airport service quality
TRANSCRIPT
![Page 1: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/1.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 1
Airport Service QualityDepartures Main Programme
FIELDWORK GUIDE, MANAGEMENT TOOLS & AWARDS ELIGIBILITY
![Page 2: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/2.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 2
Table of Content
1Introduction to the ASQ Departures Survey 4
Main programme annual cycle
Three components
Overview of the data collection process
5
6
7
2Fieldwork Preparation 8
Fieldwork agent – profile
ASQ Departures questionnaires
Sample plan review
Planning the timeline
9
10
11
13
3
Fieldwork Guidelines 14
When?
Who/where?
How?
After data collection
Summary of Dos and DONTs
15
16
24
29
32
4
Sample Plan Management Tool (SPMT) 33
Login
Targets page
Capacity page
Manage page
Shipment page
Summary page
Compliance page
User page
Info page
Edits page
Help and logout page
34
35
43
45
46
47
48
49
50
54
55
![Page 3: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/3.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 3
Table of Content
5
ASQ Quality Control Process 56
Roadmap and funnel process
Audit results communication
Quality control funnel: level 1
Quality control funnel: level 2
Quality control funnel: level 3
57
59
60
67
69
6ASQ Awards Eligibility Criteria 71
Eligibility criteria 72
![Page 4: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/4.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 4
Section 1: Introduction to the ASQ Departures Survey
Programme provides the research tools and management
information to better understand passengers’ views and what they
want from an airport’s products and services
![Page 5: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/5.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 5
Legend
Green Fieldwork Preparation: questionnaires (language, printing…), sample plan, etc.
Orange Fieldwork: data collection on site according to the sample plan
Red Questionnaires Return: ALL must be received by the 14th of the third month
Yellow Deliverables: quarterly database and reports released
![Page 6: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/6.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 6
Results
Guidelines
Survey
To collect the passengers’ views with respect
to airport’s products and services while their
experience is still fresh in their mind.
To evaluate passenger satisfaction and compare
progress with other participating airports
(Benchmarking tool, Awards)
Provide procedures, steps and tool
to ensure that each member part of
the programme is following the same
rigorous process
(Before-During-After of data
collection)
Three key components composing the ASQ departures programme
ASQ Departures SurveyThree components
![Page 7: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/7.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 7
Paper Questionnaires
Quarter specific questionnaires are printed and shipped by ACI’s authorized subcontractor to the participating airports. Fieldwork staff to use blank questionnaire for data collection.
Sample Plan
Quarterly targets are populated for each airport based on airline-destination pairs operating at airport. Fieldwork staff shall collect adhering to target totals.
Data Collection
Data collection shall follow ACI fieldwork guidelines.
Return
Deadline
Questionnaires shall be returned for scanning and analysis purposes within quarterly deadlines.
Please note that the schedule, location, and other details of the fieldwork shall be kept confidential in order to ensure that behavioral bias from airport staff is not introduced.
*The current minimum number of completed questionnaires per quarter is 350.
Quality
Control
Participating airports are subject to
receive off site and on site audits.
ASQ Departures SurveyOverview of the data collection process
![Page 8: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/8.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 8
Section 2: Fieldwork Preparation
Key checks before data collection
![Page 9: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/9.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 9
fluent in the main local language.
have upper-intermediate knowledge of English.
have previous experience in questionnaire collection and management.
have outstanding communication skills.
follow smart casual dress code or be wearing the participating airport’s uniform.
carry a visible airport identification card.
Selecting Fieldwork Agents who are..
Fieldwork AgentProfile
![Page 10: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/10.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 10
ASQ Departures QuestionnairesSelecting the languages
The ASQ Departures questionnaire is available in 47 languages
Albanian Arabic Basque Burmese
Catalan Chinese Simplified Chinese Traditional Croatian
Czech Danish Dutch English
Estonian Farsi Finnish French
Galician German Georgian (new) Greek
Hebrew Hindi Hungarian Icelandic
Indonesian Italian Japanese Korean
Latvian Lithuanian Macedonian Malay
Malayalam (new) Maltese Norwegian Polish
Portuguese Portuguese Brazilian Romanian Russian
Spanish Swedish Tamil (new) Thai
Turkish Urdu (new) Vietnamese (new)
Changing the language split of an airport’s questionnaires (for the upcoming quarter) and ordering
additional questionnaires (for the current quarter) can be done on the “Info” page of the SPMT
(Sample Plan Management Tool).
![Page 11: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/11.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 11
Sample plan outlines airline-destination pairs (IATA codes) to be surveyed and respective
quotas.
Sample plan is created by ACI before every quarter and available in (Sample plan
management tool) SPMT.
ACI obtains airport specific flight status to create sample plans from OAG World Directs
database.(OAG is able to provide ~95% of world flight statuses and extracted each quarter)
Sample plan covers all three months of the quarter and all operating day and hours at the
airport.
Sample plans are split per traffic type (Domestic, International (incl. Charters / Transborders)
Representative sample of all departures at participating airports
during the quarter is called
Sample plan
Sample Plan for DeparturesReview Quarterly Targets (1/2)
![Page 12: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/12.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 12
If passengers cannot disembark at first stop
because it is a technical stop. Sample plan
considers next stop where passenger disembark.
