ama00e ----- ----- ca104 rb mv and lv switchgear - protection setting (bop)

20
8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP) http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 1/20 Owner Project  AL – MANSURYA GA S TURBINE POWER PLA NT (Phase I) Revision History Rev. Revision Date Created by Checked by Approved by Description B 12.03.2013  AS HBK/ KSB MN Second Issue  A 14.01.2013 AS HBK/KSB  MN  First Issue  Description latest Revision: Cross Checked Department Name Date Signature Main contractor  POWER GAS BUSINESS Replaces - Derived from -  ALSTOM Document Code  AMA/00/E/----------/CA/104 Responsable dept URUK/ABB Created by  AS Checked by HBK / KSB  Approved by MN Format  A4 Originator Document Type CA Document Status Electronically released Title, Subtitle TCHGEAR - PROTECTION SETTING Identification number  AMA/00/E/----------/CA/104 Rev Date. Lang. Sheet  We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express its strictly forbidden.  ABB AETAD 2013 MV and LV Switchgear - Protection Setting (BoP) B 12.03.2013 En 1/20

Upload: hassanein86

Post on 03-Jun-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 1/20

Owner

Project

 AL – MANSURYA GAS TURBINE POWER PLANT (Phase I)

Revision History

Rev. Revision Date Created by Checked by Approved by Description

B 12.03.2013  AS  HBK/ KSB MN Second Issue

 A 14.01.2013 AS HBK/KSB   MN   First Issue  

Description latest Revision:

Cross Checked

Department Name Date Signature

Main contractor

  POWER

GAS BUSINESS

Replaces

-

Derived from

-

 ALSTOM Document Code

 AMA/00/E/----------/CA/104

Responsable dept

URUK/ABBCreated by

 ASChecked by

HBK / KSB Approved by

MNFormat

 A4Originator

Document Type

CA

Document Status

Electronically releasedTitle, Subtitle

TCHGEAR -

PROTECTION SETTING

Identification number

 AMA/00/E/----------/CA/104 

Rev Date. Lang. Sheet

 

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties withoutexpress its strictly forbidden.

 ABB AETAD 2013 

MV and LV Switchgear -Protection Setting (BoP)

B 12.03.2013 En 1/20

Page 2: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 2/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 2 of 18 A

 AL–MANSURYA GAS TURBINE POWER PLANT (PHASE I)

RELAY SETTINGS

 A 2012_12 Emissione 

P.B. G.B.

REV

Rev

DATE

Data

DESCRIPTION

Descrizione

PREPARED

Preparato

CHECKED

Controllato

APPROVED

Approvato

Page 3: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 3/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 3 of 18 A

1  INTRODUCTION 3 

2  REFERENCE DRAWING 4 

3  MV - LV ELECTRICAL SYSTEM 5 

4  SETTINGS PROTECTIONS 7 

4.1 

Settings 7 

4.2  Criterial Settings 8 

4.3 

Settings protections MV switchgear 9 

4.4  Settings protections PMCC switchgear 12 

5  COMMENTS 17 

Page 4: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 4/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 4 of 18 A

1 INTRODUCTION

Scope of application:

1. Operators, equipment and network components protection (schwitchboard MV and LV, transformers,motors, cables)

2. Selective tripping of protections devices.

Battery limit and exclusions:

•  Incoming lines MV 6,6 kV

•  Outgoing lines LV 0,4 kV

 App licable Standards:

The study of the plant were made with the utmost respect for the most current regulations and standards inthe field, with particular regard to:

IEC s tandards:

IEC 60617   PROTECTION SYMBOLIZATION

IEC 60255  PROTECTION RELAIS

IEC 60502  POWER CABLES

IEC 60909  SHORT CIRCUIT CURRENT CALCULATION

IEC 60470  CONCTACTOR AC SYSTEM MV AND STARTERS

IEC 60044  TRANSFORMER CURRENT

Page 5: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 5/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 5 of 18 A

2 REFERENCE DRAWING

DOC. IME NR. 427/12-101 (P22A-EA-200):

MV: SCHWITCHGEARS GENERAL ARRANGEMENTS AND FUNFATION PLANT

DOC. IME NR. 427/12-201:

