  • 7/24/2019 All Work Estimate

    1/32

    Dindigul District

    Revised Estimate

    Name of the Block :VEDASANDUR

    Name of the Work :

    Estimate Amount : Rs4.95 Lakhs

    Administrative Sanction No :

    Technical Sanction No :

    Mahatma Gandhi National Rural Employment

    Guarantee Scheme 2010-11

    Deepening and Strengthening the

    Tank of Thavasi kulam South SideH/o Marambadi panchayat

    Collector /Chairman/DRDA DGl

    Proceeding No :

    Date :

  • 7/24/2019 All Work Estimate

    2/32

    1 Name of the Scheme : MGNREGS 2010-11

    2 Block : VEDASANDUR

    3 Name of the Work :

    4 Panchayat : Marambadi

    5 SF.No : 1057

    6 Administrative Sanction Details :

    7 Esitmate Amount : Rs4.95 Lakhs

    8 Technical Sanction No & Date :

    9 whether FM Sketch is Enclosed : Yes

    10 Components of works taken up : 1 Light Jungle Clearence

    2 Benching the old embankment

    3 Supply Channel Desilting

    4 Supply Channel Deepening

    5 Tank Deepening

    11 If the Work already executed mention the year : No

    12 Total No.of Mandays to be generated : 4950

    13 If pond : Size of Pond

    MI Tank : Length of bund to be strengthened 500M

    Channel Work : Length of Channel

    Road : Length & Width

    : Link road !illage road

    14 Purpose of Work : Public Use

    15 No & Name of Habitation : Thavasikulam

    16 : 800

    17 Whether Panchayat resolution Obtained : Yes

    Deepening and Strengthening the

    Tank of Thavasi kulam South Side H/o

    Marambadi panchayat

    Population of Habitation Benefited In this

    Work

  • 7/24/2019 All Work Estimate

    3/32

    (PTO)

    CERTIFICATE

    ssistant Engineer / Union Engineer Block Development Officer(V.

    Vedasandur Panchayat Union Vedasandur Panchayat Union

    1) Certifed that this work has not been taken up previously underNREGS or any other schemes.

    ) Certifed that this work has been taken up in Govt!"ocal #ody landsonly.

    er e a s wor as no een a en up n any n v ualands.

    %) Certifed that this work is use&ul &or all villa'e public and not to anyindividual .

    () Certifed that this estimate has been prepared by the Concerned.E.*R.+) a&ter personally inspected the feld by the Concerned .E.

    ,) Certifed that the Estimate has been prepared as per NREGS Ruralschedule o& rate.

    -) Certifed that the Estimate is echnically scrutini/ed and countersi'ned by the concerned .E.E *R.+).

    0) Certifed that the Estimate &or this work has been prepared withthe consultation o& .2.+ En'ineers a&ter due concurrence *pplicable&or works e3ecuted in .2.+ anks4 Channels etc.4).

    5) Certifed that this work has been included in the "abour #ud'et o&concerned villa'e panchayat and approved by the Grama Sabha.

    16) Certifed that the photos enclosed &or this work has been actuallytaken in the proposed site &or this work.

  • 7/24/2019 All Work Estimate

    4/32

    Tank Length : 500M

    Estimate Amount : Rs.4.95hs

    Block : VEDASANDUR

    Panchayat : Marambadi

    No & Name of Habitation : Thavasikulam

    SF.No : 1057

    Exisitng Condition of the Tank :

    Mahatma Gandhi National Rural Employment GuaranteeScheme : (MGNREGS)

    Specification Report to Accompany the Detailed Project Report

    Deepening and Strengthening of the tank of Thavasi kulam South Side

    Marambadi panchayat

    The National Rural Employmrnt Guranatee act 2005 was enacted to provide for theechancement of livelihood security of the house holds in rural area by providing at least 100 Days

    of generated employment in every financial year to every

    The National Rural Employment Gurantee scheme (NREGS) is being implemented in

    Tamilnadu from 02.02.2006.