Departure
First stop
(technical stop)
First stop(not technical)
The destination nomenclature used in the sample plan has been set to use
first stop.
Departure
First stop/Final destination
Departure
First stop
Final destination
Destination on sample plan refers to first
stop where passenger disembark.
***Review sample plan targets before starting fieldwork***
Sample Plan for DeparturesReview Quarterly Targets (2/2)
![Page 13: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/13.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 13
Data collection starts on the first day of the quarter (questionnaires completed before the start
of a quarter will not be accepted for the new quarter).
The fieldwork shall be conducted evenly over all three months of a given quarter. Ideally, one
third of the airport’s interviews are collected per month. Due to the fact that the last month of the
quarter is cut short by the quarterly deadline , it is acceptable to collect 15% of the sample size in
the third month only.
There is a minimum of two days of fieldwork per month, and a minimum of seven days for the
whole quarter.
Every day of the week, from Monday to Sunday, shall be surveyed (at least one Monday,
Tuesday, …) during each quarter. Over the period of a quarter, on each of the seven weekdays,
at least 30 questionnaires have to be conducted.
The fieldwork will cover operating hours of the airport to maximize the heterogeneity of departing
passengers and replicate the true distribution of departing passengers at any given airport.
Distribute no more than 10 surveys per single gate visit(If more than 10 as target, airports shall plan
multiple visits).
Plan quarterly fieldwork to fulfil sampling requirements
Planning the FieldworkData collection timeline
![Page 14: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/14.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 14
Section 3: Fieldwork Guidelines
Four key questions regarding data collection
HowWhereWhoWhen
![Page 15: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/15.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 15
arrive at the gate for a selected flight at least:
▪ 30 minutes before the announced boarding time for narrow body flights (<230 seats);
▪ 45 minutes before the announced boarding time for wide body flights.
space the distribution of questionnaires over the entire available waiting time before boarding
▪ to include in the sample those travellers who usually arrive at the gate early
▪ to include travellers that arrive at a time closer to the boarding call (e.g., passengers
spending time in business lounges).
Fieldwork agents shall :
When?Arrival at the gate
![Page 16: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/16.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 16
Field agents shall randomly select passengers
Select a broad range of diverse passengers and avoid interviewing more than one person
in a group traveling together(family, friends, etc)
Two techniques used to ensure randomizing passenger section
1. Approaching every Xth passenger, taking into account that all parts of the gate area
need to be covered.
2. Identifying the seating area allocated to the gate studied; delimit the area with a
rectangle; follow the rules of thumb indicated in the pages that follow for gate samples
between 4 and 10 questionnaires.
Who / Where?Randomized selection (1/8)
![Page 17: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/17.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 17
BOARDING GATE
4 questionnaires per gate visit – aim to distribute a questionnaire to one passenger close
to the center of each of the 4 circles indicated below:
EBT - 37’
EBT - 20’
EBT - 45’
EBT - 29’
Who / Where?Randomized selection (2/8)
![Page 18: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/18.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 18
5 questionnaires per gate visit – aim to distribute a questionnaire to one passenger close
to the center of each of the 5 circles indicated below:
EBT - 38’
EBT - 19’
EBT - 25’
EBT - 45’
EBT - 32’
Who / Where?Randomized selection (3/8)
![Page 19: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/19.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 19
6 questionnaires per gate visit – aim to distribute a questionnaire to one passenger close
to the center of each of the 6 circles indicated below:
EBT - 40’
EBT - 18’
EBT - 29’
EBT - 45’
EBT - 34’ EBT - 23’
Who / Where?Randomized selection (4/8)
![Page 20: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/20.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 20
7 questionnaires per gate visit – aim to distribute a questionnaire to one passenger close to
the center of each of the 7 circles indicated below:
EBT - 36’
EBT - 17’
EBT - 40’ EBT - 45’
EBT - 31’ EBT - 26’ EBT - 21’
Who / Where?Randomized selection (5/8)
![Page 21: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/21.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 21
8 questionnaires per gate visit – aim to distribute a questionnaire to one passenger close
to the center of each of the 8 circles indicated below:
EBT - 37’
EBT - 16’
EBT - 20’
EBT - 45’EBT - 33’ EBT - 24’
EBT - 41’
EBT - 29’
Who / Where?Randomized selection (6/8)
![Page 22: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/22.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 22
9 questionnaires per gate visit – aim to distribute a questionnaire to one
passenger close to the center of each of the 9 circles indicated below:
EBT - 30’
EBT - 16’
EBT - 23’
EBT - 45’
EBT - 27’
EBT - 38’
EBT - 19’
EBT - 34’
EBT - 41’
Who / Where?Randomized selection (7/8)
![Page 23: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/23.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 23
10 questionnaires per gate visit – aim to distribute a questionnaire to one passenger close to
the center of each of the 10 circles indicated below:
EBT - 29’
EBT - 15’EBT - 22’
EBT - 45’
EBT - 25’
EBT - 35’
EBT - 19’
EBT - 32’ EBT - 38’
EBT - 42’
Who / Where?Randomized selection (8/8)
![Page 24: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/24.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 24
Fieldwork agents shall:
introduce the questionnaire to the passengers with a neutral, clear statement, for example:
offer to the passenger the different language versions available; the objective here is to provide
the questionnaire version that most appropriately addresses the linguistic needs of the passenger;
questionnaires in the local languages, the language of the flight’s destination and in English are the
basic requirement.
