all india re rap database
TRANSCRIPT
Ministry of New and Renewable Energy
All India Renewable Energy Regulatory And Policy Data Base (All India RE-RAP Data Base)
Step-1
Step-2
Template flow for RE Regulatory Data Base
A. Summary worksheet for RE Regulatory and Policy parameters provide broad summary of various renewable energy specific parameters (viz.
technology-wise FIT, RPO, OA etc.) across state and centre. This sheet has linkages to respective detailed sheets of each specific parameter.
Hyperlinks direct to detail sheets which give key sub parameters for central and state level.
Separate summary worksheets developed on the following topics and each such individual worksheet cover identified details of central, all States and UTs.
a. FIT Wind b. FIT Solar Thermal c. FIT Solar PV d. FIT Biomass e. FIT Bagasse Cogen f. FIT MSW g. FIT SHP h. FIT Biomass Gassifier i. FIT Biogas j. FIT other Technologies k. ... l. RPO Summary m. REC n. Grid Connectivity o. Open Access
Step-3
Step-4
Separate summary worksheets developed on the following topics and each such individual worksheet cover identified details of central, all States and UTs.
a. FIT Wind b. FIT Solar Thermal c. FIT Solar PV d. FIT Biomass e. FIT Bagasse Cogen f. FIT MSW g. FIT SHP h. FIT Biomass Gassifier i. FIT Biogas j. FIT other Technologies k. ... l. RPO Summary m. REC n. Grid Connectivity o. Open Access
Unique Code for each Reference Documents built based on following sub-codes which are scalable
Entire Reference document across States/Technologies/type of notifications, etc., listed in a single worksheet along with hyperlinks linking to the actual document as in the following manner:
The above list could be filtered to get exclusive list of state-wise reference docs or to get exclusive list of technology-wise reference documents. For example all reference docs for Karnataka could be filtered as shown below.
Step-5
Step-6 Folder Structure for maintaining base documents All files/ base documents maintained in single folder (Advantage: One point access of all reference document) File named using the unique code name. (Advantage: Linking file name to the Unique Code makes search easy) Each file serial numbered, which is in line with List of documents in excel sheet. (Advantage: easy search; easy to identify latest added files
– will help in monthly updation)
Entire Reference document across States/Technologies/type of notifications, etc., listed in a single worksheet along with hyperlinks linking to the actual document as in the following manner:
The above list could be filtered to get exclusive list of state-wise reference docs or to get exclusive list of technology-wise reference documents. For example all reference docs for Karnataka could be filtered as shown below.
Folder Structure for maintaining base documents All files/ base documents maintained in single folder (Advantage: One point access of all reference document) File named using the unique code name. (Advantage: Linking file name to the Unique Code makes search easy) Each file serial numbered, which is in line with List of documents in excel sheet. (Advantage: easy search; easy to identify latest added files
– will help in monthly updation)
Template flow for RE Regulatory Data Base
A. Summary worksheet for RE Regulatory and Policy parameters provide broad summary of various renewable energy specific parameters (viz.
technology-wise FIT, RPO, OA etc.) across state and centre. This sheet has linkages to respective detailed sheets of each specific parameter.
Hyperlinks direct to detail sheets which give key sub parameters for central and state level.
Separate summary worksheets developed on the following topics and each such individual worksheet cover identified details of central, all States and UTs.
a. FIT Wind b. FIT Solar Thermal c. FIT Solar PV d. FIT Biomass e. FIT Bagasse Cogen f. FIT MSW g. FIT SHP h. FIT Biomass Gassifier i. FIT Biogas j. FIT other Technologies k. ... l. RPO Summary m. REC n. Grid Connectivity o. Open Access
Separate summary worksheets developed on the following topics and each such individual worksheet cover identified details of central, all States and UTs.
a. FIT Wind b. FIT Solar Thermal c. FIT Solar PV d. FIT Biomass e. FIT Bagasse Cogen f. FIT MSW g. FIT SHP h. FIT Biomass Gassifier i. FIT Biogas j. FIT other Technologies k. ... l. RPO Summary m. REC n. Grid Connectivity o. Open Access
Unique Code for each Reference Documents built based on following sub-codes which are scalable
Entire Reference document across States/Technologies/type of notifications, etc., listed in a single worksheet along with hyperlinks linking to the actual document as in the following manner:
The above list could be filtered to get exclusive list of state-wise reference docs or to get exclusive list of technology-wise reference documents. For example all reference docs for Karnataka could be filtered as shown below.
Folder Structure for maintaining base documents All files/ base documents maintained in single folder (Advantage: One point access of all reference document) File named using the unique code name. (Advantage: Linking file name to the Unique Code makes search easy) Each file serial numbered, which is in line with List of documents in excel sheet. (Advantage: easy search; easy to identify latest added files
– will help in monthly updation)
Entire Reference document across States/Technologies/type of notifications, etc., listed in a single worksheet along with hyperlinks linking to the actual document as in the following manner:
The above list could be filtered to get exclusive list of state-wise reference docs or to get exclusive list of technology-wise reference documents. For example all reference docs for Karnataka could be filtered as shown below.
Folder Structure for maintaining base documents All files/ base documents maintained in single folder (Advantage: One point access of all reference document) File named using the unique code name. (Advantage: Linking file name to the Unique Code makes search easy) Each file serial numbered, which is in line with List of documents in excel sheet. (Advantage: easy search; easy to identify latest added files
– will help in monthly updation)
Prepared by ABPS Infra Page10/125
Summary Sheet
STATE / CENTRE
Year Rs/kWh Applicability
CERC NA NA NA
Andhra PradeshFY 13:FY 14:
So on
Assam
Bihar
Chhattisgarh
Delhi
Gujarat
Haryana
Himachal Pradesh
Jharkhand
Karnataka
Kerala
Madhya Pradesh
Maharashtra
Manipur
Mizoram
Meghalaya
Nagaland
Orissa
Punjab
Rajasthan
Sikkim
Tamil Nadu
Tripura
Uttarakhand
Uttar Pradesh
Wind Solar PV Solar Thermal Biomass Bagasse based cogeneration Municipal solid Waste Small Hydro RPO targets (%) APPC Open Access Provisions
Policy for evacuation
Tariff (Rs/kWh)
Control period
Tariff (Rs/kWh)
Control period
Tariff (Rs/kWh)
Control period
Tariff (Rs/kWh)
Control period
Tariff (Rs/kWh)
Control period
Tariff (Rs/kWh)
Control period
Tariff (Rs/kWh)
Control period
Solar(%)
Non Solar (%)
Transmission charges and
losses
Cross-subsidy surcharge
Wheeling charges
Banking provisions
Arunachal Pradesh
Jammu and Kashmir
West Bengal and so on for all the
states
Prepared by ABPS Infra Page11/125
Summary Sheet
STATE / CENTRE
Wind Solar PV Solar Thermal Biomass Bagasse based cogeneration Municipal solid Waste Small Hydro RPO targets (%) APPC Open Access Provisions
Policy for evacuation West Bengal and so on for all the
states
FIT:WIND
Prepared by ABPS Infra Page12/125
ANNEXURE-1A
STATE-WISE FEED-IN-TARIFF FOR WIND
Financial Parameters Normative Parameters
STATE / CENTRE Control period Tariff (Rs/kWh) Taxes and Duties
CERC FY 2012-16 (3 yrs) 575 (FY 2012-13) 25
Andhra Pradesh 470 24.50% 20 N.A N.A
Arunachal Pradesh N.A N.A N.A N.A
Assam N.A 25
Bihar N.A N.A N.A N.A N.A N.A N.A N.A
Chhattisgarh N.A 25
Delhi N.A N.A N.A N.A N.A N.A N.A N.A
Gujarat 24% 25 N.A
Haryana 575 25
Himachal Pradesh N.A N.A N.A 25
Jammu and Kashmir 25
Jharkhand N.A 20% 25 N.A
Karnataka 470 26.50% 25
Kerala 3.64 456 22% 20
Madhya Pradesh May 2010 to March 31, 2013 4.35 500 20% 25 N.A
Maharashtra FY 2012-13 25
Manipur
FY 2010-11 to FY 2014-15 600 Lakhs/MW (FY 2010-11) 25
Mizoram
Tariff Regulations / or Order or Draft(Ref. no. …dt……)
Capital Cost (lakh/MW)
Capacity Utilisation Factor (%)
Useful life(yrs)
Subsidy and incentive by Central /State Govt
CERC Generic RE Tariff Order for FY 2012-13;
CERC (Terms and Conditions for Tariff determination from
Renewable Energy Sources) Regulations, 2012
Wind power density Tariff(Rs /kWh)
<200 = 5.96, 5.36(with A.D)200-250 = 5.42, 4.87(with A.D)250-300 = 4.77, 4.29(with A.D)300-400 = 3.97, 3.57(with A.D)
>400 = 3.73 , 3.35(with A.D)
Wind power density CUF
<200 = 20%200-250 = 22%250-300 = 25%300-400 = 30%
>400 = 32%
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and duties,
pass through allowed on actual
basis
Wind Tariff Order in respect of "New Wind Based Power Projects
( O.P No. 6/7 of 2009)
For WPP having entered into PPA btw May 1, 2009 to
March 31, 2014
For first 10 years-3.5For next 10 years-determined
thereafter
RE Tariff Regulations, 2012 (April 9, 2012)
From 2012-13 to 2016-17 (5 yr)
Shall be taken into consideration while determining tariff
Pass through on actual incurred
basis
Draft RE Tariff Regulations, 2012 (January 13, 2012)
April 1, 2012 to March 31, 2015 (3 years)
492 (FY 2011-12), indexation mechanism as per CERC RE
Tariff Regulation
Wind power density CUF
200-250 = 20%250-300 = 23%300-400 = 27%
>400 = 30%
Shall be taken into consideration while determining tariff
Pass through on actual incurred
basis
Draft RE Tariff Regulations, 2012 (April 2, 2012)
From April 1, 2012 to 2016-17
(5 yrs)
575 (FY 2012-13) subject to indexation mechanism as per CERC RE Tariff Regulation
Wind power density CUF
upto 200 = 20%201-250 =22%251-300 =25%301-400 =30%
>400 =32%
Shall be taken into consideration while determining tariff
Pass through on actual incurred
basis
Wind Tariff Order (Order No.2 of 2012, Aug 8, 2012)
August 11, 2012 to March 31, 2016
Gross Tariff - Rs 4.23/kWhDepreciation- Rs 0.38/kWh
Net Tariff-Rs 4.23/kWh
Excluding evacuation-Rs 568 lakh/MW
Evacuation cost=Rs 38 lakh/MW
Total cost=Rs 608 lakh/MW
Takes into account benefit of depreciation. Shall take a
view on GBI once MNRE announces the scheme
Suo Moto Petition for Determination of Levellised Tariff for RE Projects dated Sept
2012Commissioned during FY
2012-13
Wind power density Tariff(Rs /kWh)
200-250 = 6.14250-300 = 4.91300-400 = 4.09
>400 = 3.84
Wind power density CUF
200-250 = 20%250-300 = 25%300-400 = 30%
>400 =32%
Shall be taken into consideration while determining tariff
Pass through on actual incurred
basis
Draft HPERC( Promotion of Generation from Renewable Energy sources and
Terms and conditions of Tariff) Regulations, 2012
(July 25, 2012)
According to the generic tariff Order (Duration to be fixed as find appropriate by
the Commission)
1. Shall be taken into consideration while determining tariff.
2. 90% of the capital subsidy available to project as per applicable scheme of MNRE/State Govt shall be
considered3. Also take into account GBI benefit as and when
notified.
Tariff determined shall be inclusive of all taxes and duties
Draft RE Tariff Regulations, 2012 FY 2012-13 to FY 2016-17 (5 years)
575 for FY 2012-13 subject to indexation
Wind power density CUF
upto 200 =20%201-250 = 22%251-300 = 25%301-400 =30%
>400 =32%
Shall be taken into consideration while determining tariff
Tariff determined shall be inclusive of all taxes and duties
Regulations for Determination of Tariff for procurement of power from wind
generators (June 23, 2010)
June 23, 2010 to March 31, 2013
515 for first year subject to indexation
Shall be taken into consideration iGBI incentive
while determining tariff
Order for determination of tariff for RE sources
(Dec, 11,2009)
1. All new RE projects, which are entering into PPA on or after Janu1, 2010 for a
period of 10 years2. Also applicable to projects
which have completed 10 years of agreement period
and no agreed tariff is available after 10 yrs
Average tariff for first 10 years from signing of PPA= Rs 3.70/kWh
Shall not take into consideration incentives allowed by Govt for tariff
determination
Pass through on actual incurred
basis
(Power Procurement from RE sources ) second amendment Regulation, 2010
(Nov 22, 2010)
Applicable to project proposals submitted after
Nov 22, 2010
Shall be taken into consideration while determining tariff.
Generating company shall disclose the details of such subsidy/incentive if availed
along with application of fixation of tariff and get the rate adjusted appropriately
Tariff determined shall be inclusive of all taxes and duties
Wind Tariff Order(May, 14, 2010)
Tariff determined shall be inclusive of all taxes and duties
Generic Tariff Order( March 30, 2012)
Wind power density Tariff(Rs /kWh)
200-250 5.67 (including AD of 0.81/kWh)
250-300 4.93 (including AD of 0.70/kWh)
300-400 4.20 (including AD of 0.60/kWh)
>400 3.78 (including AD of 0.54/kWh)
516.94 for FY 2012-13 subject to indexation
Wind power density CUF
200-250 =20%250-300 =23%300-400 =27%
>400 =30%
Takes into account benefit of depreciation. However
shall not take into account GBI benefit into tariff
determinattion
Pass through on actual incurred
basis
Joint Electricity Regulatory Commission for
Manipur & Mizoram (Terms and Conditions for Tariff determination from
Renewable Energy Sources) Regulations, 2010.
200-250 - 20%250-250 - 23%300-400 - 27%
>400 - 30%
Shall be considered in Tariff computation as when
availed
Tariff exclusive of taxes and duties. Taxes and duties
allowed allowed as pass through on actual incurred
basis
FIT:WIND
Prepared by ABPS Infra Page13/125
ANNEXURE-1A
STATE-WISE FEED-IN-TARIFF FOR WIND
Financial Parameters Normative Parameters
STATE / CENTRE Control period Tariff (Rs/kWh) Taxes and DutiesTariff Regulations / or Order or Draft(Ref. no. …dt……)
Capital Cost (lakh/MW)
Capacity Utilisation Factor (%)
Useful life(yrs)
Subsidy and incentive by Central /State Govt
Mizoram
FY 2010-11 to FY 2014-15 600 Lakhs/MW (FY 2010-11) 25
Meghalaya No Tariff Regulations/Order NA NA NA NA NA NA NA
Nagaland FY 2012-14 (3 years) 25
Orissa Tariff Order (Dated 14/09/2010) 2010-11 to 2012-13467.13 Lakhs/MW 19% 25
Punjab wind zone 1 (upto 20%)
Rajasthan 530 Lakh/MW for FY 13 25
Sikkim
Tamil Nadu 3.51 Rs/kWh 27.15% 20
Tripura NA
Uttarakhand 515 25
Uttar Pradesh UPERC - CNCE Regulations, 2009 Oct 1, 2009 to Mar 31, 2014 Not specified separately Not specified separately Not specified separately
West Bengal 10 years for wind Not specified separately Not specified separately Not specified separately
Goa No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations
Union Territories
Andaman Nicobar No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations
Chandigargh No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations
No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations
Daman & Diu No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations
Lakshadweep No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations
Pondicherry No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations
Joint Electricity Regulatory Commission for
Manipur & Mizoram (Terms and Conditions for Tariff determination from
Renewable Energy Sources) Regulations, 2010.
200-250 - 20%250-250 - 23%300-400 - 27%
>400 - 30%
Shall be considered in Tariff computation as when
availed
Tariff exclusive of taxes and duties. Taxes and duties
allowed allowed as pass through on actual incurred
basis
Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011
Rs. 467 Lakh / MW (FY 2010-11)
200-250 - 20%250-250 - 23%300-400 - 27%
>400 - 30%
Shall be considered in Tariff computation as when
availed
Tariff exclusive of taxes and duties. Taxes and duties
allowed allowed as pass through on actual incurred
basis Rs 5.31/kWh (Without AD) & Rs 4.48/kWh (With AD)
Incentive or subsidy offered by Central/State Govt. shall
be considered while determining tariff
Tariff exclusive of Tax; ROE
computed on pre-tax basis
Order on adoption of CERC RE Tariff Regulation and determination of generic
RE Tariff for FY 2012-13
Provisions akin to CERC (April 2012 to March 2017)
Provisions akin to CERC, 5.96 (without AD) 5.36 (with AD)
Provisions akin to CERC (575 lakh/MW)
Provisions akin to CERC (25)
Incentive or subsidy availed to be computed on case to case basis by Punjab State
Corporation ltd and the same to be reduced from the tariff to that extent for
a period of 12 years.
Provisions akin to CERC (Tariff
exclusive of Tax; ROE computed on
pre-tax basis)
RERC (Terms and Conditions of Tariff) Regulations, 2009,
Draft Tariff Order on Wind Projects for FY 2012-13
April 1, 2009 to March 31, 2014
5.18 (without AD) 4.90 (with AD)-for projects in aisalmer, Jodhpur and
Barmer districts
5.44 (without AD) 5.14 (with AD)-for other districts
21%- Jaisalmer, Jodhpur and Barmer districts
20%- Otherdistricts
Any Policy support by way of capital subsidy /Capital
Finance Assistance (CFA), higher depreciation benefit
or GBI, which becomes available to the
developer/generator, needs to be passed on to the
utilities.
Tax is not a pass through; ROE
comupted on pre-tax basis
Comprehensive Tariff Order on Wind Energy (Order No. 6 of 2012) dated July
31, 2012
August 31, 2012 to March 31, 2014
Rs. 575 Lakh /MW. Capital cost is apportioned among
plant machinery, civil works & land at 85%, 10% and 5%
respectively.
TERC (Cogeneration and Generation of Electricity from renewable source of
Energy) regulation 2009
FY 2009-12 (3 years from notification of these regulations)
Uttarakhand Electricity Regulatory Commission
(Tariff and Other Terms for Supply of Electricity from Renewable Energy
Sources and non-fossil fuel based Co-generating
Stations) Regulations, 2010
FY 2010-11 upto March 31, 2013
Zone-1 (5.15 Rs/kWh without AD, 4.75 with AD)
Zone-2 ((4.35 Rs/kWh without AD, 4.00 with AD)
Zone-3 (3.65 Rs/kWh without AD, 3.35 with AD)
Zone-4 ((3.20 Rs/kWh without AD, 2.90 with AD)
200-250 - 20%250-250 - 23%300-400 - 27%
>400 - 30%
Only 75% of the capital subsidy for the financial year
of commissioning as per applicable scheme of MNRE shall be considered for tariff
determination.
