always open and ready for new and existing customers · dry dock always open and ready for new and...

2
Adur Dry Dock Always open and ready for new and existing customers If you are interested in using the dry dock facility or have any further questions then please do not hesitate to contact us: Brian Rousell Deputy Port Engineer +44 (0) 1273 598113 [email protected] Keith Wadey Assistant Port Engineer +44 (0) 1273 598101 [email protected] The tariffs for the Adur Dry Dock are available on our website: www.shoreham-port.co.uk/Tariffs or please use the contact details on the back page to speak directly to the team. All tariff charges relate to the standard dock profile. If alterations are required to the keel blocks, additional charges will apply. Rates are negotiable for longer visits. Shoreham Port Nautilus House 90 - 100 Albion Street Southwick Brighton BN42 4ED T: +44 (0) 1273 598100 F: +44 (0) 1273 592492 [email protected] www.shoreham-port.co.uk Courtesy of Chris English

Upload: others

Post on 08-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

AdurDry Dock

Always open and ready for new and existing customers

If you are interested in using the dry dock facility or have any further questions thenplease do not hesitate to contact us:

Brian Rousell Deputy Port Engineer+44 (0) 1273 598113 [email protected] Keith WadeyAssistant Port Engineer+44 (0) 1273 598101 [email protected]

The tariffs for the Adur Dry Dock are available on our website:www.shoreham-port.co.uk/Tariffsor please use the contact details on the back page to speak directly to the team.

All tariff charges relate to the standard dock profile. If alterations are required to the keel blocks, additional charges will apply.

Rates are negotiable for longer visits.

Shoreham PortNautilus House90 - 100 Albion StreetSouthwickBrightonBN42 4ED

T: +44 (0) 1273 598100F: +44 (0) 1273 592492

[email protected]

Courtesy of Chris English

The port is investing heavily in a continuing programme of modernisation and improvement to our Dry Dock facilities.

Dock draining time has been shortened to approximately 3 hours and flooding time to about 2 hours, maximising the time available for work on the dock floor.

• Accesstodockareasforcranesupto80tonnes

• 500kgcapacitydavitandchainblock

• Gangwaysandnetting

• Potablewaterfrommainspressurehydrant

• Toiletandwashroomfacilities

• Workshopfacilitiesavailable

• Power-110V&240Vsinglephase16Aor440V three phase 32A

• Localengineeringfirmsavailable

Shoreham Port offers one of the few remaining dry dock facilities on the South Coast of England.

Vital Statistics:

• Length50.5metres(45matblocks)

• Breadth10metres(8.5matblocks)

• Draft5.2metresoverblocks

• Vesselaccessvialockedbasin

The dock has good road and public transport access with owners/agents able to schedule and execute their own works to vessels.

A wide variety of vessels regularly visit our Dry Dock, including tugs, trawlers, survey vessels, yachts and tall ships.

Courtesy of Chris English