provide pens – not pencils – to the passengers to fill out the questionnaires. These pens shall be
basic in nature in order not to introduce bias.
stay in the departure area while the passengers are filling out the questionnaires in order to be
available for passengers’ questions. If the passenger is unclear about the meaning of an item –
specifically regarding the service related items in Q7 and Q10 – the agents should not try to explain
the meaning of the question or the item; it is the passenger’s understanding that is relevant.
“Would you mind taking some time to fill out a brief questionnaire that [this airport] is conducting? Please hand it back to me before departing. Thank you.”
How?Data collection
![Page 25: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/25.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 25
Fieldwork agents are not allowed to:
provide incentives to encourage passengers to participate in the ASQ survey.
A small gift could be given (e.g., leaving a basic pen to the passenger) under the following
conditions:
• The agents cannot mention this gift before the passenger has completed the questionnaire.
• The gift has a value equivalent of $1 USD or less.
• The gift is given after the passenger has completed the questionnaire.
complete the ASQ Questionnaire on behalf of the passengers: all questions, including the
flight information section (questions 1 and 3) must be self-completed by the passenger at the
gate before boarding. It is not an interview.
influence passengers’ responses and scores in any way.
have more than two fieldwork agents distributing the ASQ questionnaires to passengers per
single gate visit
How?Data collection
![Page 26: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/26.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 26
If many questions are not answered (e.g. because the passenger has overlooked the
inner part of the ASQ questionnaire, pages 2 and 3),
• the fieldwork agent shall ask the passenger again to complete these pages.
• in case the passenger refuses to further complete the questionnaire, the fieldwork agent
shall write “VOID” on the first page in large letters,
• voided questionnaires shall be marked clearly as such by writing “VOID” with a red pen
across the first page of the questionnaire:
• In no case should the agent complete the questionnaire with or for the passenger
(including the flight information section*).
Fieldwork agents shall check questionnaires after collecting for
completeness and accuracy of flight information
How?Check the questionnaire completion (1/2)
![Page 27: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/27.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 27
If the passenger has written an airline name, letter code, departure(date/time)
or destination incorrectly, correct with a red pen as below.
Apart from the flight information, it is not allowed to correct any other passengers’
answers or scores.
How?Check the questionnaire completion (2/2)
If there is not enough space inside the text box, make the correction below the box.
![Page 28: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/28.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 28
Fieldwork agents shall complete the interviewer section at the end of page 4 of the
questionnaire, using block capital letters
How?Finalize the questionnaire
![Page 29: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/29.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 29
Completed questionnaires shall be returned at least twice per season to TNS.
If some information is missing on questionnaires, they shall still be returned; rejection
scores will be applied. Based on this, the further proceeding regarding a questionnaire
will be decided on.
Participating airports shall ensure that TNS receives all questionnaires before the
season deadlines published by ACI every year. Only those questionnaires that are
received before the season deadlines will be included in the reports and data sets.
Shipping address:
TNS CANADA LTD2 Bloor Street East
Suite 800Toronto, ONM4W 3H8CANADA
Attn.: Janice Bonner (t. 416-250-4215)
Please note that in cases where the number of completed questionnaires sent back exceeds the season sample size
by more than 50, a random selection of questionnaires will be used for analysis only, and the difference to the subscribed
number of questionnaires might be deleted.
If you intend to increase the sample size for your airport on a regular basis, please contact the ACI ASQ team for a quote.
After Data CollectionReturning completed questionnaires (1/2)
![Page 30: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/30.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 30
If multiple airports’ questionnaires shipped within the same box
1- Separate airports questionnaires into separate closed basic Kraft envelops or closed plastic bags inside the main box.
2- Use a folder wrapped around each airports’ questionnaires with multiple elastics to keep each folder closed during the
shipping or use plastic wrap as we are doing when shipping blank questionnaires.
Use international express courier companies only (Fedex, DHL, UPS, etc). Local post/mail
express services cannot be tracked outside of the country, and the transition with Post Canada is not
efficient enough to guarantee an on-time delivery of the shipments.
Make sure you use couriers that give you the option to track your parcel to its final destination
(TNS Canada).
When filling the waybill, mark the shipment as “Documents”, and do not indicate any value to
avoid customs fees and delays.
Make sure to use “Express/Urgent/Over-night” service when shipping your questionnaires.
Complete the “Shipments” page on the SPMT with the tracking number, the courier company
name and the number of questionnaires in the parcel. TNS is updating this page with the information
about received questionnaires.
Track your own shipments and advise us if there is any issue with the shipment by sending an
email to [email protected].
