.LDM : BASIC AIRPORT OPERATIONS COURSE
Module Title: AIRSIDE OPERATION AND MANAGING NOTAM
By: HAJI YUSOF JAMALUDDIN<26 August 2004>
![Page 2: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/2.jpg)
AIRSIDE OPERATIONSAIRSIDE OPERATIONS
![Page 3: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/3.jpg)
COURSE OBJECTIVE
By the end of the lecture, you will be able By the end of the lecture, you will be able to understand the organization of Airside to understand the organization of Airside Operations, function and key Operations, function and key responsibilities.responsibilities.
![Page 4: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/4.jpg)
BASIC AIRPORT OPERATIONS
• ll
AIRPORTOPERATIONS
CENTRE
Airside
Landside
Terminal
RUNWAY
ARRIVALCONCOURSE
PIER
GATE
APRON
TAXIWAY
RUNWAY
GATE
APRON
TAXIWAYAIRCRAFT
PROCESSINGE.G. FUEL
APPROACH
PASSENGERBAGGAGERECLAIM
ROADSPARKING ROADS PARKING
DEPARTURECONCOURSE
PIER
PASSENGERAREA
PROCESSING
CATERING
CARGOPROCESSING
OTHER GROUNDTRANSPORT
DEPARTURE
AIR
SID
EL
AN
DS
IDE
TE
RM
INA
LPUBLIC AREAS PUBLIC AREAS
SafetyEfficiencyCost effectivenessProfitability
Objectives
Engineering OperationsSecurity OperationsTracked Transit ControlBaggage Handling ControlImmigrationAFRSNetwork ManagementCrisis ControlApron Control Toweretc.
Other Centres
![Page 5: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/5.jpg)
KLIA AIRFIELD LAYOUT
![Page 6: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/6.jpg)
AIRSIDE OPERATIONS OBJECTIVES/ FUNCTIONS
Maintain a high level of airfield and apron safety as per I.C.A.O standards
Establish policies and procedures for safe airfield operations.
Promotion of safety awareness through training, licensing and Safety Campaign.
Enforce ramp safety policies and procedures.Develop and implement the ground incident and
accident reporting and investigation system.
![Page 7: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/7.jpg)
AIRSIDE OPERATIONS OBJECTIVES/ FUNCTIONS
Carry out audits of airside operators.Identify potential incident and accident
conditions, evaluate and implement preventive measure.
Dissemination of ramp incidents and accidents information.
Coordinating airside Operations during emergencies.
![Page 8: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/8.jpg)
AIRSIDE OPERATIONS KEY ACTIVITIES
1. Inspecting Movement area
2. Issuance of Airside Permit (Driving, PLB & Vehicle Permit)
3. Ground Incidents and accidents investigation
4. Safety escort or follow -me service
5. Enforcement checks
6. Work in progress Coordination (WIP)
7. Initiation of NOTAM
![Page 9: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/9.jpg)
AIRSIDE OPERATIONS KEY ACTIVITIES
8. Co-ordinations & Meetings with Airlines, Government Agencies etc.
9. Wildlife Hazard Study
![Page 10: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/10.jpg)
1. INSPECTING MOVEMENT AREA
Inspection Program ObjectivesAccident/ Incident reductionMeaningful reporting systemPrompt corrective action
![Page 11: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/11.jpg)
1. INSPECTING MOVEMENT AREA
Accident/ Incident reductionForeign Object HazardObstruction & ConstructionWild Life HazardAerodrome facilities serviceability
![Page 12: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/12.jpg)
1. INSPECTING MOVEMENT AREA
Foreign Object Damage (F.O.D)FOD : any object that is found in the maneuvering
area that can endanger aircraft (Metal, Paper, Plastic Sheets, Boxes, Parts, Tools etc.)