Direct Taxes included in the
Tariff.Taxes and duties
levied by the appropriate
Government other than direct
taxes shall be allowed as pass
through on actual incurred basis.
Rs.3.21/Kwh with an escalation of 5.72% p.a.
Not specified separately
Not specified separately
Draft WBERC(Cogeneration and Generation of
Electricity from Renewable Sources of Energy) Regulations, 2012
Tariff cap of 5.70 for 10 years from effectiveness of Regulations
Not specified separately
Price cap excludes taxes
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
Dadra and Nagar Haveli No RE
Order/RegulationsNo RE
Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
FIT:WIND
Prepared by ABPS Infra Page14/125
Normative Parameters
Reference Archives
N.A
N.A
N.A N.A
N.A N.A
N.A
N.A
N.A
Late Payment surcharge
1.25% per month if payment delayed beyond 60 days
CE98R01060212,
CE98O01270312
AP01O01010509
AR98R01090412
1.25% per month if payment delayed beyond 60 days
AS98A01130112
1.25% per month if payment delayed beyond 60 days
CG98A01020412
GJ01O01080812
1.25% per month if payment delayed beyond 60 days
HR98O01030912 HR98O01250112
1.25% per month if payment delayed beyond 60 days
HP08A01250712
1.25% per month if payment delayed beyond 60 days
JK98A01000012
1.25% per month if payment delayed beyond 30days
JH01R01230610
KA98O01111209
KL98R01221110
2% over and above short term SBI PLR
p.a. if payment delayed beyond
30days
MP01O01140510
1.25% per month if payment delayed beyond 60 days
MH98O01300312
1.25% per month for payments
delayed beyond 60 days from billing
date
MN98R01150410
FIT:WIND
Prepared by ABPS Infra Page15/125
Normative Parameters
Reference ArchivesLate Payment surcharge
NA
Not specified
1.25% per month for payments
delayed beyond 60 days from billing
date
MN98R01150410
1.25% per month for payments
delayed beyond 60 days from billing
date
NL98R01300811
1.25% per month for payments
delayed beyond 60 days from billing
date
OR98O01140910
1.25% per month for payments
delayed beyond a period of 60 days from the date of
billing
PB98O01190712
1.25% permonth on daily basis for delay beyond a
period of1.5 month from the
date of billing
RJ98R01230109
RJ01B01080612
Penalty of 1% per month shall be
levied for delayed payment by the
licensee
TN01O01310712
TR98R01230309
1.25% per month for delays beyond a period of 60 days from the date of
billing
UA98R01060710
1.25% p.m. beyond 2 months
UP98R01220310
WB98A01100812
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
No RE Order/Regulations
FIT: SOLAR
Prepared by ABPS Infra Page16/125
ANNEXURE-1B
STATE-WISE FEED-IN-TARIFF FOR SOLAR PV
Financial Parameters Normative Parameters
STATE Control period Tariff (Rs/kWh)
CERC FY 2012-16 (3 yrs) 1000 (FY 2012‐13) 19% 25
Andhra Pradesh
IA No 17 of 2010, dated July 14, 2010
2010-11 and 2011-12 25
Arunachal Pradesh April 2012 to March 2017 1000 19% 25
Assam Jan 2012 to Mar 2014 1442 19% 25
Bihar 1000 19% 25
Chhattisgarh RE Tariff Regulation dated Apr 02, 2012 April 2012 to March 2017 1000 19% 25
Delhi Solar PV Tariff Regulations (Draft) 2012 1000 19% 25
Gujarat GERC Order 1 of 2012 dated Jan 27, 2012 Jan 29, 2012 to March 31, 2015 0.25% 25
Haryana 3 years(till FY 13-FY15) 19% 0% 25
Himachal Pradesh
Jammu and Kashmir 1000 19% 25
Jharkhand June 2010 to June 2013 1700 19% 25
Karnataka 1550 19% 25
Kerala 15.18 (including incentives) 2250 21% 20
Madhya Pradesh Aug 2012 to March 2014 0.25% 25
Maharashtra 19% NA 25
Manipur
1900 (FY 2010-11) 19% NA 25
&Mizoram
Meghalaya
Tariff order or Regulation not found
NA NA NA NA NA NA
Nagaland FY- 2012-14 (3 years) 1690 19-21% NA 25
Orissa 1690 19% NA 25
Punjab 1000 19% NA 25
Rajasthan 940 0.25% 25with AD - 10.45
Sikkim Tariff order or Regulation not found NA NA NA NA NA NA
Tamil Nadu FY 2010-11 (till 31/05/12) 17.15 2% 25
TripuraNA
Uttarakhand 19% NA 25
Uttar Pradesh FY 2010-14 (5 years)
West Bengal FY 2013-17 (5 Years)
Tariff Regulations / or Order or Draft(Ref. no. …dt……)
Capital Cost (lakh/MW)
Capacity Utilisation Factor (%)
Auxiliary Consumption (%)
Useful life(yrs)
CERC Generic RE Tariff Order for FY 2012-13;
CERC (Terms and Conditions for Tariff determination from
Renewable Energy Sources) Regulations, 2012
Lev - 10.39AD - 1.04
After AD - 9.35
17.91 (Without AD) 14.95 (With AD)
APSERC RE Tariff Regulations, 2012 dated April 9, 2012
RE Tariff Regulation (Draft) dated Jan 13, 2012
BERC Order on Petition 12/2012, dated May 29, 2012, Solar Tariff Regulations
dated Aug 2, 2010
Upto March 31, 2015 commissioning
10.9 (Without AD) 09.85 (With AD)
3 years from the date of notification
For MW Scale Plants: Jan 2012-March 2013: 10.37 (Without AD),
09.28 (With AD), FY 2013-14: 9.64 (Without AD), 8.63 (With
AD), FY 2014-15: 8.97 (Without AD), 8.03 (With AD)
For kW scale Plants Jan 2012-March 2013: 12.44
(Without AD), 11.14 (With AD), FY 2013-14: 11.57 (Without AD),
10.36 (With AD), FY 2014-15: 10.76 (Without AD), 9.63 (With
AD)
1000 (MW scale Plants), 1200 (kW scale plants)
18% with 1% annual degradation
Suo Moto Petition for Determination of Levellised Tariff for RE Projects dated Sept
20129.18 (SPV Crystalline)8.90 (SPV Thin film)
894( SPV-C)863 (SPV-TF)
JKSERC (Terms and Conditions for Tariff determination from RE Sources)
Regulations (Draft), 20122012-17 (5 years from the date
of commencement)(Determination of Tariff for Procurement
of Power from Solar PV and Solar Thermal Power Projects)
REGULATIONS, 2010 dated June 23, 2010
KERC Order on Solar Power Tariff Determination dated July 13, 2010
Upto March 31, 2013 commissioning
14.5 (Including rooftop and small solar PV plants)
Power procurement from Solar Plants by Distribution
Licensee - Regulation 2008 dated Jan 1, 2009
For projects commissioned before dec 31, 2009
Tariff Order for Solar Based Power Generation dated Aug 01, 2012
10.44 (capacity >2 MW), 10.70 (Capacity upto 2 MW)
1025 (capacity >2 MW), 1050 (capacity upto 2 MW)
19% with 1% annual deration from 3rd yr
onwards
MERC RE tariff regulayions,2010 ,Case No 10 of 2012 (Mar 30, 2012)
FY 2010-14(5 years from the date of commencement )
Lev -11.16 (11.66 - RT & SSPGP)AD -1.65 (1.65)
after AD -9.51 (10.01)1000 (FY 2012-13)
JERC of Manipur & Mizorum (RE Tariff regulation) 2010 dated 15 Apr,2010
FY 2010-14(5 years from date of notification)
NERC (terms and condition for determination of generation tariff for renewable energy) regulation 2011
OERC redetermination of generic tariff for solar PV and Solar thermal,Case No
1 of 2012
Plant comissioned in FY (2012-13) onwards
Lev- 17.80AD -3.03
After AD -14.77
Adoption of CERC RE tariff regulation 2012,Petetion no 35 of 2012,dated 19
July 2012
FY 2012-16 (5 years from the notification of order)
Lev - 10.39AD - 1.04
After AD - 9.35
RERC (Determination of benchmark capital cost for solar PV and Solar thermal power
projects) dated 13 may 2012
9.63 (Plant comissioned by 31 Mar 2014) 20% with deration of 0.5%
PA after 2nd year9.63 (Roof top and SSPG comissioned by 31 mar 2014)
TNERC (tariff order for projects covered under JNNSM) dated 27/05/10
Lev - 18.45AD- 4.11
After AD - 14.34
19% with a deration of 1% every year after ten years.
TERC (Cogeneration and Generation of Electricity from renewable source of
Energy) regulation 2009
FY 2009-12 (3 years from notification of these regulations)
FY 2009-12 (3 years from the commensment of these
regulations)
Lev - 17.70AD - 1.65
after AD - 16.05
1700 (Projects comissioned on or after 1/04/09)
UPERC (Captive and Non-conventional Energy generating plants )regulation
2009
15 (comissioned by Dec 2011,not covered under GOI incentive
scheme)
Draft WBERC (Cogeneration & generation of electricity from renewable
energy source), regulation 2012
10 (Capacity ranging 100 KW to 2 MW availing GBI)
10 (Grid connected plant not eligible for any incentive and comissioned upto 2012-13)
10(Projects comissioned after FY 2012 till FY 2015
FIT: SOLAR
Prepared by ABPS Infra Page17/125
Normative Parameters
Taxes and Duties Late Payment surcharge
NA NA NA
GBI
NA NA NA
Subsidy and incentive by Central /State Govt
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and duties, pass through allowed
on actual basis
1.25% per month beyond a delay of 60 days
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and duties, pass through allowed
on actual basis1.25% per month beyond
a delay of 60 days Shall be considered
(including AD) and per unit benefit shall be derived on
levellised basis
Tariff exclusive of taxes and duties, pass through allowed
on actual basis1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and duties, pass through allowed
on actual basis1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and duties, pass through allowed
on actual basis1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and duties, pass through allowed
on actual basis1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and duties, pass through allowed
on actual basis1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff on per unit benefit derived
on levellised basis1.25% per month beyond
a delay of 30 days
1.25% per month beyond a delay of 30 days
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and duties, pass through allowed
on actual basis1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and duties, pass through allowed
on actual basis
1.25% per month beyond a delay of 60 days
Shall be factored in the tariff on per unit benefit derived
on levellised basis
RE developers shall be exempted from all types of
taxes and duties1.25% per month beyond
a delay of 60 days
Shall be factored in the tariff on per unit benefit derived
on levellised basis
RE developers shall be exempted from all types of
taxes and duties1.25% per month beyond
a delay of 60 days
Subsidy shall be workout and tariff shall be reduced
for a period of 12 years
RE developers shall be exempted from all types of
taxes and duties1.25% per month beyond
a delay of 60 days
AD benefit shall be factored in the tariff
1% per month for payment after 30 days of
billing
75% of capital subsidy for the financial year of comissioning as per
applicable scheme of MNRE shall be considered for tariff
determination
Including Direct Tax but Exclusive other tax and
duties 10% tax rate for 0-10
years,30% for balance period alongwith 10%
surcharge and 3% education cess
1.25% per month beyond a delay of 60 days Exempt from Income tax
and all other taxes and duties & other levies
imposed by State/central Govt.
1.25% per month beyond a delay of 60 days
STATE-WISE FEED-IN-TARIFF FOR SOLAR (Thermal)
STATE
CERC
Andhra Pradesh
IA No 17 of 2010, dated July 14, 2010
Arunachal Pradesh
Assam
Bihar
Chhattisgarh RE Tariff Regulation dated Apr 02, 2012
Delhi
Gujarat GERC Order 1 of 2012 dated Jan 27, 2012
Haryana
Himachal Pradesh
Tariff Regulations / or Order or Draft(Ref. no. …dt……)
CERC Generic RE Tariff Order for FY 2012-13;
CERC (Terms and Conditions for Tariff determination from
Renewable Energy Sources) Regulations, 2012
RE Tariff Regulation (Draft) dated Jan 13, 2012
Order on Petition 12/2012, dated May 29, 2012, Solar Tariff Regulations dated Aug 2,
2010
Suo Moto Petition for Determination of Levellised Tariff for RE Projects dated Sept
2012
Jammu and Kashmir
Jharkhand
Karnataka
Kerala
Madhya Pradesh
Maharashtra
Manipur
&Mizoram
Meghalaya Tariff Regulation or Order Not found
Nagaland
Orissa
Punjab
Rajasthan
Sikkim Tariff order or Regulation not found
Tamil Nadu
JKSERC (Terms and Conditions for Tariff determination from RE Sources)
Regulations (Draft), 2012
of Power from Solar PV and Solar Thermal Power Projects)
REGULATIONS, 2010 dated June 23, 2010
KERC Order on Solar Power Tariff Determination dated July 13, 2010
Tariff Order for Solar Based Power Generation dated Aug 01, 2012
MERC RE tariff regulayions,2010 ,Case No 10 of 2012 (Mar 30, 2012)
JERC of Manipur & Mizorum (RE Tariff regulation) 2010 dated 15 Apr,2010
NERC (terms and condition for determination of generation tariff for renewable energy) regulation 2011
OERC redetermination of generic tariff for solar PV and Solar thermal,Case No
1 of 2012
Adoption of CERC RE tariff regulation 2012,Petetion no 35 of 2012,dated 19
July 2012
RERC (Determination of benchmark capital cost for solar PV and Solar thermal power
projects) dated 13 may 2012
TNERC (Tariff order for Solar thermal projects covered by JNNSM) dated
08/07/2010
Tamil Nadu
Tripura
Uttarakhand
Uttar Pradesh
West Bengal NA
Goa No tariff Order
Union Territories
Andaman Nicobar No tariff Order
Chandigargh No tariff Order
No tariff Order
Daman & Diu No tariff Order
Lakshadweep No tariff Order
Pondicherry No tariff Order
TNERC (Tariff order for Solar thermal projects covered by JNNSM) dated
08/07/2010
TERC (Cogeneration and Generation of Electricity from renewable source of
Energy) regulation 2009UERC (Tariff and other terms for supply
of electricity from renewable enrgy sources and non fossil fuel based
cogeneration) regulation 2010UPERC (Captive and Non-conventional
Energy generating plants )regulation 2009
Dadra and Nagar Haveli
ANNEXURE-1B
STATE-WISE FEED-IN-TARIFF FOR SOLAR (Thermal)
Financial Parameters
Control period Tariff (Rs/kWh)
FY 2012-16 (3 yrs) 1300 (FY 2012‐13)
2010-11 and 2012-13
Jan 2012 to Mar 2014 1500
1300
April 2012 to March 2017 1300
Jan 29, 2012 to March 31, 2015 1400
3 years(till FY 13-FY15) 12.17 1300
Capital Cost (lakh/MW)
Lev - 12.46AD - 1.24
After AD - 11.22
15.31 (Without AD) 12.85 (With AD)
Upto March 31, 2015 commissioning
13.11 (Without AD) 11.87 (With AD)
12.91 (Without AD) 11.55 (With AD)
1300
June 2010 to June 2013 1300
11.35 1300
Aug 2012 to March 2014 12.65 1325
1500 (FY2010-11)
NA NA NA
FY- 2012-14 (3 years) 1530
1530
FY 2012-16
1300
FY 2012-13 1275
NA NA NA
FY 2010-11 (till 31/05/12) 1556 (FY 2010-11)
2012-17 (5 years from the date of commencement)
Upto March 31, 2013 commissioning
FY 2010-14(5 years from the date of commencement )
Lev - 13.44AD - 1.97
After AD - 11.47 1300
FY 2010-14(5 years from date of notification)
Plant comissioned in FY (2012-13) onwards
Lve - 14.73AD - 2.41
After AD-12.32
Lev - 12.46AD - 1.24
After AD - 11.2211.95 (Without AD)
With AD - 10.4511.95 (Small Solar thermal
power gen comissioned by 31 Mar 2015
Lev - 15.51AD - 3.35
After AD - 12.16
FY 2010-11 (till 31/05/12) 1556 (FY 2010-11)
NA
FY 2010-14 (5 years)
NA NA NA
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
Lev - 15.51AD - 3.35
After AD - 12.16
FY 2009-12 (3 years from notification of these
regulations)
FY 2009-12 (3 years from the commensment of these
regulations)
Lev - 12.95AD - 1.15
after AD - 11.80
1300 (Projects comissioned on or after 1/04/09)
13 (comissioned by Dec 2011,not covered under GOI
incentive scheme)
Normative Parameters
23% 10% 25
25
23% 10% 25
23% 10% 25
23% 10% 25
10.00% 25
23% 10% 25
Capacity Utilisation Factor (%)
Auxiliary Consumption (%)
Useful life(yrs)
Subsidy and incentive by Central /State Govt
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Shall be considered (including AD) and per unit benefit shall be derived on
levellised basisShall be factored in the tariff on per unit benefit derived
on levellised basis
Shall be factored in the tariff on per unit benefit derived
on levellised basis
23% with 0.25% annual degradation
23% 10% 25
23% 10 25
23% 8% 25
10% 25
23% 10% 25
23% 10% 25
NA NA NA NA
23% 10% 25
24% 10% 25
23% 10% 25
6.50% 25
NA NA NA NA
10% 25
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Shall be factored in the tariff on per unit benefit derived
on levellised basis
23% with 0.5% annual deration from 3rd yr
onwards
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Subsidy shall be workout and tariff shall be reduced
for a period of 12 years
23% with a deration of 0.25% every year after
fourth year.
23% with a deration of 1% every year after ten years.
AD benefit shall be factored in the tariff
10% 25
23% 10% 25
NA NA NA NA
No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order
23% with a deration of 1% every year after ten years.
