alessandro variola may 23 rd 2007 posipol welcome welcome posipol 2007 goals alessandro variola may...
TRANSCRIPT
Alessandro Variola
MAY 23rd 2007POSIPOL WELCOME
WELCOME
POSIPOL 2007 Goals
Alessandro VariolaMAY 23rd 2007Posipol Welcome
Alessandro Variola
MAY 23rd 2007POSIPOL WELCOME
Thank you for your participation
• 1) Posipol Program• 2) Some information• 3) Goal of the Workshop
Alessandro Variola
MAY 23rd 2007POSIPOL WELCOME
• And many thanks to the sponsors…….
Alessandro Variola
MAY 23rd 2007POSIPOL WELCOME
Program• Wednesday : Registration 9.00 - 9.30
Morning Session 9.45 – 12.30Afternoon Session 14.30 -17.30Coffee Breaks 11.00 – 11.30; 16.00 – 16.30Lunch 12.30 – 14.30
• Thursday : Morning Session 9.30 – 13.15Afternoon Session 14.30 – 16.30Coffee Break 11.30 – 12.00Lunch & Photos 13.15 – 14.30Social event: Visit and Dinner at the Orsay Museumstarting from 19.00
• Friday : Morning Session 9.30 – 12.30Afternoon Session 14.00 – 18.00Coffee Breaks 11.00 – 11.30; 15.00 – 15.30Lunch 12.30 -14.00
Alessandro Variola
MAY 23rd 2007POSIPOL WELCOME
• 1) Web Café – @ the “Science Museum” in front of the “salle bleue”• 2) Wi-fi is active in the Auditorium• 3) !!!! RER – Not all RER B trains from Paris stop in Orsay Ville. The
good ones are directed to Saint Remy les Chevreuse and their code start either by P or by L (like for example PLAN, PAPY, LADY…….)On the platform take a look at the panel lights corresponding to the stops.
• 4) All the trains leaving from Orsay Ville go to Paris• 5) Orsay Museum dinner: meeting at the museum at 19.00• 6) There will be a group leaving from LAL• 7) Lunch is foreseen at the BURES restaurant (have a look on the
map…)• 8) LAST MINUTE : TOMORROW => RESTAURANT STRIKE !!!!!!
We are trying to have an emergency “spare solution”…(Sandwiches…..)We are really sorry.
SPEAKERS (& Conveners): 10 min before your session check that your talk is loaded in the INDICO agenda.
Information
Alessandro Variola
MAY 23rd 2007POSIPOL WELCOME
For any problem:We have two kind assistants
CATHERINE ISABELLE
Alessandro Variola
MAY 23rd 2007POSIPOL WELCOME
Workshop Goals
• POSIPOL 2006:
• discuss options and open issues of polarized positron source, based on laser Compton back scattering, for CLIC and ILC.
• assess and coordinate the outstanding R&D efforts towards a complete Compton source design.
• compare the issues with the undulator source. • analyze the experimental programs carried out in the
different laboratories.• elaborate the baseline recommendation for CLIC.
Alessandro Variola
MAY 23rd 2007POSIPOL WELCOME
Workshop Goals
Main events since Posipol 2006:
1) CLIC parameters change2) ILC RDR published. Meetings in Daresbury and Bejing3) ILC next step = EDR4) E166 results5) GEANT4 polarized version
6) Compton sources: Fiber Laser Technology opens the way to high power, high repetition frequency lasers7) Daresbury meeting - ERL scheme as possible Compton Driver8) SuperB factory proposal (polarized positrons ?)9) Rising interest the use of low energy Compton sources for Medical-Industrial applications
Alessandro Variola
MAY 23rd 2007POSIPOL WELCOME
Workshop Goals
Progress in Compton related studies and experiments:
-Experimental results @ KEK and BNL (2 talks)-Fiber lasers (4 talks)-Re-circulation laser (1 talk)-2 Mirror cavity (2 talks)-4 Mirror cavity (1 talk)-Capture session ~ 2% @ ~42% polarization (3 talks), GEANT4 & EGS (1 talk)-Beam @ DR 1 mm mrad rms (1 talk)-Digital feedback for FP cavities (1 talk)-HERA fast polarimetry (1 talk)-Tech application: Lyncean Technology, other projects are starting (2 talks)
Alessandro Variola
MAY 23rd 2007POSIPOL WELCOME
1) Take stock of the situation of the different machines, schemes, studies and R&D’s.
2) Gather information on the new technologies (fiber laser, mirrors…). Define the possible associated R&D’s.
3) Find the overlap with the undulator solution, both for funding (EU FP7…) and common work.
4) Benchmark of the GEANT4 polarized version. 5) Review the industrial – medical applications of Compton machine (extremely
important for R&D fund request).
CLIC - Redefine the parameters. Analyze the differences from the earlier proposal and
have a first “feasibility” scheme.ILC- Converge towards a scheme that can produce a valid “alternative” design and
clearly assess what R&D’s are necessary to validate the scheme.- Point the way to EDR- Study the possibility of a demonstrator experiment- Define the aspects of the schemes that still need answering (stacking,
costing…) and make a work planSuperB - Introduce the new machine and address the case of polarized positrons.
Introduce the FP7 design study
Workshop Goals
Alessandro Variola
MAY 23rd 2007POSIPOL WELCOME
• ENJOY the workshop and……. PARIS
Workshop Goals