ED01P04 RRH60_21ASB Test Strategy RRH60_21ASB Test Strategy_ED01P06.DOC 22/07/2010 3BK 11251 0398 BEZZA 1/49 All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from ALU Site SH ALCATEL-LUCENT Originators LIU Zehong, ZHOU Xia, SHEN Wei,Zhang KE, Zhao hui,jia jun RRH60_21ASB Test Strategy System : WCDMA NodeB Sub-system : RRH Document Category : System Test ABSTRACT The present document describes the test strategy of China WRRH system. Approvals Name App. ZHANG Jianlin TPM LI Chunting TPM HUANG Jincao TPL REVIEW Ed. 01 Proposal 01 2009-07-27 Common platform internal review HISTORY Ed. 01 Proposal 01 2009-07-27 Initialize the contents. Ed. 01 Proposal 02 2009-08-10 Modification according to the design optimization Ed. 01 Proposal 03 2009-08-24 Include the thermal test and modification according to the architecture Ed. 01 Proposal 04 2009-09-14 Updating according to the modification of the power supply test and reliability test Ed. 01 Proposal 05 2009-09-24 Updating according to the modification of the SIT3 environment test Ed. 01 Proposal 06 2009-11-11 Updating according to the modification of the SIT1/SIT2/SIT3 test plan modification

Upload: fishman

Post on 25-Sep-2015

32 views

Category:

Documents


0 download

TRANSCRIPT

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 1/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    Site SH

    ALCATEL-LUCENT

    Originators LIU Zehong, ZHOU Xia, SHEN Wei,Zhang KE,

    Zhao hui,jia jun

    RRH60_21ASB Test Strategy

    System : WCDMA NodeB Sub-system : RRH Document Category : System Test

    ABSTRACT

    The present document describes the test strategy of China WRRH system.

    Approvals Name App.

    ZHANG Jianlin TPM

    LI Chunting TPM

    HUANG Jincao TPL

    REVIEW

    Ed. 01 Proposal 01 2009-07-27 Common platform internal review

    HISTORY

    Ed. 01 Proposal 01 2009-07-27 Initialize the contents. Ed. 01 Proposal 02 2009-08-10 Modification according to the design optimization Ed. 01 Proposal 03 2009-08-24 Include the thermal test and modification according to the

    architecture Ed. 01 Proposal 04 2009-09-14 Updating according to the modification of the power supply test

    and reliability test Ed. 01 Proposal 05 2009-09-24 Updating according to the modification of the SIT3 environment

    test Ed. 01 Proposal 06 2009-11-11 Updating according to the modification of the SIT1/SIT2/SIT3 test

    plan modification

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 2/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    TABLE OF CONTENTS TABLE OF CONTENTS.....................................................................................................................................2 LIST OF FIGURES.............................................................................................................................................4 LIST OF TABLE .................................................................................................................................................5 REFERENCED DOCUMENTS...........................................................................................................................5 PREFACE...........................................................................................................................................................6 1 SCOPE ..........................................................................................................................................................7 2 GENERAL .....................................................................................................................................................8

    2.1 RRH Architecture and Requirements.................................................................................................8 2.2 Test Definition ......................................................................................................................................9 2.3 Test Work Flow ..................................................................................................................................10

    3 SIT1 .............................................................................................................................................................12 3.1 TRX Board Test ..................................................................................................................................12

    3.1.1 Test Configuration .....................................................................................................................12 3.1.2 Test Equipment and Tool ..........................................................................................................14 3.1.3 Test Domain ..............................................................................................................................14 3.1.4 SIT1 TRX board PQ SW Test ...................................................................................................17

    3.2 Power Amplifier Test .........................................................................................................................19 3.2.1 Test Configuration .....................................................................................................................19 3.2.2 Test Equipment and Tool ..........................................................................................................20 3.2.3 Test Domain ..............................................................................................................................21

    3.3 FEU board Test ..................................................................................................................................22 3.3.1 Test Configuration .....................................................................................................................22 3.3.2 Test Equipment and Tool ..........................................................................................................23 3.3.3 Test Domain ..............................................................................................................................24

    3.4 Mainframe/TRX/PA/FEU Reliability Test .........................................................................................25 3.4.1 EMC Test(Zhang ke) .................................................................................................................25 3.4.2 Safety Test(Zhang ke) ...............................................................................................................26 3.4.3 Lightning Protection Test(Zhang ke) .........................................................................................26 3.4.4 Thermal Test(JIA JUN)..............................................................................................................26 3.4.5 Environment test(Zhao hui) .......................................................................................................26

    4 SIT2 .............................................................................................................................................................29 4.1 DL Pre-integration Test .....................................................................................................................29

    4.1.1 Test Equipment and Tool ..........................................................................................................29 4.1.2 Test Equipment and Tool ..........................................................................................................30 4.1.3 Test Domain ..............................................................................................................................31

    4.2 UL Pre-integration Test .....................................................................................................................32 4.2.1 Test Configuration .....................................................................................................................33 4.2.2 Test Equipment and Tool ..........................................................................................................34 4.2.3 Test Domain ..............................................................................................................................34

    4.3 SW Pre-integration Test ....................................................................................................................34 4.3.1 Test Configuration .....................................................................................................................34 4.3.2 Test Equipment and Tool ..........................................................................................................34 4.3.3 Test Domain ..............................................................................................................................34

    5 SIT3 .............................................................................................................................................................34 5.1 RRH Standalone Initial Test ..............................................................................................................34

    5.1.1 Test Configuration .....................................................................................................................34 5.1.2 Test Equipment and Tool ..........................................................................................................34 5.1.3 Test Domain ..............................................................................................................................34

    5.2 RRH Functional Test..........................................................................................................................34

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 3/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    5.2.1 Test Configuration .....................................................................................................................34 5.2.2 Test Equipment and Tool ..........................................................................................................34 5.2.3 Test Domain ..............................................................................................................................34

    5.3 RRH Reliability Test...........................................................................................................................34 5.3.1 EMC Test...................................................................................................................................34 5.3.2 Safety Test.................................................................................................................................34 5.3.3 Lightning Protection Test ...........................................................................................................34 5.3.4 Thermal Test .............................................................................................................................34 5.3.5 Environment test........................................................................................................................34

    6 REFERENCE: .............................................................................................................................................34 7 GLOSSARY AND ABBREVIATIONS .........................................................................................................34

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 4/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    LIST OF FIGURES

    FIGURE 2-1 RRH ARCHITECTURE ........................................................................................................................................ 8 FIGURE 2-2 TEST WORK FLOW .......................................................................................................................................... 11 FIGURE 3-1 CPRI L1/L2 INTEGRATION.............................................................................................................................. 12 FIGURE 3-2 TRX SIT1 TEST CONFIGURATION................................................................................................................... 13 FIGURE 3-3 TRX SIT1 CPRI INTERFACE TEST CONFIGURATION....................................................................................... 14 FIGURE 3-4 PQ SW TEST ENV........................................................................................................................................... 17 FIGURE 3-5 PA TEST BENCH 1 .......................................................................................................................................... 19 FIGURE 3-6 PA TEST BENCH 2 .......................................................................................................................................... 20 FIGURE 3-7 FEU TEST BENCH 1 ........................................................................................................................................ 23 FIGURE 3-8 FEU TEST BENCH 2 ........................................................................................................................................ 23 FIGURE 3-9 RRH ENVIRONMENT AND TEMPERATURE TEST ......................................................................................... 26 FIGURE 4-1 DL PRE-INTEGRATION TEST CONFIGURATION................................................................................................. 30 FIGURE 4-2 UL PRE-INTEGRATION TEST CONFIGURATION................................................................................................. 33 FIGURE 4-3 SW PRE-INTEGRATION TEST CONFIGURATION ................................................................................................ 34 FIGURE 5-1 RRH STANDALONE TEST CONFIGURATION ..................................................................................................... 34 FIGURE 5-2 RRH ENVIRONMENT TEST CONFIGURATION................................................................................................... 34

