alam langkawi sdn bhddownload.alamlangkawi.com/companyprofile_alamlangkawi8mb.pdf · 2018. 1....
TRANSCRIPT
The Malaysian Construction Industry
Excellence Awards 2005excellence has no limitations
(Engineering Project Award)
The Malaysian Construction Industry
Excellence Awards 2011excellence has no limitations
( G7 - Contractor Award )
The Malaysian Construction Industry
Excellence Awards 2017excellence has no limitations
( The Best Project Award - Building Project)
ASEAN Most Recognized Brand(Extreme Engineering & Construction Award 2016)
PLANNING & DESIGNPLANNING & DESIGNPROJECT MANAGEMENTPROJECT MANAGEMENT
ENGINEERING & CONSTRUCTIONENGINEERING & CONSTRUCTION
OPERATION & MAINTENANCEOPERATION & MAINTENANCE
ALAM LANGKAWI SDN BHD(Co. No : 520454 - A)
Our VisionDedication, Commitment, Innovation and Uncompromised Quality with Professional Competency
Pusat Khidmat Kontraktor
Corporate ProfileCorporate Profile
DETAIL
COMPANYALAM LANGKAWI SDN BHD
(Co. No : 520454 - A)
Company Name
Registered Address
Headquarters
Kuala Lumpur Branch
Website
Company Registered No.
Incorporation Date
Organisation
Company Status
PKK Registration No.
CIDB Registration No.
ALAM LANGKAWI SDN BHD
1st. Floor, 11, Lorong Pulau Tikus,Pulau Tikus, 10350 Penang.
1, Persiaran Pantai Jerjak 6, Taman Seri Jerjak,11900 Bayan Lepas, Penang.Tel: +6046116383 Fax: +6046116382
A1-21-3 St-Mary Residences, Tower A,Jalan Tengah, 50250 Kuala Lumpur.Tel: +60327104963
www.alamlangkawi.com.my
520454 - A
17 July 2000
Sendirian Berhad
Bumiputera
0704 A 2003 0220
0120030210 - PP080344
ABOUT
COMPANY
COMPANY OVERVIEW
PROJECT
SPECIAL COLLABORATIONOUR SPECIALISATION
ACHIEVEMENT
COMPANY OVERVIEW
We have been steadily charting the path of progress and move in with time and technology to provide the best to our clients. This, together with our stringent quality control, excellent and professional management ensures finished product and workmanship of the highest standard.
ALAM LANGKAWI SDN BHD is a local privately ownedMalaysian Bumiputera company established by a groupof dedicated and committed Engineers from a modestb e g i n n i n g i n y e a r 2 0 0 0 a s a n E n g i n e e r i n g a n d Construction company.
ALAM LANGKAWI SDN BHD undertakes work on Design & Build, Turnkey and Private Finance Initiative
Doppelmyr Seilbahnen Gmbh Cable Car Specialist from Austria / Switzerland
Langkawi Cable Car to Gunung Machinchang, Pulau Langkawi.Single Pylon suspension Bridge at the Peak of Gunung Machinchang, Pulau Langkawi. (MCIEA Excellence Awards 2005 - Engineering Project Award)
Upgrading work to the Penang Hill Funicular. (MCIEA Excellence Awards 2011 - G7 Contractor Award)Upgrading work to The Top Komtar, (Level 64 to 68) & Bubble Lift (Level 5 to Level 68), Komtar, Penang. (MCIEA Excellence Awards 2017 - The Best Project Award) & (Asean Most Recognized Brand Award)Port Dickson Combined Cycled Power Plant Phase 2, Gas and Steam Turbine Building, Underground Seawater Intake System and Steel Pipe Rack.
