  • ALTERNATIVE

    ENERGY STATUS IN

    PAKISTAN

    PROF DR NASIM A. KHANSENIOR EXECUTIVE DIRECTOR

    OSMANI & COMPANY (PVT) LTD

    14 MARCH 2013

    DR. [email protected], [email protected]

    7TH INTERNATIONAL CONFERENCE ON

    ALTERNATIVE ENERGY

    EXPO CENTER, KARACHI

  • EARLY GOVERNMENT EFFORT

    Originally the Pakistan Atomic Energy Commission initiated projects in solar energy but this effort was soon transferred to other Ministries. 1960S [PEC]

    They include Solar Energy Research Centre [SERC] under Pakistan Council for Scientific and Industrial Research [PCSIR] in the Ministry of Science and Technology;

    Appropriate Technology Development Organization (ATDO) in the Ministry of Science and Technology;

    a Directorate General of Renewable Energy Resources (DGER) in the Ministry of Petroleum and Natural Resources; and

    a Directorate of Renewable Energy [DAE] under the Water and Power Development Authority (WAPDA) in the Ministry of Water and Power.

  • Several solar-lit villages in different parts of the country and a small wind turbine established by the

    Directorate of New and Renewable Energy Resourcesduring the 80s

  • SERCRESEARCH RESULTS

  • EARLY GOVERNMENT EFFORT

    ATDO was later upgraded and renamed as the Pakistan Council for Appropriate Technology (PCAT) [1980S].

    A new organization the National Institute of Silicon Technology [NIST], was also created in the Ministry of Science and Technology to develop solar cell manufacturing. [1980S]

    All organizations under the Ministry of Science and Technology were later merged into the Pakistan Council for Renewable Energy Technology (PCRET) [1990S], while DGER and the Renewable Energy Directorate under WAPDA were either closed or were not utilized.

  • NATIONAL INSTITUTE OF SILICON TECHNOLOGY NOW PCRET BUILDING

  • PRIVATE SECTOR ALMOST NON EXISTENT

    FINANCING/ LEGAL INSTITUTES

    ALMOST NON EXISTENT

  • EXISTING ALTERNATIVE ENERGY DEVELOPMENT ORGANIZATIONS IN

    PAKISTAN

    AEDB [ALTERNATIVE ENERGY DEVELOPMENT BOARD] [2003/4]

    PCRET [ PAKISTAN COUNCIL FOR RENEWABLE TECHNOLOGIES]

    AED SINDH [ ALTERNATIVE ENERGY DEPARTMENT, GOVERNMENT OF

    SINDH] [2005/6]

    PUNJAB POWER DEVELOPMENT COMPANY [2007/8]

    SINDH ELECTRICTY COMPANY [2009/10]

  • CURRENT PRIVATE SECTOR

    RENEWABLE ENERGY ASSOCIATION OF PAKISTAN

    PAKISTAN WIND ENERGY ASSOCIATION SOLAR ENERGY SOCIETY CONSULTANTS INSURANCE COMPANIES STUDENTS ENERGY ENGINEERING DEPARTMENTS IN