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 5/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    LIST OF TABLE TABLE 2-1 RRH FEATURE LIST ........................................................................................................................................... 9 TABLE 2-2 UNIT TEST DEFINITION....................................................................................................................................... 9 TABLE 2-3 SIT1 DEFINITION ............................................................................................................................................. 10 TABLE 2-4 SIT2 DEFINITION ............................................................................................................................................. 10 TABLE 2-5 SIT3 DEFINITION ............................................................................................................................................. 10 TABLE 3-1 SIT1 TRX BOARD TEST TOOL LIST ................................................................................................................. 14 TABLE 3-2 SIT1 TRX BOARD TEST DOMAIN LIST ............................................................................................................ 17 TABLE 3-3 SIT1 TRX BOARD PQ SW TEST TOOL LIST..................................................................................................... 17 TABLE 3-4 SIT1 TRX BOARD PQ SW TEST DOMAIN LIST ................................................................................................ 18 TABLE 3-5 SIT1 PA TEST TOOL LIST ................................................................................................................................ 20 TABLE 3-6 SIT1 PA TEST DOMAIN LIST............................................................................................................................ 22 TABLE 3-7 SIT1 FEU TEST TOOL LIST.............................................................................................................................. 24 TABLE 3-8 SIT1 FEU TEST DOMAIN LIST ......................................................................................................................... 25 TABLE 3-9 SIT1 ENVIRONMENT TEST TOOL LIST.............................................................................................................. 27 TABLE 3-10 SIT 1 ENVIRONMENT TEST DOMAIN LIST ...................................................................................................... 28 TABLE 4-1 SIT2 DL TEST TOOL LIST ................................................................................................................................ 31 TABLE 4-2 SIT2 DL TEST DOMAIN LIST ........................................................................................................................... 32 TABLE 4-3 SIT2 UL TEST TOOL LIST ................................................................................................................................ 34 TABLE 4-4 SIT2 UL TEST DOMAIN LIST ........................................................................................................................... 34 TABLE 4-5 SIT2 CM TEST TOOL LIST ........................................................................................................................... 34 TABLE 4-6 SIT2 CM TEST DOMAIN LIST....................................................................................................................... 34 TABLE 5-1 SIT3 STANDALONE TEST TOOL LIST................................................................................................................ 34 TABLE 5-2 SIT3 STANDALONE TEST DOMAIN LIST ........................................................................................................... 34 TABLE 5-3 SIT3 FUNCTIONAL TEST TOOL LIST ............................................................................................................... 34 TABLE 5-4 SIT3 FUNCTIONAL TEST DOMAIN 1............................................................................................................... 34 TABLE 5-5 SIT3 FUNCTIONAL TEST DOMAIN 2............................................................................................................... 34 TABLE 5-6 SIT3 ENVIRONMENT TEST TOOL LIST ............................................................................................................ 34 TABLE 5-7 SIT3 ENVIRONMENT TEST DOMAIN LIST ....................................................................................................... 34

    REFERENCED DOCUMENTS [ 1 ] 3BK 10239 0041 DCZZA RRH60_21ASB documentation plan [ 2 ] 3BK 10239 0044 QMZZA RRH60_21ASB quality plan [ 3 ] 3BK 11251 0385 DRZZA RRH60_21ASB technical feature list [ 4 ] 3BK 11251 0386 DTZZA RRH60_21ASB technical feature description [ 5 ] 3BK 11251 0387 EBZZA RRH60_21ASB architecture specification

    RELATED DOCUMENTS [ 1 ] 3BK 11251 0401 BEZZA RRH60_21ASB E2E test strategy

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 6/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    PREFACE

    The present document describes the test strategy of ASB 60W RRH system. The information contained in this document should allow the test engineer to develop test plan and related test tools. This document should be used:

    - As an input to create the test cases and test plan

    - As an input to build the test configurations and test environments

    - As an input to estimate the test tools and test instruments.

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 7/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    1 SCOPE

    The present document describes the test strategy of ASB self-developed 60W WCDMA RRH. All the necessary tests during RRH development will be described in this document, which including:

    - The unitary chip level functional test (Called Unit Test), which focus on unitary analog, digital components or software functional test on host. The Unit Test carry out in the design teams in the design evaluation phase and the detail is not include in this document.

    - Chip group level functional test (Called SIT1), which focus on one functional module constructed by group of chips and circuit. Reliability test of some critical RRH asset is also included in this phase.

    - Board level functional test (Called SIT2), which focus on RRH internal DL/UL/C&M functional module integration test.

    - RRH subsystem integration test (Called SIT3), which focus on RRH standalone initial test, RRH downlink/uplink function, and pre-qualification test of whole RRH subsystem.

    For Unit Test, as it has tight relationship with design, the test itself is a part of development activity. So the test strategy of this test will be defined in related design documents and it is out of the present document scope. For each of the other up-mentioned tests, the test domain/requirements, test environment and related test tools should be included. The integration test with NodeB (d2U V2) is also out of this document scope, it will be included in RRH60_21ASB E2E test strategy [ 1 ].

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 8/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    2 GENERAL

    2.1 RRH Architecture and Requirements

    The following are RRH schematic, mainly including

    - PA board: power amplifier

    - FEU board: front end unit

    - TRX board: transmit/receive board

    FEU

    PA

    TRXDC 48V

    TX

    RX1&RX2

    TX

    SFP1&SFP2

    OAM

    DC 28vDC 12V

    TX RFDPD feedback

    Power Supply

    Figure 2-1 RRH Architecture A list of RRHs main feature is given below. It is about RRH general requirements and RRH interface. This is thought helpful to understand the test.

    Feature Requirements

    Frequency Range band I : 2110 2170 MHz (DL), 1920-1980 MHz (UL) RF Power Output at EAC 60W/47.8dBm

    RRH capability

    UMTS 5MHz,10MHz,15MHz,20MHz R99 HSDPA HSUPA HSPA+

    Dimension less than 47/48cm (h) x 26/27 cm (w) x 20/16cm (d), ( volume < 25l, target is

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 9/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    (mounting kit excluded, solar shield included)

    CPRI interface Main CPRI Interface: SFP Daisy-chained CPRI Interface: SFP

    Power interface 2 DC Grounding terminal / 2 hole lug

    RF interface

    2 external antenna connectors : 7/16 female Allow AISG signal and power transmitted through the Tx antenna feeder : Internal Bias-T 2 auxiliary antenna connectors : SMA female, (for antenna sharing, optional )

    AISG interface/User Alarm interface

    Compliant to AISG v2.0. 4 user alarm DB15 in service door

    Maintenance/Configuration/Test interfaces

    External_reference (15MHz) External_triger RJ45 for OCI / Debug

    Table 2-1 RRH Feature List

    2.2 Test Definition

    The general test scope and input/ending criteria of each test phase are described below:

    Unit Test: Unit Test Objective The purpose of this test is to verify unitary analog, digital components and software function.

