, Alpine Construction, LLC 10 Broad Street Schuylerville, New York 12871 (518) 695-6739 [email protected] Dam & Hydroelectric Experience Photographs

Upload: vophuc

Post on 22-Apr-2018

220 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

,

Alpine Construction, LLC 10 Broad Street

Schuylerville, New York 12871 (518) 695-6739

[email protected]

Dam & Hydroelectric Experience Photographs

Page 2: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Nassau Lake Dam Project

Project: Construction of New Gravity Dam with Integral Low Level Outlet

Description / Highlights

• Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under dam structure.

• Select structural fill contoured to design shapes

• Reinforced concrete gravity dam with energy dissipation basin

• Construct 2-acre wetlands area to offset wetlands areas affected by the construction of the new dam.

Page 3: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Permanent Sheet Pile Cofferdam – Frame Supported

Page 4: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Select Structural Fill Contoured to Design Shapes

Page 5: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Reinforcing Steel Installation of Downstream Energy Dissipation Basin

Page 6: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Completed Dam, Energy Dissipation Basin and Abutment with Low Level Outlet Structure

Page 7: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Middle Falls Hydroelectric Project

Project: Intake Canal Wall Rehabilitation

Description / Highlights

• Design Build Contract with Owner

• Assist with FERC and NYSDEC permitting.

• Cofferdam design concept which allowed operation of the facility during rehabilitation of canal wall.

• Demolition of existing stone masonry and concrete dam.

• Reinforced concrete gravity structure.

• Trash and ice sluice incorporated into the new canal wall section.

Page 8: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Existing Canal Wall Failure

Page 9: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Sheet Pile Cofferdam Strut Supported

Page 10: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Sheet Pile Cofferdam Strut Supported

Page 11: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Canal Wall Construction

Page 12: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Ice / Trash Sluice Construction

Page 13: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Completed Canal Wall with Integral Sluice Gate

Page 14: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Fourth Branch Hydro Electric Project

Project: Intake Canal Wall Rehabilitation

Description / Highlights

• Design Build Contract with Owner.

• Assist with FERC and NYSDEC permitting.

• Permanent sheet pile cofferdam design concept which allowed operation of the facility during rehabilitation of canal wall.

• Select demolition of existing stone masonry and concrete dam.

• Concrete gravity structure.

Page 15: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Existing Canal Wall Failure

Page 16: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Sheet Pile Cofferdam – H-Pile Supported – Design Concept

Page 17: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Sheet Pile Cofferdam –Drill H-Pile Supported

Page 18: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Dewater and Bedrock Clean Preparation

Page 19: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Formwork and Reinforcing Steel

Page 20: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Completed Wall Section

Page 21: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Sissonville Hydroelectric Project

Project: Intake Deck Replacement

Description / Highlights

• Design Build Contract with Owner.

• Assist with FERC and NYSDEC permitting.

• Design concept that did not require complete dewatering of the intake during construction and allowed select operation during non-critical phases of work.

• Demolition of composite concrete and structural steel intake deck.

• Construction of new reinforced concrete deck with stay in place structural steel shoring system.

• Stability of reinforced concrete deck independent of the structural steel shoring system.

Page 22: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Select Pier Demolition

Page 23: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Stay in Place Form / Armoring

Page 24: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Structural Steel Framing for Deck Shoring / Support

Page 25: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Reinforcing Steel Installation with Embeds for Future Trashrake

Page 26: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Complete Concrete Intake with Crane Rails for Future Trashrake

Page 27: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Middle Falls Hydroelectric Project

Project: Dam Rehabilitation

Description / Highlights

• Design Build Contract with Owner.

• Assist with FERC and NYSDEC permitting.

• Select demolition of the abutment and dam.

• Construction of new reinforced concrete dam.

• Installation of post tension anchors.

• Installation of rubber dam

Page 28: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Existing Conditions Dam with Flashboards

Page 29: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Rehabilitation with Rubber Dam

Page 30: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

North Abutment Construction

Page 31: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Dam Monolith Construction

Page 32: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Dam Outfitted with Rubber Dam

Page 33: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Geyser Pond Dam

Project: Upstream Cutoff Wall at the Base of the Existing Dam

Description / Highlights

• During construction of the new abutment it was determined that the dam was founded on glacial till that which was causing excessive uplift on the dam.

• Design cofferdam to facilitate phased dewatering of the upstream face of dam.

• Select demolition of timber crib, masonry and glacial till to bedrock.

• Installation of upstream cutoff wall that reduced flow under the dam thereby significantly reducing uplift.

Page 34: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Cofferdam Design to Facilitate Upstream Cutoff Wall Construction

Page 35: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Installation of Sheet Pile around Support Frame

Page 36: Alpine Construction, LLC€¢Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under

Alpine Construction, LLC

Cofferdam Dewatered with Upstream Cutoff Complete