AD benefit shall be factored in the tariff
the financial year of comissioning as per
applicable scheme of MNRE shall be considered for tariff
Normative Parameters
Taxes and Duties ReferenceLate Payment
surcharge
Tariff exclusive of taxes and duties, pass through allowed on actual basis
1.25% per month beyond a delay of 60
days
CE98R01060212
CE98O01270312
AP02O01140610
Tariff exclusive of taxes and duties, pass through allowed on actual basis
1.25% per month beyond a delay of 60
days AS98A01130112
Tariff exclusive of taxes and duties, pass through allowed on actual basis
1.25% per month beyond a delay of 60
days
BR02O01290512
BR02R01020810
Tariff exclusive of taxes and duties, pass through allowed on actual basis
1.25% per month beyond a delay of 60
days CG98R01020412
GJ02O01270112
HR98O01030912
NA NA
NA NA
Tariff exclusive of taxes and duties, pass through allowed on actual basis
1.25% per month beyond a delay of 60
days JK98A01000012
1.25% per month beyond a delay of 30
days
JH02R01230610
KA02O01130710
1.25% per month beyond a delay of 30
days
MP02O01010812
Tariff exclusive of taxes and duties, pass through allowed on actual basis
1.25% per month beyond a delay of 60
days MH98O01300312
Tariff exclusive of taxes and duties, pass through allowed on actual basis
1.25% per month beyond a delay of 60
days
MN98R01150410
MZ98R01150410
RE developers shall be exempted from all types
of taxes and duties
1.25% per month beyond a delay of 60
days
NL98R01300811
RE developers shall be exempted from all types
of taxes and duties
1.25% per month beyond a delay of 60
days OR02O01010212
RE developers shall be exempted from all types
of taxes and duties
1.25% per month beyond a delay of 60
days PB98O01190712
RJ02O01300512
1% per month for payment after 30 days
of billingTN02O01080710
NA NA
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order
1% per month for payment after 30 days
of billingTN02O01080710
TR98R01230309
duties 10% tax rate for 0-10
years,30% for balance period alongwith 10%
1.25% per month beyond a delay of 60
days
UA98R01060710
Exempt from Income tax and all other taxes and
duties & other levies imposed by State/central
Govt.
1.25% per month beyond a delay of 60
days
UP98R01220310
Archives
HR02Z01000612
FIT:BIOMASS
Prepared by ABPS Infra Page31/125
ANNEXURE-1C
STATE-WISE FEED-IN-TARIFF FOR BIOMASS
Financial Parameters Normative Parameters
STATE Control period Plant Load Factor (%)
CERC FY 2012-16 (3 yrs) 445 (FY 12-13) 4000 10% 3300
Andhra Pradesh Tariff Order (Dated 31/03/2009) & 2009-10 to 2014-15 NA 400 3,800 9%. 3275 80%.
Arunachal Pradesh Tariff Notification Dated April 9, 2012 NA 445 4000 10% 3300 70%
Assam NA 426 3800 10% 3467 70%
Bihar Discussion Paper- July 2012 NA NA 425 3650 10% 3150 75%
Chhattisgarh Draft RE Tariff Regulation_April 2012 NA 445 4000 10% 3300
Delhi No tariff Order No tariff Order NA NA NA NA NA NA
JERC (Goa & UT) No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
Gujarat Bagass Tariff Order - Order No. 5 of 2010-May 17, 2010 454 3800 10% 3300
Haryana 3800 10% 3458
Himachal Pradesh RE Tariff Regulations_240712 NA NA NA NA NA NA
Jammu and Kashmir Draft RE Tariff Regulations_July 2012 NA 445 4000 10% 3300
Jharkhand Till March 31, 2015 NA 450 3800 10% 3467 70%
Karnataka RE Tariff Order(111209) NA NA 487 9% 75%
Kerala No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
Madhya Pradesh Biomass Tariff Order_ March 2, 2012 450 3800 10% 3612
Maharashtra MERC suo motu Tariff Order dated 5.41 402.54 3800 10% 3611
Manipur 2010-11 to 2014-15 NA 520 3800 10% 3467
&Mizoram 2010-11 to 2014-15 NA 520 3800 10% 3467
Meghalaya NA NA NA NA NA NA NA NA
Nagaland 403 3800 10% 3467
Orissa 4.09 450 3800 10% 3522
Punjab 5.83 445 4000 10% 3300
Rajasthan 540/585 3400
Sikkim NA NA NA NA NA NA NA NA
Tamil Nadu 4.694 445 3840 10% 3200 80%
Tripura NA NA NA NA NA NA NA NA
Uttarakhand 450 4200 10% 3371
Tariff Regulations / or Order or Draft(Ref. no. …dt……)
Tariff (Rs/kWh)
Capital Cost (lakh/MW)
Specific heat rate (kcal/kWh)
Auxiliary Consumption
(%)
Calorific Value(kCal/kg)
CERC Generic RE Tariff Order for FY 2012-13;
CERC (Terms and Conditions for Tariff determination from
Renewable Energy Sources) Regulations, 2012
***given below in separate table
60% during stabilisation period ,
70% for remaining stabilisation period of 1st
year and then
80% from 2nd year onward
5 Years( 2012-13 to 2017-18)
Notification (Draft)Dated Guwahati the 13th January, 2012
3 years(till March 2014)
5 Years(2011-12-2016-17)
First six months of COD: 60%
ii. Next six months upto one year of COD: 70%iii. From 2nd Year of COD onwards: 80 %
1.06.2010 to 31.03.2013.
4.49 (with AD) 4.54(w/o AD)
70% for 1st year &80% from 2nd year
onwards.
Haryana RE (Biomass) Tariff Order -03092012
3 years(till FY 13-FY15)
5.59 (for watercooled)
5.88 (for aircooled condenser)
445 (aircooled condenser)475 (water cooled condenser)
70% for 1st year &80% from 2nd year
onwards.
From December 18, 2012 upto March
31, 2017
5 years(2012-13 to 2017-18)
During stabilisation : 60 % (ii)During the
remaining period of the first year of operation of
the plant (after stabilization) : 70% (iii)From 2nd Year
onwards : 80%Biomass and NFFcogen Tariff Regulations_27012010
March 2012 to end of FY 2013-14
During stabilisation : 60 % (ii)During the
remaining period of the first year of operation of
the plant (after stabilization) : 70% (iii)From 2nd Year
onwards : 80%FY2013-14 and FY2014-15
60% before stabilisation period , 70% for
remaining stabilisation period of 1st year and
then 80% from 2nd year onward
Joint Electricity Regulatory Commission for
Manipur & Mizoram (Terms and Conditions for Tariff determination from
RenewableEnergy Sources) Regulations, 2010.
60% before stabilisation period , 70% for
remaining stabilisation period of 1st year and
then 80% from 2nd year onward
Joint Electricity Regulatory Commission for
Manipur & Mizoram (Terms and Conditions for Tariff determination from
RenewableEnergy Sources) Regulations, 2010.
60% before stabilisation period , 70% for
remaining stabilisation period of 1st year and
then 80% from 2nd year onward
Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011
FY2010-11 to FY2014-15
60% before stabilisation period , 70% for
remaining stabilisation period of 1st year and
then 80% from 2nd year onward OERC Suo Moto Tariff Order dated
September 14, 2010 in Petition No 37/2008
From FY2010-11 to FY2012-13
60% before stabilisation period , 70% for
remaining stabilisation period of 1st year and
then 80% from 2nd year onward
PSERC Suo Motu Order on RE Tariff by adopting CERC Tariff
From FY2010-11 to FY2012-13
60% before stabilisation period , 70% for
remaining stabilisation period of 1st year and
then 80% from 2nd year onward
RERC Tariff Regulation 2009 dated January 23, 2009
FY2009-10 to FY 2013-14
4.77 for water cooled / 5.22 for
Air cooled
4300 during stabilisation and 4200
after stabilization / 4540 before
stabilization and 4440 after stabilization
10.5 % during s and 10% after tabilization / 12.5 % during s and 12% after tabilization
60% before stabilisation period , 70% for
remaining stabilisation period of 1st year and
then75% from 2nd year onward
Comprehensive Tariff Order for Biomass Power Plants, Order No 8 of
2012 dated July 31 ,2012
August1, 2012 to July 31, 2014
UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel
based Co-generating Stations) Regulations, 2010
FY2009-10 to FY2013
60% before stabilisation period , 70% for
remaining stabilisation period of 1st year and
then 80% from 2nd year onward
FIT:BIOMASS
Prepared by ABPS Infra Page32/125
ANNEXURE-1C
STATE-WISE FEED-IN-TARIFF FOR BIOMASS
Financial Parameters Normative Parameters
STATE Control period Plant Load Factor (%)Tariff Regulations / or Order or Draft
(Ref. no. …dt……)Tariff
(Rs/kWh)Capital Cost
(lakh/MW)Specific heat rate
(kcal/kWh)
Auxiliary Consumption
(%)
Calorific Value(kCal/kg)
Uttarakhand 450 4200 10% 3371
Uttar Pradesh 5.02 NA NA NA NA NA
West Bengal NA 5.00
Goa No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
Union Territories
Andaman Nicobar No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
Chandigargh No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
Daman & Diu No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
Lakshadweep No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
Pondicherry No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
CERC Tariff for Biomass for FY 2012-13
State Lev. FC Lev. VC AD Benefit
Andhra Pradesh 2.06 3.12 5.18 0.13 5.05Haryana 2.10 3.55 5.65 0.13 5.52
Maharashtra 2.11 3.63 5.74 0.13 5.61Punjab 2.12 3.71 5.83 0.13 5.70
Rajasthan 2.06 3.10 5.16 0.13 5.03Tamil Nadu 2.06 3.07 5.12 0.13 4.99
Uttar Pradesh 2.07 3.17 5.24 0.13 5.11Others 2.08 3.33 5.42 0.13 5.29
UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel
based Co-generating Stations) Regulations, 2010
FY2009-10 to FY2013
60% before stabilisation period , 70% for
remaining stabilisation period of 1st year and
then 80% from 2nd year onward
UPERC (Captive and Non- Conventional Energy Generating
Plants) Regulations, 2009(hereinafter referred to as CNCE
Regulations, 2009).
October 1, 2009 to March 31, 2014
Draft West Bengal Electricity Regulatory Commission (Cogeneration and
Generation of Electricity from Renewable Sources of Energy)
Regulations, 2012 (For replacing existing Regulation)
WBERC does not specify the project parameters for
determination of tariff. It only specifies a cap for the tariff.
WBERC does not specify the project
parameters for determination of tariff. It only specifies a cap for
the tariff.
WBERC does not specify the project
parameters for determination of tariff. It only specifies a cap for
the tariff.
WBERC does not specify the project
parameters for determination of tariff. It only specifies a cap for
the tariff.
WBERC does not specify the project
parameters for determination of tariff. It only specifies a cap for
the tariff.
Dadra and Nagar Haveli
Tariff (With AD)(FY 2012‐13)
Net Levellised (without AD)
FIT:BIOMASS
Prepared by ABPS Infra Page33/125
Normative Parameters
Reference Archives
20
20 NA
20
20
1700 20 NA NA NA
20
NA NA NA NA NA NA
No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order NA
1600 (5% esc) 20
20
NA NA NA NA NA
2500(indexation or 5% esc) 20
20 NA NA NA
1280 FY 2009-10 ( 5% esc) 20 NA NA NA
No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
2100 20 NA NA NA
2605 20 NA
20 NA
20 NA
NA NA NA NA NA NA
20 NA
1968 20 NA
2756 20 NA
20 NA
NA NA NA NA NA NA
2277 20 NA
NA NA NA NA NA NA
20 NA
Fuel Cost (Rs/ MT)
Useful life(yrs)
Subsidy and incentive by Central /State Govt
Taxes and Duties
Late Payment surcharge
Andhra Pradesh-2315Haryana-2635
Maharashtra-2695Punjab-2756
Rajasthan-2300Tamil Nadu-2277
Uttar Pradesh-2355Other States-2476
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and duties, pass
through allowed on actual basis
1.25% per month beyond a delay of
60 days CE98R01060212, CE98O01270312
1300 for base year 2009-10 (5%esc)
Passed on to utility/consumer
over and above the determined
tariffs, to be reimbursed by the DISCOMs
AP98O0120911
2283 for FY2012-13 (5%esc)
Normative capital cost, Accelerated Depreciation , Corporate income tax rate,
Capitalisation of RE projects during second half of the
fiscal year, Per unit benefit shall be derived on
levellised basis at discount factor equivalent to
weighted average cost of capital or any other
appropriate discounting factor considered by the
Commission.
pass through on actual
incurred basis subject to
production of documentary
evidenceby the
generating company.
1.25% per month, beyond 60 days
AR98R0190412
2018 for FY 2012-13 (5% esc)
Normative capital cost, Accelerated Depreciation , Corporate income tax rate,
Capitalisation of RE projects during second half of the
fiscal year, Per unit benefit shall be derived on
levellised basis at discount factor equivalent to
weighted average cost of capital or any other
appropriate discounting factor considered by the
Commission.
pass through on actual
incurred basis subject to
production of documentary
evidenceby the
generating company.
1.25% per month, beyond 60 days
AS98A01130112
BR04C01010712
2476 for FY 2012-13 (linked with indexation )
Normative capital cost, Accelerated Depreciation , Corporate income tax rate,
Capitalisation of RE projects during second half of the
fiscal year, Per unit benefit shall be derived on
levellised basis at discount factor equivalent to
weighted average cost of capital or any other
appropriate discounting factor considered by the
Commission.
pass through on actual
incurred basis subject to
production of documentary
evidenceby the
generating company.
1.25% per month, beyond 60 days
CG98A01020412
Normative capital cost, Accelerated Depreciation , Corporate income tax rate,
Capitalisation of RE projects during second half of the
fiscal year, Per unit benefit shall be derived on
levellised basis at discount factor equivalent to
weighted average cost of capital or any other
appropriate discounting factor considered by the
Commission.
pass through on actual
incurred basis subject to
production of documentary
evidenceby the
generating company.
1.25% per month, beyond 60 days
GJ04O01170510
2556 - FY 2012-13(5% esc)
Normative capital cost, Accelerated Depreciation , Corporate income tax rate,
Capitalisation of RE projects during second half of the
fiscal year, Per unit benefit shall be derived on
levellised basis at discount factor equivalent to
weighted average cost of capital or any other
appropriate discounting factor considered by the
Commission.
pass through on actual
incurred basis subject to
production of documentary
evidenceby the
generating company.
1.25% per month, beyond 60 days
HR98O01030912 HR98O01250112/ HR98R0130211
HP98A01240712
Normative capital cost, Accelerated Depreciation , Corporate income tax rate,
Capitalisation of RE projects during second half of the
fiscal year, Per unit benefit shall be derived on
levellised basis at discount factor equivalent to
weighted average cost of capital or any other
appropriate discounting factor considered by the
Commission.
pass through on actual
incurred basis subject to
production of documentary
evidenceby the
generating company.
1.25% per month, beyond 60 days
JK98A01010712
1797- FY2010-11 (5% esc)
JH04R01270110
KA98O01111209
KL07R02191108
MP04O0120312
Passed on to utility/consumer
excluded from the tariff
MH98R01070610 / MH98O01300312
2084 for FY010 -11 ( with 5% esc)
Passed on to utility/consumer
excluded from the tariff
MN98R01150410
2084 for FY010 -11 ( with 5% esc)
Passed on to utility/consumer
excluded from the tariff
MZ98R01150410
1855 for FY010 -11 ( with 5% esc)
Passed on to utility/consumer
excluded from the tariff
NL98R01300811
Passed on to utility/consumer
excluded from the tariff
OR98O01140910
Passed on to utility/consumer
excluded from the tariff
PB98O01190712
1830 for FY011-12 ( with 5% esc)
Passed on to utility/consumer
excluded from the tariff
RJ98R01230109 / RJ04O01091211
Passed on to utility/consumer
interest of 1% per Month
TN04O01310712
1518 for FY009-10 ( with 5% esc)
75% passed onto utility/consumer
1.25% p.m. beyond 60 days
UA98R01060710
FIT:BIOMASS
Prepared by ABPS Infra Page34/125
Normative Parameters
Reference ArchivesFuel Cost (Rs/ MT)
Useful life(yrs)
Subsidy and incentive by Central /State Govt
Taxes and Duties
Late Payment surcharge
20 NA
NA NA NA
No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
1518 for FY009-10 ( with 5% esc)
75% passed onto utility/consumer
1.25% p.m. beyond 60 days
UA98R01060710
passed on to utility/consumer
1.25% p.m. beyond 2 months
UP98R01220310
WBERC does not specify the project parameters for determination of tariff. It
only specifies a cap for the tariff.
WBERC does not specify the project
parameters for determination of
tariff. It only specifies a cap for
the tariff.
WBERC does not specify the project parameters for
determination of tariff. It only specifies a cap for the tariff.
WBERC does not specify the
project parameters for determination of tariff. It only specifies a cap
for the tariff.
WBERC does not specify the project
parameters for determination of
tariff. It only specifies a cap for
the tariff.
