066 Roads/BridgesUbimini-

Omoku

Ogba/Egbema

/Ndoni

Remedial Works On Ubimini Omoku

Road In Ogba/Egbema/Ndoni 105,198,745 0.00

1067 Roads/BridgesAkpajo-

ElelenwoObio Akpor

Remedial Works On Akpajo-

Elelenwo Road, Obio Akpor 144,151,875 0.00

1068 Roads/BridgesProfessor

Eneyo ClosePort Harcourt

Construction Of Professor Eneyo

Close Linking Ohakwe Road And

Otobo Street (1 Km), Rumigbo

100,000,000 0.00

1069 Roads/BridgesOld Abua

RoadAhoada East

Construction Of Old Abua Road,

Phase Li (Starting From Edeoha

Market, Through Mile 5, Linking

Gufanti And Upto The New Abua

Road (1km)

100,000,000 14,250,000 0.00

1070 Roads/BridgesRccg (Regional

Camp)Port Harcourt

Emergency Re-Construction Of

Rccg (Regional Camp) Road Lots 2,

Linking Phc/Owerri Road Ada

George/Airport Road

100,000,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 94 of 119

Page 407: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1071 Roads/BridgesRccg (Regional

Camp)Port Harcourt

Emergency Re-Construction Of

Rccg (Regional Camp) Road Lots 1 3

100,000,000 0.00

1072 Roads/Bridges

Umuajie

Roads In

Obrikom

ObrikomEmergency Rehabilitation Of

Umuajie Roads In Obrikom100,000,000 0.00

1073 Roads/Bridges Rukpokwu Obio-Akpor

Construction Of Ohia-

Igba.Rumuapu Internal

Road.Rukpokwu Town,

247,042,870 0.00

1074 Roads/Bridges Ogbunabali Port Harcourt

Emergency Rehabilitation Of

Aguma/Akjacent Street Linking

Easter By-Pass, Ogbunabali

100,000,000 0.00

1075 Roads/BridgesIwoma Green

BonnyOnelga

Const/Rehab Od Existing Rural

Water Scheme At Iwoma Green

Bonny

60,745,373 0.00

1076 Roads/Bridges Asarama AndoniConstruction Of Asarama Internal

Roads And Drains-Rigid Pavement 2,126,873,240 0.00

1077 Roads/Bridges Odagwa Etche LgaConstruction Of 2nos. 6 Classroom

Block At Odagwa43,170,004 0.00

1078 Roads/Bridges Abalama Asari Toru

Rehabilitation Of Existing Rural

Community Water Schemes,

Abalama,

29,950,855 0.00

1079 Roads/Bridges Alesa Eleme Eleme

Site Preperation And Reclamation

With Sharp Sand At The Hospital

Site At Alesa Eleme, Size 299m X

150m X 1 Meter

219,608,100 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 95 of 119

Page 408: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1080 Roads/Bridges

Mini Orlu

Road Off Ada-

George

Obio-AkporConstruction Of Mini Orlu Road

Off Ada-George Road249,098,713 0.00

1081 Roads/Bridges Elibrada Emohua LgaProvision Of Solar Powered Street

Light At Elibrada,232,876,160 0.00

1082 Roads/Bridges

Elibrada-

Oduoha

Emohua Road

EmohuaRehabilitation Of Elibrada-Oduoha

Emohua Road250,000,000 31,875,000 0.00

1083 Roads/Bridges Mile 3 Phalga

Construction Of 1km Concrete

Road At Christ The Pillar Of Life

Church, Off Cherubim Road, Mile 3

200,000,000 0.00

1084 Roads/Bridges Nihi-Umuoye Etche

Design Of Nihi-Odufor-Akpoku-

Umuoye Road, Bridge In Etche Lga-

Rv

5,000,000,000 0.00

1085 Roads/BridgesOdioukwu-

Akinima Road

Design And Construction Of

Odioukwu-Egbe-Ebiriba-Shiobele-

Akinima Road, (Ubie-Akinima Road)

3,000,000,000 0.00

1086 Roads/Bridges Ogbakiri Emohua

Construction Of Okporowo-Ihie-

Rumuada-Rumuakani Link Road And

Drains In Ogbakiri

450,000,000 0.00

1087 Roads/Bridges Rumueme Obio/Akpor

Construction Of 1km Concrete

Road At Royal House Of Grace

International Church, Rumueme

200,000,000 0.00

1088 Roads/BridgesPhalga/Etche/

Oyigbo

Phalga/Etche

/ Oyigbo

Reconstruction Of Port

Harcourt/Igbo-Etche/Oyigbo Road 2,000,000,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 96 of 119

Page 409: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1089 Roads/Bridges Egbelu Ogwe Omuma Construction Of Egbelu Ogwe Road 250,000,000 0.00

1090 Roads/Bridges Rumuigbo Obio-AkporConstruction Of 2km Road With

Drains At Ogiri Avenue Rumuigbo 250,000,000 0.00

1091 Roads/Bridges Orlumeni Obio-Akpor

Construction Of Rigid Pavement

And Drains At Orlumeni Road

3/Nporo, Rumuolumeni Port

Harcourt

300,000,000 0.00

1092 Roads/Bridges Agip Estate Obio-AkporConstruction Of Road 24

Extension A, Agip Estate 300,000,000 0.00

1093 Roads/BridgesEnunu Farm

RoadObio-Akpor

Construction Of Enunu Farm Road

At Eliozu 250,000,000 0.00

1094 Roads/Bridges Eleparanwon Obio-AkporConstruction Of Gospel Avenue

Road At Eleparanwon 150,000,000 0.00

1095 Roads/Bridges Eliokpokwuodu Obio-Akpor

Construction Of 1km Of Road 5

And 6 At Okporo Layout And

Drains In Eliokpokwuodu-Rukpoku

Town

120,000,000 0.00

1096 Roads/Bridges

Apa Ekwu

Ogbo/George

Amewhule

Obio-Akpor

Construction Of Apa Ekwu

Ogbo/George Amewhule Street

Link Road

250,000,000 0.00

1097 Roads/BridgesEriorlu/

CherubimObio-Akpor

Construction Of Eriorlu/Cherubim

Street Link Road 250,000,000 0.00

1098 Roads/Bridges Elelenwo PhalgaConstruction Of Elelenwo Estate

Internal Road And Erosion Control 250,000,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 97 of 119