    Test Domain The sample chip of following components should be tested (e.g. AMP, SAW, Switch, Mixer, BPF, DSA, Filter, VGA, PLL, Sensor, MPU, DDR2, Flash, EEPROM, CPLD, ADC, DAC, 88E1111, etc). The software running on MPU should also be tested on host PC environment or emulator board.

    Responsible HW/SW development team Input Criteria Basically after HW/SW design finish, but for some critical components, the evaluation test should be taken in parallel with design

    Ending Criteria The perform and reliability meets the requirements of RRH MTBF, and pass rate of test case reach 100%

    Table 2-2 Unit Test Definition SIT1: SIT1 Objective The purpose of this test is to verify a functional module constructed by group of chips

    and circuit. The input/output and reliability of this function module will be checked.

    Test Domain

    The performance and function of following module/board will be tested: - TRX (include the power supply) - PA - FEU - Mechanical shell

    For de-risk the reliability requirements of RRH system, the EMC test of the up-mentioned modules should be taken.

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 10/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    Responsible HW/SW development team, Mechanical shell/EMC/Safety team, RRH system test team Input Criteria After PEM1 and Unit test finished

    Ending Criteria SIT1 cases pass and the critical modules meet the requirements of EMC/Safety test.

    Table 2-3 SIT1 Definition SIT2: SIT2 Objective The purpose of this test is to verify the DL/UL data path and the MPU software integration(including CPRI L1/L2 & CM, OAM) Test Domain

    TX pre-integration RX pre-integration SW pre-integration

    Responsible RRH system test team Input Criteria SIT1 basic function test is finished exclude the Mechanical shell/EMC/Safety test and 90% test case is pass

    Ending Criteria All the test case in the SIT2 is pass

    Table 2-4 SIT2 Definition SIT3: SIT3 Objective The purpose of this test is to verify whole RRH function and performance, which including Test Domain

    - RRH standalone initial test - RRH functional test - RRH pre-qualification test

    Responsible RRH system test team Input Criteria SIT1 TX test and SW test is finished

    Ending Criteria All the test case in the SIT3 is pass

    Table 2-5 SIT3 Definition

    2.3 Test Work Flow

    The sequence of test phases and the relationship between them are listed in Figure 2-2. Although each test is an input criterion of its following test, SIT1/SIT2 and SIT2/SIT3 will overlap due to the tight schedule. The subsequence of detail test cases will be defined in test plan, and the related test will also be arranged cannily to make the test to be carried in parallel as possible.

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 11/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    Figure 2-2 Test Work Flow

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 12/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    3 SIT1

    3.1 TRX Board Test

    TRX board is the main asset of RRH system, which terminating CPRI interface at NodeB side, providing one TX channel to PA and two RX channels to LNA at the other side. The general architecture of TRX is illustrated in [ 5 ]. In this test, the outside interfaces will be simulated and the internal behaviour of TRX will be checked.

    3.1.1 Test Configuration

    For TRX SIT1, we can set up the test bench as Figure 3-2. The test bench will be tailored to adapt different tests.

    For CPRI L1/L2 integration, pre-saved data will be fetched from RAM and sent as CPRI payload. The data can be decoded by TRX or loopback to xCCM and displayed on BCI command window. The software tools, BCI command menu and xCCM host tool (including ping, telnet, tcpdump) should be used depending on tests.

    Ethernet2

    RS232

    Figure 3-1 CPRI L1/L2 Integration

    Ethernet port is for sending image files, RS232 is for board control and message report, One RS485 is for PA control, another is for AISG.JTAG is for FPGA and DSP debug. xCCM is used to test CPRI interface. PC1 is mainly as a BB board send control signals and all messages for CPRI test and system test.PC2 is used to send control signal, image download(test vectors) and data collect, for board test.

    For TRX outside alarm and AISG interface test, NI PXI card will be used to simulate these signals. AISG and PA alarm can share one PXI485 card if the two tests do not be carried simultaneously. TRX board can be tailored as a test card, with CPRI interface and MPU remained but IF/RF part cut-off. Depends on the stability of HW and develop progress, the TRX adapted card will replace PXI as low cost solution in the later test.

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 13/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    For TRX internal chipsets/module and TX/RX verification, pre-saved the I/Q test vector will be used as DL test signal, and the performance is analysed by VSA. In uplink, VSG is used to generate the wanted test signal. The test vector we need to two kinds, for ADC,DAC, FPGA test good or not test, we need only CW test vector, 1ms, period sent. For other performance test, standard WCDMA modulated signal will be generate, 1ms, period send.

    TRX

    (DUT)

    RS232

    RS485

    RJ45

    DC power

    15MHz Ref

    Frame trigger

    JTAG

    Power

    Supply

    Logic Analyzer

    Or

    USB download cable

    Power alarms

    RS485

    TX (QMA)

    AISG

    Ethernet

    Debug port

    -48V

    PA alarms

    PC2

    PC1

    NI PXI RX (SMB)

    VSG

    Multimeter(A)

    ATT

    Loopback

    Figure 3-2 TRX SIT1 Test Configuration

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 14/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    Figure 3-3 TRX SIT1 CPRI Interface Test Configuration For CPRI interface, we can use TAC card to simulate the BBU. And check the CPRI interface is compliant with design requirement.

    3.1.2 Test Equipment and Tool

    The test equipment which is used within the TRX board test environment is listed in the following table: Equipment Designation Purpose

    Power Meter NRP-Z11 Tx Set point Power Calibration

    Power Supply Agilent N6700 Supply for Test Setup & UUT

    VSG SMU/E4438C Generate the wanted signal

    VSA FSQ/E4445 Analysis the transmit signal

    Logical Analyzer Agilent 16901A TRX internal process debug

    RS485 interface card NI PXI485 Terminate AISG interface or PA alarm

    Digital interface card PXI DIO Power supply alarm interface test

    Table 3-1 SIT1 TRX board Test Tool List

    3.1.3 Test Domain Index Test Domain Description

    TRX Board function Level Test

    SIT1-TRX-01 Output power and power rate Test Tx performance test

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 15/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    SIT1-TRX-02 EVM Tx performance test

    SIT1-TRX-03 Power step accuracy Tx performance test

    SIT1-TRX-04 TX Spurious Test Tx performance test

    SIT1-TRX-05 ACLR Tx performance test

    SIT1-TRX-06 PAPR Tx performance test

    SIT1-TRX-07 Tx Frequency configure Tx performance test

    SIT1-TRX-08 Dynamic range and SNR Rx performance test

    SIT1-TRX-09 Rx Frequency configure Rx performance test

    SIT1-TRX-10 DFR dynamic range and SNR Rx performance test

    SIT1-TRX-11 DFR Frequency configure Rx performance test

    SIT1-TRX-12 -40C to +65C Environment test

    TRX Board digital part test

    SIT1-TRX-13 RS232 interface test check whether the TRX boards rs232 interface is ok or not

    SIT1-TRX-14 Ethernet interface test check whether the TRX boards rs232 Ethernet is ok or not

    SIT1-TRX-15 PA interface test check whether the TRX boards PA interface is ok or not

    SIT1-TRX-16 FEU interface test check whether the TRX boards FEU interface is ok or not