WB98A01100812
FIT:BAGASSE_COGEN
Prepared by ABPS Infra Page35/125
ANNEXURE-1D
STATE-WISE FEED-IN-TARIFF FOR BAGASSE_COGEN
Financial Parameters Normative Parameters
STATE Control period Plant Load Factor (%)
CERC FY 2012-16 (3 yrs) 420 3600 8.50% 2250 20
Andhra Pradesh Tariff Order (Dated 31/03/2009) 2009-10 to 2014-15 325 3700 9.0% 2300 55% 950 20 -
Arunachal Pradesh Tariff Notification Dated April 9, 2012 No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order 20
Assam NA 421 3600 8.50% 2250 53% 1306(5% esc) 20
Bihar Discussion Paper- July 2012 NA NA 400 3650 8.50% 2275 53% 1200(5% esc) 20
Chhattisgarh NA 420 3600 8.50% 2250 53% 20
Delhi No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
Gujarat Bagass Tariff Order - Order No. 4 of 2010-May 31, 2010 4.65 (with AD) 4.71(w/o AD) 415 3600 8.50% 2250 60% 1200(5% esc) 20
Haryana Haryana Biomass Tariff Order -03092012 3.83 421.3 3600 8.50% 2250 53% 662(with 5% esc) 20
Himachal Pradesh RE Tariff Regulations_240712 No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order
Jammu and Kashmir Draft RE Tariff Regulations_July 2012 NA 420 3600 8.50% 2250 53%20
Jharkhand Till March 31, 2015 NA 400 3600 8.5% 2250 53% 1163(5% esc) 20
Karnataka RE Tariff Order(111209) NA NA 365 3600 8% 2250 60% 1025(with 5% esc) 20
Kerala Power Procurement Regulations 2008 NA 2.55 350 55% 12
Madhya Pradesh till 31.3.2013 275 3700 8% 2300 55% 775 20
Maharashtra 2010-11 to 2014-15 398.07 3600 8.50% 2250 60% 1832 20
Manipur Tariff Regulations (Dated 15/04/2010) 2010-11 to 2014-15 NA 516 3600 8.50% 2250 53% 1350 20
&Mizoram Tariff Regulations (Dated 15/04/2010) 2010-11 to 2014-16 NA 516 3600 8.50% 2250 53% 1350 20
Meghalaya No Tariff Order/Regulations available
Nagaland Tariff Regulations (Dated 08/2011) 2011-12 to 2014-15 NA 398 3600 8.50% 2250 53% 1221 20
Orissa Tariff Order (Dated 14/09/2010) 2010-11 to 2012-13 398.07 3600 8.50% 2250 53% 1221 20
Punjab Tariff Order (Dated 19/07/2012) 2012-13 420 3600 8.50% 2250 80% 2357 20
Rajasthan Tariff Regulations (Dated 23/01/2009) 2009-10 to 2014-15
Sikkim No Tariff Order/Regulations available
Tamil Nadu Tariff Order (Dated 31/07/2012) NA 420 3700 9% 2300 55% 1050 20 NA NA
Tripura No Tariff Order/Regulations available
Uttarakhand Tariff Regulations (Dated 06/07/2010) NA NA 445 3600 8.50% 2250 45% 1013 20
Uttar Pradesh Tariff Regulations (Dated 22/03/2010) 2010-11 to 2013-14 NA
West Bengal 3.3 NA NA NA
Goa No Tariff Order/Regulations available
Union Territories
Andaman Nicobar No Tariff Order/Regulations available
Chandigargh No Tariff Order/Regulations available
No Tariff Order/Regulations available
Daman & Diu No Tariff Order/Regulations available
Lakshadweep No Tariff Order/Regulations available
Pondicherry No Tariff Order/Regulations available
CERC Tariff for Bagasse Co-gen for FY 2012-13
State Lev. FC Lev. VC AD Benefit
Andhra Pradesh 2.77 2.29 5.06 0.21 4.85Haryana 2.48 3.25 5.73 0.18 5.55
Maharashtra 2.22 3.2 5.42 0.16 5.26Punjab 2.44 2.86 5.3 0.18 5.12
Tamil Nadu 2.15 2.46 4.61 0.16 4.45Uttar Pradesh 2.8 2.55 5.35 0.21 5.14
Others 2.43 2.77 5.2 0.18 5.02
Tariff Regulations / or Order or Draft(Ref. no. …dt……)
Tariff (Rs/kWh)
Capital Cost (lakh/MW)
Station heat rate (kcal/kWh)
Auxiliary Consumption
(%)
Calorific Value(kCal/kg)
Fuel Cost (Rs/ MT)
Useful life(yrs)
Subsidy and incentive by Central /State Govt
Taxes and Duties
Late Payment surcharge
CERC Generic RE Tariff Order for FY 2012-13;
CERC (Terms and Conditions for Tariff determination from
Renewable Energy Sources) Regulations, 2012
***given below in separate table
UP&AP - 45%TN & Maha - 60%
Other States - 53%
Andhra Pradesh-1307Haryana-1859
Maharashtra-1832Punjab-1636
Tamil Nadu-1408Uttar Pradesh-1458Other States-1583
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and duties, pass
through allowed on actual basis
1.25% per month beyond a delay of
60 days
Passed on to utility/consumer
over and above the determined
tariffs, to be reimbursed by the DISCOMs
5 Years( 2012-13 to 2017-18)
Normative capital cost, Accelerated Depreciation , Corporate income tax rate,
Capitalisation of RE projects during second half of the
fiscal year, Per unit benefit shall be derived on
levellised basis at discount factor equivalent to
weighted average cost of capital or any other
appropriate discounting factor considered by the
Commission.
pass through on actual
incurred basis subject to
production of documentary
evidenceby the
generating company.
1.25% per month, beyond 60 days
Notification (Draft)Dated Guwahati the 13th January, 2012
3 years(till March 2014)
Normative capital cost, Accelerated Depreciation , Corporate income tax rate,
Capitalisation of RE projects during second half of the
fiscal year, Per unit benefit shall be derived on
levellised basis at discount factor equivalent to
weighted average cost of capital or any other
appropriate discounting factor considered by the
Commission.
pass through on actual
incurred basis subject to
production of documentary
evidenceby the
generating company.
1.25% per month, beyond 60 days
Draft RE Tariff Regulation_April 2012(NFF Cogen)
5 Years(2011-12-2016-17)
1583 ( for first year, after through indexation)
Normative capital cost, Accelerated Depreciation , Corporate income tax rate,
Capitalisation of RE projects during second half of the
fiscal year, Per unit benefit shall be derived on
levellised basis at discount factor equivalent to
weighted average cost of capital or any other
appropriate discounting factor considered by the
Commission.
pass through on actual
incurred basis subject to
production of documentary
evidenceby the
generating company.
1.25% per month, beyond 60 days
three years from 1st June,
2010 to 31st May, 2013.
Normative capital cost, Accelerated Depreciation , Corporate income tax rate,
Capitalisation of RE projects during second half of the
fiscal year, Per unit benefit shall be derived on
levellised basis at discount factor equivalent to
weighted average cost of capital or any other
appropriate discounting factor considered by the
Commission.
pass through on actual
incurred basis subject to
production of documentary
evidenceby the
generating company.
1.25% per month, beyond 60 days
3 years(till FY 13-FY15)
Normative capital cost, Accelerated Depreciation , Corporate income tax rate,
Capitalisation of RE projects during second half of the
fiscal year, Per unit benefit shall be derived on
levellised basis at discount factor equivalent to
weighted average cost of capital or any other
appropriate discounting factor considered by the
Commission.
pass through on actual
incurred basis subject to
production of documentary
evidenceby the
generating company.
1.25% per month, beyond 60 days
18th day of December, 2012 and shall end on the 31st day of
March,2017
90% of the capital subsidy available
pass through on actual
incurred basis subject to
production of documentary
evidenceby the
generating company.
1.25% per month, beyond 60 days
5 years(2012-13 to 2017-18)
1600 (indexation or 5% esc)
Normative capital cost, Accelerated Depreciation , Corporate income tax rate,
Capitalisation of RE projects during second half of the
fiscal year, Per unit benefit shall be derived on
levellised basis at discount factor equivalent to
weighted average cost of capital or any other
appropriate discounting factor considered by the
Commission.
pass through on actual
incurred basis subject to
production of documentary
evidenceby the
generating company.
1.25% per month, beyond 60 days
Biomass and NFFcogen Tariff Regulations_27012010
Tariff Order on Bagass based Co-gen_03092008
1.91(FT)+1.99(VT)= 3.90(for FY 2012-13
Tariff Regulations (Dated 07/06/2010) & RE Tariff Order March 31, 2012
2.26(F.C)+ 2.53(V.C)= 4.79 (for FY 2012-13)
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
Rs 4.4/kWh (Without AD) & Rs 4.12/kWh (With AD)
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
Rs 5.32/kWh (Without AD) & Rs 5.2/kWh (With AD)
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
Parameters and tariffs to be determined through suo-motu
petition or on case-to-case basis
Parameters and tariffs to be determined through suo-motu
petition or on case-to-case basis
Parameters and tariffs to be determined through suo-motu
petition or on case-to-case basis
Parameters and tariffs to be determined through suo-motu
petition or on case-to-case basis
Parameters and tariffs to be determined through suo-motu
petition or on case-to-case basis
Parameters and tariffs to be determined through suo-motu petition or on
case-to-case basis
Parameters and tariffs to be determined through suo-motu petition or on
case-to-case basis
Parameters and tariffs to be determined
through suo-motu petition or on case-to-case
basis
Parameters and tariffs to be determined through suo-
motu petition or on case-to-case basis
Parameters and tariffs to be
determined through suo-
motu petition or on case-to-case basis
Parameters and tariffs to be
determined through suo-motu petition or
on case-to-case basisNo Tariff
Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
01/08/2012 to 31/07/2014
1% p.m. beyond 30 days
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
75% passed onto utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
refer worksheet 'Additional Data', Table 1
UPERC specifies 'year of operation' based fixed cost and financial year based variable cost. It does not
specify the parameters for tariff determination.
UPERC specifies 'year of operation' based
fixed cost and financial year based variable
cost. It does not specify the parameters for tariff
determination.
UPERC specifies 'year of operation' based
fixed cost and financial year based variable
cost. It does not specify the parameters for tariff
determination.
UPERC specifies 'year of operation' based
fixed cost and financial year based variable
cost. It does not specify the parameters for tariff
determination.
UPERC specifies 'year of operation' based fixed cost and financial year based variable cost. It does not
specify the parameters for tariff determination.
UPERC specifies 'year of operation' based fixed cost and financial year based variable cost. It does not
specify the parameters for tariff determination.
UPERC specifies 'year of operation' based fixed cost
and financial year based variable
cost. It does not specify the
parameters for tariff
determination.
passed on to utility/consumer
1.25% p.m. beyond 2 months
Draft Tariff Regulations (Dated 10/08/2012)
10/08/2012 to 10/08/2015
WBERC does not specify the project parameters for
determination of tariff. It only specifies a cap for the tariff.
WBERC does not specify the project
parameters for determination of tariff. It only specifies a cap for
the tariff.
WBERC does not specify the project
parameters for determination of tariff. It only specifies a cap for
the tariff.
WBERC does not specify the project
parameters for determination of tariff. It only specifies a cap for
the tariff.
WBERC does not specify the project parameters for determination of tariff. It
only specifies a cap for the tariff.
WBERC does not specify the project parameters for determination of tariff. It
only specifies a cap for the tariff.
WBERC does not specify the project
parameters for determination of
tariff. It only specifies a cap for
the tariff.No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
Dadra and Nagar Haveli No Tariff
Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
Tariff (With AD)(FY 2012‐13)
Net Levellised (without AD)
FIT:BAGASSE_COGEN
Prepared by ABPS Infra Page36/125
Reference Archives
CE98R01060212
CE98O01270312
AP98O01310309
AP98O0120911
AS98A01130112
AR98R0190412
BR07C01000712
CG98R01120412
GJ07O01310510
HR98O01030912 HR98O01250112/ HR0O01270511/ HR98R0130211
HP98A01240712
JK98A01000712
JH07R01270110
KA98O01111209
KL07R02191108
MP07O0130908
MH98R01070610 / MH98O01300312
MN98R01150410
MZ98R01150411
No Tariff Order/Regulations available
NL98R01300811
OR98O01140910
PB98O01190712
RJ98R01230109
No Tariff Order/Regulations available
TN07O01310712
No Tariff Order/Regulations available
UA98R01060710
UP98R01220310
WB98A01100812
FIT:SMALL HYDRO
Prepared by ABPS Infra Page37/125
ANNEXURE-1F
STATE-WISE FEED-IN-TARIFF FOR SMALL HYDRO
Financial Parameters Normative Parameters
STATE Control period Tariff (Rs/kWh)
CERC FY 2012-16 (3 yrs) 1% 35
Andhra Pradesh No Tariff/Parameters Defined No Tariff/Parameters Defined
Arunachal Pradesh Tariff Regulations (Dated 9/4/2012) 9/4/2012 to 8/4/2017 NA 45% 1% 35
Assam 31/3/2012 to 31/3/2015 NA 45% 1% 35
Bihar No Tariff Order/Regulations available
Chhattisgarh 5 Years(2011-12-2016-17) NA 30% 1% 35
Delhi No Tariff Order/Regulations available
Gujarat No Tariff Order/Regulations available
Haryana RE Tariff Regulations (Dated 03/02/2011) 3 years(till FY 13) Case to Case basis Case to Case basis Case to Case basis Case to Case basis 35
Himachal Pradesh 18/12/2012 to 31/3/2017 NA 55% 1% 35
Jammu and Kashmir Draft RE Tariff Regulations 2012-13 to 2016-17 NA 45% 1% 35
Jharkhand Tariff Regulations (Dated 03/07/2007) NA NA NA NA 0.50% 20 NA NA NA
Karnataka RE Tariff Order (Dated 11/12/2009) NA 475 30% 1% NA NA NA
Kerala NA Rs 2.94/kWh 520 30% 0.50% 25 NA NA NA
Madhya Pradesh 30/06/2010 to 31/03/2013 Refer Table 1 below 1% 30 NA NA NA
Maharashtra Tariff Regulations (Dated 07/06/2010) 2010-11 to 2014-15 NA 30% 1% 35
Manipur Tariff Regulations (Dated 15/04/2010) 2010-11 to 2014-15 NA 40% 101% 35
&Mizoram Tariff Regulations (Dated 15/04/2010) 2010-11 to 2014-16 NA 40% 201% 35
Meghalaya No Tariff Order/Regulations available
Nagaland Tariff Regulations (Dated 08/2011) 2011-12 to 2014-15 NA 30% 1% 35
Orissa Tariff Order (Dated 14/09/2010) 2010-11 to 2012-13 35% 1% 35
Punjab Tariff Order (Dated 19/07/2012) 2012-13 30% 1% 35
Rajasthan Tariff Regulations (Dated 23/01/2009) 2009-10 to 2014-15
Sikkim No Tariff Order/Regulations available
Tamil Nadu
Tripura No Tariff Order/Regulations available
Uttarakhand Tariff Regulations (Dated 06/07/2010) NA 45% 1% 35
Uttar Pradesh Tariff Regulations (Dated 22/03/2010) 2010-11 to 2013-14 NA
West Bengal 10/08/2012 to 10/08/2015 4.4 NA NA NA
Goa No Tariff Order/Regulations available
Union Territories
Andaman Nicobar No Tariff Order/Regulations available
Chandigargh No Tariff Order/Regulations available
No Tariff Order/Regulations available
Daman & Diu No Tariff Order/Regulations available
Lakshadweep No Tariff Order/Regulations available
Pondicherry No Tariff Order/Regulations available
Tariff Regulations / or Order or Draft(Ref. no. …dt……)
Capital Cost (lakh/MW)
Capacity Utilisation Factor (%)
Auxiliary Consumption(%)
Useful life(yrs)
Subsidy and incentive by Central /State Govt
Taxes and Duties
Late Payment surcharge
CERC Generic RE Tariff Order for FY 2012-13;
CERC (Terms and Conditions for Tariff determination from
Renewable Energy Sources) Regulations, 2012
HP, Uttarakhand and NEStates
(Below 5MW) - 4.14(without AD), 3.82 (with AD)
(5MW-25MW)-3.54(without AD), 3.25 (with
AD)
Other States (Below 5MW) - 4.88(without
AD), 4.50 (with AD)(5MW-25MW)-
4.16(without AD), 3.82 (with AD)
HP, Uttarakhand and NEStates
(Below 5MW) - 770(5MW-25MW)- 700
Other States (Below 5MW) - 600(5MW-25MW)- 550
HP, Uttarakhand and NE States - 45%
Other States- 30%
Shall be factored in the tariff on per unit benefit derived
on levellised basis
Tariff exclusive of taxes and duties, pass
through allowed on actual basis
1.25% per month beyond a delay of
60 days
No Tariff/Parameters Defined
No Tariff/Parameters Defined
No Tariff/Parameters Defined
No Tariff/Parameters Defined
No Tariff/Parameters
Defined
No Tariff/Parameters Defined
No Tariff/Paramete
rs Defined
No Tariff/Parameters
Defined
700 (<=5 MW) & 630 (5-25 MW)
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
Draft Tariff Regulations (Dated 13/01/2012)
669 (<=5 MW) & 602 (5-25 MW)
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulatio
ns available
No Tariff Order/Regulations
available
Draft RE Tariff Regulation_April 2012(NFF Cogen)
600 (<=5 MW) & 550 (5-25 MW)
passed on to utility/consumer
water charges/statutory charges as levied by the
StateGovernment shall not be
included in the tariff. It is to be paid separately
and shall be pass through
on actual incurred basis
1.25% p.m. beyond 60 days
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulatio
ns available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulatio
ns available
No Tariff Order/Regulations
available
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
Draft RE Tariff Regulation (Dated 24/07/2012)
780 (100kW - 2MW), 750 (2-5 MW) & 700 (5-25 MW)
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
770 (<=5 MW) & 700 (5-25 MW)
passed on to utility/consumer
1.25% p.m. beyond 60 days
Rs 3.40/kWh for the first 10 years after signing the PPA
passed on to utility/consumer not included in
the tariff
Tariff amendment Regulations (Dated 22/11/2010)
SHP Tariff Regulations (Dated 30/06/2010)
700 for Run of the river, 600 for canal based generation
35% for Run of the river, 30% for canal based
generation
498.88 (<=5 MW) & 453.53 (5-25 MW)
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
812 (<=5 MW) & 730 (5-25 MW)
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
812 (<=5 MW) & 730 (5-25 MW)
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
635 (<=5 MW) & 571 (5-25 MW)
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
Rs 3.91/kWh (<=5 MW) & Rs 3.64/kWh (5-25 MW) w/o AD and Rs 3.31/kWh & Rs 3.09/kWh respectively with
AD
600 (<=5 MW) & 550 (5-25 MW)
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
Rs 4.88/kWh (<=5 MW) & Rs 4.16/kWh (5-25 MW) w/o
AD and Rs 4.5/kWh & Rs 3.82/kWh respectively with
AD
600 (<=5 MW) & 550 (5-25 MW)
passed on to utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
Parameters and tariffs to be determined through suo-
motu petition or on case-to-case basis
Parameters and tariffs to be determined through suo-motu
petition or on case-to-case basis
Parameters and tariffs to be determined through suo-motu petition or on
case-to-case basis
Parameters and tariffs to be determined through suo-motu petition or on
case-to-case basis
Parameters and tariffs to be determined
through suo-motu petition or on case-to-case
basis
Parameters and tariffs to be determined through suo-
motu petition or on case-to-case basis
Parameters and tariffs to be
determined through suo-
motu petition or on case-to-case basis
Parameters and tariffs to be
determined through suo-motu petition or
on case-to-case basis
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
Parameters are defined on case to case basis
Parameters are defined on case to case basis
Parameters are defined on case to case basis
Parameters are defined on case to case basis
Parameters are defined on case to case basis
Parameters are defined on case to case basis
Parameters are defined on case to
case basis
Parameters are defined on case to case basis
Parameters are defined on
case to case basis
Parameters are defined on case to
case basis
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available700 For 0-5 MW, 685 For 5-10 MW, 670 For 10-15 MW, 650 For 15-20 MW & 630 For 20-
25 MW
75% passed onto utility/consumer
passed on to utility/consumer
1.25% p.m. beyond 60 days
UPERC specifies 'year of operation' based fixed cost and financial year based
tariff. It does not specify the parameters for tariff
determination.