DedicationCommitment
InnovationUncompromised Quality
Garaventa AG Funiculars Specialist from Switzerland
L-Tec Outdoorlift
Gulf Glass Fiber Technological Industrial from Australia
Fuji Elevator (M) Sdn Bhd
OUR VISION / OBJECTIVE
Building and Civil Engineering WorkProject ManagementInterior DesignMechanical & Electrical WorkTransportationInfrastructure WorkRepair & Slope ProtectionMaintenance WorkEngineering, Procurement, Constructionand Commissioning (EPCC)
DIRECTOR
IR SOON ENG KOOI B.A.Sc (Hons.)., P.Eng., MIEM
Managing Director
Ir. Soon Eng Kooi, aged 58 is a Registered Professional Engineer with the Board of Engineers Malaysia and Member of the Institute of Engineers Malaysia. He graduated with the Bachelor Degree in Civil Engineering with Honours from University of Windsor, Canada.
A hand on Engineer, Ir Soon Eng Kooi has almost three decades of extensive experience invarious consultancy, engineering and construction work ranging from Hotel and ResortDevelopment to Cable Stay Bridges and Reclamation Works. He specialized in ecotourismand ropeway eng ineer ing p ro jec t such as Cab le Car and Fun icu la r.
He was one of the founders of the company and was appointed as a Director since year 2000.He lead the company to win various engineering awards and currently responsible as theTechnical Advisor for the Company.
Dedication, Commitment, Innovation and Uncompromised Quality with Professional Competency
ABD SAMAD BIN AHMADDirector
Mr. Abd Samad Bin Ahmad, graduated with Certificate in Architectural from Institute KemahiranMara and Bachelor Degree in Project Management with Honors from University Science Malaysia.
He has more 8 years of extensive experience in various design, engineering and projectmanagement involved Complexes and Quarters for the Royal Malaysian Police Force.He has dedication and special skill in Mechanical and Electrical Works in particular thecontrol system for the Cable Car and Funicular.
He was the Project Manager and main driver for the Penang Hill Funicular Construction inwhich the project was recognized for achieving the highest quality to international standardand was reward Accolade for Excellence Awards by the Malaysian Construction IndustryDevelopment Board in 2011. He is also responsible for planning and engineering designfor the Taiping and Melaka Cable Car System. He was appointed as a Director in year 2012.He is currently the Project Director for the company.
Dedication, Commitment, Innovation and Uncompromised Quality with Professional Competency
DIRECTOR
JUNAIDAH BINTI MANSORDirector
Dedication, Commitment, Innovation and Uncompromised Quality with Professional Competency
DIRECTOR
Junaidah Binti Mansor, age 43, is the Director of the company and she possessed Certificate in Photoshop Illustration, Advance Level. She is responsible for daily office administration, stock monitoring and clerical management.
She has almost twenty-five years' working experience. She involved in upgrading works of pedestrian walkway and construction of banquet hall for Komtar Tower (Phase 1), upgrading works for other related works in Komtar (Phase 2) and upgrading work for extension of lift lobby for Komtar Tower in Georgetown, Penang and development of residential housing scheme in Pokok Sena, Kedah.
She began her career in Motorola Solutions Malaysia Sdn. Bhd., Penang in 1993 and in 1996, she became an officer for Centre of Policy Research, University Science Malaysia. She was also an officer for Expeditor Penang in 2002.
ADAM CHEAH SCProject Finance & Procurement Advisor
Adam Cheah SC has been in legal practice for 20 years and is presently attached to the law office of Azwar & Associates, Kuala Lumpur and the Millenium International Law Office, Cambodia. He is an advisor to several other companies and organisations around the world, including CRCC of China, Shin Young Steel of South Korea Paragon Corp. of Canada, the AUG Group, Australia etc. Adam was formerly partner of Adnan Sundra & Low, Kuala Lumpur (until 2013) which is listed as a top ranked law firm in the Asia Pacific Legal 500 . Adam was a l ega l counse l t o PRASARANA Ma lays ia Be rhad .
In 2014, Adam co-founded Gerabak Consulting (M) Sdn Bhd a specialist firm of rail transport oriented consultants based in Malaysia established to consolidate local and regional knowhow for MRT, LRT, HSR and other local railway developments. Recent engagements under this group include the supply of rolling stock for MRT2 for HAP Consortium led by Hyundai Rotem Company in 2016 worth RM1.62 Billion and LRT3/MRT2 station civil work packages worth more than RM1.1 Billion for Apex Communications / CRCC in 2017.