PMCC: GENERAL ARRANGEMENTS SINGLE LINE DIAGRAMM AND SCHEMATIC DIAGRAMM

DOC. ALSTOM NR. AMA/00/E/……/CA004:

Protection Relay Setting and Coordination for Plant Auxiliaries

Page 6: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 6/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 6 of 18 A

3 MV - LV ELECTRICAL SYSTEM

MV NETWORK:

•  Short circuit max. 31.5kA x 1s

•  Neutral system connected to earth trough a resistore of 10 ohm

•  Operating Voltage Ve = 6,6kV

•  Nominal frequence fn = 50 Hz

MV SWITCHGEAR

The characteristics of the switchboards are as follows

•  Operating Voltage Ve = 6,6kV

•  Nominal Voltage Vn = 7,2 kV

•  Nominal frequence fn = 50 Hz

•  Nominale current In = 1250 A

•  Maximum Short circuit Icc = 31,5 kA x 1s

•  Peak maximum short circuit Ip = 80 kA

TRANSFORMER 90BFT30 – 90BFT40 – 90BFT50

The characteristics of the transformers are as follows

•  Insulation Dry, Dyn11

•  Nominal Power An = 250 kVA

•  Vcc% Vcc% = 6%

•  Nominal Voltage V1n V1n = 6,6kV

•  Nominal Voltage V2n V2n = 0,4 kV

•  Nominal frequence fn = 50 Hz

•  inrush 265A for 0.25s 

•  ansi point IA = 100/vcc% In, tA = 3s

TRANSFORMER 90BFT10 – 90BFT20

The characteristics of the transformers are as follows

•  Insulation Dry, Dyn11

•  Nominal Power An = 2.200 kVA

•  Vcc% Vcc% = 6%

•  Nominal Voltage V1n V1n = 6,6kV

•  Nominal Voltage V2n V2n = 0,4 kV

•  Nominal frequence fn = 50 Hz

•  inrush 1600A for 0.8Sec

•  ansi point IA = 100/vcc% In, tA = 3s

Page 7: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 7/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 7 of 18 A

SWITCHBOARD PMCC

The characteristics of the switchboards are as follows

•  Operating Voltage Ve = 0,4/0,23kV

•  Nominal Voltage Vn = 0,4 kV

•  Nominal frequence fn = 50 Hz

•  Nominale current In = 4.000 A

•  Maximum Short circuit Icc = 50kA x 1s

•  Peak maximum short circuit Ip = 105 kA

Page 8: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 8/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 8 of 18 A

4 SETTINGS PROTECTIONS

4.1 Settings

The selectivity between the protections can be realized in the mode defined below:

• zone selectivity

•  directional selectivity•  current selectivity

•  chronometric selectivity

•  current / chronometric selectivity

•  logical selectivity

•  selectivity test

The choice of the type of selectivity to be taken is linked to the following parameters:limits imposed by the systemprotections functionsshort circuit lelev

The current system adopted foresees the realization of a type of selectivity, chronometric / amp.

The range between the time settings of protection was calculated by the following:

DT =   ∆T Te Ta Ti To Tm= + + + +

DT, time margin between two protectionsTe, the sum of the errors in time relaysTa, any time of auxiliary relays (block) interposed on the opening circuitTi, time of openingTo, time of inertia of the upstream protection (overshoot)Tm, margin of safety

Were also undertaken the following key assumptions:

a) The transformers current transformers (CTs) are considered suitable for the detection of short-circuit current in the transitional arrangement.

b) It is assumed the maximum efficiency of protections installed and corrected the links betweenguards and auxiliary current transformers and voltage.

c) DT min (MV) = 150ms, DT min (LV) = 100ms.