    SIT1-TRX-17 AISG&ALM interface test

    check whether the TRX boards AISG&ALM interface is ok or not

    SIT1-TRX-18 ALDI interface test check whether the TRX boards ALDI interface is ok or not

    SIT1-TRX-19 Front LED interface test check whether the front led is ok or not

    SIT1-TRX-20 Board self test check whether the TRX boards main component is ok or not

    SIT1-TRX-21 Board temperature test

    check whether the TRX boards temperature sensor value is ok or not

    SIT1-TRX-22 Remote 48V power off test check whether the remote power off circuit is ok or not

    SIT1-TRX-23 -48V Current test check that the current consumption is within expected limits

    SIT1-TRX-24 JTAG Chain Test verify the function block of JTAG chain

    SIT1-TRX-25 Reset test

    check whether the TRX boards function is ok or not after many times reset

    TRX Board CPRI inteface Test

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 16/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    SIT1-TRX-26 remote loop back CPRI interface Test

    SIT1-TRX-27 receive clock test CPRI interface Test

    SIT1-TRX-28 DDR test CPRI interface Test

    SIT1-TRX-29 whole IQ loop test CPRI interface Test

    SIT1-TRX-30 whole ETH loop test CPRI interface Test

    SIT1-TRX-31 L1 inband and vendor specific test CPRI interface Test

    CPRI L1/L2 Integration

    SIT1-TRX-32 CPRI link status check #2

    SIT1-TRX-33 CPRI link status check #2

    SIT1-TRX-34 RRH IP configuration To check RRH IP configuration using DHCP

    SIT1-TRX-35 RRH FTP test

    Test the file transfer on C&M link, catch Ethernet packets and analyze C&M link quality

    SIT1-TRX-36 Line speed negotiation

    To check CPRI rate2/3 negotiation is possible between xCCM and RRH

    SIT1-TRX-37 C&M Ethernet Speed Negotiation

    SIT1-TRX-38 Reset RRH from xCCM To check if xCCM is able to Reset RRH

    SIT1-TRX-39 Ping test Ping the RRH from xCCM side

    SIT1-TRX-40 Telnet test Telnet to the RRH on the xCCM side.

    OS startupSW

    SIT1-TRX-41 RAM

    SIT1-TRX-42 Serial Port

    SIT1-TRX-43 Ethernet Port

    SIT1-TRX-44 Device Chip test

    IQ integrationSW

    SIT1-TRX-45 IQ data loopback

    SIT1-TRX-46 9E2 decoding data

    SIT1-TRX-47 BER test

    Init sequence with 2uv2SW

    SIT1-TRX-48 Nominal iBTS Static start-up without DLU

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 17/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    Cell setup with 2uv2SW

    SIT1-TRX-49 Cell normally setup and delete

    Table 3-2 SIT1 TRX Board Test Domain List

    3.1.4 SIT1 TRX board PQ SW Test

    PQ SW is software running on RRH PQ2 CPU. During PQ SW test, the object under test is whole PQ SW only with the cooperation with TRX board hardware (i.e. FPGA, ADC, DAC, etc).

    3.1.4.1 Test Configuration

    In real condition, RRH is connected to BBU via fiber line based on CPRI. The control between RRH and BBU is all triggered by ARD546 message based on CPRI L1/L2.

    But during PQ SW test, FPGA CPRI function will not be involved. We use Ethernet instead to transport ARD546 message.

    Test configuration is as below, The PC with linux OS is connected to RRH via Ethernet line. Test software NodeB simulator runs on the PC and trigger the test with RRH

    Figure 3-4 PQ SW Test Env

    3.1.4.2 Test Equipment and Tool

    The test equipment used for the FEU board test is listed in the following table: Equipment Designation Purpose

    PC with linux OS Normal PC NodeB simulator residence

    NodeB Simulator Software running on linux PC

    simulating BBU behaviour to trigger ARD546 message

    Table 3-3 SIT1 TRX board PQ SW Test Tool List

    3.1.4.3 Test Domain During PQ SW SIT1, only normal cases will be applied, no abnormal cases will be considered.

    Index Test Domain Description

    RRH PC Eth

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 18/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    PQ SW Test

    SIT1-TRX-50 startup Startup sequence

    SIT1-TRX-51 cell setup Cell mapping and cell config message to setup 3 cell(STSR3) SIT1-TRX-52 cell delete delete 3 cells (STSR3) SIT1-TRX-53 Indication enable/disable Enable/disable indication request

    SIT1-TRX-54 measurement report get periodic measurement reports from the RE

    SIT1-TRX-55

    Delay report

    Message exchange with dummy values

    retrieve CPRI delay information from the RE

    SIT1-TRX-56 counter report get performance counters from the RE

    SIT1-TRX-57 Alarm report

    get a snapshot of all (internal and external) alarms managed by the RE with their associated status, severity and description

    SIT1-TRX-58

    Tx enable/disable

    only message exchange, no hardware action

    disable radio transmission onto the antenna,

    SIT1-TRX-59 selftest report get detailed information concerning self test results

    SIT1-TRX-60 Flr enable Enabling a Flr (tracing mechanism provided by RE) SIT1-TRX-61

    Txlaser switch

    only message exchange, no hardware action

    request to switch on or off the laser towards next RE in the daisy chain

    SIT1-TRX-62

    Set new time stamp

    The Timestamp attribute provides the remote unit with the current time of day in the form of a 32 bit UMTS time value in units of seconds. Upon receipt the remote unit aligns its internal clock with this timestamp and uses this timing for writing timestamps to any internal log

    SIT1-TRX-63 Loopback and stop loopback

    only message exchange, no hardware action

    IQ data loopback,

    SIT1-TRX-64 Save recsnapshot

    save in persistent location (flash, eeprom) the information relative to the REC

    SIT1-TRX-65 Led status ask for led information

    SIT1-TRX-66 TmaAccess

    SIT1-TRX-67 setvswrthreshold

    SIT1-TRX-68 RRH load download RRH load download via ethernet

    Table 3-4 SIT1 TRX board PQ SW Test Domain List

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 19/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    3.2 Power Amplifier Test

    Power amplifier is another critical asset of RRH system, a Doherty PA with three stages amplifier, digital part, forward/backward power detect and DPD channel will be used in this RRH system. The general architecture of PA is illustrated in [ 5 ]. In PA SIT1 test, the components inside PA as well as PA outside interface should also be verified.

    3.2.1 Test Configuration

    Figure 3-5 shows the test configuration for most PA function and outside interface test. A RS485 interface is used for PA alarm, which can be controlled by PC with RS485 to RS232 converter.

    Figure 3-5 PA Test Bench 1

    For some test cases, such as PA gain, VSWR, vector network analyzer will be used. The test configuration is illustrated in Figure 3-6. Before test setup, the test link should be calibrated and compensated.