In 2016, Adam co-founded Pars Energy Samangan in Iran to venture into solar energy IPPs. Pars is presently developing 20MW solar farm in Kerman, Iran in collaboration with Univergy Internacional Co. of Japan/Spain. Adam has particular interests in project development, finance and international procurement.
Adam has particular interests in project development, finance and international procurement. Adam read law and history and is a graduate of Bond University, Australia and Oxford University, UK. He also received an MBA (distinction) from the Cardiff Met. University, UK.
Dedication, Commitment, Innovation and Uncompromised Quality with Professional Competency
MANAGEMENT
KEY
CLARENCE H.B. CHOWSenior Manager
Dedication, Commitment, Innovation and Uncompromised Quality with Professional Competency
MANAGEMENT
KEY
management, negotiation and consultancy. He has vast capabilities in project tendering, project management and technical consultation for project consultation team.
He started his career at Siemens Malaysia Sdn. Bhd. as System Engineer where he was involved in various data analysis, detail specification and design. He began to explore into business development with Dematic Malaysia Sdn. Bhd. as a Sales Manager. He was the Regional Sales Manager for South East Asia region for Swisslog Malaysia Sdn. Bhd. and Rockwell Southeast Asia Pte. Ltd., which is responsible for consultative sales, system design and implementation He joined Honeywell Pte. Ltd. as Regional Sales Director and he was the Managing Director of Flexalt Pte. Ltd for the region of Malaysia and Singapore.
Clarence has more than twenty years' extensive experience in various business
Clarence Chow graduated with Bachelor Degree in Computer Science with Honours from University of Science Malaysia.
CHARLES SOLOMON BARKERProject Director
Dedication, Commitment, Innovation and Uncompromised Quality with Professional Competency
MANAGEMENT
KEY
Charles Solomon Barker graduated with Master in Business Administration and Diploma in Architecture Studies. He has accomplished many mega steel projects in the construction industries with extensive background in projects related to the field of structural steelworks which involved mainly in the project management for structural fabrication, inspection and installation works.
Charles has more than thirty years' practical experience in various construction management and site administrative. He has vast abilities to execute all aspects of project management joint inspection, budgetary control, shop detailing and technical proposal. He is responsible to conduct and chair progress meeting with project management team and closely coordinates the construction works with project staffs, client's representatives, architect, consulting engineers, clerk of works, sub-contractors and vendors.
He has involved in mega steel projects namely Coal Fired Power Generation Plant, Combined Cycle Power Generation Plant, Seawater Intake Supply Pipe Lines, Formula One Racing Circuit, Hotel Ballroom Steel Roof Structure, Convention Hall Steel Roof Structure, Cement Processing Plant, Steel Mass Communication & Observation Tower, Arc Furnace Melt-Shop Plant, Steel Mill Production Plant, Cement Pre-Heater Steel Tower, Flyover Steel Bridges, Cabled Stayed Suspension Bridges, Steel Arch Bridges, Electronic Manufacturing Plant & Factories, Warehouses, Port Container Crane, Mill Overhead Gantry Crane, Launching Gantry Girders & Beams, Steel Hooper & Ducting Works, Steel Pipe Rack Structure, Chemical Processing Plant, Coal Conveyor Belt Structure, Cable Car Steel Pylon, Steel Working Platform, Steel Decking and Cantilevered Steel Platforms and Bridges.
He also specialized in the manufacturing process of welded steel plate built-up box section with internal reinforced cavity steel diaphragms plates for heavy structural section and welded steel plate built-up girder beam section with stiffener plates for long span structural members.
Dedication, Commitment, Innovation and Uncompromised Quality with Professional Competency
MANAGEMENT
KEY
HAJI IR ABD MANAF BIN MAJIDTechnical Advisor
Haji Ir. Abd Manaf is a Registered Professional Engineer with the Board of Engineer Malaysiaand Member of the Institute of Engineers Malaysia. He graduated with Bachelor of Sciencein Civil Engineering from Institute Technology Mara, Malaysia.