    UNIVERSITIES

    SEVERAL BUSINESSES OPERATING SEVERAL NGOS PRESENT

  • ENERGY SECURITY DILEMMA

    POPULATION PATTERN

    ENERGY GENERATION PATTERN

    SOLAR AND WIND ENERGY SCENARIO

  • POPULATION

    PATTERN

  • EXISTING AND POTENTIAL HYDROPOWER

    PROJECTS IN PAKISTAN

    HYDRO-

    POWERJAMMU&

    KASHMIR

    ENERGY GENERATION

    PATTERN

  • EXISTING AND POTENTIAL OIL, GAS AND COAL

    RESERVES IN PAKISTAN

    HYDRO-

    POWERJAMMU&

    KASHMIR

    SUI

    THAR

    COAL

    LAKHRA

    KHOST

    SHARIGSOR-RANGE

    OIL

    THERMAL

    THERMAL

    ENERGY GENERATION

    PATTERN

  • AVAILABILTY OF SOLAR ENERGY IN POPULATION

    CENTERS IN PAKISTAN

    JAMMU&

    KASHMIR

  • SOURCE: SOLAR ENERGY

    GUIDE AND DATABOOK

    FOR PAKISTAN

    N.A.KHAN

    APRIL

  • JIWANI ORMARA

    PANJGUR

    NOKUNDI

    DALBANDIN

    KHUZDAR

    QUETTA

    SIBI

    LORALAI

    ZHOB

    BARKHAN

    KALAT

    KARACHI

    BADIN

    HYDERABAD

    SUKKUR

    CHOR

    NAWABSHAH

    JACOBABAD

    PADIDAN

    BAHAWALPUR

    BAHAWALNAGAR

    FAISALABAD

    LAHORE

    ISLAMABAD

    KHANPUR

    MULTAN

    SIALKOT

    BALAKOT

    CHITRAL

    D. I. KHAN

    DIR

    DROSH

    KAKULPARACHINAR

    PESHAWAR

    ASTOR

    BUNJI

    CHILAS

    GILGIT

    GUPIS

    KOTLI

    MUZAFFARABAD

    SKARDU

    8.3

    9.1

    4.5

    3.0

    5.9

    4.2

    2.3

    2.1

    3.5

    2.1

    5.0

    2.0

    3.5

    5.1

    3.3

    3.4

    2.5

    1.8

    2.1

    3.2

    1.6

    1.9

    1.2

    1.9

    3.3

    2.7

    0.9

    JHELUM

    1.7

    3.8

    2.4

    0.9

    3.0

    0.9

    3.0

    1.9

    2.3

    2.5

    2.6

    1.5

    3.3

    3.9

    1.3

    3.0

    MONTHLY WIND MAPPING OF PAKISTAN

    DATA SOURCE: METEOROLOGICAL DEPARTMENT OF PAKISTAN

    COMPILED BY BRIG DR NASIM A. KHAN

    STUDY REPORT BY

    PAKISTAN COUNCIL FOR APPROPRIATE TECHNOLOGY

    MONTH: MAY

    ANEMOMETER HEIGHT 30METERS

    10.8

    1 M/S

    2 M/S

    3 M/S

    4 M/S

    WIND SPEED

    COLOUR CODE

    5 M/S

    6 M/S

    7 M/S

    8 M/S

    9 M/S

    10 M/S

    MAY

  • JIWANI ORMARA

    PANJGUR

    NOKUNDI

    DALBANDIN

    KHUZDAR

    QUETTA

    SIBI

    LORALAI

    ZHOB

    BARKHAN

    KALAT

    KARACHI

    BADIN

    HYDERABAD

    SUKKUR

    CHOR

    NAWABSHAH

    JACOBABAD

    PADIDAN

    BAHAWALPUR

    BAHAWALNAGAR

    FAISALABAD

    LAHORE

    ISLAMABAD

    KHANPUR

    MULTAN

    SIALKOT

    BALAKOT

    CHITRAL

    D. I. KHAN

    DIR