Page 9: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 9/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 9 of 18 A

4.2 Criterial Settings

The settings of the devices have been made considering the following electrical parameters:

1. Short circuit current2. Thermal and dynamic characteristics of MV and LV cables, switchboards, transformers, motors

3. Nominal current4. Start current e start time motor transformers

5. Start current e start time motor

The security functions used by digital type ABB REF 615

1. 50-51:  three phase overcurrent

2. 50N-51N:   residual earth overcurrent

3. 27: phase undervoltages

4. 59: phase overvoltages

5. 87: transformer differential protection

CT, VT and toroidal transformer (TO)

CT:transformation ratio: 1.000/1A – 400/1A – 50/1Aperformance measures: 15VA cl. 0,5

performance protection: 10VA 5P20 – cl X (transformer differential protection)VT:transformation ratio: 6,6:1,73/110:1,73 – 100/3 Vperformance measures: 30VA cl. 1performance protection: 30VA cl. 6PTO:transformation ratio: 100/1 Aperformance protection: 1VA 5P10

Page 10: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 10/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 10 of 18 A

4.3 Settings protections MV swi tchgear

MV schwit chgear 6,6kV

SWIITCH CT / VT PROTECTION TYPE ANSI SETTING CATALOGUE NOTE

01 AUX.

TRANSF.90BTF30

250kVA

50/1A10VA 5P20

to 100/1A1VA/5P10

RET 615 ABBVD4

50/51

50N-51N

87T

I>= 0,05 - 5 Int>= 0,05 - 15 sI>>= 0,1 - 40 Int>>= 0,04–200s

I>= 0,01 - 5 Int>= 0,05 - 15 s

restraint mode

2h & 5h &wavHigh operate value

500 – 3000%low operate value

5 – 50%slope section 2

10 – 500%end section 2

100 – 500%start value 2.H

7 – 20%start value 5.H

10 – 50%operation

winding 1 type

Y,YN;D,Z,ZNwinding 2 type

Y,YN;D,Z,ZN

I>=0,45Int>= dipVI (10)K=0,5I>>= 8 Int>>=0,1s

Io>=0,1 Into>=0,1s

2h&5h

1000%

30%

75%

150%

20%

35%

on

D

y

REF 615

02

 AUX.TRANSF.

90BTF10

2.200kVA

400/1A10VA cl X

to 100/1A1VA/5P10

RET 615 ABBVD4

50/51

50N-51N

87T

I>= 0,05 - 5 Int>= 0,05 - 15 sI>>= 0,1 - 40 Int>>= 0,04–200s

I>= 0,01 - 5 Int>= 0,05 - 15 s

restraint mode

2h & 5h &wavHigh operate value

500 – 3000%low operate value

5 – 50%slope section 2

10 – 500%end section 2

100 – 500%start value 2.H

7 – 20%start value 5.H

10 – 50%operation

winding 1 type

Y,YN;D,Z,ZNwinding 2 type

Y,YN;D,Z,ZN

I>=0,5InVI

K=0.5

I>>= 4.5 In

t>>=0.9s

Io>=0,1 Into>=0,1s

2h&5h

1000%

30%

75%

150%

20%

35%

on

D

y

REF 615

Page 11: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 11/20

  AL –MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFICAZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –  

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO -SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMPANYFOGLIO Nr.-Sh. N. REV. Nr.

AL –  

MANSURYAIRAQ

END USER: MINISTRY OF ELECTRICITY,

IRAQ11 of 18 A

03

INCOMING

FEEDER A

245A

1000/1A 10VA5P20 to100/1A1VA/5P10

REF 615 ABB VD4 50/5150N-51N

I>= 0,05 -5 Int>= 0,05 -15 sI>>= 0,1 -40In t>>=0,04 –200sI>= 0,01 -5 Int>= 0,05 -15 s

