Glycol Offgas Emission Reduction
‘t verschil
![Page 3: Amec, Jacobs en Stork (AJS-ISC) - KIVI€¦ · Woodstork =>AJS •enviromental. Waves, wind, waste Project Duration: through planning by prioritizing; missing materials, sickness](https://reader034.vdocuments.us/reader034/viewer/2022051806/60017defe266691090233610/html5/thumbnails/3.jpg)
3
![Page 4: Amec, Jacobs en Stork (AJS-ISC) - KIVI€¦ · Woodstork =>AJS •enviromental. Waves, wind, waste Project Duration: through planning by prioritizing; missing materials, sickness](https://reader034.vdocuments.us/reader034/viewer/2022051806/60017defe266691090233610/html5/thumbnails/4.jpg)
4
Off-course = start route
Problem:
ONEgas has committed themselves to reduced carbon
emmissions from their offshore installations. In order
to meet the target emissions levels and dates, they have agreed
with the Dutch Government and NOGEPA
(Netherlands Oil and Gas Exploration en Production Association)
L15-FA-1, L5-FA-1 & L02-FA-1
Solution is given by Shell.
Start February 2005.
![Page 5: Amec, Jacobs en Stork (AJS-ISC) - KIVI€¦ · Woodstork =>AJS •enviromental. Waves, wind, waste Project Duration: through planning by prioritizing; missing materials, sickness](https://reader034.vdocuments.us/reader034/viewer/2022051806/60017defe266691090233610/html5/thumbnails/5.jpg)
5
Process overview
![Page 6: Amec, Jacobs en Stork (AJS-ISC) - KIVI€¦ · Woodstork =>AJS •enviromental. Waves, wind, waste Project Duration: through planning by prioritizing; missing materials, sickness](https://reader034.vdocuments.us/reader034/viewer/2022051806/60017defe266691090233610/html5/thumbnails/6.jpg)
6
Glycol Offgas mixing Vessel
![Page 7: Amec, Jacobs en Stork (AJS-ISC) - KIVI€¦ · Woodstork =>AJS •enviromental. Waves, wind, waste Project Duration: through planning by prioritizing; missing materials, sickness](https://reader034.vdocuments.us/reader034/viewer/2022051806/60017defe266691090233610/html5/thumbnails/7.jpg)
7
Design Principles
•Is the process safe guarding.
•Does it meet the proces requirements.
•Proces conditions from input to output.
Questions raised by AJS
•As input: variable gascompositions.
•As output:Steady gas consumption at furnace
Off-course = vanzelfsprekend??
![Page 8: Amec, Jacobs en Stork (AJS-ISC) - KIVI€¦ · Woodstork =>AJS •enviromental. Waves, wind, waste Project Duration: through planning by prioritizing; missing materials, sickness](https://reader034.vdocuments.us/reader034/viewer/2022051806/60017defe266691090233610/html5/thumbnails/8.jpg)
8
Yes, Off-course = vanzelfsprekend
AJS is streamlined to take it on.
•Designing disciplines:Process, Piping and Mechanical, Instrumentation, Electrical,
Structural.
•Workpack, support construction, construction it self, welding, vendors, software,
electriciens, scaffolders,
•Inhouse services: Shell, Nam, Painting, Scaffolding. 2Rent (tools and Equipment).
•Short lines with suppliers weekly updates,
•Planning department, each asset, flightscheduling, vessels, boatsupplier,warehouses
•From projects to maintenance
AJS can deliver as asked.
![Page 9: Amec, Jacobs en Stork (AJS-ISC) - KIVI€¦ · Woodstork =>AJS •enviromental. Waves, wind, waste Project Duration: through planning by prioritizing; missing materials, sickness](https://reader034.vdocuments.us/reader034/viewer/2022051806/60017defe266691090233610/html5/thumbnails/9.jpg)
9
![Page 10: Amec, Jacobs en Stork (AJS-ISC) - KIVI€¦ · Woodstork =>AJS •enviromental. Waves, wind, waste Project Duration: through planning by prioritizing; missing materials, sickness](https://reader034.vdocuments.us/reader034/viewer/2022051806/60017defe266691090233610/html5/thumbnails/10.jpg)
10
Operations point of view
•Gasproduction (no downtime)
•Safeguarding for everyone
•24hrs alarm standby
•Don’t want an unstable system
•Dont want the extra administration on offgas
emission,
•Other projects have more priority,
maintenance, Fire&Gas, well services,
drilling, unwanted shutdowns.
•16 beds, 8 taken by operations, cook,
steward, and crane-operator and 5 operations
crew.
Off-course = afwijking van de route
•Restart Project
Woodstork =>AJS
•enviromental.
Waves, wind, waste
Project Duration:
through planning by prioritizing; missing
materials, sickness
•New project people
AJS point of view
300% budget overspend, (initial budget 3,4K)
March 2009, glycol offgas reduction is taken in production.
![Page 11: Amec, Jacobs en Stork (AJS-ISC) - KIVI€¦ · Woodstork =>AJS •enviromental. Waves, wind, waste Project Duration: through planning by prioritizing; missing materials, sickness](https://reader034.vdocuments.us/reader034/viewer/2022051806/60017defe266691090233610/html5/thumbnails/11.jpg)
11
Off-course = start route
Off-course = vanzelfsprekend
Off-course =afwijking van de route
What can you learn??
![Page 12: Amec, Jacobs en Stork (AJS-ISC) - KIVI€¦ · Woodstork =>AJS •enviromental. Waves, wind, waste Project Duration: through planning by prioritizing; missing materials, sickness](https://reader034.vdocuments.us/reader034/viewer/2022051806/60017defe266691090233610/html5/thumbnails/12.jpg)
12
Any Questions??
Otherwise thank you, for your interest.