Page 410: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1099 Roads/Bridges ArukwoConstruction Of Arukwo-Rumu

Road 150,000,000 0.00

1100 Roads/BridgesAmalem-

Okoboh

Rehabitation Of Amalem-Okoboh

Bypass 150,000,000 0.00

1101 Roads/Bridges BunduConstruction Of Internal Road At

Bundu Community 250,000,000 0.00

1102 Roads/Bridges Abana Phalga

Construction Of Abana Street

Extension/Alalibo Avenue Old Gra,

Port Harcourt.

249,000,000 0.00

1103 Roads/Bridges Kings Avenue Phalga

Construction Of Kings Avenue Off

Tombia Street Extension Gra, Port

Harcourt

248,000,000 0.00

1104 Roads/BridgesChief A. K.

Dikibo RoadObio-Akpor

Construction Of Chief A. K. Dikibo

Road, Rumuekporlu-Rumuowha At

Eneka

100,000,000 0.00

1105 Roads/Bridges Usokun DegemaConstruction Of 2.4km Road At

Usokun Community Internal Road 245,000,000 0.00

1106 Roads/Bridges Rumuolukwu Obio-AkporConstruction Of Eliopke Amadioha

Bukwu 11 245,000,000 0.00

1107 Roads/Bridges Borikiri PhalgaConstruction Of 1.7km Road At

Christ Word Avenue 210,000,000 0.00

1108 Roads/Bridges

Ohia Owhuru

Eli-Eli

Rumuwele

Rumuokwurusi

Obio-AkporConstruction Of Ohia Owhuru Eli-

Eli Rumuwele Rumuokwurusi Road 180,000,000 22,950,000 0.00

1109 Roads/BridgesArukwu-

EmelesueObio-Akpor

Construction Of Arukwu-Emelesue

Road 246,550,000 31,435,125 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 98 of 119

Page 411: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1110 Roads/BridgesArukwu-

EmelesueObio-Akpor Construction Of Wachukwu Street 235,520,000 70,046,350 0.00

1111 Roads/Bridges Obi-Wali Obio-Akpor

Construction Of Obi-Wali Street-

Nta Mgbuoba Market Junction

Link Road

186,542,190 0.00

1112 Roads/Bridges Ogbogoro Obio-Akpor

Construction Of Mgbu-Odudu-

Akpa Wede Through Enyinda Int'l

College Egbelu Ozodo

500,000,000 0.00

1113 Roads/BridgesConsruction Of 4km Road At Odau-

Odual 800,000,000 0.00

1114 Roads/BridgesConstruction Of 6km Road At

Ogboloma Odual 800,000,000 0.00

1115 Roads/Bridges Port Harcourt Obio-Akpor

Rehabitation And Upgrading Of

New Heavens Link Road And Drains

(Link Road Between Tombia

Extension-Oroazi Location Road

Gra Phase 2

250,000,000 0.00

1116 Roads/Bridges Okochiri OkrikaConstruction Of 2km Okochiri

Internal Road 800,000,000 2,550,000 0.00

1117 Roads/BridgesMayor/King

AgaraObio-Akpor

Construction Of 2km Road At

Mayor/King Agara Street At

Mgbuosimi Rumuolumini Community

400,000,000 0.00

1118 Roads/BridgesField/Rumudik

e

Construction Of 2.2km

Field/Rumudike Road 330,000,000 0.00

1119 Roads/Bridges Ohia EgbeluConstruction Of Ohia Egbelu Road

Off K 17 Ph-Aba Road0.00

1120 Roads/Bridges Ohia Agbada Obio AkporConstruction Of 2km Ohia Agbada

Eshralu Street 230,000,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 99 of 119

Page 412: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1121 Roads/BridgesOmuchiolu/O

muokiriIkwere

Construction Of 1.5km Internal

Road With Drains At

Omuhiolu/Omuokiri Road

230,000,000 0.00

1122 Roads/Bridges Oyigbo Oyigbo

Construction Of 1.8km

Road/Drainage At Police Housing

Estate

240,000,000 30,600,000 0.00

1123 Roads/Bridges Abonnema AkulgaRe-Habitation Of Abonnema-

Obonoma Road 234,000,000 0.00

1124 Roads/Bridges Rumuadi Obio AkporConstruction Of Rumuadi

Community Internal Road 200,000,000 30,000,000 25,500,000 0.00

1125 Roads/BridgesPorth

HarcourtObio Akpor

Construction Of Christ Avenue

Street To Redeemed Road 100,000,000 12,750,000 0.00

1126 Roads/Bridges Umuosinla Obowo

Construction Of Road Linking Uzzi

Spring Water-Sacred Heart

Technical College In Umuosinta

100,000,000 12,750,000 0.00

1127Roads/Bridges

Total 315,743,016,696 79,689,945,289 17,494,862,955 13,729,878,262

1128

Governance,

Social Services

& Sports

various various Stakeholders 709,528,170 106,429,226

1129

Governance,

Social Services

& Sports

3 Senatorial

District

3 Senatorial

District

Establishment Of A Rivers State

Development Foundation (Rsdf) In

Each Of The Senatorial Districts

75,000,000 75,000,000

1130

Governance,

Social Services

& Sports

Various Various Payment For Retentions 300,000,000 210,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 100 of 119

Page 413: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1131

Governance,

Social Services

& Sports

OgboguOgba/Egbema

/ Ndoni

Ogbogu Integrated Civic Center

With I.T. Centre688,343,906 72,984,416 80,000,000

1132

Governance,

Social Services

& Sports

Rebisi Obio/Akpor

Construction Of Integrated Youth

Development Center At Eze-Apara,

Rebisi, Obio/Akpor Lga, Rivers

State.

