Page 1: All India RE RAP Database

Ministry of New and Renewable Energy

All India Renewable Energy Regulatory And Policy Data Base (All India RE-RAP Data Base)

Page 2: All India RE RAP Database

Step-1

Step-2

Template flow for RE Regulatory Data Base

A. Summary worksheet for RE Regulatory and Policy parameters provide broad summary of various renewable energy specific parameters (viz.

technology-wise FIT, RPO, OA etc.) across state and centre. This sheet has linkages to respective detailed sheets of each specific parameter.

Hyperlinks direct to detail sheets which give key sub parameters for central and state level.

Separate summary worksheets developed on the following topics and each such individual worksheet cover identified details of central, all States and UTs.

a. FIT Wind b. FIT Solar Thermal c. FIT Solar PV d. FIT Biomass e. FIT Bagasse Cogen f. FIT MSW g. FIT SHP h. FIT Biomass Gassifier i. FIT Biogas j. FIT other Technologies k. ... l. RPO Summary m. REC n. Grid Connectivity o. Open Access

Page 3: All India RE RAP Database

Step-3

Step-4

Separate summary worksheets developed on the following topics and each such individual worksheet cover identified details of central, all States and UTs.

a. FIT Wind b. FIT Solar Thermal c. FIT Solar PV d. FIT Biomass e. FIT Bagasse Cogen f. FIT MSW g. FIT SHP h. FIT Biomass Gassifier i. FIT Biogas j. FIT other Technologies k. ... l. RPO Summary m. REC n. Grid Connectivity o. Open Access

Unique Code for each Reference Documents built based on following sub-codes which are scalable

Entire Reference document across States/Technologies/type of notifications, etc., listed in a single worksheet along with hyperlinks linking to the actual document as in the following manner:

The above list could be filtered to get exclusive list of state-wise reference docs or to get exclusive list of technology-wise reference documents. For example all reference docs for Karnataka could be filtered as shown below.

Page 4: All India RE RAP Database

Step-5

Step-6 Folder Structure for maintaining base documents All files/ base documents maintained in single folder (Advantage: One point access of all reference document) File named using the unique code name. (Advantage: Linking file name to the Unique Code makes search easy) Each file serial numbered, which is in line with List of documents in excel sheet. (Advantage: easy search; easy to identify latest added files

– will help in monthly updation)

Entire Reference document across States/Technologies/type of notifications, etc., listed in a single worksheet along with hyperlinks linking to the actual document as in the following manner:

The above list could be filtered to get exclusive list of state-wise reference docs or to get exclusive list of technology-wise reference documents. For example all reference docs for Karnataka could be filtered as shown below.

Page 5: All India RE RAP Database

Folder Structure for maintaining base documents All files/ base documents maintained in single folder (Advantage: One point access of all reference document) File named using the unique code name. (Advantage: Linking file name to the Unique Code makes search easy) Each file serial numbered, which is in line with List of documents in excel sheet. (Advantage: easy search; easy to identify latest added files

– will help in monthly updation)

Page 6: All India RE RAP Database

Template flow for RE Regulatory Data Base

A. Summary worksheet for RE Regulatory and Policy parameters provide broad summary of various renewable energy specific parameters (viz.

technology-wise FIT, RPO, OA etc.) across state and centre. This sheet has linkages to respective detailed sheets of each specific parameter.

Hyperlinks direct to detail sheets which give key sub parameters for central and state level.

Separate summary worksheets developed on the following topics and each such individual worksheet cover identified details of central, all States and UTs.

a. FIT Wind b. FIT Solar Thermal c. FIT Solar PV d. FIT Biomass e. FIT Bagasse Cogen f. FIT MSW g. FIT SHP h. FIT Biomass Gassifier i. FIT Biogas j. FIT other Technologies k. ... l. RPO Summary m. REC n. Grid Connectivity o. Open Access

Page 7: All India RE RAP Database

Separate summary worksheets developed on the following topics and each such individual worksheet cover identified details of central, all States and UTs.

a. FIT Wind b. FIT Solar Thermal c. FIT Solar PV d. FIT Biomass e. FIT Bagasse Cogen f. FIT MSW g. FIT SHP h. FIT Biomass Gassifier i. FIT Biogas j. FIT other Technologies k. ... l. RPO Summary m. REC n. Grid Connectivity o. Open Access

Unique Code for each Reference Documents built based on following sub-codes which are scalable

Entire Reference document across States/Technologies/type of notifications, etc., listed in a single worksheet along with hyperlinks linking to the actual document as in the following manner:

The above list could be filtered to get exclusive list of state-wise reference docs or to get exclusive list of technology-wise reference documents. For example all reference docs for Karnataka could be filtered as shown below.

Page 8: All India RE RAP Database

Folder Structure for maintaining base documents All files/ base documents maintained in single folder (Advantage: One point access of all reference document) File named using the unique code name. (Advantage: Linking file name to the Unique Code makes search easy) Each file serial numbered, which is in line with List of documents in excel sheet. (Advantage: easy search; easy to identify latest added files

– will help in monthly updation)

Entire Reference document across States/Technologies/type of notifications, etc., listed in a single worksheet along with hyperlinks linking to the actual document as in the following manner:

The above list could be filtered to get exclusive list of state-wise reference docs or to get exclusive list of technology-wise reference documents. For example all reference docs for Karnataka could be filtered as shown below.

Page 9: All India RE RAP Database

Folder Structure for maintaining base documents All files/ base documents maintained in single folder (Advantage: One point access of all reference document) File named using the unique code name. (Advantage: Linking file name to the Unique Code makes search easy) Each file serial numbered, which is in line with List of documents in excel sheet. (Advantage: easy search; easy to identify latest added files

– will help in monthly updation)

Page 10: All India RE RAP Database

Prepared by ABPS Infra Page10/125

Summary Sheet

STATE / CENTRE

Year Rs/kWh Applicability

CERC NA NA NA

Andhra PradeshFY 13:FY 14:

So on

Assam

Bihar

Chhattisgarh

Delhi

Gujarat

Haryana

Himachal Pradesh

Jharkhand

Karnataka

Kerala

Madhya Pradesh

Maharashtra

Manipur

Mizoram

Meghalaya

Nagaland

Orissa

Punjab

Rajasthan

Sikkim

Tamil Nadu

Tripura

Uttarakhand

Uttar Pradesh

Wind Solar PV Solar Thermal Biomass Bagasse based cogeneration Municipal solid Waste Small Hydro RPO targets (%) APPC Open Access Provisions

Policy for evacuation

Tariff (Rs/kWh)

Control period

Tariff (Rs/kWh)

Control period

Tariff (Rs/kWh)

Control period

Tariff (Rs/kWh)

Control period

Tariff (Rs/kWh)

Control period

Tariff (Rs/kWh)

Control period

Tariff (Rs/kWh)

Control period

Solar(%)

Non Solar (%)

Transmission charges and

losses

Cross-subsidy surcharge

Wheeling charges

Banking provisions

Arunachal Pradesh

Jammu and Kashmir

West Bengal and so on for all the

states

Page 11: All India RE RAP Database

Prepared by ABPS Infra Page11/125

Summary Sheet

STATE / CENTRE

Wind Solar PV Solar Thermal Biomass Bagasse based cogeneration Municipal solid Waste Small Hydro RPO targets (%) APPC Open Access Provisions

Policy for evacuation West Bengal and so on for all the

states

Page 12: All India RE RAP Database

FIT:WIND

Prepared by ABPS Infra Page12/125

ANNEXURE-1A

STATE-WISE FEED-IN-TARIFF FOR WIND

Financial Parameters Normative Parameters

STATE / CENTRE Control period Tariff (Rs/kWh) Taxes and Duties

CERC FY 2012-16 (3 yrs) 575 (FY 2012-13) 25

Andhra Pradesh 470 24.50% 20 N.A N.A

Arunachal Pradesh N.A N.A N.A N.A

Assam N.A 25

Bihar N.A N.A N.A N.A N.A N.A N.A N.A

Chhattisgarh N.A 25

Delhi N.A N.A N.A N.A N.A N.A N.A N.A

Gujarat 24% 25 N.A

Haryana 575 25

Himachal Pradesh N.A N.A N.A 25

Jammu and Kashmir 25

Jharkhand N.A 20% 25 N.A

Karnataka 470 26.50% 25

Kerala 3.64 456 22% 20

Madhya Pradesh May 2010 to March 31, 2013 4.35 500 20% 25 N.A

Maharashtra FY 2012-13 25

Manipur

FY 2010-11 to FY 2014-15 600 Lakhs/MW (FY 2010-11) 25

Mizoram

Tariff Regulations / or Order or Draft(Ref. no. …dt……)

Capital Cost (lakh/MW)

Capacity Utilisation Factor (%)

Useful life(yrs)

Subsidy and incentive by Central /State Govt

CERC Generic RE Tariff Order for FY 2012-13;

CERC (Terms and Conditions for Tariff determination from

Renewable Energy Sources) Regulations, 2012

Wind power density Tariff(Rs /kWh)

<200 = 5.96, 5.36(with A.D)200-250 = 5.42, 4.87(with A.D)250-300 = 4.77, 4.29(with A.D)300-400 = 3.97, 3.57(with A.D)

>400 = 3.73 , 3.35(with A.D)

Wind power density CUF

<200 = 20%200-250 = 22%250-300 = 25%300-400 = 30%

>400 = 32%

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Tariff exclusive of taxes and duties,

pass through allowed on actual

basis

Wind Tariff Order in respect of "New Wind Based Power Projects

( O.P No. 6/7 of 2009)

For WPP having entered into PPA btw May 1, 2009 to

March 31, 2014

For first 10 years-3.5For next 10 years-determined

thereafter

RE Tariff Regulations, 2012 (April 9, 2012)

From 2012-13 to 2016-17 (5 yr)

Shall be taken into consideration while determining tariff

Pass through on actual incurred

basis

Draft RE Tariff Regulations, 2012 (January 13, 2012)

April 1, 2012 to March 31, 2015 (3 years)

492 (FY 2011-12), indexation mechanism as per CERC RE

Tariff Regulation

Wind power density CUF

200-250 = 20%250-300 = 23%300-400 = 27%

>400 = 30%

Shall be taken into consideration while determining tariff

Pass through on actual incurred

basis

Draft RE Tariff Regulations, 2012 (April 2, 2012)

From April 1, 2012 to 2016-17

(5 yrs)

575 (FY 2012-13) subject to indexation mechanism as per CERC RE Tariff Regulation

Wind power density CUF

upto 200 = 20%201-250 =22%251-300 =25%301-400 =30%

>400 =32%

Shall be taken into consideration while determining tariff

Pass through on actual incurred

basis

Wind Tariff Order (Order No.2 of 2012, Aug 8, 2012)

August 11, 2012 to March 31, 2016

Gross Tariff - Rs 4.23/kWhDepreciation- Rs 0.38/kWh

Net Tariff-Rs 4.23/kWh

Excluding evacuation-Rs 568 lakh/MW

Evacuation cost=Rs 38 lakh/MW

Total cost=Rs 608 lakh/MW

Takes into account benefit of depreciation. Shall take a

view on GBI once MNRE announces the scheme

Suo Moto Petition for Determination of Levellised Tariff for RE Projects dated Sept

2012Commissioned during FY

2012-13

Wind power density Tariff(Rs /kWh)

200-250 = 6.14250-300 = 4.91300-400 = 4.09

>400 = 3.84

Wind power density CUF

200-250 = 20%250-300 = 25%300-400 = 30%

>400 =32%

Shall be taken into consideration while determining tariff

Pass through on actual incurred

basis

Draft HPERC( Promotion of Generation from Renewable Energy sources and

Terms and conditions of Tariff) Regulations, 2012

(July 25, 2012)

According to the generic tariff Order (Duration to be fixed as find appropriate by

the Commission)

1. Shall be taken into consideration while determining tariff.

2. 90% of the capital subsidy available to project as per applicable scheme of MNRE/State Govt shall be

considered3. Also take into account GBI benefit as and when

notified.

Tariff determined shall be inclusive of all taxes and duties

Draft RE Tariff Regulations, 2012 FY 2012-13 to FY 2016-17 (5 years)

575 for FY 2012-13 subject to indexation

Wind power density CUF

upto 200 =20%201-250 = 22%251-300 = 25%301-400 =30%

>400 =32%

Shall be taken into consideration while determining tariff

Tariff determined shall be inclusive of all taxes and duties

Regulations for Determination of Tariff for procurement of power from wind

generators (June 23, 2010)

June 23, 2010 to March 31, 2013

515 for first year subject to indexation

Shall be taken into consideration iGBI incentive

while determining tariff

Order for determination of tariff for RE sources

(Dec, 11,2009)

1. All new RE projects, which are entering into PPA on or after Janu1, 2010 for a

period of 10 years2. Also applicable to projects

which have completed 10 years of agreement period

and no agreed tariff is available after 10 yrs

Average tariff for first 10 years from signing of PPA= Rs 3.70/kWh

Shall not take into consideration incentives allowed by Govt for tariff

determination

Pass through on actual incurred

basis

(Power Procurement from RE sources ) second amendment Regulation, 2010

(Nov 22, 2010)

Applicable to project proposals submitted after

Nov 22, 2010

Shall be taken into consideration while determining tariff.

Generating company shall disclose the details of such subsidy/incentive if availed

along with application of fixation of tariff and get the rate adjusted appropriately

Tariff determined shall be inclusive of all taxes and duties

Wind Tariff Order(May, 14, 2010)

Tariff determined shall be inclusive of all taxes and duties

Generic Tariff Order( March 30, 2012)

Wind power density Tariff(Rs /kWh)

200-250 5.67 (including AD of 0.81/kWh)

250-300 4.93 (including AD of 0.70/kWh)

300-400 4.20 (including AD of 0.60/kWh)

>400 3.78 (including AD of 0.54/kWh)

516.94 for FY 2012-13 subject to indexation

Wind power density CUF

200-250 =20%250-300 =23%300-400 =27%

>400 =30%

Takes into account benefit of depreciation. However

shall not take into account GBI benefit into tariff

determinattion

Pass through on actual incurred

basis

Joint Electricity Regulatory Commission for

Manipur & Mizoram (Terms and Conditions for Tariff determination from

Renewable Energy Sources) Regulations, 2010.

200-250 - 20%250-250 - 23%300-400 - 27%

>400 - 30%

Shall be considered in Tariff computation as when

availed

Tariff exclusive of taxes and duties. Taxes and duties

allowed allowed as pass through on actual incurred

basis

Page 13: All India RE RAP Database

FIT:WIND

Prepared by ABPS Infra Page13/125

ANNEXURE-1A

STATE-WISE FEED-IN-TARIFF FOR WIND

Financial Parameters Normative Parameters

STATE / CENTRE Control period Tariff (Rs/kWh) Taxes and DutiesTariff Regulations / or Order or Draft(Ref. no. …dt……)

Capital Cost (lakh/MW)

Capacity Utilisation Factor (%)

Useful life(yrs)

Subsidy and incentive by Central /State Govt

Mizoram

FY 2010-11 to FY 2014-15 600 Lakhs/MW (FY 2010-11) 25

Meghalaya No Tariff Regulations/Order NA NA NA NA NA NA NA

Nagaland FY 2012-14 (3 years) 25

Orissa Tariff Order (Dated 14/09/2010) 2010-11 to 2012-13467.13 Lakhs/MW 19% 25

Punjab wind zone 1 (upto 20%)

Rajasthan 530 Lakh/MW for FY 13 25

Sikkim

Tamil Nadu 3.51 Rs/kWh 27.15% 20

Tripura NA

Uttarakhand 515 25

Uttar Pradesh UPERC - CNCE Regulations, 2009 Oct 1, 2009 to Mar 31, 2014 Not specified separately Not specified separately Not specified separately

West Bengal 10 years for wind Not specified separately Not specified separately Not specified separately

Goa No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations

Union Territories

Andaman Nicobar No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations

Chandigargh No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations

No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations

Daman & Diu No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations

Lakshadweep No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations

Pondicherry No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations No RE Order/Regulations

Joint Electricity Regulatory Commission for

Manipur & Mizoram (Terms and Conditions for Tariff determination from

Renewable Energy Sources) Regulations, 2010.

200-250 - 20%250-250 - 23%300-400 - 27%

>400 - 30%

Shall be considered in Tariff computation as when

availed

Tariff exclusive of taxes and duties. Taxes and duties

allowed allowed as pass through on actual incurred

basis

Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011

Rs. 467 Lakh / MW (FY 2010-11)

200-250 - 20%250-250 - 23%300-400 - 27%

>400 - 30%

Shall be considered in Tariff computation as when

availed

Tariff exclusive of taxes and duties. Taxes and duties

allowed allowed as pass through on actual incurred

basis Rs 5.31/kWh (Without AD) & Rs 4.48/kWh (With AD)

Incentive or subsidy offered by Central/State Govt. shall

be considered while determining tariff

Tariff exclusive of Tax; ROE

computed on pre-tax basis

Order on adoption of CERC RE Tariff Regulation and determination of generic

RE Tariff for FY 2012-13

Provisions akin to CERC (April 2012 to March 2017)

Provisions akin to CERC, 5.96 (without AD) 5.36 (with AD)

Provisions akin to CERC (575 lakh/MW)

Provisions akin to CERC (25)

Incentive or subsidy availed to be computed on case to case basis by Punjab State

Corporation ltd and the same to be reduced from the tariff to that extent for

a period of 12 years.

Provisions akin to CERC (Tariff

exclusive of Tax; ROE computed on

pre-tax basis)

RERC (Terms and Conditions of Tariff) Regulations, 2009,

Draft Tariff Order on Wind Projects for FY 2012-13

April 1, 2009 to March 31, 2014

5.18 (without AD) 4.90 (with AD)-for projects in aisalmer, Jodhpur and

Barmer districts

5.44 (without AD) 5.14 (with AD)-for other districts

21%- Jaisalmer, Jodhpur and Barmer districts

20%- Otherdistricts

Any Policy support by way of capital subsidy /Capital

Finance Assistance (CFA), higher depreciation benefit

or GBI, which becomes available to the

developer/generator, needs to be passed on to the

utilities.

Tax is not a pass through; ROE

comupted on pre-tax basis

Comprehensive Tariff Order on Wind Energy (Order No. 6 of 2012) dated July

31, 2012

August 31, 2012 to March 31, 2014

Rs. 575 Lakh /MW. Capital cost is apportioned among

plant machinery, civil works & land at 85%, 10% and 5%

respectively.

TERC (Cogeneration and Generation of Electricity from renewable source of

Energy) regulation 2009

FY 2009-12 (3 years from notification of these regulations)

Uttarakhand Electricity Regulatory Commission

(Tariff and Other Terms for Supply of Electricity from Renewable Energy

Sources and non-fossil fuel based Co-generating

Stations) Regulations, 2010

FY 2010-11 upto March 31, 2013

Zone-1 (5.15 Rs/kWh without AD, 4.75 with AD)

Zone-2 ((4.35 Rs/kWh without AD, 4.00 with AD)

Zone-3 (3.65 Rs/kWh without AD, 3.35 with AD)

Zone-4 ((3.20 Rs/kWh without AD, 2.90 with AD)

200-250 - 20%250-250 - 23%300-400 - 27%

>400 - 30%

Only 75% of the capital subsidy for the financial year

of commissioning as per applicable scheme of MNRE shall be considered for tariff

determination.