I>=0.245InNIK=0.12I>>=1.8t>>=1sIo>=0,2 Into>=0,4s

REF 615

04 6600:1,73 / REU 615 ABB 27U<=0,1 –1,2Un

U< = 0,8 REU 615

MEASUREM

E110:1,73 V 59 tU<=0,1-300 s tU< =1s

NT BUS AU<=0,1 –1,6Un

U> = 1,1

6600:1,73 /tU<=0,05-300s

tU> =1s

110:3 V

05 1000/1A REF 615 ABB 50/51 I>= 0,05 -5 In I>=0.2ln REF 615

BUS TIE 10VA 5P20 VD4 t>= 0,05 -15 s NI

245AI>>= 0,1 -40In

K=0.1

t>>=0,04 –200s

I>>=1.8t>>=1s

to 100/1A 50N-51N I>= 0,01 -5 In Io>=0,2 In

1VA/5P10 t>= 0,05 -15 s to>=0,25s

06 6600:1,73 / REU 615 ABB 27U<=0,1 –1,2Un

U< = 0,8 REU 615

MEASUREM

E110:1,73 V 59 tU<=0,1-300 s tU< =1s

NT BUS BU<=0,1 –1,6Un

U> = 1,1

6600:1,73 /tU<=0,05-300s

tU> =1s

110:3 V07 1000/1A REF 615 ABB 50/51 I>= 0,05 -5 In I>=0.245In REF 615

INCOMING 10VA 5P20 VD4 t>= 0,05 -15 s NI

FEEDER B 50N-51NI>>= 0,1 -40In

245A t>>=0,04 –200s

K=0.12I>>= 1.8In t>>=1s

to 100/1A I>= 0,01 -5 In Io>=0,2 In

1VA/5P10 t>= 0,05 -15 s to>=0,4s

08 400/1A RET 615 ABB 50/51 I>= 0,05 -5 In I>=0,5In REF 615

AUX.

TRANSF.

90BTF20

2200kVA

10VA cl X VD4 t>= 0,05 -15 sI>>= 0,1 -40In t>>=0,04 –200s

VIK=0,5I>>= 4.5 Int>>=0.9s

50N-51N I>= 0,01 -5 In Io>=0,1 In

to 100/1A t>= 0,05 -15 s to>=0,1s

1VA/5P10

87T restraint mode

2h & 5h &wavHigh operate value

500  – 3000%low operate value

5  – 50%slope section 2

10  – 500%end section 2

100  – 500%start value 2.H

7  – 20%start value 5.H

10  – 50%operation

winding 1 type

Y,YN;D,Z,ZNwinding 2 type

Y,YN;D,Z,ZN

2h&5h

1000%

30%

75%

150%

20%

35%OnDy

Page 12: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 12/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFIC AZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMP ANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF E LECTR ICITY, IRAQ 12 of 18 A

09

 AUX.

TRANSF.

90BTF40

250kVA

50/1A10VA 5P20

to 100/1A1VA/5P10

RET 615 ABBVD4

50/51

50N-51N

87T

I>= 0,05 - 5 Int>= 0,05 - 15 sI>>= 0,1 - 40 Int>>= 0,04–200s

I>= 0,01 - 5 Int>= 0,05 - 15 s

restraint mode

2h & 5h &wavHigh operate value

500 – 3000%low operate value

5 – 50%slope section 2

10 – 500%end section 2

100 – 500%start value 2.H

7 – 20%start value 5.H

10 – 50%operation

winding 1 type

Y,YN;D,Z,ZNwinding 2 type

Y,YN;D,Z,ZN

I>=0,45Int>= dipVI (10)K=0,5I>>>= 8 Int>>>=0,1s

Io>=0,1 Into>=0,1s

2h&5h

1000%

30%

75%

150%

20%

35%

on

D

y

REF 615

10

 AUX.

TRANSF.

90BTF50250kVA

50/1A10VA 5P20

to 100/1A1VA/5P10

RET 615 ABBVD4

50/51

50N-51N

87T

I>= 0,05 - 5 Int>= 0,05 - 15 sI>>= 0,1 - 40 In

t>>= 0,04–200s

I>= 0,01 - 5 Int>= 0,05 - 15 s

restraint mode

2h & 5h &wavHigh operate value

500 – 3000%low operate value

5 – 50%slope section 2

10 – 500%end section 2

100 – 500%start value 2.H

7 – 20%

start value 5.H10 – 50%operation

winding 1 type

Y,YN;D,Z,ZNwinding 2 type

Y,YN;D,Z,ZN

I>=0,45Int>= dipVI (10)

K=0,5I>>>= 8 Int>>>=0,1s

Io>=0,1 Into>=0,1s

2h&5h

1000%

30%

75%

150%

20%

35%

on

D

y

REF 615

Note:

Tab. 4.3: Settings protections MV switchgear 

Page 13: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 13/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFIC AZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMP ANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF E LECTR ICITY, IRAQ 13 of 18 A

4.4 Settings protections PMCC switchgear

Mv schw itchgear 0,4kV

SWIITCH CT / VT PROTECTION TYPE ANSI RANGE SETTING CATALOGUE NOTE

1D – 1E

INCOMINGLINE 1

2200 kVA3.179A

4000/1A30VA cl 0,530VA cl X

PR123 ABBE4S

LSIG I1= 0,4 - 1 Int1=3-144s (3I1)I2= 0,6 - 10 Int2= 0,05s–0,8 sI3= 1,5 - 15 In

I4 = 0,2-1 Int4 = 0,1-1s

I1= 0,8 Int1 =3s (3I1)I2=2,8 Int2 =0,4sI3=off

I4 = 0,3 Int4 = 0,4s

EMAX

1B -1CTIE

BREAKER2200 kVA

3.179A

4000/1A30VA cl 0,530VA cl X

PR123 ABBE4S

LSIG I1= 0,4 - 1 Int1=3-144s (3I1)I2= 0,6 - 10 Int2= 0,05s–0,8 sI3= 1,5 - 15 In

I4 = 0,2-1 Int4 = 0,1-1s

I1= 0,75 Int1 =3s (3I1)I2=2,5 Int2 =0,25sI3=off

I4 = 0,2 Int4 = 0,25s

EMAX

1D – 1EINCOMING

LINE 2

2200 kVA3.179A

4000/1A30VA cl 0,530VA cl X

PR123 ABBE4S

LSIG I1= 0,4 - 1 Int1=3-144s (3I1)I2= 0,6 - 10 Int2= 0,05s–0,8 sI3= 1,5 - 15 In

I4 = 0,2-1 Int4 = 0,1-1s

I1= 0,8 Int1 =3s (3I1)I2=2,8 Int2 =0,4sI3=off

I4 = 0,3 Int4 = 0,4s

EMAX

2B/2FUEL GASLINE HEAT

TRACING50kW

80A

EKIP ABBXT2S3P 100A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,8 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

2C/3

 ADMINISTRATION

BUILDINGSWITCH

BOARD

114kW183A

EKIP ABBXT4S3P 250A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,74 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

2D/3

WASTEWATER

PUMPSSYSTEM

SWITCH

BOARD100kW

160A

EKIP ABBXT4S3P 250A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,65 Int1 =9s (3I1)I2=3 Int2 =0,15sI3=off

TMAX

2E/211 BR V10

UNIT 11 DCTRANSFERT

75kW120A

EKIP ABBXT2S3P 160A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,75 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

Page 14: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 14/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFIC AZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMP ANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF E LECTR ICITY, IRAQ 14 of 18 A

2F/2

12 BR V10

UNIT 11 DC

TRANSFERT

75kW

120A

EKIP ABBXT2S3P 160A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,75 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

2G/6

FEEDER TO

 ALSTOM

442,9kW

711A

PR331 ABBX1N103P 1000A

LSI I1= 0,4 - 1 Int1=3-144s (3I1)I2= 0,6 - 10 Int2= 0,05s–0,8 sI3= 1,5 - 15 In

I1= 0,72 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

3B/2 AIR

COMPRESSO

R SWITCH

BOARD

INCOMER 1

50kW

80A

EKIP ABBXT2S3P 100A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,8 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

3C/2

UPS SYSTEM

48 VDC

INVERTER

INCOMER 1

15kW

24A

EKIP ABBXT2S3P 63A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,4 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

3D/2

UPS SYSTEM

48 VDC

CHARGER

INCOMER 1

45kW

72A

EKIP ABBXT2S3P 160A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,45 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

3E/2

OTHER

CRANES

SPARE

25kW

40A

EKIP ABBXT2S3P 63A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,64 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

3F/3

UTILITYSPARE 1

100kW

160A

EKIP ABBXT4S3P 250A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,65 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