243,312,941 100,048,772 36,496,941

1133

Governance,

Social Services

& Sports

Ibaa Emohua Ibaa Youth Development Complex 248,500,000 133,750,825 34,000,000 60,000,000

1134

Governance,

Social Services

& Sports

Obio/Akpor Obio/Akpor

Construction Of Mobile Police

Barracks (Special Protection Unit -

Base 6), Lot 6 - General External

Works, Port Harcourt

249,750,825 99,900,330 37,462,624

1135

Governance,

Social Services

& Sports

Obio/Akpor Obio/Akpor

The Nigeria Police Barracks

(Special Protection Unit-Base6)

Lot 5 Construction Of Block Of

Flats/Residential Quarters (Block

D) In Ph Rivers State

249,750,000 37,462,500 37,462,500

1136

Governance,

Social Services

& Sports

Obio/Akpor Obio/Akpor

The Const. Of Nig. Police Barracks -

Base 6 Lot 2: Const Of Block Of

Flats/ Res Quarters (Block A) In

P/H,

249,750,000 37,462,500 37,462,500

1137

Governance,

Social Services

& Sports

Obio/Akpor Obio/Akpor

The Const. Of Nig. Police Barracks -

Base 6 Lot 4: Const Of Block Of

Flats/ Res Quarters (Block A) In

P/H,

249,750,000 37,462,500 37,462,500

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 101 of 119

Page 414: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1138

Governance,

Social Services

& Sports

Obio/Akpor Obio/Akpor

Construction Of Nigerian Police

Barracks (Special Protection Unit-

Base 6) Lot 3: Construction Of

Block Of Flats/Residential

Quarters (Block B) In Port

Harcourt, Rivers State.

249,750,000 37,462,500 37,462,500

1139

Governance,

Social Services

& Sports

Port Harcourt Port Harcourt

Renovation Of 3 Units Of 3-

Storey Buildings (16no. 2 Bedroom

Flats Each) At The Nigerian Navy

Barracks, Borokiri (Lot 4b), Rivers

State.

243,456,387 36,518,458

1140

Governance,

Social Services

& Sports

Port Harcourt Port Harcourt

Renovation Of The Nigerian Navy

(Pathfinder) Administrative

Block/Rehabilitation Of Base

Swimming Pool/General External

Works (Lot 5) At Rumuoluemni,

Port Harcourt, Rivers State.

102,556,125 15,383,419 15,383,419

1141Governance &

Social servicesObio/Akpor Obio/Akpor

Completion of Obi/Akpor Youth

Development Centre Rumuodani 90,000,000 13,500,000

1142

Governance,

Social Services

& Sports

Port Harcourt Port Harcourt

Renovation Of 2 Units Of 3-

Storey Buildings (56no. 1 Bedroom

Flats Each) At Nigerian Navy

Barracks, Borokiri At The Nigeria

Navy Ship Pathfinder, Port

Harcourt, (Lot 3b), Rivers State.

235,240,460 58,810,115 60,000,000

1143

Governance,

Social Services

& Sports

Egwere-Boue KhanaConstruction Integrated Youth

Development Centre249,500,000 57,634,500

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 102 of 119

Page 415: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1144

Governance,

Social Services

& Sports

Abonnema Akuku-ToruYouth Development Centre In

Abonema248,500,000 93,556,132 24,396,488 55,000,000

1145

Governance,

Social Services

& Sports

Nchia ElemeIntegrated Skill Acquisition

Centre/Ict250,000,000 37,425,000 29,452,500 55,000,000

1146

Governance,

Social Services

& Sports

Mgbuelia

NdeleEmohua Construction of ICT Centre 100,000,000 15,000,000

1147

Governance,

Social Services

& Sports

Ogbakiri Emohua Ogbakiri Youth Centre 248,349,150 22,500,000 15,513,513 55,000,000

1148

Governance,

Social Services

& Sports

Buguma Asari-Toru Buguma Youth Centre 248,349,150 37,112,013 55,000,000

1149

Governance,

Social Services

& Sports

Port Harcourt Port Harcourt

Synthetic Running Surface At The

University Of Port Harcourt

Reorientation Project For Youths

To

250,000,000 37,500,000 55,000,000

1150

Governance,

Social Services

& Sports

Rebisi Port Harcourt Youth Centre - Eze Apara Rebisi 243,312,941 100,048,772 28,664,698 55,000,000

1151

Governance,

Social Services

& Sports

Aleto ElemeConstruction Of Skills Acquisition

Center245,000,500 28,863,450 55,000,000

1152

Governance,

Social Services

& Sports

Onne ElemeConstruction Of Skills Acquisition

Center248,561,350 55,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 103 of 119

Page 416: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1153

Governance,

Social Services

& Sports

EdeOgba/Egbema

/NdoniEde youth secretariate 50,000,000 30,000,000

1154

Governance,

Social Services

& Sports

Abam OkrikaConstruction of Police Station and

Health centre200,000,000 30,000,000

1155

Governance,

Social Services

& Sports

Rebisi Port Harcourt

The Construction Of Oroworukwo

Community Centre, Oroworukwo

Rebisi, Port Harcourt, Rivers

State.

150,000,000 22,500,000

1156

Governance,

Social Services

& Sports

Emohua Emohua

The Construction Of Emohua

Hospital- Rumueche Road In

Emohua Lga, Rivers State

247,131,675 37,069,751 37,069,751

1157Governance &

Social servicesElelenwo Obio/Akpor

Construction of Elelenwo Market/

Betico Ring road . 200,000,000 30,000,000

1158

Governance,

Social Services

& Sports

Amadi-Ama Port HarcourtConstruction of ICT Centre at

Amadi-Ama100,000,000 15,000,000

1159

Governance,

Social Services

& Sports

Rumukpalukwu

zoPort-Harcourt

Civic Centre In Rumukpalukwuzo -

Orainowo, Diobu100,000,000 16,551,352 23,562,000 45,000,000

1160

Governance,

Social Services

& Sports

Obio/Akpor Obio/Akpor

Construction Of Nigerian Police

Barracks (Special Protection Unit-

Base 6) Lot 1: Construction Of

Admin Block, Commander's

Residence, Service Block And Gate

House.