    The Supplementary guidelines are issues by Director of Rural Development and

    Panchayat Raj, Chennai in D.O.Lr. No : 43857/2006/TREGS-1, Dt : 17.07.2006 for Speedy

    implementation of this Programme.

    The Supply Channel is having a average width of2.00 Mand length of500M. It Connects

    the tank ofThavasi kulam South Side

  • 7/24/2019 All Work Estimate

    5/32

    Description of Works Proposed :

    1

    2 Earth Work Excavation for removeal of Silt and othe loose soil (Top soilremoval)

    3 Earth Work Excavation for strengthening of side bund

    4 Name board, Photographic charge with album five set.

    Cost of this Esimate

    Rates Adopted :

    Assistant Engineer(RD),

    Panchayat Union,

    Vedasandur.

    Assistant executiveEngineer,

    Rural Development,

    Vedasandur

    Clearing of light jungle as directed by the Department Officer in bund portion and

    Water spread area.

    The Estimate cost works out toRs. 4.95 lakhs. The assets created under NREGS will be

    maintained by Concermed Panchayat union /Village Panchayat. This Work Administrative

    Sanction No : /10/A10 Date :

    The Estimate has been prepared based on the Rural Schedule of rate which has been

    approved in G.O.Ms.No : 77 RD & Panchayat Raj (CGS) Dept.Dt : 14.07.2006 for the

    unskilled labour oriented works exclusively for National Rural Employment Guarantee

    Scheme a

  • 7/24/2019 All Work Estimate

    6/32

    ABSTRACT ESTIMATE

    Name of the Work :

    Esitmate Amou: Rs.4.95 La

    Quantity Details Rate Per Amount

    1 2 3 4 5 6

    1 7950 3"92 #$m 31164

    2 1000 % 1"30 % 1300

    3 2500 42"20 '(m 105500

    4 3450 61"20 '(m 211140

    ) 1100 * +t Lead 3"65 4015

    B 1150 ** nd Lead 7"30 8395

    ' 1200 *** rd Lead 10"95 13140

    , 0 *! th Lead 14"60 0

    - 1100 2"95 6490

    . 1150 5"90 6785

    / 1200 *** rd Lit 8"85 10620

    5 L# -

    6 L# -

    7 L#

    Total 398549

    Deepening and Strengthening the Tank

    of Thavasi kulam South Side H/o

    Marambadi panchayat

    .

    N

    2

    'learing the Light (ngle ith(rootingand remoedaa rom the +ite

    incl(ding all c(tting charge+ and alllabo(r charge+ a+ er +tandard+eciication"

    Benching old embankment +loe+ 45 45 a+ er W, #ched(le o %ate

    3

    -arth ork ecaation and deo+itingon bank ith an initial lead o 10 mand initial lit 2 m in +and +ilt or otherloo+e +oil el +and or +oil +andloam and ordinar +oil incl(dingecaatedearth a+ er

    3

    -arth ork ecaation and deo+itingon bank ith an initial lead o 10 mand initial lit 2 m in hard red earth+hale+m(r(amgrael +tone earthand art mied ith +mall +i;e bo(ldee+and hard grael +oil a+ er

    3 3

    3 3

    3 3

    3 3

    3 * +t Lit 3

    3 ** nd Lit 3

    3 3

    %eair o eir +l(ice+ and otherma+onr ork+ #l(ice %eair

  • 7/24/2019 All Work Estimate

    7/32

    Assistant Engineer(RD),

    Panchayat Union,

    Vedasandur.

    Name of the Work :

    Name of the Scheme : MGNREGS 2010-11

    ADMINISTRATIVE SANCTION PROCEEDING NO : Collector /Chairman/DRDA/DGL

    Technically Sanctioned for (Rs. ___________________________________/-)

    (Rupees ______________________________________________________________________only)

    and Registered as AEE(RD) Palani Reg.no :

    Assistant executiveEngineer,

    Rural Development,

    Vedasandur .

