alexandria city council county board session · alexandria city council ... four mile run...

56
1 DRAFT Alexandria City Council Alexandria City Council Arlington County Board Arlington County Board Joint Work Session Joint Work Session October 14, 2010

Upload: hoangnga

Post on 31-Mar-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

1DRAFT

Alexandria City CouncilAlexandria City Council Arlington County BoardArlington County Board Joint Work SessionJoint Work Session

October 14, 2010

Page 2: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

2DRAFT

Agenda

1.

Welcome and Introductions

2.

Purpose and Overview of Coordination Efforts

3.

Route 1 Corridor Development and Transit Initiatives

4.

Beauregard / Van Dorn / Columbia Pike Corridors Development and Transit 

Initiatives

5.

Four Mile Run Restoration Project

6.

Community Energy Plan

7.

Closing Remarks

Page 3: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

3DRAFT

2.  Purpose and Overview

Page 4: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

4DRAFT

Overview

Joint initiatives

CCPY Transitway and Route 1 Streetcar 

Sustainability study

Joint earmarks

Beauregard‐Columbia Pike transit

Four Mile Run Restoration Project

Staff meeting monthly

Joint Manager meeting in spring 2010

Page 5: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

5DRAFT

Bailey’s Crossroads

Beauregard

Shirlington

Potomac Yard

Crystal City

Eisenhower East

Landmark/Van Dorn

Pentagon City

Pentagon

Mark Center

NVCC

Town Center

Neighborhood Center

Old Town

Eisenhower West

Regional Development and Transit Corridors

Page 6: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

6DRAFT

3.  Route 1 Corridor Development  and Transit Initiatives

Page 7: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

7DRAFT

Route 1 Corridor Context                          Pentagon to Braddock Road

Pent

agon

Airport

Old Town

Four

Mile

Run

Route 1

Page 8: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

8DRAFTFo

ur M

ile R

un

Dangerfield Island

Route 1

Potential Development: Alexandria

Potential Alexandria Potomac Yard Development

0.6 0.8 1.10.7

0.90.8

3.81.9

6.9

0.8

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

Existing Exist+ Approved Capacity

Million SF

Residential

Office

Hotel

Retail & Other

1.4 12.74.2

*Total square feet will vary depending on size of dwelling units in future approvals

Page 9: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

9DRAFT Potential Development: Alexandria

Page 10: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

10DRAFTExisting Transit Service in Route 1 Corridor

Existing corridor transit ridershipWeekday bus boardings: 6,800Weekday rail boardings: 58,400

M

M

M

MM

Page 11: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

11DRAFTPlanned Transit Service in Route 1 Corridor

M

M

M

MM

M

Page 12: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

12DRAFT

M

M

Segment Aby: AlexandriaIn planning$2 MDeveloper

Segment Bby: AlexandriaIn planning$13.5 MFederal, State, Developer

Segment Cby: AlexandriaIn planning$16.0 MDeveloper

Metrorail Stationby: AlexandriaIn planning$240 MTax Districts, TIF, Developers

Streetcar Conversionby: AlexandriaIn planning$140 MFederal / Local

Transit Project Status: Alexandria

Page 13: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

13DRAFT

Potomac Yard Metrorail Station

M

M

Page 14: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

14DRAFT

Potomac Yard Metrorail Station

Page 15: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

15DRAFT Potomac Yard Metrorail Station                             Draft Timeline

Page 16: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

16DRAFT

Potomac Yard Metrorail Station  Financing 

Studies, Design,ConstructionCapitalized Interest

Debt ServiceInterest

Planned Uses and Sources of Funding

$ 240 M$ 221.6 M

$ 35 M

TOTAL: $496.6 Million

DeveloperContributionsNet New TaxRevenuesSpecial TaxDistrict Revenues

$ 35 M

Uses

$ 229 M

$ 74 M

$ 194 M

Sources

Page 17: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

17DRAFT Potential Development: ArlingtonNational AirportNational Airport

PentagonPentagon

Four Mile Run

Four Mile Run

Potential Arlington Route 1 Corridor Development

3.0 3.1 3.74.0 4.7

6.5

13.015.3

22.0

15.8

18.3

27.2

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

Existing Exist+ Approved Capacity

Million SF

Residential

Office

Hotel

Retail & Other

35.8 59.441.4

*Total square feet will vary depending on size of dwelling units in future approvals