After Data CollectionReturning completed questionnaires (2/2)
![Page 31: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/31.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 31
Unused questionnaires received for a specific quarter cannot be used for different
quarters. If they are used, they will be rejected (like photocopies of the ASQ questionnaire).
Unused and voided questionnaires shall be kept by the airport for a period of one year
after the end of each quarter, with the exception shown in the paragraph below. After this
period, these questionnaires shall be destroyed.
Participating airports with global ranking from 1 to 25 in the previous quarter
“year-to-date” of “Overall Satisfaction” shall send all unused and voided
questionnaires to ACI or its authorized subcontractor.
Other participating airports may be requested to send unused and voided
questionnaires to ACI or its authorized subcontractor for quality control purposes.
What to do with unused and voided questionnaires
After Data CollectionUnused questionnaire management
![Page 32: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/32.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 32
Fieldwork agent: requirements
• Fluent in local language
• Upper-intermediate knowledge of English
• Smart casual dress code or airport’s uniform
• Visible airport ID pass
Time related aspects
• Arrive at the gate in time (narrow body flights: 30 and wide body flights: / 45 minutes before boarding)
• Distribute questionnaires evenly over time
• Before boarding, collect the number of questionnaires according to your sample plan (and never collect more than 10 questionnaires per gate visit)
Random selection of participants
• Distribute the questionnaires to a broad range of passengers
• Avoid distributing two (or more) questionnaires to passengers travelling together
Neutral attitude
• Introduce the survey in a neutral way
• Avoid any coaching of / influence on the passenger
• Don’t conduct an interview, the ASQ questionnaire is self-completed by the passenger
• Don’t provide gifts to the participants
• Respect the maximum of 2 fieldwork agents per gate visit
Support activities
• Provide the questionnaire in the language needed by the passenger
• Provide pens (not pencils) to the participants
• Be available for clarification
Final check of every
questionnaire
• Check for missing information (e.g., has the passenger completed the interior pages of the ASQ questionnaire?)
• Flight information: Check for missing information (and correct information if necessary)
• Complete the interviewer section of the questionnaire
• Mark voided questionnaires clearly
Please note that this is a summary. ALL fieldwork rules and guidelines have to be applied.
DOs and DONTsFieldwork summary
![Page 33: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/33.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 33
Section 4: Sample Plan Management Tool (SPMT)
User friendly tool to access/manage and track
fieldwork
![Page 34: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/34.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 34
Secure login: Each user requires unique login credentials
Login Page:
To access pages Targets, Capacity, Shipment, Summary, Manage, Users, info, Help, Edit, Logout
ACI can display important programme reminders
Users:
Two type of access: Administrator and Field agent (can only access Manage, Shipment, Help pages)
https://tracking.tns-cf.com/ASQSampleManagement/Login.aspx
SPMTLogin
![Page 35: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/35.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 35
Targets Page: Access/view your sample plan, Modify your targets,
Export your sample plan to Excel
Filters
Functions InfoDownload Targets
Sample plan provides quarterly
targets for each airport
Targets PageSample plan
Airport Day/Time flight
distribution
![Page 36: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/36.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 36
Sample plan is based on OAG Direct flightsdata.
The target is calculated based on theoretical number of seats for each
“airline / destination per traffic type
The target is referred to as the “Original ”
Airline are listed in columns and destinationin rows
A representative sample of departing traffic split by airline/destination pairs
Targets PageSample plan variables
![Page 37: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/37.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 37
Original targets for each airline and destination pair is combined to calculate
“Total Original”
Targets PageTotal variable
![Page 38: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/38.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 38
Modified refers to changed original target due to reallocation
If no value is entered in the modified cell, the quota will remain the same as original target
The completion rate is calculated by dividing modified/original.
Any airport shall aim to obtain completion rates of 100%, the number will be displayed in red font-color if at least 85% is not achieved.
***No questionnaires can be created or deleted, only reallocated. ***
Targets PageSample plan modified
![Page 39: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/39.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 39
Where is the Sample
plan?
•Sample plan found on the Targets Page of the SPMT Link
Is quarterly sample
representative of traffic?
• Review Sample Plan forNew airline(s)
New destination(s)
Change(s) in route
Charter flights
Change in number of seats per quarter
Destination(s) cancelled
Airline(s) not operating
What to do if sample
needs modification?
•Perform one of two type of changes to sample plan (More info on next slide)
Targets PageYour sample plan may require modifications
![Page 40: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/40.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 40
When
• Any time in the season
(Only applicable when airline-destination quotas are less than 4 questionnaires but ensure the ccompletion rate for airline and destination total shall be equal to or greater than 85%)
Who• Completed by airport
• ACI will not need to approve these changes
Where • “Targets page” in SPMT
Why
• Airline(s) cancelled, airlines/destinations cancelled or changes number of seats
When
• Before starting fieldwork or early as possible during the season
Who
• Requested by airport
• Reviewed by ACI
• Sample plan recalculated by research supplier
Where
• “Capacity page” in SPMT
Why
Airline(s) cancelled, airlines/destinations cancelled or changes number of seats, new airline/destination pair
Reallocation
Recalculation
Two type of modifications
Targets PageSample plan: types of modifications
![Page 41: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/41.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 41
Targets PageReallocation (1/2)
1. Reallocation only applicable to airline/destination pairs with less than 4 questionnaires
2. User can reallocate to
-same destination but different airline(move horizontally)
-same airline flying to another destination(move vertically)
3. Completion rates for each “airline-destination” combination, airline total, destination total shall be equal to or greater than 85% per season when reallocating.
