allotement of land 1
TRANSCRIPT
7/23/2019 Allotement of Land 1
http://slidepdf.com/reader/full/allotement-of-land-1 1/1
Page 1 of 44 1
ALLOTMENT OF PLOTS IN PQA INDUSTRIAL ZONES.
PQA BOARD IN ITS MEETING HELD ON 1ST JULY, 2006 HAS AGREED TO ALLOT LAND TO THEAPPLICANTS WHO HAVE APPLIED FOR ALLOTMENT OF LAND IN PQA ON FAST TRACK BASIS ANDFULFILLED ALL PREREQUITIES.
THE ALLOTMENT OF LAND IN RESPECT OF APPLICANTS LISTED HEREIN BELOW HAS BEENCONSIDERED. HOWEVER, THE ALLOCATION OF PLOTS WILL BE MADE TO THEM ON THE BASISOF SENIORITY FIXED ACCORDING TO THE DATES FO SUBMISSIONS OF UNDERTAKINGS BYTHEM.
NORTH WESTERN INDUSTRIAL ZONE AGAINST DIFFERENT CATEGORIES:
S.No. Name Nature of trade / industry Size of plot in acres
1. M/s. Bulk ManagementPakistan (Pvt.) Limited
Extraction, Processing of EdibleOil
05 (five)
2. M/s.M Haroon Qasim Textile Weaving Industry 2.5 (two & half)
3. M/s.Metatex (Pvt.) Ltd. Polyester Film Manufacturing 4.08 (four point zero eight)
4. M/s.Emjay General Impex Textile Weaving 2.5 acres (two point five)
5. M/s.Shakoo (Pvt.) Limited LPG / OIL Storage 07 (seven)
6. M/s.Modern TerminalOperator
C.F.S 05 (five)
SOUTH WESTERN INDUSTRIAL ZONE (EDIBLE OIL & MOLASSES AREA):
1. M/s.M.M. Commodities Refinery / Storage of Edible Oil& Molasses
04 (four)
2. M/s.FWQ Enterprises (Pvt.)
Limited
Expansion of dedicated Oil
Terminal / Storage Facility ofEdible Oil / Molasses
04 (four)
EASTERN INDUSTRIAL ZONE AGAINST DIFFERENT CATEGORIES:LIGHT / MEDIUM / HEAVY INDUSTRY
S.No. Name and Particulars Size of plot approved1. M/s.Silver Packages
Nature of Project : Packaging IndustryUndertaking received on :13.04.2005
01 (one)
2. M/s. R.T.M Engineering IndustryNature of Project : Wire Draining IndustryUndertaking received on :11.06.2005
01 (one)
3. M/s. Kauser ChemicalsNature of Project : Jacket Manufacturing UnitUndertaking received on :01.07.2005
05 (five)
4. M/s. Muhammad HussainNature of Project : Textile Weaving IndustryUndertaking received on :06.07.2005
03 (three)
5. M/s.Shoaib EnterprisesNature of Project : Textile & Garment UnitUndertaking received on : 13-07-2005
02 (two)