Page 18: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

18DRAFT Potential Development: Arlington

Page 19: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

19DRAFT

M

M

M

M

Segment Dby: ArlingtonIn design$9.0 MFederal, State, Local

Segment Eby: ArlingtonIn design$7.8 MFederal, State, Local

Segment Fby: ArlingtonFuture$8 MFunding not identified

Streetcar Conversionby: ArlingtonIn planning$140 MFunding not finalized

Columbia Pikeby: Arlington, Fairfax ‐

In planning$160 M (Federal, State, Local)

Transit Project Status: Arlington

Page 20: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

20DRAFTPe

ntag

on

Airport

Del RayFo

ur M

ile R

un

Potential Development

Potential Combined Route 1 Corridor Development

3.6 3.9 4.84.0 5.4

7.4

13.016.1

25.816.6

20.2

34.1

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

Existing Exist+ Approved Capacity

Million SF

Residential

Office

Hotel

Retail & Other

72.137.2 45.6

*Total square feet will vary depending on size of dwelling units in future approvals

Page 21: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

21DRAFT

CCPY Bus Transitway and Route 1 Streetcar:  Two Projects

$20.5 million in Federal funds identified specifically for bus transitway

Preserving Federal participation requires completing NEPA

Bus transitway sets the stage for streetcar: –

Building high quality stations

Increasing frequencies

Attracting more transit ridership

NEPA requires maintaining distinctions between the CCPY bus and Route 

1 streetcar projects

Page 22: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

22DRAFT

Focus community development around high quality / high 

capacity transit

Provide connected street network giving travel options to 

all users

Maximize viable transportation choices for workers, 

residents and visitors

Apply Best Practices in TDM to reduce vehicular travel

Monitor development and transportation performance with 

measurable targets

Integrating Development and Transportation

Page 23: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

23DRAFT

To support high density development–

High Capacity Transit options

Transportation Demand Management

Pedestrian and Bicycle Friendly Infrastructure

Parking Management

Minimum Densities

Development conditioned upon major transit investments 

(facilities and services – up to $600M in capital cost)

Require development project approvals

New Metrorail Station a precondition for higher 

development density in Alexandria

Combined Potential Development Needs

Page 24: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

24DRAFT

Benefits of Coordinated Planning

Provide high‐capacity, high‐quality transit to serve growth in 

the Crystal City / Potomac Yard corridor•

Connect new development to the existing Metrorail system

Provide new infill Metrorail station to support high‐density 

development

Set the stage for long‐term transit improvements

Joint project between Arlington and Alexandria

Page 25: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

25DRAFT

Implementation Timelines                                  Route 1 Corridor Transit Initiatives