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 20/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    Figure 3-6 PA Test Bench 2

    3.2.2 Test Equipment and Tool

    The test equipment which is used for the PA board test environment is listed in the following table: Equipment Designation Purpose

    Power Meter N1912A Test output power

    Peak and Average Power Sensor

    N1912A Test output power

    Power Supply 62012P-100-50(Chroma)/ N6700 Series(Aglient)

    Supply for Test Setup & UUT

    VSG SMU/E4438C Generate the wanted signal

    VSA FSQ/E4445 Analysis the transmit signal

    Network Analyzer E5071C For gain and line offset

    Attenuator 30Db/40Db To protect the device

    Coupler 30Db/40Db couple the power

    RS485 to RS232 converter card

    Control signal, debug signal, alarm signal and state report

    Table 3-5 SIT1 PA Test Tool List

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 21/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    3.2.3 Test Domain

    Index Test Domain Description

    PA Components Test

    SIT1-PA-001 Gain/Gain Flatness PA Lineup Performance

    SIT1-PA-002 Delay PA Lineup Performance

    SIT1-PA-003 CCDF vs. Pout under

    26V 28V 32V Vdd PA Lineup Performance

    SIT1-PA-004 ACPR vs. Pout under 26V 28V 32V Vdd PA Lineup Performance

    SIT1-PA-005 Spectrum

    Emission Mask PA Lineup Performance

    SIT1-PA-006 Spurious Emission PA Lineup Performance

    SIT1-PA-007 Efficiency vs. Pout uner

    26V, 28V, 32V Vdd PA Lineup Performance

    SIT1-PA-008 Return Loss at

    Input,Output and FB/Rev

    Port PA Lineup Performance

    SIT1-PA-009 Dynamic Range PA Lineup Performance

    SIT1-PA-010 Tx Intermodulation PA Lineup Performance

    SIT1-PA-011 Check In-rush

    Capability/Trip Point PA Lineup Performance

    SIT1-PA-012 CheckThreashold adjustability PA Lineup Performance

    SIT1-PA-013 ON/Off

    Timing Measurement PA Lineup Performance

    SIT1-PA-014 DPD Feedback Path Gain/Gain Flatness PA Lineup Performance

    SIT1-PA-015 DPD Feedback Path Delay PA Lineup Performance

    SIT1-PA-016 Reverse Power Coupling

    Path Gain/Gain Flatness PA Lineup Performance

    SIT1-PA-017 Dynamic range DPD Close-loop Test

    SIT1-PA-018 SNR DPD Close-loop Test

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 22/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    SIT1-PA-019 gain step accuracy DPD Close-loop Test

    SIT1-PA-020 isolation between

    RX/TX DPD Close-loop Test

    SIT1-PA-021 IP3 DPD Close-loop Test

    SIT1-PA-022 NF DPD Close-loop Test

    SIT1-PA-023 ber DPD Close-loop Test

    SIT1-PA-024 VSWRAD temp and

    failure temp point DPD Close-loop Test

    SIT1-PA-025 -40C to +85C Environment test

    Table 3-6 SIT1 PA Test Domain List

    3.3 FEU board Test

    As a RF asset near to antenna port, FEU has two cavity filters and two LNAs. The general architecture of FEU is illustrated in [ 5 ]. The FEU is assumed a third party asset which will be brought in pre-tested. The FEU inside components verification is not necessary, but FEU board level performance and outside interface should be tested.

    3.3.1 Test Configuration

    For FEU TX performance test, a PA board is necessary to send the high power signal. The control signal can be delivered by RS485, illustrated in Figure 3-7. VNA is used to test gain, IL, VSWR, isolation and so on. And NFA is used to test the noise figure. The test bench is illustrated in Figure 3-8.

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 23/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    Figure 3-7 FEU Test Bench 1

    Figure 3-8 FEU Test Bench 2

    3.3.2 Test Equipment and Tool

    The test equipment used for the FEU board test is listed in the following table: Equipment Designation Purpose

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 24/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    Power Meter N1912A Test output power

    Peak and Average Power Sensor

    N1912A Test output power

    Power Supply 62012P-100-50(Chroma)/ N6700 Series(Aglient)

    Supply for Test Setup & UUT

    SG SMU/E4438C Generate the wanted signal

    VSA FSQ/E4445 Analysis the transmit signal

    Network Analyzer E5071C For gain and line offset

    Attenuator 30Db/40Db To protect the device

    Coupler 30Db/40Db couple the power

    NF analysis N8973A To test NF

    RS485 to RS232 converter card

    Control signal, debug signal, alarm and state report

    Table 3-7 SIT1 FEU Test Tool List

    3.3.3 Test Domain

    Index Test Domain Description

    FEU Board Level Test

    SIT1-FEU-001 Tx Insertion Loss & VSWR Tests

    performance test

    SIT1-FEU-002 Tx In-band Ripple & Group Delay Tests

    performance test

    SIT1-FEU-003 Tx Rejection Tests performance test SIT1-FEU-004 Average Input Power

    Test performance test

    SIT1-FEU-005 Peak Envelope Power ( PEP )Test

    performance test

    SIT1-FEU-006 Inter-modulation Distortion ( IMD )Test

    performance test

    SIT1-FEU-007 ALDI Port Test performance test

    SIT1-FEU-008 Rx Gain and Adjustment Gain Range

    performance test

    SIT1-FEU-009 Rx Rejection Tests performance test

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 25/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    SIT1-FEU-010 Rx VSWR and Group Delay Test

    performance test

    SIT1-FEU-011 NF test performance test

    SIT1-FEU-012 Input IP3 Test performance test

    SIT1-FEU-013 Maximum RF Input Test performance test

    SIT1-FEU-014 LNA Alarm Test performance test

    SIT1-FEU-015 Receiver Spurious Emission Tests

    performance test

    SIT1-FEU-016 Isolation between TX port input to RX output port

    performance test

    SIT1-FEU-017 Isolation between RX1 and RX2 output ports

    performance test

    SIT1-FEU-018 Isolation between EAC1 and EAC2 ports

    performance test

    SIT1-FEU-019 I2C Verification Tests performance test

    Table 3-8 SIT1 FEU Test Domain List

    3.4 Mainframe/TRX/PA/FEU Reliability Test

    The system reliability is much depends on the performance of its individual asset. After the TRX/PA/FEU Module SIT1 function test, it should be validated to verify the reliability of the RRH mainframe and modules(TRX/PA/FEU) inner the RRH ; the SIT1 reliability test is important and the purpose of the SIT1 reliability test is to validate 90% reliability issue for the RRH product, in SIT3 RRH reliability test only cover the rest 10% validation on the reliability issue because it very hard to do the big inner modification at that time. Because the RRH integration function test has not performed when the SIT1 reliability test begin, it will use the simulation load mode to fit the SIT1 reliability test requirement on the EMC/Heat . The SIT1 reliability test will be classified as:

    - EMC Test(TRX/PA) - Safety Test(Mainframe/TRX/PA/FEU) - Lightning Protection Test(TRX/PA)

    - Heat Test(Mainframe/TRX/PA/FEU) - Environment test(Mainframe/TRX/PA/FEU) The reliability tests can be executed in 3 team of the ASB CCC lab in different test branch.

    3.4.1 EMC Test(Zhang ke) Abou the detail in the test configuration/test equipment/test domain, please find it in reference_EMC_SATETY_LIGHTNING chapter 2 EMC test , only the SIT1 test will perform in this phase

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 26/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    3.4.2 Safety Test(Zhang ke) Abou the detail in the test configuration/test equipment/test domain, please find it in reference_EMC_SATETY_LIGHTNING chapter 3 safety test, only the SIT1 test will perform in this phase

    3.4.3 Lightning Protection Test(Zhang ke) Abou the detail in the test configuration/test equipment/test domain, please find it in reference_EMC_SATETY_LIGHTNING chapter 4 lightning protection test , only the SIT1 test will perform in this phase

    3.4.4 Thermal Test(JIA JUN) In SIT1, it only perform the thermal simulation test in the system thermal design , and no thermal test in the real environment in the SIT1 phase.