UPERC specifies 'year of operation' based fixed cost
and financial year based tariff. It does not specify the parameters for tariff
determination.
UPERC specifies 'year of operation' based fixed cost and financial year based tariff. It does not specify the parameters for tariff
determination.
UPERC specifies 'year of operation' based fixed cost and financial year based tariff. It does not specify the parameters for tariff
determination.
UPERC specifies 'year of operation' based fixed cost
and financial year based tariff. It
does not specify the parameters
for tariff determination.
passed on to utility/consumer
1.25% p.m. beyond 2 months
Draft Tariff Regulations (Dated 10/08/2012)
WBERC does not specify the project parameters for
determination of tariff. It only specifies a cap for the tariff.
WBERC does not specify the project parameters for determination of tariff. It
only specifies a cap for the tariff.
WBERC does not specify the project parameters for determination of tariff. It
only specifies a cap for the tariff.
WBERC does not specify the project
parameters for determination of
tariff. It only specifies a cap for
the tariff.No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulatio
ns available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulatio
ns available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulatio
ns available
No Tariff Order/Regulations
available
Dadra and Nagar Haveli No Tariff Order/Regulations
availableNo Tariff Order/Regulations
availableNo Tariff Order/Regulations
availableNo Tariff Order/Regulations
availableNo Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulatio
ns available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulatio
ns available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulatio
ns available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulatio
ns available
No Tariff Order/Regulations
available
FIT:SMALL HYDRO
Prepared by ABPS Infra Page38/125
ANNEXURE-1F
STATE-WISE FEED-IN-TARIFF FOR SMALL HYDRO
Financial Parameters Normative Parameters
STATE Control period Tariff (Rs/kWh)Tariff Regulations / or Order or Draft(Ref. no. …dt……)
Capital Cost (lakh/MW)
Capacity Utilisation Factor (%)
Auxiliary Consumption(%)
Useful life(yrs)
Subsidy and incentive by Central /State Govt
Taxes and Duties
Late Payment surcharge
Table 1: Tariffs of SHP in Madhya Pradesh
YearRun of the River Projects Canal Based Projects
Tariff considering GoMP free power policy (Rs./kWh) Tariff considering GoMP free power policy (Rs./kWh)<5 MW 5-10 MW 10 - 25 MW <5 MW 5-10 MW 11 - 25 MW
1 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4
2 5.22 5.22 5.22 5.8 5.22 5.22 5.22 5.8
3 5.04 5.04 5.48 5.6 5.04 5.04 5.48 5.6
4 4.86 5.12 5.28 5.4 4.86 5.12 5.28 5.4
5 4.68 4.93 5.09 5.2 4.68 4.93 5.09 5.2
6 4.5 4.74 4.9 5.01 4.5 4.74 4.9 5.01
7 4.33 4.56 4.71 4.81 4.33 4.56 4.71 4.81
8 4.16 4.37 4.52 4.62 4.16 4.37 4.52 4.62
9 3.98 4.19 4.33 4.43 3.98 4.19 4.33 4.43
10 3.81 4.01 4.14 4.23 3.81 4.01 4.14 4.23
11 2.3 2.42 2.5 2.56 2.3 2.42 2.5 2.56
12 2.34 2.46 2.54 2.6 2.34 2.46 2.54 2.6
13 2.38 2.51 2.59 2.64 2.38 2.51 2.59 2.64
14 2.42 2.55 2.63 2.69 2.42 2.55 2.63 2.69
15 2.46 2.59 2.68 2.74 2.46 2.59 2.68 2.74
16 2.51 2.64 2.73 2.79 2.51 2.64 2.73 2.79
17 2.56 2.69 2.78 2.84 2.56 2.69 2.78 2.84
18 2.6 2.74 2.83 2.89 2.6 2.74 2.83 2.89
19 2.65 2.79 2.88 2.95 2.65 2.79 2.88 2.95
20 2.71 2.85 2.94 3.01 2.71 2.85 2.94 3.01
21 2.76 2.91 3 3.07 2.76 2.91 3 3.07
22 2.82 2.96 3.06 3.13 2.82 2.96 3.06 3.13
23 2.88 3.03 3.13 3.19 2.88 3.03 3.13 3.19
24 2.94 3.09 3.19 3.26 2.94 3.09 3.19 3.26
25 3 3.16 3.26 3.33 3 3.16 3.26 3.33
26 3.07 3.23 3.33 3.41 3.07 3.23 3.33 3.41
27 3.14 3.3 3.41 3.48 3.14 3.3 3.41 3.48
28 3.21 3.38 3.49 3.56 3.21 3.38 3.49 3.56
29 3.28 3.45 3.57 3.65 3.28 3.45 3.57 3.65
30 3.36 3.54 3.65 3.73 3.36 3.54 3.65 3.73
Tariff without considering GoMP free power policy
(Rs./kWh)
Tariff without considering GoMP free power policy
(Rs./kWh)
FIT:SMALL HYDRO
Prepared by ABPS Infra Page39/125
Reference
CE98R01060212, CE98O01270312
AP98O01310309
AR98R01090412
AS98A01130112
No Tariff Order/Regulations available
CG98A01020412
No Tariff Order/Regulations available
No Tariff Order/Regulations available
HR98O01250112/ HR0O01270511/ HR98R0130211
HP98A01240712
JK98A01000712
JH08R01030707
KA98O01111209
KL98R01221110
MP08R01300608
MH98R01070610
MN98R01150410
MZ98R01150411
No Tariff Order/Regulations available
NL98R01300811
OR98O01140910
PB98O01190712
RJ98R01230109
No Tariff Order/Regulations available
TN08Z01000310
No Tariff Order/Regulations available
UA98R01060710
UP98R01220310
WB98A01100812
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
STATE
CERC
Andhra Pradesh NA -
Arunachal Pradesh
Assam
Bihar NA NA
Chhattisgarh NA NA
Delhi
JERC (Goa & UT)
Gujarat Incineration
Haryana
Projects (Project name)
Technology (Incineration/ Biomethanation/ Gasification)
Timarpur Okhla Waste Management Co. Ltd.
(16 MW)
Incineration & Biomethanation
Hanjer Green Power Pvt. Ltd. (15 MW)
Haryana
Himachal Pradesh
Jammu and Kashmir NA NA
Jharkhand NA NA
Karnataka Incineration
Kerala NA NA
Madhya Pradesh NA NA
Maharashtra Biomethanation
Manipur NA -
&Mizoram NA -
Meghalaya NA -
Nagaland NA -
Orissa NA -
Punjab NA -
Rajasthan NA -
Sikkim NA -
Srinivasa Gayathri Resource Recovery
Ltd. (8 MW)
Solapur Bioenergy Systems Pvt. Ltd. (2.83
MW)
Sikkim NA -
Tamil Nadu NA -
Tripura NA -
Uttarakhand NA -
Uttar Pradesh NA -
West Bengal NA -
Goa NA NA
Union Territories
Andaman Nicobar NA NA
Chandigargh NA NA
NA NA
Daman & Diu NA NA
Lakshadweep NA NA
Pondicherry NA NA
Dadra and Nagar Haveli
ANNEXURE-1E
STATE-WISE FEED-IN-TARIFF FOR MSW
Financial Parameters
NA NA NA
NA NA NA
Order dt 20/01/2011
Tariff order (dt 30/07/2011) 6.8 690.7
Tariff Order(Ref. no. …dt……)
Tariff (Rs/kWh)
Capital Cost (lakh/MW)
Tariff Order(dt 31/03/2009)
4.04 in 2009-10 and 5% escalation
thereafter till 2013-14
Project Parameters not specified in the order
Tariff Regulations (dt 09/04/2012)
Project Specific Tariff Determination
Project Specific Tariff Determination
Draft Tariff Regulations (Dated January 13, 2012)
Project Specific Tariff Determination
Project Specific Tariff Determination
Draft RE Tariff Regulation_April 2012(NFF Cogen)
Project Specific Tariff Determination
Project Specific Tariff Determination
Rs 2.49/kWh for the first year and Rs
2.833/kWh from the second year onwards
Project awarded through tariff based competitive bidding.
(Auxilliary Consumption of 22%)
Tariff Regulations (Dated February 03, 2011)
Project Specific Tariff Determination
Project Specific Tariff Determination
Draft RE Tariff Regulations_July 2012
NA NA NA
Tariff Order (dt 28/02/2012) Rs 4.15/kWh 1111.125
NA NA NA
NA NA NA
Tariff Order (dt 03/09/2010) Rs 4.88/kWh 1277
Tariff Regulations (Dated 15/04/2010)
Tariff Regulations (Dated 15/04/2010)
No Tariff Order/Regulations available
Tariff Regulations (Dated 08/2011)
Tariff Order (Dated 14/09/2010)
Tariff Order (Dated 19/07/2012)
Tariff Regulations (Dated 23/01/2009)
No Tariff Order/Regulations available
Tariff Regulations (Dated February 03, 2011)
Project Specific Tariff Determination
Project Specific Tariff Determination
Draft Tariff Regulations (Dated July 24, 2012)
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
Tariff Regulations (Dated 06/07/2010)
Tariff Regulations (Dated 22/03/2010)
No parameters specified
NA NA NA
NA NA NA
NA NA NA
NA NA NA
NA NA NA
NA NA NA
NA NA NA
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
No Tariff Order/Regulations
available
No Tariff Order/Regulations available
Project Specific Tariff Determination
Project Specific Tariff Determination
Rs 2.89/kWh for existing projects and
Rs 3.21 for new Projects under the head 'Other NCE
Projects'
The regulations have the provision of determining the
tariffs of new projects on case-to-case basis
Draft Tariff Regulations (Dated 10/08/2012)
Capped at Rs 5.1/kWh upto August 10, 2022
Normative Parameters
NA NA NA
NA NA NA
4100 11.5% 2250
Station heat rate (kcal/kWh)
Auxiliary Consumption (%)
Calorific Value Range(kCal/kg)
Project Parameters not specified in the order
Project Parameters not specified in the order
Project Parameters not specified in the order
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project awarded through tariff based competitive bidding.
(Auxilliary Consumption of 22%)
Project awarded through tariff based competitive bidding.
(Auxilliary Consumption of 22%)
Project awarded through tariff based competitive bidding.
(Auxilliary Consumption of 22%)
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
NA NA NA
4300 15% 2200
NA NA NA
NA NA NA
- 12.72% 4800
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
NA NA NA
NA NA NA
NA NA NA
NA NA NA
NA NA NA
NA NA NA
NA NA NA
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
The regulations have the provision of
determining the tariffs of new projects on case-to-case basis
The regulations have the provision of
determining the tariffs of new projects on case-to-case basis
The regulations have the provision of
determining the tariffs of new projects on case-to-case basis
No parameters specified
No parameters specified
No parameters specified
Normative Parameters
Plant Load Factor (%)
NA NA NA
NA NA NA
20
1320 20
Fuel Cost (Rs/ MT)
Useful life(yrs)
Project Parameters not specified in the order
Project Parameters not specified in the order
Project Parameters not specified in the
order
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff
Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff
Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff
Determination
Project awarded through tariff based competitive
bidding. (Auxilliary Consumption of 22%)
Project awarded through tariff based competitive
bidding. (Auxilliary Consumption of 22%)
60% for the first year and 80% from the second year
onwards
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff
Determination
NA NA NA
73% NA 20
NA NA NA
NA NA NA
78.90% - 20
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff
Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff
Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff
Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff
Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff
Determination
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff
Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff
Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff
Determination
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff
Determination
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No parameters specified No parameters specified
NA NA NA
NA NA NA
NA NA NA
NA NA NA
NA NA NA
NA NA NA
NA NA NA
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
No Tariff Order/Regulations
available
Project Specific Tariff Determination
Project Specific Tariff Determination
Project Specific Tariff
DeterminationThe regulations have the provision of determining the tariffs of new projects
on case-to-case basis
The regulations have the provision of determining the tariffs of new projects
on case-to-case basis
The regulations have the provision of determining the
tariffs of new projects on case-
to-case basisNo parameters
specified
Reference
NA
AP98O01310309
AR98R01090412
AS98A01130112
CG98A01020412
DL09O01200111
GJ09O01300711
HR98R01030211
NA
NA
NA
HR98R01030211
HP98A01240712
JK98A01000712
KA09O01280212
MH09O01030910
MN98R01150410
MZ98R01150411
No Tariff Order/Regulations available
NL98R01300811
OR98O01140910
PB98O01190712
RJ98R01230109
No Tariff Order/Regulations available
NA
NA
NA
NA
NA
NA
NA
No Tariff Order/Regulations available
No Tariff Order/Regulations available
No Tariff Order/Regulations available
UA98R01060710
UP98R01220310
WB98A01100812
Incineration
Biomethanation
Gasification
RPO
Prepared by ABPS Infra Page56/125
ANNEXURE-II
STATE-WISE SUMMARY of RPO REGULATIONS
STATE RPO Regulation No. RE Technology 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
Andhra Pradesh Y (Captive- 1 MW and Above) & OA
Non-Solar 4.75% 4.75% 4.75% 4.75% 4.75% 4.75%Solar 0.25% 0.25% 0.25% 0.25% 0.25% 0.25%
Total 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%
Arunachal Pradesh Not Issued
Assam Notification-(AERC/21/2010)- November 2, 2010 Y Regulation 4.1, Page no:- 2663
Non-Solar 2.70% 4.05% 5.40% 6.75%Solar 0.10% 0.15% 0.20% 0.25%
Total 2.80% 4.20% 5.60% 7.00%
Bihar Y (Captive- 5 MW and Above) & OA
Non-Solar 2.25% 3.75% 4.00% 4.25%Solar 0.25% 0.25% 0.50% 0.75% 1.00% 1.25% 1.50% 1.75% 2.00% 2.50%
Total 2.50% 4.00% 4.50% 5.00%
Chhattisgarh Y- Captive and OA (1 MW and above) Regulation 4.3, Page no:- 7 of 19
Non-Solar 5.00% 5.25%Solar 0.25% 0.50%
Total 5.25% 5.75%
Delhi Notification (Final RPO REC Regulation dated 01/10/12 ) Regulation 4.1, Page no:- 13
Non-Solar 1.90% 3.40% 4.80% 6.20% 7.60% 9.00%Solar 0.10% 0.15% 0.20% 0.25% 0.30% 0.35%
Total 2.00% 3.55% 5.00% 6.45% 7.90% 9.35%
JERC (Goa & UT) NA Regulation 1.1, Page no:- 3
Non-Solar 1.70% 2.60%Solar 0.30% 0.40%
Total 2.00% 3.00%
Gujarat Notification No. 3 of 2010, April, 17, 2010 Captive (5 MW and Above) & OA Regulation 4.1, Page no:- 7
Non-Solar 5.50% 6.00%Solar 0.50% 1.00%
Total 6.00% 7.00%
Haryana Captive (5 MW and Above) & OA Reg 64 Chapter 10, page no. 26
Non-Solar 1.50% 2.00% 3.00%Solar 0.00% 0.05% 0.10%
Total 1.50% 2.05% 3.10%
Himachal Pradesh Y Captive 1 MW and Above & OA Regulation 4.1, Page no:- 3
Non-Solar 10.00% 10.00% 10.00% 10.00% 11.00% 12.00% 13.00% 14.00% 15.00% 15.50%Solar 0.01% 0.25% 0.25% 0.25% 0.25% 0.25% 0.50% 0.75% 1.00% 2.00%
Total 10.01% 10.25% 10.25% 10.25% 11.25% 12.25% 13.50% 14.75% 16% 17.50%
Jammu and Kashmir Regulation 7.1, Page no:- 8
Non-Solar 2.90% 4.75%Solar 0.10% 0.25%
Total 3.00% 5.00%
Jharkhand Regulation 5.2 Page no:- 5
Non-Solar 2.50% 3.00%Solar 0.50% 1.00%
Total 3.00% 4.00%
Karnataka Notification (No. S/03/1) March 16, 2011
Non-Solar 10% and 7%Solar 0.25%
Kerala Y Regulation 3.1 Page no:- 2
Non-Solar 3.35% 3.65% 3.95% 4.25% 4.55% 4.85% 5.15% 5.45% 5.75% 6.05%Solar 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25%
Total 3.60% 3.90% 4.20% 4.50% 4.80% 5.10% 5.40% 5.70% 6.00% 6.30%
Madhya Pradesh Y Regulation 4.1 Page no:- 3
Non-Solar 2.10% 3.40% 4.70% 6.00%Solar 0.40% 0.60% 0.80% 1.00%
Total 2.50% 4.00% 5.50% 7.00%
Maharashtra Regulation 7.1, Page no:- 5
Non-Solar 6.75% 7.75% 8.50% 8.50% 8.50%Solar 0.25% 0.25% 0.50% 0.50% 0.50%
Total 7.00% 8.00% 9.00% 9.00% 9.00%
Manipur
Regulation 2.1, Page no-5
Non-Solar 2.75% 4.75%
Solar 0.25% 0.25%
Total 3.00% 5.00%
&Mizoram
Non-Solar 5.75% 6.75%
Solar 0.25% 0.25%
Total 6.00% 7.00%
Meghalaya Y Regulation 4 (2), Page No- 3
Non-Solar 0.45% 0.60%Solar 0.30% 0.40%
Total 0.75% 1.00%
Nagaland Y Regulation 2.1, Page No-5
Non-Solar 6.75% 7.75%Solar 0.25% 0.25%
Total 7.00% 8.00%
Orissa Y Captive(5MW and Above) & OA Regulation 3(1), page No-2
Non-Solar 4.90% 5.35% 5.80% 6.25% 6.70%Solar 0.10% 0.15% 0.20% 0.25% 0.30%
Total 5.00% 5.50% 6.00% 6.50% 7.00%
Punjab Y Regulation 3(1), page No-3
Non-Solar 2.37% 2.83% 3.37% 3.81%Solar 0.03% 0.07% 0.13% 0.19%
Total 2.40% 2.90% 3.50% 4.00%
Rajasthan Regulation 4(2), Page No-4
Non-Solar 5.50% 6.35% 7.00%Solar 0.50% 0.75% 1.00%
Total 6.00% 7.10% 8.20%
Sikkim Not Issued
Tamil Nadu Amendment to Regulation 3, Page 2
Non-Solar 8.95%
Solar 0.05%
Total 9.00%
Tripura Y Captive(5MW and Above) and OA Regulation 4.1, Page 4
Non-Solar 0.90% 1.90%Solar 0.10% 0.10%
Total 1.00% 2.00%
Uttarakhand Y Regulation9(1) Page no:- 13 of 48
Non-Solar 4.50% 5.00%Solar 0.03% 0.05%
Total 4.52% 5.05%
Uttar Pradesh Y Captive (1 MW and Above) & OA Regulation 4.1 Page no:- 4
Non-Solar 4.50% 5.00%Solar 0.50% 1.00%
Total 5.00% 6.00%
West Bengal Y Regulation 3.1 Page no:- 4 of 19
Non-Solar 3.75% 4.70% 5.60% 6.50% 7.40%Solar 0.25% 0.30% 0.40% 0.50% 0.60%
Total 3.00% 4.00% 4.00% 5.00% 6.00% 7.00% 8.00%
RPO/REC Regulations / or Order or Draft(Ref. no. …dt……)
Applicability to Captive / Open Access (Y / N) & Capacity
Order 16 of 2008 (March 31, 2009),Order 10 of 2010 (July 6, 2010),
Regulation No 1 of 2012 (FY 13 to FY 17)
Order 16 of 2008 (Para 1)Order 10 of 2010 (Page no:-7)
Regulation 3, Page No:- 3
RPO Regulation Notification Nov 2010, Solar RPO amended vide Order on Case 12 of 2012
dated May 29, 2012
Regulation 4.1, Page no:- 3, Page 7 of 17 of Order 12 of 2012
Regulation (No. 36/CSERC/2011) March 04, 2011
Captive:- 5 MW and above, OA:- Contract Demand of 1 MVA
NOTIFICATION(No.: JERC-14/2010) November 30, 2010
Regulation (No: HERC/23/2011 2nd Amendment) November 25, 2011
Notification (No. HPERC/438 Amendment) October 3, 2011
Notification(No: JKSERC/10) March 11, 2011
OA and Captive( Contract Demand 1 MVA/MW and Above)
Notification (No. 28 --) July 21, 2010 OA and Captive( Contract Demand 1 MVA/ 5 MW and Above)
OA and Captive( Contract Demand 5 MVA/ 5 MW and Above) 5% RPO for Captive and OA
consumers
Regulation 4(i)Page no:- 3 for Discoms and Regulation 4(ii), (iii) for captive
and OA Total (Discoms only)
10.25% & 7.25%
Notification(No. 1517/CT/2010/KSERC) November 23, 2010
Notification (No. 3042/MPERC-2010.) November 9, 2010
Notification (No.MERC/Legal/2010/483) June 7, 2010
OA ( Contract Demand 1 MVA and Above) and Captive( Contract Demand 1 MW and
Above)
Notification(No. H. 13011/5/09-JERC) May 5, 2010.