    DROSH

    KAKULPARACHINAR

    PESHAWAR

    ASTOR

    BUNJI

    CHILAS

    GILGIT

    GUPIS

    KOTLI

    MUZAFFARABAD

    SKARDU

    8.1

    9.0

    5.2

    3.4

    5.9

    6.1

    3.0

    2.9

    3 .3

    2 .2

    5.1

    2 .2

    3.1

    7.8

    9.7

    3.6

    4.1

    2 .5

    2 .2

    2.5

    3.8

    2 .3

    1.9

    1.4

    2.5

    4.3

    4.0

    0.9

    JHELUM

    1.7

    4.6

    2 .5

    1.0

    3 .3

    1.1

    3 .4

    1.9

    2 .5

    2 .5

    2 .9

    1.5

    3.6

    3.3

    1.3

    3.1

    MONTHLY WIND MAPPING OF PAKISTAN

    DATA SOURCE: METEOROLOGICAL DEPARTMENT OF PAKISTAN

    COMPILED BY BRIG DR NASIM A. KHAN

    STUDY REPORT BY

    PAKISTAN COUNCIL FOR APPROPRIATE TECHNOLOGY

    MONTH: JUNE

    ANEMOMETER HEIGHT 30 METERS

    1 M/S

    2 M/S

    3 M/S

    4 M/S

    WIND SPEED

    COLOUR CODE

    5 M/S

    6 M/S

    7 M/S

    8 M/S

    9 M/S

    10 M/S

    JUNE

  • WIND MAPPING SURVEY FOR POWER POTENTIAL

    PAKISTAN METEOROLOGICAL DEPARTMENT WIND MEASURING SITES IN BALUCHISTAN

    Pakistan Meteorological Department

  • WIND MAPPING SURVEY FOR POWER POTENTIAL

    PAKISTAN METEOROLOGICAL DEPARTMENTWIND MEASURING SITES IN SIND

  • WIND TURBINES ON

    COASTLINE OF KARACHI

    DEVELOPED BY

    DIRECTOR PROJECT 10 CORPS, ADVANCED ENGINEERING

    RESEARCH ORGANIZATION (AERO), SOLAR TEAM EME,NATIONAL COMMISSION FOR ALTERNATIVE ENERGY (NCAE)

    IN COLLABORATION WITH DHA KARACHI, VOLTA BATTERIES,

    OCEAN SERVICES, NICE LINK TRUST, SOLAR PRODUCTS INCORPORATED PAKISTAN, WIND

    BARON

  • WIND LIT COAST OF DHA KARACHI

  • Street lights of Beach Avenue, DHA Karachi

  • Micro wind turbines installed at

    Village Dandari, Ghora Bari, Thatta Sindh

  • TWO WIND PUMPS BY MERIN PVT OPERATIONAL IN BALOCHISTAN

  • Project experienceTechnical Advisor

    Hybrid Power System

    Community Managed

    Client New Zealand Ministry of Foreign Affairs & Trade (MFAT)

    Location Coastal Balochistan, Pakistan

    Date 2002 ongoing, (Co-partnered with Empower Consultants Ltd)

    Facilities; Solar-diesel hybrid system

    Services; Resource assessment, System design, Site installation

  • Hybrid System Installation

    Wind, Solar and Diesel

    Client New Zealand Ministry of Foreign

    Affairs & Trade (MFAT)

    (Co-partnered with Empower Consultants Ltd)

    Location Durgai, Baluchestan, Pakistan

    Date 2003

    Facilities

    7.5 kW wind turbine, 0.5 kW solar panels, a 10 kW diesel

    generator, and 60 x 2v long-life

    acid batteries.