2G/2

OIL WATER

SEPARATOR

SCHWITCHB

OARD

INCOMER 1

75kW

120A

EKIP ABBXT2S3P 160A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,75 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

Page 15: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 15/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFICAZIONE CL IENTE-ID ClientTITOLO-Title: SETTAGGIO P ROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 15 of 18 A

3H/2

132kV GIS

BUILDING

SCHWITCH

BOARD

INCOMER 1

61,1kW

98A

EKIP ABBXT2S3P 160A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,62 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

3I/7

400kV GIS

BUILDING

SCHWITCH

BOARD

INCOMER 1

250kW

401A

PR222 ABBT6S6303P 630A

LSI I1= 0,4 - 1 Int1=3-18s (6I1)I2= 0,6 - 10 Int2= 0,05s–0,5 sI3= 1,5 - 12 In

I1= 0,64 Int1 =9s (6I1)I2=4 Int2 =0,15sI3=off

TMAX

4B/2

PROCESS

SPARE 1

30kW

48A

EKIP ABBXT2S3P 63A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,76 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

4C/2

PROCESS

SPARE 2

30kW

48A

EKIP ABBXT2S3P 63A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,76 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

4D/2PROCESS

SPARE 3

25kW

40A

EKIP ABBXT2S3P 63A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,64 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

4E/2

PROCESS

SPARE 3

25kW

40A

EKIP ABBXT2S3P 63A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,64 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

4G/4

CORE

BUILDING

SWITCHBOARD

INCOMER 1

130kW

208A

PR222 ABBT6S4003P 400A

LSI I1= 0,4 - 1 Int1=3-18s (6I1)I2= 0,6 - 10 In

t2= 0,05s–0,5 sI3= 1,5 - 12 In

I1= 0,52 Int1 =9s (6I1)I2=4 In

t2 =0,15sI3=off

TMAX

4H/7

FIRE

FIGHTING

250kW

401A

PR222 ABBT6S6303P 630A

LSI I1= 0,4 - 1 Int1=3-18s (6I1)I2= 0,6 - 10 Int2= 0,05s–0,5 sI3= 1,5 - 12 In

I1= 0,64 Int1 =9s (6I1)I2=4 Int2 =0,15sI3=off

TMAX

2B/2

GEN. PUR.

SPARE 1

30kW

48A

EKIP ABBXT2S3P 63A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 s

I3= 1 - 10 In

I1= 0,76 Int1 =9s (3I1)I2=4 Int2 =0,15s

I3=off

TMAX

Page 16: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 16/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFIC AZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMPANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF ELECTRICITY, IRAQ 16 of 18 A

2E/2

UNIT 21 DC

TRANSFERT

75kW

120A

EKIP ABBXT2S3P 160A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,75 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

2RF/2

UNIT 22 DC

TRANSFERT

75kW120A

EKIP ABBXT2S3P 160A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 s

I3= 1 - 10 In

I1= 0,75 Int1 =9s (3I1)I2=4 Int2 =0,15s

I3=off

TMAX

2G/6

FEEDER TO

 ALSTOM

442,9kW

711A

PR331 ABBX1N103P 1000A

LSI I1= 0,4 - 1 Int1=3-144s (3I1)I2= 0,6 - 10 Int2= 0,05s–0,8 sI3= 1,5 - 15 In

I1= 0,72 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

3B/2

 AIR

COMPRESSO

R SWITCH

BOARD

INCOMER 2

50kW

80A

EKIP ABBXT2S3P 100A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,8 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

3C/2

UPS SYSTEM

48 VDC

INVERTER

INCOMER 2

15kW

24A

EKIP ABBXT2S3P 63A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,4 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

3D/2

UPS SYSTEM

48 VDC

CHARGER

INCOMER 245kW

72A

EKIP ABBXT2S3P 160A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 s

I3= 1 - 10 In

I1= 0,45 Int1 =9s (3I1)I2=4 Int2 =0,15s

I3=off

TMAX

2F/2

EOT CRANE

70kW

112A

EKIP ABBXT2S3P 160A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,7 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