OA ( Contract Demand 1 MW and Above) and Captive( Contract Demand 1 MW and
Above)
Notification (NO.MSERC/05/61) December, 21 2010
Notification (No.NERC/REGN/2011) August 29, 2011
Notification (No. OERC-Engg-02/2010) September 30, 2010
Notification (No.PSERC/Secy./Reg./55)June 3, 2011
Notification (No.RERC/Secy./Regulation - 85) MAY 24, 2011
Y(RPO target at aggregate level and not Technology specific)
Notification No. (TNERC / RPO / 19 / 2,) July 29, 2011
Y--- OA, Phase 1 -(till April 1, 2012):- 2 MVA and above, Phase 2- ( April1, 2012 to April
1, 2013):- 1 MVA and Above. Phase 3 - (after April 1, 2013:- all OA Consumers
Notification (No. F.25/TERC/2009/415) September 16, 2010.
UERC (Tariff and other terms for supply of electricity from RE sources and non-fossil fuel
based Co-generating stations), dated July 6, 2010
Notification (No. UPERC/Secy/Regulation/10 - 787) August 17 , 2010
WBERC (Cogeneration and Generation of electricity from RE), 2010, dated August 10, 2010
RPO
Prepared by ABPS Infra Page57/125
2021-22
3.00%
16.00%3.00%
19.00%
6.35%0.25%
6.60%
REC
Prepared by ABPS Infra Page58/125
ANNEXURE-III
STATE-WISE REC PROVISIONS
STATE Nodal Agency Applicability Reference (REC Regulation) Reference (SNA) Reference (APPC)
Andhra Pradesh Y State Load Dispatch Centre 2.00 March 2012 to May 31, 2012
Arunachal Pradesh N
Assam Y Assam Energy Development Agency
Bihar Y Bihar Renewable Energy Development Agency
Chhattisgarh Y 2011-12
Delhi Y (Draft)
JERC (Goa & UT) Y
Gujarat Y Gujarat Energy Development Agency
Haryana Y Haryana Renewable Energy Development Agency
Himachal Pradesh Y Directorate of Energy 2.20 2012-13
Jammu and Kashmir Y
Jharkhand Y Jharkhand Renewable Energy Development Agency
Karnataka Y State Load Dispatch Center 2.60 2012-13
Kerala Y
Madhya Pradesh Y MP Urja Vikas Nigam Ltd.
Maharashtra Y Maharashtra Energy Development Agency
Manipur Y Manipur Renewable Energy Development Agency
&Mizoram Y Imphal & Zoram Energy Development Agency
Meghalaya Y
Nagaland Y
Orissa Y Orissa Renewable Energy Development Agency
Punjab Y Punjab Energy Development Agency
Rajasthan Y Rajasthan Renewable Energy Corporation 2.57 2011-12
Sikkim N
Tamil Nadu Y State Load Dispatch Centre 2.54 2012-13
Tripura Y Tripura Renewable Energy Development Agency
Uttarakhand Y Uttrakhand Renewable Energy Development Agency 2.68 2012-13
Uttar Pradesh Y
West Bengal Y (Draft)
REC Regulations(Y/N)
Average Power Purchase Cost(Rs/kWh)
AP98R02210312 AP98R03210312 AP98R03210312
AS98R02011210 AS98Z03041110
BR98R02161110 BR98Z03241110
Chhattisgarh Renewable Energy Development AgencyCSPDCL: 1.67 BSP-TEED: 3.26
JSPL: 3.00CG98R02040311 CG98O03091110 CG98O03220611
Energy Efficiency and Renewable Energy Management Centre DL98R02011012 DL98O03181111
GJ98R02170410 GJ98Z03160710
HR98R02030211 HR98Z03061010
HP98R02260510 HP98Z03190610 HP98O03160712Jammu & Kashmir State Power Development Corporation (for SHP >2MW), Jammu & Kashmir Energy Development
Agency (for all RE other than >2MW SHP), Ladakh Renewable Energy Development Agency (for all RE in the district of Leh other than >2MW SHP ), Kargil Renewable Energy Development Agency (for all RE in the district of
Kargil other than >2MW SHP)
JK98R02110311 JK98Z03030111
JH98R02210710 JH98Z03210810
KA98R02160311 KA98Z03010411 KA98O03270612
Agency for Nonconventional Energy and Rural Technology
KL98R02231110 KL98O03031210
MP98R02191110 MP98O03070211
MH98R02070610 MH98O03010710
MN98R02050510 MN98Z03070910
MZ98R02050510 MZ98Z03070910
Meghalaya Non- Conventional & Rural Energy Development Agency
ML98R02211210 ML98Z03201211
NL98R02290811
OR98R02300910 OR98Z03030211
PJ98R02030611 PJ98Z03301110
RJ98R02301210 RJ98Z03160610 RJ98O03131011
TN98R02071210 TN98O03071210 TN98O03030912
TR98R02160910 TR98Z03080910
UK98R02031110 UK98O03020512 UK98O03290512
Uttar Pradesh New and Renewable Energy Development agency
UP98O02170810 UP98O03040211
GRID CONNECTIVITY
Prepared by ABPS Infra Page59/125
ANNEXURE-IV
STATE Scheduling and Forecasting mechanism Reference
Andhra Pradesh
Arunachal Pradesh
Assam
Bihar
Chhattisgarh
Delhi
Gujarat GJ01O01080812
Haryana
Himachal Pradesh
Jammu and Kashmir
Jharkhand
Karnataka
Kerala
Madhya Pradesh
Maharashtra
Manipur
&Mizoram
Meghalaya
Nagaland
Orissa
Punjab
Rajasthan
Sikkim
Tamil Nadu
Tripura
Uttarakhand
Uttar Pradesh
West Bengal
Goa
Union Territories
Andaman Nicobar
Chandigargh
STATE-WISE GRID CONNECTIVITY STANDARDS
Connectivity Standards ( minimum capacity/ maximum evacuation etc)
Policy for evacuation ( responsibility for development of
evacuation infrastructure)
Dadra and Nagar Haveli
GRID CONNECTIVITY
Prepared by ABPS Infra Page60/125
ANNEXURE-IV
STATE Scheduling and Forecasting mechanism Reference
STATE-WISE GRID CONNECTIVITY STANDARDS
Connectivity Standards ( minimum capacity/ maximum evacuation etc)
Policy for evacuation ( responsibility for development of
evacuation infrastructure)
Daman & Diu
Lakshadweep
Pondicherry
Dadra and Nagar Haveli
OPEN ACCESS
Prepared by ABPS Infra Page61/125
ANNEXURE-V
Applicable Charges and losses
STATE Nodal agency Wheeling charges Banking provisions Reference
Andhra Pradesh
Arunachal Pradesh
Assam
Bihar
Chhattisgarh
Delhi
Gujarat GJ01O01080812
Haryana
Himachal Pradesh
Jammu and Kashmir
Jharkhand
Karnataka
Kerala
Madhya Pradesh
Maharashtra
Manipur
&Mizoram
Meghalaya
Nagaland
Orissa
Punjab
Rajasthan
Sikkim
Tamil Nadu
Tripura
Uttarakhand
Uttar Pradesh
West Bengal
Goa
Union Territories
Andaman Nicobar
Chandigargh
Daman & Diu
Lakshadweep
Pondicherry
STATE-WISE OPEN ACCESS PROVISIONS
Intra-State Open Access Regulations
(Y/N)
Application fee(Rs)
Availability of Model PPA/ Banking and wheeling
Agreement
Transmission charges and losses
Cross-subsidy surcharge
Dadra and Nagar Haveli
Determination of Tariff for Order No.2 of 8/8/2012
RE Technology
Central CodeCode Body 01CE CERC 02ME MNRE 03PM Ministry of Power 04FR FOR 05CA CEA 06Code State 07AP Andhra Pradesh 08AR Arunachal Pradesh 09AS Assam 10BR Bihar 11CG Chattisgarh 12DL Delhi 13GJ Gujarat 14HR Haryana ..HP Himachal Pradesh ..JK Jammu & Kashmir ..JH Jharkhand 97KA Karnataka 98KL Kerala 99MP Madhya Pradesh
Notification No./
Case No.
List of Centre/States/UTs and respective Codes
G J 0 1
State/Central
RE Technology
Type of Notification
Denotation of each Parameters listed below of
MH Maharashtra MN Manipur MZ Mizoram ML Meghalaya NL Nagaland OR Orissa PB Punjab RJ Rajasthan SK Sikkim TN Tamil Nadu TR Tripura UA Uttarakhand UP Uttar Pradesh WB West Bengal GA GoaUnion TerritoriesCode UTAN Andaman & Nicobar CH Chandigarh DN Dadra and Nagar Haveli DD Daman & Diu LD Lakshadweep PY Pondicherry GT Goa and UTs combined
RE Technology Type of Notification
Technology Code NotificationWind R RegulationSolar Thermal O OrderSolar PV A Draft RegulationsBiomass-Rankine Cycle B Draft OrderBiomass-Gassifier C Discussion PaperBiogas Z OthersBagasse Co-genSHPMSWGeothermalWind OffshoreWind RepoweringSolar HybridTidal
Off-Grid REAll RE combinedOther
O 1 0 8 0 G
Data of Issuance/ Notification
(DD/MM/YY)
Matter of notification
Denotation of each Parameters listed below of
8 1 20
Matter of the Notification
Code Matter01 Tariff02 RPO-REC03 APPC-State Agency04 Grid Connectivity05 Open Access06 Grid Code07 Competitive Bidding……99 Other
Sl.No. State/ Centre Tech Type
1 Andhra Pradesh Wind 01 O
2 Arunachal Pradesh Wind 98 R
3 Assam Wind 98 A
4 Chattisgarh Wind 01 R
5 Gujarat Wind 01 O
6 Haryana Wind 98 O
7 Himachal Pradesh Wind 08 A
8 Jammu & Kashmir Wind 98 A
9 Jharkhand Wind 01 R
10 Karnataka Wind 98 O
11 Kerala Wind 98 R
12 Madhya Pradesh Wind 01 O13 Maharashtra Wind 98 O
14 Manipur Wind 98 R
15 Nagaland Wind 98 R
16 Orissa Wind 98 O
17 Punjab Wind 98 O
18 Rajasthan Wind 98 R
Tech Code based on Technology covered in
the document
19 Rajasthan Wind 01 B20 Tamil Nadu Wind 01 O
21 Tripura Wind 98 R
22 Uttarakhand Wind 98 R
23 Uttar Pradesh Wind 98 R
24 West Bengal Wind 98 A
25 Andhra Pradesh Solar PV 02 O
26 Assam Solar PV 98 A
27 Bihar Solar PV 02 R
28 Bihar Solar PV 02 O29 Chattisgarh Solar PV 98 R
30 Gujarat Solar PV 02 O
31 Haryana Solar PV 98 Z
32 Jammu & Kashmir Solar PV 98 A
33 Jharkhand Solar PV 02 R
34 Karnataka Solar PV 02 O
35 Madhya Pradesh Solar PV 02 O
36 Maharashtra Solar PV 98 R
37 Manipur Solar PV 98 R
38 Mizoram Solar PV 98 R
39 Nagaland Solar PV 98 R
40 Orissa Solar PV 03 O
41 Punjab Solar PV 98 O
43 Rajasthan Solar PV 03 O
44 Tamil Nadu Solar PV 03 O
45 Tripura Solar PV 03 R46 Uttarakhand Solar PV 98 R
47 Uttar Pradesh Solar PV 98 R
48 West Bengal Solar PV 98 A
49 Andhra Pradesh 02 O
50 Assam 98 A
51 Bihar 02 R
52 Bihar 02 O
53 Chattisgarh 98 R
54 Gujarat 02 O
55 Haryana 98 Z
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
56 Jammu & Kashmir 98 A
57 Jharkhand 02 R
58 Karnataka 02 O
59 Madhya Pradesh 02 O
60 Maharashtra 98 R
61 Manipur 98 R
62 Mizoram 98 R
63 Nagaland 98 R
64 Orissa 02 O
65 Punjab 98 O
66 Rajasthan 02 O
67 Tamil Nadu 02 O
68 Tripura 02 R
69 Uttarakhand 98 R
70 Uttar Pradesh 98 R
71 Andhra Pradesh 98 O
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
Solar Thermal
Bagasse Co-gen
72 Andhra Pradesh 98 O
73 Assam 98 A
74 Arunachal Pradesh 98 R
75 Bihar 07 C
76 Chattisgarh 98 R
77 Gujarat 07 O
78 Haryana 98 R
79 Himachal Pradesh 98 A
80 Jammu & Kashmir 98 A
81 Jharkhand 07 R
82 Karnataka 98 O
83 Kerala 07 R
84 Madhya Pradesh 07 O
85 Maharashtra 98 R
86 Maharashtra 98 O
87 Manipur 98 R
88 Mizoram 98 R
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
89 Nagaland 98 R
90 Orissa 98 O
91 Punjab 98 O
92 Rajasthan 98 R
93 Tamil Nadu 07 O
94 Uttarakhand 98 R
95 Uttar Pradesh 98 R
96 West Bengal 98 A
97 Andhra Pradesh SHP 98 O
98 Arunachal Pradesh SHP 98 R
99 Assam SHP 98 A
100 Chattisgarh SHP 98 A
101 Haryana SHP 98 O
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
Bagasse Co-gen
102 Himachal Pradesh SHP 98 R
103 Jammu & Kashmir SHP 98 A
104 Karnataka SHP 98 O
105 Kerala SHP 08 R
106 Madhya Pradesh SHP 08 O
107 Maharashtra SHP 98 R
108 Manipur SHP 98 R
109 Mizoram SHP 98 R
110 Nagaland SHP 98 R
111 Orissa SHP 98 O
112 Punjab SHP 98 O
113 Rajasthan SHP 98 R
114 Tamil Nadu SHP 08 Z
115 Uttarakhand SHP 98 R
116 Uttar Pradesh SHP 98 R
117 West Bengal SHP 98 A
118 Andhra Pradesh MSW 98 O
119 Arunachal Pradesh MSW 98 R
120 Assam MSW 98 A
121 Chattisgarh MSW 98 A
122 Delhi MSW 09 O
123 Gujarat MSW 09 O
124 Haryana MSW 98 R
125 Himachal Pradesh MSW 98 A
126 Jammu & Kashmir MSW 98 A
127 Karnataka MSW 09 O
128 Maharashtra MSW 98 R
129 Manipur MSW 98 R
130 Mizoram MSW 98 R
131 Nagaland MSW 98 R
132 Orissa MSW 98 O
133 Punjab MSW 98 O
134 Rajasthan MSW 98 R
135 Uttarakhand MSW 98 R
136 Uttar Pradesh MSW 98 R
137 West Bengal MSW 98 A
138 Andhra Pradesh 98 O
139 Arunachal Pradesh 98 R
140 Assam 98 A
141 Bihar 4 C
142 Chattisgarh
98 A
143 Gujarat 04 O
144 Haryana
98 O
145 Haryana 98 R
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
146 Himachal Pradesh 98 A
147 Jammu & Kashmir 98 A
148 Jharkhand 04 R
149 Karnataka 98 O
150 Kerala 07 R
151 Madhya Pradesh 04 O
152 Maharashtra 98 R
153 Maharashtra 98 O
154 Manipur
98 R
155 Mizoram
98 R
156 Nagaland
98 R
157 Orissa 98 O
158 Punjab 98 O
159 Rajasthan 98 R
160 Rajasthan 04 O
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
161 Tamil Nadu 4 O
162 Uttarakhand 98 R
163 Uttar Pradesh
98 R
164 West Bengal 98 A
165 CERC All RE 98 R166 CERC All RE 98 O
167 Jharkhand SHP 08 R
168 Andhra Pradesh All RE 98 R
169 Andhra Pradesh All RE 98 O170 Andhra Pradesh Solar PV 02 O171 Assam All RE 98 R
172 Bihar All RE 98 R
173 Bihar Solar PV 02 O
174 Chattisgarh All RE 98 R175 Delhi All RE 98 R
176 All RE 98 R
177 Gujarat All RE 98 R
178 Haryana All RE 98 R
179 Himachal Pradesh All RE 98 R
180 Himachal Pradesh All RE 98 R181 Jammu & Kashmir All RE 98 R
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Biomass-Rankine Cycle
Goa and Union Territories
182 Jharkhand All RE 98 R
183 Karnataka All RE 98 R
184 Kerala All RE 98 R
185 Madhya Pradesh All RE 98 R
186 Maharashtra All RE 98 R
187 Manipur All RE 98 R
188 Mizoram All RE 98 R
189 Meghalaya All RE 98 R
190 Nagaland All RE 98 R
191 Orissa All RE 98 R
192 Punjab All RE 98 R
193 Rajasthan All RE 98 R
194 Tamil Nadu All RE 98 R
195 Tripura All RE 98 R
196 Uttarakhand All RE 98 R
197 Uttar Pradesh All RE 98 O
198 West Bengal All RE 98 A
199 Andhra Pradesh All RE 98 A
200 Assam All RE 98 R
201 Bihar All RE 98 R
202 Chattisgarh All RE 98 R
203 Delhi All RE 98 R
204 Gujarat All RE 98 R
205 Haryana All RE 98 R
206 Himachal Pradesh All RE 98 R
207 Jammu & Kashmir All RE 98 R
208 Jharkhand All RE 98 R
209 Karnataka All RE 98 R
210 Kerala All RE 98 R
211 Madhya Pradesh All RE 98 R
212 Maharashtra All RE 98 R
213 Manipur All RE 98 R
214 Mizoram All RE 98 R
215 Meghalaya All RE 98 R
216 Nagaland All RE 98 R
217 Orissa All RE 98 R
218 Punjab All RE 98 R
219 Rajasthan All RE 98 R
220 Tamil Nadu All RE 98 R
221 Tripura All RE 98 R
222 Uttarakhand All RE 98 R
223 Uttar Pradesh All RE 98 O
224 Andhra Pradesh All RE 98 O
225 Assam All RE 98 O226 Bihar All RE 98 O227 Chattisgarh All RE 98 O228 Delhi All RE 98 O229 Gujarat All RE 98 O230 Haryana All RE 98 O231 Himachal Pradesh All RE 98 O232 Jammu & Kashmir All RE 98 O233 Jharkhand All RE 98 O234 Karnataka All RE 98 O235 Kerala All RE 98 O236 Madhya Pradesh All RE 98 O237 Maharashtra All RE 98 O238 Manipur All RE 98 O239 Mizoram All RE 98 O240 Meghalaya All RE 98 O241 Orissa All RE 98 O242 Punjab All RE 98 O243 Rajasthan All RE 98 O244 Tamil Nadu All RE 98 O245 Tripura All RE 98 O246 Uttarakhand All RE 98 O247 Uttar Pradesh All RE 98 O248 Andhra Pradesh All RE 98 O249 Chattisgarh All RE 98 O
250 Himachal Pradesh All RE 98 O251 Karnataka All RE 98 O252 Rajasthan All RE 98 O253 Tamil Nadu All RE 98 O254 Uttarakhand All RE 98 O255 Haryana 98 O
256 Haryana 98 O
257 Haryana Solar PV 98 O
258 Haryana 98 O
258 Haryana Wind 98 O
Biomass-Rankine Cycle
Bagasse Co-gen
Solar Thermal
Matter Date Code
01 010509 AP01O01010509