He has mor 30 years of experience in planning, design and project management. He servedthe Malaysia Public Work Department as District Engineer before he was handpicked by thePrime Minister Department to lead the Technical Department of newly formed LangkawiDevelopmeny Authority as the Technical Director, when the Prime Minister of MalaysiaTun Dr. Mahathir earmarked Langkawi Island for big development as a international touristdestination in 1990. He was the key person in all the conceptual plan to implementationof the Prime Minister’s vision for the Langkawi Island Developmeny Master Plan.
Currently, he has retired from civil service and sits on the Board of Director of Baron Groupof companies.
KOH LEONG CHYEContract Manager
Dedication, Commitment, Innovation and Uncompromised Quality with Professional Competency
MANAGEMENT
KEY
Koh Leong Chye, a Malaysian male, age 46, is the Contract Manager. He graduated from University of Science Malaysia with Master's Degree in Science (Project Management) in 1998 and Bachelor's Degree in Science with Honours in Housing, Building and Planning in 1996.
His responsibilities are ensuring all contracts and procurement matters from inception to completion, support construction and development progress, ensuring that works are completed within budget, responsible for cost estimates, contract and procurement matters, advise management on contractual matters, interpret contract matters efficiently and to settle or recommend solutions during contractual disputes or ambiguities and prepare technical and commercial proposal for various types of construction
He has more than twenty years' experience in various contract administration and project management. He has vast abilities in cost planning and commercial management throughout the entire life cycle of the project from inception to post-completion, value engineering exercise, financial modelling, feasibility study, cash flow projection, risk management and tender analysis. He has involved in prestige projects namely Business Processing Outsourcing Prime (BPO Prime) consist of 2 blocks of Grade A and MSC status office towers, 2 blocks of residential towers and multi-storey car park podium in Bayan Baru, Penang, Project Cable Car from Oriental Village to Matchinchang Mountain at Padang Mat Sirat, Langkawi, Kedah, construction of suspension steel bridge on top of Matchinchang Mountain at Padang Mat Sirat, Langkawi, Kedah, high end property consist of 2 ½ storey bungalow and 2 ½ storey semi-detached house in Puchong, Selangor, residential development consist of one block high rise condominium, a four-star hotel development, swimming pool and other facilities at Queensbay, Sungai Nibong, Penang.
ENGKU MAHUSIN BIN ENGKU OTHMANSenior Construction Manager
Dedication, Commitment, Innovation and Uncompromised Quality with Professional Competency
MANAGEMENT
KEY
Engku Mahusin Bin Engku Othman, age 54, is a Registered Engineer with Malaysian Board of Engineer. He graduated from Seoul National University, Republic of Korea with Bachelor's Degree in Engineering (Civil Engineering).
He has more than thirty years' experience in various construction project and has involved in prestige projects namely Tuanku Jaafar Power Plant Station, Port Dickson Rehabilitation Project – 750MW Combined Cycle Power Plant, Walkway Steel Structure for PETRONAS FERTLIZER, Kedah, maintenance of 16 numbers of PETRONAS Gas Metering Station Regional of Negeri Sembilan, Melaka and Selangor and rehabilitation of sewerage system for UiTM, Shah Alam, Selangor.
He is a trained Professional Engineer who is in charge of site management, construction monitoring and resources control. He is also familiar with quality management for construction works and has vast practical experiences in petrochemical plant in Middle East countries and Malaysia.
HJ. KAMARUDIN BIN KARIMProject Manager
Dedication, Commitment, Innovation and Uncompromised Quality with Professional Competency
MANAGEMENT
KEY
Kamaruddin Bin Abdul Karim, Malaysian male, age 58, graduated with Advanced Diploma and Diploma in Civil Engineering from MARA University of Technology (UiTM), Shah Alam, Selangor, Malaysia.
Kamaruddin has more than thirty years of working experience in various project construction management, planning and monitoring. He is capable to execute all matters pertaining to project management, planning and oversee the day to day operation for construction progress, to ensure projects are accomplished within the time frame, within budget and comply with Quality Assurance and Quality Control standard.
