ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE. JTLS at JWC [12 Dec 2012]. Mr Ivan Vianello Chief Team A CAX Support Branch Simulation Modelling & C4 Division. New NATO ’ s Military Structure. Military Committee. ACT. ACO. HQ-SACT. SHAPE. JFC Brunssum. JFC Naples. JC - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

ALLIED COMMAND TRANSFORMATION

JOINT WARFARE CENTRE

Mr Ivan VianelloChief Team A

CAX Support BranchSimulation Modelling & C4 Division

JTLS at JWC[12 Dec 2012]

Page 2: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

New NATO’s Military Structure

HQAIRCOMMRamstein

HQMARCOMMNorthwood

HQ LANDCOM

izmir

JFC Brunssum

JFC Naples

Military Committee

SHAPE HQ-SACT

NC3A NCST

ACO ACT

JWC JFTC JALLC

2 CAOCs

EUROCORPS ARRC

NRDC-GE/NL

NRDC-T NRDC-I

NRDC-SNCIANCIA

FRRCORP

LCCHeidelberg

HQ Madrid

JC Lisbon

MCCNaples

NRDC : NATO’s Rapid Deployable Corps ; ARRC : Allies Rapid Reac Corps

Page 3: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

JWC Mission

JWC plans, conducts and executes operational training; conducts and supports collective training of joint and combined staffs of the NATO Command Structure (NCS) and NATO Force Structure (NFS) for Major Joint Operations (MJOs) and Small Joint Operations (SJOs)

SIMULATION, MODELING & C4 DIVISION (SMC4) is responsible for the planning, management and provision of Computer Assisted Exercises (CAX) and the C4 and CIS environments related to the JWC Programme of Work (POW).

CAX SUPPORT BRANCH is responsible for providing appropriate modeling and simulation support to deliver CAX capabilities for training events.

Page 5: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

Models in JWCJTLS + VBS2 to support NRF (Nato Response Force ) Exercises • 2 Main Events per year • 1 JFC and 3 HQ’s involved (1200 people) - Distributed• Exercise Control 400 people - centralized in JWC• JWC CAX Specialist Team 9 People (Core Team) . Additional

Support from Contractors , R&A , M&S COE (2 people)

VBS2 to support ISAF HQ Training Event

Live Stream is definitely a TA requirement but at today : -Multiple streams are not possible -max 3/4 vignettes per day (manpower demanding)- difficulties to support TA last minute requests for streaming outside the MEL MIL (MSEL) plan .Going towards Kinetic (Article V) scenarios this requirement may rise more frequently. TA can take initiative not only React.

Page 6: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

2012 a Challenging YearSteadfast Joist 12 Moving to New Building

The Complete infrastructure is Virtualized• JWC Staff use Thin client for daily job

During the Execution JTLS is running on VM : • Two Pools : 1 for Server (JTLS Services) , 1 for

Clients (Whips). • In Total 5 full Games Running• 1 JWC CAX Technician prepare and look after the

entire CAX Infrastructure

Page 7: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

2012 a Challenging YearSteadfast Juncture 12 New Scenario (towards Article V)

Settings (GEO – DB) : •52 national Boundaries•17 Countries•Around 140.000 targets• (46520 Bridges , 69688 Facilities , 3040 Runways , 9789 Tunnels etc etc )• 8 Sides•6345 Flight Corridor for Civilian flights. •1500 Civilians Flights per day over the exercise Area

Orbat : Alliance , Sitfor , OPFOR (new concept) , built with JOBE

Page 8: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

JTLS in JWC

• Flexible ( easy to Rerun and deploy the model) • Manageable - no complex Architecture key

• Size of the Game has impact on crash procedures i.e . CEP start time .(example of Next exercise)

Page 9: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

“ Keep the CAX Architecture as Simple as possible” -Scenario Size implications• Reduce Complexity of Setup / Crash - Recover procedures • Game Start up time

-Only CAX tools considered Critical for a specific Event are added in the event CAX Architecture . -CAX Environment has to be easily reproducible after the exercise with minimum manpower and resources -Minimize the possibility that required Architecture updates , can prevent a new model version to be used for an event.

Current Approach fits with JWC IT (VM) Environment and available Manpower

JTLS in JWC

Page 10: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

SFJE12 EXPERIENCE

• JTLS to play a Cyber Attack incident

• JTLS for EXCON “next day preview” in support of a Kinetic Incident.

• JTLS information’s combined with Mel Mil (MSEL) layer and UAV Stream on a NATO C2 System

Page 11: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

CYBER ATTACK with JTLS

One of the goals of Cyber Attacks is to discredit the “trust” in the IT systems used.

However, from training perspective, such an effect could be intentionally planned to achieve a specific training Objective.

Page 12: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

CYBER ATTACK with JTLS

During the Execution of SFJE12 Mel Mil (MSEL) Team planned a specific Cyber Incident

One of the two C2 systems (MCCIS) used had to be “attacked” : Additional enemy tracks were supposed to appear in the RMP.

The goal was to have a mismatch in the Training Audience C2 systems.• MCCIS showing “enemy tracks detected”• AIR and Land C2 with no information's about the

incoming threat

Page 13: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

CYBER ATTACK with JTLS

A Specific side was selected as temporary source for the “fake” tracks .Copies of enemies ships were created from the chosen side.In JTOI the Naval update for the “fake tracks” side was Filtered out in order to prevent Air C2 system to be stimulated (potentially it could receive Ship updates as well)

TPFDD in

Page 14: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

• Fake Ships were then Magic Moved and ordered to start sailing • Unit intel was passed to Training Audience Side to force

detection• Fake Ships started getting reported only in 1 C2 system (MCCIS) • No DSA in the area• Air Cell were role playing “no detection” from air asset in the

area (fake tracks were still appearing in the WHIP)

CYBER ATTACK with JTLS

Page 15: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

CYBER ATTACK with JTLS

Page 16: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

”The day after”Requirements : An MEL MIL (MSEL) Incident triggered the Training Audience Decision to conduct an Amphibious Attack during the Night. (No 24 hrs manning).

Mel Mil team needed the “next day “ situation for a possible contingency plan.

Solution : CAX team implemented the Amphibious in Run Ahead game Runahed was fast forwarded until the next morning with the TRIPP connected .During the Evening MEL MIL Sync meeting , Mel Mil team intensively used the TRIPP to analyze the situation.

Page 17: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

Experiment : C2 as UDOP

From Theatre : UDOP (User Defined Operational Picture) . The goal was to optimize the information flow and access within the HQ itself. The key was to reuse tools available in NATO (ICC) without starting new projects.

ICC 2.8.2 clients have been fed with different KML files :

•“Incidents” and “Actions” pulled from JEMM (MSEL tool)•Simulation data’s updated in real time from JTLS. (KOI) •JOC WATCH information's (Training Audience perception of incidents)•VBS2 Stream Hyperlink within the KML “info bubble” the pointed operator to directly to the Live feed (As in real Life)

Page 18: ALLIED COMMAND TRANSFORMATION JOINT WARFARE CENTRE

Questions

“……Clearly the value of JTLS to an operational-level exercise is enormous. If we were not able to maintain “white truth” via JTLS , the exercise would not only be unmanageable but the entire exercise would fall apart.

……JTLS set conditions for the execution of a revolutionary exercise in numerous way to include : cyber play , incorporating kinetic play as part of an operational-level exercise ….and the list goes on; I realize that we have only begun to tap into the potential for JTLS and I cannot imagine a serious exercise without it. ………”

JWC Chief Mel Mil Steadfast Juncture 12 Exercise.