Direct Taxes included in the

Tariff.Taxes and duties

levied by the appropriate

Government other than direct

taxes shall be allowed as pass

through on actual incurred basis.

Rs.3.21/Kwh with an escalation of 5.72% p.a.

Not specified separately

Not specified separately

Draft WBERC(Cogeneration and Generation of

Electricity from Renewable Sources of Energy) Regulations, 2012

Tariff cap of 5.70 for 10 years from effectiveness of Regulations

Not specified separately

Price cap excludes taxes

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

Dadra and Nagar Haveli No RE

Order/RegulationsNo RE

Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

Page 14: All India RE RAP Database

FIT:WIND

Prepared by ABPS Infra Page14/125

Normative Parameters

Reference Archives

N.A

N.A

N.A N.A

N.A N.A

N.A

N.A

N.A

Late Payment surcharge

1.25% per month if payment delayed beyond 60 days

CE98R01060212,

CE98O01270312

AP01O01010509

AR98R01090412

1.25% per month if payment delayed beyond 60 days

AS98A01130112

1.25% per month if payment delayed beyond 60 days

CG98A01020412

GJ01O01080812

1.25% per month if payment delayed beyond 60 days

HR98O01030912 HR98O01250112

1.25% per month if payment delayed beyond 60 days

HP08A01250712

1.25% per month if payment delayed beyond 60 days

JK98A01000012

1.25% per month if payment delayed beyond 30days

JH01R01230610

KA98O01111209

KL98R01221110

2% over and above short term SBI PLR

p.a. if payment delayed beyond

30days

MP01O01140510

1.25% per month if payment delayed beyond 60 days

MH98O01300312

1.25% per month for payments

delayed beyond 60 days from billing

date

MN98R01150410

Page 15: All India RE RAP Database

FIT:WIND

Prepared by ABPS Infra Page15/125

Normative Parameters

Reference ArchivesLate Payment surcharge

NA

Not specified

1.25% per month for payments

delayed beyond 60 days from billing

date

MN98R01150410

1.25% per month for payments

delayed beyond 60 days from billing

date

NL98R01300811

1.25% per month for payments

delayed beyond 60 days from billing

date

OR98O01140910

1.25% per month for payments

delayed beyond a period of 60 days from the date of

billing

PB98O01190712

1.25% permonth on daily basis for delay beyond a

period of1.5 month from the

date of billing

RJ98R01230109

RJ01B01080612

Penalty of 1% per month shall be

levied for delayed payment by the

licensee

TN01O01310712

TR98R01230309

1.25% per month for delays beyond a period of 60 days from the date of

billing

UA98R01060710

1.25% p.m. beyond 2 months

UP98R01220310

WB98A01100812

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

No RE Order/Regulations

Page 16: All India RE RAP Database

FIT: SOLAR

Prepared by ABPS Infra Page16/125

ANNEXURE-1B

STATE-WISE FEED-IN-TARIFF FOR SOLAR PV

Financial Parameters Normative Parameters

STATE Control period Tariff (Rs/kWh)

CERC FY 2012-16 (3 yrs) 1000 (FY 2012‐13) 19% 25

Andhra Pradesh

IA No 17 of 2010, dated July 14, 2010

2010-11 and 2011-12 25

Arunachal Pradesh April 2012 to March 2017 1000 19% 25

Assam Jan 2012 to Mar 2014 1442 19% 25

Bihar 1000 19% 25

Chhattisgarh RE Tariff Regulation dated Apr 02, 2012 April 2012 to March 2017 1000 19% 25

Delhi Solar PV Tariff Regulations (Draft) 2012 1000 19% 25

Gujarat GERC Order 1 of 2012 dated Jan 27, 2012 Jan 29, 2012 to March 31, 2015 0.25% 25

Haryana 3 years(till FY 13-FY15) 19% 0% 25

Himachal Pradesh

Jammu and Kashmir 1000 19% 25

Jharkhand June 2010 to June 2013 1700 19% 25

Karnataka 1550 19% 25

Kerala 15.18 (including incentives) 2250 21% 20

Madhya Pradesh Aug 2012 to March 2014 0.25% 25

Maharashtra 19% NA 25

Manipur

1900 (FY 2010-11) 19% NA 25

&Mizoram

Meghalaya

Tariff order or Regulation not found

NA NA NA NA NA NA

Nagaland FY- 2012-14 (3 years) 1690 19-21% NA 25

Orissa 1690 19% NA 25

Punjab 1000 19% NA 25

Rajasthan 940 0.25% 25with AD - 10.45

Sikkim Tariff order or Regulation not found NA NA NA NA NA NA

Tamil Nadu FY 2010-11 (till 31/05/12) 17.15 2% 25

TripuraNA

Uttarakhand 19% NA 25

Uttar Pradesh FY 2010-14 (5 years)

West Bengal FY 2013-17 (5 Years)

Tariff Regulations / or Order or Draft(Ref. no. …dt……)

Capital Cost (lakh/MW)

Capacity Utilisation Factor (%)

Auxiliary Consumption (%)

Useful life(yrs)

CERC Generic RE Tariff Order for FY 2012-13;

CERC (Terms and Conditions for Tariff determination from

Renewable Energy Sources) Regulations, 2012

Lev - 10.39AD - 1.04

After AD - 9.35

17.91 (Without AD) 14.95 (With AD)

APSERC RE Tariff Regulations, 2012 dated April 9, 2012

RE Tariff Regulation (Draft) dated Jan 13, 2012

BERC Order on Petition 12/2012, dated May 29, 2012, Solar Tariff Regulations

dated Aug 2, 2010

Upto March 31, 2015 commissioning

10.9 (Without AD) 09.85 (With AD)

3 years from the date of notification

For MW Scale Plants: Jan 2012-March 2013: 10.37 (Without AD),

09.28 (With AD), FY 2013-14: 9.64 (Without AD), 8.63 (With

AD), FY 2014-15: 8.97 (Without AD), 8.03 (With AD)

For kW scale Plants Jan 2012-March 2013: 12.44

(Without AD), 11.14 (With AD), FY 2013-14: 11.57 (Without AD),

10.36 (With AD), FY 2014-15: 10.76 (Without AD), 9.63 (With

AD)

1000 (MW scale Plants), 1200 (kW scale plants)

18% with 1% annual degradation

Suo Moto Petition for Determination of Levellised Tariff for RE Projects dated Sept

20129.18 (SPV Crystalline)8.90 (SPV Thin film)

894( SPV-C)863 (SPV-TF)

JKSERC (Terms and Conditions for Tariff determination from RE Sources)

Regulations (Draft), 20122012-17 (5 years from the date

of commencement)(Determination of Tariff for Procurement

of Power from Solar PV and Solar Thermal Power Projects)

REGULATIONS, 2010 dated June 23, 2010

KERC Order on Solar Power Tariff Determination dated July 13, 2010

Upto March 31, 2013 commissioning

14.5 (Including rooftop and small solar PV plants)

Power procurement from Solar Plants by Distribution

Licensee - Regulation 2008 dated Jan 1, 2009

For projects commissioned before dec 31, 2009

Tariff Order for Solar Based Power Generation dated Aug 01, 2012

10.44 (capacity >2 MW), 10.70 (Capacity upto 2 MW)

1025 (capacity >2 MW), 1050 (capacity upto 2 MW)

19% with 1% annual deration from 3rd yr

onwards

MERC RE tariff regulayions,2010 ,Case No 10 of 2012 (Mar 30, 2012)

FY 2010-14(5 years from the date of commencement )

Lev -11.16 (11.66 - RT & SSPGP)AD -1.65 (1.65)

after AD -9.51 (10.01)1000 (FY 2012-13)

JERC of Manipur & Mizorum (RE Tariff regulation) 2010 dated 15 Apr,2010

FY 2010-14(5 years from date of notification)

NERC (terms and condition for determination of generation tariff for renewable energy) regulation 2011

OERC redetermination of generic tariff for solar PV and Solar thermal,Case No

1 of 2012

Plant comissioned in FY (2012-13) onwards

Lev- 17.80AD -3.03

After AD -14.77

Adoption of CERC RE tariff regulation 2012,Petetion no 35 of 2012,dated 19

July 2012

FY 2012-16 (5 years from the notification of order)

Lev - 10.39AD - 1.04

After AD - 9.35

RERC (Determination of benchmark capital cost for solar PV and Solar thermal power

projects) dated 13 may 2012

9.63 (Plant comissioned by 31 Mar 2014) 20% with deration of 0.5%

PA after 2nd year9.63 (Roof top and SSPG comissioned by 31 mar 2014)

TNERC (tariff order for projects covered under JNNSM) dated 27/05/10

Lev - 18.45AD- 4.11

After AD - 14.34

19% with a deration of 1% every year after ten years.

TERC (Cogeneration and Generation of Electricity from renewable source of

Energy) regulation 2009

FY 2009-12 (3 years from notification of these regulations)

FY 2009-12 (3 years from the commensment of these

regulations)

Lev - 17.70AD - 1.65

after AD - 16.05

1700 (Projects comissioned on or after 1/04/09)

UPERC (Captive and Non-conventional Energy generating plants )regulation

2009

15 (comissioned by Dec 2011,not covered under GOI incentive

scheme)

Draft WBERC (Cogeneration & generation of electricity from renewable

energy source), regulation 2012

10 (Capacity ranging 100 KW to 2 MW availing GBI)

10 (Grid connected plant not eligible for any incentive and comissioned upto 2012-13)

10(Projects comissioned after FY 2012 till FY 2015

Page 17: All India RE RAP Database

FIT: SOLAR

Prepared by ABPS Infra Page17/125

Normative Parameters

Taxes and Duties Late Payment surcharge

NA NA NA

GBI

NA NA NA

Subsidy and incentive by Central /State Govt

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Tariff exclusive of taxes and duties, pass through allowed

on actual basis

1.25% per month beyond a delay of 60 days

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Tariff exclusive of taxes and duties, pass through allowed

on actual basis1.25% per month beyond

a delay of 60 days Shall be considered

(including AD) and per unit benefit shall be derived on

levellised basis

Tariff exclusive of taxes and duties, pass through allowed

on actual basis1.25% per month beyond

a delay of 60 days

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Tariff exclusive of taxes and duties, pass through allowed

on actual basis1.25% per month beyond

a delay of 60 days

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Tariff exclusive of taxes and duties, pass through allowed

on actual basis1.25% per month beyond

a delay of 60 days

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Tariff exclusive of taxes and duties, pass through allowed

on actual basis1.25% per month beyond

a delay of 60 days

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Tariff exclusive of taxes and duties, pass through allowed

on actual basis1.25% per month beyond

a delay of 60 days

Shall be factored in the tariff on per unit benefit derived

on levellised basis1.25% per month beyond

a delay of 30 days

1.25% per month beyond a delay of 30 days

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Tariff exclusive of taxes and duties, pass through allowed

on actual basis1.25% per month beyond

a delay of 60 days

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Tariff exclusive of taxes and duties, pass through allowed

on actual basis

1.25% per month beyond a delay of 60 days

Shall be factored in the tariff on per unit benefit derived

on levellised basis

RE developers shall be exempted from all types of

taxes and duties1.25% per month beyond

a delay of 60 days

Shall be factored in the tariff on per unit benefit derived

on levellised basis

RE developers shall be exempted from all types of

taxes and duties1.25% per month beyond

a delay of 60 days

Subsidy shall be workout and tariff shall be reduced

for a period of 12 years

RE developers shall be exempted from all types of

taxes and duties1.25% per month beyond

a delay of 60 days

AD benefit shall be factored in the tariff

1% per month for payment after 30 days of

billing

75% of capital subsidy for the financial year of comissioning as per

applicable scheme of MNRE shall be considered for tariff

determination

Including Direct Tax but Exclusive other tax and

duties 10% tax rate for 0-10

years,30% for balance period alongwith 10%

surcharge and 3% education cess

1.25% per month beyond a delay of 60 days Exempt from Income tax

and all other taxes and duties & other levies

imposed by State/central Govt.

1.25% per month beyond a delay of 60 days

Page 18: All India RE RAP Database

STATE-WISE FEED-IN-TARIFF FOR SOLAR (Thermal)

STATE

CERC

Andhra Pradesh

IA No 17 of 2010, dated July 14, 2010

Arunachal Pradesh

Assam

Bihar

Chhattisgarh RE Tariff Regulation dated Apr 02, 2012

Delhi

Gujarat GERC Order 1 of 2012 dated Jan 27, 2012

Haryana

Himachal Pradesh

Tariff Regulations / or Order or Draft(Ref. no. …dt……)

CERC Generic RE Tariff Order for FY 2012-13;

CERC (Terms and Conditions for Tariff determination from

Renewable Energy Sources) Regulations, 2012

RE Tariff Regulation (Draft) dated Jan 13, 2012

Order on Petition 12/2012, dated May 29, 2012, Solar Tariff Regulations dated Aug 2,

2010

Suo Moto Petition for Determination of Levellised Tariff for RE Projects dated Sept

2012

Page 19: All India RE RAP Database

Jammu and Kashmir

Jharkhand

Karnataka

Kerala

Madhya Pradesh

Maharashtra

Manipur

&Mizoram

Meghalaya Tariff Regulation or Order Not found

Nagaland

Orissa

Punjab

Rajasthan

Sikkim Tariff order or Regulation not found

Tamil Nadu

JKSERC (Terms and Conditions for Tariff determination from RE Sources)

Regulations (Draft), 2012

of Power from Solar PV and Solar Thermal Power Projects)

REGULATIONS, 2010 dated June 23, 2010

KERC Order on Solar Power Tariff Determination dated July 13, 2010

Tariff Order for Solar Based Power Generation dated Aug 01, 2012

MERC RE tariff regulayions,2010 ,Case No 10 of 2012 (Mar 30, 2012)

JERC of Manipur & Mizorum (RE Tariff regulation) 2010 dated 15 Apr,2010

NERC (terms and condition for determination of generation tariff for renewable energy) regulation 2011

OERC redetermination of generic tariff for solar PV and Solar thermal,Case No

1 of 2012

Adoption of CERC RE tariff regulation 2012,Petetion no 35 of 2012,dated 19

July 2012

RERC (Determination of benchmark capital cost for solar PV and Solar thermal power

projects) dated 13 may 2012

TNERC (Tariff order for Solar thermal projects covered by JNNSM) dated

08/07/2010

Page 20: All India RE RAP Database

Tamil Nadu

Tripura

Uttarakhand

Uttar Pradesh

West Bengal NA

Goa No tariff Order

Union Territories

Andaman Nicobar No tariff Order

Chandigargh No tariff Order

No tariff Order

Daman & Diu No tariff Order

Lakshadweep No tariff Order

Pondicherry No tariff Order

TNERC (Tariff order for Solar thermal projects covered by JNNSM) dated

08/07/2010

TERC (Cogeneration and Generation of Electricity from renewable source of

Energy) regulation 2009UERC (Tariff and other terms for supply

of electricity from renewable enrgy sources and non fossil fuel based

cogeneration) regulation 2010UPERC (Captive and Non-conventional

Energy generating plants )regulation 2009

Dadra and Nagar Haveli

Page 21: All India RE RAP Database

ANNEXURE-1B

STATE-WISE FEED-IN-TARIFF FOR SOLAR (Thermal)

Financial Parameters

Control period Tariff (Rs/kWh)

FY 2012-16 (3 yrs) 1300 (FY 2012‐13)

2010-11 and 2012-13

Jan 2012 to Mar 2014 1500

1300

April 2012 to March 2017 1300

Jan 29, 2012 to March 31, 2015 1400

3 years(till FY 13-FY15) 12.17 1300

Capital Cost (lakh/MW)

Lev - 12.46AD - 1.24

After AD - 11.22

15.31 (Without AD) 12.85 (With AD)

Upto March 31, 2015 commissioning

13.11 (Without AD) 11.87 (With AD)

12.91 (Without AD) 11.55 (With AD)

Page 22: All India RE RAP Database

1300

June 2010 to June 2013 1300

11.35 1300

Aug 2012 to March 2014 12.65 1325

1500 (FY2010-11)

NA NA NA

FY- 2012-14 (3 years) 1530

1530

FY 2012-16

1300

FY 2012-13 1275

NA NA NA

FY 2010-11 (till 31/05/12) 1556 (FY 2010-11)

2012-17 (5 years from the date of commencement)

Upto March 31, 2013 commissioning

FY 2010-14(5 years from the date of commencement )

Lev - 13.44AD - 1.97

After AD - 11.47 1300

FY 2010-14(5 years from date of notification)

Plant comissioned in FY (2012-13) onwards

Lve - 14.73AD - 2.41

After AD-12.32

Lev - 12.46AD - 1.24

After AD - 11.2211.95 (Without AD)

With AD - 10.4511.95 (Small Solar thermal

power gen comissioned by 31 Mar 2015

Lev - 15.51AD - 3.35

After AD - 12.16

Page 23: All India RE RAP Database

FY 2010-11 (till 31/05/12) 1556 (FY 2010-11)

NA

FY 2010-14 (5 years)

NA NA NA

No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order

Lev - 15.51AD - 3.35

After AD - 12.16

FY 2009-12 (3 years from notification of these

regulations)

FY 2009-12 (3 years from the commensment of these

regulations)

Lev - 12.95AD - 1.15

after AD - 11.80

1300 (Projects comissioned on or after 1/04/09)

13 (comissioned by Dec 2011,not covered under GOI

incentive scheme)

Page 24: All India RE RAP Database

Normative Parameters

23% 10% 25

25

23% 10% 25

23% 10% 25

23% 10% 25

10.00% 25

23% 10% 25

Capacity Utilisation Factor (%)

Auxiliary Consumption (%)

Useful life(yrs)

Subsidy and incentive by Central /State Govt

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Shall be considered (including AD) and per unit benefit shall be derived on

levellised basisShall be factored in the tariff on per unit benefit derived

on levellised basis

Shall be factored in the tariff on per unit benefit derived

on levellised basis

23% with 0.25% annual degradation

Page 25: All India RE RAP Database

23% 10% 25

23% 10 25

23% 8% 25

10% 25

23% 10% 25

23% 10% 25

NA NA NA NA

23% 10% 25

24% 10% 25

23% 10% 25

6.50% 25

NA NA NA NA

10% 25

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Shall be factored in the tariff on per unit benefit derived

on levellised basis

23% with 0.5% annual deration from 3rd yr

onwards

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Subsidy shall be workout and tariff shall be reduced

for a period of 12 years

23% with a deration of 0.25% every year after

fourth year.

23% with a deration of 1% every year after ten years.

AD benefit shall be factored in the tariff

Page 26: All India RE RAP Database

10% 25

23% 10% 25

NA NA NA NA

No tariff Order No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order No tariff Order

23% with a deration of 1% every year after ten years.