4. If airlines or destination totals are less than 4 questionnaires, exempt from 85% criteria.
4 Rules Step by step guide to reallocation
Yes
Yes
YesYes
Yes
Yes
No
No
No
Yes
![Page 42: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/42.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 42
When “airline-destination” combination, airline total, destination total
shall be equal to or greater than 85% per quarter.
reallocate to same destination but different airline(move horizontally) but in case total of airline ≤ 85% which is not compliant
same airline flying to another destination(move vertically but in case total of airline ≥85% which is compliant
Targets PageReallocation (2/2)
![Page 43: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/43.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 43
Airports submits recalculation
change
ACI reviews request
Airport receives result of ACI
review
Sample plan recalculated
New sample plan in SPMT
Airport receives e-mail
notification
Follow instructions to submit recalculation request
Press submit once all request have been added
Fill in detail related to change request
**Once the request is submitted, To add a new request ACI/TNS has to address/close the current request**
Capacity PageProcess Overview
![Page 44: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/44.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 44
Enter the IATA 2-letter code for the CarrierIATA 3-letter code for Airport Destination
To ADD a flight that was not in the original Sample Plan, enter the seat capacity for the whole
quarter.
1- Select traffic and change
Type
A- Select the traffic type
B- Choose change type
2- Fill relevant information depending on
the type of change
C- IATA carrier(airline)
D- IATA Destination code
E- Seat capacity(Total for quarter)
F- New IATA carrier Code
3-Supporting info/Confirmation
G- Airport comment supporting change
request
H- To save change request and submit
additional changes
J- Submit change request (The status
will then be “Under review by ACI”.)
Follow instructions to submit change request
Capacity PageRequest submission
![Page 45: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/45.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 45
Update the number of completed questionnaires collected
Type in the boxes the number of questionnaires completed. Updates are incremental; the “agent” has to fill in the number of new
questionnaires completed since its previous update.
Fieldwork agents know the targeted number of questionnaires to be collected. They can also see the original one.
By clicking on the Completion Rates are displayed for
each pair. When completion rates are less than 85%, numbers will be in red.
COMPLETION %
In case of errors, the number of completed questionnaires could be decreased by entering a negative number.
**Changes made on targets pages will automatically reflected on “Manage page”**
Monitor the fieldwork progression and completion rates
Manage PageOverview
![Page 46: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/46.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 46
ADD
Tracking of all returned batches of completed questionnaires
Enter shipment details request and click on to save the information
Shipment PageOverview
![Page 47: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/47.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 47
Compare quarterly airports Completion rates and Rejection rates
**Changes made on manage page will automatically reflected on “Summary” during the quarter and final numbers updated when quarterly results are released**
Summary PageOverview
![Page 48: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/48.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 48
Measures airport’s quarterly compliance level to
sample plan and fieldwork guidelines
Compliance PageOverview
![Page 49: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/49.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 49
Enter a usernameUsernames are unique,
you cannot use one that is already used by one of
the other ASQ participating airports.
Select a roleField agent or
Admin
Enter an emailThe SPMT will NOT send
the login/password to the user
Add/create the new user
Edit user info: ✓ edit the Password ✓ edit the Role ✓ edit the Email✓ delete a profile
Create users profile and modify user passwords
Enter passwordDo not share with
other users
User PageOverview
![Page 50: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/50.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 50
© 2016 ACI
Shipping Address used to
• enter airport address to receive questionnaires
Custom Panel used for
• benchmarking purposes on the Reporting Portal
and the Quarterly PowerPoint Reports.
Questionnaire Language used for
• change language split for next quarter and
request additional forms during the current
quarter
Shipping address/custom panel/questionnaires language
Click on Edit to review the
information
Info PageOverview (1/4)
![Page 51: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/51.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 51
Shipping Address for the blank questionnaires delivery:
limited by 35 characters
limited by 2 characters
limited by 15 characters + 6 for extension
Provide accurate contact information, especially a phone number that will not go to an automatic voicemail
Number of characters are limited, avoid accents.
The Shipping address changes need to be done maximum 4 weeks before the beginning of the following quarter.(refer to Main Programme-Key dates 2018 under “Help” page of SPMT for deadlines)
Before leaving, click on
Info PageShipping address (2/4)
![Page 52: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/52.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 52
Select all participating airports to be used for benchmarking purposes
on the Reporting Portal and the Quarterly PowerPoint Reports.
The maximum number of airports is 50(including own airport) that can be selected in custom panel.