Engine Ingestion on aircraftVelocity impact of debris launched by jet blast into
other aircraft, personnel,(Ramp/ Passengers) and buildings
Can contribute to in-flight engine failuresBoth Safety and economic issue
![Page 13: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/13.jpg)
1. INSPECTING MOVEMENT AREA
FOD prevention in KLIA Apron Sweeping Program Routine airfield inspection Pavement Inspection prior to each aircraft
arrival/ departure. Training Maintenance activities Communication/ coordination
![Page 14: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/14.jpg)
1. INSPECTING MOVEMENT AREA
Inspection & Reporting SystemDeficiency ReportingUse of Checklist
Paved areas, Markings, Signs, Lighting,
Condition’s Written recordsAction on Priority situationsNOTAM emission
![Page 15: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/15.jpg)
1. SAMPLE OF CHECKLIST
CHECKLIST FOR OSCAR 3 (RUNWAY/TAXIWAY/PERIMETER/HANGAR AREA)Check on markings, lightings, signages, pavements and other conditions
Names: Date: Time inspected:
RUNWAY 1 (14L/32R) Checked Condition REMARKSThreshold 14L/32RTouchdown 14L/32R
EdgeCentrelineEndPAPI 14L/32RApproach Light 14L/32RWind Indicator 14L/32RLocaliser (LLZ) 14L/32RGlide Path (GP) 14L/32RRunway Visul Range (RVR) 14L/32RRVR Mid Runway
RUNWAY 2 (14R/32L) Checked ConditionThreshold 14R/32LTouchdown 14R/32LEdgeCentrelineEndPAPI 14R/32LApproach Light 14R/32LWind Indicator 14R/32LLocaliser (LLZ) 14R/32LGlide Path (GP) 14R/32LRunway Visul Range (RVR) 14R/32LRVR Mid Runway
TAXIWAYS Checked ConditionABCDEFGHKLM
PERIMETER Checked ConditionRunway 1Runway2
HANGAR AREA Checked ConditionHangar apron
Engine Ground Run(EGR)
PREPARED BY(Oscar 3): CHECKED BY(Oscar 1/Oscar E):
Attachments(if any):
Form number : Ops/AO/10Revision number : 0Revision date:
![Page 16: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/16.jpg)
1. INSPECTING MOVEMENT AREA
Prompt Corrective actioncorrect or advise responsible party - DocketVehicles/ Equipment removalArea closed or cordoned off
![Page 17: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/17.jpg)
1. SAMPLE OF DOCKET
1. Kepada : 2. Tempat :
Attention To : Location :
3. No. Docket : Tarikh :
Docket Ref No : Date Send :
5. Peringatan :
Reminder :
6. Kerosakan :
Facility Fault :
7. Masa Aduan : Aduan Oleh :
Time Reported : Reported By :
9. Tarikh/Masa 10. Tarikh/Masa Dibaiki :
Tindakan Diambil : Date/Time Fault
Date/Time Attended to : Cleared :
11. Dibaiki Oleh :
Fault Cleared by :
12. Ulasan Pegawai Bertugas
dan tandatangan :
Executive remarks and
Counter Signature :
13. Ulasan Lain :
Other Remarks :
BORANG DOCKET
MALAYSIA AIRPORTS (SEPANG) SDN BHDKUALA LUMPUR INTERNATIONAL AIRPORT
LAPORAN KEROSAKAN KEMUDAHAN- KEMUDAHAN OPERASI
OPERATIONS FACILITIES DEFECT
![Page 18: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/18.jpg)
2. ISSUANCE OF AIRSIDE PERMITS
Civil Aviation Act 1969Airfield Vehicle Permit ( MCAR 105)Airfield Driving Permit (MCAR 106)Temporary Entry Permit (MCAR 105)PLB Operator Permit.Electrical Vehicle/ Buggy Permit
![Page 19: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/19.jpg)
3. GROUND INCIDENT/ ACCIDENTS
Determine Facts to establish causeMake recommendations to prevent re-
occurrenceTake all corrective action
![Page 20: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/20.jpg)
3. GROUND INCIDENT/ ACCIDENTS
0
5
10
15
20
25
30
35
40
45
1999 2000 2001 2002 2003
Ground Accidents/ Incidents Record in KLIA
![Page 21: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/21.jpg)
3. GROUND INCIDENT/ ACCIDENTS
80% of ground accident in KLIA involving collision between vehicles/ equipment or facilities.