    Deepening and Strengthening the

    Tank of Thavasi kulam South Side H/o

    Marambadi panchayat

    Proceding No : /09/A10

    DATE :

  • 7/24/2019 All Work Estimate

    8/32

    Detailed Estimate

    Name of the Work :

    Esitmate Amount Rs. 4.95 Lakhs

    Details NoMeasurements

    ContentsL B D

    1

    Tank Bund 1x2 500 2 - 2000

    Tank inside 1x1 450 25 11250

    13250

    Deduct 40% voids -(-) 5300

    7950

    2 1x2 500 - - 1000 RM

    3 1x1 500 50 0.1 2500

    4 3450

    A I st Lead 1100

    B II nd Lead 1150

    C III rd Lead 1200

    D I st Lift 1100

    E II nd Lift 1150

    F III rd Lift 1200

    5 Repair of weir, sluices and other masonry works

    6 -

    Deepening and Strengthening the Tank of

    Thavasi kulam South Side H/o

    Marambadi anchaat

    Sl.

    NoClearing the light jungle withuprooting and

    removedaway from the site including all cutting

    charges and all labour charges as per standard

    specification.

    M3

    Benching old embankment slopes 45X 45 cm as Per

    PWD Schedule rates

    Earth work excavation and depositing on bank

    with an initial lead of 10m and initial lift of 2m in

    sand ,silt or other loose soil ,wet sand or silt not

    under water, light black cotton soil, sandy loam

    and ordinary soil including excavated earth as per

    M3

    Earth work excavation and depositing on bank

    with an initial lead of 10m on initial lift of 2m in

    hard stiff clay ,stiff block cotton soil hard red earth

    shales,muram,gravel stoney earth and earth mixed

    with small size bouldees and hard gravely soil as

    pe

    As per Calculation

    Sheet enclosedM3

    M3

    M3

    M3

    M3

    M3

    M3

    On farm Development works likes deepening of the

    main Channel from the sluices as per

  • 7/24/2019 All Work Estimate

    9/32

    7 -

    8 Contigencies and other unforeseen etc., -

    Assistant Engineer(RD),

    Panchayat Union,

    Vedasandur.

    DATA Sheet 2009-10

    As Per GO.Ms.No.77/RD & PR(CGS!t.17/07/200"

    S#.No Ite$ o% or'

    I Erth )or' e*+,to or!r so#

    1 Cteor I

    2.20+3$

    2 Cteor II

    For farm ponds and plantation pits 2.20/+3$

    3 Cteor III

    For all other works 2.20/+3$II Erth )or' e*+,to hr! so#

    1 Cteor I

    "1.20/+3$

    2 Cteor II

    For farm ponds and plantation pits "1.20/+3$

    3 Cteor III

    For all other works "1.20/+3$

    III Stoe Pt+h(3s'##e!

    1 Farm Ponds 450.5"/+3$

    2 Mini percolation tank 450.5"/+3$

    I6 Ro3h Stoe !r P+' (3s'##e!

    1 Rock fill dams ,Stone checks 450.5"/+3$

    2 Contour bunding 450.5"/+3$

    6 3#e +#er+e

    1 Scrub ungle 4.92/S8$

    !ight ungle .24/S8$

    2 Medium ungle 2."0/S8$

    Name board ,Photograph charges with album five

    set,

    Rte to e !o:te!o# %or or's

    3!erTNREGS(Rs.

    For contour bunding ,road ,rock fill dams and desilting oftank

    For contour bunding ,road ,rock fill dams and desilting oftank

  • 7/24/2019 All Work Estimate

    10/32

    "ense ungle ;.40/S8$

    3 ;."9/S8$

    P#" being adopted for all other items of works$

    Assstt Eeer(RD

    Deepening and Strengthening the Tank

    and Supply Channel of Oonan kulam H/o

    Ammapatty Panchayat

    Proceding No :

    DATE :

  • 7/24/2019 All Work Estimate

    29/32

    Detailed Estimate

    Name of the Work :

