Alignment (results by Jo van den Brand)

Preparing IP 8

Velo arrived at IP 8

Preparing UXA C3

Installation transfer lines for the cooling system

Next steps

Frans Mul 31 May 2006

Drilling holes for th

e LV - boxes

Drilling holes for th

e LV - boxes

Drilling holes for the service platform

Drilling holes for the service platform

Preparing skates Preparing skates

Preparing IP 8

Preparing the false floor

Preparing the false floor

Frans Mul 31 May 2006

Velo arrived at IP 8

In the air

On the road

Frans Mul 31 May 2006

All pictures http://www.nikhef.nl/~fmul/velo/Velo_May 19, 2006, 3:25:56 PM/

Pushing the last meters Velo at IP8

Frans Mul 31 May 2006

Preparing UXA C3Luc, Piet and Jaap started May 29th cabling the racks.

Frans Mul 31 May 2006

On the corner

Installation transfer lines for the cooling system at IP8

Frans Mul 31 May 2006

Next steps:

Velo Alignment at IP8

Installation Velo vacuum system

Cabling at IP 8

Installation service platform

Velo overall test before installation exit window!

Frans Mul 31 May 2006