    Services Resource assessment

    System design Site installation

    Project experienceTechnical Advisor

  • GHARO-KATIBANDAR-HYDERABAD WIND CORRIDOR AT 50 METERS

    0

    2

    4

    6

    8

    10

    12

    14

    JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

    MONTH

    ME

    TE

    RS

    /SE

    CO

    ND

    HYDERABAD

    GHARO

    KATIBANDAR

  • JIWANI ORMARA

    PANJGUR

    NOKUNDI

    DALBANDIN

    KHUZDAR

    QUETTA

    SIBI

    LORALAI

    ZHOB

    BARKHAN

    KALAT

    KARACHI

    BADIN

    HYDERABAD

    SUKKUR

    CHOR

    NAWABSHAH

    JACOBABAD

    PADIDAN

    BAHAWALPUR

    BAHAWALNAGAR

    FAISALABAD

    LAHORE

    ISLAMABAD

    KHANPUR

    MULTAN

    SIALKOT

    BALAKOT

    CHITRAL

    D. I. KHAN

    DIR

    DROSH

    KAKULPARACHINAR

    PESHAWAR

    ASTOR

    BUNJI

    CHILAS

    GILGIT

    GUPIS

    KOTLI

    MUZAFFARABAD

    SKARDU

    8.1

    9.0

    5.2

    3.4

    5.9

    6.1

    3.0

    2.9

    3 .3

    2 .2

    5.1

    2 .2

    3.1

    7.8

    9.7

    3.6

    4.1

    2 .5

    2 .2

    2.5

    3.8

    2 .3

    1.9

    1.4

    2.5

    4.3

    4.0

    0.9

    JHELUM

    1.7

    4.6

    2 .5

    1.0

    3 .3

    1.1

    3 .4

    1.9

    2 .5

    2 .5

    2 .9

    1.5

    3.6

    3.3

    1.3

    3.1

    MONTHLY WIND MAPPING OF PAKISTAN

    DATA SOURCE: METEOROLOGICAL DEPARTMENT OF PAKISTAN

    COMPILED BY BRIG DR NASIM A. KHAN

    STUDY REPORT BY

    PAKISTAN COUNCIL FOR APPROPRIATE TECHNOLOGY

    MONTH: JUNE

    ANEMOMETER HEIGHT 30 METERS

    1 M/S

    2 M/S

    3 M/S

    4 M/S

    WIND SPEED

    COLOUR CODE

    5 M/S

    6 M/S

    7 M/S

    8 M/S

    9 M/S

    10 M/S

    JUNE

    .

    Average summer wind

    direction from Gharo to

    Hyderabad

  • GHARO AREA

    MICRO SITING OF WIND FARMS BY AEDB EXPERTSWIND PROJECTS IN PAKISTAN

    AEDB DATA

  • 50m Wind Mast Zephyr Power

    WIND PROJECTS IN PAKISTAN

  • 60m Wind Measuring Mast- NPE

    First 60m Wind Measuring mast in

    Pakistan

    (www.KonDen.com)