AD benefit shall be factored in the tariff

the financial year of comissioning as per

applicable scheme of MNRE shall be considered for tariff

Page 27: All India RE RAP Database

Normative Parameters

Taxes and Duties ReferenceLate Payment

surcharge

Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 60

days

CE98R01060212

CE98O01270312

AP02O01140610

Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 60

days AS98A01130112

Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 60

days

BR02O01290512

BR02R01020810

Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 60

days CG98R01020412

GJ02O01270112

HR98O01030912

Page 28: All India RE RAP Database

NA NA

NA NA

Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 60

days JK98A01000012

1.25% per month beyond a delay of 30

days

JH02R01230610

KA02O01130710

1.25% per month beyond a delay of 30

days

MP02O01010812

Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 60

days MH98O01300312

Tariff exclusive of taxes and duties, pass through allowed on actual basis

1.25% per month beyond a delay of 60

days

MN98R01150410

MZ98R01150410

RE developers shall be exempted from all types

of taxes and duties

1.25% per month beyond a delay of 60

days

NL98R01300811

RE developers shall be exempted from all types

of taxes and duties

1.25% per month beyond a delay of 60

days OR02O01010212

RE developers shall be exempted from all types

of taxes and duties

1.25% per month beyond a delay of 60

days PB98O01190712

RJ02O01300512

1% per month for payment after 30 days

of billingTN02O01080710

Page 29: All India RE RAP Database

NA NA

No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order

1% per month for payment after 30 days

of billingTN02O01080710

TR98R01230309

duties 10% tax rate for 0-10

years,30% for balance period alongwith 10%

1.25% per month beyond a delay of 60

days

UA98R01060710

Exempt from Income tax and all other taxes and

duties & other levies imposed by State/central

Govt.

1.25% per month beyond a delay of 60

days

UP98R01220310

Page 30: All India RE RAP Database

Archives

HR02Z01000612

Page 31: All India RE RAP Database

FIT:BIOMASS

Prepared by ABPS Infra Page31/125

ANNEXURE-1C

STATE-WISE FEED-IN-TARIFF FOR BIOMASS

Financial Parameters Normative Parameters

STATE Control period Plant Load Factor (%)

CERC FY 2012-16 (3 yrs) 445 (FY 12-13) 4000 10% 3300

Andhra Pradesh Tariff Order (Dated 31/03/2009) & 2009-10 to 2014-15 NA 400 3,800 9%. 3275 80%.

Arunachal Pradesh Tariff Notification Dated April 9, 2012 NA 445 4000 10% 3300 70%

Assam NA 426 3800 10% 3467 70%

Bihar Discussion Paper- July 2012 NA NA 425 3650 10% 3150 75%

Chhattisgarh Draft RE Tariff Regulation_April 2012 NA 445 4000 10% 3300

Delhi No tariff Order No tariff Order NA NA NA NA NA NA

JERC (Goa & UT) No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

Gujarat Bagass Tariff Order - Order No. 5 of 2010-May 17, 2010 454 3800 10% 3300

Haryana 3800 10% 3458

Himachal Pradesh RE Tariff Regulations_240712 NA NA NA NA NA NA

Jammu and Kashmir Draft RE Tariff Regulations_July 2012 NA 445 4000 10% 3300

Jharkhand Till March 31, 2015 NA 450 3800 10% 3467 70%

Karnataka RE Tariff Order(111209) NA NA 487 9% 75%

Kerala No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

Madhya Pradesh Biomass Tariff Order_ March 2, 2012 450 3800 10% 3612

Maharashtra MERC suo motu Tariff Order dated 5.41 402.54 3800 10% 3611

Manipur 2010-11 to 2014-15 NA 520 3800 10% 3467

&Mizoram 2010-11 to 2014-15 NA 520 3800 10% 3467

Meghalaya NA NA NA NA NA NA NA NA

Nagaland 403 3800 10% 3467

Orissa 4.09 450 3800 10% 3522

Punjab 5.83 445 4000 10% 3300

Rajasthan 540/585 3400

Sikkim NA NA NA NA NA NA NA NA

Tamil Nadu 4.694 445 3840 10% 3200 80%

Tripura NA NA NA NA NA NA NA NA

Uttarakhand 450 4200 10% 3371

Tariff Regulations / or Order or Draft(Ref. no. …dt……)

Tariff (Rs/kWh)

Capital Cost (lakh/MW)

Specific heat rate (kcal/kWh)

Auxiliary Consumption

(%)

Calorific Value(kCal/kg)

CERC Generic RE Tariff Order for FY 2012-13;

CERC (Terms and Conditions for Tariff determination from

Renewable Energy Sources) Regulations, 2012

***given below in separate table

60% during stabilisation period ,

70% for remaining stabilisation period of 1st

year and then

80% from 2nd year onward

5 Years( 2012-13 to 2017-18)

Notification (Draft)Dated Guwahati the 13th January, 2012

3 years(till March 2014)

5 Years(2011-12-2016-17)

First six months of COD: 60%

ii. Next six months upto one year of COD: 70%iii. From 2nd Year of COD onwards: 80 %

1.06.2010 to 31.03.2013.

4.49 (with AD) 4.54(w/o AD)

70% for 1st year &80% from 2nd year

onwards.

Haryana RE (Biomass) Tariff Order -03092012

3 years(till FY 13-FY15)

5.59 (for watercooled)

5.88 (for aircooled condenser)

445 (aircooled condenser)475 (water cooled condenser)

70% for 1st year &80% from 2nd year

onwards.

From December 18, 2012 upto March

31, 2017

5 years(2012-13 to 2017-18)

During stabilisation : 60 % (ii)During the

remaining period of the first year of operation of

the plant (after stabilization) : 70% (iii)From 2nd Year

onwards : 80%Biomass and NFFcogen Tariff Regulations_27012010

March 2012 to end of FY 2013-14

During stabilisation : 60 % (ii)During the

remaining period of the first year of operation of

the plant (after stabilization) : 70% (iii)From 2nd Year

onwards : 80%FY2013-14 and FY2014-15

60% before stabilisation period , 70% for

remaining stabilisation period of 1st year and

then 80% from 2nd year onward

Joint Electricity Regulatory Commission for

Manipur & Mizoram (Terms and Conditions for Tariff determination from

RenewableEnergy Sources) Regulations, 2010.

60% before stabilisation period , 70% for

remaining stabilisation period of 1st year and

then 80% from 2nd year onward

Joint Electricity Regulatory Commission for

Manipur & Mizoram (Terms and Conditions for Tariff determination from

RenewableEnergy Sources) Regulations, 2010.

60% before stabilisation period , 70% for

remaining stabilisation period of 1st year and

then 80% from 2nd year onward

Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011

FY2010-11 to FY2014-15

60% before stabilisation period , 70% for

remaining stabilisation period of 1st year and

then 80% from 2nd year onward OERC Suo Moto Tariff Order dated

September 14, 2010 in Petition No 37/2008

From FY2010-11 to FY2012-13

60% before stabilisation period , 70% for

remaining stabilisation period of 1st year and

then 80% from 2nd year onward

PSERC Suo Motu Order on RE Tariff by adopting CERC Tariff

From FY2010-11 to FY2012-13

60% before stabilisation period , 70% for

remaining stabilisation period of 1st year and

then 80% from 2nd year onward

RERC Tariff Regulation 2009 dated January 23, 2009

FY2009-10 to FY 2013-14

4.77 for water cooled / 5.22 for

Air cooled

4300 during stabilisation and 4200

after stabilization / 4540 before

stabilization and 4440 after stabilization

10.5 % during s and 10% after tabilization / 12.5 % during s and 12% after tabilization

60% before stabilisation period , 70% for

remaining stabilisation period of 1st year and

then75% from 2nd year onward

Comprehensive Tariff Order for Biomass Power Plants, Order No 8 of

2012 dated July 31 ,2012

August1, 2012 to July 31, 2014

UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel

based Co-generating Stations) Regulations, 2010

FY2009-10 to FY2013

60% before stabilisation period , 70% for

remaining stabilisation period of 1st year and

then 80% from 2nd year onward

E56
Ravi: Revised Total Tariff estimated for Biomass Projects for FY 2012-13 based on equivalent heat value methhod in Suo moto Tariff Order dated 31 March 2012
F56
Ravi: for the Year 2011-12. Then Capita lIndexation Mechanism to be applied to derive the cost for FY 2013-14 and FY 2014-15
F59
Ravi: Capital Cost for FY 2010-11 which is then linked with indexation mechanism
F62
Ravi: Capital Cost for FY 2010-11 which is then linked with indexation mechanism
F68
Ravi: Capital cost for FY2010-11 linked with CERC Indexation formula
E83
Ravi: Fixed Cost and Variable cost
Page 32: All India RE RAP Database

FIT:BIOMASS

Prepared by ABPS Infra Page32/125

ANNEXURE-1C

STATE-WISE FEED-IN-TARIFF FOR BIOMASS

Financial Parameters Normative Parameters

STATE Control period Plant Load Factor (%)Tariff Regulations / or Order or Draft

(Ref. no. …dt……)Tariff

(Rs/kWh)Capital Cost

(lakh/MW)Specific heat rate

(kcal/kWh)

Auxiliary Consumption

(%)

Calorific Value(kCal/kg)

Uttarakhand 450 4200 10% 3371

Uttar Pradesh 5.02 NA NA NA NA NA

West Bengal NA 5.00

Goa No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

Union Territories

Andaman Nicobar No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

Chandigargh No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

Daman & Diu No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

Lakshadweep No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

Pondicherry No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

CERC Tariff for Biomass for FY 2012-13

State Lev. FC Lev. VC AD Benefit

Andhra Pradesh 2.06 3.12 5.18 0.13 5.05Haryana 2.10 3.55 5.65 0.13 5.52

Maharashtra 2.11 3.63 5.74 0.13 5.61Punjab 2.12 3.71 5.83 0.13 5.70

Rajasthan 2.06 3.10 5.16 0.13 5.03Tamil Nadu 2.06 3.07 5.12 0.13 4.99

Uttar Pradesh 2.07 3.17 5.24 0.13 5.11Others 2.08 3.33 5.42 0.13 5.29

UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel

based Co-generating Stations) Regulations, 2010

FY2009-10 to FY2013

60% before stabilisation period , 70% for

remaining stabilisation period of 1st year and

then 80% from 2nd year onward

UPERC (Captive and Non- Conventional Energy Generating

Plants) Regulations, 2009(hereinafter referred to as CNCE

Regulations, 2009).

October 1, 2009 to March 31, 2014

Draft West Bengal Electricity Regulatory Commission (Cogeneration and

Generation of Electricity from Renewable Sources of Energy)

Regulations, 2012 (For replacing existing Regulation)

WBERC does not specify the project parameters for

determination of tariff. It only specifies a cap for the tariff.

WBERC does not specify the project

parameters for determination of tariff. It only specifies a cap for

the tariff.

WBERC does not specify the project

parameters for determination of tariff. It only specifies a cap for

the tariff.

WBERC does not specify the project

parameters for determination of tariff. It only specifies a cap for

the tariff.

WBERC does not specify the project

parameters for determination of tariff. It only specifies a cap for

the tariff.

Dadra and Nagar Haveli

Tariff (With AD)(FY 2012‐13)

Net Levellised (without AD)

Page 33: All India RE RAP Database

FIT:BIOMASS

Prepared by ABPS Infra Page33/125

Normative Parameters

Reference Archives

20

20 NA

20

20

1700 20 NA NA NA

20

NA NA NA NA NA NA

No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order NA

1600 (5% esc) 20

20

NA NA NA NA NA

2500(indexation or 5% esc) 20

20 NA NA NA

1280 FY 2009-10 ( 5% esc) 20 NA NA NA

No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

2100 20 NA NA NA

2605 20 NA

20 NA

20 NA

NA NA NA NA NA NA

20 NA

1968 20 NA

2756 20 NA

20 NA

NA NA NA NA NA NA

2277 20 NA

NA NA NA NA NA NA

20 NA

Fuel Cost (Rs/ MT)

Useful life(yrs)

Subsidy and incentive by Central /State Govt

Taxes and Duties

Late Payment surcharge

Andhra Pradesh-2315Haryana-2635

Maharashtra-2695Punjab-2756

Rajasthan-2300Tamil Nadu-2277

Uttar Pradesh-2355Other States-2476

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Tariff exclusive of taxes and duties, pass

through allowed on actual basis

1.25% per month beyond a delay of

60 days CE98R01060212, CE98O01270312

1300 for base year 2009-10 (5%esc)

Passed on to utility/consumer

over and above the determined

tariffs, to be reimbursed by the DISCOMs

AP98O0120911

2283 for FY2012-13 (5%esc)

Normative capital cost, Accelerated Depreciation , Corporate income tax rate,

Capitalisation of RE projects during second half of the

fiscal year, Per unit benefit shall be derived on

levellised basis at discount factor equivalent to

weighted average cost of capital or any other

appropriate discounting factor considered by the

Commission.

pass through on actual

incurred basis subject to

production of documentary

evidenceby the

generating company.

1.25% per month, beyond 60 days

AR98R0190412

2018 for FY 2012-13 (5% esc)

Normative capital cost, Accelerated Depreciation , Corporate income tax rate,

Capitalisation of RE projects during second half of the

fiscal year, Per unit benefit shall be derived on

levellised basis at discount factor equivalent to

weighted average cost of capital or any other

appropriate discounting factor considered by the

Commission.

pass through on actual

incurred basis subject to

production of documentary

evidenceby the

generating company.

1.25% per month, beyond 60 days

AS98A01130112

BR04C01010712

2476 for FY 2012-13 (linked with indexation )

Normative capital cost, Accelerated Depreciation , Corporate income tax rate,

Capitalisation of RE projects during second half of the

fiscal year, Per unit benefit shall be derived on

levellised basis at discount factor equivalent to

weighted average cost of capital or any other

appropriate discounting factor considered by the

Commission.

pass through on actual

incurred basis subject to

production of documentary

evidenceby the

generating company.

1.25% per month, beyond 60 days

CG98A01020412

Normative capital cost, Accelerated Depreciation , Corporate income tax rate,

Capitalisation of RE projects during second half of the

fiscal year, Per unit benefit shall be derived on

levellised basis at discount factor equivalent to

weighted average cost of capital or any other

appropriate discounting factor considered by the

Commission.

pass through on actual

incurred basis subject to

production of documentary

evidenceby the

generating company.

1.25% per month, beyond 60 days

GJ04O01170510

2556 - FY 2012-13(5% esc)

Normative capital cost, Accelerated Depreciation , Corporate income tax rate,

Capitalisation of RE projects during second half of the

fiscal year, Per unit benefit shall be derived on

levellised basis at discount factor equivalent to

weighted average cost of capital or any other

appropriate discounting factor considered by the

Commission.

pass through on actual

incurred basis subject to

production of documentary

evidenceby the

generating company.

1.25% per month, beyond 60 days

HR98O01030912 HR98O01250112/ HR98R0130211

HP98A01240712

Normative capital cost, Accelerated Depreciation , Corporate income tax rate,

Capitalisation of RE projects during second half of the

fiscal year, Per unit benefit shall be derived on

levellised basis at discount factor equivalent to

weighted average cost of capital or any other

appropriate discounting factor considered by the

Commission.

pass through on actual

incurred basis subject to

production of documentary

evidenceby the

generating company.

1.25% per month, beyond 60 days

JK98A01010712

1797- FY2010-11 (5% esc)

JH04R01270110

KA98O01111209

KL07R02191108

MP04O0120312

Passed on to utility/consumer

excluded from the tariff

MH98R01070610 / MH98O01300312

2084 for FY010 -11 ( with 5% esc)

Passed on to utility/consumer

excluded from the tariff

MN98R01150410

2084 for FY010 -11 ( with 5% esc)

Passed on to utility/consumer

excluded from the tariff

MZ98R01150410

1855 for FY010 -11 ( with 5% esc)

Passed on to utility/consumer

excluded from the tariff

NL98R01300811

Passed on to utility/consumer

excluded from the tariff

OR98O01140910

Passed on to utility/consumer

excluded from the tariff

PB98O01190712

1830 for FY011-12 ( with 5% esc)

Passed on to utility/consumer

excluded from the tariff

RJ98R01230109 / RJ04O01091211

Passed on to utility/consumer

interest of 1% per Month

TN04O01310712

1518 for FY009-10 ( with 5% esc)

75% passed onto utility/consumer

1.25% p.m. beyond 60 days

UA98R01060710

K56
Ravi: during FY 2010-11, FY 2011-12, FY2012-13. For FY 2012-14 and for FY2014-15 Fuel Cost will be calculated based on the indexation mechanism
K71
Ravi: Base Price of 1785 of Biomss Fuel for FY 2010-11 is escalated with 5% for biolass Price for FY 2012-13 as per the Regulations
K77
Ravi: Biomass Price of 1830 is escalated with 5% as per the 3rd Amendment dated18.11.2011
Page 34: All India RE RAP Database

FIT:BIOMASS

Prepared by ABPS Infra Page34/125

Normative Parameters

Reference ArchivesFuel Cost (Rs/ MT)

Useful life(yrs)

Subsidy and incentive by Central /State Govt

Taxes and Duties

Late Payment surcharge

20 NA

NA NA NA

No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

1518 for FY009-10 ( with 5% esc)

75% passed onto utility/consumer

1.25% p.m. beyond 60 days

UA98R01060710

passed on to utility/consumer

1.25% p.m. beyond 2 months

UP98R01220310

WBERC does not specify the project parameters for determination of tariff. It

only specifies a cap for the tariff.

WBERC does not specify the project

parameters for determination of

tariff. It only specifies a cap for

the tariff.

WBERC does not specify the project parameters for

determination of tariff. It only specifies a cap for the tariff.

WBERC does not specify the

project parameters for determination of tariff. It only specifies a cap

for the tariff.

WBERC does not specify the project

parameters for determination of

tariff. It only specifies a cap for

the tariff.