249,910,500 37,486,575 37,486,575

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 104 of 119

Page 417: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1161

Governance,

Social Services

& Sports

Port Harcourt Port Harcourt

Construction Of Residential

Quarters For Police Personnel At

Port Harcourt, Rivers State

130,000,000 10,971,287 19,500,000

1162

Governance,

Social Services

& Sports

Oyorokoto

CommunityAndoni

Construction of office and

residential blocks for the Nigerian

Police at Oyorokoto Community

150,000,000 22,500,000

1163Governance &

Social servicesOkrika Okrika

Construction of 4 Nos. Public

Convenience and Recreation Centre

for Adedeme-Biri, Anyangu-Biri,

Ogan-Polo, Graeme-Polo (Lots 1-2)

300,000,000 45,000,000

1164

Governance,

Social Services

& Sports

Navy Barracks Port Harcourt

Renovation Of 2 Units Of 2-

Storey Buildings (12no. 2 Bedroom

Flats Each) At Nigerian Navy

Barracks, Borokiri At The Nigeria

Navy Ship Pathfinder, (Lot 4a),

Port Harcourt, Rivers State.

126,277,803 84,886,836 18,941,670

1165

Governance,

Social Services

& Sports

Kaa Khana Kaa Market Project 100,000,000 21,774,446 30,000,000

1166

Governance,

Social Services

& Sports

Port Harcourt

ClubPort Harcourt

Construction Of Port Harcourt

Sports Hall100,759,307 33,182,093 19,784,090 25,000,000

1167

Governance,

Social Services

& Sports

Zaakpor KhanaConstruction Of Civic Centre At

Zaakpon Community154,471,443 89,304,754 15,165,234 25,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 105 of 119

Page 418: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1168

Governance,

Social Services

& Sports

Eleme ElemeEleme Community Resource Centre

(Running For 3years)150,000,000 23,100,000

1169Governance &

Social ServicesEbeni/Omuma

Construction of Ebeni/Omuma

Town Hall 60,000,000 9,000,000

1170

Governance,

Social Services

& Sports

Port Harcourt Phalga

Renovation Of State Security

Service Office Complex And

Ancillary Building

66,164,950 15,284,103

1171

Governance,

Social Services

& Sports

Port Harcourt PhalgaRenovation Of Rivers State Police

Command Armory52,717,212 12,177,676

1172

Governance,

Social Services

& Sports

Port-Harcourt PhalgaRenovation Of Police Guest House

At William Jumbo Street34,067,587 7,869,613

1173Governance &

Social ServicesBori Khana

Construction of Skill Acquisition

Centre in Bori 150,000,000 22,500,000

1174

Governance,

Social Services

& Sports

Opobo Opobo/Nkoro

Support To Existing Cdfs In

Opobo/Nkoro, Ogba And Ekpeye

Kingdom

100,000,000 50,000,000 0.00

1175

Governance,

Social Services

& Sports

Amnama- Orji Onelga Lgra-Bu-Eni Youth Devt Complex 248,500,000 38,290,729 44,730,000 0.00

1176

Governance,

Social Services

& Sports

Rivers State Ail Lg As Nddc Technical Aids Corps 50,000,000 - 0.00

1177

Governance,

Social Services

& Sports

Woji Obio/Akpor Endless Road- Woji 49,537,400 7,430,610 14,590,003 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 106 of 119

Page 419: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1178

Governance,

Social Services

& Sports

Police Hq Portharcourt

Renovation Of Police

Headquarters, Moscow

Rd,Portharcourt

150,000,000 22,500,000 0.00

1179

Governance,

Social Services

& Sports

Port Harcourt Port Harcourt Supply Of Garri Grating Machines 980,000,000 980,000,000 0.00

1180

Governance,

Social Services

& Sports

Port Harcourt.Port

HarcourtSupply Of Boats And Fibre 980,000,000 980,000,000 0.00

1181

Governance,

Social Services

& Sports

South East

Zone

Community Outreach Sensitization

Programme For Peace And Security

Of Oil Producing Communities In

Rivers State

200,000,000 25,500,000 0.00

1182

Governance,

Social Services

& Sports

Alesa ElemeConstruction Of Mini Stadium,

Alesa, Eleme 248,349,150 37,252,373 0.00

1183

Governance,

Social Services

& Sports

Rivers State

Community Outreach Sensitization

Programme For Peace And Security

Of Oil Producing Communities In

Rivers State

200,000,000 25,500,000 0.00

1184

Governance,

Social Services

& Sports

Okochiri OkrikaCommunity Hall And Multipurpose

Centre75,000,000 17,671,500 0.00

1185

Governance,

Social Services

& Sports

Amanongo/Ng

emebiriOkrika

Construction Of Community Hall

Amanongo/Ngemebiri180,000,000 27,000,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 107 of 119

Page 420: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1186

Governance,

Social Services

& Sports

Alesa Eleme Integrated Community Centre 249,500,000 29,393,595 0.00

1187

Governance,

Social Services

& Sports

Abua Central Abua/OdualSupply Of Ict Materials For Acss

Library228,000,000 29,070,000 0.00

1188

Governance,

Social Services

& Sports

Anyu Abua/OdualSupply Of Ict Materials For Acss

Library228,000,000 29,070,000 0.00

1189

Governance,

Social Services

& Sports

Rivers State All LgasPromote Peace And Economic

Growth150,000,000 22,500,000 75,000,000 0.00

1190

Governance,

Social Services

& Sports

All Lgas In

Rivers StateRivers State

Secondary Schools In River State-

Quiz/Drama Competitions100,000,000 9,817,500 0.00

1191

Governance,

Social Services

& Sports

Emohua Community Hall In Emohua 230,000,000.00 22,580,250 0.00

1192

Governance,

Social Services

& Sports

Abalama Asari -Toru Water Front Toilet Blocks Phase 2 65,000,000 39,921,907 6,381,375 0.00

1193

Governance,

Social Services

& Sports

Abalama Asari -Toru Abalama Public Pier Toilet 64,120,125 9,618,019 32,779,484 0.00

1194

Governance,

Social Services

& Sports

Eleme/Oyigbo

/Tai

Eleme/Oyigbo

/Tai

Supply And Distribution Of

Computer/Accessories To

Secondary Schools In

Eleme/Oyigbo/ Tai Lga's.