The projects he involved including Tuanku Jaafar 750MW Combined Cycle Power Plant Station at Port Dickson, Selangor, Gas Processing Plant GPP2, GPP3 & GPP4, Centre Foundation Studies of International Islamic University Malaysia, Gambang Campus, Pahang and various infrastructure projects in Selangor.
MUHAMED SUPIAN BIN ABDUL JAMALM&E Coordinator
Dedication, Commitment, Innovation and Uncompromised Quality with Professional Competency
MANAGEMENT
KEY
Muhamed Supian Bin Abdul Jamal, age 60, is a well-trained Mechanical and Electrical Coordinator who has experience in power plant project. He graduated from Institute of Kemahiran Mara (IKM) Malaysia in Mechanical Draftsmanship in 1979.
He has more than thirty-eight years' experience in various construction project and has involved in prestige projects namely Tuanku Jaafar Power Plant Station, Port Dickson Rehabilitation Project – 750MW Combined Cycle Power Plant, DIGI Corporate Office, Ampang – Kuala Lumpur Elevated Highway Project, Air-conditioning services for split units and central air-condition system, fire protection services of CO2 system sprinkler, hose reel, wet riser and dry rise, lift installation, ventilation and pressurization system, Gondola system, electrical H.V and Electrical L.V.
He is responsible for all Mechanical and Electrical services, from underground to power plant and office building. He assists Project Director in delegating works, coordination works with sub-contractors and monitoring works for compliance with required specification and standard of operation.
ZULKIFLI BIN ASMARProject Planning & Quality
Dedication, Commitment, Innovation and Uncompromised Quality with Professional Competency
MANAGEMENT
KEY
Zulkifli Bin Asmar graduated with Master in Business Management from University Malaysia Pahang in 2016. He also obtained Diploma in Land Surveying, from University Technology Malaysia in 1991. He is Member of the Malaysian Institute of Management.
Zulkifli has twenty-seven years of experience in various project construction planning and scheduling. He is capable to execute all matters pertaining to project planning and conduct construction progress meeting with project management teams, all consultants, sub-contractors, suppliers and site management teams, to ensure they are closely monitored and co-ordinates each other related to the construction works.
He involved in Tuanku Jaafar 750MW Combined Cycle Power Plant Station at Port Dickson, Selangor, bridges and road work project at Taman Gaya Interchange, Johor Bahru Inner Ring Road (Phase 2 and Phase 3), Second Link Tuas Bridge Project, Lumut Maritime Terminal in Setiawan, Perak , marine, port maintenance dredging and reclamation works in Malacca.
RAUDZAH BINTI LOKMANDocument Controller
Dedication, Commitment, Innovation and Uncompromised Quality with Professional Competency
MANAGEMENT
KEY
Raudzah Binti Lokman, age 41, has vast experience in document controlling for power plant project. She graduated with Bachelor of Business Administration, major in management from
in 2001 and Diploma in Public Administration from MARA Institute of Technology Malaysia in 1998.
She has almost thirty years' working experience and has involved in Tuanku Jaafar Power Plant Station, Port Dickson Rehabilitation Project – 750MW Combined Cycle Power Plant started from Year 2003.
She is responsible to control the documentation at site office, prepare the progress schedule for Site Engineer and Project Manager, prepare the Engineering Communication Sheet (ECS) to issue to Sub-contractor,, filing jobs.create the filing system for the outgoing and incoming letters with reference numbers, control all incoming and outgoing letters and distribution, DMS System (Consortium Document Management System), scan and uploading all letters, comment sheet and weekly report received from consultants,
National University of Malaysia
SY. NURFARHANIM BINTI SYED JUNITQuantity Surveyor
Dedication, Commitment, Innovation and Uncompromised Quality with Professional Competency
MANAGEMENT
KEY
Syarifah Nurfarhanim, age 31, graduated with Bachelor of Quantity Surveying with Honours in 2012. She has completed various prestige projects in the construction industries, mainly the upgrading works for Komtar Tower (Phase 2 and 3), installation of gondola for Komtar Tower, inclinator project for Langkawi Cable Car, Community Nursing College in Sungai PEtani, Kedah, housing development and business centre in Bukit Kayu Hitam and Baling, Kedah.