    Esitmate Amount Rs. 4.97

    Details NoMeasurements

    ContentsL B D

    1

    Tank Bund 1x2300 3 - 1800

    Tank inside 1x1250 50 12500

    14300

    Deduct 40% voids - (-) 5720

    8580

    2 2x2300 - - 1200 RM

    3 1x1300 50 0.1 1500

    4 3100

    A I st Lead 1000

    B II nd Lead 1000

    C III rd Lead 1100

    D IV th Lead 0

    E I st Lift 1000

    F II nd Lift 1000

    G III rd Lift 1100

    5 Repair of weir, sluices and other masonry works

    Deepening and Strengthening the Tank and

    Supply Channel of Oonan kulam H/o

    Ammaatt PanchaatLakh

    sSl.

    NoClearing the light jungle withuprooting and

    removedaway from the site including all cutting

    charges and all labour charges as per standard

    secification.

    M3

    Benching old embankment slopes 45X 45 cm asPer PWD Schedule ratesar wor excavaion an eposiing on an

    with an initial lead of 10m and initial lift of 2m

    in sand ,silt or other loose soil ,wet sand or silt

    not under water, light black cotton soil, sandy

    loam and ordinary soil including excavated earth

    M3

    ar wor excavaion an eposiing on an

    with an initial lead of 10m on initial lift of 2m in

    hard stiff clay ,stiff block cotton soil hard red

    earth shales,muram,gravel stoney earth and

    earth mixed with small size bouldees and hard

    As per Calculation Sheet

    enclosedM3

    M3

    M3

    M3

    M3

    M3

    M3

    M3

  • 7/24/2019 All Work Estimate

    30/32

    6 -

    7 -

    8 Contigencies and other unforeseen etc., -

    Assistant Engineer(RD),

    Panchayat Union,

    Vedasandur.

    Det#e! Est$te

    =ame o the Work :

    Esitmate Amount %+" 4"97 Lakh+

    Details No

    Measurements

    Contents

    L B D

    1

    Channel 1x2300 10 - 6000

    Deduct 40% voids 2400

    3600

    2 1x1300 30 0.15 1350

    3 1500

    4 Repair of weir, sluices and other masonry works -

    5 -

    6 -

    On farm Development works likes deepening of

    the main Channel from the sluices as per

    Name board ,Photograph charges with album

    five set,

    ,eeening and #trengthening the ?ank and#(l 'hannel o

  • 7/24/2019 All Work Estimate

    31/32

    7 Contigencies and other unforeseen etc., LS

    Assistant Engineer(RD),

    Panchayat Union,

    Vedasandur.

    DATA Sheet 2009-10

    As Per GO.Ms.No.77/RD & PR(CGS!t.17/07/200"

    S#.No Ite$ o% or'

    I Erth )or' e*+,to or!r so#

    1 Cteor I

    2.20+3$

    2 Cteor IIFor farm ponds and plantation pits 2.20/+3$

    3 Cteor III

    For all other works 2.20/+3$

    II Erth )or' e*+,to hr! so#

    1 Cteor I

    "1.20/+3$

    2 Cteor II

    For farm ponds and plantation pits "1.20/+3$

    3 Cteor III

    For all other works "1.20/+3$

    III Stoe Pt+h(3s'##e!

    1 Farm Ponds 450.5"/+3$

    2 Mini percolation tank 450.5"/+3$

    I6 Ro3h Stoe !r P+' (3s'##e!

    1 Rock fill dams ,Stone checks 450.5"/+3$

    2 Contour bunding 450.5"/+3$

    6 3#e +#er+e

    1 Scrub ungle 4.92/S8$

    Rte to e !o:te! o#%or or's 3!erTNREGS(Rs.

    For contour bunding ,road ,rock fill dams anddesilting of tank

    For contour bunding ,road ,rock fill dams anddesilting of tank

  • 7/24/2019 All Work Estimate

    32/32

    !ight ungle .24/S8$

    2 Medium ungle 2."0/S8$

    "ense ungle ;.40/S8$

    3 ;."9/S8$

    P#" being adopted for all other items of works$

    Assstt Eeer(RD