WB98A01100812

Page 35: All India RE RAP Database

FIT:BAGASSE_COGEN

Prepared by ABPS Infra Page35/125

ANNEXURE-1D

STATE-WISE FEED-IN-TARIFF FOR BAGASSE_COGEN

Financial Parameters Normative Parameters

STATE Control period Plant Load Factor (%)

CERC FY 2012-16 (3 yrs) 420 3600 8.50% 2250 20

Andhra Pradesh Tariff Order (Dated 31/03/2009) 2009-10 to 2014-15 325 3700 9.0% 2300 55% 950 20 -

Arunachal Pradesh Tariff Notification Dated April 9, 2012 No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order 20

Assam NA 421 3600 8.50% 2250 53% 1306(5% esc) 20

Bihar Discussion Paper- July 2012 NA NA 400 3650 8.50% 2275 53% 1200(5% esc) 20

Chhattisgarh NA 420 3600 8.50% 2250 53% 20

Delhi No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

Gujarat Bagass Tariff Order - Order No. 4 of 2010-May 31, 2010 4.65 (with AD) 4.71(w/o AD) 415 3600 8.50% 2250 60% 1200(5% esc) 20

Haryana Haryana Biomass Tariff Order -03092012 3.83 421.3 3600 8.50% 2250 53% 662(with 5% esc) 20

Himachal Pradesh RE Tariff Regulations_240712 No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order No tariff Order

Jammu and Kashmir Draft RE Tariff Regulations_July 2012 NA 420 3600 8.50% 2250 53%20

Jharkhand Till March 31, 2015 NA 400 3600 8.5% 2250 53% 1163(5% esc) 20

Karnataka RE Tariff Order(111209) NA NA 365 3600 8% 2250 60% 1025(with 5% esc) 20

Kerala Power Procurement Regulations 2008 NA 2.55 350 55% 12

Madhya Pradesh till 31.3.2013 275 3700 8% 2300 55% 775 20

Maharashtra 2010-11 to 2014-15 398.07 3600 8.50% 2250 60% 1832 20

Manipur Tariff Regulations (Dated 15/04/2010) 2010-11 to 2014-15 NA 516 3600 8.50% 2250 53% 1350 20

&Mizoram Tariff Regulations (Dated 15/04/2010) 2010-11 to 2014-16 NA 516 3600 8.50% 2250 53% 1350 20

Meghalaya No Tariff Order/Regulations available

Nagaland Tariff Regulations (Dated 08/2011) 2011-12 to 2014-15 NA 398 3600 8.50% 2250 53% 1221 20

Orissa Tariff Order (Dated 14/09/2010) 2010-11 to 2012-13 398.07 3600 8.50% 2250 53% 1221 20

Punjab Tariff Order (Dated 19/07/2012) 2012-13 420 3600 8.50% 2250 80% 2357 20

Rajasthan Tariff Regulations (Dated 23/01/2009) 2009-10 to 2014-15

Sikkim No Tariff Order/Regulations available

Tamil Nadu Tariff Order (Dated 31/07/2012) NA 420 3700 9% 2300 55% 1050 20 NA NA

Tripura No Tariff Order/Regulations available

Uttarakhand Tariff Regulations (Dated 06/07/2010) NA NA 445 3600 8.50% 2250 45% 1013 20

Uttar Pradesh Tariff Regulations (Dated 22/03/2010) 2010-11 to 2013-14 NA

West Bengal 3.3 NA NA NA

Goa No Tariff Order/Regulations available

Union Territories

Andaman Nicobar No Tariff Order/Regulations available

Chandigargh No Tariff Order/Regulations available

No Tariff Order/Regulations available

Daman & Diu No Tariff Order/Regulations available

Lakshadweep No Tariff Order/Regulations available

Pondicherry No Tariff Order/Regulations available

CERC Tariff for Bagasse Co-gen for FY 2012-13

State Lev. FC Lev. VC AD Benefit

Andhra Pradesh 2.77 2.29 5.06 0.21 4.85Haryana 2.48 3.25 5.73 0.18 5.55

Maharashtra 2.22 3.2 5.42 0.16 5.26Punjab 2.44 2.86 5.3 0.18 5.12

Tamil Nadu 2.15 2.46 4.61 0.16 4.45Uttar Pradesh 2.8 2.55 5.35 0.21 5.14

Others 2.43 2.77 5.2 0.18 5.02

Tariff Regulations / or Order or Draft(Ref. no. …dt……)

Tariff (Rs/kWh)

Capital Cost (lakh/MW)

Station heat rate (kcal/kWh)

Auxiliary Consumption

(%)

Calorific Value(kCal/kg)

Fuel Cost (Rs/ MT)

Useful life(yrs)

Subsidy and incentive by Central /State Govt

Taxes and Duties

Late Payment surcharge

CERC Generic RE Tariff Order for FY 2012-13;

CERC (Terms and Conditions for Tariff determination from

Renewable Energy Sources) Regulations, 2012

***given below in separate table

UP&AP - 45%TN & Maha - 60%

Other States - 53%

Andhra Pradesh-1307Haryana-1859

Maharashtra-1832Punjab-1636

Tamil Nadu-1408Uttar Pradesh-1458Other States-1583

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Tariff exclusive of taxes and duties, pass

through allowed on actual basis

1.25% per month beyond a delay of

60 days

Passed on to utility/consumer

over and above the determined

tariffs, to be reimbursed by the DISCOMs

5 Years( 2012-13 to 2017-18)

Normative capital cost, Accelerated Depreciation , Corporate income tax rate,

Capitalisation of RE projects during second half of the

fiscal year, Per unit benefit shall be derived on

levellised basis at discount factor equivalent to

weighted average cost of capital or any other

appropriate discounting factor considered by the

Commission.

pass through on actual

incurred basis subject to

production of documentary

evidenceby the

generating company.

1.25% per month, beyond 60 days

Notification (Draft)Dated Guwahati the 13th January, 2012

3 years(till March 2014)

Normative capital cost, Accelerated Depreciation , Corporate income tax rate,

Capitalisation of RE projects during second half of the

fiscal year, Per unit benefit shall be derived on

levellised basis at discount factor equivalent to

weighted average cost of capital or any other

appropriate discounting factor considered by the

Commission.

pass through on actual

incurred basis subject to

production of documentary

evidenceby the

generating company.

1.25% per month, beyond 60 days

Draft RE Tariff Regulation_April 2012(NFF Cogen)

5 Years(2011-12-2016-17)

1583 ( for first year, after through indexation)

Normative capital cost, Accelerated Depreciation , Corporate income tax rate,

Capitalisation of RE projects during second half of the

fiscal year, Per unit benefit shall be derived on

levellised basis at discount factor equivalent to

weighted average cost of capital or any other

appropriate discounting factor considered by the

Commission.

pass through on actual

incurred basis subject to

production of documentary

evidenceby the

generating company.

1.25% per month, beyond 60 days

three years from 1st June,

2010 to 31st May, 2013.

Normative capital cost, Accelerated Depreciation , Corporate income tax rate,

Capitalisation of RE projects during second half of the

fiscal year, Per unit benefit shall be derived on

levellised basis at discount factor equivalent to

weighted average cost of capital or any other

appropriate discounting factor considered by the

Commission.

pass through on actual

incurred basis subject to

production of documentary

evidenceby the

generating company.

1.25% per month, beyond 60 days

3 years(till FY 13-FY15)

Normative capital cost, Accelerated Depreciation , Corporate income tax rate,

Capitalisation of RE projects during second half of the

fiscal year, Per unit benefit shall be derived on

levellised basis at discount factor equivalent to

weighted average cost of capital or any other

appropriate discounting factor considered by the

Commission.

pass through on actual

incurred basis subject to

production of documentary

evidenceby the

generating company.

1.25% per month, beyond 60 days

18th day of December, 2012 and shall end on the 31st day of

March,2017

90% of the capital subsidy available

pass through on actual

incurred basis subject to

production of documentary

evidenceby the

generating company.

1.25% per month, beyond 60 days

5 years(2012-13 to 2017-18)

1600 (indexation or 5% esc)

Normative capital cost, Accelerated Depreciation , Corporate income tax rate,

Capitalisation of RE projects during second half of the

fiscal year, Per unit benefit shall be derived on

levellised basis at discount factor equivalent to

weighted average cost of capital or any other

appropriate discounting factor considered by the

Commission.

pass through on actual

incurred basis subject to

production of documentary

evidenceby the

generating company.

1.25% per month, beyond 60 days

Biomass and NFFcogen Tariff Regulations_27012010

Tariff Order on Bagass based Co-gen_03092008

1.91(FT)+1.99(VT)= 3.90(for FY 2012-13

Tariff Regulations (Dated 07/06/2010) & RE Tariff Order March 31, 2012

2.26(F.C)+ 2.53(V.C)= 4.79 (for FY 2012-13)

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

Rs 4.4/kWh (Without AD) & Rs 4.12/kWh (With AD)

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

Rs 5.32/kWh (Without AD) & Rs 5.2/kWh (With AD)

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

Parameters and tariffs to be determined through suo-motu

petition or on case-to-case basis

Parameters and tariffs to be determined through suo-motu

petition or on case-to-case basis

Parameters and tariffs to be determined through suo-motu

petition or on case-to-case basis

Parameters and tariffs to be determined through suo-motu

petition or on case-to-case basis

Parameters and tariffs to be determined through suo-motu

petition or on case-to-case basis

Parameters and tariffs to be determined through suo-motu petition or on

case-to-case basis

Parameters and tariffs to be determined through suo-motu petition or on

case-to-case basis

Parameters and tariffs to be determined

through suo-motu petition or on case-to-case

basis

Parameters and tariffs to be determined through suo-

motu petition or on case-to-case basis

Parameters and tariffs to be

determined through suo-

motu petition or on case-to-case basis

Parameters and tariffs to be

determined through suo-motu petition or

on case-to-case basisNo Tariff

Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

01/08/2012 to 31/07/2014

1% p.m. beyond 30 days

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

75% passed onto utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

refer worksheet 'Additional Data', Table 1

UPERC specifies 'year of operation' based fixed cost and financial year based variable cost. It does not

specify the parameters for tariff determination.

UPERC specifies 'year of operation' based

fixed cost and financial year based variable

cost. It does not specify the parameters for tariff

determination.

UPERC specifies 'year of operation' based

fixed cost and financial year based variable

cost. It does not specify the parameters for tariff

determination.

UPERC specifies 'year of operation' based

fixed cost and financial year based variable

cost. It does not specify the parameters for tariff

determination.

UPERC specifies 'year of operation' based fixed cost and financial year based variable cost. It does not

specify the parameters for tariff determination.

UPERC specifies 'year of operation' based fixed cost and financial year based variable cost. It does not

specify the parameters for tariff determination.

UPERC specifies 'year of operation' based fixed cost

and financial year based variable

cost. It does not specify the

parameters for tariff

determination.

passed on to utility/consumer

1.25% p.m. beyond 2 months

Draft Tariff Regulations (Dated 10/08/2012)

10/08/2012 to 10/08/2015

WBERC does not specify the project parameters for

determination of tariff. It only specifies a cap for the tariff.

WBERC does not specify the project

parameters for determination of tariff. It only specifies a cap for

the tariff.

WBERC does not specify the project

parameters for determination of tariff. It only specifies a cap for

the tariff.

WBERC does not specify the project

parameters for determination of tariff. It only specifies a cap for

the tariff.

WBERC does not specify the project parameters for determination of tariff. It

only specifies a cap for the tariff.

WBERC does not specify the project parameters for determination of tariff. It

only specifies a cap for the tariff.

WBERC does not specify the project

parameters for determination of

tariff. It only specifies a cap for

the tariff.No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

Dadra and Nagar Haveli No Tariff

Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

Tariff (With AD)(FY 2012‐13)

Net Levellised (without AD)

Page 36: All India RE RAP Database

FIT:BAGASSE_COGEN

Prepared by ABPS Infra Page36/125

Reference Archives

CE98R01060212

CE98O01270312

AP98O01310309

AP98O0120911

AS98A01130112

AR98R0190412

BR07C01000712

CG98R01120412

GJ07O01310510

HR98O01030912 HR98O01250112/ HR0O01270511/ HR98R0130211

HP98A01240712

JK98A01000712

JH07R01270110

KA98O01111209

KL07R02191108

MP07O0130908

MH98R01070610 / MH98O01300312

MN98R01150410

MZ98R01150411

No Tariff Order/Regulations available

NL98R01300811

OR98O01140910

PB98O01190712

RJ98R01230109

No Tariff Order/Regulations available

TN07O01310712

No Tariff Order/Regulations available

UA98R01060710

UP98R01220310

WB98A01100812

Page 37: All India RE RAP Database

FIT:SMALL HYDRO

Prepared by ABPS Infra Page37/125

ANNEXURE-1F

STATE-WISE FEED-IN-TARIFF FOR SMALL HYDRO

Financial Parameters Normative Parameters

STATE Control period Tariff (Rs/kWh)

CERC FY 2012-16 (3 yrs) 1% 35

Andhra Pradesh No Tariff/Parameters Defined No Tariff/Parameters Defined

Arunachal Pradesh Tariff Regulations (Dated 9/4/2012) 9/4/2012 to 8/4/2017 NA 45% 1% 35

Assam 31/3/2012 to 31/3/2015 NA 45% 1% 35

Bihar No Tariff Order/Regulations available

Chhattisgarh 5 Years(2011-12-2016-17) NA 30% 1% 35

Delhi No Tariff Order/Regulations available

Gujarat No Tariff Order/Regulations available

Haryana RE Tariff Regulations (Dated 03/02/2011) 3 years(till FY 13) Case to Case basis Case to Case basis Case to Case basis Case to Case basis 35

Himachal Pradesh 18/12/2012 to 31/3/2017 NA 55% 1% 35

Jammu and Kashmir Draft RE Tariff Regulations 2012-13 to 2016-17 NA 45% 1% 35

Jharkhand Tariff Regulations (Dated 03/07/2007) NA NA NA NA 0.50% 20 NA NA NA

Karnataka RE Tariff Order (Dated 11/12/2009) NA 475 30% 1% NA NA NA

Kerala NA Rs 2.94/kWh 520 30% 0.50% 25 NA NA NA

Madhya Pradesh 30/06/2010 to 31/03/2013 Refer Table 1 below 1% 30 NA NA NA

Maharashtra Tariff Regulations (Dated 07/06/2010) 2010-11 to 2014-15 NA 30% 1% 35

Manipur Tariff Regulations (Dated 15/04/2010) 2010-11 to 2014-15 NA 40% 101% 35

&Mizoram Tariff Regulations (Dated 15/04/2010) 2010-11 to 2014-16 NA 40% 201% 35

Meghalaya No Tariff Order/Regulations available

Nagaland Tariff Regulations (Dated 08/2011) 2011-12 to 2014-15 NA 30% 1% 35

Orissa Tariff Order (Dated 14/09/2010) 2010-11 to 2012-13 35% 1% 35

Punjab Tariff Order (Dated 19/07/2012) 2012-13 30% 1% 35

Rajasthan Tariff Regulations (Dated 23/01/2009) 2009-10 to 2014-15

Sikkim No Tariff Order/Regulations available

Tamil Nadu

Tripura No Tariff Order/Regulations available

Uttarakhand Tariff Regulations (Dated 06/07/2010) NA 45% 1% 35

Uttar Pradesh Tariff Regulations (Dated 22/03/2010) 2010-11 to 2013-14 NA

West Bengal 10/08/2012 to 10/08/2015 4.4 NA NA NA

Goa No Tariff Order/Regulations available

Union Territories

Andaman Nicobar No Tariff Order/Regulations available

Chandigargh No Tariff Order/Regulations available

No Tariff Order/Regulations available

Daman & Diu No Tariff Order/Regulations available

Lakshadweep No Tariff Order/Regulations available

Pondicherry No Tariff Order/Regulations available

Tariff Regulations / or Order or Draft(Ref. no. …dt……)

Capital Cost (lakh/MW)

Capacity Utilisation Factor (%)

Auxiliary Consumption(%)

Useful life(yrs)

Subsidy and incentive by Central /State Govt

Taxes and Duties

Late Payment surcharge

CERC Generic RE Tariff Order for FY 2012-13;

CERC (Terms and Conditions for Tariff determination from

Renewable Energy Sources) Regulations, 2012

HP, Uttarakhand and NEStates

(Below 5MW) - 4.14(without AD), 3.82 (with AD)

(5MW-25MW)-3.54(without AD), 3.25 (with

AD)

Other States (Below 5MW) - 4.88(without

AD), 4.50 (with AD)(5MW-25MW)-

4.16(without AD), 3.82 (with AD)

HP, Uttarakhand and NEStates

(Below 5MW) - 770(5MW-25MW)- 700

Other States (Below 5MW) - 600(5MW-25MW)- 550

HP, Uttarakhand and NE States - 45%

Other States- 30%

Shall be factored in the tariff on per unit benefit derived

on levellised basis

Tariff exclusive of taxes and duties, pass

through allowed on actual basis

1.25% per month beyond a delay of

60 days

No Tariff/Parameters Defined

No Tariff/Parameters Defined

No Tariff/Parameters Defined

No Tariff/Parameters Defined

No Tariff/Parameters

Defined

No Tariff/Parameters Defined

No Tariff/Paramete

rs Defined

No Tariff/Parameters

Defined

700 (<=5 MW) & 630 (5-25 MW)

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

Draft Tariff Regulations (Dated 13/01/2012)

669 (<=5 MW) & 602 (5-25 MW)

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulatio

ns available

No Tariff Order/Regulations

available

Draft RE Tariff Regulation_April 2012(NFF Cogen)

600 (<=5 MW) & 550 (5-25 MW)

passed on to utility/consumer

water charges/statutory charges as levied by the

StateGovernment shall not be

included in the tariff. It is to be paid separately

and shall be pass through

on actual incurred basis

1.25% p.m. beyond 60 days

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulatio

ns available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulatio

ns available

No Tariff Order/Regulations

available

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

Draft RE Tariff Regulation (Dated 24/07/2012)

780 (100kW - 2MW), 750 (2-5 MW) & 700 (5-25 MW)

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

770 (<=5 MW) & 700 (5-25 MW)

passed on to utility/consumer

1.25% p.m. beyond 60 days

Rs 3.40/kWh for the first 10 years after signing the PPA

passed on to utility/consumer not included in

the tariff

Tariff amendment Regulations (Dated 22/11/2010)

SHP Tariff Regulations (Dated 30/06/2010)

700 for Run of the river, 600 for canal based generation

35% for Run of the river, 30% for canal based

generation

498.88 (<=5 MW) & 453.53 (5-25 MW)

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

812 (<=5 MW) & 730 (5-25 MW)

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

812 (<=5 MW) & 730 (5-25 MW)

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

635 (<=5 MW) & 571 (5-25 MW)

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

Rs 3.91/kWh (<=5 MW) & Rs 3.64/kWh (5-25 MW) w/o AD and Rs 3.31/kWh & Rs 3.09/kWh respectively with

AD

600 (<=5 MW) & 550 (5-25 MW)

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

Rs 4.88/kWh (<=5 MW) & Rs 4.16/kWh (5-25 MW) w/o

AD and Rs 4.5/kWh & Rs 3.82/kWh respectively with

AD

600 (<=5 MW) & 550 (5-25 MW)

passed on to utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

Parameters and tariffs to be determined through suo-

motu petition or on case-to-case basis

Parameters and tariffs to be determined through suo-motu

petition or on case-to-case basis

Parameters and tariffs to be determined through suo-motu petition or on

case-to-case basis

Parameters and tariffs to be determined through suo-motu petition or on

case-to-case basis

Parameters and tariffs to be determined

through suo-motu petition or on case-to-case

basis

Parameters and tariffs to be determined through suo-

motu petition or on case-to-case basis

Parameters and tariffs to be

determined through suo-

motu petition or on case-to-case basis

Parameters and tariffs to be

determined through suo-motu petition or

on case-to-case basis

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

Parameters are defined on case to case basis

Parameters are defined on case to case basis

Parameters are defined on case to case basis

Parameters are defined on case to case basis

Parameters are defined on case to case basis

Parameters are defined on case to case basis

Parameters are defined on case to

case basis

Parameters are defined on case to case basis

Parameters are defined on

case to case basis

Parameters are defined on case to

case basis

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available700 For 0-5 MW, 685 For 5-10 MW, 670 For 10-15 MW, 650 For 15-20 MW & 630 For 20-

25 MW

75% passed onto utility/consumer

passed on to utility/consumer

1.25% p.m. beyond 60 days

UPERC specifies 'year of operation' based fixed cost and financial year based

tariff. It does not specify the parameters for tariff

determination.

UPERC specifies 'year of operation' based fixed cost

and financial year based tariff. It does not specify the parameters for tariff

determination.

UPERC specifies 'year of operation' based fixed cost and financial year based tariff. It does not specify the parameters for tariff

determination.

UPERC specifies 'year of operation' based fixed cost and financial year based tariff. It does not specify the parameters for tariff

determination.