She was trained by profession as Quantity Surveyor and specialized in the tendering, costing, pricing, preparation of final account, contract documentation, pre and post tender documentation, identify cost-risks in tender returns and analysis of tender documents submitted by contractors and preparation of tender reports.
She has involved in the company tendering process, include asking for sub-contractors' bid and suppliers' quotation and she has assisted company in obtaining various project contracts awarded by the clients.
CERTIFICATE
CERTIFICATE
CERTIFICATE
CERTIFICATE
CERTIFICATE
CERTIFICATE
ACHIEVEMENT
ACHIEVEMENT
ACHIEVEMENT
ACHIEVEMENT
ACHIEVEMENT
SUB – CONTRACT TUANKU JAAFAR COMBINED CYCLED
POWER PLANT (PHASE 2)
Tuanku Jaafar Power Plant Station
Rehabilitation Project – 750MW
Combined Cycle Power Plant is one
of the main power
stations in Malaysia, located in Port
Dickson, Negeri Sembilan. The power
station belongs to Tenaga Nasional
Berhad and is a state-of-art combined
cycle power plants comprise Phase 1
(750MW MHI Technology) and Phase
2 (750MW GE-TOSHIBA Technology).
Phase 1 was on commercial loading
in 2005 whereas Phase 2 started in
February 2009. Both combined cycle
plants are firing natural gas supplied
by Petronas with distillate as a stand-
by fuel.
The Manjung power station (also
known as the Janamanjung
power station or the Sultan Azlan
Shah Power Plant) is a 4,180
megawatt (MW) coal-fired power
station in Perak, Malaysia. It is
located on a reclaimed island off
the western coast of the state of
Perak, around 10 km south of
Lumut and 288 km north of Kuala
Lumpur in in the district of Seri
Manjung.
The first three 700 MW
subcritical units (Phase 1) of the
plants were built in 2002 and
2003. It employed a seawater
scrubbing process for flue gas
desulphurization.
SUB – CONTRACT MANJUNG POWER PLANT (PHASE 1) COAL FIRE
SUB – CONTRACT FOR PROPOSED INTERIOR DESIGN
WORKS FOR 5 UNIT OF SHOP LOT AT ORIENTAL VILLAGE,
LANGKAWI, KEDAH DARUL AMAN
Interior Design Works for Premium
Outlet shop lot at Oriental Village,
Langkawi.
Project was awarded by Langkawi
Development Authority (LADA)
Interior Design Works for Premium
Outlet shop lot at Oriental Village,
Langkawi.
Project was awarded by Langkawi
Development Authority (LADA)
PROPOSED PROJECT CABLE CAR SYSTEM FROM
ORIENTAL VILLAGE TO MATCHINCHANG MOUNTAIN,
PADANG MAT SIRAT, LANGKAWI, KEDAH
The Langkawi Cable Car,
is one of the major
attractions in Langkawi
island, Kedah, Malaysia.
It provides an aerial link
from the Oriental Village
at Burau Bay to the peak
of Matchinchang
Mountain. The total
length is 2.2 km (1.4 mi),
with a journey time from
the base to the top of
around 15 minutes. It
was officially opened in
2003.
Langkawi cable car has
horizontal distance of
2079m, vertical rise of
680 m, inclined distance
of 2158 m, haul rope
diameter of 50 mm, bull
wheel diameter of
6.10 m, design speed:
5 m/s, operating speed:
3 m/s and turn around
trip time of 28 minutes
Langkawi Sky Bridge is a 125-
metre (410 ft) curved
pedestrian cable-stayed bridge in
Malaysia, completed in 2005. The
bridge deck is located 660 metres
above sea level at the peak of
Matchinchang Mountain. The
bridge was pre-fabricated, and
sections were then lifted to the top
of the mountain using
Russian Kamov helicopters, and
the entire bridge assembled in its
current position by the pylon.