Apron accidents involving aircraft are frequently caused by equipment used for passenger handling, aircraft loading and servicing i.e. PLB, Loading Bridges, catering trucks, baggage carts)
![Page 22: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/22.jpg)
4. SAFETY ESCORT AND FOLLOW-ME
Provide safety escort for VVIP movements - vehicles on the aircraft maneuvering area
Provide Follow-Me service to foreign aircraft - on request especially VVIP flights that requires special coordination
Filming Safety Escort
![Page 23: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/23.jpg)
5. ENFORCEMENT CHECK
Errant drivers or apron users for contravening the Civil Aviation Act
Vehicles conditions and validity of the vehicle & driving permits
Vandalism
![Page 24: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/24.jpg)
6. CONSTRUCTION SAFETY
Requirement for Safety plan (Coordination meeting) Define safety standard and safety specifications Follow-up on safety procedures Monitor day to day practices Discuss specific concern with operator Safe Movement of individual & Vehicles Minimum disruption of activity Clear routes fire station on active area
![Page 25: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/25.jpg)
6. CONSTRUCTION SAFETY
NOTAM Initiation, Restriction of aircraft/ vehicle activity Threshold displacement Temporary lighting/ Marking Revise vehicle control procedures Access control equipment, manpower Equipment and material storage Supervision
![Page 26: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/26.jpg)
6. CONSTRUCTION SAFETY
Hazardous conditions Excavation near runways, taxiways, apron Construction materials, earth mounds or
stockpiles Temporary structures Obstacles in operational areas or approach
zones
![Page 27: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/27.jpg)
7. WILDLIFE HAZARD STUDY
Bird studyOther Mammal
![Page 28: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/28.jpg)
8. RAMP SAFETY COMMITTEE
Participants MA(Sepang), DCA, Air Carriers, Ground
Services, Fuel Operators, Emergency Services
Promote Safety Identify unsafe conditions and practices Develop improvement recommendations Ensure Corrective action Considers complaints
![Page 29: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/29.jpg)
9. NOTAM
Notice to Airmen- Shall be originated and issued promptly
whenever the information to be disseminated is of a Temporary nature and of short duration Operationally significant permanent changes or
temporary changes of long duration are made at short notice.
![Page 30: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/30.jpg)
9. WHEN WE ISSUE NOTAM
Establishment, closure or significant changes in operation of aerodrome or runways
Establishment, withdrawal or changes in operation of aeronautical services (AGA,AIS, ATS, COM, MET, SAR etc.)
Establishment, withdrawal or changes in visual aids
Interruption of or return to operation of major components of aerodrome lighting system.
![Page 31: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/31.jpg)
9. WHEN WE ISSUE NOTAM
Occurrence or correction of major defect in the maneuvering area.
Changes to and limitation on availability of fuel supply.
Major changes to rescue facilities and services available.
Presence of hazard which affect air navigation (including obstacle, air displays etc.)
![Page 32: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/32.jpg)
9. GENERAL SPECIFICATION OF NOTAM
Each NOTAM shall be allocated a serial number.
NOTAM shall be as brief as possible. Each NOTAM shall be transmitted as a
single telecommunication message. When NOTAM is issued which cancels or
supersedes a previous NOTAM, the serial number of the previous NOTAM shall be indicated.
![Page 33: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/33.jpg)
9. GENERAL SPECIFICATION OF NOTAM
When error occur in a NOTAM, replacement NOTAM shall be issued.
Location indicators included in the text of a NOTAM shall conform to ICAO list.
![Page 34: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/34.jpg)
9. DISTRIBUTION OF NOTAM
NOTAM shall be distributed to addressees to whom the information is of direct operational significance by AIS.
Except as otherwise provided, each NOTAM shall contain the information in the order of NOTAM format.
![Page 35: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/35.jpg)
9. WHO ISSUES NOTAMS
NOTAM office is advised by responsible person from airport
Person(s) responsible for inspecting the aerodromes and reporting aerodrome condition change
Responsible person must be appropriately trained
Fulfill and aerodrome operator’s duty of care and to avoid possible accusation of negligence
![Page 36: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/36.jpg)
9. SAMPLE OF NOTAMS
![Page 37: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/37.jpg)
9. NOTAM DISSEMINATION
YSAXXXX GG WMKKNTMA WMKKNTMC 311500 WMKKYNYX (A1635/04 NOTAMN Q)WMFC/QMRLC/IV/NBO/A/000/999/ A)WMKK B)0408020300 C)0408300900 D)MON-RWY 14L/32R BTN 0300 UTC TILL 0900 UTC
THU- RWY 14R/32L BTN 0300 UTC TILL 0900 UTC
E)RWY CLSD FOR MNTD.)
![Page 38: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/38.jpg)
Malaysia Airports Holdings Berhad (487092-W)
![Page 39: airside operation 3](https://reader034.vdocuments.us/reader034/viewer/2022052118/554a0bf8b4c9058c5d8b45a1/html5/thumbnails/39.jpg)
Thank you
End of End of PresentationPresentation