UPERC specifies 'year of operation' based fixed cost

and financial year based tariff. It

does not specify the parameters

for tariff determination.

passed on to utility/consumer

1.25% p.m. beyond 2 months

Draft Tariff Regulations (Dated 10/08/2012)

WBERC does not specify the project parameters for

determination of tariff. It only specifies a cap for the tariff.

WBERC does not specify the project parameters for determination of tariff. It

only specifies a cap for the tariff.

WBERC does not specify the project parameters for determination of tariff. It

only specifies a cap for the tariff.

WBERC does not specify the project

parameters for determination of

tariff. It only specifies a cap for

the tariff.No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulatio

ns available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulatio

ns available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulatio

ns available

No Tariff Order/Regulations

available

Dadra and Nagar Haveli No Tariff Order/Regulations

availableNo Tariff Order/Regulations

availableNo Tariff Order/Regulations

availableNo Tariff Order/Regulations

availableNo Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulatio

ns available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulatio

ns available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulatio

ns available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulatio

ns available

No Tariff Order/Regulations

available

Page 38: All India RE RAP Database

FIT:SMALL HYDRO

Prepared by ABPS Infra Page38/125

ANNEXURE-1F

STATE-WISE FEED-IN-TARIFF FOR SMALL HYDRO

Financial Parameters Normative Parameters

STATE Control period Tariff (Rs/kWh)Tariff Regulations / or Order or Draft(Ref. no. …dt……)

Capital Cost (lakh/MW)

Capacity Utilisation Factor (%)

Auxiliary Consumption(%)

Useful life(yrs)

Subsidy and incentive by Central /State Govt

Taxes and Duties

Late Payment surcharge

Table 1: Tariffs of SHP in Madhya Pradesh

YearRun of the River Projects Canal Based Projects

Tariff considering GoMP free power policy (Rs./kWh) Tariff considering GoMP free power policy (Rs./kWh)<5 MW 5-10 MW 10 - 25 MW <5 MW 5-10 MW 11 - 25 MW

1 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4

2 5.22 5.22 5.22 5.8 5.22 5.22 5.22 5.8

3 5.04 5.04 5.48 5.6 5.04 5.04 5.48 5.6

4 4.86 5.12 5.28 5.4 4.86 5.12 5.28 5.4

5 4.68 4.93 5.09 5.2 4.68 4.93 5.09 5.2

6 4.5 4.74 4.9 5.01 4.5 4.74 4.9 5.01

7 4.33 4.56 4.71 4.81 4.33 4.56 4.71 4.81

8 4.16 4.37 4.52 4.62 4.16 4.37 4.52 4.62

9 3.98 4.19 4.33 4.43 3.98 4.19 4.33 4.43

10 3.81 4.01 4.14 4.23 3.81 4.01 4.14 4.23

11 2.3 2.42 2.5 2.56 2.3 2.42 2.5 2.56

12 2.34 2.46 2.54 2.6 2.34 2.46 2.54 2.6

13 2.38 2.51 2.59 2.64 2.38 2.51 2.59 2.64

14 2.42 2.55 2.63 2.69 2.42 2.55 2.63 2.69

15 2.46 2.59 2.68 2.74 2.46 2.59 2.68 2.74

16 2.51 2.64 2.73 2.79 2.51 2.64 2.73 2.79

17 2.56 2.69 2.78 2.84 2.56 2.69 2.78 2.84

18 2.6 2.74 2.83 2.89 2.6 2.74 2.83 2.89

19 2.65 2.79 2.88 2.95 2.65 2.79 2.88 2.95

20 2.71 2.85 2.94 3.01 2.71 2.85 2.94 3.01

21 2.76 2.91 3 3.07 2.76 2.91 3 3.07

22 2.82 2.96 3.06 3.13 2.82 2.96 3.06 3.13

23 2.88 3.03 3.13 3.19 2.88 3.03 3.13 3.19

24 2.94 3.09 3.19 3.26 2.94 3.09 3.19 3.26

25 3 3.16 3.26 3.33 3 3.16 3.26 3.33

26 3.07 3.23 3.33 3.41 3.07 3.23 3.33 3.41

27 3.14 3.3 3.41 3.48 3.14 3.3 3.41 3.48

28 3.21 3.38 3.49 3.56 3.21 3.38 3.49 3.56

29 3.28 3.45 3.57 3.65 3.28 3.45 3.57 3.65

30 3.36 3.54 3.65 3.73 3.36 3.54 3.65 3.73

Tariff without considering GoMP free power policy

(Rs./kWh)

Tariff without considering GoMP free power policy

(Rs./kWh)

Page 39: All India RE RAP Database

FIT:SMALL HYDRO

Prepared by ABPS Infra Page39/125

Reference

CE98R01060212, CE98O01270312

AP98O01310309

AR98R01090412

AS98A01130112

No Tariff Order/Regulations available

CG98A01020412

No Tariff Order/Regulations available

No Tariff Order/Regulations available

HR98O01250112/ HR0O01270511/ HR98R0130211

HP98A01240712

JK98A01000712

JH08R01030707

KA98O01111209

KL98R01221110

MP08R01300608

MH98R01070610

MN98R01150410

MZ98R01150411

No Tariff Order/Regulations available

NL98R01300811

OR98O01140910

PB98O01190712

RJ98R01230109

No Tariff Order/Regulations available

TN08Z01000310

No Tariff Order/Regulations available

UA98R01060710

UP98R01220310

WB98A01100812

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

Page 40: All India RE RAP Database

STATE

CERC

Andhra Pradesh NA -

Arunachal Pradesh

Assam

Bihar NA NA

Chhattisgarh NA NA

Delhi

JERC (Goa & UT)

Gujarat Incineration

Haryana

Projects (Project name)

Technology (Incineration/ Biomethanation/ Gasification)

Timarpur Okhla Waste Management Co. Ltd.

(16 MW)

Incineration & Biomethanation

Hanjer Green Power Pvt. Ltd. (15 MW)

Page 41: All India RE RAP Database

Haryana

Himachal Pradesh

Jammu and Kashmir NA NA

Jharkhand NA NA

Karnataka Incineration

Kerala NA NA

Madhya Pradesh NA NA

Maharashtra Biomethanation

Manipur NA -

&Mizoram NA -

Meghalaya NA -

Nagaland NA -

Orissa NA -

Punjab NA -

Rajasthan NA -

Sikkim NA -

Srinivasa Gayathri Resource Recovery

Ltd. (8 MW)

Solapur Bioenergy Systems Pvt. Ltd. (2.83

MW)

Page 42: All India RE RAP Database

Sikkim NA -

Tamil Nadu NA -

Tripura NA -

Uttarakhand NA -

Uttar Pradesh NA -

West Bengal NA -

Goa NA NA

Union Territories

Andaman Nicobar NA NA

Chandigargh NA NA

NA NA

Daman & Diu NA NA

Lakshadweep NA NA

Pondicherry NA NA

Dadra and Nagar Haveli

Page 43: All India RE RAP Database

ANNEXURE-1E

STATE-WISE FEED-IN-TARIFF FOR MSW

Financial Parameters

NA NA NA

NA NA NA

Order dt 20/01/2011

Tariff order (dt 30/07/2011) 6.8 690.7

Tariff Order(Ref. no. …dt……)

Tariff (Rs/kWh)

Capital Cost (lakh/MW)

Tariff Order(dt 31/03/2009)

4.04 in 2009-10 and 5% escalation

thereafter till 2013-14

Project Parameters not specified in the order

Tariff Regulations (dt 09/04/2012)

Project Specific Tariff Determination

Project Specific Tariff Determination

Draft Tariff Regulations (Dated January 13, 2012)

Project Specific Tariff Determination

Project Specific Tariff Determination

Draft RE Tariff Regulation_April 2012(NFF Cogen)

Project Specific Tariff Determination

Project Specific Tariff Determination

Rs 2.49/kWh for the first year and Rs

2.833/kWh from the second year onwards

Project awarded through tariff based competitive bidding.

(Auxilliary Consumption of 22%)

Tariff Regulations (Dated February 03, 2011)

Project Specific Tariff Determination

Project Specific Tariff Determination

Page 44: All India RE RAP Database

Draft RE Tariff Regulations_July 2012

NA NA NA

Tariff Order (dt 28/02/2012) Rs 4.15/kWh 1111.125

NA NA NA

NA NA NA

Tariff Order (dt 03/09/2010) Rs 4.88/kWh 1277

Tariff Regulations (Dated 15/04/2010)

Tariff Regulations (Dated 15/04/2010)

No Tariff Order/Regulations available

Tariff Regulations (Dated 08/2011)

Tariff Order (Dated 14/09/2010)

Tariff Order (Dated 19/07/2012)

Tariff Regulations (Dated 23/01/2009)

No Tariff Order/Regulations available

Tariff Regulations (Dated February 03, 2011)

Project Specific Tariff Determination

Project Specific Tariff Determination

Draft Tariff Regulations (Dated July 24, 2012)

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

Page 45: All India RE RAP Database

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

Tariff Regulations (Dated 06/07/2010)

Tariff Regulations (Dated 22/03/2010)

No parameters specified

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

No Tariff Order/Regulations

available

No Tariff Order/Regulations available

Project Specific Tariff Determination

Project Specific Tariff Determination

Rs 2.89/kWh for existing projects and

Rs 3.21 for new Projects under the head 'Other NCE

Projects'

The regulations have the provision of determining the

tariffs of new projects on case-to-case basis

Draft Tariff Regulations (Dated 10/08/2012)

Capped at Rs 5.1/kWh upto August 10, 2022

Page 46: All India RE RAP Database

Normative Parameters

NA NA NA

NA NA NA

4100 11.5% 2250

Station heat rate (kcal/kWh)

Auxiliary Consumption (%)

Calorific Value Range(kCal/kg)

Project Parameters not specified in the order

Project Parameters not specified in the order

Project Parameters not specified in the order

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project awarded through tariff based competitive bidding.

(Auxilliary Consumption of 22%)

Project awarded through tariff based competitive bidding.

(Auxilliary Consumption of 22%)

Project awarded through tariff based competitive bidding.

(Auxilliary Consumption of 22%)

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Page 47: All India RE RAP Database

NA NA NA

4300 15% 2200

NA NA NA

NA NA NA

- 12.72% 4800

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

Page 48: All India RE RAP Database

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

The regulations have the provision of

determining the tariffs of new projects on case-to-case basis

The regulations have the provision of

determining the tariffs of new projects on case-to-case basis

The regulations have the provision of

determining the tariffs of new projects on case-to-case basis

No parameters specified

No parameters specified

No parameters specified

Page 49: All India RE RAP Database

Normative Parameters

Plant Load Factor (%)

NA NA NA

NA NA NA

20

1320 20

Fuel Cost (Rs/ MT)

Useful life(yrs)

Project Parameters not specified in the order

Project Parameters not specified in the order

Project Parameters not specified in the

order

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff

Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff

Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff

Determination

Project awarded through tariff based competitive

bidding. (Auxilliary Consumption of 22%)

Project awarded through tariff based competitive

bidding. (Auxilliary Consumption of 22%)

60% for the first year and 80% from the second year

onwards

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff

Determination

Page 50: All India RE RAP Database

NA NA NA

73% NA 20

NA NA NA

NA NA NA

78.90% - 20

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff

Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff

Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff

Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff

Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff

Determination

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff

Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff

Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff

Determination

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff

Determination

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

Page 51: All India RE RAP Database

No parameters specified No parameters specified

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

NA NA NA

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

No Tariff Order/Regulations

available

Project Specific Tariff Determination

Project Specific Tariff Determination

Project Specific Tariff

DeterminationThe regulations have the provision of determining the tariffs of new projects

on case-to-case basis

The regulations have the provision of determining the tariffs of new projects

on case-to-case basis

The regulations have the provision of determining the

tariffs of new projects on case-

to-case basisNo parameters

specified

Page 52: All India RE RAP Database

Reference

NA

AP98O01310309

AR98R01090412

AS98A01130112

CG98A01020412

DL09O01200111

GJ09O01300711

HR98R01030211

Page 53: All India RE RAP Database

NA

NA

NA

HR98R01030211

HP98A01240712

JK98A01000712

KA09O01280212

MH09O01030910

MN98R01150410

MZ98R01150411

No Tariff Order/Regulations available

NL98R01300811

OR98O01140910

PB98O01190712

RJ98R01230109

No Tariff Order/Regulations available

Page 54: All India RE RAP Database

NA

NA

NA

NA

NA

NA

NA

No Tariff Order/Regulations available

No Tariff Order/Regulations available

No Tariff Order/Regulations available

UA98R01060710

UP98R01220310

WB98A01100812

Page 55: All India RE RAP Database

Incineration

Biomethanation

Gasification

Page 56: All India RE RAP Database

RPO

Prepared by ABPS Infra Page56/125

ANNEXURE-II

STATE-WISE SUMMARY of RPO REGULATIONS

STATE RPO Regulation No. RE Technology 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21

Andhra Pradesh Y (Captive- 1 MW and Above) & OA

Non-Solar 4.75% 4.75% 4.75% 4.75% 4.75% 4.75%Solar 0.25% 0.25% 0.25% 0.25% 0.25% 0.25%

Total 5.00% 5.00% 5.00% 5.00% 5.00% 5.00%

Arunachal Pradesh Not Issued

Assam Notification-(AERC/21/2010)- November 2, 2010 Y Regulation 4.1, Page no:- 2663

Non-Solar 2.70% 4.05% 5.40% 6.75%Solar 0.10% 0.15% 0.20% 0.25%

Total 2.80% 4.20% 5.60% 7.00%

Bihar Y (Captive- 5 MW and Above) & OA

Non-Solar 2.25% 3.75% 4.00% 4.25%Solar 0.25% 0.25% 0.50% 0.75% 1.00% 1.25% 1.50% 1.75% 2.00% 2.50%

Total 2.50% 4.00% 4.50% 5.00%

Chhattisgarh Y- Captive and OA (1 MW and above) Regulation 4.3, Page no:- 7 of 19

Non-Solar 5.00% 5.25%Solar 0.25% 0.50%

Total 5.25% 5.75%

Delhi Notification (Final RPO REC Regulation dated 01/10/12 ) Regulation 4.1, Page no:- 13

Non-Solar 1.90% 3.40% 4.80% 6.20% 7.60% 9.00%Solar 0.10% 0.15% 0.20% 0.25% 0.30% 0.35%

Total 2.00% 3.55% 5.00% 6.45% 7.90% 9.35%

JERC (Goa & UT) NA Regulation 1.1, Page no:- 3

Non-Solar 1.70% 2.60%Solar 0.30% 0.40%

Total 2.00% 3.00%

Gujarat Notification No. 3 of 2010, April, 17, 2010 Captive (5 MW and Above) & OA Regulation 4.1, Page no:- 7

Non-Solar 5.50% 6.00%Solar 0.50% 1.00%

Total 6.00% 7.00%

Haryana Captive (5 MW and Above) & OA Reg 64 Chapter 10, page no. 26

Non-Solar 1.50% 2.00% 3.00%Solar 0.00% 0.05% 0.10%

Total 1.50% 2.05% 3.10%

Himachal Pradesh Y Captive 1 MW and Above & OA Regulation 4.1, Page no:- 3

Non-Solar 10.00% 10.00% 10.00% 10.00% 11.00% 12.00% 13.00% 14.00% 15.00% 15.50%Solar 0.01% 0.25% 0.25% 0.25% 0.25% 0.25% 0.50% 0.75% 1.00% 2.00%

Total 10.01% 10.25% 10.25% 10.25% 11.25% 12.25% 13.50% 14.75% 16% 17.50%

Jammu and Kashmir Regulation 7.1, Page no:- 8

Non-Solar 2.90% 4.75%Solar 0.10% 0.25%

Total 3.00% 5.00%

Jharkhand Regulation 5.2 Page no:- 5

Non-Solar 2.50% 3.00%Solar 0.50% 1.00%

Total 3.00% 4.00%

Karnataka Notification (No. S/03/1) March 16, 2011

Non-Solar 10% and 7%Solar 0.25%

Kerala Y Regulation 3.1 Page no:- 2

Non-Solar 3.35% 3.65% 3.95% 4.25% 4.55% 4.85% 5.15% 5.45% 5.75% 6.05%Solar 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25% 0.25%

Total 3.60% 3.90% 4.20% 4.50% 4.80% 5.10% 5.40% 5.70% 6.00% 6.30%

Madhya Pradesh Y Regulation 4.1 Page no:- 3

Non-Solar 2.10% 3.40% 4.70% 6.00%Solar 0.40% 0.60% 0.80% 1.00%

Total 2.50% 4.00% 5.50% 7.00%

Maharashtra Regulation 7.1, Page no:- 5

Non-Solar 6.75% 7.75% 8.50% 8.50% 8.50%Solar 0.25% 0.25% 0.50% 0.50% 0.50%

Total 7.00% 8.00% 9.00% 9.00% 9.00%

Manipur

Regulation 2.1, Page no-5

Non-Solar 2.75% 4.75%

Solar 0.25% 0.25%

Total 3.00% 5.00%

&Mizoram

Non-Solar 5.75% 6.75%

Solar 0.25% 0.25%

Total 6.00% 7.00%

Meghalaya Y Regulation 4 (2), Page No- 3

Non-Solar 0.45% 0.60%Solar 0.30% 0.40%

Total 0.75% 1.00%

Nagaland Y Regulation 2.1, Page No-5

Non-Solar 6.75% 7.75%Solar 0.25% 0.25%

Total 7.00% 8.00%

Orissa Y Captive(5MW and Above) & OA Regulation 3(1), page No-2

Non-Solar 4.90% 5.35% 5.80% 6.25% 6.70%Solar 0.10% 0.15% 0.20% 0.25% 0.30%

Total 5.00% 5.50% 6.00% 6.50% 7.00%

Punjab Y Regulation 3(1), page No-3

Non-Solar 2.37% 2.83% 3.37% 3.81%Solar 0.03% 0.07% 0.13% 0.19%

Total 2.40% 2.90% 3.50% 4.00%

Rajasthan Regulation 4(2), Page No-4

Non-Solar 5.50% 6.35% 7.00%Solar 0.50% 0.75% 1.00%

Total 6.00% 7.10% 8.20%

Sikkim Not Issued

Tamil Nadu Amendment to Regulation 3, Page 2

Non-Solar 8.95%

Solar 0.05%

Total 9.00%

Tripura Y Captive(5MW and Above) and OA Regulation 4.1, Page 4

Non-Solar 0.90% 1.90%Solar 0.10% 0.10%

Total 1.00% 2.00%

Uttarakhand Y Regulation9(1) Page no:- 13 of 48

Non-Solar 4.50% 5.00%Solar 0.03% 0.05%

Total 4.52% 5.05%

Uttar Pradesh Y Captive (1 MW and Above) & OA Regulation 4.1 Page no:- 4

Non-Solar 4.50% 5.00%Solar 0.50% 1.00%

Total 5.00% 6.00%

West Bengal Y Regulation 3.1 Page no:- 4 of 19

Non-Solar 3.75% 4.70% 5.60% 6.50% 7.40%Solar 0.25% 0.30% 0.40% 0.50% 0.60%

Total 3.00% 4.00% 4.00% 5.00% 6.00% 7.00% 8.00%

RPO/REC Regulations / or Order or Draft(Ref. no. …dt……)

Applicability to Captive / Open Access (Y / N) & Capacity

Order 16 of 2008 (March 31, 2009),Order 10 of 2010 (July 6, 2010),

Regulation No 1 of 2012 (FY 13 to FY 17)

Order 16 of 2008 (Para 1)Order 10 of 2010 (Page no:-7)

Regulation 3, Page No:- 3

RPO Regulation Notification Nov 2010, Solar RPO amended vide Order on Case 12 of 2012

dated May 29, 2012

Regulation 4.1, Page no:- 3, Page 7 of 17 of Order 12 of 2012

Regulation (No. 36/CSERC/2011) March 04, 2011

Captive:- 5 MW and above, OA:- Contract Demand of 1 MVA

NOTIFICATION(No.: JERC-14/2010) November 30, 2010

Regulation (No: HERC/23/2011 2nd Amendment) November 25, 2011

Notification (No. HPERC/438 Amendment) October 3, 2011

Notification(No: JKSERC/10) March 11, 2011

OA and Captive( Contract Demand 1 MVA/MW and Above)

Notification (No. 28 --) July 21, 2010 OA and Captive( Contract Demand 1 MVA/ 5 MW and Above)

OA and Captive( Contract Demand 5 MVA/ 5 MW and Above) 5% RPO for Captive and OA

consumers

Regulation 4(i)Page no:- 3 for Discoms and Regulation 4(ii), (iii) for captive

and OA Total (Discoms only)

10.25% & 7.25%

Notification(No. 1517/CT/2010/KSERC) November 23, 2010

Notification (No. 3042/MPERC-2010.) November 9, 2010

Notification (No.MERC/Legal/2010/483) June 7, 2010

OA ( Contract Demand 1 MVA and Above) and Captive( Contract Demand 1 MW and

Above)

Notification(No. H. 13011/5/09-JERC) May 5, 2010.