The Panel changes need to be done maximum 3 weeks before the beginning of a quarter to be considered for this quarter. (refer to Main Programme-Key dates 2018 under “Help” page of SPMT for deadlines)
Before leaving, click on
Info PageCustom panel (3/4)
![Page 53: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/53.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 53
Change language split for next quarter and request additional
forms during the current quarter
Quantity of questionnaires
received for the previous
quarter.
Quantity of questionnaires required for the following Quarter.
Quantity of additional questionnaires required during the current Quarter.
Before leaving, click on
Ensure to make request within quarterly deadlines. (refer to Main Programme-Key dates 2018 under “Help” page of SPMT for deadlines)
Total questionnaires (original + requested) should be between 20% and 30% more than your
Sample Size
Info PageQuestionnaire language (4/4)
![Page 54: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/54.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 54
Edits PageOverview
If you have specific requirements at your airport and certain questions on ASQ
questionnaires does not apply-Use Edit Page
Specify the question that needs to be edited during ACI data processing and provide reason(no changes need to be made to the physical copies of questionnaires)
Categories on Edit Page
Traffic
Connecting Flights
Airlines
Access
Passport/Personal ID
Control
Airport Facilities
Arrivals
Other
Airports submits Edit
request
ACI reviews request
Airport receives
review results
Editing rule applied if accepted
![Page 55: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/55.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 55
The system automatically logs you out without saving any changes after 25 minutes of inactivity
Help page: Contact and programme information available
Logout page: Used to exit SPMT tool
Help and Logout PageOverview
![Page 56: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/56.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 56
Section 5: ASQ Quality Control Process
Mission:
“ACI… promotes professional excellence in airport management and operations.”
![Page 57: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/57.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 57
2.Sampling
Distribution: Verify data collection follows distribution over month, day, time rules
1. Compliance
Dashboard:Verify sample plan compliance
4.Quality of
Questionnaires: Verify if agents complete a final check of questionnaires
6.Return Questionnaires:
Verify timely reception of voids/blank upon ACI request)
3.Demographics:
Verify data collection is randomized(passenger profile)
5.Score Fluctuation:
Verify significant score increase
7.Visual Inspection:
Verify questionnaires completed by unique respondents
Quality checkpoints mirror each step of fieldwork
Quality ControlRoadmap
![Page 58: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/58.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 58
SamplingDistribution
DemographicsSample plan compliance
Quality of Questionnaires
Leve
l 1
Score Fluctuation
Return unusedQuestionnaires
VisualInspectionLe
vel 2
On site AuditLeve
l 3
LARGE SELECTION OF AIRPORTS
LIMITED NUMBER OF AIRPORTS
ALL AIRPORTS
Level 1 and Level 2
correspond to remote audit
which complemented by
Level 3 on site evaluation.
Quality ControlFunnel process
![Page 59: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/59.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 59
Audit results and eligibility status available in Reporting portal
File name: Quality Hub
Audit ResultsCommunication
![Page 60: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/60.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 60
A completion rate is the proportion of completed questionnaires against the original sample plan target.
▪ Any airport shall aim to obtain completion rates of 100% per traffic type (domestic and international).
▪ The assessment of the completion rates of each airport will be shared with other participating airports
at the end of each quarter.
Completion rate based on “airline-destination” combination pairs:
▪ While any airport shall aim to obtain completion rates of 100%, tolerance levels are as follows: The completion rate of the collected sample of “airline-destination” pairs shall be at least 85% of the original sample plan for each quarter.
▪ For quality control purposes and to ensure the airports’ compliance with the original sample plan, the completion rate of the “airline-destination” combinations will be calculated by dividing the actual number of the completed questionnaires by the original number of questionnaires from the sample plan.
▪ Completion rates for each “airline-destination” combination and “airline-destination” totals shall be equal to or greater than 85% per quarter, with the exception of the combinations and totals with less than 4 questionnaires.
Quality Control Funnel: Level 1Sample pan compliance
![Page 61: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/61.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 61
Overall Quantitative Performance of the fieldwork:
Maximum score of 2523 to 2520 to 23<20
Dashboard populated quarterly for each participant. Available in SPMT.
Quality Control Funnel: Level 1Compliance dashboard (1/4)
![Page 62: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/62.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 62
Rule : To respect the Sample Plan and collect the requested number of questionnaires by traffic type.
This section recaps if all questionnaires were collected, overall, by traffic type and for each airline and destination with 4 questionnaires or more. The completion rate is based on the actual number of collected questionnaires
against the number of questionnaires to be collected for each type of traffic, by airline and destination.
For each indicator: >95% : score=290% to 95% : score=1<90% : score=0
1
2
1
2
The objective was to collect 2779 questionnaires for the International traffic type, 2785 questionnaires were collected. This represents a completion rates of 100.2%
Taking into consideration all destinations with 4 or more questionnaires to be collected, the original target was 2921 questionnaires, 2929 questionnaires were collected. This represents a completion rates of 100.3%
3
3 The excel file list all Airlines (A), Destinations (B) and Combinations (C) with 4 questionnaires or more to be collected.
Quality Control Funnel: Level 1Compliance dashboard (2/4)
![Page 63: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/63.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 63
Rule : To achieve a 85% completion rate when 4 or more questionnaires have to be collected.