  • LAND IN JHIMPIR, THATTA DISTRICT, SINDH

    JHIMPIR

    WIND PROJECTS IN PAKISTAN

    AEDB DATA

  • JHIMPIR AREA WIND FARMS

    AEDB DATA

  • 85m Wind Measuring Mast- Masterwind

  • 85m Wind Measuring Mast- Masterwind

  • 85m Wind Measuring Mast- Zorlu

  • 85m Wind Measuring Mast- Zorlu

  • WIND FARM AT JHIMPIR

  • 010

    20

    30

    40

    50

    60

    70

    80

    2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

    NUMBER OF WIND SPEED DATA COLLECTION MASTS INSTALLED IN PAKISTAN

    INSTALLED/YR CUMULATIVE MASTS

  • WIND ENERGY POWER PROJECTS TARIFF

    S.No Name of IPP

    Tariff (US$ Cents

    per kWh) Date Announced

    1 Dawood Power Ltd 11.87 6 Dec, 2008

    2 Zorlu Enerji 13.3456 13 Dec, 2011

    3 FFC Energy Ltd 16.109 10 Aug, 2010

    4

    Three Gorges First WInd Farm

    Pakistan 13.9399 15 Dec, 2011

    5 Yunus Energy Ltd 17.3672 15 Feb, 2012

    6 Foundation Wind Energy - I Ltd 14.1359 16 Mar, 2012

    7 Foundation Wind Energy - II Ltd 14.1164 16 Mar, 2012

    8 Tenaga Generasi Ltd 13.6202 26 April, 2012

    9 Gul Ahmed Wind Power Ltd 14.6098 8 May, 2012

    10 Sapphire Wind Power Company Ltd 13.2483 8 May, 2012

    11 Metro Power Company Ltd 14.5236 15 May, 2012

    12 Master Wind Energy Ltd 14.532 29 June, 2012

    13 Zephr Power Ltd 15.9135 24 May, 2012

    14 Sachal Energy Development Pvt Ltd 14.8618 3 Jan, 2012

    13.9399 15 Dec, 2011

    AEDB DATA

  • STAKEHOLDER ORGANIZATIONS INVOLVED IN WIND POWER PROJECTS

    AEDB

    GOVT OF SINDH

    NEPRA

    NTDC

    HESCO

    KESC

    INVETSTORS

  • INVESTORS

    STATE BANK OF PAKISTAN

    NATIONAL BANK OF PAKISTAN

    HABIB BANK OF PAKISTAN

    MUSLIM COMMECIAL BANK

    ALLIED BANK

    FAYSAL BANK

    ASKARI BANK

  • LEGAL AND FINANCING INSTITUTES DEVELOPED

    LEGAL COUNCILS; KABRAJI & TALIBUDDIN HAIDERMOTA & CO

    FINANCIAL CONSULTANTS; BRIDGE FACTOR

    WIND ENERGY CONSULTANTS ME CONSULT RER OSMANI WIND ROSE IPEC

  • EXISTING SOLAR

    ENERGY SCENARIO IN

    PAKISTAN

  • SOLAR POTENTIAL OF PAKISTAN

    TOTAL ANNUAL SOLAR ENERGY OVER

    PAKISTAN= 2,324,320,000,000 MWH

    SOLAR POTENTIAL IS

    30,000 TIMES

    ANNUAL ENERGY GENERATED IN PAKISTAN

  • KEL

    BURZIL

    VINJORE

    MARA

    POST

    RANAK

    DHAR

    AWARAN

    QUETTA

    ADILGOMA

    GYONG GHAYARI

    NARAM ADM PAIJU

    IHEC

    SKARDUHAMZI GHUND

    LEH

    NULLAHSHAKMA

    GULTARI

    OLDING

    BUNYAL

    SERVING THE NATION WITH A DIFFERENCE

    DUMBA BAO

    GILGIT

    NEKRUN

    SHARDA

    URAN

    KEL

    TARIQ

    CAMP

    KARACHI

    GHARO

  • SOLAR SYSTEMS LAB

    COLLEGE OF EME

  • MINI SOLAR THERMAL POWER PLANTSPONSORED BY

    MINISTRY OF S&T AND UNESCO

  • MINI SOLAR THERMAL POWER PLANTSPONSORED BY

    MINISTRY OF S&T AND UNESCO

  • SOLAR CELL FABRICATION MACHINE AT

    SOLAR SYSTEMS LAB

  • CADMIUM TELLURIDE SOLAR CELLS

    FABRICATED AT SOLAR SYSTEMS LAB

  • SOLAR WATER DISINFECTOR FOR 100 LITERS/DAY

  • INSTL OF SOLAR PANEL AT IHEC

    18,500 FEET ELEVATION

  • SOLAR LIGHTS AT

    GOMA HOSPITAL

    SOLAR LIGHTS AT

    GOMA WORKSHOP

  • DEMONSTRATION OF SOLAR PV SYSTEMS

    TO MASSES IN NA

  • Solar lighting System on top of Mosque in

    Awaran, Balochistan

  • SOLAR LIT ROOMI PARK

    RAWALPINDI

  • SOLAR LIT PRESIDENCY PARK

  • SOLAR LIT PARK AT

    GILGIT

  • SOLAR LIT CAA PARK

    GILGIT

  • FCNA GATE LIT BY NIGHT WITH SOLAR ENERGY

  • SOLAR CARDESIGNED BY STUDENTS AT

    SOLAR SYSTEMS LAB

    CAN BE IMPROVED FOR AUTO RICKSHAWS

  • FRONT WALL AFTER GLASS FITMENT

  • FINAL FRONT VIEW OF THE HOSPITAL IN WINTERS

  • Hospital at Jambar Kashmir being heated by solar

    heated water

  • STIRLING ENGINE DEVELOPED IN PAKISTAN

  • STIRLING ENGINE DEVELOPED IN PAKISTAN

  • Remote Village Electrification

    Demonstration project of 100 solar homes at Narian Khorian completed, and inaugurated by the Prime Minister in June 2005.

    Pilot project of 100 solar homes in each province completed.