OA ( Contract Demand 1 MW and Above) and Captive( Contract Demand 1 MW and

Above)

Notification (NO.MSERC/05/61) December, 21 2010

Notification (No.NERC/REGN/2011) August 29, 2011

Notification (No. OERC-Engg-02/2010) September 30, 2010

Notification (No.PSERC/Secy./Reg./55)June 3, 2011

Notification (No.RERC/Secy./Regulation - 85) MAY 24, 2011

Y(RPO target at aggregate level and not Technology specific)

Notification No. (TNERC / RPO / 19 / 2,) July 29, 2011

Y--- OA, Phase 1 -(till April 1, 2012):- 2 MVA and above, Phase 2- ( April1, 2012 to April

1, 2013):- 1 MVA and Above. Phase 3 - (after April 1, 2013:- all OA Consumers

Notification (No. F.25/TERC/2009/415) September 16, 2010.

UERC (Tariff and other terms for supply of electricity from RE sources and non-fossil fuel

based Co-generating stations), dated July 6, 2010

Notification (No. UPERC/Secy/Regulation/10 - 787) August 17 , 2010

WBERC (Cogeneration and Generation of electricity from RE), 2010, dated August 10, 2010

I91
Rohit: Draft West Bengal Electricity Regulatory Commission (Procedure for Accreditation of a Renewable Generation Project for REC Mechanism) Regulations, 2012
Page 57: All India RE RAP Database

RPO

Prepared by ABPS Infra Page57/125

2021-22

3.00%

16.00%3.00%

19.00%

6.35%0.25%

6.60%

Page 58: All India RE RAP Database

REC

Prepared by ABPS Infra Page58/125

ANNEXURE-III

STATE-WISE REC PROVISIONS

STATE Nodal Agency Applicability Reference (REC Regulation) Reference (SNA) Reference (APPC)

Andhra Pradesh Y State Load Dispatch Centre 2.00 March 2012 to May 31, 2012

Arunachal Pradesh N

Assam Y Assam Energy Development Agency

Bihar Y Bihar Renewable Energy Development Agency

Chhattisgarh Y 2011-12

Delhi Y (Draft)

JERC (Goa & UT) Y

Gujarat Y Gujarat Energy Development Agency

Haryana Y Haryana Renewable Energy Development Agency

Himachal Pradesh Y Directorate of Energy 2.20 2012-13

Jammu and Kashmir Y

Jharkhand Y Jharkhand Renewable Energy Development Agency

Karnataka Y State Load Dispatch Center 2.60 2012-13

Kerala Y

Madhya Pradesh Y MP Urja Vikas Nigam Ltd.

Maharashtra Y Maharashtra Energy Development Agency

Manipur Y Manipur Renewable Energy Development Agency

&Mizoram Y Imphal & Zoram Energy Development Agency

Meghalaya Y

Nagaland Y

Orissa Y Orissa Renewable Energy Development Agency

Punjab Y Punjab Energy Development Agency

Rajasthan Y Rajasthan Renewable Energy Corporation 2.57 2011-12

Sikkim N

Tamil Nadu Y State Load Dispatch Centre 2.54 2012-13

Tripura Y Tripura Renewable Energy Development Agency

Uttarakhand Y Uttrakhand Renewable Energy Development Agency 2.68 2012-13

Uttar Pradesh Y

West Bengal Y (Draft)

REC Regulations(Y/N)

Average Power Purchase Cost(Rs/kWh)

AP98R02210312 AP98R03210312 AP98R03210312

AS98R02011210 AS98Z03041110

BR98R02161110 BR98Z03241110

Chhattisgarh Renewable Energy Development AgencyCSPDCL: 1.67 BSP-TEED: 3.26

JSPL: 3.00CG98R02040311 CG98O03091110 CG98O03220611

Energy Efficiency and Renewable Energy Management Centre DL98R02011012 DL98O03181111

GJ98R02170410 GJ98Z03160710

HR98R02030211 HR98Z03061010

HP98R02260510 HP98Z03190610 HP98O03160712Jammu & Kashmir State Power Development Corporation (for SHP >2MW), Jammu & Kashmir Energy Development

Agency (for all RE other than >2MW SHP), Ladakh Renewable Energy Development Agency (for all RE in the district of Leh other than >2MW SHP ), Kargil Renewable Energy Development Agency (for all RE in the district of

Kargil other than >2MW SHP)

JK98R02110311 JK98Z03030111

JH98R02210710 JH98Z03210810

KA98R02160311 KA98Z03010411 KA98O03270612

Agency for Nonconventional Energy and Rural Technology

KL98R02231110 KL98O03031210

MP98R02191110 MP98O03070211

MH98R02070610 MH98O03010710

MN98R02050510 MN98Z03070910

MZ98R02050510 MZ98Z03070910

Meghalaya Non- Conventional & Rural Energy Development Agency

ML98R02211210 ML98Z03201211

NL98R02290811

OR98R02300910 OR98Z03030211

PJ98R02030611 PJ98Z03301110

RJ98R02301210 RJ98Z03160610 RJ98O03131011

TN98R02071210 TN98O03071210 TN98O03030912

TR98R02160910 TR98Z03080910

UK98R02031110 UK98O03020512 UK98O03290512

Uttar Pradesh New and Renewable Energy Development agency

UP98O02170810 UP98O03040211

Page 59: All India RE RAP Database

GRID CONNECTIVITY

Prepared by ABPS Infra Page59/125

ANNEXURE-IV

STATE Scheduling and Forecasting mechanism Reference

Andhra Pradesh

Arunachal Pradesh

Assam

Bihar

Chhattisgarh

Delhi

Gujarat GJ01O01080812

Haryana

Himachal Pradesh

Jammu and Kashmir

Jharkhand

Karnataka

Kerala

Madhya Pradesh

Maharashtra

Manipur

&Mizoram

Meghalaya

Nagaland

Orissa

Punjab

Rajasthan

Sikkim

Tamil Nadu

Tripura

Uttarakhand

Uttar Pradesh

West Bengal

Goa

Union Territories

Andaman Nicobar

Chandigargh

STATE-WISE GRID CONNECTIVITY STANDARDS

Connectivity Standards ( minimum capacity/ maximum evacuation etc)

Policy for evacuation ( responsibility for development of

evacuation infrastructure)

Dadra and Nagar Haveli

Page 60: All India RE RAP Database

GRID CONNECTIVITY

Prepared by ABPS Infra Page60/125

ANNEXURE-IV

STATE Scheduling and Forecasting mechanism Reference

STATE-WISE GRID CONNECTIVITY STANDARDS

Connectivity Standards ( minimum capacity/ maximum evacuation etc)

Policy for evacuation ( responsibility for development of

evacuation infrastructure)

Daman & Diu

Lakshadweep

Pondicherry

Dadra and Nagar Haveli

Page 61: All India RE RAP Database

OPEN ACCESS

Prepared by ABPS Infra Page61/125

ANNEXURE-V

Applicable Charges and losses

STATE Nodal agency Wheeling charges Banking provisions Reference

Andhra Pradesh

Arunachal Pradesh

Assam

Bihar

Chhattisgarh

Delhi

Gujarat GJ01O01080812

Haryana

Himachal Pradesh

Jammu and Kashmir

Jharkhand

Karnataka

Kerala

Madhya Pradesh

Maharashtra

Manipur

&Mizoram

Meghalaya

Nagaland

Orissa

Punjab

Rajasthan

Sikkim

Tamil Nadu

Tripura

Uttarakhand

Uttar Pradesh

West Bengal

Goa

Union Territories

Andaman Nicobar

Chandigargh

Daman & Diu

Lakshadweep

Pondicherry

STATE-WISE OPEN ACCESS PROVISIONS

Intra-State Open Access Regulations

(Y/N)

Application fee(Rs)

Availability of Model PPA/ Banking and wheeling

Agreement

Transmission charges and losses

Cross-subsidy surcharge

Dadra and Nagar Haveli

Page 62: All India RE RAP Database

Determination of Tariff for Order No.2 of 8/8/2012

RE Technology

Central CodeCode Body 01CE CERC 02ME MNRE 03PM Ministry of Power 04FR FOR 05CA CEA 06Code State 07AP Andhra Pradesh 08AR Arunachal Pradesh 09AS Assam 10BR Bihar 11CG Chattisgarh 12DL Delhi 13GJ Gujarat 14HR Haryana ..HP Himachal Pradesh ..JK Jammu & Kashmir ..JH Jharkhand 97KA Karnataka 98KL Kerala 99MP Madhya Pradesh

Notification No./

Case No.

List of Centre/States/UTs and respective Codes

G J 0 1

State/Central

RE Technology

Type of Notification

Denotation of each Parameters listed below of

Page 63: All India RE RAP Database

MH Maharashtra MN Manipur MZ Mizoram ML Meghalaya NL Nagaland OR Orissa PB Punjab RJ Rajasthan SK Sikkim TN Tamil Nadu TR Tripura UA Uttarakhand UP Uttar Pradesh WB West Bengal GA GoaUnion TerritoriesCode UTAN Andaman & Nicobar CH Chandigarh DN Dadra and Nagar Haveli DD Daman & Diu LD Lakshadweep PY Pondicherry GT Goa and UTs combined

Page 64: All India RE RAP Database

RE Technology Type of Notification

Technology Code NotificationWind R RegulationSolar Thermal O OrderSolar PV A Draft RegulationsBiomass-Rankine Cycle B Draft OrderBiomass-Gassifier C Discussion PaperBiogas Z OthersBagasse Co-genSHPMSWGeothermalWind OffshoreWind RepoweringSolar HybridTidal

Off-Grid REAll RE combinedOther

O 1 0 8 0 G

Data of Issuance/ Notification

(DD/MM/YY)

Matter of notification

Denotation of each Parameters listed below of

8 1 20

Page 65: All India RE RAP Database

Matter of the Notification

Code Matter01 Tariff02 RPO-REC03 APPC-State Agency04 Grid Connectivity05 Open Access06 Grid Code07 Competitive Bidding……99 Other

Page 66: All India RE RAP Database

Sl.No. State/ Centre Tech Type

1 Andhra Pradesh Wind 01 O

2 Arunachal Pradesh Wind 98 R

3 Assam Wind 98 A

4 Chattisgarh Wind 01 R

5 Gujarat Wind 01 O

6 Haryana Wind 98 O

7 Himachal Pradesh Wind 08 A

8 Jammu & Kashmir Wind 98 A

9 Jharkhand Wind 01 R

10 Karnataka Wind 98 O

11 Kerala Wind 98 R

12 Madhya Pradesh Wind 01 O13 Maharashtra Wind 98 O

14 Manipur Wind 98 R

15 Nagaland Wind 98 R

16 Orissa Wind 98 O

17 Punjab Wind 98 O

18 Rajasthan Wind 98 R

Tech Code based on Technology covered in

the document

Page 67: All India RE RAP Database

19 Rajasthan Wind 01 B20 Tamil Nadu Wind 01 O

21 Tripura Wind 98 R

22 Uttarakhand Wind 98 R

23 Uttar Pradesh Wind 98 R

24 West Bengal Wind 98 A

25 Andhra Pradesh Solar PV 02 O

26 Assam Solar PV 98 A

27 Bihar Solar PV 02 R

28 Bihar Solar PV 02 O29 Chattisgarh Solar PV 98 R

30 Gujarat Solar PV 02 O

31 Haryana Solar PV 98 Z

32 Jammu & Kashmir Solar PV 98 A

33 Jharkhand Solar PV 02 R

34 Karnataka Solar PV 02 O

35 Madhya Pradesh Solar PV 02 O

36 Maharashtra Solar PV 98 R

37 Manipur Solar PV 98 R

Page 68: All India RE RAP Database

38 Mizoram Solar PV 98 R

39 Nagaland Solar PV 98 R

40 Orissa Solar PV 03 O

41 Punjab Solar PV 98 O

43 Rajasthan Solar PV 03 O

44 Tamil Nadu Solar PV 03 O

45 Tripura Solar PV 03 R46 Uttarakhand Solar PV 98 R

47 Uttar Pradesh Solar PV 98 R

48 West Bengal Solar PV 98 A

49 Andhra Pradesh 02 O

50 Assam 98 A

51 Bihar 02 R

52 Bihar 02 O

53 Chattisgarh 98 R

54 Gujarat 02 O

55 Haryana 98 Z

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Page 69: All India RE RAP Database

56 Jammu & Kashmir 98 A

57 Jharkhand 02 R

58 Karnataka 02 O

59 Madhya Pradesh 02 O

60 Maharashtra 98 R

61 Manipur 98 R

62 Mizoram 98 R

63 Nagaland 98 R

64 Orissa 02 O

65 Punjab 98 O

66 Rajasthan 02 O

67 Tamil Nadu 02 O

68 Tripura 02 R

69 Uttarakhand 98 R

70 Uttar Pradesh 98 R

71 Andhra Pradesh 98 O

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Solar Thermal

Bagasse Co-gen

Page 70: All India RE RAP Database

72 Andhra Pradesh 98 O

73 Assam 98 A

74 Arunachal Pradesh 98 R

75 Bihar 07 C

76 Chattisgarh 98 R

77 Gujarat 07 O

78 Haryana 98 R

79 Himachal Pradesh 98 A

80 Jammu & Kashmir 98 A

81 Jharkhand 07 R

82 Karnataka 98 O

83 Kerala 07 R

84 Madhya Pradesh 07 O

85 Maharashtra 98 R

86 Maharashtra 98 O

87 Manipur 98 R

88 Mizoram 98 R

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Page 71: All India RE RAP Database

89 Nagaland 98 R

90 Orissa 98 O

91 Punjab 98 O

92 Rajasthan 98 R

93 Tamil Nadu 07 O

94 Uttarakhand 98 R

95 Uttar Pradesh 98 R

96 West Bengal 98 A

97 Andhra Pradesh SHP 98 O

98 Arunachal Pradesh SHP 98 R

99 Assam SHP 98 A

100 Chattisgarh SHP 98 A

101 Haryana SHP 98 O

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Bagasse Co-gen

Page 72: All India RE RAP Database

102 Himachal Pradesh SHP 98 R

103 Jammu & Kashmir SHP 98 A

104 Karnataka SHP 98 O

105 Kerala SHP 08 R

106 Madhya Pradesh SHP 08 O

107 Maharashtra SHP 98 R

108 Manipur SHP 98 R

109 Mizoram SHP 98 R

110 Nagaland SHP 98 R

111 Orissa SHP 98 O

112 Punjab SHP 98 O

113 Rajasthan SHP 98 R

114 Tamil Nadu SHP 08 Z

115 Uttarakhand SHP 98 R

116 Uttar Pradesh SHP 98 R

117 West Bengal SHP 98 A

Page 73: All India RE RAP Database

118 Andhra Pradesh MSW 98 O

119 Arunachal Pradesh MSW 98 R

120 Assam MSW 98 A

121 Chattisgarh MSW 98 A

122 Delhi MSW 09 O

123 Gujarat MSW 09 O

124 Haryana MSW 98 R

125 Himachal Pradesh MSW 98 A

126 Jammu & Kashmir MSW 98 A

127 Karnataka MSW 09 O

128 Maharashtra MSW 98 R

129 Manipur MSW 98 R

130 Mizoram MSW 98 R

131 Nagaland MSW 98 R

Page 74: All India RE RAP Database

132 Orissa MSW 98 O

133 Punjab MSW 98 O

134 Rajasthan MSW 98 R

135 Uttarakhand MSW 98 R

136 Uttar Pradesh MSW 98 R

137 West Bengal MSW 98 A

138 Andhra Pradesh 98 O

139 Arunachal Pradesh 98 R

140 Assam 98 A

141 Bihar 4 C

142 Chattisgarh

98 A

143 Gujarat 04 O

144 Haryana

98 O

145 Haryana 98 R

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Page 75: All India RE RAP Database

146 Himachal Pradesh 98 A

147 Jammu & Kashmir 98 A

148 Jharkhand 04 R

149 Karnataka 98 O

150 Kerala 07 R

151 Madhya Pradesh 04 O

152 Maharashtra 98 R

153 Maharashtra 98 O

154 Manipur

98 R

155 Mizoram

98 R

156 Nagaland

98 R

157 Orissa 98 O

158 Punjab 98 O

159 Rajasthan 98 R

160 Rajasthan 04 O

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Page 76: All India RE RAP Database