This section recaps if your airport has reached the minimum of 85% of questionnaires to be collected for the Airlines, the Destinations and for each Combinations Airline-Destination with 4 questionnaires or more.
1
23
4
1
2
3
4
136 Destinations have 4 questionnaires or more to be collected. The minimum completion rate to achieve for those 136 destinations is 85%, for 132 destinations (97.1%) the final completion rate was 85% or more.
222 Combinations Airline-Destination have 4 questionnaires or more to be collected. The minimum completion rate to achieve for those 222 Combinations is 85%, for 213 Combinations (95.9%) the final completion rate was 85% or more.
For the remaining combinations that have not reached the 85% (9=222-213), ACI will consider as well if one of the totals Airline or Destination have 4 questionnaires or more collected. In this example, at least one total from these Combinations achieved a completion rate at 85%.
The final % of compliance is 100%
For each indicator: >95% : score=290% to 95% : score=1<90% : score=0
Quality Control Funnel: Level 1Compliance dashboard (3/4)
![Page 64: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/64.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 64
Rule: The data collection shall cover evenly every month of the quarter, all days of the week, all operating hours.
<10% : score=210% to 15% : score=1Difference >15% : score=0
Months= 3: score=1Months< 3: score=0
10 or less questionnaires: >95%: score=210-15 questionnaires: 1 to less than 5% : score=115 questionnaires or more >1%: score=0
1
1 Based on the World Direct Flight OAG Database, filtered on the same flights as the ones listed on the Sample Plan.
Rule : A maximum of 10 questionnaires must be collected per gate visit.
Quality Control Funnel: Level 1Compliance dashboard (4/4)
![Page 65: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/65.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 65
Demographics
To analyze sudden gaps in distribution versus the previous scores for this category
Non-compliant result is given if significant/unexplainable changes in demographics is observed and
proven to be due error in sampling.
Sampling Distribution
Questionnaires collection is verified for compliance to distribution criteria stated on p.13 respecting
month, day, and total quota.
Non-compliant result is given if distribution guidelines are not respected in one or more quarter.
Quality Control Funnel: Level 1Sampling and demographics
![Page 66: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/66.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 66
Quality of questionnaires
ACI verifies the number and percentage of completed quarterly questionnaires received
with errors in flight information
Time not entered in 24h format
Incorrect dates with month/day switched or not entered
Incorrect destinations or omitted.
Inconclusive Destination: More than 1 airport exists for this destination
Compliance is measured on a quarterly basis to verify fieldwork teams at airport are reviewing and correcting (not pre-filling) flight information Question1/3 when necessary.
When How
To Correct
Quality Control Funnel: Level 1Quality of questionnaires
![Page 67: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/67.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 67
Score Fluctuation
Return unusedQuestionnaires
VisualInspectionLe
vel 2
Score Fluctuation
ACI verifies if an airports score increased significantly increase in comparison to previous quarter or same
quarter previous year.
Compliance not measured on this variable but ACI reviews factors contributed to overall score increase
based on the Airports’ feedback and review of the historical data.
Used to screen airports for visual inspection and request to return unused questionnaires.
Return Unused Questionnaires
ACI verifies that no questionnaire selection has been done based by accounting for all printed blank
questionnaires. The Selected and top 25 YTD ranking airports shall return all printed questionnaires
including blank/voided.
Non-compliant finding is given if 99% printed quarter questionnaires not returned.
Quality Control Funnel: Level 2Score fluctuation and unused questionnaires
![Page 68: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/68.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 68
Visual inspection
ACI reviews the handwriting on the completed paper questionnaires collected during the quarter for
selected airports.
Non-compliant result is given if airport questionnaires were found to have been completed, totally or partially, by
the same person(s) and not by unique respondents.
The ASQ questionnaire has to be self-completed by the passenger. Fieldwork agents cannot complete or pre-fill any of the 18 questions(also including flight information, connect and demographics questions on behalf of a passenger.
Only the (Interviewer section) at the bottom of the page 4, has to be completed by the fieldwork agent.
Quality Control Funnel: Level 2Visual inspection
Score Fluctuation
Return unusedQuestionnaires
VisualInspectionLe
vel 2
![Page 69: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/69.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 69
The scope is to assess airports’ compliance to ASQ fieldwork guideline during normal data collection at the airport.
On site audits are required to be conducted during normal airport operations
During the audit visit, the fieldwork staff will follow the same process as the one followed normally during ASQ sample fieldwork
Auditors(third party) will only observe, and will not tell the fieldwork staff what to do.
Fieldwork staff and airport staff are required to act exactly like if the auditors were not there.
On site audit procedure
Quality Control Funnel: Level 3On site evaluation (1/2)
![Page 70: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/70.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 70
On-site Evaluation Definitions
Minor Fail: Deviation from fieldwork guidelines
Major Fail : A major fail is highly unusual and will include aggressive or intimidating behaviour towards a
Passenger (or Auditor), blatantly amending passenger scores, completing questionnaires on behalf of
passengers and/or disposing of completed questionnaires.