    3.4.5 Environment test(Zhao hui) 3.4.5.1 Test Configuration

    In this section, Mainframe/TRX/PA/FEU reliability test include environment temperature testTRX/PA, mechanical characteristic test(Mainframe) and Ingress protection test(Mainframe/TRX/PA/FEU). Expect mechanical characteristic test and IP(ingress Protection ) test, all the test is in the power on condition and the test bench is the same as Figure 5-13.

    Figure 3-9 RRH environment and temperature test

    3.4.5.2 Test Equipment and Tool

    Equipment Designation Purpose

    Temperature Chamber ESPEC Low / high storage and operation test

    Temperature and Humidity Cabinet ESPEC LHU-213 Damp heat test

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 27/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    Thermal Cycle Temp Chamber ESPEC SET-Z-080U Thermal cycle and temp fast change test

    Vibration Machine WXASPR RT-50A Vibration test

    Mechanical Shock Machine EPCU SD-24 Mechanical shock test

    Drop Machine WXASPR PK-318 Free fall test

    Transport Simulation Machine WXASPR PK-1000 Transport simulation test

    Salt Frog Corrosion Chamber WXASPR AHL-60-SS Salt mist cycle test

    Mildew Cultivation Chamber WXASPR MC-225 Mildew test

    Rain Simulation Chamber WXASPR RI-1000 Rain simulation test

    Sand Dust Chamber WXASPR SD-1500 Sand dust test

    Table 3-9 SIT1 Environment Test Tool List

    3.4.5.3 Test Domain Index Test Domain Description

    Temperature Test

    SIT1-ENV-001 Low temperature start-up -40 storage for 8 hours and then power up, base function must be executed after cold start;

    SIT1-ENV-002 Working test at low temperature

    -40 / RH not defined /16 hours; base function test shall be executed during the test;

    SIT1-ENV-003 Working at dry heat test 50 / 10 % RH /16 hours, Base function test shall be executed during the test;

    SIT1-ENV-004 Working at damp heat test 45/ 85 % RH/ 96 (16) hours; Base Function test shall be executed during the test;

    SIT1-ENV-005 Damp heat start-up test 45/ 85 % RH storage for 8 hours and then power up, base function must be executed during damp heat start;

    SIT1-ENV-006 Temperature cycle test -40,3hours,50,3hours,temperature change 1/min,3 times cycle; Base Function test shall be executed during the test;

    Mechanical Characteristic Test

    SIT1-ENV-007 Vibration test Vibration frequency range: 5 to 200 Hz, axes of vibration: 3 axes, duration: 3 x 30 minutes; test condition: 562 Hz: velocity 5 mm/s.; 62200 Hz: max. peak acceleration of 2 m/s2. Base function, visual and mechanical inspection check after vibration test;

    SIT1-ENV-008 Shock test direction of bumps: 3 directions, duration: 6 ms, acceleration: 180 m / s2 ; Base function and visual inspection check after shock test;

    SIT1-ENV-009 Free Fall test Free fall from 1m high, 2 falls in the normal attitude faces; Base function and visual and mechanical inspection check after free fall test;

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 28/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    Ingress Protection Test

    SIT1-ENV-010 Salt mist test At the temp of 35, 5% Nacl liquor for 48hour. Base function , visual and mechanical inspection check after salt mist test;

    SIT1-ENV-011 Mildew test 29, 90%~98%RH for 24hours; Base function and visual and mechanical inspection check after mildew test;

    SIT1-ENV-012 Rain simulation test Raindrop diameter 2~4.5mm,nozzle water pressure 375 kPa for 40min; Base function and visual and mechanical inspection check after rain simulation test;

    SIT1-ENV-013 Sand dust test 15~35, 45%~75%RH,50um metal square hole very dry French chalk with 2Kg/m3 at air flow speed 2m/s take out for 2 hours; Base function and visual and mechanical inspection check after sand dust test;

    Table 3-10 SIT 1 Environment Test Domain List

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 29/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    4 SIT2

    After SIT1, each asset of RRH is verified individually. And in this test phase, all the assets are put together for first pre-integration. The RRH inner interface between two assets will be checked to verify the middle results satisfy the designed performance.

    SIT2 focus on these aspects about the RRH inner integration and validation:

    - RRH inner module and connection integration

    - RRH DL function process validation except the SFP module connection on the CPRI interface

    - RRH UL function process validation except the SFP module connection on the CPRI interface

    - RRH OAM function process validation except the SFP module connection on the CPRI interface

    - SFP module connection loop test and FPGA L1/L2 process validation of the CPRI interface

    4.1 DL Pre-integration Test

    After the SIT1 validation, the TRX board and PA module and FEU module and Power module pass the module individual test. All of these modules will assemble in the RRH rack and connect together with the RF/Power/Control cable. About the RRH DL function, the following tests will be performed in the SIT2:

    - Modules Power On and initialization after the assembly and connection

    - Power supply module validation when all the module is power-on

    - Module temperature validation when all the module is power-on and load current warm up

    - Module input/output signal and impedance matching validation

    - PA and DPD algorithm in the TRX integration and validation

    DL IQ SFP module connection loop test and FPGA L1/L2 process validation of the CPRI interface

    4.1.1 Test Equipment and Tool

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 30/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    Figure 4-1 DL Pre-integration Test Configuration

    In the SIT2 DL pre-integration test environment, the RRH Test SW work on the test mode and do the module &DL configuration and debug function in the test, it also monitor the module status and internal process. The DL test vector is generated in the FPGA with the RRH Test SW operation. The RRH test SW also perform the SFP module connection test and FPGA L1/L2 process validation of the CPRI interface .It run in the PC and connect with TRX with 100M Ethernet RJ45 cable and RS232 debug cable.

    After the module power-on, if the power supply module status and module initialization is abnormal, the test power supply will replace the power supply module and verify the character of the power supply module and TRX/PA/FEU internal disturbance.

    In order to validate the DL signal input/output character in the module process, the vector signal analyzer is used in the RF signal test and connects the TRX module DL RF output port and PA module DL RF input port and output port and DPD feedback output port. It also connects the FEU DL input/output RF port to validate the FEU process. A high power attenuator is added in the high power output port test to protect the vector signal analyzer. The vector signal analysis SW is used when it need to analysis the RF signal Vector modulation character. This SW either is a Vector Signal Analyzer option or a individual SW running in a PC and connect with Vector Signal Analyzer with LAN cable.

    The Network Analyzer is used to test the module impedance matching and module network character when it has the abnormal in the DL signal input/output test.

    It has the digital signal process and analog signal process in the TRX board, when the Vector Signal Analyzer cant verify the abnormal status in the DL signal process on the module input/output port, it need to connect ADC/DAC input/output bus with the probe of the Logical Analyzer and capture the internal Digital signal into the Vector Signal Analysis SW to do the detail analysis job.

    About the synchronization and trigger connection between the test module and test tools, it not give the description for the figure drawing limit.