01 090412 AR98R01090412
01 130112 AS98A01130112
01 020412 CG01R01020412
01 080812 GJ01O01080812
01 250112 HR98O01250112
01 250712 HP08A01250712
01 080812 JK98A01000012
01 230610 JH01R01230610
01 111209 KA98O01111209
01 221110 KL98R01221110
01 140510 MP01O0114051001 300312 MH98O01300312
01 150410 MN98R01150410
01 300811 NL98R01300811
01 140910 OR98O01140910
01 190712 PB98O01190712
01 230109 RJ98R01230109
01 080612 RJ01B0108061201 310712 TN01O01310712
01 230309 TR98R01230309
01 060710 UA98R01060710
01 220310 UP98R01220310
01 100812 WB98A01100812
01 140610 AP02O01140610
01 130112 AS98A01130112
01 020810 BR02R01020810
01 290512 BR02O0129051201 020412 CG98R01020412
01 270112 GJ02O01270112
01 000612 HR98Z01000612
01 000012 JK98A01000012
01 230610 JH02R01230610
01 130710 KA02O01130710
01 010812 MP02O01010812
01 300312 MH98R01300312
01 150410 MN98R01150410
01 150410 MZ98R01150410
01 300811 NL98R01300811
01 10212 OR03O0110212
01 90712 PB98O0190712
01 300512 RJ03O01300512
01 270510 TN03O01270510
01 230309 TR03R0123030901 60710 UA98R01060710
01 220310 UP98R01220310
01 100812 WB98A01100812
01 140610 AP02O01140610
01 130112 AS98A01130112
01 020810 BR02R01020810
01 290512 BR02O01290512
01 020412 CG98R01020412
01 270112 GJ02O01270112
01 000612 HR98Z01000612
01 000012 JK98A01000012
01 230610 JH02R01230610
01 130710 KA02O01130710
01 010812 MP02O01010812
01 300312 MH98R01300312
01 150410 MN98R01150410
01 150410 MZ98R01150410
01 300811 NL98R01300811
01 10212 OR02O0110212
01 90712 PB98O0190712
01 300512 RJ02O01300512
01 080710 TN02O01080710
01 230309 TR02R01230309
01 060710 UA98R01060710
01 220310 UP98R01220310
01 310309 AP98O01310309
01 120911 AP98O01120911
01 130112 AS98A01130112
01 090412 AR98R01090412
01 000712 BR07C01000712
01 120412 CG98R01120412
01 310510 GJ07O01310510
01 030211 HR98R01030211
01 240712 HP98A01240712
01 000712 JK98A01000712
01 270110 JH07R01270110
01 111209 KA98O01111209
01 191108 KL07R01191108
01 130908 MP07O01130908
01 070610 MH98R01070610
01 300312 MH98O01300312
01 150410 MN98R01150410
01 150410 MZ98R01150410
01 300811 NL98R01300811
01 140910 OR98O01140910
01 190712 PB98O01190712
01 230109 RJ98R01230109
01 310712 TN07O01310712
01 060710 UA98R01060710
01 220310 UP98R01220310
01 100812 WB98A01100812
01 310309 AP98O01310309
01 090412 AR98R01090412
01 130112 AS98A01130112
01 020412 CG98A01020412
01 250112 HR98O01250112
01 240712 HP98R01240712
01 000712 JK98A01000712
01 111209 KA98O01111209
01 221110 KL08R01221110
01 300608 MP08O01300608
01 070610 MH98R01070610
01 150410 MN98R01150410
01 150410 MZ98R01150410
01 300811 NL98R01300811
01 140910 OR98O01140910
01 190712 PB98O01190712
01 230109 RJ98R01230109
01 000310 TN08Z01000310
01 060710 UA98R01060710
01 220310 UP98R01220310
01 100812 WB98A01100812
01 310309 AP98O01310309
01 090412 AR98R01090412
01 130112 AS98A01130112
01 020412 CG98A01020412
01 200111 DL09O01200111
01 300711 GJ09O01300711
01 030211 HR98R01030211
01 240712 HP98A01240712
01 000712 JK98A01000712
01 280212 KA09O01280212
01 070610 MH98R01070610
01 150410 MN98R01150410
01 150410 MZ98R01150410
01 300811 NL98R01300811
01 140910 OR98O01140910
01 190712 PB98O01190712
01 230109 RJ98R01230109
01 060710 UA98R01060710
01 220310 UP98R01220310
01 100812 WB98A01100812
01 20911 AP98O0120911
01 90412 AR98R0190412
01 130112 AS98A01130112
01 010712 BR4C01010712
01 020412 CG98A01020412
01 170510 GJ04O01170510
01 250112 HR98O01250112
01 030211 HR98R01030211
01 240712 HP98A01240712
01 010712 JK98A01000712
01 270110 JH04R01270110
01 111209 KA98O01111209
02 191108 KL07R02191108
01 20312 MP04O0120312
01 070610 MH98R01070610
01 300312 MH98O01300312
01 150410 MN98R01150410
01 150410 MZ98R01150410
01 300811 NL98R01300811
01 140910 OR98O01140910
01 190712 PB98O01190712
01 230109 RJ98R01230109
01 091211 RJ04O01091211
01 310712 TN4O01310712
01 060710 UA98R01060710
01 220310 UP98R01220310
01 100812 WB98A01100812
01 060212 CE98R0106021201 270312 CE98O01270312
01 030707 JH08R01030707
02 210312 AP98R02210312
02 310309 AP98O0231030902 060710 AP02O0206071002 011210 AS98R02011210
02 161110 BR98R02161110
02 290512 BR02O02290512
02 040311 CG98R0204031102 011012 DL98R02011012
02 301110 GT98R02301110
02 170410 GJ98R02170410
02 030211 HR98R02030211
02 260510 HP98R02260510
02 031011 HP98R0203101102 110311 JK98R02110311
02 210710 JH98R02210710
02 160311 KA98R02160311
02 231110 KL98R02231110
02 191110 MP98R02191110
02 070610 MH98R02070610
02 050510 MN98R02050510
02 050510 MZ98R02050510
02 211210 ML98R02211210
02 290811 NL98R02290811
02 300910 OR98R02300910
02 030611 PJ98R02030611
02 240511 RJ98R02240511
02 100811 TN98R02100811
02 080910 TR98R02160910
02 060710 UK98R02060710
02 170810 UP98O02170810
02 100812 WB98A02100812
02 210312 AP98R02210312
02 011210 AS98R02011210
02 161110 BR98R02161110
02 040311 CG98R02040311
02 011012 DL98R02011012
02 170410 GJ98R02170410
02 030211 HR98R02030211
02 260510 HP98R02260510
02 110311 JK98R02110311
02 210710 JH98R02210710
02 160311 KA98R02160311
02 231110 KL98R02231110
02 191110 MP98R02191110
02 070610 MH98R02070610
02 050510 MN98R02050510
02 050510 MZ98R02050510
02 211210 ML98R02211210
02 290811 NL98R02290811
02 300910 OR98R02300910
02 030611 PJ98R02030611
02 301210 RJ98R02301210
02 100811 TN98R02100811
02 160910 TR98R02160910
02 060710 UK98R02031110
02 170810 UP98O02170810
03 210312 AP98R03210312
03 041110 AS98Z0304111003 241110 BR98Z0324111003 091110 CG98O0309111003 181111 DL98O0318111103 160710 GJ98Z0316071003 061010 HR98Z0306101003 190610 HP98Z0319061003 030111 JK98Z0303011103 210810 JH98Z0321081003 010411 KA98Z0301041103 031210 KL98O0303121003 070211 MP98O0307021103 010710 MH98O0301071003 070910 MN98O0307091003 070910 MZ98O0307091003 201211 ML98O0320121103 030211 OR98O0303021103 301110 PJ98O0330111003 160610 RJ98O0316061003 071210 TN98O0307121003 080910 TR98O0308091003 020512 UK98O0302051203 040211 UP98O0304021103 210312 AP98R0321031203 220611 CH98O03220611
03 160712 HP98O0316071203 270612 KA98O0327061203 131011 RJ98O0313101103 030912 TN98O0303091203 290512 UK98O0329051201 030912 HR98O01030912
01 030912 HR98O01030912
01 030912 HR98O01030912
01 030912 HR98O01030912
01 030912 HR98O01030912
Name of the Regulation/Case as in the Reference Doc
AERC.25/2012
N.A
Order No. 2 of 2012
Case No. 20 of 2011
No. HPERC/428
N.A
Notification No. 27
Case No. OP/28/2008
NO. 1163/CT/2010/KSERC
Order for procurement of power from wind electric generators SMP-20/2010Case No. 10 of 2012
No. H.13011/17/10
No.NERC/REGN/2011
Petition No. 37/2008
Petition No. 35 of 2012
RERC (Terms and Conditions of Tariff) Regulations, 2009, No. RERC/Secy/ Reg. -76
Notification No./ Case No.
Determination of Tariff/power purchase Price in respect of "New wind Based power projects"
O.P No. 6/2009 &O.P.No 7 of 2009
Regulations on Terms and Conditions for Tariff determination from Renewable energy sources
APSERC/Notification/7/2012
Regulations onTerms and Conditions for Tariff determination from Renewable energy sources
Regulations on Terms and Conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources.
Order on Determination of tariff for procurement by distribution licensees and others from wind power projects
Order on Suo-moto petition for determination of levellised generic tariff of renewable energy projects to be commissioned during FY 2011-12
Draft Regulations on promotion of generation from renewable energy sources and terms and conditions for tariff determination
Draft Regulations on terms and conditions for determination from renewable energy sources
Regulations on determination of tariff for procurement of power from wind electric generators
Order in the matter of determination of Tariff in respect of renewable energy sources
Second Amendment Regulations on power procurement from renewable sources by distribution licensee
Order for determination of Generic Tariff for third year of first control period
Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010.
Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011
Suo-motu proceeding initiated by the Commission for finalization of Policy on Harnessing of Power from Renewable Energy Sources including Co-generation
Order on adoption of CERC RE Tariff Regulation and determination of generic RE Tariff for FY 2012-13
Draft Tariff Order on Wind Projects for FY 2012-13Order No 6 of 2012
No.F.25/TERC/2009/415
UPERC - CNCE Regulations, 2009
Order on Solar Power Tariff In. I.A.No.17 of 2010
No. AERC.25/2012
Order on Determination of long term solar RPO and Solar tariff Order No. 12 of 2012-
Order No 1 of 2012
-
-
No 26/2010
No.S/03/1
SMP 25/2012
No. H.13011/17/10- JERC
Comprehensive Tariff Order on Wind Energy (Order No. 6 of 2012) dated July 31, 2012
TERC (Cogeneration and Generation of Electricity from renewable source of Energy) regulation 2009
Uttarakhand Electricity Regulatory Commission(Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010
No.F-9(21)/RG/UERC/2010/ 697
UPERC / Secy / CNCE Regulation, 2009
Draft WBERC(Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2012
WBERC/Regulation/34/10-11/0647
Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2012 (Draft)
Terms and Conditions for Tariff Determination from Solar Energy Sources Regulations, 2010
No. BERC-Regl/Solar-2/2010-03
Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources Regulations, 2012
Determination of tariff for Procurement by the Distribution Licensees and others from Solar Energy Projects
Public Notice for Inviting Objections/Suggestions on the Suo Moto Petition for Determination of Levellised Tariff in Respect of Renewable Energy Projects to be Commissioned during FY 2012-13
Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2012
Terms and conditions for determination of generation tariff for Procurement of Power from Solar PV and Solar Thermal Power Project Regulation 2010
Determination of tariff for grid connected Solar PV, Solar Thermal power plants (other than demonstration projects) and Rooftop Solar Photovoltaic and other small solar power Plants connected to Distribution network at voltage levels below 33KV.
Tariff Order for Solar Energy Based Power Generation in Madhya Pradesh
Order for determination of Generic Tariff for third year of first control period
No.MERC/Legal/2010/482/
Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010
No. H.13011/17/10- JERC
No.NERC/REGN/2011
Case No.01/2012
Petition No. 35 of 2012
Order No.
Order No 1 of 2010
RE Regulations, 2009 -
Order on Solar Power Tariff In. I.A.No.17 of 2010
No. AERC.25/2012
Order on Determination of long term solar RPO and Solar tariff Order No. 12 of 2012
-
Order No 1 of 2012
-
Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010
Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011
Suo-motu proceeding for re-determination of generic tariff in respect of Solar PV and Solar Thermal power.
Adoption of CERC (Terms & Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2012-13
In the matter of Determination of Benchmark Capital Cost for Solar PV and Solar Thermal Power Projects and resultant Generic Levellised Tariff
Tariff Order for projects covered by Jawaharlal Nehru National Solar Mission
Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010
No.F-9(21)/RG/UERC/2010/ 697
UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009
Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696
Draft West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2012 (For replacing existing Regulation)
No. WBERC/Regulation/34/10-11/0647
Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2012 (Draft)
Terms and Conditions for Tariff Determination from Solar Energy Sources Regulations, 2010
No. BERC-Regl/Solar-2/2010-03
Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources Regulations, 2012
Determination of tariff for Procurement by the Distribution Licensees and others from Solar Energy Projects
Public Notice for Inviting Objections/Suggestions on the Suo Moto Petition for Determination of Levellised Tariff in Respect of Renewable Energy Projects to be Commissioned during FY 2012-13
-
No 26/2010
No.S/03/1
SMP 25/2012
No. H.13011/17/10- JERC
No. H.13011/17/10- JERC
No.NERC/REGN/2011
Case No.01/2012
Petition No. 35 of 2012
Order No.
Order No 2 of 2010
RE Regulations, 2009 -
O.P. No. 5 /2009
Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2012
Terms and conditions for determination of generation tariff for Procurement of Power from Solar PV and Solar Thermal Power Project Regulation 2010
Determination of tariff for grid connected Solar PV, Solar Thermal power plants (other than demonstration projects) and Rooftop Solar Photovoltaic and other small solar power Plants connected to Distribution network at voltage levels below 33KV.
Tariff Order for Solar Energy Based Power Generation in Madhya Pradesh
Order for determination of Generic Tariff for third year of first control period
No.MERC/Legal/2010/482/
Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010
Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010
Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011
Suo-motu proceeding for re-determination of generic tariff in respect of Solar PV and Solar Thermal power.
Adoption of CERC (Terms & Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2012-13
In the matter of Determination of Benchmark Capital Cost for Solar PV and Solar Thermal Power Projects and resultant Generic Levellised Tariff
Tariff Order for Solar Thermal Projects covered by Jawaharlal Nehru National Solar Mission
Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010
No.F-9(21)/RG/UERC/2010/ 697
UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009
Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696
Determination of Tariff / Power Purchase Price (Variable Cost or Single Part Tariff) for the period from 01-04-2009 to 31-03-2014 in respect of the “New and Renewable Sources of Energy” in the State of Andhra Pradesh covered by the Commission Order Dated 20-03-2004.