161 Tamil Nadu 4 O

162 Uttarakhand 98 R

163 Uttar Pradesh

98 R

164 West Bengal 98 A

165 CERC All RE 98 R166 CERC All RE 98 O

167 Jharkhand SHP 08 R

168 Andhra Pradesh All RE 98 R

169 Andhra Pradesh All RE 98 O170 Andhra Pradesh Solar PV 02 O171 Assam All RE 98 R

172 Bihar All RE 98 R

173 Bihar Solar PV 02 O

174 Chattisgarh All RE 98 R175 Delhi All RE 98 R

176 All RE 98 R

177 Gujarat All RE 98 R

178 Haryana All RE 98 R

179 Himachal Pradesh All RE 98 R

180 Himachal Pradesh All RE 98 R181 Jammu & Kashmir All RE 98 R

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Biomass-Rankine Cycle

Goa and Union Territories

Page 77: All India RE RAP Database

182 Jharkhand All RE 98 R

183 Karnataka All RE 98 R

184 Kerala All RE 98 R

185 Madhya Pradesh All RE 98 R

186 Maharashtra All RE 98 R

187 Manipur All RE 98 R

188 Mizoram All RE 98 R

189 Meghalaya All RE 98 R

190 Nagaland All RE 98 R

191 Orissa All RE 98 R

192 Punjab All RE 98 R

193 Rajasthan All RE 98 R

194 Tamil Nadu All RE 98 R

195 Tripura All RE 98 R

196 Uttarakhand All RE 98 R

197 Uttar Pradesh All RE 98 O

198 West Bengal All RE 98 A

Page 78: All India RE RAP Database

199 Andhra Pradesh All RE 98 A

200 Assam All RE 98 R

201 Bihar All RE 98 R

202 Chattisgarh All RE 98 R

203 Delhi All RE 98 R

204 Gujarat All RE 98 R

205 Haryana All RE 98 R

206 Himachal Pradesh All RE 98 R

207 Jammu & Kashmir All RE 98 R

208 Jharkhand All RE 98 R

209 Karnataka All RE 98 R

210 Kerala All RE 98 R

211 Madhya Pradesh All RE 98 R

212 Maharashtra All RE 98 R

213 Manipur All RE 98 R

214 Mizoram All RE 98 R

215 Meghalaya All RE 98 R

Page 79: All India RE RAP Database

216 Nagaland All RE 98 R

217 Orissa All RE 98 R

218 Punjab All RE 98 R

219 Rajasthan All RE 98 R

220 Tamil Nadu All RE 98 R

221 Tripura All RE 98 R

222 Uttarakhand All RE 98 R

223 Uttar Pradesh All RE 98 O

224 Andhra Pradesh All RE 98 O

225 Assam All RE 98 O226 Bihar All RE 98 O227 Chattisgarh All RE 98 O228 Delhi All RE 98 O229 Gujarat All RE 98 O230 Haryana All RE 98 O231 Himachal Pradesh All RE 98 O232 Jammu & Kashmir All RE 98 O233 Jharkhand All RE 98 O234 Karnataka All RE 98 O235 Kerala All RE 98 O236 Madhya Pradesh All RE 98 O237 Maharashtra All RE 98 O238 Manipur All RE 98 O239 Mizoram All RE 98 O240 Meghalaya All RE 98 O241 Orissa All RE 98 O242 Punjab All RE 98 O243 Rajasthan All RE 98 O244 Tamil Nadu All RE 98 O245 Tripura All RE 98 O246 Uttarakhand All RE 98 O247 Uttar Pradesh All RE 98 O248 Andhra Pradesh All RE 98 O249 Chattisgarh All RE 98 O

Page 80: All India RE RAP Database

250 Himachal Pradesh All RE 98 O251 Karnataka All RE 98 O252 Rajasthan All RE 98 O253 Tamil Nadu All RE 98 O254 Uttarakhand All RE 98 O255 Haryana 98 O

256 Haryana 98 O

257 Haryana Solar PV 98 O

258 Haryana 98 O

258 Haryana Wind 98 O

Biomass-Rankine Cycle

Bagasse Co-gen

Solar Thermal

Page 81: All India RE RAP Database

Matter Date Code

01 010509 AP01O01010509

01 090412 AR98R01090412

01 130112 AS98A01130112

01 020412 CG01R01020412

01 080812 GJ01O01080812

01 250112 HR98O01250112

01 250712 HP08A01250712

01 080812 JK98A01000012

01 230610 JH01R01230610

01 111209 KA98O01111209

01 221110 KL98R01221110

01 140510 MP01O0114051001 300312 MH98O01300312

01 150410 MN98R01150410

01 300811 NL98R01300811

01 140910 OR98O01140910

01 190712 PB98O01190712

01 230109 RJ98R01230109

Page 82: All India RE RAP Database

01 080612 RJ01B0108061201 310712 TN01O01310712

01 230309 TR98R01230309

01 060710 UA98R01060710

01 220310 UP98R01220310

01 100812 WB98A01100812

01 140610 AP02O01140610

01 130112 AS98A01130112

01 020810 BR02R01020810

01 290512 BR02O0129051201 020412 CG98R01020412

01 270112 GJ02O01270112

01 000612 HR98Z01000612

01 000012 JK98A01000012

01 230610 JH02R01230610

01 130710 KA02O01130710

01 010812 MP02O01010812

01 300312 MH98R01300312

01 150410 MN98R01150410

Page 83: All India RE RAP Database

01 150410 MZ98R01150410

01 300811 NL98R01300811

01 10212 OR03O0110212

01 90712 PB98O0190712

01 300512 RJ03O01300512

01 270510 TN03O01270510

01 230309 TR03R0123030901 60710 UA98R01060710

01 220310 UP98R01220310

01 100812 WB98A01100812

01 140610 AP02O01140610

01 130112 AS98A01130112

01 020810 BR02R01020810

01 290512 BR02O01290512

01 020412 CG98R01020412

01 270112 GJ02O01270112

01 000612 HR98Z01000612

Page 84: All India RE RAP Database

01 000012 JK98A01000012

01 230610 JH02R01230610

01 130710 KA02O01130710

01 010812 MP02O01010812

01 300312 MH98R01300312

01 150410 MN98R01150410

01 150410 MZ98R01150410

01 300811 NL98R01300811

01 10212 OR02O0110212

01 90712 PB98O0190712

01 300512 RJ02O01300512

01 080710 TN02O01080710

01 230309 TR02R01230309

01 060710 UA98R01060710

01 220310 UP98R01220310

01 310309 AP98O01310309

Page 85: All India RE RAP Database

01 120911 AP98O01120911

01 130112 AS98A01130112

01 090412 AR98R01090412

01 000712 BR07C01000712

01 120412 CG98R01120412

01 310510 GJ07O01310510

01 030211 HR98R01030211

01 240712 HP98A01240712

01 000712 JK98A01000712

01 270110 JH07R01270110

01 111209 KA98O01111209

01 191108 KL07R01191108

01 130908 MP07O01130908

01 070610 MH98R01070610

01 300312 MH98O01300312

01 150410 MN98R01150410

01 150410 MZ98R01150410

Page 86: All India RE RAP Database

01 300811 NL98R01300811

01 140910 OR98O01140910

01 190712 PB98O01190712

01 230109 RJ98R01230109

01 310712 TN07O01310712

01 060710 UA98R01060710

01 220310 UP98R01220310

01 100812 WB98A01100812

01 310309 AP98O01310309

01 090412 AR98R01090412

01 130112 AS98A01130112

01 020412 CG98A01020412

01 250112 HR98O01250112

Page 87: All India RE RAP Database

01 240712 HP98R01240712

01 000712 JK98A01000712

01 111209 KA98O01111209

01 221110 KL08R01221110

01 300608 MP08O01300608

01 070610 MH98R01070610

01 150410 MN98R01150410

01 150410 MZ98R01150410

01 300811 NL98R01300811

01 140910 OR98O01140910

01 190712 PB98O01190712

01 230109 RJ98R01230109

01 000310 TN08Z01000310

01 060710 UA98R01060710

01 220310 UP98R01220310

01 100812 WB98A01100812

Page 88: All India RE RAP Database

01 310309 AP98O01310309

01 090412 AR98R01090412

01 130112 AS98A01130112

01 020412 CG98A01020412

01 200111 DL09O01200111

01 300711 GJ09O01300711

01 030211 HR98R01030211

01 240712 HP98A01240712

01 000712 JK98A01000712

01 280212 KA09O01280212

01 070610 MH98R01070610

01 150410 MN98R01150410

01 150410 MZ98R01150410

01 300811 NL98R01300811

Page 89: All India RE RAP Database

01 140910 OR98O01140910

01 190712 PB98O01190712

01 230109 RJ98R01230109

01 060710 UA98R01060710

01 220310 UP98R01220310

01 100812 WB98A01100812

01 20911 AP98O0120911

01 90412 AR98R0190412

01 130112 AS98A01130112

01 010712 BR4C01010712

01 020412 CG98A01020412

01 170510 GJ04O01170510

01 250112 HR98O01250112

01 030211 HR98R01030211

Page 90: All India RE RAP Database

01 240712 HP98A01240712

01 010712 JK98A01000712

01 270110 JH04R01270110

01 111209 KA98O01111209

02 191108 KL07R02191108

01 20312 MP04O0120312

01 070610 MH98R01070610

01 300312 MH98O01300312

01 150410 MN98R01150410

01 150410 MZ98R01150410

01 300811 NL98R01300811

01 140910 OR98O01140910

01 190712 PB98O01190712

01 230109 RJ98R01230109

01 091211 RJ04O01091211

Page 91: All India RE RAP Database

01 310712 TN4O01310712

01 060710 UA98R01060710

01 220310 UP98R01220310

01 100812 WB98A01100812

01 060212 CE98R0106021201 270312 CE98O01270312

01 030707 JH08R01030707

02 210312 AP98R02210312

02 310309 AP98O0231030902 060710 AP02O0206071002 011210 AS98R02011210

02 161110 BR98R02161110

02 290512 BR02O02290512

02 040311 CG98R0204031102 011012 DL98R02011012

02 301110 GT98R02301110

02 170410 GJ98R02170410

02 030211 HR98R02030211

02 260510 HP98R02260510

02 031011 HP98R0203101102 110311 JK98R02110311

Page 92: All India RE RAP Database

02 210710 JH98R02210710

02 160311 KA98R02160311

02 231110 KL98R02231110

02 191110 MP98R02191110

02 070610 MH98R02070610

02 050510 MN98R02050510

02 050510 MZ98R02050510

02 211210 ML98R02211210

02 290811 NL98R02290811

02 300910 OR98R02300910

02 030611 PJ98R02030611

02 240511 RJ98R02240511

02 100811 TN98R02100811

02 080910 TR98R02160910

02 060710 UK98R02060710

02 170810 UP98O02170810

02 100812 WB98A02100812

Page 93: All India RE RAP Database

02 210312 AP98R02210312

02 011210 AS98R02011210

02 161110 BR98R02161110

02 040311 CG98R02040311

02 011012 DL98R02011012

02 170410 GJ98R02170410

02 030211 HR98R02030211

02 260510 HP98R02260510

02 110311 JK98R02110311

02 210710 JH98R02210710

02 160311 KA98R02160311

02 231110 KL98R02231110

02 191110 MP98R02191110

02 070610 MH98R02070610

02 050510 MN98R02050510

02 050510 MZ98R02050510

02 211210 ML98R02211210

Page 94: All India RE RAP Database

02 290811 NL98R02290811

02 300910 OR98R02300910

02 030611 PJ98R02030611

02 301210 RJ98R02301210

02 100811 TN98R02100811

02 160910 TR98R02160910

02 060710 UK98R02031110

02 170810 UP98O02170810

03 210312 AP98R03210312

03 041110 AS98Z0304111003 241110 BR98Z0324111003 091110 CG98O0309111003 181111 DL98O0318111103 160710 GJ98Z0316071003 061010 HR98Z0306101003 190610 HP98Z0319061003 030111 JK98Z0303011103 210810 JH98Z0321081003 010411 KA98Z0301041103 031210 KL98O0303121003 070211 MP98O0307021103 010710 MH98O0301071003 070910 MN98O0307091003 070910 MZ98O0307091003 201211 ML98O0320121103 030211 OR98O0303021103 301110 PJ98O0330111003 160610 RJ98O0316061003 071210 TN98O0307121003 080910 TR98O0308091003 020512 UK98O0302051203 040211 UP98O0304021103 210312 AP98R0321031203 220611 CH98O03220611

Page 95: All India RE RAP Database

03 160712 HP98O0316071203 270612 KA98O0327061203 131011 RJ98O0313101103 030912 TN98O0303091203 290512 UK98O0329051201 030912 HR98O01030912

01 030912 HR98O01030912

01 030912 HR98O01030912

01 030912 HR98O01030912

01 030912 HR98O01030912

Page 96: All India RE RAP Database

Name of the Regulation/Case as in the Reference Doc

AERC.25/2012

N.A

Order No. 2 of 2012

Case No. 20 of 2011

No. HPERC/428

N.A

Notification No. 27

Case No. OP/28/2008

NO. 1163/CT/2010/KSERC

Order for procurement of power from wind electric generators SMP-20/2010Case No. 10 of 2012

No. H.13011/17/10

No.NERC/REGN/2011

Petition No. 37/2008

Petition No. 35 of 2012

RERC (Terms and Conditions of Tariff) Regulations, 2009, No. RERC/Secy/ Reg. -76

Notification No./ Case No.

Determination of Tariff/power purchase Price in respect of "New wind Based power projects"

O.P No. 6/2009 &O.P.No 7 of 2009

Regulations on Terms and Conditions for Tariff determination from Renewable energy sources

APSERC/Notification/7/2012

Regulations onTerms and Conditions for Tariff determination from Renewable energy sources

Regulations on Terms and Conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources.

Order on Determination of tariff for procurement by distribution licensees and others from wind power projects

Order on Suo-moto petition for determination of levellised generic tariff of renewable energy projects to be commissioned during FY 2011-12

Draft Regulations on promotion of generation from renewable energy sources and terms and conditions for tariff determination

Draft Regulations on terms and conditions for determination from renewable energy sources

Regulations on determination of tariff for procurement of power from wind electric generators

Order in the matter of determination of Tariff in respect of renewable energy sources

Second Amendment Regulations on power procurement from renewable sources by distribution licensee

Order for determination of Generic Tariff for third year of first control period

Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010.

Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011

Suo-motu proceeding initiated by the Commission for finalization of Policy on Harnessing of Power from Renewable Energy Sources including Co-generation

Order on adoption of CERC RE Tariff Regulation and determination of generic RE Tariff for FY 2012-13

Page 97: All India RE RAP Database

Draft Tariff Order on Wind Projects for FY 2012-13Order No 6 of 2012

No.F.25/TERC/2009/415

UPERC - CNCE Regulations, 2009

Order on Solar Power Tariff In. I.A.No.17 of 2010

No. AERC.25/2012

Order on Determination of long term solar RPO and Solar tariff Order No. 12 of 2012-

Order No 1 of 2012

-

-

No 26/2010

No.S/03/1

SMP 25/2012

No. H.13011/17/10- JERC

Comprehensive Tariff Order on Wind Energy (Order No. 6 of 2012) dated July 31, 2012

TERC (Cogeneration and Generation of Electricity from renewable source of Energy) regulation 2009

Uttarakhand Electricity Regulatory Commission(Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010

No.F-9(21)/RG/UERC/2010/ 697

UPERC / Secy / CNCE Regulation, 2009

Draft WBERC(Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2012

WBERC/Regulation/34/10-11/0647

Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2012 (Draft)

Terms and Conditions for Tariff Determination from Solar Energy Sources Regulations, 2010

No. BERC-Regl/Solar-2/2010-03

Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources Regulations, 2012

Determination of tariff for Procurement by the Distribution Licensees and others from Solar Energy Projects

Public Notice for Inviting Objections/Suggestions on the Suo Moto Petition for Determination of Levellised Tariff in Respect of Renewable Energy Projects to be Commissioned during FY 2012-13

Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2012

Terms and conditions for determination of generation tariff for Procurement of Power from Solar PV and Solar Thermal Power Project Regulation 2010

Determination of tariff for grid connected Solar PV, Solar Thermal power plants (other than demonstration projects) and Rooftop Solar Photovoltaic and other small solar power Plants connected to Distribution network at voltage levels below 33KV.

Tariff Order for Solar Energy Based Power Generation in Madhya Pradesh

Order for determination of Generic Tariff for third year of first control period

No.MERC/Legal/2010/482/

Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010

Page 98: All India RE RAP Database

No. H.13011/17/10- JERC

No.NERC/REGN/2011

Case No.01/2012

Petition No. 35 of 2012

Order No.

Order No 1 of 2010

RE Regulations, 2009 -

Order on Solar Power Tariff In. I.A.No.17 of 2010

No. AERC.25/2012

Order on Determination of long term solar RPO and Solar tariff Order No. 12 of 2012

-

Order No 1 of 2012

-

Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010

Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011

Suo-motu proceeding for re-determination of generic tariff in respect of Solar PV and Solar Thermal power.

Adoption of CERC (Terms & Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2012-13

In the matter of Determination of Benchmark Capital Cost for Solar PV and Solar Thermal Power Projects and resultant Generic Levellised Tariff

Tariff Order for projects covered by Jawaharlal Nehru National Solar Mission

Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010

No.F-9(21)/RG/UERC/2010/ 697

UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009

Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696

Draft West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2012 (For replacing existing Regulation)

No. WBERC/Regulation/34/10-11/0647

Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2012 (Draft)

Terms and Conditions for Tariff Determination from Solar Energy Sources Regulations, 2010

No. BERC-Regl/Solar-2/2010-03

Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources Regulations, 2012

Determination of tariff for Procurement by the Distribution Licensees and others from Solar Energy Projects

Public Notice for Inviting Objections/Suggestions on the Suo Moto Petition for Determination of Levellised Tariff in Respect of Renewable Energy Projects to be Commissioned during FY 2012-13

Page 99: All India RE RAP Database

-

No 26/2010

No.S/03/1

SMP 25/2012

No. H.13011/17/10- JERC

No. H.13011/17/10- JERC

No.NERC/REGN/2011

Case No.01/2012

Petition No. 35 of 2012

Order No.

Order No 2 of 2010

RE Regulations, 2009 -

O.P. No. 5 /2009

Terms and Conditions for Tariff determination from Renewable Energy Sources Regulations, 2012

Terms and conditions for determination of generation tariff for Procurement of Power from Solar PV and Solar Thermal Power Project Regulation 2010

Determination of tariff for grid connected Solar PV, Solar Thermal power plants (other than demonstration projects) and Rooftop Solar Photovoltaic and other small solar power Plants connected to Distribution network at voltage levels below 33KV.

Tariff Order for Solar Energy Based Power Generation in Madhya Pradesh

Order for determination of Generic Tariff for third year of first control period

No.MERC/Legal/2010/482/

Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010

Joint Electricity Regulatory Commission for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010

Nagaland Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff for Renewable Energy) Regulations, 2011

Suo-motu proceeding for re-determination of generic tariff in respect of Solar PV and Solar Thermal power.

Adoption of CERC (Terms & Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2012-13

In the matter of Determination of Benchmark Capital Cost for Solar PV and Solar Thermal Power Projects and resultant Generic Levellised Tariff

Tariff Order for Solar Thermal Projects covered by Jawaharlal Nehru National Solar Mission

Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010

No.F-9(21)/RG/UERC/2010/ 697

UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009

Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696

Determination of Tariff / Power Purchase Price (Variable Cost or Single Part Tariff) for the period from 01-04-2009 to 31-03-2014 in respect of the “New and Renewable Sources of Energy” in the State of Andhra Pradesh covered by the Commission Order Dated 20-03-2004.

Page 100: All India RE RAP Database

O.P no. 1075/2000

-

-

-

No. 4 of 2010

-

-

-

-

-

-

-

MERC Generic Tariff for FY 2012-13 -

No. H.13011/17/10- JERC

No. H.13011/17/10- JERC

Order in the matter of power purchase from non-conventional sources of energy

Draft-Assam Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

Terms and Conditions for tariff determination from renewable energy sources regulation - 2012

APSERC/NOTIFICATION/7/2012

Discussion paper on Benchmarks For Tariff DeterminationFor Biomass And Bagasse Based Cogeneration PlantsTo Be Commissioned In 2012-13 And 2013-14.