Helicopters were used in the
erection of the pylons and the main
section of the deck, later decks
sections were assembled using
conventional working cable and
winches
PROPOSED CONSTRUCTION OF SUSPENSION BRIDGE ON TOP OF
MATCHINCHANG MOUNTAIN, MUKIM PADANG MAT SIRAT,
LANGKAWI, KEDAH DARUL AMAN
SUB – CONTRACT FOR INTERIOR DESIGN WORKS
FOR 4 UNITS OF RESTAURANT AT ORIENTAL VILLAGE, LANGKAWI,
KEDAH DARUL AMAN
Interior Design Works for Themed
Restaurant at Oriental Village,
Langkawi.
Project was awarded by Langkawi
Development Authority (LADA)
Interior Design Works for Themed
Restaurant at Oriental Village, Langkawi.
SUB – CONTRACT FOR INTERIOR DESIGN WORKS FOR
ADDITIONAL BLOCK OF PERDANA GALLERY,
LANGKAWI, KEDAH DARUL AMAN
Interior Design Works
for additional block of
Perdana Gallery,
Langkawi.
Project was awarded by
Langkawi Development
Authority (LADA)
DESIGN, SUPPLY, INSTALL, TESTING AND COMMISSIONING
PENANG HILL FUNICULAR ELECTRICAL DRIVE SYSTEM,
PENANG
Scope of work involved
design, supply, install,
test and commission
Penang Hill Funicular
Electrical Drive System
Awarded by Malaysian
Public Works
Department after
electrical drive
breakdown
SUB – CONTRACT FOR PROPOSED CONSTRUCTION OF RAFT
FOUDATION INCLUDING PILING WORKS, REINFORCED CONCRETE
STEEL TANK FOR WASTE WATER TREATIMENT PLANT AT KAMUNTING,
PERAK
Scope of work
involved
construction of raft
foundation, piling
works, reinforced
concrete walls for
Waste Water
Treatment Plant
PROPOSED REPAIR WORKS FOR PONTOON DAMAGED BY
TSUNAMI AT TELAGA HARBOUR PARK, LANGKAWI,
KEDAH DARUL AMAN
Repair works for pontoon
damaged by Tsunami at
Telaga Harbour Park,
Langakwi, Kedah.
Scope of work included steel
piling and replace damaged
pontoon
Project was awarded by
Langkawi Development
Authority (LADA)
PROPOSED DEVELOPMENT FOR 2 STOREY TO 3 STOREY FERRINGHI VILLAS
RESIDENCE (108 UNITS) AND 1 BLOCK 1 STOREY TO 2 STOREY COMMUNITY
AMENITY ON LOT 2,3,4,46 AND 47, SECTION 1, BATU FERRINGHI TOWN,
NORTH EAST DISTRICT ,PENANG
Construction for high end landed properties in Batu Ferringhi, Penang
Scope of work included piling, building works and infrastructure works
Interior Design & Lanscape
PROPOSED SLOPE EROSION REPAIRING WORK AT
MIDDLE STATION, CABLE CAR STATION, LANGKAWI,
KEDAH DARUL AMAN
Scope of work is to stabilize
the slopes of Cable Car
Middle Station at
Matchinchang Mountain,
Langkawi.
REPAIR WORKS FOR DAMAGED 40V AC CABLE AND
INSTALLATION OF CABLE FOR PENANG HILL FUNICULAR,
PENANG
Scope of work involved repair,
design, supply, install, test and
commission of 40V AC cable for
Penang Hill Funicular and
installation of the steel rope
cable for the funucular
Awarded by Malaysian Public
Works Department
UPGRADING EXISTING FUNICULAR SYSTEM AT
PENANG HILL, PENANG
On 22 February 2010, the 87-year-old funicular railway was closed for an
upgrade. Our Scope of Work involved laying new tracks, realignment, new
equipment, machine room and installation of new coaches to increase the
passenger capacity and the speed of the train. With the new train and railway,
passengers can have non-stop service in the new blue and white, air-conditioned
Swiss-made cars which are capable of ferrying up to 100 passengers at one go.
The funicular train maximum working load has been set at 7,500 kg. It can carry
1,000 passengers per hour compared to 250 under the old system.[12]
On April 25, 2011, the new railway system resumed its service.