    4.1.2 Test Equipment and Tool

    Below is the detail requirement about the test tools in the environment Equipment Designation Purpose

    Multimeter Agilent 34401A Power supply voltage/current/ground test

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 31/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    Power meter TBD Test the RF signal power Signal generator Agilent E4438C Generate the interference signal Spectrum analyzer Agilent 4445A Spectrum analysis and vector signal analysis Network analyzer TBD Test the VSWR and S11/S12/S22 Oscilloscope Agilent DSA90604A Test the power supply ripple and DL time delay Logical analyzer Agilent 17901A Capture the Digital IQ signal and control signal Attenuator 10dB/40dB protect the instrument and absorb the reflect

    power Notch Filter JRF-01-60/2140 absorb the DL transmit signal in the spurious

    test in 9K~3GHz

    High pass filter JRF-01-3/13 Filter the DL transmit signal in the spurious test in 3~12.75GHz

    Duplexer WCDMA Duplexer absorb the DL transmit signal in the spurious test in 1920~1980MHz

    circulator TBD Protect the instrument from the high reflect power

    Test board TAC board Generate the test vector in the CPRI optic interface

    PC1 TAC OM PC Config TAC and monitor TAC status PC2 OM PC Config RRH and monitor RRH status Temperature chamber TBD Provide the temperature test environment

    Table 4-1 SIT2 DL Test Tool List

    4.1.3 Test Domain

    These sub functions will perform in the DL pre-integration environment Index Test Domain Description

    RRH DL basic integration Test SIT2_DL_001

    RRH power-on HW/SW initialization

    Integration of the TRX/PA/FEU module and validation of the TRX/PA/FEU power-on HW/SW initialization procedure

    SIT2_DL_002

    RRH internal Power supply test

    Integration of the TRX/PA/FEU moduleand validation of the TRX/PA/FEU power supply in the RF-off mode on the voltage/current/ripple

    SIT2_DL_003

    DL Frequency /Carrier /Power/Gain/control configuration test

    config frequency/carrier/channel power and monitor the output signal character

    RRH DL function Test

    SIT2_DL_004

    DL IQ signal gain/outputpower integration test with RRH frequency calibration

    Integration of the TRX/PA/FEU module and validation of the low/middle/high frequency 1/2/3/4 carrier DL gain/output power

    SIT2_DL_005

    DL signal occupied bandwidth validation of the DL occupied bandwidth

    SIT2_DL_006 DL IQ signal gain/outputpower Integration of the TRX/PA/FEU module and validation of the low/middle/high frequency 1/2/3/4 carrier un-balance power config

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 32/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    unbalance power config integration test with RRH frequency calibration

    DL gain/output power

    SIT2_DL_007

    DL IQ signal intermodulation test

    validation of the low/middle/high frequency 1 carrier DL gain/output power

    SIT2_DL_008

    DL IQ signal ACLR/Emission Mask

    validation of the low/middle/high frequency 1/4 carrier ACLR/Emission Mask in normal temperature

    SIT2_DL_009 DL VSWR and VSWR alarm test

    validation of the low/middle/high frequency 1/4 carrier VSWR and VSWR in normal temperature

    SIT2_DL_010 DL spurious test validation of the low/middle/high frequency 1/4 carrier VSWR and VSWR in normal temperature SIT2_DL_011

    RRH high output power power supply test

    validation of the TRX/PA/FEU power supply in the 1 hour high output power on the voltage/current/ripple

    SIT2_DL_012 DL IQ signal gain integration test with RRH temperature calibration

    validation of the low/middle/high frequency 1/2/3/4 carrier DL gain/output power with temperature change in Temperature Chamber

    SIT2_DL_013 DL IQ signal ACLR/Emission Mask in high output power

    validation of the low/middle/high frequency 1/2/3/4 carrier DL gain/output power with temperature change inTemperature Chamber

    SIT2_DL_014 DL IQ signal CCDF/EVM in high output power

    validation of the low/middle/high frequency 1/2/3/4 carrier DL EVM/CCDF with temperature change in Temperature Chamber

    SIT2_DL_015 Overdrive alarm protection test validation of the low/middle/high frequency overdrive alarm protection with the FPGA ALC ON/OFF

    SIT2_DL_016 DL forward and DPD channel isolation test

    validation of the low/middle/high frequency 1 carrier DL forward channel DPD channel isolation with temperature change in Temperature Chamber

    RRH DL delay and interface Test

    SIT2_DL_017 DL chain delay test validation of the low/middle/high frequency 1 carrier DL chain delay SIT2_DL_018 AISG port test validation of the AISG port function and performance

    SIT2_DL_019 Over-temperature test validation of the RRH temperature report and over-temperature alarm report and disable control in Temperature Chamber

    SIT2_DL_020 DL to UL RX1 antenna port isolation test validation of the isolation of the DL to the UL RX1 antenna port

    Table 4-2 SIT2 DL Test Domain List

    4.2 UL Pre-integration Test

    After the SIT1 validation, the TRX board and LNA module and FEU module and Power module pass the module individual test. All of these modules will assemble in the RRH rack and connect together with the RF/Power/Control cable. About the RRH UL function, The following tests will be performed in the SIT2:

    - Module input/output signal and impedance matching validation

    - UL gain and delay/noise validation

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 33/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    - 2 UL channel balance validation

    - UL IQ SFP module connection loop test and FPGA L1/L2 process validation of the CPRI interface

    4.2.1 Test Configuration

    Figure 4-2 UL Pre-integration Test Configuration

    In the SIT2 UL pre-integration test environment, the RRH Test SW work on the test mode and do the module &UL configuration and debug function in the test, it also monitor the module status and internal process. With the internal proceeding on the test mode the UL TRX FPGA output the UL IQ data/UL test result to the RRH Test SW PC with the RRH Test SW operation. The RRH test SW also perform the SFP module connection loop test and FPGA L1/L2 process validation of the CPRI interface .It run in the PC and connect with TRX with 100M Ethernet RJ45 cable and RS232 debug cable.

    In order to validate the UL signal input/output character in the module process , the vector signal generator is used in the UL RF signal test and connect the FEU module UL RF input port and LNA module RF input port and TRX UL input port . it also need a additional AWGN noise generator in the UL noise character test. the vector signal analyzer is used in the UL RF signal test and noise figure test and connect the FEU module DL RF output port and LNA module RF output port . The vector signal analysis SW is used when it need to analysis the UL RF signal Vector modulation character. This SW either is a Vector Signal Analyzer option or a individual SW running in a PC and connect with Vector Signal Analyzer with LAN cable.

    The Network Analyzer is used to test the module impedance matching and module network character when it has the abnormal in the UL signal input/output test.

    It has the digital signal process and analog signal process in the TRX board, when the UL Signal analysis SW cant verify the abnormal status in the DL signal process on the module input/output port, it need to

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 34/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    connect ADC output bus with the probe of the Logical Analyzer and capture the internal Digital signal into the Vector Signal Analysis SW to do the detail analysis job.

    About the synchronization and trigger connection between the test module and test tools, it not give the description for the figure drawing limit.

