Nassau Lake Dam Project
Project: Construction of New Gravity Dam with Integral Low Level Outlet
Description / Highlights
• Dam foundation incorporates a permanent sheet pile structure which acts as cofferdam and cutoff wall along the upstream face of dam to reduce seepage under dam structure.
• Select structural fill contoured to design shapes
• Reinforced concrete gravity dam with energy dissipation basin
• Construct 2-acre wetlands area to offset wetlands areas affected by the construction of the new dam.
Alpine Construction, LLC
Permanent Sheet Pile Cofferdam – Frame Supported
Alpine Construction, LLC
Select Structural Fill Contoured to Design Shapes
Alpine Construction, LLC
Reinforcing Steel Installation of Downstream Energy Dissipation Basin
Alpine Construction, LLC
Completed Dam, Energy Dissipation Basin and Abutment with Low Level Outlet Structure
Alpine Construction, LLC
Middle Falls Hydroelectric Project
Project: Intake Canal Wall Rehabilitation
Description / Highlights
• Design Build Contract with Owner
• Assist with FERC and NYSDEC permitting.
• Cofferdam design concept which allowed operation of the facility during rehabilitation of canal wall.
• Demolition of existing stone masonry and concrete dam.
• Reinforced concrete gravity structure.
• Trash and ice sluice incorporated into the new canal wall section.
Alpine Construction, LLC
Existing Canal Wall Failure
Alpine Construction, LLC
Sheet Pile Cofferdam Strut Supported
Alpine Construction, LLC
Sheet Pile Cofferdam Strut Supported
Alpine Construction, LLC
Canal Wall Construction
Alpine Construction, LLC
Ice / Trash Sluice Construction
Alpine Construction, LLC
Completed Canal Wall with Integral Sluice Gate
Alpine Construction, LLC
Fourth Branch Hydro Electric Project
Project: Intake Canal Wall Rehabilitation
Description / Highlights
• Design Build Contract with Owner.
• Assist with FERC and NYSDEC permitting.
• Permanent sheet pile cofferdam design concept which allowed operation of the facility during rehabilitation of canal wall.
• Select demolition of existing stone masonry and concrete dam.
• Concrete gravity structure.
Alpine Construction, LLC
Existing Canal Wall Failure
Alpine Construction, LLC
Sheet Pile Cofferdam – H-Pile Supported – Design Concept
Alpine Construction, LLC
Sheet Pile Cofferdam –Drill H-Pile Supported
Alpine Construction, LLC
Dewater and Bedrock Clean Preparation
Alpine Construction, LLC
Formwork and Reinforcing Steel
Alpine Construction, LLC
Completed Wall Section
Alpine Construction, LLC
Sissonville Hydroelectric Project
Project: Intake Deck Replacement
Description / Highlights
• Design Build Contract with Owner.
• Assist with FERC and NYSDEC permitting.
• Design concept that did not require complete dewatering of the intake during construction and allowed select operation during non-critical phases of work.
• Demolition of composite concrete and structural steel intake deck.
• Construction of new reinforced concrete deck with stay in place structural steel shoring system.
• Stability of reinforced concrete deck independent of the structural steel shoring system.
Alpine Construction, LLC
Select Pier Demolition
Alpine Construction, LLC
Stay in Place Form / Armoring
Alpine Construction, LLC
Structural Steel Framing for Deck Shoring / Support
Alpine Construction, LLC
Reinforcing Steel Installation with Embeds for Future Trashrake
Alpine Construction, LLC
Complete Concrete Intake with Crane Rails for Future Trashrake
Alpine Construction, LLC
Middle Falls Hydroelectric Project
Project: Dam Rehabilitation
Description / Highlights
• Design Build Contract with Owner.
• Assist with FERC and NYSDEC permitting.
• Select demolition of the abutment and dam.
• Construction of new reinforced concrete dam.
• Installation of post tension anchors.
• Installation of rubber dam
Alpine Construction, LLC
Existing Conditions Dam with Flashboards
Alpine Construction, LLC
Rehabilitation with Rubber Dam
Alpine Construction, LLC
North Abutment Construction
Alpine Construction, LLC
Dam Monolith Construction
Alpine Construction, LLC
Dam Outfitted with Rubber Dam
Alpine Construction, LLC
Geyser Pond Dam
Project: Upstream Cutoff Wall at the Base of the Existing Dam
Description / Highlights
• During construction of the new abutment it was determined that the dam was founded on glacial till that which was causing excessive uplift on the dam.
• Design cofferdam to facilitate phased dewatering of the upstream face of dam.
• Select demolition of timber crib, masonry and glacial till to bedrock.
• Installation of upstream cutoff wall that reduced flow under the dam thereby significantly reducing uplift.
Alpine Construction, LLC
Cofferdam Design to Facilitate Upstream Cutoff Wall Construction
Alpine Construction, LLC
Installation of Sheet Pile around Support Frame
Alpine Construction, LLC
Cofferdam Dewatered with Upstream Cutoff Complete