Page 26: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

26DRAFT

Discussion of Coordination Opportunities

Project Management

Interim and future operations planning

Alexandria decision to participate in streetcar  environmental study

Continue to identify funding opportunities

Streetcar technology selection

Sustainable design opportunities

Page 27: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

27DRAFT

4. Beauregard / Van Dorn and  Columbia Pike Corridors 

Development and Transit Initiatives

Page 28: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

28DRAFT

Beauregard‐Van Dorn and                           Columbia Pike Corridors

Bailey’s Crossroads

Beauregard

Shirlington

Eisenhower East

Landmark/Van Dorn

Pentagon City

Mark Center

NVCC

Town Center

Neighborhood Center

Eisenhower West

Page 29: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

29DRAFT

Planning  and Proposed Development

Landmark/Van Dorn 

Corridor Plan

– proposed 

over 17.2 million square 

feet where 4.9 exists 

today

Beauregard Corridor Plan

planning and 

transportation analysis 

underway Alexandria

FairfaxArlington

Legend

Plan Area Boundaries

Beauregard

Landmark/Van Dorn

Page 30: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

30DRAFT

Duke Street

I-395

Van Dorn Street

Edsall Road

Pickett Street

Stevenson Avenue

Landmark/Van Dorn Corridor Plan

Page 31: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

31DRAFT

Avg. Weekday DASH Ridership: 5,153

Existing Corridor Transit Ridership

Avg. Weekday WMATA Ridership: 7,530

Route 7 Series

25B

AT1, AT2

AT628A

Existing Transit Service –

Beauregard Corridor

Page 32: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

32DRAFT

Planned Transit Service  Beauregard / Van Dorn Corridor

Page 33: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

33DRAFT

PentagonPentagon

Pentagon CityPentagon City

ShirlingtonShirlington

SkylineSkyline

Columbia P

ike

Columbia P

ike

Columbia Pike Corridor Revitalization & Form‐Based Code

Page 34: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

34DRAFT

Existing Transit Service –

Columbia Pike

Existing corridor transit ridershipWeekday bus boardings: 15,000

Page 35: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

35DRAFT

Planned Transit Service                                     Columbia Pike Alignment Alternatives

Page 36: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

36DRAFT

Beauregard / Van Dorn / Columbia Pike  Corridors Potential Transitway Connection

Possible Connection 

at NVCC campus

Maintenance Facility 

Location

Inter‐operability 

System operator(s)

Beau

rega

rdTr

ansi

tway

NVCC

Skyline

Bailey’sCrossroads

Page 37: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

37DRAFT

Discussion

Alignment / Corridor Connection

Coordination with Fairfax County

Location of maintenance facility

Vehicle Technologies

System Operator(s)

Potential for terminus in Alexandria

Page 38: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

38DRAFT

5.  Four Mile Run Restoration  Project

Page 39: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

39DRAFT

Project Vision:

Four Mile Run will become a model of urban ecological 

restoration. Through the sensitive and sustainable 

integration of a restored natural stream channel with an 

active urban environment the Four Mile Run corridor will 

be a place where the communities of Arlington County 

and the City of Alexandria can gather, recreate and 

celebrate a shared waterfront legacy.

Page 40: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

40DRAFTProject Area and Timeline

1983: Flood control project completed for lower 2.3 miles – Shirlington to 

Potomac River

2006: Master Plan adopted for multiple objective

restoration after 6 year 

planning process ($1M EPA grant)

2009: Design Guidelines adopted

Partners: Arlington, Alexandria, US Army Corps of Engineers, NVRC

Monthly meetings,  since 2005

Led by joint Arlington‐Alexandria Citizen Joint Task Force with 1 main 

workgroup and multiple subcommittees

Project Area and Timeline

Page 41: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

41DRAFTDemonstration Project:  Tidal Corridor Restoration

Wetland and streambank restoration, Mt. Vernon Ave to Route 1 area 

60% designs nearly complete

90% designs by end of year

$7M cost estimate; ~$5M funded (~$3M EPA STAG funds)

Demonstration Project:  Tidal Corridor Restoration

Page 42: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

42DRAFT

Alluvial stream restoration, Shirlington to Mt. Vernon Ave

60% designs completed by USACE 2009

Final design within a few years

$9M cost estimate; ~$1.6M local share each jurisdiction         

(17.5% Arlington) + (17.5% Alexandria), $6.75M USACE (65%)

Non‐Tidal Corridor Restoration

Page 43: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

43DRAFT

Key linkage in vicinity of South Eads Street and Commonwealth Avenue

VDOT grant for bridge design completed and construction funding TBD

Design competition completed March 2010

Formal design contract underway with winning firm (Grimshaw

Arup Scape)

Pedestrian & Cyclist Bridge

Page 44: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

44DRAFT

City recently acquired four parcels (63,803 sq ft) adjacent to stream at Mt. Vernon 

Ave. for $4,800,000

Re‐use plan for public spaces connected to Four Mile Run under development

Joint programming potential

Open Space Acquisition ‐

Alexandria

Proposed Site Plan

Page 45: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

45DRAFTCurrent and Future Funding

Federal STAG Funds

FED/VDOT 

Transportation 

Enhancement Grant

USACE Cost‐Share

Jurisdictional Capital 

Improvement Programs

NEA Grant

Developer Proffers

Page 46: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

46DRAFTFunding and Timing Issues

CIP funding in place for most of stream corridor environmental restoration 

STAG funding may only be used for in‐stream environmental work

Additional funding needed for design and implementation of near stream elements

Identification of pedestrian/bicycle and nature trail locations,

design and funding

Funding and Timing Issues

Page 47: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

47DRAFTNorth Potomac Yard Developer Contribution

$8,700,000 developer contribution (adjusted annually for CPI after 2010)