    4.2.2 Test Equipment and Tool

    Below are the detail requirements about the test tools in the environment

    Tool Designation Purpose

    RRH Test Tool SW

    Config/Debug/Monitor Tool SW on the RRH test, it is a internal development LMT SW tool

    Do the configuration of the RRH modules

    Debug the RRH modules and do the the analysis/decode the UL signal and CPRI interface loop

    Monitor the RRH module process and status

    Vector Signal Generator Instrument to generate the UL RF test vector signal

    Generate the UL RF Vector signal and AWGN noise signal and feed into the UL module input test point

    Vector Signal Analyzer

    Instrument on the RF signal measurement and capture . it has the noise figure test option

    Measure the UL RF signal character

    Capture the signal to the Vector Signal Analyzer SW

    Vector Signal Analysis SW SW to analysis the UL vector signal modulation character

    analysis the vector signal modulation character

    Network Analyzer Instrument on the module and connector character measurement

    Measure the module and connector impedance matching

    Power Meter Instrument to calibrate the test system cable loss

    Calibrate the test system cable loss

    Logical Analyzer Instrument to capture the digital signal in the TRX board

    Capture the UL digital signal into the Vector Signal Analysis SW to verify the UL signal process

    Table 4-3 SIT2 UL Test Tool List

    4.2.3 Test Domain

    These sub functions will perform in the UL pre-integration environment. Index Test Domain Description

    Rx Internal Alarm Test Check the Rx chain internal alarm report and disable control SIT2_UL_001 ALDI interface test Check the ALD interface function and performance

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 35/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    SIT2_UL_002 Rx maximum gain test Check the receive path gain with minimum RF attenuation. SIT2_UL_003 Rx gain test with the TMA Check the gain settling of FEU with the TMA optional SIT2_UL_004 Rx gain test under extreme

    condition Validate the Rx gain under high and low temperature condition

    SIT2_UL_005 Rx AGC dynamic range test Validate the Rx AGC dynamic range SIT2_UL_006 Rx RSSI test To measure the RSSI accuracy of the complete RRH over

    frequency, SIT2_UL_007 Rx Noise floor test and

    calculated NF test Check the receiver sensitivity by determining the noise figure of the receiver paths

    SIT2_UL_008 Rx EVM test To check if the EVM budget of 10% for the analogue part of the receiver is met

    SIT2_UL_009 Rx path delay test To check the Rx path group delay SIT2_UL_010 Rx VSWR test To test the Rx VSWR in EAC1 and EAC2 input port SIT2_UL_011 Isolation between EAC1

    and EAC2 ports To verify that the Isolation between EAC1 and EAC2 output ports

    SIT2_UL_012 Dual RRH (x+y) test validate the combined cabinet control function in the Rx gain function test

    Table 4-4 SIT2 UL Test Domain List

    4.3 SW Pre-integration Test

    After the SIT1 validation, the TRX board and LNA module and FEU module and Power module pass the module individual test. All of these module will assemble in the RRH rack and connect together with the RF/Power/Control cable. About the RRH C&M function, the SIT2 only do the RRH inner integration and validation, the C&M validation only cover the CPRI entity except the CPRI layer1/layer2 and do a individual loop test on the CPRI layer1/layer2 process

    The following tests will be performed in the SIT2:

    - C&M simulation Ethernet connection integration and validation

    - RRH C&M attribute validation

    - RRH status indication validation

    - C&M SFP module connection loop test and FPGA L1/L2 process validation of the CPRI interface

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 36/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    4.3.1 Test Configuration

    Figure 4-3 SW Pre-integration Test Configuration

    In the SIT2 C&M pre-integration test environment, the RRH Test SW work on the test mode and do the module &RRH configuration and debug function in the test, it also monitor the module status and internal process. It run in the PC and connects with TRX with 100M Ethernet RJ45 cable and RS232 debug cable. In the C&M test ,the RRH Test SW control the FPGA bypass the CPRI lay1/lay2 process entity and direct connect the CPRI Ethernet driver entity with MCU and the Ethernet port which connect with the MCU.

    The NodeB C&M simulator is a self development SW which run in the PC, it do the NodeB side C&M message simulation and send out the message to RRH and receive the RRH C&M message and display in the GUI. it connect with TRX with 100M Ethernet RJ45 cable

    It also needs to do manual trigger on the C&M message/action in the test.

    In order to validate the RRH C&M character in the module process, it needs to simulate the UL input signal and monitor the DL signal to trigger and verify the C&M action. The vector signal generator is used to connect the FEU module RF input port to simulate the UL input signal. The vector signal analyzer is used in the FEU DL RF output port to monitor the DL RF signal. The vector signal analysis SW is used when it need to analysis the UL RF signal Vector modulation character. This SW either is a Vector Signal Analyzer option or a individual SW running in a PC and connect with Vector Signal Analyzer with LAN cable.

    About the synchronization and trigger connection between the test module and test tools, it not give the description for the figure drawing limit.

    4.3.2 Test Equipment and Tool

    Below are the detail requirements about the test tools in the environment Equipment Designation Purpose

    NodeB Simulator PC with Linux OS Run the NodeB simulator on the C&M message and entity

    Signal generator Agilent E4438C Generate the interference signal Spectrum analyzer Agilent 4445A Spectrum analysis and vector signal analysis

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 37/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    Oscilloscope Agilent DSA90604A Test the time delay Attenuator 10dB/40dB protect the instrument and absorb the reflect

    power Test board TAC board Generate the test vector in the CPRI optic

    interface PC1 TAC OM PC Config TAC and monitor TAC status PC2 OM PC Config RRH and monitor RRH status

    Table 4-5 SIT2 CM Test Tool List

    4.3.3 Test Domain

    These sub functions will perform in the C&M pre-integration environment Index Test Domain Description

    RRH C&M basic integration Test

    SIT2_C&M_001

    C&M Ethernet connection test HW/SW initialization

    validation the connection and config of the NodeB simulator SW and RRH in the Ethernet and protocol

    RRH C&M message Test

    SIT2_C&M_002 General attribute C&M test validation the C&M General attribute messages and RRH status

    SIT2_C&M_003 delay attribute C&M test SIT2_C&M_004 Non-Volatile Memory attribute C&M test SIT2_C&M_005 RF attribute C&M test SIT2_C&M_006 Carrier attribute C&M test SIT2_C&M_007 Antenna line device attribute C&M test SIT2_C&M_008 General Action Request attribute C&M test SIT2_C&M_009 Antenna line device request attribute C&M test SIT2_C&M_010 Event Reporting attribute C&M test SIT2_C&M_011 RRH scenario test

    Table 4-6 SIT2 CM Test Domain List

  • ED01P04 RRH60_21ASB Test Strategy

    RRH60_21ASB Test Strategy_ED01P06.DOC

    22/07/2010 3BK 11251 0398 BEZZA 38/49

    All r

    ight

    s re

    serv

    ed.

    Pa

    ssin

    g on

    a

    nd

    copy

    ing

    of t

    his

    docu

    me

    nt,

    use

    an

    d co

    mm

    unic

    atio

    n of

    its

    co

    nte

    nts

    no

    t pe

    rmitt

    ed

    with

    ou

    t writ

    ten

    a

    uth

    oriz

    atio

    n fro

    m AL

    U

    5 SIT3

    After SIT2 test, the basic DL/UL function and SW can work properly. In SIT3, an assembly RRH will be treated as a black box, the RF performance and pre-qualification for whole RRH system will be checked. About the CPRI C&M test, SIT3 does not perform it because it is verified in the SIT1 and SIT2 and the C&M only focus in the SW/Protocol aspect,

    5.1 RRH Standalone Initial Test

    This is an initial test after full RRH system assembly, and the tests listed here should be taken prior to full system function test.

    5.1.1 Test Configuration

    In this test phase, we suppose TRX adaptive card and related test tools are full ready, otherwise NI PAX plus d2U solution will be used. The test configuration is illustrated in Figure 5-1. For some standalone initial test, such as grounding, this test bench is not necessary, a multimeter and a RRH without power on are enough.

    Figure 5-1 RRH Standalone Test Configuration

  • ED01P04 RRH60_21ASB Test Strategy