PROPOSED UPGRADING FOOTWALK PATH AND CONSTRUCTION
OF BANQUET HALL AT LEVEL 5 KOMTAR, LOT 389 SECTION 7,
NORTH EAST DISTRICT, GEORGETOWN PENANG (PHASE 1)
Scope of work included
upgrading the footwalk path
and construct a banquet hall at
Level 5 of Komtar, Penang
PROPOSED UPGRADING WORKS FOR KOMTAR AND OTHER RELATED
WORKS (PHASE 2) AT LEVEL 64, 65 AND 66 ON LOT 400, SECTION 17,
NORTH EAST DISTRICT, GEORGETOWN, PENANG
Scope of work included upgrading works involving
construction of new floors & facilities at Level 64, 65
and 66 of Komtar, Penang.
PROPOSED UPGRADING WORKS FOR KOMTAR AND OTHER RELATED
WORKS (PHASE 2) AT LEVEL 64, 65 AND 66 ON LOT 400, SECTION 17,
NORTH EAST DISTRICT, GEORGETOWN, PENANG
Work involving Construction Three addition floors and facilities like The Rainbow
Skywalk and Observatory Deck. These new facilities offer a stunning seamless
view of George Town and beyond. Located at George Town’s highest point, the
open-air Rainbow Skywalk is at on the rooftop of Komtar tower, offering visitors
the thrilling experience of walking on air 249m above ground.
PROPOSED UPGRADING WORK OF KOMTAR & EXTENSION LOBBY AT
LEVEL 1, CONSTRUCTION OF ADDITIONAL LIFT FROM LEVEL 1 TO LEVEL
5 ON PARTIAL PARCEL OF LOT 400, SECTION 17, NORTH EAST DISTRICT,
GEARGETOWN PENANG (PHASE 3)
Scope of work included
upgrading works of Komtar,
extension of lobby at Level 1
and construction of additional
roof and escalator from Level 1
to Level 5 of Komtar, Penang.
SUB – CONTRACT WORK FOR PROPOSED DEVELOPMENT (PHASE A1)
CONSIST OF 60 UNITS MEDIUM COST TERRACE HOUSE SINGLE STOREY.
17 UNITS SINGLE STOREY LOW COST TERRACE HOUSE, ONE UNITS
ELCTRICAL SUB STATION ON LOT PT 165 MUKIM POKOK SENA TOWN,
POKOK SENA DISTRICT, KEDAH
Construction for development of
landed properties in Pokok Sena,
Kedah
Scope of work included piling,
building works and infrastructure
works
PROPOSED CONSTRUCTION OF BUILDING FOR MAINTENANCE
AND GONDOLA STORAGE AND ALL OTHER RELATED WORKS AT
BOTTOM STATION LANGKAWI CABLE CAR LANGKAWI,
KEDAH DARUL AMAN
Construction for building
for maintenance and
gondola storage at
bottom station of
Langkawi Cable Car,
Kedah
Scope of work included
piling, building works
and infrastructure works
PROPOSED REPAIR WORKS FOR SUSPENSION SKYBRIDGE ON TOP
STATION LANGKAWI CABLE CAR, LANGKAWI,
KEDAH DARUL AMAN
In July 2012, the suspension Sky
bridge was closed for
maintenance, upgrading and
structural strengthening of the Sky
Bridge. The upgraded structure
consisted of new stainless steel
balustrade and railing and it has a
sections of glass bottom walkway
in the middle span so that visitors
may look down the valley from
where they stand, and an inclined
elevator or inclinator that can bring
visitors from the top station down
to the bridge.
The bridge reopened in February
2015
A special designed inclinator using
German Technology was
constructed and a new platform
were built linking the top station
and Sky Bridge, taking passengers
down to the Sky Bridge. It opened
in December 2015.The inclinator
cabin can accommodate 12
passengers or 1,050 kg load per
trip, and the ride lasts around two
minutes.
PROPOSED INCLINATOR INSTALLATION AND OTHER CONSTRUCTION
WORKS CONNECTED TO CABLE CAR STATION AND SUSPENSION
BRIDGE AT MATCHINCHANG MOUNTAIN LANGKAWI,
KEDAH DARUL AMAN