Timing of funding is tied to phases of North Potomac Yard over 20‐year build out

Further clarification to be provided upon Metro Station study completion

Page 48: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

48DRAFTFuture Decisions

Construction synergies and efficiencies appear to exist between planned and funded 

in‐stream improvements, and desired but not funded nature trail improvements

Sequencing and pricing of construction

Development of proposed Capital Improvement Program (CIP) project plan

Identification of additional local capital funding needed beyond

grant match

Page 49: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

49DRAFT

Project website:•

http://www.novaregion.org/restoration.htm

Discussion

Page 50: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

DRAFT 50

Community Energy & Sustainability Task Force Charter

Purpose

• Recommend countywide goals for long-term, mid- term and short-term reduction of greenhouse gas (GHG) emissions as well as key strategies and actions to be taken by government, the private sector, the non- profit sector and individuals to meet those goals. Energy use is the predominant cause of GHG emissions and is therefore the primary focus of this effort.

• Produce a Community Energy Plan (CEP) that will be the foundation for an Energy Master Plan, which could ultimately become an element of Arlington County’s Comprehensive Plan.

Adopted by Arlington County Board, January 1, 2010

Page 51: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

DRAFT 51

Project Task Force (30 members)Project Task Force (30 members)

• Businesses– JBG– Little Diversified

Architectural Consulting– Lockheed Martin– Marriott International– SRA International– Turner Construction– VA Hospital Center– Vornado

• Citizens– Arlington Civic Federation– Commissions

• Educational Institutions– Arlington Public Schools– Virginia Tech

• Energy & Energy Tech Industry– Dominion Virginia Power– United Solar Ovonics (Uni-Solar)– Washington Gas

• Local, State and Federal Govts– The Pentagon– US EPA– Commonwealth of Virginia Senate

• Nonprofits/Associations– Apartment and Office Building Association– Arlington Chamber of Commerce– Arlington Partnership for Affordable Housing – Arlingtonians for a Clean Environment– Pew Center on Global Climate

• Regional Transportation Authorities– Metro Washington Airports Authority– Metro Washington Area Transit Authority

Page 52: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

DRAFT 52

CEP Project Timeline

• January 2010 - Project Kick-Off– Bi-monthly Task Force meetings– Monthly Technical Working Group meetings

• April & October 2010– Community Energy Town Hall meetings

• July 2010 - Energy modeling efforts• September 2010 - Preliminary

recommendations presented• April 2011 – County Board considers

Community Energy Plan• TBD - Implementation Plan

Economic, Energy and Environmental FutureEconomic, Energy and Environmental Future

Page 53: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

DRAFT 53

Community Energy Plan: Smart Growth – Part II

CompetitivenessCompetitiveness SecuritySecurity

EnvironmentEnvironment

Supply security

Supply quality

Flexibility

Energy cost

Employment

Investment

Greenhouse Gas Reduction

Three Groups of BenefitsThree Groups of Benefits

Page 54: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

DRAFT 54

Arlington CEP Framework

• Energy efficiency – If you don’t need it don’t use it– Efficient buildings, vehicles– Urban design for transport efficiency– Local employment for commuting efficiency

• Heat Recovery – If it’s already there – use it– Distributed combined heat and power – Use existing “waste” heat– Structure commercial sites to maximize “waste” heat use

• Renewable energy – If it makes sense, go carbon free– Renewable electricity – Photovoltaic, Wind, Run-of-river Hydro– Renewable heat - Solar thermal, Biomass, geothermal– Renewable heat and power – waste-to-energy, biomass

• Energy distribution – Invest where it makes sense– Flexibility – electricity, gas, heating, cooling, ….– Accepts multiple fuels and energy conversion technologies– Optimize local / regional investment choices

Integrated Solution Integrated Solution –– Tailored for the CountyTailored for the County

Page 55: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

DRAFT 55

Questions?

Page 56: Alexandria City Council County Board Session · Alexandria City Council ... Four Mile Run Restoration Project 6. Community Energy Plan 7. ... Hotel Retail & Other 35.8 41.4 59.4

56DRAFT

6.  Closing Remarks