    A total of 1,762 homes electrified in 30 villages so far in all four provinces

    7,874 off-grid villages to be electrified by AEDB in Balochistan (6,968) and Sindh (906)

    400 (300 in Balochistan and 100 in Sindh) to be electrified in the Ist phase of the program

    3000 homes in Sindh electrified

  • Overview of village

    Bharomal (Sindh)

    SINDH

    3000

    HOMES

  • ALLAH BAKHSH DANDAR, BALOCHISTAN

  • SOLAR WATER PUMPING FROM COAL MINE

  • NE recently completed a successful installation of Pakistan's

    largest solar water pumping system. The system employs a

    solar array size of 7 kW and is capable of delivering a daily

    water output of more than 600,000 litres.

  • DHA CITY

    KARACHI

  • PAKISTAN ENGINEERING

    COUNCIL

    ISLAMABAD

  • SOLAR PV CELL MANUFACTURERS

    AKHTER SOLAR

    SARA SOLAR

    AROUND 9 MW OF SOLAR PV CELLS HAVE BEEN MANUFACTURED AND

    INSTALLED IN PAKISTAN

    Around $ 100 MILLIONS MARKET

  • BIO-ENERGY

    BIO-DIESEL POLICY APPROVED AND AVAILABLE

    THOUSANDS OF ACRES OF JATROPHA, PONGAMIA PLANTED

    BIO GAS PLANTS [5000 INSTALLED, 1000 BEING INSTALLED IN PUNJAB]

  • GERMAN AGENCY FOR TECHNICALCOOPERATION (GTZ)

    Renewable Energy & Energy Efficiency Programme of six years duration

    Initiated in October 2003

    Euro 3,500,000 committed by Germany for the first two years of the Programme

    Aims to improve capacity / capability of the Public & Private Sectors for RE, including

    i) Rural Electrification

    ii) Energy Efficiency activities in selected

    SMEs

  • UNDP-GEF

    Two-year project for Sustainable Development of Utility Scale Wind

    Power Production approved by GoP

    Project funding amounts to US $ 3.1 Million

    Aims to elaborate on the existing wind policy

    Country-wide wind resource assessment also part of the project

  • USAID / SOUTH ASIAN REGIONAL INITIATIVE ON ENERGY (SARI)

    Country-wide Wind and Solar Resource Assessment carried out under the

    USAID/SARI Programme amounting to

    US $ 1.9 Million

    Project spanned over a two-year time period; initiated in 2004

  • CONCLUSION

  • EUROPEAN ENERGY SOURCES SHIFT TO NOTE

    SHARE OF RENEWABLE ENERGY IN ALL NEW POWER (GW)

    IN EUROPE DURING THE YEAR 2009

    0

    2

    4

    6

    8

    10

    12

    WIND

    GAS

    SOLAR

    PV

    COAL

    BIOMASS

    OIL

    WASTE

    NUCLEAR

    HYDRO

    SOLAR

    CSP

    ENERGY SOURCE

    PO

    WE

    R G

    IGA

    WA

    TT

    S

  • ENERGY CYCLE OF TRANSITION

    OF WEST

    WOOD COAL

    OIL & GAS

    NUCLEAR

    SOLAR/AE

    MILLIONS

    OF YRS

    150 YEARS

    50

    YRS

    50

    YRS

    NIL

    THOUSANDS OF YRS

  • NIL WOOD

    (MILLIONS OF YEARS)

    ENERGY CYCLE OF TRANSITION

    OF REMOTE AREAS OF PAKISTAN

  • ENERGY CYCLE OF TRANSITION

    RECOMMENDED STRATEGY PAKISTAN

    WOOD COAL

    OIL & GAS

    NUCLEAR

    SOLAR/AE

    MILLIONS

    OF YRS

    150 YEARS

    50 YRS

    50

    YRS

    NIL

    THOUSANDS OF YRS

  • INNOVATIVE STRATEGIES

    A QUESTION IS, WHEN WOULD AN

    AVERAGE PAKISTANI USE ENERGY

    EQUAL TO ENGLAND OF 1970 ?

    PLAN SUCH A TARGETTED

    GROWTH FOR THE

    YEAR 2030 OR 2050

  • IN REALITY

    IN PAKISTAN,

    SOLAR ENERGY AND WIND

    ARE THE ACTUAL SOURCES

    REST ALL ARE ALTERNATE SOURCES OF ENERGY