O.P no. 1075/2000
-
-
-
No. 4 of 2010
-
-
-
-
-
-
-
MERC Generic Tariff for FY 2012-13 -
No. H.13011/17/10- JERC
No. H.13011/17/10- JERC
Order in the matter of power purchase from non-conventional sources of energy
Draft-Assam Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012
Terms and Conditions for tariff determination from renewable energy sources regulation - 2012
APSERC/NOTIFICATION/7/2012
Discussion paper on Benchmarks For Tariff DeterminationFor Biomass And Bagasse Based Cogeneration PlantsTo Be Commissioned In 2012-13 And 2013-14.
CSERC (Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources) Regulations, 2012
Order on Determination of tariff for Procurement of Power byDistribution Licensees from Bagasse based co-generationPower Plants and Other Commercial Issues
HERC(Terms and Conditions for determination of Tariff fromRenewable Energy Sources, Renewable Purchase Obligation andRenewable Energy Certificate) Regulations, 2010
Draft Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012
Jammu and Kashmir State Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012
Jharkhand State Electricity RegulatoryCommission (Terms and Conditions for Tariff Determination for Biomass and nonfossil fuel based co-generation projects) Regulations, 2010
In the matter of Determination of Tariff in respect of Renewable Sources of Energy
Kerala State Electricity Regulatory Commission (Power Procurement from Cogeneration Plants by Distribution Licensees) Regulations, 2008
Tariff Order for procurement of power from Bagasse based cogeneration Plants in Madhya Pradesh
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS FOR DETERMINATION OF RE TARIFF) REGULATIONS, 2010
No.MERC/Legal/2010/482/
Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010
Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2011
Petition No. 37/2008
Petition No. 35 of 2012
No. RERC/Secy/ Reg. -76
Order No. 7 of 2012
O.P. No. 5 /2009
-
-
-
Terms and Conditions for Determination of Generation Tariff for Renewable Energy
No.NERC/REGN/2011 Dated Kohima, the 30th August, 2011
Suo-motu proceeding initiated by the Commission for finalization of Policy on Harnessing of Power from Renewable Energy Sources including Co-generation
Adoption of Central Electricity Regulatory Commission (Terms & Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2012-13
The Rajasthan Electricity Regulatory Commission (Terms and Conditions forDetermination of Tariff) Regulations, 2009
Power procurement by Distribution Licensee from Bagasse based Co-generation plants and allied issues relating to captive use and third party sale
UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010
No.F-9(21)/RG/UERC/2010/ 697
UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009
Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696
Draft West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2012 (For replacing existing Regulation)
No. WBERC/Regulation/34/10-11/0647
Determination of Tariff / Power Purchase Price (Variable Cost or Single Part Tariff) for the period from 01-04-2009 to 31-03-2014 in respect of the “New and Renewable Sources of Energy” in the State of Andhra Pradesh covered by the Commission Order Dated 20-03-2004.
Terms and Conditions for tariff determination from renewable energy sources regulation - 2012
APSERC/NOTIFICATION/7/2012
Draft-Assam Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012
Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources Regulations, 2012
Petition filed by Haryana Power Generation Corporation Limited (HPGCL), Panchkula vide letter No. 781 / GMP – 321 dated 7th June, 2011 for determination of tariff for supply of electricity from 6.5 MW solar power project to be set up by HPGCL at Powerhouse – D, WYC Hydel, Yamunanagar (Case No. HERC / PRO - 12 of 2011).
No. HPERC/428
-
Determination of Tariff in respect of Renewable Sources of Energy-
No. 1163/CT/2010/KSERC
SMP-77/2011
No. H.13011/17/10- JERC
No. H.13011/17/10- JERC
Petition No. 37/2008
Petition No. 35 of 2012
No. RERC/Secy/ Reg. -76
-
Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012
Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012.
KSERC (Power Procurement from Renewable Sources by Distribution Licensee) Second Amendment Regulations, 2010
Tariff Order for Procurement of Power by Distribution Licensees from Small Hydro Based GenerationMAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS FOR DETERMINATION OF RE TARIFF) REGULATIONS, 2010
No.MERC/Legal/2010/482/
Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010
Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2011
Terms and Conditions for Determination of Generation Tariff for Renewable Energy
No.NERC/REGN/2011 Dated Kohima, the 30th August, 2011
Suo-motu proceeding initiated by the Commission for finalization of Policy on Harnessing of Power from Renewable Energy Sources including Co-generation
Adoption of Central Electricity Regulatory Commission (Terms & Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2012-13
The Rajasthan Electricity Regulatory Commission (Terms and Conditions forDetermination of Tariff) Regulations, 2009
Consultative Paper on “Procurement of Power from small hydro power(up to 5 MW)”
UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010
No.F-9(21)/RG/UERC/2010/ 697
UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009
Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696
Draft West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2012 (For replacing existing Regulation)
No. WBERC/Regulation/34/10-11/0647
O.P. No. 5 /2009
No. AERC.25/2012/
-
Petition No.18/2010
Petition No.1052/2010
No. HPERC/428-
-
Case No. OP 14/2011
No. H.13011/17/10- JERC
No. H.13011/17/10- JERC
Determination of Tariff / Power Purchase Price (Variable Cost or Single Part Tariff) for the period from 01-04-2009 to 31-03-2014 in respect of the “New and Renewable Sources of Energy” in the State of Andhra Pradesh covered by the Commission Order Dated 20-03-2004.
Terms and Conditions for tariff determination from renewable energy sources regulation - 2012
APSERC/NOTIFICATION/7/2012
Draft Assam Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012
Chhattisgarh State ElectricityRegulatory Commission (Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based renewable energy sources) Regulations, 2012
Petition for adoption of Tariff and approval of energy purchase entered between Timarpur Okhla Waste Management Company Private Limited and BSES Rajdhani Power Limited, for purchase of 16 MW of Power by BSES on Long-term basis from power station to be set up at Okhla.
Approval of tariff for power generated from RDF based power generation plant for sale to Distribution Licensees in the State of Gujarat.
Haryana Electricity Regulatory Commission ( Terms and Conditions for Determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate ) Regulations 2010
Regulation No. HERC/23/2010
Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012
Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012.Case between Srinivasa Gayathri Resource Recovery Ltd., and BESCOM, & Govt. of Karnataka, Urban Development and KPTCL
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS FOR DETERMINATION OF RE TARIFF) REGULATIONS, 2010
No.MERC/Legal/2010/482/
Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010
Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2011
Terms and Conditions for Determination of Generation Tariff for Renewable Energy
No.NERC/REGN/2011 Dated Kohima, the 30th August, 2011
Petition No. 37/2008
Petition No. 35 of 2012
No. RERC/Secy/ Reg. -76
AERC.25/2012
-
Order No. 5 of 2010
-
Suo-motu proceeding initiated by the Commission for finalization of Policy on Harnessing of Power from Renewable Energy Sources including Co-generation
Adoption of Central Electricity Regulatory Commission (Terms & Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2012-13
The Rajasthan Electricity Regulatory Commission (Terms and Conditions forDetermination of Tariff) Regulations, 2009
UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010
No.F-9(21)/RG/UERC/2010/ 697
UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009
Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696
Draft West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2012 (For replacing existing Regulation)
No. WBERC/Regulation/34/10-11/0647
In the matter of purchase of power from Non-Conventional Energy Projects
Order dated September 02, 2011
TERMS AND CONDITIONS FOR TARIFF DETERMINATION FROM RENEWABLE ENERGY SOURCES, REGULATIONS, 2012
APSERC/NOTIFICATION/7/2012
TERMS AND CONDITIONS FOR TARIFF DETERMINATION FROM RENEWABLE ENERGY SOURCES, REGULATIONS, 2012
Benchmarks For Tariff Determination For Biomass And Bagasse Based Cogeneration Plants To Be Commissioned In 2012-13 And 2013-14.
a Discussion paper issued for comments
Chhattisgarh State Electricity Regulatory Commission (Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources) Regulations, 2012
Determination of tariff for Procurement of Power by Distribution Licensees from Biomass based Power Generator and Other Commercial Issues
Petition filed by Haryana Power Generation Corporation Limited (HPGCL), Panchkula vide letter No. 781 / GMP – 321 dated 7th June, 2011 for determination of tariff for supply of electricity from 6.5 MW solar power project to be set up by HPGCL at Powerhouse – D, WYC Hydel, Yamunanagar (Case No. HERC / PRO - 12 of 2011).
Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2010.
Regulation No. HERC/ 23 / 2010
No. HPERC/428
-
No. 24
Determination of Tariff in respect of Renewable Sources of Energy-
-
SMP-77/2011
MERC RE Tariff Regulations 2010
Suo Moto Order by MERC dated March 30, 2012 Case 10 of 2012
PSERC Suo Motu Order on RE Generic Tariff by adopting CERC Tariff Petition No 35 of 2012
RERC Tariff Regulation 2009
Order No 14
Draft Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012
Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012.
Terms and Conditions for Tariff Determination for Biomass and nonfossil fuel based co-generation projects) Regulations, 2010.
Power Procurement from Cogeneration Plants by Distribution Licensees) Regulations, 2008
Tariff Order for procurement of power from Biomass based Power Projects
No/MERC/Legal/2010/482/
Joint Electricity Regulatory Commission forManipur & Mizoram (Terms and Conditions for Tariff determination from RenewableEnergy Sources) Regulations, 2010
No. H.13011/17/10- JERC Dated Aizawl, the 15th
April, 2010
Joint Electricity Regulatory Commission forManipur & Mizoram (Terms and Conditions for Tariff determination from RenewableEnergy Sources) Regulations, 2010
No. H.13011/17/10- JERC Dated Aizawl, the 15th
April, 2010
Terms and Conditions forDetermination of Generation Tariff for Renewable Energy
REGULATION
No.NERC/REGN/2011 Dated Kohima, the 30th
August, 2011
Suo-motu proceeding initiated by the Commission for finalization of Policy on Harnessing of Power from Renewable Energy Sources including Co-generation
Petition No 37/2010 (Suo Motu Order)
No. RERC/Secy/ Reg. -76 January 23, 2009
Revised tariff for sale of electricity by Bio-mass based power plants in the State to distribution licensees commissioned during FY 2011-12 of the control period 2009-14.
Comprehensive Tariff Order for Biomass Power Plants
CERC RE Regulations, 2012 L-1/94/CERC/2011CERC RE generic Tariff Order for FY 2012-13
No. 360
1 of 2012
Suo-Motu Order on RPPO O. P. No. 16 of 2008Solar RPO Order O. P. No. 10 of 2010
Solar RPO amended vide Order on Case 12 of 2012 dated May 29, 2012
RPO Regulation (No. 36/CSERC/2011) March 04, 2011DERC RPO Regulations
JERC-14/2010
Notification No. 3 of 2010
Reg 23/2010
HPERC/438
HPERC RPO Ammendment Regulations HPERC/438JKSERC/10
Order No 8 of 2012 dated July 31 ,2012
UERC(Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010
UERC notification No.F-9(21)/RG/UERC/2010/
697: dated July 06, 2010
UPERC (Captive and Non- Conventional Energy Generating Plants) Regulations, 2009 (hereinafter referred to as CNCE Regulations, 2009).
Notification dated March 22, 2010 and Notification no. UPERC / Secy / CNCE
Regulation, 2009/ 696
West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2010.
Notification No. 47/WBERC dated August
10, 2012
Petition No. 35/2012 (Suo‐Motu)
JSERC (Terms and Conditions of tariff determination,Small Hydropower Generation) Regulation, 2007
Renewable PowerPurchase Obligation (Compliance by purchase of Renewable Energy /Renewable Energy Certificates) Regulations, 2012
AERC (Renewable Purchase Obligation and itsCompliance) Regulations, 2010
(Renewable Purchase Obligation, its Compliance and REC Framework Implementation) Regulations, 2010.
No: F.3(292)/Tariff/DERC/2010-11/3026/
Joint Electricity Regulatory Commission forstate of Goa & Union Territories (Procurement of Renewable energy) Regulations, 2010.
GERC (Procurement of Energy from RenewableSources) Regulations, 2010.
HERC(Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2010
HPERC (Renewable Power Purchase Obligation and its Compliance) Regulations, 2010
J&KSERC (Renewable Power Purchase obligation, its compliance and REC frame work implementation) Regulations, 2011.
No.28
No. 1517/CT/2010/KSERC
RG-33(I) of 2010
No.MERC/Legal/2010/483
2 of 2010
No.NERC/REGN/2011
No. OERC-Engg-02/2010
No.PSERC/Secy./Reg./55
No.F.25/TERC/2009/415
Jharkhand State Electricity Regulatory Commission (Renewable purchase obligation and its compliance) Regulations, 2010
KERC (Power Procurement from Renewable Sources by Distribution Licensee and Renewable Energy Certificate Framework) Regulations, 2011
Notification No. S/03/1 dated 16th March 2011
KSERC (Renewable Purchase Obligation and its Compliance) Regulations, 2010
Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2010 (Revision-I)
Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its compliance and REC framework Implementation) Regulations, 2010
Manipur & Mizoram (Renewable Purchase Obligation and its Compliance) Regulations, 2010.
No. H. 13011/5/09-JERC Dated Aizawl, the 5th May, 2010
Manipur & Mizoram (Renewable Purchase Obligation and its Compliance) Regulations, 2010.
No. H. 13011/5/09-JERC Dated Aizawl, the 5th May, 2010
Meghalaya State Electricity RegulatoryCommission (Renewal Energy Purchase Obligation and its Compliance) Regulations, 2010
Nagaland Electricity Regulatory Commission (Renewable Purchase Obligation and its Compliance) Regulations, 2011
OERC (Renewable and Co-generationPurchase Obligation and its Compliance) Regulations, 2010.
PSERC (Renewable Purchase Obligation and its compliance) Regulations, 2011
Rajasthan Electricity Regulatory Commission (Power Purchase & Procurement Process of Distribution Licensee) (2nd Amendment) Regulations, 2011.
No.RERC/Secy./Regulation - 85
Amendment to Renewable Energy Purchase Obligation Regulations, 2010.
Notification No. TNERC / RPO / 19 / 2, dated 29-07-2011
T.E.R.C. (Procurement of Energy fromRenewable Sources) Regulations, 2010.
Uttarakhand Electricity Regulatory Commission(Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010.
No.F-9(21)/RG/UERC/2010/ 697
Uttar Pradesh Electricity Regulatory Commission (Promotion of Green Energy through Renewable PurchaseObligation) Regulations, 2010
No. UPERC/Secy/Regulation/10 - 787
Draft West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2012 (For replacing existing Regulation).
WBERC/Regulation/34/10-11/0647
Reg No. 1 of 2012
No. AERC/21/2010
BERC-Regl-01/10–05
No. 36/CSERC/2011
DERC RPO Regulations
Notification No. 3 of 2010
Reg 23/2010
HPERC/438
JKSERC/10
No.28
No. 1517/CT/2010/KSERC
RG-33(I) of 2010
No.MERC/Legal/2010/483
2 of 2010
APERC - Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy /Renewable Energy Certificates) Regulations, 2012
AERC (Renewable Purchase Obligation and itsCompliance) Regulations, 2010
Bihar Electricity Regulatory Commission(Renewable Purchase Obligation, its Compliance and REC Framework Implementation) Regulations, 2010.
Chhattisgarh State Electricity Regulatory Commission (Renewable Purchase Obligation and REC framework Implementation) Regulations, 2011.
No: F.3(292)/Tariff/DERC/2010-11/3026/
GERC (Procurement of Energy from RenewableSources) Regulations, 2010.
HERC(Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2010
HPERC (Renewable Power Purchase Obligation and its Compliance) Regulations, 2010
J&KSERC (Renewable Power Purchase obligation, its compliance and REC frame work implementation) Regulations, 2011.
Jharkhand State Electricity Regulatory Commission (Renewable purchase obligation and its compliance) Regulations, 2010
KERC (Power Procurement from Renewable Sources by Distribution Licensee and Renewable Energy Certificate Framework) Regulations, 2011
Notification No. S/03/1 dated 16th March 2011
KSERC (Renewable Purchase Obligation and its Compliance) Regulations, 2010
Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2010 (Revision-I)
Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its compliance and REC framework Implementation) Regulations, 2010
Manipur & Mizoram (Renewable Purchase Obligation and its Compliance) Regulations, 2010.
No. H. 13011/5/09-JERC Dated Aizawl, the 5th May, 2010
Manipur & Mizoram (Renewable Purchase Obligation and its Compliance) Regulations, 2010.
No. H. 13011/5/09-JERC Dated Aizawl, the 5th May, 2010
Meghalaya State Electricity RegulatoryCommission (Renewal Energy Purchase Obligation and its Compliance) Regulations, 2010
No.NERC/REGN/2011
No. OERC-Engg-02/2010
No.PSERC/Secy./Reg./55
No.F.25/TERC/2009/415
Reg No. 1 of 2012
Notification of State agency for REC AERC/341/2010/138Notification of State agency for REC PT No. 40Notification of State agency for REC No. 1370Notification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECOrder for APPCOrder for APPC
Nagaland Electricity Regulatory Commission (Renewable Purchase Obligation and its Compliance) Regulations, 2011
OERC (Renewable and Co-generationPurchase Obligation and its Compliance) Regulations, 2010.
PSERC (Renewable Purchase Obligation and its compliance) Regulations, 2011
Rajasthan Electricity Regulatory Commission(Renewable Energy Certificate and Renewable Purchase Obligation Compliance Framework) Regulations, 2010.
No.RERC/Secy./Regulation - 82
Amendment to Renewable Energy Purchase Obligation Regulations, 2010.
Notification No. TNERC / RPO / 19 / 2, dated 29-07-2011
T.E.R.C. (Procurement of Energy fromRenewable Sources) Regulations, 2010.
UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010
No.F-9(21)/RG/UERC/2010/ 697
Uttar Pradesh Electricity Regulatory Commission (Promotion of Green Energy through Renewable PurchaseObligation) Regulations, 2010
No. UPERC/Secy/Regulation/10 - 787
Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy / Renewable Energy Certificates) Regulations, 2012
Order for APPCOrder for APPCOrder for APPCOrder for APPCOrder for APPC
10 of 2012
10 of 2012
10 of 2012
10 of 2012
10 of 2012
Suo motu petition for determination of generic tariff for renewable energy generation projects to be commissioned during FY 2012-13
Suo motu petition for determination of generic tariff for renewable energy generation projects to be commissioned during FY 2012-13
Suo motu petition for determination of generic tariff for renewable energy generation projects to be commissioned during FY 2012-13
Suo motu petition for determination of generic tariff for renewable energy generation projects to be commissioned during FY 2012-13
Suo motu petition for determination of generic tariff for renewable energy generation projects to be commissioned during FY 2012-13
Reference Document Link
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click HereClick Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick Here
Click HereClick HereClick HereClick HereClick Here
Click Here
Click Here
Click Here
Click Here
Click Here