249,500,650 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 108 of 119

Page 421: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1195

Governance,

Social Services

& Sports

Various Various

Provision Of Desktop Computers

For Supply To Secondary School In

Rivers State

206,130,000 30,919,500 30,919,500

1196

Governance,

Social Services

& Sports

Obuoma Degema

Supply Of Ict Ed/Mat/Sch

Upgrade At Community Secondary

School I & Ii

200,000,000 30,000,000 2,500,000

1197

Governance,

Social Services

& Sports

Rumuobiakani Obio/Akpor

Supply Of Ict Ed/Mat/Sch

Upgrade At Community Primary

School, Rumuobiakani

200,000,000 30,000,000 2,500,000

1198Governance &

Social ServicesOmoku

Construction and Equipping of

Community Hall, Omoku 150,000,000 22,500,000

1199

Governance,

Social Services

& Sports

State Office

/ StatePort Harcourt

The Police Radio

Project/Communication Equipments144,330,500 300,006,407 32,725,000 0.00

1200

Governance,

Social Services

& Sports

Oporoma/

Tema

/Sama/Lfoko/

Llel

Ena/Okpo/Ab

al Ama

Asari-Toru24no. Toilet Blocks And Solar

Lights882,325,800 10,897,095 86,622,335 0.00

1201

Governance,

Social Services

& Sports

Oroworukwu PortharcourtConstruction Of Oroworukwu

Community Centre150,000,000 51,584,733 17,671,500 0.00

1202

Governance,

Social Services

& Sports

Koroma Tai Civic/Recreation Centre 250,000,000 24,543,750 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 109 of 119

Page 422: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1203

Governance,

Social Services

& Sports

Various

Technical

Institutions

In The State

Various

Technical

Institutions

In The State

Supply Of Critical Machine Tools

To Rv State Polytechnic Bori.Rs

College Of Arts And Science,

Rumola Ph, Fstc Ahoada, Gtc Ph.

Gtc Ahoada, Gic Tombia.

81,989,210 12,298,381 0.00

1204

Governance,

Social Services

& Sports

Elioparanwo Obio/AkporConstruction Youth Development

Centre99,780,480 14,967,072 23,562,000 0.00

1205

Governance,

Social Services

& Sports

Elekahia Port Harcourt

Remodelling of

Volleyball/Basketball court

Elekahia Housing Estate Of Port

Harcourt

150,000,000 - 0.00

1206

Governance,

Social Services

& Sports

Port Harcourt PhalgaRenovation/Rehabitation Of 2

Brigade Garrison Office Complex30,979,000 10,062,927 0.00

1207

Governance,

Social Services

& Sports

Port-Harcourt Phalga

Renovation Of Of Director State

Security Residence/Boys Quarters

& On Storey 8 Room Transit

38,116,851 1,668,168 15,984,244 0.00

1208

Governance,

Social Services

& Sports

Various Various Payment For Retentions 100,000,000 0.00

1209

Governance,

Social Services

& Sports

Various VariousPayment For Special Projects And

Consultancy Projects201,781,900 0.00

1210

Governance,

Social Services

& Sports

George-Ama OkrikaConstruction Of Multipurpose Hall

In George-Ama, Okrika. 250,000,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 110 of 119

Page 423: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1211

Governance,

Social Services

& Sports

Eleme ElemeEleme Community Resource Centre

(Running For 3years)150,000,000 0.00

1212

Governance,

Social Services

& Sports

Port Harcourt PhalgaRenovation Of Rivers State Police

Command Armory52,717,212 0.00

1213

Governance,

Social Services

& Sports

Port Harcourt Phalga

Renovation Of State Security

Service Office Complex And

Ancillary Building

66,164,950 0.00

1214

Governance,

Social Services

& Sports

Port Harcourt PhalgaRenovation Of Police Guest House

At William Jumbo Street34,067,587 0.00

1215

Governance,

Social Services

& Sports

Egwere-Boue KhanaConstruction Integrated Youth

Development Centre249,500,000 0.00

1216

Governance,

Social Services

& Sports

Port Harcourt PhalgaConstruction Of Staff Quarters

At University Of Port Harcourt250,000,000 31,875,000 0.00

1217

Governance,

Social Services

& Sports

Abua Abua/OdualYouth Training & Skills

Development Scheme550,000,000 525,923,583 0.00

1218

Governance,

Social Services

& Sports Total

17,961,625,028 1,686,700,496 3,725,707,402 1,899,624,056

1219 Water Supply Various Various Lga

Omademe, Bodo, Ogbogoro,

Mgbuorda.Bakana, Abarikpo,

Kriegani, Ibaa, Eporo, Iwoma,

Obie, Obor Communities

675,000,000 113,559,481 50,069,500 100,000,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 111 of 119

Page 424: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1220 Water Supply Omuichi Ikwerre

Construction Of Omuichi Water

Project At Omopi, Omerelu

Community, Kelga, Rivers State.

230,515,862 34,577,379

1221 Water Supply Elelenwo Obio/Akpor

Award Of Contract For The

Elelenwo Municipal Water Supply

Project

151,130,381 37,782,595 22,669,557

1222 Water Supply Asarama Andoni Asarama Water Project 200,130,001 44,561,715 19,058,330 50,000,000

1223 Water SupplyUmuogbeni-

OdagwaEtche

Construction Of Major Water

Project At Umuogbeni-Odagwa,

Etche Lga, Rivers State.