CSERC (Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources) Regulations, 2012

Order on Determination of tariff for Procurement of Power byDistribution Licensees from Bagasse based co-generationPower Plants and Other Commercial Issues

HERC(Terms and Conditions for determination of Tariff fromRenewable Energy Sources, Renewable Purchase Obligation andRenewable Energy Certificate) Regulations, 2010

Draft Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012

Jammu and Kashmir State Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

Jharkhand State Electricity RegulatoryCommission (Terms and Conditions for Tariff Determination for Biomass and nonfossil fuel based co-generation projects) Regulations, 2010

In the matter of Determination of Tariff in respect of Renewable Sources of Energy

Kerala State Electricity Regulatory Commission (Power Procurement from Cogeneration Plants by Distribution Licensees) Regulations, 2008

Tariff Order for procurement of power from Bagasse based cogeneration Plants in Madhya Pradesh

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS FOR DETERMINATION OF RE TARIFF) REGULATIONS, 2010

No.MERC/Legal/2010/482/

Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010

Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2011

Page 101: All India RE RAP Database

Petition No. 37/2008

Petition No. 35 of 2012

No. RERC/Secy/ Reg. -76

Order No. 7 of 2012

O.P. No. 5 /2009

-

-

-

Terms and Conditions for Determination of Generation Tariff for Renewable Energy

No.NERC/REGN/2011 Dated Kohima, the 30th August, 2011

Suo-motu proceeding initiated by the Commission for finalization of Policy on Harnessing of Power from Renewable Energy Sources including Co-generation

Adoption of Central Electricity Regulatory Commission (Terms & Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2012-13

The Rajasthan Electricity Regulatory Commission (Terms and Conditions forDetermination of Tariff) Regulations, 2009

Power procurement by Distribution Licensee from Bagasse based Co-generation plants and allied issues relating to captive use and third party sale

UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010

No.F-9(21)/RG/UERC/2010/ 697

UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009

Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696

Draft West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2012 (For replacing existing Regulation)

No. WBERC/Regulation/34/10-11/0647

Determination of Tariff / Power Purchase Price (Variable Cost or Single Part Tariff) for the period from 01-04-2009 to 31-03-2014 in respect of the “New and Renewable Sources of Energy” in the State of Andhra Pradesh covered by the Commission Order Dated 20-03-2004.

Terms and Conditions for tariff determination from renewable energy sources regulation - 2012

APSERC/NOTIFICATION/7/2012

Draft-Assam Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources Regulations, 2012

Petition filed by Haryana Power Generation Corporation Limited (HPGCL), Panchkula vide letter No. 781 / GMP – 321 dated 7th June, 2011 for determination of tariff for supply of electricity from 6.5 MW solar power project to be set up by HPGCL at Powerhouse – D, WYC Hydel, Yamunanagar (Case No. HERC / PRO - 12 of 2011).

Page 102: All India RE RAP Database

No. HPERC/428

-

Determination of Tariff in respect of Renewable Sources of Energy-

No. 1163/CT/2010/KSERC

SMP-77/2011

No. H.13011/17/10- JERC

No. H.13011/17/10- JERC

Petition No. 37/2008

Petition No. 35 of 2012

No. RERC/Secy/ Reg. -76

-

Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012

Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012.

KSERC (Power Procurement from Renewable Sources by Distribution Licensee) Second Amendment Regulations, 2010

Tariff Order for Procurement of Power by Distribution Licensees from Small Hydro Based GenerationMAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS FOR DETERMINATION OF RE TARIFF) REGULATIONS, 2010

No.MERC/Legal/2010/482/

Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010

Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2011

Terms and Conditions for Determination of Generation Tariff for Renewable Energy

No.NERC/REGN/2011 Dated Kohima, the 30th August, 2011

Suo-motu proceeding initiated by the Commission for finalization of Policy on Harnessing of Power from Renewable Energy Sources including Co-generation

Adoption of Central Electricity Regulatory Commission (Terms & Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2012-13

The Rajasthan Electricity Regulatory Commission (Terms and Conditions forDetermination of Tariff) Regulations, 2009

Consultative Paper on “Procurement of Power from small hydro power(up to 5 MW)”

UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010

No.F-9(21)/RG/UERC/2010/ 697

UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009

Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696

Draft West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2012 (For replacing existing Regulation)

No. WBERC/Regulation/34/10-11/0647

Page 103: All India RE RAP Database

O.P. No. 5 /2009

No. AERC.25/2012/

-

Petition No.18/2010

Petition No.1052/2010

No. HPERC/428-

-

Case No. OP 14/2011

No. H.13011/17/10- JERC

No. H.13011/17/10- JERC

Determination of Tariff / Power Purchase Price (Variable Cost or Single Part Tariff) for the period from 01-04-2009 to 31-03-2014 in respect of the “New and Renewable Sources of Energy” in the State of Andhra Pradesh covered by the Commission Order Dated 20-03-2004.

Terms and Conditions for tariff determination from renewable energy sources regulation - 2012

APSERC/NOTIFICATION/7/2012

Draft Assam Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

Chhattisgarh State ElectricityRegulatory Commission (Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based renewable energy sources) Regulations, 2012

Petition for adoption of Tariff and approval of energy purchase entered between Timarpur Okhla Waste Management Company Private Limited and BSES Rajdhani Power Limited, for purchase of 16 MW of Power by BSES on Long-term basis from power station to be set up at Okhla.

Approval of tariff for power generated from RDF based power generation plant for sale to Distribution Licensees in the State of Gujarat.

Haryana Electricity Regulatory Commission ( Terms and Conditions for Determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate ) Regulations 2010

Regulation No. HERC/23/2010

Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012

Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012.Case between Srinivasa Gayathri Resource Recovery Ltd., and BESCOM, & Govt. of Karnataka, Urban Development and KPTCL

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS FOR DETERMINATION OF RE TARIFF) REGULATIONS, 2010

No.MERC/Legal/2010/482/

Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010

Joint Electricity Regulatory Commission for Manipur & Mizoram Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2011

Terms and Conditions for Determination of Generation Tariff for Renewable Energy

No.NERC/REGN/2011 Dated Kohima, the 30th August, 2011

Page 104: All India RE RAP Database

Petition No. 37/2008

Petition No. 35 of 2012

No. RERC/Secy/ Reg. -76

AERC.25/2012

-

Order No. 5 of 2010

-

Suo-motu proceeding initiated by the Commission for finalization of Policy on Harnessing of Power from Renewable Energy Sources including Co-generation

Adoption of Central Electricity Regulatory Commission (Terms & Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 and Determination of generic levellised generation tariff for Renewable Energy Power Projects for FY 2012-13

The Rajasthan Electricity Regulatory Commission (Terms and Conditions forDetermination of Tariff) Regulations, 2009

UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010

No.F-9(21)/RG/UERC/2010/ 697

UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2009

Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696

Draft West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2012 (For replacing existing Regulation)

No. WBERC/Regulation/34/10-11/0647

In the matter of purchase of power from Non-Conventional Energy Projects

Order dated September 02, 2011

TERMS AND CONDITIONS FOR TARIFF DETERMINATION FROM RENEWABLE ENERGY SOURCES, REGULATIONS, 2012

APSERC/NOTIFICATION/7/2012

TERMS AND CONDITIONS FOR TARIFF DETERMINATION FROM RENEWABLE ENERGY SOURCES, REGULATIONS, 2012

Benchmarks For Tariff Determination For Biomass And Bagasse Based Cogeneration Plants To Be Commissioned In 2012-13 And 2013-14.

a Discussion paper issued for comments

Chhattisgarh State Electricity Regulatory Commission (Terms and conditions for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources) Regulations, 2012

Determination of tariff for Procurement of Power by Distribution Licensees from Biomass based Power Generator and Other Commercial Issues

Petition filed by Haryana Power Generation Corporation Limited (HPGCL), Panchkula vide letter No. 781 / GMP – 321 dated 7th June, 2011 for determination of tariff for supply of electricity from 6.5 MW solar power project to be set up by HPGCL at Powerhouse – D, WYC Hydel, Yamunanagar (Case No. HERC / PRO - 12 of 2011).

Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2010.

Regulation No. HERC/ 23 / 2010

Page 105: All India RE RAP Database

No. HPERC/428

-

No. 24

Determination of Tariff in respect of Renewable Sources of Energy-

-

SMP-77/2011

MERC RE Tariff Regulations 2010

Suo Moto Order by MERC dated March 30, 2012 Case 10 of 2012

PSERC Suo Motu Order on RE Generic Tariff by adopting CERC Tariff Petition No 35 of 2012

RERC Tariff Regulation 2009

Order No 14

Draft Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012

Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012.

Terms and Conditions for Tariff Determination for Biomass and nonfossil fuel based co-generation projects) Regulations, 2010.

Power Procurement from Cogeneration Plants by Distribution Licensees) Regulations, 2008

Tariff Order for procurement of power from Biomass based Power Projects

No/MERC/Legal/2010/482/

Joint Electricity Regulatory Commission forManipur & Mizoram (Terms and Conditions for Tariff determination from RenewableEnergy Sources) Regulations, 2010

No. H.13011/17/10- JERC Dated Aizawl, the 15th

April, 2010

Joint Electricity Regulatory Commission forManipur & Mizoram (Terms and Conditions for Tariff determination from RenewableEnergy Sources) Regulations, 2010

No. H.13011/17/10- JERC Dated Aizawl, the 15th

April, 2010

Terms and Conditions forDetermination of Generation Tariff for Renewable Energy

REGULATION

No.NERC/REGN/2011 Dated Kohima, the 30th

August, 2011

Suo-motu proceeding initiated by the Commission for finalization of Policy on Harnessing of Power from Renewable Energy Sources including Co-generation

Petition No 37/2010 (Suo Motu Order)

No. RERC/Secy/ Reg. -76 January 23, 2009

Revised tariff for sale of electricity by Bio-mass based power plants in the State to distribution licensees commissioned during FY 2011-12 of the control period 2009-14.

Page 106: All India RE RAP Database

Comprehensive Tariff Order for Biomass Power Plants

CERC RE Regulations, 2012 L-1/94/CERC/2011CERC RE generic Tariff Order for FY 2012-13

No. 360

1 of 2012

Suo-Motu Order on RPPO O. P. No. 16 of 2008Solar RPO Order O. P. No. 10 of 2010

Solar RPO amended vide Order on Case 12 of 2012 dated May 29, 2012

RPO Regulation (No. 36/CSERC/2011) March 04, 2011DERC RPO Regulations

JERC-14/2010

Notification No. 3 of 2010

Reg 23/2010

HPERC/438

HPERC RPO Ammendment Regulations HPERC/438JKSERC/10

Order No 8 of 2012 dated July 31 ,2012

UERC(Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010

UERC notification No.F-9(21)/RG/UERC/2010/

697: dated July 06, 2010

UPERC (Captive and Non- Conventional Energy Generating Plants) Regulations, 2009 (hereinafter referred to as CNCE Regulations, 2009).

Notification dated March 22, 2010 and Notification no. UPERC / Secy / CNCE

Regulation, 2009/ 696

West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2010.

Notification No. 47/WBERC dated August

10, 2012

Petition No. 35/2012 (Suo‐Motu)

JSERC (Terms and Conditions of tariff determination,Small Hydropower Generation) Regulation, 2007

Renewable PowerPurchase Obligation (Compliance by purchase of Renewable Energy /Renewable Energy Certificates) Regulations, 2012

AERC (Renewable Purchase Obligation and itsCompliance) Regulations, 2010

(Renewable Purchase Obligation, its Compliance and REC Framework Implementation) Regulations, 2010.

No: F.3(292)/Tariff/DERC/2010-11/3026/

Joint Electricity Regulatory Commission forstate of Goa & Union Territories (Procurement of Renewable energy) Regulations, 2010.

GERC (Procurement of Energy from RenewableSources) Regulations, 2010.

HERC(Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2010

HPERC (Renewable Power Purchase Obligation and its Compliance) Regulations, 2010

J&KSERC (Renewable Power Purchase obligation, its compliance and REC frame work implementation) Regulations, 2011.

Page 107: All India RE RAP Database

No.28

No. 1517/CT/2010/KSERC

RG-33(I) of 2010

No.MERC/Legal/2010/483

2 of 2010

No.NERC/REGN/2011

No. OERC-Engg-02/2010

No.PSERC/Secy./Reg./55

No.F.25/TERC/2009/415

Jharkhand State Electricity Regulatory Commission (Renewable purchase obligation and its compliance) Regulations, 2010

KERC (Power Procurement from Renewable Sources by Distribution Licensee and Renewable Energy Certificate Framework) Regulations, 2011

Notification No. S/03/1 dated 16th March 2011

KSERC (Renewable Purchase Obligation and its Compliance) Regulations, 2010

Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2010 (Revision-I)

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its compliance and REC framework Implementation) Regulations, 2010

Manipur & Mizoram (Renewable Purchase Obligation and its Compliance) Regulations, 2010.

No. H. 13011/5/09-JERC Dated Aizawl, the 5th May, 2010

Manipur & Mizoram (Renewable Purchase Obligation and its Compliance) Regulations, 2010.

No. H. 13011/5/09-JERC Dated Aizawl, the 5th May, 2010

Meghalaya State Electricity RegulatoryCommission (Renewal Energy Purchase Obligation and its Compliance) Regulations, 2010

Nagaland Electricity Regulatory Commission (Renewable Purchase Obligation and its Compliance) Regulations, 2011

OERC (Renewable and Co-generationPurchase Obligation and its Compliance) Regulations, 2010.

PSERC (Renewable Purchase Obligation and its compliance) Regulations, 2011

Rajasthan Electricity Regulatory Commission (Power Purchase & Procurement Process of Distribution Licensee) (2nd Amendment) Regulations, 2011.

No.RERC/Secy./Regulation - 85

Amendment to Renewable Energy Purchase Obligation Regulations, 2010.

Notification No. TNERC / RPO / 19 / 2, dated 29-07-2011

T.E.R.C. (Procurement of Energy fromRenewable Sources) Regulations, 2010.

Uttarakhand Electricity Regulatory Commission(Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2010.

No.F-9(21)/RG/UERC/2010/ 697

Uttar Pradesh Electricity Regulatory Commission (Promotion of Green Energy through Renewable PurchaseObligation) Regulations, 2010

No. UPERC/Secy/Regulation/10 - 787

Draft West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2012 (For replacing existing Regulation).

WBERC/Regulation/34/10-11/0647

Page 108: All India RE RAP Database

Reg No. 1 of 2012

No. AERC/21/2010

BERC-Regl-01/10–05

No. 36/CSERC/2011

DERC RPO Regulations

Notification No. 3 of 2010

Reg 23/2010

HPERC/438

JKSERC/10

No.28

No. 1517/CT/2010/KSERC

RG-33(I) of 2010

No.MERC/Legal/2010/483

2 of 2010

APERC - Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy /Renewable Energy Certificates) Regulations, 2012

AERC (Renewable Purchase Obligation and itsCompliance) Regulations, 2010

Bihar Electricity Regulatory Commission(Renewable Purchase Obligation, its Compliance and REC Framework Implementation) Regulations, 2010.

Chhattisgarh State Electricity Regulatory Commission (Renewable Purchase Obligation and REC framework Implementation) Regulations, 2011.

No: F.3(292)/Tariff/DERC/2010-11/3026/

GERC (Procurement of Energy from RenewableSources) Regulations, 2010.

HERC(Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2010

HPERC (Renewable Power Purchase Obligation and its Compliance) Regulations, 2010

J&KSERC (Renewable Power Purchase obligation, its compliance and REC frame work implementation) Regulations, 2011.

Jharkhand State Electricity Regulatory Commission (Renewable purchase obligation and its compliance) Regulations, 2010

KERC (Power Procurement from Renewable Sources by Distribution Licensee and Renewable Energy Certificate Framework) Regulations, 2011

Notification No. S/03/1 dated 16th March 2011

KSERC (Renewable Purchase Obligation and its Compliance) Regulations, 2010

Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2010 (Revision-I)

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its compliance and REC framework Implementation) Regulations, 2010

Manipur & Mizoram (Renewable Purchase Obligation and its Compliance) Regulations, 2010.

No. H. 13011/5/09-JERC Dated Aizawl, the 5th May, 2010

Manipur & Mizoram (Renewable Purchase Obligation and its Compliance) Regulations, 2010.

No. H. 13011/5/09-JERC Dated Aizawl, the 5th May, 2010

Meghalaya State Electricity RegulatoryCommission (Renewal Energy Purchase Obligation and its Compliance) Regulations, 2010

Page 109: All India RE RAP Database

No.NERC/REGN/2011

No. OERC-Engg-02/2010

No.PSERC/Secy./Reg./55

No.F.25/TERC/2009/415

Reg No. 1 of 2012

Notification of State agency for REC AERC/341/2010/138Notification of State agency for REC PT No. 40Notification of State agency for REC No. 1370Notification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECNotification of State agency for RECOrder for APPCOrder for APPC

Nagaland Electricity Regulatory Commission (Renewable Purchase Obligation and its Compliance) Regulations, 2011

OERC (Renewable and Co-generationPurchase Obligation and its Compliance) Regulations, 2010.

PSERC (Renewable Purchase Obligation and its compliance) Regulations, 2011

Rajasthan Electricity Regulatory Commission(Renewable Energy Certificate and Renewable Purchase Obligation Compliance Framework) Regulations, 2010.

No.RERC/Secy./Regulation - 82

Amendment to Renewable Energy Purchase Obligation Regulations, 2010.

Notification No. TNERC / RPO / 19 / 2, dated 29-07-2011

T.E.R.C. (Procurement of Energy fromRenewable Sources) Regulations, 2010.

UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010

No.F-9(21)/RG/UERC/2010/ 697

Uttar Pradesh Electricity Regulatory Commission (Promotion of Green Energy through Renewable PurchaseObligation) Regulations, 2010

No. UPERC/Secy/Regulation/10 - 787

Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy / Renewable Energy Certificates) Regulations, 2012

Page 110: All India RE RAP Database

Order for APPCOrder for APPCOrder for APPCOrder for APPCOrder for APPC

10 of 2012

10 of 2012

10 of 2012

10 of 2012

10 of 2012

Suo motu petition for determination of generic tariff for renewable energy generation projects to be commissioned during FY 2012-13

Suo motu petition for determination of generic tariff for renewable energy generation projects to be commissioned during FY 2012-13

Suo motu petition for determination of generic tariff for renewable energy generation projects to be commissioned during FY 2012-13

Suo motu petition for determination of generic tariff for renewable energy generation projects to be commissioned during FY 2012-13

Suo motu petition for determination of generic tariff for renewable energy generation projects to be commissioned during FY 2012-13

Page 111: All India RE RAP Database

Reference Document Link

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Page 112: All India RE RAP Database

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Page 113: All India RE RAP Database

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Page 114: All India RE RAP Database

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Page 115: All India RE RAP Database

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Page 116: All India RE RAP Database

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Page 117: All India RE RAP Database

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Page 118: All India RE RAP Database

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Page 119: All India RE RAP Database

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Page 120: All India RE RAP Database

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Page 121: All India RE RAP Database

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click HereClick Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Page 122: All India RE RAP Database

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Page 123: All India RE RAP Database

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Page 124: All India RE RAP Database

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click Here

Click HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick HereClick Here

Page 125: All India RE RAP Database