3G/4

CORE

BUILDING

SWITCH

BOARD

INCOMER 2

130kW208A

PR222 ABBT6S4003P 400A

LSI I1= 0,4 - 1 Int1=3-18s (6I1)I2= 0,6 - 10 Int2= 0,05s–0,5 sI3= 1,5 - 12 In

I1= 0,52 Int1 =9s (6I1)I2=4 Int2 =0,15sI3=off

TMAX

Page 17: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 17/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFIC AZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMP ANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF E LECTR ICITY, IRAQ 17 of 18 A

3H/7

400kV GIS

BUILDING

SCHWITCH

BOARD

INCOMER 2

250kW

401A

PR222 ABBT6S6303P 630A

LSI I1= 0,4 - 1 Int1=3-18s (6I1)I2= 0,6 - 10 Int2= 0,05s–0,5 sI3= 1,5 - 12 In

I1= 0,64 Int1 =9s (6I1)I2=4 Int2 =0,15sI3=off

TMAX

4D/2

SEWAGE

TREATMENT

PLANT

SWITCHBOA

RD INCOMER

20kW

32A

EKIP ABBXT2S3P 63A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,0.5 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

4E/2

GATE HOUSE

SWITCH

BOARD

INCOMER

25kW

40A

EKIP ABBXT2S3P 63A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,64 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

2G/2

OIL WATER

SEPARATOR

SCHWITCHB

OARDINCOMER 2

75kW

120A

EKIP ABBXT2S3P 160A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,75 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

3H/2

132kV GIS

BUILDING

SCHWITCH

BOARD

INCOMER 2

61,1kW

98A

EKIP ABBXT2S3P 160A

LSI I1= 0,4 - 1 Int1=3-60s (3I1)I2= 1 - 10 Int2= 0,05s–40 sI3= 1 - 10 In

I1= 0,62 Int1 =9s (3I1)I2=4 Int2 =0,15sI3=off

TMAX

4I/7

FIRE

FIGHTING

SWITCHBOARD

INCOMER

202kW

401A

PR222 ABBT6S6303P 630A

LSI I1= 0,4 - 1 Int1=3-18s (6I1)I2= 0,6 - 10 In

t2= 0,05s–0,5 sI3= 1,5 - 12 In

I1= 0,52 Int1 =9s (6I1)I2=4 In

t2 =0,15sI3=off

TMAX

Note:

Tab. 4.4: Settings protections LV switchgear 

Page 18: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 18/20

 AL–MANSURYA GAS TURBINEPOWER PLANT (PHASE I)

CODICE IDENTIFIC AZIONE CLIENTE-ID ClientTITOLO-Title: SETTAGGIO PROTEZIONI –

RELAY SETTINGSCODICE IDENTIFICAZIONE -ID

427-12-RS-101

IMPIANTO -

PLANTSITO - SITE

CLIENTE-Client: URUK ENGINEERING &

CONSTRACTIONC COMP ANYFOGLIO Nr.- Sh. N. REV. Nr.

AL–

MANSURYA IRAQ END USER: MINISTRY OF EL ECTRIC ITY, IRAQ 18 of 18  A

5 COMMENTS

Comparing the features of dynamic and thermal stress equipment (switchboards, transformers MV/LV.cables), and maximum levels of short-time and current settings of the protections we observe a high level ofnetwork security.

 _________________________________________________________________________________________________________________________

Giovanni Pietro Bianchessi 

 ALBO INGEGNERI BG

  NR. 2160

 Annex 1: d iagramm Annex 2: veri fi cat ion CT: doc. Nr. 427-12-CTC-101_A_BASE

Page 19: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 19/20

Page 20: AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

8/11/2019 AMA00E ----- ----- CA104 RB MV and LV Switchgear - Protection Setting (BoP)

http://slidepdf.com/reader/full/ama00e-ca104-rb-mv-and-lv-switchgear-protection-setting-bop 20/20

±

±

±

I> 2200kVA TRAFO

CB22CB22

I> ALSTOM O/G to URUK 

I> URUK 6.6kV I /C

I> 6.6kV Buscoupl er

URUK 6.6kV I /C

6.6kV Buscoupl er

2200kVA TRAFO

ALSTOM O/G to URUK