240,037,640 36,005,646 36,005,646

1224 Water Supply Bolo Ogu/BoloMajor Water Works In Bolo

Community133,785,356 20,067,803 15,720,566 45,000,000

1225 Water Supply Ulakwo EtcheConstruction Of Ulakwo Water

Project In Etche244,000,000 23,954,700 45,000,000

1226 Water Supply Abua Central Abua Solar Powered Water Projecl 199,142,920 57,376,199 26,067,808 45,000,000

1227 Water Supply ObiozuminiOgba/Egbema

/Ndoni

Provision Of Solar Powered Water

Project At Obiozumini In Onelga,

Rivers State

113,500,487 45,000,000

1228 Water Supply Abonema Akuku-Toru

Abonema Water Reticulation Phase

2 Comprehensive Water Scheme

Atapani,Ubima,Ozuoha,Omanwa,

85,000,000 12,750,000 16,189,058 40,000,000

1229 Water Supply AniezeOgba/Egbema

/Ndoni

The Solar Water Scheme In Line

With Vision 202020(Lot 14) At

Anieze In Ogba/Egbema/Ndoni

L.G.A Rivers State.

44,750,000 6,712,500 6,712,500

1230 Water Supply Ogbakiri EmohuaSolar Water Project At Okporo-

Owo Ogbakiri Road 48,768,211 7,315,232

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 112 of 119

Page 425: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1231 Water Supply Ozuahia Ikwerre

Comprehensive Water Scheme

(Solar Powered) At Ozuaha,

Ikwerre Lga

47,750,000 6,712,500 7,162,500

1232 Water Supply Ogbogu OnelgaExtension Of Existing Water

Infrastructure In Ogbogu97,331,918 14,599,788 22,245,346 30,000,000

1233 Water SupplyMgbuonumini

RumuijiSolar Powered Water Project 57,272,460 30,000,000

1234 Water Supply Luuse Sogho Gokana

Solar Water Scheme In Line With

Vision 202020 (Lot 2) At Luuse

Sogho In Gokana Lga, Rivers State.

44,750,001 15,662,500 6,712,500

1235 Water Supply AliguOgba/Egbema

/Ndoni

Provision Of Solar Powered Water

Project At Aligu, Og 48,768,211 7,315,232

1236 Water SupplyOgan/Duma

AmaOkrika Solar Powered Water Project 49,800,000 7,470,000 14,137,200 25,000,000

1237 Water Supply Omerelu Ikwere Solar Powered Water Project 50,000,000 7,500,000 12,856,016 22,000,000

1238 Water Supply Port Harcourt PH

Construction of Solar water

scheme at Port Harcourt township

(2)

50,000,000 7,500,000

1239 Water Supply Kalaibiama Opobo/Nkoro

The Solar Water Scheme In Line

With Vision 202020(Lot 14) At

Kalaibiama In Opobo/Nkoro L.G.A

Rivers State.

44,750,000 15,662,500 6,712,500

1240 Water Supply Akuku Toru Akuku-ToruContract For The Solar Powered

Water Project 45,446,087 24,639,109 6,816,913

1241 Water Supply Dikibo Ama OkrikaPipe-bome water project for

Dikibo-Ama 50,000,000 7,500,000

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 113 of 119

Page 426: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1242 Water Supply Akwu Etche

Construction Of Solar Powered

Water Project At Akwu In Etche

Lga, R/S

44,541,920 6,681,288

1243 Water Supply Egbelu Obio/AkporConstruction Ofsolar Powered

Water Project At Egbelu, R/S 45,320,000 6,798,000

1244 Water Supply ObagiOgba/Egbema

/Ndoni

Const Of Solar Powered Water

Project At Obagi, Onelga, Rivers

State

41,354,730 16,515,549 6,203,209

1245 Water Supply Rumuwoji PHConstruction of Solar water

scheme at Rumuwoji community 50,000,000 7,500,000

1246 Water Supply Ubimini Ikwerre

Solar Water Scheme In Line With

Vision 202020 (Lot Ii) At Ubimini

In Ikwerre Lga, Rivers State.

44,750,000 6,712,500

1247 Water Supply Obite Onelga Solar Powered Water Project 39,753,782 5,963,067 9,464,357 20,000,000

1248 Water Supply Ogbagi Onelga Solar Powered Water Project 54,435,746 8,165,362 10,367,805 20,000,000

1249 Water Supply Buguma Asari -Toru Water Project(Solar Powered) 45,446,087 16,596,210 10,819,549 20,000,000

1250 Water Supply Ekede Andoni Water Project 54,435,745 21,774,298 10,367,805 20,000,000

1251 Water Supply Oyorokoto Andoni Provision Of Water Scheme 54,435,745 8,165,362 10,367,804 20,000,000

1252 Water Supply Egbormung Andoni Water Project 42,305,333 6,345,800 10,071,816 20,000,000

1253 Water Supply Ozuoba Obio/Akpor Solar Powered Water Project 42,305,333 14,823,427 20,000,000

1254 Water Supply Ikiri/Elieta Onelga Solar Powered Water Project 48,768,211 16,837,477 11,610,461 20,000,000

1255 Water Supply OsiakpuOgba/Egbema

/ NdoniSolar Powered Water 50,000,000 14,284,463 20,000,000

1256 Water Supply Okuru-Ama Phalga Solar Powered Water 44,750,000 19,951,992 20,000,000

1257 Water Supply Lewe Gokana Community Water Project 43,000,000 20,000,000

1258 Water Supply Kula AkulgaRehabilitation/Treatment Of Kula

Water Scheme44,777,333 6,716,600 12,723,480 20,000,000

1259 Water Supply Sakpenwa Tai Major Water Works 139,000,000 119,508,928 19,491,072

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 114 of 119

Page 427: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1260 Water Supply Uju OnelgaSolar Water Project In Uju