3 Minor fails or 1 Major fail results in a Failed audit.
Less than 3 minor fails or 0 major fail is a PASS result.
Quality Control Funnel: Level 3On site evaluation (2/2)
![Page 71: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/71.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 71
Section 6: ASQ Awards Eligibility Criteria
The prestigious annual ACI Airport Service Quality (ASQ) Awards are presented
to the top performing airports around the world, who partake in the
ASQ main type survey programme.
![Page 72: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/72.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 72
To be eligible for an ACI ASQ award, airport shall
1-Complete full calendar year of participation
2-Comply fully with the Fieldwork Guide and Schedules
Complying with fieldwork guidelines will enable airports to satisfy at least the
minimum eligibility criteria stated in this section on the quarterly basis
for awards
*Additional award details and examples regarding eligibility criteria can be found in the document ACI_ASQ Awards-Eligibility criteria
under the “Help” page of SPMT*
Criteria A- Self-completed criterion
Submitted ASQ questionnaires that have been self-completed by the passenger. In the event of a visual
inspection, no submitted questionnaire must present clear evidence of non-compliance to the self-
completion rule (e.g. of clear evidence: all questions filled by the agent, second ticking in rated
items/questionnaires etc.).
ASQ AwardsEligibility criteria (1/5)
![Page 73: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/73.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 73
Criteria B- Minimum of 2 days per month criterion
Airport shall have distributed their fieldwork evenly over all three (3) months of a given quarter and have
surveyed a minimum of two (2) days each month of each quarter.
Criteria C- 10 questionnaires or less collected per gate visit criterion
Airport shall have collected a maximum of ten (10) questionnaires per gate visit.
TOLERANCE:
The equivalent of 5% of the total gate visits where more than ten (10) questionnaires were collected will be
tolerated.
Distribution Criteria
ASQ AwardsEligibility criteria (2/5)
![Page 74: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/74.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 74
Criteria D- 100% completion per traffic type criterion
Airport shall have obtained a completion rate (proportion of completed questionnaire against the original
target) of 100%, per traffic type (domestic and international).
TOLERANCE:
A completion rate of 95%, per traffic type (domestic and international) will be tolerated. If a traffic type
(domestic or international) accounts for ≤ 5 % of sample size, the requirement of 95% completion rate per
traffic type will not apply.
Criteria E- 7 weekdays criterion
Airport shall have distributed their fieldwork evenly over all three (3) months of a given quarter and have
surveyed at least once during the quarter, each day of the week (from Monday to Sunday) and collected at
least 30 questionnaires on each of the seven (7) days.
Distribution Criteria
ASQ AwardsEligibility criteria (3/5)
![Page 75: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/75.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 75
Criteria F- Distribution of the sampling criterion
Airport shall have distributed their fieldwork evenly over all three (3) months of a given quarter.
TOLERANCE:
Minimally, the airport shall have surveyed, each quarter, at least:
▪ 30% of the sample size collected on the 1st month
▪ 30% of the sample size collected on the 2nd month
▪ 10% of the sample size collected on the 3rd month
Criteria G- Returned unused questionnaire criterion
Airport ranked in the Top 25, or upon ACI’s request, the eligible airport shall have returned all their unused
and voided questionnaires for a specific quarter.
TOLERANCE:
The equivalent of 1% of the printed questionnaires for this specific quarter in missing questionnaires will be
tolerated.
Distribution/Return Criteria
ASQ AwardsEligibility criteria (4/5)
![Page 76: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/76.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 76
Criteria H- On-site audit criterion
In the event that an on-site audit has been performed at a given airport, the eligible airport shall have
obtained a PASS mark.
ASQ AwardsEligibility criteria (5/5)
A tool which allows airports to enter data collection details :
Airline-destination pairs
Traffic
Dates of data collection
Number of surveys collected
which is then tabulated on a dashboard to monitor progress
specific to eligibility criteria(B,D,E,F) during the quarter.
Note: It is still mandatory that airports comply with eligibility criteria
(A,C,G,H). Not possible to measure compliance with tracker.
****NEW****Eligibility criteria tracker tool
Tracker available for download from “Help” page in SPMT tool. Instructions included in tracker.
![Page 77: Airport Service Quality](https://reader030.vdocuments.us/reader030/viewer/2022012509/61871c9b9554ca671321aede/html5/thumbnails/77.jpg)
© 2018 ACI ASQ Departures Main Programme Fieldwork Guide, Schedules and Management Tools 2018 77
Contact Us
Connect with us today!
@ACI_ASQ
You are new to your role in managing the ASQ programme?
You can't get connected to the Sample Plan Management Tool (SPMT)?
You need to obtain access to the SPMT for yourself or another team member?
You need training to use the tool or need help to navigate in it?
Please send an email to our ASQ Help Desk at [email protected] including your three-letter
IATA code* followed by the topic you need assistance with. Your request will be directed to one of
our qualified team members.
* E.g. “XYZ – ASQ SPMT Connection Problems”. (XYZ=your airport code)
ACI Airport Service Quality (ASQ) Improving Passenger Experience at Your Airport