Communiity39,761,031 12,989,095 6,178,480 18,000,000

1261 Water Supply Nonwa TaiAward Of Contract For The Nonwa

Water Project 30,000,000 12,373,515 4,500,000

1262 Water Supply Igwuruta Ikwerre

Award Of Contract For The

Completion Of Igwuruta Water

Distribution Project

56,286,173 40,787,255 8,442,926

1263 Water Supply Oshie Ahoada West Water Project 29,714,441 11,917,691 15,000,000

1264 Water Supply Joinkrama Ahoada West Watei Rehabilitaion 25,000,000 7,068,600 15,000,000

1265 Water Supply Nkpolu PH

Construction of Solar water

scheme at Eagle island Nkpolu

Oroworukwo

50,000,000 7,500,000

1266 Water Supply Yeghe Gokana Water Rehabilitaion 21,000,000 9,072,000 3,150,000

1267 Water Supply Tombia Degema Solar Powered Water Project 45,446,087 30,969,958 6,816,913

1268 Water SupplyPeterside

TownBonny

Award Of Contract For The

Peterside Town Water Project 50,000,000 36,078,946 7,500,000

1269 Water Supply Okrika OkrikaIntegrated water scheme project

in Okrika (lot 1 - 5)1,350,000,000 202,500,000

1270 Water Supply Abonnema Akuku-ToruAward Of Contract For The

Abonnema Water Project 30,844,954 17,525,761 4,626,743

1271 Water Supply Tai Solar Powered Water Project 41,354,730 28,722,424 12,632,305

1272 Water Supply Betern Khana Water In Betem Community Supply 39,753,782 27,242,846 12,510,936

1273 Water Supply Odiereke Ahoada West Water Project 25,092,337 3,763,851 5,973,842 12,000,000

1274 Water Supply Ogoda Ahoada West Water Project 25,154,441 10,667,469 5,988,628 12,000,000

1275 Water SupplyOgbako

OduforEtche

Rehabilitation Of Existing Water

Scheme44,995,391 33,746,543 11,248,848

1276 Water Supply AggahOgba/Egbema

/Ndoni

Award Of Contract For The Aggah

Water Project 58,285,785 47,898,817 8,742,868

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 115 of 119

Page 428: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1277 Water Supply Kalaibiama Bonny Water Rehabilitaion 28,000,000 7,916,832 10,000,000

1278 Water Supply Agwu-Obolo Andoni Rehabitation Of Water Project 28,057,109 4,208,866 10,000,000

1279 Water Supply Beeri Khana Beeri Water Project Khana 102,522,750 76,712,097 0.00

1280 Water Supply MgbedeOgba/Egbema

/ NdoniWater Project At Mgbede 103,194,960 92,221,316 0.00

1281 Water Supply Eleme Eleme Solar Powered Water Project 41,354,730 18,122,206 15,042,783 0.00

1282 Water Supply Oyigbo Oyigbo Solar Powered Water Project 41,354,730 6,203,209 15,042,783 0.00

1283 Water Supply Isiokpo Ikwerre Water Reticulation Project 245,128,456 163,895,896 28,125,906 0.00

1284 Water Supply Llelema Asari ToruConstruction Of Solar Powered

Water Project At Llelema In Asari45,018,343 0.00

1285 Water Supply Ula-Ehuda Ahoada East Water Project 29,498,411 4,424,762 10,730,047 0.00

1286 Water Supply Ula-Upata Ahoada East Water Project 20,000,000 3,000,000 4,761,488 0.00

1287 Water Supply Akara-Olu Ahoada West Water Project Rehabilitation 29,608,022 4,441,203 10,769,918 0.00

1288 Water Supply Aminigboko Ahoada West Water Rehabilitation 10,000,000 1,500,000 2,380,744 0.00

1289 Water SupplyOchigbo/Lkat

aAhoada East

Water Project To

Ochigbo/Nkata/Edeoha And300,000,000 45,000,000 78,540,000 0.00

1290 Water Supply Ogbogolo Ahoada West Water Project 25,048,022 3,757,203 7,155,951 0.00

1291 Water Supply Obonoma Akuku-Toru Completion Of Water Project. 40,000,000 6,000,000 9,522,975 0.00

1292 Water Supply Egbolom Abua/Odual

Construction Of 20,000 Gallons

Solar Powered Water Project In

Egbolom Okpeden Community

100,000,000 12,750,000 0.00

1293 Water Supply Ido Asari -Toru Refurbishment Of Water Supply 20,000,000 3,000,000 4,161,488 0.00

1294 Water Supply Abissa Akuku-Toru Solar Powered Water Project 54,435,746 40,668,822 3,229,460 0.00

1295 Water Supply Egbada Onelga Solar Powered Water Project 45,000,000 6,750,000 10,713,347 0.00

1296 Water SupplyIsaka

CommunityOkrika Solar Water Reticulation 100,000,000 15,000,000 19,045,950 0.00

1297 Water Supply Dawes Island Okrika Solar Water Reticulation 100,000,000 15,000,000 19,045,950 0.00

1298 Water Supply Agbonchia Eleme Major Water Works 243,250,000 114,798,286 57,236,789 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 116 of 119

Page 429: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1299 Water Supply Tuatua Tai Major Water Works 139,631,731 20,944,760 13,297,095 0.00

1300 Water Supply Senie Tai Major Water Works 139,000,000 79,255,122 15,779,708 0.00

1301 Water Supply Alesa Eleme Major Water Works 244,050,000 72,100,756 35,509,275 0.00

1302 Water Supply Aminigboko Ahoada West Solar Water Reticulation 39,753,782 5,963,067 11,361,445 0.00

1303 Water SupplyOkobo-Abua

CentraAbua/Odual Solar Water Reticulation 42,305,533 6,345,830 18,466,365 0.00

1304 Water Supply Rumuigbo Port HarcourSolar Powered Water At Igbologi

Off East-West Road Rumuigbo 50,000,000 21,825,000 0.00

1305 Water Supply Zaakpor Khana Solar Powered Water Project 45,000,000 19,642,500 0.00

1306 Water SupplyAbissa

CommunityAkuku-Toru

Installation Of Fordetop Type

8,000litres/Hour Water

Treatment/Rehabilitation Works

At Abissa Community

49,000,000 6,800,000 0.00

1307 Water Supply Mlna-Ama Asari -Toru Solar Powered Water Project 53,875,539 8,081,331 10,155,324 0.00

1308 Water SupplyOmoku-

ObakataOnelga

Water Scheme At Obakata New

Lay-Out45,000,000 12,723,480 0.00

1309 Water Supply Obrikom Onelga Solar Water Project 221,981,500 197,798,941 38,358,403 0.00

1310 Water Supply Elehia OnelgaSolar Water Project In Elehia

Communiity45,000,000 6,178,480 0.00

1311 Water Supply Ohiauga OnelgaSolar Water Project In Ohiauga

Communiity45,000,000 6,179,480 0.00

1312 Water Supply Aluu Ikwere Water Rehabilitaion 20,000,000 18,179,962 8,640,000 0.00

1313 Water Supply Apani Ikwere Water Rehabilitaion 22,000,000 19,610,604 9,504,000 0.00

1314 Water Supply Afam-Nta Oylgbo Water Rehabilitaion 25,000,000 7,068,600 0.00

1315 Water Supply Ndoni. OnelgaSolar Water Powered Water

Project50,000,000 25,230,264 3,665,200 0.00

1316 Water Supply Umuechem Etche Water Rehabilitalon 25,000,000 7,068,600 0.00

1317 Water Supply Akinima Ahoada West Water Rehabilitaion 25,000,000 20,924,109 10,800,000 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 117 of 119

Page 430: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1318 Water Supply Agba Ndele Emuoha Water Rehabilitaion 25,000,000 19,626,421 10,800,000 0.00

1319 Water Supply Kpite Tai Water Rehabilitaion 25,000,000 23,248,364 10,800,000 0.00

1320 Water Supply Kono Khana Water Rehabilitaion 22,000,000 6,220,368 0.00

1321 Water Supply Oporoama Asalga Water Rehabilitaion 28,000,000 7,916,832 0.00

1322 Water Supply Okrika Okrika Water Rehabilitaion 29,165,308 12,797,583 8,482,320 0.00

1323 Water Supply Obour EtcheProvision Of Solar Power Water

Project At Obour Community41,350,289 6,202,543 7,863,325 0.00

1324 Water Supply Opobo Town Opobo/Nkoro Solar Powered Water Project 100,000,000 9,817,500 0.00

1325 Water Supply Choba Obio/Akpo Solar Powered Water Project 37,986,309 5,697,946 11,187,918 0.00

1326 Water Supply Ishiato Etche Solar Powered Water Project 44,155,308 6,623,296 10,837,368 0.00

1327 Water Supply

Borokiri

Sandfilled

Area

Port Harcourt

Provision Of Boreholes Along

Wilson Bakery Road, Off Navy

Junction, Borokiri Sandfilled Area

50,000,000 7,500,000 0.00

1328 Water Supply Barako Gokana Solar Powered Water Project 39,753,782 5,963,067 15,810,438 0.00

1329 Water Supply Owerewere Abua/OdualRehabilitation Of Existing Water

Scheme27,949,759 24,459,727 0.00

1330 Water Supply Ozuzu Etche Isolar Powered Water Project 48,240,425 0.00

1331 Water SupplyTuatua

CommunityKoroma

Integrated Water Program/Syste

With Treated Plant480,000,000 61,200,000 0.00

1332 Water Supply Luewil Khana Solar Powered Water Project 57,272,460 0.00

1333 Water SupplyRumuchakara.

C HobaObio-Akpor Solar Powered Water Project 121,527,285 0.00

1334 Water Supply Obukegi Onelga Solar Powered Water Project 113,450,932 0.00

1335 Water Supply Amaji Etche Solar Powered Water Project 42,305,333 0.00

1336 Water Supply Alabama Asari ToruRehabilitation Of Existing Water

Ischeme29,950,855 0.00

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 118 of 119

Page 431: AMOUNT APPROVED FOR S/N STATE/REGION BUDGET COST COMMITMENT …nddc.gov.ng/banners/bud.pdf · S/N PROJECT TYPE PROJECT DESCRIPTION BUDGETED COST COMMITMENT AMOUNT APPROVED IN 2015

S/N Project Type Location Lga Project Description BUDGETED COST COMMITMENT AMOUNT

APPROVED 2015

AMOUNT

APPROVED IN

2016

NDDC RIVERS STATE 2016 BUDGET

1337 Water Supply Atigu Solar Powered Water Project 48,768,211 0.00

1338 Water Supply Deeyor Gokana Solar Powered Water Project 57,272,460 0.00

1339 Water Supply Ulokwo Ii Etche Solar Powered Water Project 42,299,768 0.00

1340 Water Supply Akaramin Ahoada West Solar Powered Water Project 43,134,434 0.00

1341 Water Supply AbonnemaAbonnema Water Reticulation

Works Phase Iii85,000,000 0.00

1342 Water Supply Obigwe OnelgaRehabitation Of Obigwe Water

Scheme23,548,110 13,453,887 6,004,768 0.00

1343 Water Supply Port-Harcourt Phalga

Rehabitation Of 2 Broken

Idowngiant Water Reserviours In

Mopol 19 Community

18,427,500 0.00

1344 Water Supply Ekede Andoni Ekede Water Project 60,000,000 0.00

1345 Water Supply Kalio-Ama OkrikaReconstruction Of Kalio-Ama

Water Project 80,000,000 20,000,000

Water Supply

Total 10,743,326,541 2,214,322,027 1,088,293,815 1,329,557,567

Grand-Total 501,041,643,635 97,846,693,221 31,707,363,738 22,244,104,326

2016 APPROPRIATION ACT- RIVERS NATIONAL ASSEMBLY Page 119 of 119